:^) Design a 20 KFT 24 AWG copper loop indicating: Load placement Using a 20 Kft , thereare 3 loads at 3, 9 and 15 Kft The end section = 20-15 or 5 Kft Bridge tap use more stringent specification BT = 12 K ES = 7 Kft Calculate the power level at the Tel set (in mw) if a signal starts at the Telco at 7 mw First convert 7mw to dBm..10 log (7/1) = 8.45 dBm Then calculate the loss in the cable..20 x .23 = 4.6 dB Then find the dB level at the phone set8.45 4.6 = 3.85 dB Then convert 3.85 dBm into a mw valuelog-1(3.85/10) = 2.42 mw Remember dBm = 10 log ( P/1mw)