Você está na página 1de 51

NO SNI KODE

6
6.2
6.4
6.5
6.6
6.8
6.11
6.13
6.14
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.14
6.15
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6
6.1
6.2
6.3
HARGA SATUAN PEKERJAAN KOTA SEMARANG
03-2835-2002 I
II 03-2835-2008
III 03-2836-2008
IV 03-6897-2008
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.20
6.21
6.22
6.23
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19
6.20
6.23
6.24
6.25
6.26
6.27
6
6.1
6.2
6.3
6.5
IV 03-6897-2008
V 03-2837-2008
VI 03-3434-2008
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19
6.20
6.21
6.22
6.23
6.24
6.26
6.27
6.28
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.17
6.18
6.19
6.20
6.21
6.22
6.23
6.24
6.25
6.26
6.27
VI 03-3434-2008
VII 03-7394-2008
6.28
6.29
6.30
6.31
6.32
6.33
6.34
6.35
6.36
6
6.1
6.2
6.3
6.4
6.5
6.6
6.9
6.10
6.12
6.15
6.30
6.33
6.34
6.37
6.38
6.39
6.42
6
6.1
6.2
6.3
6.5
6.6
6.7
6.9
6.10
6
6.1
6.2
6.4
6.5
6.8
6.14
6.15
VII 03-7394-2008
VIII 03-3436-2002
IX 03-2839-2008
X
6.20
6.23
6.24
6.25
6.29
6.31
6.33
6.35
6.36
6
6.1
6.2
6.3
6.4
6.5
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19
6
6.2
6.3
6.4
6.5
6.6
6.7
6.9
6.10
6.11
6.13
6.14
6.15
6.16
6.17
6.20
X
XI 03-7393-2008
XII
6
6.3
6.9
6.19
6.34
6.35
6.36
6.39
6.40
6.43
6.44
6.46
6.53
6.54
6.55
6.57
6.60
6.63
6
6.1
6.2
6.3
6.4
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
XIII 03-7395-2008
XIV 03 24
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
Pengukuran dan Pemasangan Bouwplank
Pembuatan Kantor Sementara dg Lantai Plesteran
Pembuatan Gudang Semen dan Alat- alat
Membersihkan Lapangan dan Perataan
Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm
Bongkaran Beton Bertulang
Bongkaran Dinding Tembok Bata Merah
PEKERJAAN TANAH
Menggali Tanah Biasa Sedalam 1m
Menggali Tanah Biasa Sedalam 2m
Menggali Tanah Biasa Sedalam 3m
Menggali Tanah Keras Sedalam 1m
Menggali Tanah Cadas Sedalam 1m
Menggali Tanah Lumpur Sedalam 1m
Mengerjakan Striping Tebing Setinggi 1m
Membuang Tanah Sejauh 10m'
Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)
Pemadatan Tanah (per 20cm)
Urugan Pasir
Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL
Pemasangan Lapisan Ijuk tebal 10cm
Mengurug Sirtu Padat Untuk Peninggian Lantai Bangunan
PEKERJAAN PONDASI
Memasang Pondasi Batu Kali 1 Pc: 3PP
Memasang Pondasi Batu Kali 1 Pc: 4PP
Memasang Pondasi Batu Kali 1 Pc: 5PP
Memasang Pondasi Batu Kali 1 Pc: 6PP
Memasang Pondasi Batu Kali 1 Pc: 8PP
Memasang Pondasi Batu Kali 1Kp : 1Sm : 2Pp
Memasang Pondasi Batu Kali 1 Pc : 3Kp : 10PP
Memasang Pondasi Batu Kali 1, 1/4 Pc : 1Kp : 4 PP
Pasang Pondasi Batu Kosong
Pasang Pondasi Siklop, 60% Beton Camp, 1PC: 2PB : 3KR & 40% Batu Belah
Pasang Pondasi Sumuran Diameter 100 cm
PEKERJAAN DINDING
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 2 Pp
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 3 Pp
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 4 Pp
HARGA SATUAN PEKERJAAN KOTA SEMARANG
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 5 Pp
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 6 Pp
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : :3 Kp : 6 Pp
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 bata Camp. 1Pc : 2 Pp
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 bata Camp. 1Pc : 3 Pp
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 bata Camp. 1Pc : 4 Pp
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 bata Camp. 1Pc : 5 Pp
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 bata Camp. 1Pc : 6 Pp
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 bata Camp. 1Pc : 8 Pp
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 bata Camp. 1Pc : 3Kp : 10 Pp
Memasang Dinding HB/ CB 10, speci cam. 1 Pc : 3Pp
Memasang Dinding HB/ CB 10, speci cam. 1 Pc : 4Pp
Memasang Dinding Terawang (Rooster) Uk, (12x11x24) cm Camp. 1 Pc: 2Pp
Memasang Dinding Terawang (Rooster) Uk, (12x11x24) cm Camp. 1 Pc: 4Pp
PEKERJAAN PLESTERAN
Memasang Plesteran 1 Pc : 1 Pp : Tebal 15mm
Memasang Plesteran 1 Pc : 2 Pp : Tebal 15mm
Memasang Plesteran 1 Pc : 3 Pp : Tebal 15mm
Memasang Plesteran 1 Pc : 4 Pp : Tebal 15mm
Memasang Plesteran 1 Pc : 5 Pp : Tebal 15mm
Memasang Plesteran 1 Pc : 6 Pp : Tebal 15mm
Memasang Plesteran 1 Pc : 7 Pp : Tebal 15mm
Memasang Plesteran 1 Pc : 8 Pp : Tebal 15mm
Memasang Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm
Memasang Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm
Memasang Plesteran 1 SM : 1 Kp : 1 Pp Tebal 15mm
Memasang Plesteran 1 SM : 1 Kp : 2 Pp Tebal 15mm
Memasang Plesteran 1 Pc : 2 Pp : Tebal 20mm
Memasang Plesteran 1 Pc : 3 Pp : Tebal 20mm
Memasang Plesteran 1 Pc : 4 Pp : Tebal 20mm
Memasang Plesteran 1 Pc : 5 Pp : Tebal 20mm
Memasang Plesteran 1 Pc : 6 Pp : Tebal 20mm
Memasang Plesteran 1 SM : 2 Kp : 2 Pp Tebal 20mm
Memasang Berapen 1Pc : 5 Pp Tebal 15mm
Memasang Plesteran Skoning 1Pc : 2 Pp Lebar 10mm
Memasang Plesteran Ciprat 1Pc : 2Pp
Memasang Finishing Siar Pasangan Dinding Bata Merah (=20 m')
Memasang Finishing Siar Pasangan Dinding Conblok Ekspose (=8 m')
Memasang Finishing Siar Pas Batu Kali Adukan 1 Pc : 2 Pp
Memasang Acian
PEKERJAAN KAYU
Membuat Kosen Pintu dan Jendela Kayu Kelas I
Membuat Kosen Pintu dan Jendela Kayu Kelas II atau III
Membuat Pintu Klam Standart Kayu Klas II (Kayu Kamfer)
Membuat Daun Pintu Panel Kayu Klas I atau II
Membuat Pintu dan Jendela Kaca Kayu Klas I atau II
Membuat Pintu dan Jendela Jalusi Kayu Klas I atau II
Membuat Pintu Kayu Lapis (Plywood) Rangkap Rangka Kayu Klas II (lbr s/d 90cm)
Membuat Pintu Plywood Rangkap, Rangka Ekspose Kayu Klas I atau II
Membuat Jalusi Mati Kosen Kayu Klas I atau II
Membuat Pintu Teakwood Rangkap, Rangka Ekspose Kayu Klas I
Membuat Pint Teakwood Rangkap Lapis Formika, Rangka Ekspose Kayu Klas II
Memasang Konstruksi Kuda-kuda Konvensional, Kayu Klas I; II & III Bentang 6 m
Memasang Konstruksi Kuda-kuda Ekspose, Kayu klas I
Memasang Konstruksi Gording, kayu klas II
Memasang Rangka Atap Genteng Keramik, Kayu Klas II
Memasang Rangka Atap Genteng Beton, Kayu Klas II
Memasang Rangka Atap Sirap, Kayu Klas II
Memasang Rangka Langit-langit (1,00 x 1,00)m, Kayu klas II atau III
Memasang Rangka Langit-langit (60 x 60)m, Kayu klas II atau III
Memasang Listplank Uk (3x20)cm Kayu klas I atau II
Memasang Listplank Uk (3x30)cm Kayu klas I atau II
Memasang Rangka Dinding Pemisah (60x120)cm, Kayu klas II atau III
Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II
Memasang Dinding Lambriziring dari Papan Klas I
Memasang Dinding Lambriziring Dari Plywood Ukurang (120x240) cm
Memasang Dinding Bilik, Rangka Kayu Klas III atau IV
PEKERJAAN BETON
Membuat Beton Mutu f' c= 7.4 Mpa (K100), slum (12 2)cm, w/c = 0.87
Membuat Beton Mutu f' c= 9.8 Mpa (K125), slum (12 2)cm, w/c = 0.78
Membuat Beton Mutu f' c= 12.2 Mpa (K150), slum (12 2)cm, w/c = 0.72
Membuat Lantai Kerja Beton Mutu f' c = 7.4 Mpa (K100), slum (3-6) cm, w/ c = 0.87
Membuat Beton Mutu f' c= 14.5 Mpa (K175), slum (12 2)cm, w/c = 0.66
Membuat Beton Mutu f' c= 16.9 Mpa (K200), slum (12 2)cm, w/c = 0.61
Membuat Beton Mutu f' c= 19.3 Mpa (K225), slum (12 2)cm, w/c = 0.58
Membuat Beton Mutu f' c= 21.7 Mpa (K250), slum (12 2)cm, w/c = 0.56
Membuat Lantai Kerja Beton Mutu f' c = 24.0 Mpa (K275), slum (12 2) cm, w/ c = 0.53
Membuat Beton Mutu f' c= 26.4 Mpa (K300), slum (12 2)cm, w/c = 0.52
Membuat Beton Mutu f' c= 28.8 Mpa (K325), slum (12 2)cm, w/c = 0.49
Membuat Beton Mutu f' c= 31.2 Mpa (K350), slum (12 2)cm, w/c = 0.48
Pembesian Dengan Besi Polos atau Besi Ulir
Kabel Presstred Polos/ strand
Jaring Kawat Baja/ wire mesh
Memasang Bekisting Untuk Pondasi
Memasang Bekisting Untuk Sloof
Memasang Bekisting Untuk Kolom
Memasang Bekisting Untuk Balok
Memasang Bekisting Untuk Lantai
Memasang Bekisting Untuk Dinding
Memasang Bekisting Untuk Tangga
Memasang Jemabatan Cor
Membuat Pondasi Beton Bertulang (150kg Besi + Bekisting)
Membuat Sloof Beton Bertulang (200kg Besi + Bekisting)
Membuat Kolom Beton Bertulang (300kg Besi + Bekisting)
Membuat Balok Beton Bertulang (200kg Besi + Bekisting)
Membuat Balok Beton Bertulang (150kg Besi + Bekisting)
Membuat Dinding Beton Bertulang (150kg Besi + Bekisting)
Membuat Tangga Beton Bertulang (200kg Besi + Bekisting)
Membuat Kolom Penguat Beton Bertulang (11 x 11) cm
Membuat Ring Balok Beton (10 x 15) cm
PEKERJAAN PENUTUP ATAP
Pasang Atap Genteng Plentong Kecil
Pasang Atap Genteng Kodok/ Glasur
Pasang Atap Genteng Plentong Super/ Besar
Pasang Genteng Bubung Plentong
Pasang Genteng Bubung Kodok/ Glasur
Pasang Genteng Bubung Plentong Besar
Pasang Atap Asbes Gelombang (2.25 x 0.92) x 5mm
Pasang Atap Asbes Gelombang (2.00 x 0.92) x 5mm
Pasang Atap Asbes Gelombang (3.00 x 1.05) x 4mm
Pasang Atap Asbes Gelombang (2.10 x 1.05) x 4mm
Pasang Atap Genteng Beton
Pasang Atap Sirap
Pasang Nok Genteng Beton
Pasang Nok Sirap
Pasang Atap Seng Gelombang
Pasang Atap Nok Seng
Pasang Alumunium Foil/ Sisalation
PEKERJAAN LANGIT-LANGIT
Memasang Langit-Langit Asbes (1.00 x 1.00) m, tebal 4mm, 5mm dan 6mm
Memasang Langit-Langit Akustik Ukuran ( 30x30) cm
Memasang Langit-Langit Akustik Ukuran ( 30x60) cm
Memasang Langit-langit Tripleks Uk (120 x 240) cm, tebal 3m, 4mm dan 6mm
