CUADRO N 42

CRONOGRAMA DE EJECUCIN VALORIZADA ALTERNATIVA 01


Partida

Und

N
1.-

Descripcin

Parcial

TIEMPO EN MESES

S/.

ESTUDIOS

DISEO DEFINITIVO

GBL

18,000.00

9000

9,000.00

2.-

INVERSION FIJA
INFRAESTRUCTURA

ESTRUCTURAS

01.00.00

OBRAS PROVISIONALES

GBL

4,940.87

3952.7

02.00.00

TRABAJOS PRELIMINARES

GBL

13,812.42

13812.42

03.00.00

MOVIMIENTO DE TIERRAS

GBL

68,086.47

68086.47

04.00.00

OBRAS DE CONCRETO SIMPLE

GBL

36,436.74

21862.04

14574.7

05.00.00

OBRAS DE CONCRETO ARMADO

GBL

178,531.94

107119.16

71412.78

06.00.00

ESTRUCTURAS METALICAS

GBL

112,569.73

112569.73

07.00.00

GBL

61,883.83

61883.83

08.00.00

MUROS Y TABIQUES
REVOQUES, ENLUCIDOS Y
MOLDURAS

GBL

47,430.06

47430.06

09.00.00

CIELO RASOS

GBL

9,363.44

1872.69

10.00.00

PISOS Y PAVIMENTOS

GBL

91,029.73

91029.73

11.00.00

CONTRAZOCALOS

GBL

2,090.54

1463.38

12.00.00

ZOCALOS

GBL

2,133.08

14.00.00

CARPINTERIA DE MADERA

GBL

10,224.29

15.00.00

CARPINTERIA METALICA

GBL

13,165.68

13165.68

16.00.00

CERRAJERIA

GBL

1,171.31

1171.31

17.00.00

VIDRIOS, CRISTALES Y SIMILARES

GBL

3,439.08

3439.08

18.00.00

PINTURA

GBL

18,207.21

18207.21

19.00.00

VARIOS, LIMPIEZA, JARDINERIA

GBL

26,230.62

20984.5

5246.12

21.00.00

APARATOS SANITARIOS

GBL

3,185.20

2229.64

955.56

22.00.00

SISTEMA DE DESAGE

GBL

9,280.43

4640.215

4640.215

23.00.00

SISTEMA DE AGUA FRIA

GBL

14,731.98

7365.99

7365.99

24.00.00

SISTEMA DE EVACUACION PLUVIAL

GBL

54,115.41

27057.705

16234.623

25.00.00

INSTALACIONES ELECTRICAS

GBL

70,114.54

35057.27

35057.27

988.17

7490.75
627.16
2133.08

3067.29

10823.082

4089.72

3067.29

COSTO DIRECTO

852,174.60

213043.65

213043.65

213043.65

213043.65

GASTOS GENERALES

10%

85,217.46

21304.365

21304.365

21304.365

21304.365

UTILIDAD

10%

85,217.46

21304.365

21304.365

21304.365

21304.365

1,022,609.52

255652.38

255652.38

255652.38

255652.38

194,295.81

48573.9522

48573.9522

48573.9522

48573.9522

304226.3322 304226.3322 304226.3322

304226.3322

SUB TOTAL
IGV

19%

TOTAL

1,216,905.33
-

3.-

MOBILIARIO Y EQUIPAMIENTO
MOBILIARIO Y EQUIPO

GBL

71,279.25

71279.25

'EXTINTORES Y SEALIZACION

Gbl

1500

1500

5.-

SUPERVISION (2% DE 2)

GBL

24,338.11

6084.526644 6084.526644 6084.526644

6084.526644

6.-

IMPREVISTOS (2.5% DE 2)

GBL

30,422.63

7605.658305 7605.658305 7605.658305

7605.658305

4.-

MEDIDAS DE SEGURIDAD

TOTAL (1+2+3+4+5+6)

1,362,445.32

9,000.00

9,000.00

317,916.52