Memasang Langit-langit Lambrizing Kayu Jati, tebal 6mm
Memasang Langit-langit Gypsu Board Uk (120x240) tebal 9mm
Memasang Langit-angit akuatik Uk (60x120) cm & rangka alluminium
List langit-langit Kayu Profil
PEKERJAAN SANITASI
Memasang Kloset Duduk/ Mono blok
Memasang Kloset Jongkok Porselen
Memasang Urinoir
Memasang Wastafel
Memasang Bak Mandi Batu Bata Vol 0.30 m3
Memasang Pipa Beton 15 - 20 cm
Memasang Pipa Beton 30 - 100 cm
Memasang Pipa Galvanis 3/4 "
Memasang Pipa Galvanis 3 "
Memasang Pipa Galvanis 4 "
Memasang Pipa PVC Type AW 1/2 "
Memasang Pipa PVC Type AW 2"
Memasang Pipa PVC Type AW 3"
Memasang Bak Cuci Piring Stainless Steel
Memasang Kran 3/4" atau 1/2"
Memasang Floor Drain
PEKERJAAN BESI & ALUMINIUM
Memasang Besi Profil
Memasang Rangka Kuda- kuda Baja IWF
Mengerjakan Pekerjaan Perakitan (Kuda- kuda Baja)
Membuat Pintu Besi Plat Baja Tebal 2mm Rangkap, Rangka Baja Siku
Mengerjakan Pengelasan Dengan Las Listrik
Memasang Pintu Rolling Door Besi
Memasang Pintu Lipat (Folding Door)
Sunscreen Alumunium
Memasang Rolling Door Aluminium
Memasang Kusen Pintu Alumunium
Memasang Pintu Alumunium Strip Lebar 8 cm
Memasang Pintu Kaca Rangka Alumunium
Memasang Venetions Blinds & Vertical Blinds
Memasang Teralli Besi Strip (2x3) cm
Memasang Kawat Nyamuk
Memasang Jendela Nako & Tralis
Memasang Talang Datar/ Jurai, Seng BJLS 28 Lebar 90 cm
Memasang Talang 1/2 Lingkaran 15cm, Seng Plat BJLS 30 Lebar 45 cm
PEKERJAAN KUNCI & KACA
Memasang Kunci Tanam Biasa
Memasang Kunci Kamar Mandi
Mamasang Kunci Silinder
Memasang Engsel Pintu
Pasang Engsel Jendela Kupu- kupu
Pasang Engsel Angin
Pasang Kait Angin
Pasang Door Closer
Pasang Kunci Selot
Pasang Door Stop
Pasang Rel Pintu Dorong
Pasang Kunci Lemari
Pasang Kaca tebal 3mm
Pasang Kaca Tebal 5mm
Pasang Kaca Cermin tebal 5mm
PEKERJAAN PENUTUP LANTAI & DINDING
Memasang Lantai Ubin PC Abu-abu Uk. 20 x 20 cm
Memasang Lantai Ubin Granito Uk. 40 x 40 cm
Pasang Plint Ubin PC Warna Uk. 10 x 20 cm
Memasang Lantai Keramik 33 x 33 cm
Memasang Lantai Keramik 30 x 30 cm
Memasang Lantai Keramik 20 x 20 cm
Memasang Plint Keramik Ukuran 10 x 20 cm
Memasang Plint Keramik Ukuran 10 x 10 cm
Memasang Lantai Marmer Ukuran 1.00 x 1.00 cm
Memasang Lantai Karpet
Memasang Lantai Parquet Jati
Memasang Dinding Keramik 10 x 20 cm
Memasang Dinding Keramik 20 x 20 cm
Memasang Dinding Marmer Ukuran 1.00 x 1.00 cm
Memasang Dinding Batu Paros/ Batu Tempel Hitam
Memasang Wall Paper Lebar 50 cm
Memasang Plint Kayu Klas II Ukuran 20 x 10 cm
PENGERJAAN PENGECATAN
Mengikis/ mengerok Permukaan Cat Tembok Lama
Mencuci Bidang Permukaan tembok yg Pernah Dicat
Mengerok Karat Cat Lama Permukaan Baja Dengan Cara Manual
Penyabun Permukaan Tembok Lama
Mendempul dan Menggosok Kayu
Pengecatan Bidang Lama
Pengecatan Bidang Kayu Baru (1 lap. Plamir) 1 lap. Cat dasar & 2 lap. Cat penutup
Pengecatan Bidang Kayu Baru (1 lap. Plamir) 1 lap. Cat dasar & 3 lap. Cat penutup
Pelaburan Bidang Kayu Dengan Teak Oil
Pelaburan Bidang Kayu Dengan Politur
Pelaburan Bidang Kayu dengan Cat Residu & Ter
Pelaburan Bidang Kayu dengan Vernis
Pengecat Tembok Baru (1 lap. Plamir, 1 lap. Cat dasar, 2 lap. Cat penutup)
Pengecat Tembok Baru (1 lap. Plamir, 2 lap. Cat penutup)
SAT MAXIMUM
m' 524,370.00 Rp
m' 110,915.00 Rp
m2 805,375.00 Rp
m2 696,875.00 Rp
m2 6,750.00 Rp
m2 36,351.50 Rp
m3 284,995.00 Rp
m3 268,495.00 Rp
m3 31,375.00 Rp
m3 38,475.00 Rp
m3 45,685.00 Rp
m3 107.00 Rp
m3 63,300.00 Rp
m3 50,475.00 Rp
m3 2,275.00 Rp
m3 13,750.00 Rp
m3 - Rp
m3 22,750.00 Rp
m3 132,550.00 Rp
m3 224,995.00 Rp
m3 50,025.00 Rp
m3 215,375.00 Rp
m3 606,050.00 Rp
m3 563,600.00 Rp
m3 534,170.00 Rp
m3 513,480.00 Rp
m3 485,120.00 Rp
m3 394,600.00 Rp
m3 464,135.00 Rp
m3 435,535.00 Rp
m3 256,530.00 Rp
m3 2,007,665.00 Rp
m3 607,185.00 Rp
m2 176,725.00 Rp
m2 165,517.50 Rp
m2 157,877.50 Rp
HARGA SATUAN PEKERJAAN KOTA SEMARANG
m2 154,060.00 Rp
m2 153,035.00 Rp
m2 143,387.50 Rp
m2 143,387.50 Rp
m2 79,137.50 Rp
m2 76,090.00 Rp
m2 74,175.00 Rp
m2 73,195.00 Rp
m2 71,100.00 Rp
m2 71,975.00 Rp
m2 147,010.00 Rp
m2 147,542.50 Rp
m2 267,235.00 Rp
m2 264,025.00 Rp
m2 44,310.00 Rp
m2 38,430.00 Rp
m2 35,910.00 Rp
m2 34,170.00 Rp
m2 33,213.75 Rp
m2 32,430.00 Rp
m2 32,010.00 Rp
m2 31,590.00 Rp
m2 32,985.00 Rp
m2 31,245.00 Rp
m2 27,945.00 Rp
m2 28,235.00 Rp
m2 28,235.00 Rp
m2 41,955.00 Rp
m2 45,670.00 Rp
m2 44,450.00 Rp
m2 43,350.00 Rp
m2 39,135.00 Rp
m2 22,245.00 Rp
m2 30,985.00 Rp
m2 25,455.00 Rp
m2 14,970.00 Rp
m2 7,205.00 Rp
m2 32,135.00 Rp
m2 18,762.50 Rp
m3 23,628,875.00 Rp
m3 9,921,625.00 Rp
m2 380,290.00 Rp
m2 528,250.00 Rp
m2 367,800.00 Rp
m2 1,645,250.00 Rp
m2 417,010.00 Rp
m2 444,235.00 Rp
m2 1,490,400.00 Rp
m2 798,235.00 Rp
m2 472,725.00 Rp
m3 9,010,200.00 Rp
m3 25,813,775.00 Rp
m3 8,608,900.00 Rp
m2 139,010.00 Rp
m2 164,570.00 Rp
m2 1,186,910.00 Rp
m2 140,815.00 Rp
m2 146,355.00 Rp
m' 255,625.00 Rp
m' 99,800.00 Rp
m2 235,090.00 Rp
m2 297,890.00 Rp
m2 293,825.00 Rp
m2 30,425.00 Rp
m2 112,239.00 Rp
m3 669,036.76 Rp
m3 700,966.38 Rp
m3 726,070.08 Rp
m3 628,319.98 Rp
m3 755,658.96 Rp
m3 784,090.44 Rp
m3 805,142.28 Rp
m3 819,366.36 Rp
m3 843,836.74 Rp
m3 851,433.04 Rp
m3 903,961.94 Rp
m3 913,917.50 Rp
10 Kg 119,975.00 Rp
10 Kg 187,440.00 Rp
1 Kg 19,170.00 Rp
m2 87,570.00 Rp
m2 93,070.00 Rp
m2 277,310.00 Rp
m2 293,510.00 Rp
m2 357,310.00 Rp
m2 335,310.00 Rp
m2 265,810.00 Rp
m2 57,255.00 Rp
m3 3,010,780.00 Rp
m3 3,712,785.00 Rp
m3 6,903,785.00 Rp
m3 5,354,710.00 Rp
m3 4,915,625.00 Rp
m3 4,883,430.00 Rp
m3 4,958,285.00 Rp
m' 53,920.00 Rp
m' 72,605.00 Rp
m2 51,085.00 Rp
m2 79,835.00 Rp
m2 67,730.00 Rp
m' 70,170.00 Rp
m' 81,670.00 Rp
m' 72,570.00 Rp
m2 59,645.00 Rp
m2 59,250.00 Rp
m2 36,950.00 Rp
m2 38,295.00 Rp
m2 53,635.00 Rp
m2 124,355.00 Rp
m' 75,685.00 Rp
m' 73,225.00 Rp
m2 56,010.00 Rp
m' 31,380.00 Rp
m2 16,970.00 Rp
m2 22,920.00 Rp
m2 73,235.00 Rp
m2 80,750.00 Rp
m2 33,360.00 Rp
m2 413,545.00 Rp
m2 28,855.00 Rp
m2 147,675.00 Rp
m' 10,635.00 Rp
Unit 1,738,365.00 Rp
Unit 388,100.00 Rp
Unit 519,300.00 Rp
Unit 1,120,525.00 Rp
Unit 984,598.80 Rp
m' 70,045.00 Rp
m' 311,135.00 Rp
m' 40,696.66 Rp
m' 144,853.66 Rp
m' 177,194.84 Rp
m' 12,979.00 Rp
m' 27,580.16 Rp
m' 44,092.16 Rp
Buah 359,732.50 Rp
Buah 21,900.00 Rp
Buah 31,825.00 Rp
Kg 23,842.50 Rp
Kg 22,642.50 Rp
100 Kg 25,280.00 Rp
m2 804,804.00 Rp
10 cm 19,419.00 Rp
m2 367,130.00 Rp
m2 445,870.00 Rp
m2 362,620.00 Rp
m2 334,250.00 Rp
m2 92,530.00 Rp
m' 922,858.50 Rp
m2 247,485.00 Rp
m2 141,515.00 Rp
m2 313,134.65 Rp
m2 67,023.51 Rp
m2 36,555.00 Rp
m' 161,392.50 Rp
m' 75,085.00 Rp
Buah 168,825.00 Rp
Buah 83,162.50 Rp
Buah 168,162.50 Rp
Buah 19,237.50 Rp
Buah 9,325.00 Rp
Buah 29,650.00 Rp
Buah 24,866.25 Rp
Buah 382,887.50 Rp
Buah 23,155.00 Rp
Buah 356,577.50 Rp
Buah 249,465.00 Rp
Buah 26,443.75 Rp
m2 75,866.25 Rp
m2 89,616.25 Rp
m2 240,866.25 Rp
m2 74,925.00 Rp
m' 276,633.00 Rp
m2 41,685.00 Rp
m2 135,246.20 Rp
m2 134,771.80 Rp
m' 134,802.00 Rp
m' 18,212.04 Rp
m2 25,049.07 Rp
m2 421,827.50 Rp
m2 86,875.00 Rp
m2 256,200.00 Rp
m2 153,195.00 Rp
m2 148,039.00 Rp
m2 467,745.11 Rp
m2 158,237.50 Rp
m2 132,590.00 Rp
m' 35,015.50 Rp
m2 6,787.50 Rp
m2 6,787.50 Rp
m2 6,787.50 Rp
m2 6,787.50 Rp
m2 5,752.50 Rp
m2 19,805.00 Rp
m2 23,432.50 Rp
m2 32,767.50 Rp
m2 31,617.50 Rp
m2 44,241.50 Rp
m2 5,467.50 Rp
m2 26,672.50 Rp
m2 13,008.00 Rp
m2 9,268.50 Rp
HAGA BAHAN/ UPAH JUMLAH
MAX MAX
PEKERJAAN PERSIAPAN
6.2 1 m' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m 524,370.00 Rp
6.2.1 Bahan 494,970.00 Rp
1.25 Btg Kayu Dolken diameter 8-10/ 400cm 20,000.00 Rp 25,000.00 Rp
2.5 Kg Portland Semen 1,250.00 Rp 3,125.00 Rp
1.2 Lbr Seng gelombang 3' - 5" 67,000.00 Rp 80,400.00 Rp
0.005 m3 Pasir beton 210,000.00 Rp 1,050.00 Rp
0.009 m3 Koral beton 125,000.00 Rp 1,125.00 Rp
0.072 m3 Ksyu 5/7x4m kayu kruing 5,200,000.00 Rp 374,400.00 Rp
0.06 Kg Paku biasa 2" - 5" 14,500.00 Rp 870.00 Rp
0.45 Kg Meni Besi 20,000.00 Rp 9,000.00 Rp
6.2.2 Tenaga 29,400.00 Rp
0.2 OH Tukang kayu 55,000.00 Rp 11,000.00 Rp
0.4 OH Pekerja 40,000.00 Rp 16,000.00 Rp
0.02 OH Kepala tukang 65,000.00 Rp 1,300.00 Rp
0.02 OH Mandor 55,000.00 Rp 1,100.00 Rp
6.4 1 m' Pengukuran Dan Pemasangan Bouwplank 110,915.00 Rp
6.4.1 Bahan 100,490.00 Rp
0.012 m3 kayu 5/7x 4m kayu Kruing 5,200,000.00 Rp 62,400.00 Rp
0.02 Kg Paku biasa 2" - 5" 14,500.00 Rp 290.00 Rp
0.007 m3 Kayu Papan 3/20 Kruing 5,400,000.00 Rp 37,800.00 Rp
6.4.2 Tenaga 10,425.00 Rp
0.1 OH Tukang Kayu 55,000.00 Rp 5,500.00 Rp
0.1 OH Pekerja 40,000.00 Rp 4,000.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.5 1 m2 Pembuatan Kantor Sementara dg Lantai Plesteran 805,375.00 Rp
6.5.1 Bahan 538,125.00 Rp
1.25 Btg Kayu Dolken 8-10/ 4m 20,000.00 Rp 25,000.00 Rp
0.18 m3 Kayu 1,750,000.00 Rp 315,000.00 Rp
0.85 Kg Paku biasa 2"- 5" 14,500.00 Rp 12,325.00 Rp
1.1 Kg Besi Strip 14,000.00 Rp 15,400.00 Rp
35 Kg Portland Sement 1,250.00 Rp 43,750.00 Rp
0.15 m3 Pasir Pasang 180,000.00 Rp 27,000.00 Rp
0.1 m3 Pasir Beton 210,000.00 Rp 21,000.00 Rp
0.15 m3 Koral Beton 125,000.00 Rp 18,750.00 Rp
30 buah Batu Bata Merah 500.00 Rp 15,000.00 Rp
0.25 Lbr Seng Plat 22,000.00 Rp 5,500.00 Rp
2 buah Jendela Naco 11,000.00 Rp 22,000.00 Rp
0.08 m2 Kaca Polos 60,000.00 Rp 4,800.00 Rp
0.15 buah Kunci Tanam 55,000.00 Rp 8,250.00 Rp
0.3 buah Engsel 2,500.00 Rp 750.00 Rp
0.06 Lbr Plywood 4mm 60,000.00 Rp 3,600.00 Rp
6.5.2 Tenaga 267,250.00 Rp
2 OH Tukang Kayu 55,000.00 Rp 110,000.00 Rp
1 OH Tukang Batu 55,000.00 Rp 55,000.00 Rp
2 OH Pekerja 40,000.00 Rp 80,000.00 Rp
0.3 OH Kepala Tukang 65,000.00 Rp 19,500.00 Rp
0.05 OH mandor 55,000.00 Rp 2,750.00 Rp
6.6 1 m2 Pembuatan Gudang Semen dan Alat-alat 696,875.00 Rp
6.6.1 Bahan 531,125.00 Rp
1.7 Btg Kayu Dolken 8-10/ 400cm 20,000.00 Rp 34,000.00 Rp
0.21 m3 Kayu 1,750,000.00 Rp 367,500.00 Rp
0.3 Kg Paku biasa 2"- 5" 14,500.00 Rp 4,350.00 Rp
10.5 Kg Portland Semen 1,250.00 Rp 13,125.00 Rp
0.03 m3 Pasir Beton 180,000.00 Rp 5,400.00 Rp
0.05 m3 Koral Beton 125,000.00 Rp 6,250.00 Rp
1.5 Lbr Seng Gelombang BJLS 32 67,000.00 Rp 100,500.00 Rp
6.6.2 Tenaga 165,750.00 Rp
2 OH Tukang Kayu 55,000.00 Rp 110,000.00 Rp
1 OH Pekerja 40,000.00 Rp 40,000.00 Rp
0.2 OH Kepala Tukang 65,000.00 Rp 13,000.00 Rp
0.05 OH Mandor 55,000.00 Rp 2,750.00 Rp
6.8 1 m2 Membersihkan Lapangan dan Perataan 6,750.00 Rp
Tenaga 6,750.00 Rp
0.1 OH Pekerja 40,000.00 Rp 4,000.00 Rp
0.05 OH Mandor 55,000.00 Rp 2,750.00 Rp
6.11 1 m2 Pembuatan Stager dari Bambu Uk. 40x50x20 cm 36,351.50 Rp
6.11.1 Bahan 16,800.00 Rp
1 Btg Bambu diameter 6-8/ 600 cm 15,000.00 Rp 15,000.00 Rp
0.25 Kg Tali Ijuk 7,200.00 Rp 1,800.00 Rp
6.11.2 Tenaga 19,551.50 Rp
0.17 OH Tukang Kayu 55,000.00 Rp 9,350.00 Rp
0.25 OH Pekerja 40,000.00 Rp 10,000.00 Rp
0.002 OH Kepala Tukang 65,000.00 Rp 130.00 Rp
0.0013 OH Mandor 55,000.00 Rp 71.50 Rp
6.13 1 m3 Bongkaran Beton Bertulang 284,995.00 Rp
6.13.2 Tenaga 284,995.00 Rp
6.667 OH Pekerja 40,000.00 Rp 266,680.00 Rp
0.333 OH Mandor 55,000.00 Rp 18,315.00 Rp
6.14 1 m3 Bongkaran Dinding Tembok Bata Merah 268,495.00 Rp
I
ANALISA PEKERJAAN KOTA SEMARANG
NO SNI KODE KOEF SAT URAIAN PEKERJAAN
03-2835-2002
6.14.2 Tenaga 268,495.00 Rp
6.667 OH Pekerja 40,000.00 Rp 266,680.00 Rp
0.033 OH Mandor 55,000.00 Rp 1,815.00 Rp
I 03-2835-2002
PEKERJAAN TANAH
6.1 1 m3 Menggali Tanah Biasa Sedalam 1m 31,375.00 Rp
6.1.2 Tenaga 31,375.00 Rp
0.75 OH Pekerja 40,000.00 Rp 30,000.00 Rp
0.025 OH Mandor 55,000.00 Rp 1,375.00 Rp
6.2 1 m3 Menggali Tanah Biasa Sedalam 2m 38,475.00 Rp
6.2.1 Tenaga 38,475.00 Rp
0.9 OH Pekerja 40,000.00 Rp 36,000.00 Rp
0.045 OH Mandor 55,000.00 Rp 2,475.00 Rp
6.3 1 m3 Menggali Tanah Biasa Sedalam 3m 45,685.00 Rp
6.3.1 Tenaga 45,685.00 Rp
1.05 OH Pekerja 40,000.00 Rp 42,000.00 Rp
0.067 OH Mandor 55,000.00 Rp 3,685.00 Rp
6.4 1 m3 Menggali Tanah Keras Sedalam 1m 41,760.00 Rp
6.4.2 Tenaga 41,760.00 Rp
1 OH Pekerja 40,000.00 Rp 40,000.00 Rp
0.032 OH Mandor 55,000.00 Rp 1,760.00 Rp
6.5 1 m3 Menggali Tanah Cadas Sedalam 1m 63,300.00 Rp
6.5.2 Tenaga 63,300.00 Rp
1.5 OH Pekerja 40,000.00 Rp 60,000.00 Rp
0.06 OH Mandor 55,000.00 Rp 3,300.00 Rp
6.6 1 m3 Menggali Tanah Lumpur Sedalam 1m 50,475.00 Rp
6.6.2 Tenaga 50,475.00 Rp
1.2 OH Pekerja 40,000.00 Rp 48,000.00 Rp
0.045 OH Mandor 55,000.00 Rp 2,475.00 Rp
6.7 1 m2 Mengerjakan Striping Tebing Setinggi 1m 2,275.00 Rp
6.7.2 Tenaga 2,275.00 Rp
0.05 OH Pekerja 40,000.00 Rp 2,000.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.8 1 m3 Membuang Tanah Sejauh 10m' 13,750.00 Rp
6.8.2 Tenaga 13,750.00 Rp
0.33 OH Pekerja 40,000.00 Rp 13,200.00 Rp
0.01 OH Mandor 55,000.00 Rp 550.00 Rp
6.9 1 m3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)
6.10 1 m3 Pemadatan Tanah (per 20cm) 22,750.00 Rp
6.10.2 Tenaga 22,750.00 Rp
0.5 OH Pekerja 40,000.00 Rp 20,000.00 Rp
0.05 OH Mandor 55,000.00 Rp 2,750.00 Rp
6.11 1 m3 Urugan Pasir 132,550.00 Rp
6.11.1 Bahan 120,000.00 Rp
1.2 m3 Pasir Urug 100,000.00 Rp 120,000.00 Rp
6.11.2 Tenaga 12,550.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.01 OH Mandor 55,000.00 Rp 550.00 Rp
6.12 1 m3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL 224,995.00 Rp
6.12.1 Bahan 163,995.00 Rp
0.4 m3 Pasir Pasang 180,000.00 Rp 72,000.00 Rp
0.135 m3 Pasir Padam 225,000.00 Rp 30,375.00 Rp
0.948 m3 Tanah Liat 65,000.00 Rp 61,620.00 Rp
6.12.2 Tenaga 61,000.00 Rp
0.8 OH Pekerja 32,000.00 Rp
0.4 OH Tukang Batu 40,000.00 Rp 22,000.00 Rp
0.04 OH Kepala Tukang 55,000.00 Rp 2,600.00 Rp
0.8 OH Mandor 65,000.00 Rp 4,400.00 Rp
6.14 1 m2 Pemasangan Lapisan Ijuk tebal 10cm 50,025.00 Rp
6.14.1 Bahan 43,200.00 Rp
6 Kg Ijuk 7,200.00 Rp 43,200.00 Rp
6.14.2 Tenaga 6,825.00 Rp
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.15 1 m3 Mengurug Sirtu Padat Untuk Peninggian Lantai Bangunan 215,375.00 Rp
6.15.1 Bahan 204,000.00 Rp
1.2 m3 Sirtu 170,000.00 Rp 204,000.00 Rp
6.15.2 Tenaga 11,375.00 Rp
0.25 OH Pekerja 40,000.00 Rp 10,000.00 Rp
0.025 OH Mandor 55,000.00 Rp 1,375.00 Rp
II 03-2835-2008
PEKERJAAN PONDASI
6.1 1 m3 Memasang Pondasi Batu Kali 1 Pc: 3PP 606,050.00 Rp
6.1.1 Bahan 495,800.00 Rp
1.2 m3 Batu Belah 15/ 20 130,000.00 Rp 156,000.00 Rp
202 Kg Portland Sement 1,250.00 Rp 252,500.00 Rp
0.485 m3 Pasir Pasang 180,000.00 Rp 87,300.00 Rp
6.1.2 Tenaga 110,250.00 Rp
1.5 OH Pekerja 40,000.00 Rp 60,000.00 Rp
0.75 OH Tukang Batu 55,000.00 Rp 41,250.00 Rp
0.075 OH Kepala Tukang 65,000.00 Rp 4,875.00 Rp
0.075 OH Mandor 55,000.00 Rp 4,125.00 Rp
6.2 1 m3 Memasang Pondasi Batu Kali 1 Pc: 4PP 563,600.00 Rp
6.2.1 Bahan 453,350.00 Rp
1.2 m3 Batu Belah 15/ 20 130,000.00 Rp 156,000.00 Rp
163 Kg Portland Sement 1,250.00 Rp 203,750.00 Rp
0.52 m3 Pasir Pasang 180,000.00 Rp 93,600.00 Rp
6.2.2 Tenaga 110,250.00 Rp
1.5 OH Pekerja 40,000.00 Rp 60,000.00 Rp
0.75 OH Tukang Batu 55,000.00 Rp 41,250.00 Rp
0.075 OH Kepala Tukang 65,000.00 Rp 4,875.00 Rp
0.075 OH Mandor 55,000.00 Rp 4,125.00 Rp
6.3 1 m3 Memasang Pondasi Batu Kali 1 Pc: 5PP 534,170.00 Rp
6.3.1 Bahan 423,920.00 Rp
1.2 m3 Batu Belah 15/ 20 130,000.00 Rp 156,000.00 Rp
136 Kg Portland Sement 1,250.00 Rp 170,000.00 Rp
0.544 m3 Pasir Pasang 180,000.00 Rp 97,920.00 Rp
6.3.2 Tenaga 110,250.00 Rp
1.5 OH Pekerja 40,000.00 Rp 60,000.00 Rp
0.75 OH Tukang Batu 55,000.00 Rp 41,250.00 Rp
0.075 OH Kepala Tukang 65,000.00 Rp 4,875.00 Rp
0.075 OH Mandor 55,000.00 Rp 4,125.00 Rp
6.4 1 m3 Memasang Pondasi Batu Kali 1 Pc: 6PP 513,480.00 Rp
6.4.1 Bahan 403,230.00 Rp
1.2 m3 Batu Belah 15/ 20 130,000.00 Rp 156,000.00 Rp
117 Kg Portland Sement 1,250.00 Rp 146,250.00 Rp
0.561 m3 Pasir Pasang 180,000.00 Rp 100,980.00 Rp
6.4.2 Tenaga 110,250.00 Rp
1.5 OH Pekerja 40,000.00 Rp 60,000.00 Rp
0.75 OH Tukang Batu 55,000.00 Rp 41,250.00 Rp
0.075 OH Kepala Tukang 65,000.00 Rp 4,875.00 Rp
0.075 OH Mandor 55,000.00 Rp 4,125.00 Rp
6.5 1 m3 Memasang Pondasi Batu Kali 1 Pc: 8PP 485,120.00 Rp
6.5.1 Bahan 374,870.00 Rp
1.2 m3 Batu Belah 15/ 20 130,000.00 Rp 156,000.00 Rp
91 Kg Portland Sement 1,250.00 Rp 113,750.00 Rp
0.584 m3 Pasir Pasang 180,000.00 Rp 105,120.00 Rp
6.5.2 Tenaga 110,250.00 Rp
1.5 OH Pekerja 40,000.00 Rp 60,000.00 Rp
0.75 OH Tukang Batu 55,000.00 Rp 41,250.00 Rp
0.075 OH Kepala Tukang 65,000.00 Rp 4,875.00 Rp
0.075 OH Mandor 55,000.00 Rp 4,125.00 Rp
6.6 1 m3 Memasang Pondasi Batu Kali 1Kp : 1Sm : 2Pp 394,600.00 Rp
6.6.1 Bahan 284,350.00 Rp
1.2 m3 Batu Belah 15/ 20 130,000.00 Rp 156,000.00 Rp
0.17 m3 Kapur Pasang (KP) 225,000.00 Rp 38,250.00 Rp
0.17 Kg Semen Merah (SM) 170,000.00 Rp 28,900.00 Rp
0.34 m3 Pasir Pasang 180,000.00 Rp 61,200.00 Rp
6.6.2 Tenaga 110,250.00 Rp
1.5 OH Pekerja 40,000.00 Rp 60,000.00 Rp
0.75 OH Tukang Batu 55,000.00 Rp 41,250.00 Rp
0.075 OH Kepala Tukang 65,000.00 Rp 4,875.00 Rp
0.075 OH Mandor 55,000.00 Rp 4,125.00 Rp
6.7 1 m3 Memasang Pondasi Batu Kali 1 Pc : 3Kp : 10PP 464,135.00 Rp
6.7.1 Bahan 353,885.00 Rp
1.2 m3 Batu Belah 15/ 20 130,000.00 Rp 156,000.00 Rp
61 Kg Portland Sement 1,250.00 Rp 76,250.00 Rp
0.147 m3 Kapur Pasang 225,000.00 Rp 33,075.00 Rp
0.492 m3 Pasir 180,000.00 Rp 88,560.00 Rp
6.7.2 Tenaga 110,250.00 Rp
1.5 OH Pekerja 40,000.00 Rp 60,000.00 Rp
0.75 OH Tukang Batu 55,000.00 Rp 41,250.00 Rp
0.075 OH Kepala Tukang 65,000.00 Rp 4,875.00 Rp
0.075 OH Mandor 55,000.00 Rp 4,125.00 Rp
6.8 1 m3 Memasang Pondasi Batu Kali 1, 1/4 Pc : 1Kp : 4 PP 435,535.00 Rp
6.8.1 Bahan 325,285.00 Rp
1.2 m3 Batu Belah 15/ 20 130,000.00 Rp 156,000.00 Rp
41 Kg Portland Sement 1,250.00 Rp 51,250.00 Rp
0.131 m3 Kapur Pasang 225,000.00 Rp 29,475.00 Rp
0.492 m3 Pasir 180,000.00 Rp 88,560.00 Rp
6.8.2 Tenaga 110,250.00 Rp
1.5 OH Pekerja 40,000.00 Rp 60,000.00 Rp
0.75 OH Tukang Batu 55,000.00 Rp 41,250.00 Rp
0.075 OH Kepala Tukang 65,000.00 Rp 4,875.00 Rp
III 03-2836-2008
0.075 OH Mandor 55,000.00 Rp 4,125.00 Rp
6.9 1 m3 Pasang Pondasi Batu Kosong 256,530.00 Rp
6.9.1 Bahan 199,200.00 Rp
1.2 m3 Batu Belah 15/ 20 130,000.00 Rp 156,000.00 Rp
0.432 m3 Pasir Urug 100,000.00 Rp 43,200.00 Rp
6.9.2 Tenaga 57,330.00 Rp
0.78 OH Pekerja 40,000.00 Rp 31,200.00 Rp
III 03-2836-2008
0.39 OH Tukang Batu 55,000.00 Rp 21,450.00 Rp
0.039 OH Kepala Tukang 65,000.00 Rp 2,535.00 Rp
0.039 OH Mandor 55,000.00 Rp 2,145.00 Rp
6.10 1 m3 Pasang Pondasi Siklop, 60% Beton Camp, 1PC: 2PB : 3KR & 40% Batu Belah 2,007,665.00 Rp
6.10.1 Bahan 1,811,140.00 Rp
0.48 m3 Batu Belah 15/ 20 130,000.00 Rp 62,400.00 Rp
126 Kg Besi Beton 10,500.00 Rp 1,323,000.00 Rp
194 Kg Portland Sement 1,250.00 Rp 242,500.00 Rp
0.312 m3 Pasir Beton 210,000.00 Rp 65,520.00 Rp
0.468 m3 Koral Beton 190,000.00 Rp 88,920.00 Rp
1.8 Kg Kawat Beton 16,000.00 Rp 28,800.00 Rp
6.10.2 Tenaga 196,525.00 Rp
3.4 OH Pekerja 40,000.00 Rp 136,000.00 Rp
0.85 OH Tukang Batu 55,000.00 Rp 46,750.00 Rp
0.085 OH Kepala Tukang 65,000.00 Rp 5,525.00 Rp
0.15 OH Mandor 55,000.00 Rp 8,250.00 Rp
6.11 1 m3 Pasang Pondasi Sumuran Diameter 100 cm 607,185.00 Rp
6.11.1 Bahan 455,440.00 Rp
0.45 m3 Batu Belah 15/ 20 130,000.00 Rp 58,500.00 Rp
194 Kg Portland Sement 1,250.00 Rp 242,500.00 Rp
0.312 m3 Pasir Beton 210,000.00 Rp 65,520.00 Rp
0.468 m3 Koral Beton 190,000.00 Rp 88,920.00 Rp
6.11.2 Tenaga 151,745.00 Rp
2.4 OH Pekerja 40,000.00 Rp 96,000.00 Rp
0.8 OH Tukang Batu 55,000.00 Rp 44,000.00 Rp
0.08 OH Kepala Tukang 65,000.00 Rp 5,200.00 Rp
0.119 OH Mandor 55,000.00 Rp 6,545.00 Rp
III 03-2836-2008
PEKERJAAN DINDING
6.1 1 m2 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 2 Pp 176,725.00 Rp
6.1.1 Bahan 138,775.00 Rp
140 Buah Bata Merah 500.00 Rp 70,000.00 Rp
43.5 Kg Portland Sement (PC) 1,250.00 Rp 54,375.00 Rp
0.08 m3 Pasir Pasang (PP) 180,000.00 Rp 14,400.00 Rp
6.1.2 Tenaga 37,950.00 Rp
0.6 OH Pekerja 40,000.00 Rp 24,000.00 Rp
0.2 OH Tukang Batu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang Batu 65,000.00 Rp 1,300.00 Rp
0.03 OH Mandor 55,000.00 Rp 1,650.00 Rp
6.2 1 m2 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 3 Pp 165,517.50 Rp
6.2.1 Bahan 127,567.50 Rp
140 Buah Bata Merah 500.00 Rp 70,000.00 Rp
32.95 Kg Portland Sement (PC) 1,250.00 Rp 41,187.50 Rp
0.091 m3 Pasir Pasang (PP) 180,000.00 Rp 16,380.00 Rp
6.2.2 Tenaga 37,950.00 Rp
0.6 OH Pekerja 40,000.00 Rp 24,000.00 Rp
0.2 OH Tukang Batu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang Batu 65,000.00 Rp 1,300.00 Rp
0.03 OH Mandor 55,000.00 Rp 1,650.00 Rp
6.3 1 m2 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 4 Pp 157,877.50 Rp
6.3.1 Bahan 119,927.50 Rp
140 Buah Bata Merah 500.00 Rp 70,000.00 Rp
26.55 Kg Portland Sement (PC) 1,250.00 Rp 33,187.50 Rp
0.093 m3 Pasir Pasang (PP) 180,000.00 Rp 16,740.00 Rp
6.3.2 Tenaga 37,950.00 Rp
0.6 OH Pekerja 40,000.00 Rp 24,000.00 Rp
0.2 OH Tukang Batu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang Batu 65,000.00 Rp 1,300.00 Rp
0.03 OH Mandor 55,000.00 Rp 1,650.00 Rp
6.4 1 m2 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 5 Pp 154,060.00 Rp
6.4.1 Bahan 116,110.00 Rp
140 Buah Bata Merah 500.00 Rp 70,000.00 Rp
22.2 Kg Portland Sement (PC) 1,250.00 Rp 27,750.00 Rp
0.102 m3 Pasir Pasang (PP) 180,000.00 Rp 18,360.00 Rp
6.4.2 Tenaga 37,950.00 Rp
0.6 OH Pekerja 40,000.00 Rp 24,000.00 Rp
0.2 OH Tukang Batu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang Batu 65,000.00 Rp 1,300.00 Rp
0.03 OH Mandor 55,000.00 Rp 1,650.00 Rp
6.5 1 m2 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 6 Pp 153,035.00 Rp
6.5.1 Bahan 115,085.00 Rp
140 Buah Bata Merah 500.00 Rp 70,000.00 Rp
18.5 Kg Portland Sement (PC) 1,250.00 Rp 23,125.00 Rp
0.122 m3 Pasir Pasang (PP) 180,000.00 Rp 21,960.00 Rp
6.5.2 Tenaga 37,950.00 Rp
0.6 OH Pekerja 40,000.00 Rp 24,000.00 Rp
0.2 OH Tukang Batu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang Batu 65,000.00 Rp 1,300.00 Rp
0.03 OH Mandor 55,000.00 Rp 1,650.00 Rp
6.6 1 m2 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : :3 Kp : 6 Pp 143,387.50 Rp
6.6.1 Bahan 105,437.50 Rp
140 Buah Bata Merah 500.00 Rp 70,000.00 Rp
10.08 Kg Portland Sement (PC) 1,250.00 Rp 12,600.00 Rp
0.0925 m3 Pasir Pasang (PP) 180,000.00 Rp 16,650.00 Rp
0.0275 m3 Kapur Pasang (KP) 225,000.00 Rp 6,187.50 Rp
6.6.2 Tenaga 37,950.00 Rp
0.6 OH Pekerja 40,000.00 Rp 24,000.00 Rp
0.2 OH Tukang Batu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang Batu 65,000.00 Rp 1,300.00 Rp
0.03 OH Mandor 55,000.00 Rp 1,650.00 Rp
6.7 1 m2 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 bata Camp. 1Pc : 2 Pp 84,502.50 Rp
6.7.1 Bahan 65,527.50 Rp
70 Buah Bata Merah 5 x 11 x 22 500.00 Rp 35,000.00 Rp
18.95 Kg Portland Sement (PC) 1,250.00 Rp 23,687.50 Rp
0.038 m3 Pasir Pasang (PP) 180,000.00 Rp 6,840.00 Rp
6.7.2 Tenaga 18,975.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.1 OH Tukang Batu 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.8 1 m2 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 bata Camp. 1Pc : 3 Pp 79,137.50 Rp
6.8.1 Bahan 60,162.50 Rp
70 Buah Bata Merah 5 x 11 x 22 500.00 Rp 35,000.00 Rp
14.37 Kg Portland Sement (PC) 1,250.00 Rp 17,962.50 Rp
0.04 m3 Pasir Pasang (PP) 180,000.00 Rp 7,200.00 Rp
6.8.2 Tenaga 18,975.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.1 OH Tukang Batu 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.9 1 m2 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 bata Camp. 1Pc : 4 Pp 76,090.00 Rp
IV 03-6897-2008
6.9.1 Bahan 57,115.00 Rp
70 Buah Bata Merah 5 x 11 x 22 500.00 Rp 35,000.00 Rp
11.5 Kg Portland Sement (PC) 1,250.00 Rp 14,375.00 Rp
0.043 m3 Pasir Pasang (PP) 180,000.00 Rp 7,740.00 Rp
6.9.2 Tenaga 18,975.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.1 OH Tukang Batu 55,000.00 Rp 5,500.00 Rp
IV 03-6897-2008
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.10 1 m2 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 bata Camp. 1Pc : 5 Pp 74,175.00 Rp
6.10.1 Bahan 55,200.00 Rp
70 Buah Bata Merah 5 x 11 x 22 500.00 Rp 35,000.00 Rp
9.68 Kg Portland Sement (PC) 1,250.00 Rp 12,100.00 Rp
0.045 m3 Pasir Pasang (PP) 180,000.00 Rp 8,100.00 Rp
6.10.2 Tenaga 18,975.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.1 OH Tukang Batu 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.11 1 m2 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 bata Camp. 1Pc : 6 Pp 73,195.00 Rp
6.11.1 Bahan 54,220.00 Rp
70 Buah Bata Merah 5 x 11 x 22 500.00 Rp 35,000.00 Rp
8.32 Kg Portland Sement (PC) 1,250.00 Rp 10,400.00 Rp
0.049 m3 Pasir Pasang (PP) 180,000.00 Rp 8,820.00 Rp
6.11.2 Tenaga 18,975.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.1 OH Tukang Batu 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.12 1 m2 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 bata Camp. 1Pc : 8 Pp 71,100.00 Rp
6.12.1 Bahan 52,125.00 Rp
70 Buah Bata Merah 5 x 11 x 22 500.00 Rp 35,000.00 Rp
6.5 Kg Portland Sement (PC) 1,250.00 Rp 8,125.00 Rp
0.05 m3 Pasir Pasang (PP) 180,000.00 Rp 9,000.00 Rp
6.12.2 Tenaga 18,975.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.1 OH Tukang Batu 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.13 1 m2 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 bata Camp. 1Pc : 3Kp : 10 Pp 71,975.00 Rp
6.13.1 Bahan 53,000.00 Rp
70 Bata Merah 5 x 11 x 22 500.00 Rp 35,000.00 Rp
4.5 Portland Sement 1,250.00 Rp 5,625.00 Rp
0.05 Pasir Pasang 180,000.00 Rp 9,000.00 Rp
0.015 Kapur Padam 225,000.00 Rp 3,375.00 Rp
6.13.2 Tenaga 18,975.00 Rp
0.3 Pekerja 40,000.00 Rp 12,000.00 Rp
0.1 Tukang Batu 55,000.00 Rp 5,500.00 Rp
0.01 Kepala Tukang 65,000.00 Rp 650.00 Rp
0.015 Mandor 55,000.00 Rp 825.00 Rp
6.14 1 m2 Memasang Dinding Bata Merah Ukuran (5 x 11 x 22) cm Tebal 1/2 Bata Camp. 1Pc : 1SM : 1Pp 64,325.00 Rp
6.14.2 Bahan 45,350.00 Rp
70 Bata Merah 5 x 11 x 22 500.00 Rp 35,000.00 Rp
0.018 Semen Merah 170,000.00 Rp 3,060.00 Rp
0.018 Pasir Pasang 180,000.00 Rp 3,240.00 Rp
0.018 Kapur Padam 225,000.00 Rp 4,050.00 Rp
6.14.2 Tenaga 18,975.00 Rp
0.3 Pekerja 40,000.00 Rp 12,000.00 Rp
0.1 Tukang Batu 55,000.00 Rp 5,500.00 Rp
0.01 Kepala Tukang 65,000.00 Rp 650.00 Rp
0.015 Mandor 55,000.00 Rp 825.00 Rp
IV 03-6897-2008
6.15 1 m2 Memasang Dinding Bata Merah Ukuran (5 x 11 x 22) cm Tebal 1/2 Bata Camp. 1Pc : 1SM : 2Pp 64,545.00 Rp
6.15.1 Bahan 45,570.00 Rp
70 Bata Merah 5 x 11 x 22 500.00 Rp 35,000.00 Rp
0.014 Semen Merah 170,000.00 Rp 2,380.00 Rp
0.028 Pasir Pasang 180,000.00 Rp 5,040.00 Rp
0.014 Kapur Padam 225,000.00 Rp 3,150.00 Rp
6.15.2 Tenaga 18,975.00 Rp
0.3 Pekerja 40,000.00 Rp 12,000.00 Rp
0.1 Tukang Batu 55,000.00 Rp 5,500.00 Rp
0.01 Kepala Tukang 65,000.00 Rp 650.00 Rp
0.015 Mandor 55,000.00 Rp 825.00 Rp
6.20 1 m2 Memasang Dinding HB/ CB 10, speci cam. 1 Pc : 3Pp 147,010.00 Rp
6.20.1 Bahan 128,035.00 Rp
12.5 Batako 3,250.00 Rp 40,625.00 Rp
15.16 PC 1,250.00 Rp 18,950.00 Rp
0.364 Pasir Pasang 180,000.00 Rp 65,520.00 Rp
0.28 Besi Angkur 8mm 10,500.00 Rp 2,940.00 Rp
6.20.2 Tenaga 18,975.00 Rp
0.3 Pekerja 40,000.00 Rp 12,000.00 Rp
0.1 Tukang Batu 55,000.00 Rp 5,500.00 Rp
0.01 Kepala Tukang 65,000.00 Rp 650.00 Rp
0.015 Mandor 55,000.00 Rp 825.00 Rp
6.21 1 m2 Memasang Dinding HB/ CB 10, speci cam. 1 Pc : 4Pp 147,542.50 Rp
6.21.1 Bahan 128,567.50 Rp
12.5 Batako 3,250.00 Rp 40,625.00 Rp
12.13 PC 1,250.00 Rp 15,162.50 Rp
0.388 Pasir Pasang 180,000.00 Rp 69,840.00 Rp
0.28 Besi Angkur 8mm 10,500.00 Rp 2,940.00 Rp
6.21.2 Tenaga 18,975.00 Rp
0.3 Pekerja 40,000.00 Rp 12,000.00 Rp
0.1 Tukang Batu 55,000.00 Rp 5,500.00 Rp
0.01 Kepala Tukang 65,000.00 Rp 650.00 Rp
0.015 Mandor 55,000.00 Rp 825.00 Rp
6.22 1 m2 Memasang Dinding Terawang (Rooster) Uk, (12x11x24) cm Camp. 1 Pc: 2Pp 267,235.00 Rp
6.22.1 Bahan 248,260.00 Rp
30 Terawang/ Rooster 7,500.00 Rp 225,000.00 Rp
14 Portland Sement 1,250.00 Rp 17,500.00 Rp
0.032 Pasir Pasang 180,000.00 Rp 5,760.00 Rp
6.22.2 Tenaga 18,975.00 Rp
0.3 Pekerja 40,000.00 Rp 12,000.00 Rp
0.1 Tukang Batu 55,000.00 Rp 5,500.00 Rp
0.01 Kepala Tukang 65,000.00 Rp 650.00 Rp
0.015 Mandor 55,000.00 Rp 825.00 Rp
6.23 1 m2 Memasang Dinding Terawang (Rooster) Uk, (12x11x24) cm Camp. 1 Pc: 4Pp 264,025.00 Rp
6.22.1 Bahan 245,050.00 Rp
30 Terawang/ Rooster 7,500.00 Rp 225,000.00 Rp
11 Portland Sement 1,250.00 Rp 13,750.00 Rp
0.035 Pasir Pasang 180,000.00 Rp 6,300.00 Rp
6.22.2 Tenaga 18,975.00 Rp
0.3 Pekerja 40,000.00 Rp 12,000.00 Rp
0.1 Tukang Batu 55,000.00 Rp 5,500.00 Rp
0.01 Kepala Tukang 65,000.00 Rp 650.00 Rp
0.015 Mandor 55,000.00 Rp 825.00 Rp
PEKERJAAN PLESTERAN
6.1 1 m2 Memasang Plesteran 1 Pc : 1 Pp : Tebal 15mm 44,310.00 Rp
6.1.1 Bahan 22,260.00 Rp
15.504 Kg Portland Sement 1,250.00 Rp 19,380.00 Rp
0.016 m3 Pasir Pasang 180,000.00 Rp 2,880.00 Rp
6.1.2 Tenaga 22,050.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.15 OH Tukang Batu 55,000.00 Rp 8,250.00 Rp
0.015 OH Kepala Tukang 65,000.00 Rp 975.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.2 1 m2 Memasang Plesteran 1 Pc : 2 Pp : Tebal 15mm 38,430.00 Rp
6.2.1 Bahan 16,380.00 Rp
10.224 Kg Portland Sement 1,250.00 Rp 12,780.00 Rp
0.02 m3 Pasir Pasang 180,000.00 Rp 3,600.00 Rp
6.2.1 Tenaga 22,050.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.15 OH Tukang Batu 55,000.00 Rp 8,250.00 Rp
0.015 OH Kepala Tukang 65,000.00 Rp 975.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.3 1 m2 Memasang Plesteran 1 Pc : 3 Pp : Tebal 15mm 35,910.00 Rp
6.3.1 Bahan 13,860.00 Rp
7.776 Kg Portland Sement 1,250.00 Rp 9,720.00 Rp
0.023 m3 Pasir Pasang 180,000.00 Rp 4,140.00 Rp
6.3.2 Tenaga 22,050.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.15 OH Tukang Batu 55,000.00 Rp 8,250.00 Rp
0.015 OH Kepala Tukang 65,000.00 Rp 975.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.4 1 m2 Memasang Plesteran 1 Pc : 4 Pp : Tebal 15mm 34,170.00 Rp
6.4.1 Bahan 12,120.00 Rp
V
IV 03-6897-2008
03-2837-2008
6.24 Kg Portland Sement 1,250.00 Rp 7,800.00 Rp
0.024 m3 Pasir Pasang 180,000.00 Rp 4,320.00 Rp
6.4.2 Tenaga 22,050.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.15 OH Tukang Batu 55,000.00 Rp 8,250.00 Rp
0.015 OH Kepala Tukang 65,000.00 Rp 975.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.5 1 m2 Memasang Plesteran 1 Pc : 5 Pp : Tebal 15mm 33,213.75 Rp
6.5.1 Bahan 11,163.75 Rp
5.187 Kg Portland Sement 1,250.00 Rp 6,483.75 Rp
0.026 m3 Pasir Pasang 180,000.00 Rp 4,680.00 Rp
6.5.2 Tenaga 22,050.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.15 OH Tukang Batu 55,000.00 Rp 8,250.00 Rp
0.015 OH Kepala Tukang 65,000.00 Rp 975.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.6 1 m2 Memasang Plesteran 1 Pc : 6 Pp : Tebal 15mm 32,430.00 Rp
6.6.1 Bahan 10,380.00 Rp
4.416 Kg Portland Sement 1,250.00 Rp 5,520.00 Rp
0.027 m3 Pasir Pasang 180,000.00 Rp 4,860.00 Rp
6.6.2 Tenaga 22,050.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.15 OH Tukang Batu 55,000.00 Rp 8,250.00 Rp
0.015 OH Kepala Tukang 65,000.00 Rp 975.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.7 1 m2 Memasang Plesteran 1 Pc : 7 Pp : Tebal 15mm 32,010.00 Rp
6.7.1 Bahan 9,960.00 Rp
3.936 Kg Portland Sement 1,250.00 Rp 4,920.00 Rp
0.028 m3 Pasir Pasang 180,000.00 Rp 5,040.00 Rp
6.7.2 Tenaga 22,050.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.15 OH Tukang Batu 55,000.00 Rp 8,250.00 Rp
0.015 OH Kepala Tukang 65,000.00 Rp 975.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.8 1 m2 Memasang Plesteran 1 Pc : 8 Pp : Tebal 15mm 31,590.00 Rp
6.8.1 Bahan 9,540.00 Rp
3.456 Kg Portland Sement 1,250.00 Rp 4,320.00 Rp
0.029 m3 Pasir Pasang 180,000.00 Rp 5,220.00 Rp
6.8.2 Tenaga 22,050.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.15 OH Tukang Batu 55,000.00 Rp 8,250.00 Rp
0.015 OH Kepala Tukang 65,000.00 Rp 975.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.9 1 m2 Memasang Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm 32,985.00 Rp
6.9.1 Bahan 10,215.00 Rp
5.76 Kg Portland Sement 1,250.00 Rp 7,200.00 Rp
0.003 m3 Kapur Pasang 225,000.00 Rp 675.00 Rp
0.013 m3 Pasir Pasang 180,000.00 Rp 2,340.00 Rp
6.9.2 Tenaga 22,770.00 Rp
0.36 OH Pekerja 40,000.00 Rp 14,400.00 Rp
0.12 OH Tukang Batu 55,000.00 Rp 6,600.00 Rp
0.012 OH Kepala Tukang 65,000.00 Rp 780.00 Rp
0.018 OH Mandor 55,000.00 Rp 990.00 Rp
6.10 1 m2 Memasang Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm 31,245.00 Rp
6.10.1 Bahan 8,475.00 Rp
3 Kg Portland Sement 1,250.00 Rp 3,750.00 Rp
0.005 m3 Kapur Padam 225,000.00 Rp 1,125.00 Rp
0.02 m3 Pasir Pasang 180,000.00 Rp 3,600.00 Rp
6.10.2 Tenaga 22,770.00 Rp
0.36 OH Pekerja 40,000.00 Rp 14,400.00 Rp
0.12 OH Tukang Batu 55,000.00 Rp 6,600.00 Rp
0.012 OH Kepala Tukang 65,000.00 Rp 780.00 Rp
0.018 OH Mandor 55,000.00 Rp 990.00 Rp
6.11 1 m2 Memasang Plesteran 1 SM : 1 Kp : 1 Pp Tebal 15mm 27,945.00 Rp
6.11.1 Bahan 5,175.00 Rp
0.009 Kg Semen Merah 170,000.00 Rp 1,530.00 Rp
0.009 m3 Kapur Padam 225,000.00 Rp 2,025.00 Rp
0.009 m3 Pasir Pasang 180,000.00 Rp 1,620.00 Rp
6.11.2 Tenaga 22,770.00 Rp
0.36 OH Pekerja 40,000.00 Rp 14,400.00 Rp
0.12 OH Tukang Batu 55,000.00 Rp 6,600.00 Rp
0.012 OH Kepala Tukang 65,000.00 Rp 780.00 Rp
0.018 OH Mandor 55,000.00 Rp 990.00 Rp
6.12 1 m2 Memasang Plesteran 1 SM : 1 Kp : 2 Pp Tebal 15mm 28,235.00 Rp
6.12.1 Bahan 5,465.00 Rp
0.007 Kg Semen Merah 170,000.00 Rp 1,190.00 Rp
0.007 m3 Kapur Padam 225,000.00 Rp 1,575.00 Rp
0.015 m3 Pasir Pasang 180,000.00 Rp 2,700.00 Rp
6.12.2 Tenaga 22,770.00 Rp
0.36 OH Pekerja 40,000.00 Rp 14,400.00 Rp
0.12 OH Tukang Batu 55,000.00 Rp 6,600.00 Rp
0.012 OH Kepala Tukang 65,000.00 Rp 780.00 Rp
V 03-2837-2008
0.018 OH Mandor 55,000.00 Rp 990.00 Rp
6.14 1 m2 Memasang Plesteran 1 Pc : 3 Pp : Tebal 20mm 41,955.00 Rp
6.14.1 Bahan 18,540.00 Rp
10.368 Kg Portland Sement 1,250.00 Rp 12,960.00 Rp
0.031 m3 Pasir Pasang 180,000.00 Rp 5,580.00 Rp
6.14.2 Tenaga 23,415.00 Rp
0.26 OH Pekerja 40,000.00 Rp 10,400.00 Rp
0.2 OH Tukang Batu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang 65,000.00 Rp 1,300.00 Rp
0.013 OH Mandor 55,000.00 Rp 715.00 Rp
6.15 1 m2 Memasang Plesteran 1 Pc : 4 Pp : Tebal 20mm 45,670.00 Rp
6.15.1 Bahan 16,160.00 Rp
8.32 Kg Portland Sement 1,250.00 Rp 10,400.00 Rp
0.032 m3 Pasir Pasang 180,000.00 Rp 5,760.00 Rp
6.15.2 Tenaga 29,510.00 Rp
0.4 OH Pekerja 40,000.00 Rp 16,000.00 Rp
0.2 OH Tukang Batu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang 65,000.00 Rp 1,300.00 Rp
0.022 OH Mandor 55,000.00 Rp 1,210.00 Rp
6.16 1 m2 Memasang Plesteran 1 Pc : 5 Pp : Tebal 20mm 44,450.00 Rp
6.16.1 Bahan 14,940.00 Rp
6.912 Kg Portland Sement 1,250.00 Rp 8,640.00 Rp
0.035 m3 Pasir Pasang 180,000.00 Rp 6,300.00 Rp
6.16.2 Tenaga 29,510.00 Rp
0.4 OH Pekerja 40,000.00 Rp 16,000.00 Rp
0.2 OH Tukang Batu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang 65,000.00 Rp 1,300.00 Rp
0.022 OH Mandor 55,000.00 Rp 1,210.00 Rp
6.17 1 m2 Memasang Plesteran 1 Pc : 6 Pp : Tebal 20mm 43,350.00 Rp
6.17.1 Bahan 13,840.00 Rp
5.888 Kg Portland Sement 1,250.00 Rp 7,360.00 Rp
0.036 m3 Pasir Pasang 180,000.00 Rp 6,480.00 Rp
6.17.2 Tenaga 29,510.00 Rp
0.4 OH Pekerja 40,000.00 Rp 16,000.00 Rp
0.2 OH Tukang Batu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang 65,000.00 Rp 1,300.00 Rp
0.022 OH Mandor 55,000.00 Rp 1,210.00 Rp
6.18 1 m2 Memasang Plesteran 1 SM : 2 Kp : 2 Pp Tebal 20mm 39,135.00 Rp
6.18.1 Bahan 6,795.00 Rp
0.009 Kg Semen Merah 170,000.00 Rp 1,530.00 Rp
0.009 m3 Kapur Padam 225,000.00 Rp 2,025.00 Rp
0.018 m3 Pasir Pasang 180,000.00 Rp 3,240.00 Rp
6.18.2 Tenaga 32,340.00 Rp
0.44 OH Pekerja 40,000.00 Rp 17,600.00 Rp
0.22 OH Tukang Batu 55,000.00 Rp 12,100.00 Rp
0.022 OH Kepala Tukang 65,000.00 Rp 1,430.00 Rp
0.022 OH Mandor 55,000.00 Rp 1,210.00 Rp
6.19 1 m2 Memasang Berapen 1Pc : 5 Pp Tebal 15mm 22,245.00 Rp
6.19.1 Bahan 11,160.00 Rp
5.184 Kg Portland Semen 1,250.00 Rp 6,480.00 Rp
0.026 m3 Pasir Pasang 180,000.00 Rp 4,680.00 Rp
6.19.2 Tenaga 11,085.00 Rp
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.075 OH Tukang Batu 55,000.00 Rp 4,125.00 Rp
0.008 OH Kepala Tukang 65,000.00 Rp 520.00 Rp
0.008 OH Mandor 55,000.00 Rp 440.00 Rp
6.20 1 m2 Memasang Plesteran Skoning 1Pc : 2 Pp Lebar 10mm 30,985.00 Rp
6.20.1 Bahan 2,965.00 Rp
0.5 Kg Portland Semen 1,250.00 Rp 625.00 Rp
0.013 m3 Pasir Pasang 180,000.00 Rp 2,340.00 Rp
6.20.2 Tenaga 28,020.00 Rp
0.08 OH Pekerja 40,000.00 Rp 3,200.00 Rp
0.4 OH Tukang Batu 55,000.00 Rp 22,000.00 Rp
0.04 OH Kepala Tukang 65,000.00 Rp 2,600.00 Rp
0.004 OH Mandor 55,000.00 Rp 220.00 Rp
6.23 1 m2 Memasang Plesteran Ciprat 1Pc : 2Pp 25,455.00 Rp
6.23.1 Bahan 6,480.00 Rp
4.32 Kg Portland Semen 1,250.00 Rp 5,400.00 Rp
0.006 m3 Pasir Pasang 180,000.00 Rp 1,080.00 Rp
6.23.2 Tenaga 18,975.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.1 OH Tukang Batu 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.24 1 m2 Memasang Finishing Siar Pasangan Dinding Bata Merah (=20 m') 14,970.00 Rp
6.24.1 Bahan 3,885.00 Rp
3.108 Kg Portland Semen 1,250.00 Rp 3,885.00 Rp
6.14.2 Tenaga 11,085.00 Rp
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.075 OH Tukang Batu 55,000.00 Rp 4,125.00 Rp
0.008 OH Kepala Tukang 65,000.00 Rp 520.00 Rp
0.008 OH Mandor 55,000.00 Rp 440.00 Rp
V 03-2837-2008
6.25 1 m2 Memasang Finishing Siar Pasangan Dinding Conblok Ekspose (=8 m') 7,205.00 Rp
6.25.1 Bahan 2,000.00 Rp
1.6 Kg Portland Semen 1,250.00 Rp 2,000.00 Rp
6.25.2 Tenaga 5,205.00 Rp
0.07 OH Pekerja 40,000.00 Rp 2,800.00 Rp
0.035 OH Tukang Batu 55,000.00 Rp 1,925.00 Rp
0.004 OH Kepala Tukang 65,000.00 Rp 260.00 Rp
0.004 OH Mandor 55,000.00 Rp 220.00 Rp
6.26 1 m2 Memasang Finishing Siar Pas Batu Kali Adukan 1 Pc : 2 Pp 32,135.00 Rp
6.26.1 Bahan 10,085.00 Rp
6.34 Kg Pc 1,250.00 Rp 7,925.00 Rp
0.012 m3 PP 180,000.00 Rp 2,160.00 Rp
6.26.2 Tenaga 22,050.00 Rp
0.3 OH Pekerja 40,000.00 Rp 12,000.00 Rp
0.15 OH Tukang Batu 55,000.00 Rp 8,250.00 Rp
0.015 OH Kepala Tukang 65,000.00 Rp 975.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6.27 1 m2 Memasang Acian 18,762.50 Rp
6.27.1 Bahan 4,062.50 Rp
3.25 Kg Portland Semen 1,250.00 Rp 4,062.50 Rp
6.27.2 Tenaga 14,700.00 Rp
0.2 OH Pekerja 40,000.00 Rp 8,000.00 Rp
0.1 OH Tukang Batu 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.01 OH Mandor 55,000.00 Rp 550.00 Rp
PEKERJAAN KAYU
6.1 1 m3 Membuat Kosen Pintu dan Jendela Kayu Kelas I 23,628,875.00 Rp
6.1.1 Bahan 22,038,125.00 Rp
1.1 m3 Kayu Klas I (Jati), Balok 20,000,000.00 Rp 22,000,000.00 Rp
1.25 Kg Paku Biasa 2" - 5" 14,500.00 Rp 18,125.00 Rp
1 Kg Lem Kayu 20,000.00 Rp 20,000.00 Rp
6.1.2 Tenaga 1,590,750.00 Rp
7 OH Pekerja 40,000.00 Rp 280,000.00 Rp
21 OH Tukang Kayu 55,000.00 Rp 1,155,000.00 Rp
2.1 OH Kepala Tukang 65,000.00 Rp 136,500.00 Rp
0.35 OH Mandor 55,000.00 Rp 19,250.00 Rp
6.2 1 m3 Membuat Kosen Pintu dan Jendela Kayu Kelas II atau III 9,921,625.00 Rp
6.2.1 Bahan 8,558,125.00 Rp
1.2 m3 Kayu Klas II (Kamfer), Balok 7,100,000.00 Rp 8,520,000.00 Rp
1.25 Kg Paku Biasa 2" - 5" 14,500.00 Rp 18,125.00 Rp
1 Kg Lem Kayu 20,000.00 Rp 20,000.00 Rp
6.2.2 Tenaga 1,363,500.00 Rp
6 OH Pekerja 40,000.00 Rp 240,000.00 Rp
18 OH Tukang Kayu 55,000.00 Rp 990,000.00 Rp
1.8 OH Kepala Tukang 65,000.00 Rp 117,000.00 Rp
0.3 OH Mandor 55,000.00 Rp 16,500.00 Rp
6.3 1 m2 Membuat Pintu Klam Standart Kayu Klas II (Kayu Kamfer) 380,290.00 Rp
6.3.1 Bahan 300,725.00 Rp
0.04 m3 Kayu Klas II (Kamfer), Papan 7,500,000.00 Rp 300,000.00 Rp
0.05 Kg Paku Biasa 2" - 5" 14,500.00 Rp 725.00 Rp
6.3.2 Tenaga 79,565.00 Rp
0.35 OH Pekerja 40,000.00 Rp 14,000.00 Rp
1.05 OH Tukang Kayu 55,000.00 Rp 57,750.00 Rp
0.105 OH Kepala Tukang 65,000.00 Rp 6,825.00 Rp
0.018 OH Mandor 55,000.00 Rp 990.00 Rp
6.5 1 m2 Membuat Daun Pintu Panel Kayu Klas I atau II 528,250.00 Rp
6.5.1 Bahan 301,000.00 Rp
0.04 m3 Kayu Klas II (Kamfer), Papan 7,500,000.00 Rp 300,000.00 Rp
0.05 Kg Lem Kayu 20,000.00 Rp 1,000.00 Rp
6.5.2 Tenaga 227,250.00 Rp
1 OH Pekerja 40,000.00 Rp 40,000.00 Rp
3 OH Tukang Kayu 55,000.00 Rp 165,000.00 Rp
0.3 OH Kepala Tukang 65,000.00 Rp 19,500.00 Rp
0.05 OH Mandor 55,000.00 Rp 2,750.00 Rp
6.6 1 m2 Membuat Pintu dan Jendela Kaca Kayu Klas I atau II 367,800.00 Rp
6.6.1 Bahan 186,000.00 Rp
0.024 m3 Kayu Klas II (Kamfer), Papan 7,500,000.00 Rp 180,000.00 Rp
0.3 Kg Lem Kayu 20,000.00 Rp 6,000.00 Rp
6.6.2 Tenaga 181,800.00 Rp
0.8 OH Pekerja 40,000.00 Rp 32,000.00 Rp
2.4 OH Tukang Kayu 55,000.00 Rp 132,000.00 Rp
0.24 OH Kepala Tukang 65,000.00 Rp 15,600.00 Rp
0.04 OH Mandor 55,000.00 Rp 2,200.00 Rp
6.7 1 m2 Membuat Pintu dan Jendela Jalusi Kayu Klas I atau II 1,645,250.00 Rp
6.7.1 Bahan 1,418,000.00 Rp
0.064 m3 Kayu Klas I (Jati), Papan 22,000,000.00 Rp 1,408,000.00 Rp
0.5 Kg Lem Kayu 20,000.00 Rp 10,000.00 Rp
6.7.2 Tenaga 227,250.00 Rp
1 OH Pekerja 40,000.00 Rp 40,000.00 Rp
3 OH Tukang Kayu 55,000.00 Rp 165,000.00 Rp
0.3 OH Kepala Tukang 65,000.00 Rp 19,500.00 Rp
0.05 OH Mandor 55,000.00 Rp 2,750.00 Rp
V
VI
03-2837-2008
03-3434-2008
6.8 1 m2 Membuat Pintu Kayu Lapis (Plywood) Rangkap Rangka Kayu Klas II (lbr s/d 90cm) 417,010.00 Rp
6.8.1 Bahan 257,935.00 Rp
0.025 m3 Kayu Klas II (Kamfer), Papan 7,500,000.00 Rp 187,500.00 Rp
0.03 Kg Paku Biasa 1/2" - 1" 14,500.00 Rp 435.00 Rp
0.5 Ltr Lem Kayu 20,000.00 Rp 10,000.00 Rp
1 Lbr Plywood Tebal 4mm Uk. 90x220cm 60,000.00 Rp 60,000.00 Rp
6.8.2 Tenaga 159,075.00 Rp
0.7 OH Pekerja 40,000.00 Rp 28,000.00 Rp
2.1 OH Tukang Kayu 55,000.00 Rp 115,500.00 Rp
0.21 OH Kepala Tukang 65,000.00 Rp 13,650.00 Rp
0.035 OH Mandor 55,000.00 Rp 1,925.00 Rp
6.9 1 m2 Membuat Pintu Plywood Rangkap, Rangka Ekspose Kayu Klas I atau II 444,235.00 Rp
6.9.1 Bahan 262,435.00 Rp
0.0256 m3 Kayu Klas II (Kamfer), Papan 7,500,000.00 Rp 192,000.00 Rp
0.03 Kg Paku Biasa 1/2" - 1" 14,500.00 Rp 435.00 Rp
0.5 Ltr Lem Kayu 20,000.00 Rp 10,000.00 Rp
1 Lbr Plywood Tebal 4mm Uk. 90x220cm 60,000.00 Rp 60,000.00 Rp
6.9.2 Tenaga 181,800.00 Rp
0.8 OH Pekerja 40,000.00 Rp 32,000.00 Rp
2.4 OH Tukang Kayu 55,000.00 Rp 132,000.00 Rp
0.24 OH Kepala Tukang 65,000.00 Rp 15,600.00 Rp
0.04 OH Mandor 55,000.00 Rp 2,200.00 Rp
6.10 1 m2 Membuat Jalusi Mati Kosen Kayu Klas I atau II 1,490,400.00 Rp
6.10.1 Bahan 1,322,175.00 Rp
0.06 m3 Kayu Klas I (Jati), Papan 22,000,000.00 Rp 1,320,000.00 Rp
0.15 Kg Paku Biasa 1/2" - 1" 14,500.00 Rp 2,175.00 Rp
6.10.2 Tenaga 168,225.00 Rp
0.67 OH Pekerja 40,000.00 Rp 26,800.00 Rp
2 OH Tukang Kayu 55,000.00 Rp 110,000.00 Rp
0.2 OH Kepala Tukang 65,000.00 Rp 13,000.00 Rp
0.335 OH Mandor 55,000.00 Rp 18,425.00 Rp
6.11 1 m2 Membuat Pintu Teakwood Rangkap, Rangka Ekspose Kayu Klas I 798,235.00 Rp
6.11.1 Bahan 616,435.00 Rp
0.025 m3 Kayu Klas I (Jati), Papan 22,000,000.00 Rp 550,000.00 Rp
0.03 Kg Paku Biasa 1/2" - 1" 14,500.00 Rp 435.00 Rp
0.3 Ltr Lem Kayu 20,000.00 Rp 6,000.00 Rp
1 Lbr Teakwood (90x220) cm x 4mm 60,000.00 Rp 60,000.00 Rp
6.11.2 Tenaga 181,800.00 Rp
0.8 OH Pekerja 40,000.00 Rp 32,000.00 Rp
2.4 OH Tukang Kayu 55,000.00 Rp 132,000.00 Rp
0.24 OH Kepala Tukang 65,000.00 Rp 15,600.00 Rp
0.04 OH Mandor 55,000.00 Rp 2,200.00 Rp
6.12 1 m2 Membuat Pint Teakwood Rangkap Lapis Formika, Rangka Ekspose Kayu Klas II 472,725.00 Rp
6.12.1 Bahan 279,535.00 Rp
0.025 m3 Kayu Klas II (Kamfer), Papan 7,500,000.00 Rp 187,500.00 Rp
0.03 Kg Paku Biasa 1/2" - 1" 14,500.00 Rp 435.00 Rp
0.08 Ltr Lem Kayu 20,000.00 Rp 1,600.00 Rp
1 Lbr Teakwood (90x220) cm x 4mm 60,000.00 Rp 60,000.00 Rp
0.5 Lbr Formika 60,000.00 Rp 30,000.00 Rp
6.12.2 Tenaga 193,190.00 Rp
0.85 OH Pekerja 40,000.00 Rp 34,000.00 Rp
2.55 OH Tukang Kayu 55,000.00 Rp 140,250.00 Rp
0.255 OH Kepala Tukang 65,000.00 Rp 16,575.00 Rp
0.043 OH Mandor 55,000.00 Rp 2,365.00 Rp
6.13 1 m3 Memasang Konstruksi Kuda-kuda Konvensional, Kayu Klas I; II & III Bentang 6 m 9,010,200.00 Rp
6.13.1 Bahan 8,101,200.00 Rp
1.1 m3 Kayu Kamfer Balok 7,100,000.00 Rp 7,810,000.00 Rp
15 Kg Besi Strip 14,000.00 Rp 210,000.00 Rp
5.6 Kg Paku Biasa 2" - 5" 14,500.00 Rp 81,200.00 Rp
6.13.2 Tenaga 909,000.00 Rp
4 OH Pekerja 40,000.00 Rp 160,000.00 Rp
12 OH Tukang Kayu 55,000.00 Rp 660,000.00 Rp
1.2 OH Kepala Tukang 65,000.00 Rp 78,000.00 Rp
0.2 OH Mandor 55,000.00 Rp 11,000.00 Rp
6.14 1 m3 Memasang Konstruksi Kuda-kuda Ekspose, Kayu klas I 25,813,775.00 Rp
6.14.1 Bahan 24,291,200.00 Rp
1.2 m3 Kayu Klas I (Jati) Balok 20,000,000.00 Rp 24,000,000.00 Rp
15 Kg Besi Strip 14,000.00 Rp 210,000.00 Rp
5.6 Kg Paku Biasa 2" - 5" 14,500.00 Rp 81,200.00 Rp
6.14.2 Tenaga 1,522,575.00 Rp
6.7 OH Pekerja 40,000.00 Rp 268,000.00 Rp
20.1 OH Tukang Kayu 55,000.00 Rp 1,105,500.00 Rp
2.01 OH Kepala Tukang 65,000.00 Rp 130,650.00 Rp
0.335 OH Mandor 55,000.00 Rp 18,425.00 Rp
6.15 1 m3 Memasang Konstruksi Gording, kayu klas II 8,608,900.00 Rp
6.15.1 Bahan 8,063,500.00 Rp
1.1 m3 Kayu Klas I (Kamfer) Balok 7,100,000.00 Rp 7,810,000.00 Rp
15 Kg Besi Strip 14,000.00 Rp 210,000.00 Rp
3 Kg Paku Biasa 2" - 5" 14,500.00 Rp 43,500.00 Rp
6.15.2 Tenaga 545,400.00 Rp
2.4 OH Pekerja 40,000.00 Rp 96,000.00 Rp
7.2 OH Tukang Kayu 55,000.00 Rp 396,000.00 Rp
0.72 OH Kepala Tukang 65,000.00 Rp 46,800.00 Rp
VI 03-3434-2008
0.12 OH Mandor 55,000.00 Rp 6,600.00 Rp
6.16 1 m2 Memasang Rangka Atap Genteng Keramik, Kayu Klas II 139,010.00 Rp
6.16.1 Bahan 128,585.00 Rp
0.014 m3 Kayu Klas II (Kamfer), Kaso-kaso (5x7)cm 7,100,000.00 Rp 99,400.00 Rp
0.0036 Kg Reng (2x3) cm 7,100,000.00 Rp 25,560.00 Rp
0.25 Kg Paku Biasa 2" - 5" 14,500.00 Rp 3,625.00 Rp
6.16.2 Tenaga 10,425.00 Rp
0.1 OH Pekerja 40,000.00 Rp 4,000.00 Rp
0.1 OH Tukang Kayu 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.17 1 m2 Memasang Rangka Atap Genteng Beton, Kayu Klas II 164,570.00 Rp
6.17.1 Bahan 154,145.00 Rp
0.014 m3 Kayu Klas II (Kamfer), Kaso-kaso (5x7)cm 7,100,000.00 Rp 99,400.00 Rp
0.0072 Kg Reng (2x3) cm 7,100,000.00 Rp 51,120.00 Rp
0.25 Kg Paku Biasa 2" - 5" 14,500.00 Rp 3,625.00 Rp
6.17.2 Tenaga 10,425.00 Rp
0.1 OH Pekerja 40,000.00 Rp 4,000.00 Rp
0.1 OH Tukang Kayu 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.18 1 m2 Memasang Rangka Atap Sirap, Kayu Klas II 1,186,910.00 Rp
6.18.1 Bahan 1,174,400.00 Rp
0.165 m3 Kayu Klas II (Kamfer), Balok 7,100,000.00 Rp 1,171,500.00 Rp
0.2 Kg Paku Biasa 2" - 5" 14,500.00 Rp 2,900.00 Rp
6.18.2 Tenaga 12,510.00 Rp
0.12 OH Pekerja 40,000.00 Rp 4,800.00 Rp
0.12 OH Tukang Kayu 55,000.00 Rp 6,600.00 Rp
0.012 OH Kepala Tukang 65,000.00 Rp 780.00 Rp
0.006 OH Mandor 55,000.00 Rp 330.00 Rp
6.19 1 m2 Memasang Rangka Langit-langit (1,00 x 1,00)m, Kayu klas II atau III 140,815.00 Rp
6.19.1 Bahan 112,240.00 Rp
0.0154 m3 Kayu Klas II (Kamfer), Balok 7,100,000.00 Rp 109,340.00 Rp
0.2 Kg Paku Biasa 2" - 5" 14,500.00 Rp 2,900.00 Rp
6.19.2 Tenaga 28,575.00 Rp
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.3 OH Tukang Kayu 55,000.00 Rp 16,500.00 Rp
0.03 OH Kepala Tukang 65,000.00 Rp 1,950.00 Rp
0.075 OH Mandor 55,000.00 Rp 4,125.00 Rp
6.20 1 m2 Memasang Rangka Langit-langit (60 x 60)m, Kayu klas II atau III 146,355.00 Rp
6.20.1 Bahan 119,355.00 Rp
0.0163 m3 Kayu Klas II (Kamfer), Balok 7,100,000.00 Rp 115,730.00 Rp
0.25 Kg Paku Biasa 2" - 5" 14,500.00 Rp 3,625.00 Rp
6.20.2 Tenaga 27,000.00 Rp
0.2 OH Pekerja 40,000.00 Rp 8,000.00 Rp
0.3 OH Tukang Kayu 55,000.00 Rp 16,500.00 Rp
0.03 OH Kepala Tukang 65,000.00 Rp 1,950.00 Rp
0.01 OH Mandor 55,000.00 Rp 550.00 Rp
6.21 1 m' Memasang Listplank Uk (3x20)cm Kayu klas I atau II 255,625.00 Rp
6.21.1 Bahan 239,050.00 Rp
0.0108 m3 Kayu Klas I (Jati) Papan 22,000,000.00 Rp 237,600.00 Rp
0.1 Kg Paku Biasa 2" - 5" 14,500.00 Rp 1,450.00 Rp
6.21.2 Tenaga 16,575.00 Rp
0.1 OH Pekerja 40,000.00 Rp 4,000.00 Rp
0.2 OH Tukang Kayu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang 65,000.00 Rp 1,300.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.22 1 m' Memasang Listplank Uk (3x30)cm Kayu klas I atau II 99,800.00 Rp
6.22.1 Bahan 83,225.00 Rp
0.011 m3 Kayu Klas II (Kamfer) Papan 7,500,000.00 Rp 82,500.00 Rp
0.05 Kg Paku Biasa 2" - 5" 14,500.00 Rp 725.00 Rp
6.22.2 Tenaga 16,575.00 Rp
0.1 OH Pekerja 40,000.00 Rp 4,000.00 Rp
0.2 OH Tukang Kayu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang 65,000.00 Rp 1,300.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.23 1 m2 Memasang Rangka Dinding Pemisah (60x120)cm, Kayu klas II atau III 235,090.00 Rp
6.23.1 Bahan 200,975.00 Rp
0.028 m3 Kayu Klas II (Kamfer) Balok 7,100,000.00 Rp 198,800.00 Rp
0.15 Kg Paku Biasa 2" - 5" 14,500.00 Rp 2,175.00 Rp
6.23.2 Tenaga 34,115.00 Rp
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.45 OH Tukang Kayu 55,000.00 Rp 24,750.00 Rp
0.045 OH Kepala Tukang 65,000.00 Rp 2,925.00 Rp
0.008 OH Mandor 55,000.00 Rp 440.00 Rp
6.24 1 m2 Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II 297,890.00 Rp
6.24.1 Bahan 263,775.00 Rp
0.028 m3 Kayu Klas II (Kamfer), Balok 7,100,000.00 Rp 198,800.00 Rp
0.15 Kg Paku Biasa 2" - 5" 14,500.00 Rp 2,175.00 Rp
0.86 Lbr Teakwood 120x240 Tebal 4mm 60,000.00 Rp 51,600.00 Rp
0.56 Ltr Lem 20,000.00 Rp 11,200.00 Rp
6.24.2 Tenaga 34,115.00 Rp
VI 03-3434-2008
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.45 OH Tukang Kayu 55,000.00 Rp 24,750.00 Rp
0.045 OH Kepala Tukang 65,000.00 Rp 2,925.00 Rp
0.008 OH Mandor 55,000.00 Rp 440.00 Rp
6.26 1 m2 Memasang Dinding Lambriziring dari Papan Klas I 293,825.00 Rp
6.26.1 Bahan 157,475.00 Rp
0.007 m3 Kayu Klas I (Jati) Papan 22,000,000.00 Rp 154,000.00 Rp
0.1 Kg Paku Biasa 2" - 5" 14,500.00 Rp 1,450.00 Rp
0.15 Lbr Paku Skrup 3,5" 13,500.00 Rp 2,025.00 Rp
6.26.2 Tenaga 136,350.00 Rp
0.6 OH Pekerja 40,000.00 Rp 24,000.00 Rp
1.8 OH Tukang Kayu 55,000.00 Rp 99,000.00 Rp
0.18 OH Kepala Tukang 65,000.00 Rp 11,700.00 Rp
0.03 OH Mandor 55,000.00 Rp 1,650.00 Rp
6.27 1 m2 Memasang Dinding Lambriziring Dari Plywood Ukurang (120x240) cm 30,425.00 Rp
6.27.1 Bahan 24,725.00 Rp
0.4 Lbr Plywood (120 x 240) cm x 4mm 60,000.00 Rp 24,000.00 Rp
0.05 Kg Paku Biasa 1/2" - 1" 14,500.00 Rp 725.00 Rp
6.27.2 Tenaga 5,700.00 Rp
0.025 OH Pekerja 40,000.00 Rp 1,000.00 Rp
0.075 OH Tukang Kayu 55,000.00 Rp 4,125.00 Rp
0.008 OH Kepala Tukang 65,000.00 Rp 520.00 Rp
0.001 OH Mandor 55,000.00 Rp 55.00 Rp
6.28 1 m2 Memasang Dinding Bilik, Rangka Kayu Klas III atau IV 112,239.00 Rp
6.28.1 Bahan 104,889.00 Rp
1.5 m2 Bilik Bambu 25,000.00 Rp 37,500.00 Rp
0.014 m3 Kayu Klas III (Meranti) 4,800,000.00 Rp 67,200.00 Rp
0.012 Kg Paku Biasa 1/2" - 1" 14,500.00 Rp 174.00 Rp
0.003 m' List Kayu 2/4 5,000.00 Rp 15.00 Rp
6.28.2 Tenaga 7,350.00 Rp
0.1 OH Pekerja 40,000.00 Rp 4,000.00 Rp
0.05 OH Tukang Kayu 55,000.00 Rp 2,750.00 Rp
0.005 OH Kepala Tukang 65,000.00 Rp 325.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6 PEKERJAAN BETON
6.1 1 m3 Membuat Beton Mutu f' c= 7.4 Mpa (K100), slum (12 2)cm, w/c = 0.87 669,036.76 Rp
6.1.1 Bahan 581,526.76 Rp
247 Kg Porland Semen 1,250.00 Rp 308,750.00 Rp
869 Kg Pasir Beton 150.00 Rp 130,350.00 Rp
999 Kg Kerikil (maksimum 30 mm) 140.74 Rp 140,599.26 Rp
215 Ltr Air 8.50 Rp 1,827.50 Rp
6.1.2 Tenaga 87,510.00 Rp
1.65 OH Pekerja 40,000.00 Rp 66,000.00 Rp
0.275 OH Tukang Kayu 55,000.00 Rp 15,125.00 Rp
0.028 OH Kepala Tukang 65,000.00 Rp 1,820.00 Rp
0.083 OH Mandor 55,000.00 Rp 4,565.00 Rp
6.2 1 m3 Membuat Beton Mutu f' c= 9.8 Mpa (K125), slum (12 2)cm, w/c = 0.78 700,966.38 Rp
6.2.1 Bahan 613,456.38 Rp
276 Kg Porland Semen 1,250.00 Rp 345,000.00 Rp
828 Kg Pasir Beton 150.00 Rp 124,200.00 Rp
1012 Kg Kerikil (maksimum 30 mm) 140.74 Rp 142,428.88 Rp
215 Ltr Air 8.50 Rp 1,827.50 Rp
6.2.2 Tenaga 87,510.00 Rp
1.65 OH Pekerja 40,000.00 Rp 66,000.00 Rp
0.275 OH Tukang Kayu 55,000.00 Rp 15,125.00 Rp
0.028 OH Kepala Tukang 65,000.00 Rp 1,820.00 Rp
0.083 OH Mandor 55,000.00 Rp 4,565.00 Rp
6.3 1 m3 Membuat Beton Mutu f' c= 12.2 Mpa (K150), slum (12 2)cm, w/c = 0.72 726,070.08 Rp
6.3.1 Bahan 638,560.08 Rp
299 Kg Porland Semen 1,250.00 Rp 373,750.00 Rp
799 Kg Pasir Beton 150.00 Rp 119,850.00 Rp
1017 Kg Kerikil (maksimum 30 mm) 140.74 Rp 143,132.58 Rp
215 Ltr Air 8.50 Rp 1,827.50 Rp
6.3.2 Tenaga 87,510.00 Rp
1.65 OH Pekerja 40,000.00 Rp 66,000.00 Rp
0.275 OH Tukang Kayu 55,000.00 Rp 15,125.00 Rp
0.028 OH Kepala Tukang 65,000.00 Rp 1,820.00 Rp
0.083 OH Mandor 55,000.00 Rp 4,565.00 Rp
6.4 1 m3 Membuat Lantai Kerja Beton Mutu f' c = 7.4 Mpa (K100), slum (3-6) cm, w/ c = 0.87 628,319.98 Rp
6.4.1 Bahan 567,689.98 Rp
230 Kg Porland Semen 1,250.00 Rp 287,500.00 Rp
893 Kg Pasir Beton 150.00 Rp 133,950.00 Rp
1027 Kg Kerikil (maksimum 30 mm) 140.74 Rp 144,539.98 Rp
200 Ltr Air 8.50 Rp 1,700.00 Rp
6.4.2 Tenaga 60,630.00 Rp
1.2 OH Pekerja 40,000.00 Rp 48,000.00 Rp
0.2 OH Tukang Kayu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang 65,000.00 Rp 1,300.00 Rp
0.006 OH Mandor 55,000.00 Rp 330.00 Rp
6.5 1 m3 Membuat Beton Mutu f' c= 14.5 Mpa (K175), slum (12 2)cm, w/c = 0.66 755,658.96 Rp
6.5.1 Bahan 668,148.96 Rp
326 Kg Porland Semen 1,250.00 Rp 407,500.00 Rp
760 Kg Pasir Beton 150.00 Rp 114,000.00 Rp
1029 Kg Kerikil (maksimum 30 mm) 140.74 Rp 144,821.46 Rp
VI
VII
03-3434-2008
03-7394-2008
215 Ltr Air 8.50 Rp 1,827.50 Rp
6.5.2 Tenaga 87,510.00 Rp
1.65 OH Pekerja 40,000.00 Rp 66,000.00 Rp
0.275 OH Tukang Kayu 55,000.00 Rp 15,125.00 Rp
0.028 OH Kepala Tukang 65,000.00 Rp 1,820.00 Rp
0.083 OH Mandor 55,000.00 Rp 4,565.00 Rp
6.6 1 m3 Membuat Beton Mutu f' c= 16.9 Mpa (K200), slum (12 2)cm, w/c = 0.61 784,090.44 Rp
6.6.1 Bahan 696,580.44 Rp
352 Kg Porland Semen 1,250.00 Rp 440,000.00 Rp
731 Kg Pasir Beton 150.00 Rp 109,650.00 Rp
1031 Kg Kerikil (maksimum 30 mm) 140.74 Rp 145,102.94 Rp
215 Ltr Air 8.50 Rp 1,827.50 Rp
6.6.2 Tenaga 87,510.00 Rp
1.65 OH Pekerja 40,000.00 Rp 66,000.00 Rp
0.275 OH Tukang Kayu 55,000.00 Rp 15,125.00 Rp
0.028 OH Kepala Tukang 65,000.00 Rp 1,820.00 Rp
0.083 OH Mandor 55,000.00 Rp 4,565.00 Rp
6.7 1 m3 Membuat Beton Mutu f' c= 19.3 Mpa (K225), slum (12 2)cm, w/c = 0.58 805,142.28 Rp
6.7.1 Bahan 717,632.28 Rp
371 Kg Porland Semen 1,250.00 Rp 463,750.00 Rp
698 Kg Pasir Beton 150.00 Rp 104,700.00 Rp
1047 Kg Kerikil (maksimum 30 mm) 140.74 Rp 147,354.78 Rp
215 Ltr Air 8.50 Rp 1,827.50 Rp
6.7.2 Tenaga 87,510.00 Rp
1.65 OH Pekerja 40,000.00 Rp 66,000.00 Rp
0.275 OH Tukang Kayu 55,000.00 Rp 15,125.00 Rp
0.028 OH Kepala Tukang 65,000.00 Rp 1,820.00 Rp
0.083 OH Mandor 55,000.00 Rp 4,565.00 Rp
6.8 1 m3 Membuat Beton Mutu f' c= 21.7 Mpa (K250), slum (12 2)cm, w/c = 0.56 819,366.36 Rp
6.8.1 Bahan 731,856.36 Rp
384 Kg Porland Semen 1,250.00 Rp 480,000.00 Rp
692 Kg Pasir Beton 150.00 Rp 103,800.00 Rp
1039 Kg Kerikil (maksimum 30 mm) 140.74 Rp 146,228.86 Rp
215 Ltr Air 8.50 Rp 1,827.50 Rp
6.8.2 Tenaga 87,510.00 Rp
1.65 OH Pekerja 40,000.00 Rp 66,000.00 Rp
0.275 OH Tukang Kayu 55,000.00 Rp 15,125.00 Rp
0.028 OH Kepala Tukang 65,000.00 Rp 1,820.00 Rp
0.083 OH Mandor 55,000.00 Rp 4,565.00 Rp
6.9 1 m3 Membuat Lantai Kerja Beton Mutu f' c = 24.0 Mpa (K275), slum (12 2) cm, w/ c = 0.53 843,836.74 Rp
6.9.1 Bahan 756,326.74 Rp
406 Kg Porland Semen 1,250.00 Rp 507,500.00 Rp
684 Kg Pasir Beton 150.00 Rp 102,600.00 Rp
1026 Kg Kerikil (maksimum 30 mm) 140.74 Rp 144,399.24 Rp
215 Ltr Air 8.50 Rp 1,827.50 Rp
6.9.2 Tenaga 87,510.00 Rp
1.65 OH Pekerja 40,000.00 Rp 66,000.00 Rp
0.275 OH Tukang Kayu 55,000.00 Rp 15,125.00 Rp
0.028 OH Kepala Tukang 65,000.00 Rp 1,820.00 Rp
0.083 OH Mandor 55,000.00 Rp 4,565.00 Rp
6.10 1 m3 Membuat Beton Mutu f' c= 26.4 Mpa (K300), slum (12 2)cm, w/c = 0.52 851,433.04 Rp
6.10.1 Bahan 763,923.04 Rp
413 Kg Porland Semen 1,250.00 Rp 516,250.00 Rp
681 Kg Pasir Beton 150.00 Rp 102,150.00 Rp
1021 Kg Kerikil (maksimum 30 mm) 140.74 Rp 143,695.54 Rp
215 Ltr Air 8.50 Rp 1,827.50 Rp
6.10.2 Tenaga 87,510.00 Rp
1.65 OH Pekerja 40,000.00 Rp 66,000.00 Rp
0.275 OH Tukang Kayu 55,000.00 Rp 15,125.00 Rp
0.028 OH Kepala Tukang 65,000.00 Rp 1,820.00 Rp
0.083 OH Mandor 55,000.00 Rp 4,565.00 Rp
6.11 1 m3 Membuat Beton Mutu f' c= 28.8 Mpa (K325), slum (12 2)cm, w/c = 0.49 903,961.94 Rp
6.11.1 Bahan 792,661.94 Rp
439 Kg Porland Semen 1,250.00 Rp 548,750.00 Rp
670 Kg Pasir Beton 150.00 Rp 100,500.00 Rp
1006 Kg Kerikil (maksimum 30 mm) 140.74 Rp 141,584.44 Rp
215 Ltr Air 8.50 Rp 1,827.50 Rp
6.11.2 Tenaga 111,300.00 Rp
2.1 OH Pekerja 40,000.00 Rp 84,000.00 Rp
0.35 OH Tukang Kayu 55,000.00 Rp 19,250.00 Rp
0.035 OH Kepala Tukang 65,000.00 Rp 2,275.00 Rp
0.105 OH Mandor 55,000.00 Rp 5,775.00 Rp
6.12 1 m3 Membuat Beton Mutu f' c= 31.2 Mpa (K350), slum (12 2)cm, w/c = 0.48 913,917.50 Rp
6.12.1 Bahan 802,617.50 Rp
448 Kg Porland Semen 1,250.00 Rp 560,000.00 Rp
667 Kg Pasir Beton 150.00 Rp 100,050.00 Rp
1000 Kg Kerikil (maksimum 30 mm) 140.74 Rp 140,740.00 Rp
215 Ltr Air 8.50 Rp 1,827.50 Rp
6.12.2 Tenaga 111,300.00 Rp
2.1 OH Pekerja 40,000.00 Rp 84,000.00 Rp
0.35 OH Tukang Kayu 55,000.00 Rp 19,250.00 Rp
0.035 OH Kepala Tukang 65,000.00 Rp 2,275.00 Rp
0.105 OH Mandor 55,000.00 Rp 5,775.00 Rp
VII 03-7394-2008
6.17 1 Kg Pembesian Dengan Besi Polos atau Besi Ulir 119,975.00 Rp
6.17.1 Bahan 112,650.00 Rp
10.5 Kg Besi Beton (Polos/ Ulir) 10,500.00 Rp 110,250.00 Rp
0.15 Kg Kawat Beton 16,000.00 Rp 2,400.00 Rp
6.17.2 Tenaga 7,325.00 Rp
0.07 OH Pekerja 40,000.00 Rp 2,800.00 Rp
0.07 OH Tukang Kayu 55,000.00 Rp 3,850.00 Rp
0.007 OH Kepala Tukang 65,000.00 Rp 455.00 Rp
0.004 OH Mandor 55,000.00 Rp 220.00 Rp
6.18 1 Kg Kabel Presstred Polos/ strand 187,440.00 Rp
6.18.1 Bahan 182,200.00 Rp
10.5 Kg Besi Presstres Polos 17,200.00 Rp 180,600.00 Rp
0.1 Kg Kawat Beton 16,000.00 Rp 1,600.00 Rp
6.18.2 Tenaga 5,240.00 Rp
0.05 OH Pekerja 40,000.00 Rp 2,000.00 Rp
0.05 OH Tukang Kayu 55,000.00 Rp 2,750.00 Rp
0.005 OH Kepala Tukang 65,000.00 Rp 325.00 Rp
0.003 OH Mandor 55,000.00 Rp 165.00 Rp
6.19 1 Kg Jaring Kawat Baja/ wire mesh 19,170.00 Rp
6.19.1 Bahan 16,610.00 Rp
1.02 Kg Jaring Kawat Baja Dilas 15,500.00 Rp 15,810.00 Rp
0.05 Kg Kawat Beton 16,000.00 Rp 800.00 Rp
6.19.2 Tenaga 2,560.00 Rp
0.025 OH Pekerja 40,000.00 Rp 1,000.00 Rp
0.025 OH Tukang Kayu 55,000.00 Rp 1,375.00 Rp
0.002 OH Kepala Tukang 65,000.00 Rp 130.00 Rp
0.001 OH Mandor 55,000.00 Rp 55.00 Rp
6.20 1 m2 Memasang Bekisting Untuk Pondasi 87,570.00 Rp
6.20.1 Bahan 49,350.00 Rp
0.04 m3 Kayu Klas III (Terentang) 1,100,000.00 Rp 44,000.00 Rp
0.3 Kg Paku Biasa 2" - 5" 14,500.00 Rp 4,350.00 Rp
0.1 Ltr Minyak Bekistng 10,000.00 Rp 1,000.00 Rp
6.20.2 Tenaga 38,220.00 Rp
0.52 OH Pekerja 40,000.00 Rp 20,800.00 Rp
0.26 OH Tukang Kayu 55,000.00 Rp 14,300.00 Rp
0.026 OH Kepala Tukang 65,000.00 Rp 1,690.00 Rp
0.026 OH Mandor 55,000.00 Rp 1,430.00 Rp
6.21 1 m2 Memasang Bekisting Untuk Sloof 93,070.00 Rp
6.21.1 Bahan 54,850.00 Rp
0.045 m3 Kayu Klas III (Terentang) 1,100,000.00 Rp 49,500.00 Rp
0.3 Kg Paku Biasa 2" - 5" 14,500.00 Rp 4,350.00 Rp
0.1 Ltr Minyak Bekistng 10,000.00 Rp 1,000.00 Rp
6.21.2 Tenaga 38,220.00 Rp
0.52 OH Pekerja 40,000.00 Rp 20,800.00 Rp
0.26 OH Tukang Kayu 55,000.00 Rp 14,300.00 Rp
0.026 OH Kepala Tukang 65,000.00 Rp 1,690.00 Rp
0.026 OH Mandor 55,000.00 Rp 1,430.00 Rp
6.22 1 m2 Memasang Bekisting Untuk Kolom 277,310.00 Rp
6.22.1 Bahan 228,800.00 Rp
0.04 m3 Kayu Klas III (Terentang) 1,100,000.00 Rp 44,000.00 Rp
0.4 Kg Paku Biasa 2" - 5" 14,500.00 Rp 5,800.00 Rp
0.2 Ltr Minyak Bekistng 10,000.00 Rp 2,000.00 Rp
0.015 m3 Balok Kayu Klas II 5,400,000.00 Rp 81,000.00 Rp
0.35 Lbr Plywood Tebal 9mm 160,000.00 Rp 56,000.00 Rp
2 Btg Dolken Kayu Galam 8-10cm/ 4m 20,000.00 Rp 40,000.00 Rp
6.22.2 Tenaga 48,510.00 Rp
0.66 OH Pekerja 40,000.00 Rp 26,400.00 Rp
0.33 OH Tukang Kayu 55,000.00 Rp 18,150.00 Rp
0.033 OH Kepala Tukang 65,000.00 Rp 2,145.00 Rp
0.033 OH Mandor 55,000.00 Rp 1,815.00 Rp
6.23 1 m2 Memasang Bekisting Untuk Balok 293,510.00 Rp
6.23.1 Bahan 245,000.00 Rp
0.04 m3 Kayu Klas III (Terentang) 1,100,000.00 Rp 44,000.00 Rp
0.4 Kg Paku Biasa 2" - 5" 14,500.00 Rp 5,800.00 Rp
0.2 Ltr Minyak Bekistng 10,000.00 Rp 2,000.00 Rp
0.018 m3 Balok Kayu Klas II 5,400,000.00 Rp 97,200.00 Rp
0.35 Lbr Plywood Tebal 9mm 160,000.00 Rp 56,000.00 Rp
2 Btg Dolken Kayu Galam 8-10cm/ 4m 20,000.00 Rp 40,000.00 Rp
6.23.2 Tenaga 48,510.00 Rp
0.66 OH Pekerja 40,000.00 Rp 26,400.00 Rp
0.33 OH Tukang Kayu 55,000.00 Rp 18,150.00 Rp
0.033 OH Kepala Tukang 65,000.00 Rp 2,145.00 Rp
0.033 OH Mandor 55,000.00 Rp 1,815.00 Rp
6.24 1 m2 Memasang Bekisting Untuk Lantai 357,310.00 Rp
6.24.1 Bahan 308,800.00 Rp
0.04 m3 Kayu Klas III (Terentang) 1,100,000.00 Rp 44,000.00 Rp
0.4 Kg Paku Biasa 2" - 5" 14,500.00 Rp 5,800.00 Rp
0.2 Ltr Minyak Bekistng 10,000.00 Rp 2,000.00 Rp
0.015 m3 Balok Kayu Klas II (borneo) 5,400,000.00 Rp 81,000.00 Rp
0.35 Lbr Plywood Tebal 9mm 160,000.00 Rp 56,000.00 Rp
6 Btg Dolken Kayu Galam 8-10cm/ 4m 20,000.00 Rp 120,000.00 Rp
6.24.2 Tenaga 48,510.00 Rp
0.66 OH Pekerja 40,000.00 Rp 26,400.00 Rp
VII 03-7394-2008
0.33 OH Tukang Kayu 55,000.00 Rp 18,150.00 Rp
0.033 OH Kepala Tukang 65,000.00 Rp 2,145.00 Rp
0.033 OH Mandor 55,000.00 Rp 1,815.00 Rp
6.25 1 m2 Memasang Bekisting Untuk Dinding 335,310.00 Rp
6.25.1 Bahan 286,800.00 Rp
0.03 m3 Kayu Klas III (Terentang) 1,100,000.00 Rp 33,000.00 Rp
0.4 Kg Paku Biasa 2" - 5" 14,500.00 Rp 5,800.00 Rp
0.2 Ltr Minyak Bekistng 10,000.00 Rp 2,000.00 Rp
0.02 m3 Balok Kayu Klas II 5,400,000.00 Rp 108,000.00 Rp
0.35 Lbr Plywood Tebal 9mm 160,000.00 Rp 56,000.00 Rp
3 Btg Dolken Kayu Galam 8-10cm/ 4m 20,000.00 Rp 60,000.00 Rp
4 Buah Formite/ Penjaga Jarak/ Spacer (alat bantu) 5,500.00 Rp 22,000.00 Rp
6.25.2 Tenaga 48,510.00 Rp
0.66 OH Pekerja 40,000.00 Rp 26,400.00 Rp
0.33 OH Tukang Kayu 55,000.00 Rp 18,150.00 Rp
0.033 OH Kepala Tukang 65,000.00 Rp 2,145.00 Rp
0.033 OH Mandor 55,000.00 Rp 1,815.00 Rp
6.26 1 m2 Memasang Bekisting Untuk Tangga 265,810.00 Rp
6.26.1 Bahan 217,300.00 Rp
0.03 m3 Kayu Klas III (Terentang) 1,100,000.00 Rp 33,000.00 Rp
0.4 Kg Paku Biasa 2" - 5" 14,500.00 Rp 5,800.00 Rp
0.15 Ltr Minyak Bekistng 10,000.00 Rp 1,500.00 Rp
0.015 m3 Balok Kayu Klas II 5,400,000.00 Rp 81,000.00 Rp
0.35 Lbr Plywood Tebal 9mm 160,000.00 Rp 56,000.00 Rp
2 Btg Dolken Kayu Galam 8-10cm/ 4m 20,000.00 Rp 40,000.00 Rp
6.26.2 Tenaga 48,510.00 Rp
0.66 OH Pekerja 40,000.00 Rp 26,400.00 Rp
0.33 OH Tukang Kayu 55,000.00 Rp 18,150.00 Rp
0.033 OH Kepala Tukang 65,000.00 Rp 2,145.00 Rp
0.033 OH Mandor 55,000.00 Rp 1,815.00 Rp
6.27 1 m2 Memasang Jemabatan Cor 57,255.00 Rp
6.27.1 Bahan 47,740.00 Rp
0.0264 m3 Kayu Terentang 1,100,000.00 Rp 29,040.00 Rp
0.6 Kg Paku Biasa 2" - 5" 14,500.00 Rp 8,700.00 Rp
0.5 Btg Dolken Kayu Galam 8-10cm/ 4m 20,000.00 Rp 10,000.00 Rp
6.27.2 Tenaga 9,515.00 Rp
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.05 OH Tukang Kayu 55,000.00 Rp 2,750.00 Rp
0.005 OH Kepala Tukang 65,000.00 Rp 325.00 Rp
0.008 OH Mandor 55,000.00 Rp 440.00 Rp
6.28 1 m3 Membuat Pondasi Beton Bertulang (150kg Besi + Bekisting) 3,010,780.00 Rp
6.28.1 Bahan 2,622,800.00 Rp
0.2 m3 Kayu Klas III (Terentang) 1,100,000.00 Rp 220,000.00 Rp
1.5 Kg Paku Biasa 2" - 5" 14,500.00 Rp 21,750.00 Rp
0.4 Ltr Minyak Bekistng 10,000.00 Rp 4,000.00 Rp
157.5 Kg Besi Beton Polos 10,500.00 Rp 1,653,750.00 Rp
2.25 Kg Kawat Beton 16,000.00 Rp 36,000.00 Rp
336 Kg Portland Sement 1,250.00 Rp 420,000.00 Rp
0.54 m3 Pasir Beton 210,000.00 Rp 113,400.00 Rp
0.81 m3 Kerikil Beton 190,000.00 Rp 153,900.00 Rp
6.28.2 Tenaga 387,980.00 Rp
5.3 OH Pekerja 40,000.00 Rp 212,000.00 Rp
0.275 OH Tukang Batu 55,000.00 Rp 15,125.00 Rp
1.3 OH Tukang Kayu 55,000.00 Rp 71,500.00 Rp
1.05 OH Tukang Besi 55,000.00 Rp 57,750.00 Rp
0.262 OH Kepala Tukang 65,000.00 Rp 17,030.00 Rp
0.265 OH Mandor 55,000.00 Rp 14,575.00 Rp
6.29 1 m3 Membuat Sloof Beton Bertulang (200kg Besi + Bekisting) 3,712,785.00 Rp
6.29.1 Bahan 3,272,300.00 Rp
0.27 m3 Kayu Klas III (Terentang) 1,100,000.00 Rp 297,000.00 Rp
2 Kg Paku Biasa 2" - 5" 14,500.00 Rp 29,000.00 Rp
0.6 Ltr Minyak Bekistng 10,000.00 Rp 6,000.00 Rp
210 Kg Besi Beton Polos 10,500.00 Rp 2,205,000.00 Rp
3 Kg Kawat Beton 16,000.00 Rp 48,000.00 Rp
336 Kg Portland Sement 1,250.00 Rp 420,000.00 Rp
0.54 m3 Pasir Beton 210,000.00 Rp 113,400.00 Rp
0.81 m3 Kerikil Beton 190,000.00 Rp 153,900.00 Rp
6.29.2 Tenaga 440,485.00 Rp
5.65 OH Pekerja 40,000.00 Rp 226,000.00 Rp
0.275 OH Tukang Batu 55,000.00 Rp 15,125.00 Rp
1.56 OH Tukang Kayu 55,000.00 Rp 85,800.00 Rp
1.4 OH Tukang Besi 55,000.00 Rp 77,000.00 Rp
0.323 OH Kepala Tukang 65,000.00 Rp 20,995.00 Rp
0.283 OH Mandor 55,000.00 Rp 15,565.00 Rp
6.30 1 m3 Membuat Kolom Beton Bertulang (300kg Besi + Bekisting) 6,903,785.00 Rp
6.30.1 Bahan 6,354,800.00 Rp
0.4 m3 Kayu Klas III (Terentang) 1,100,000.00 Rp 440,000.00 Rp
4 Kg Paku Biasa 2" - 5" 14,500.00 Rp 58,000.00 Rp
2 Ltr Minyak Bekistng 10,000.00 Rp 20,000.00 Rp
315 Kg Besi Beton Polos 10,500.00 Rp 3,307,500.00 Rp
4.5 Kg Kawat Beton 16,000.00 Rp 72,000.00 Rp
336 Kg Portland Sement 1,250.00 Rp 420,000.00 Rp
0.54 m3 Pasir Beton 210,000.00 Rp 113,400.00 Rp
0.81 m3 Kerikil Beton 190,000.00 Rp 153,900.00 Rp
0.15 m3 Kayu Klas II Balok 5,400,000.00 Rp 810,000.00 Rp
3.5 Lbr Plywood 9mm 160,000.00 Rp 560,000.00 Rp
VII 03-7394-2008
20 Btg Dolken 8 / 4 rm 20,000.00 Rp 400,000.00 Rp
6.30.2 Tenaga 548,985.00 Rp
7.05 OH Pekerja 40,000.00 Rp 282,000.00 Rp
0.275 OH Tukang Batu 55,000.00 Rp 15,125.00 Rp
1.65 OH Tukang Kayu 55,000.00 Rp 90,750.00 Rp
2.1 OH Tukang Besi 55,000.00 Rp 115,500.00 Rp
0.403 OH Kepala Tukang 65,000.00 Rp 26,195.00 Rp
0.353 OH Mandor 55,000.00 Rp 19,415.00 Rp
6.31 1 m3 Membuat Balok Beton Bertulang (200kg Besi + Bekisting) 5,354,710.00 Rp
6.31.1 Bahan 4,878,700.00 Rp
0.32 m3 Kayu Klas III (Terentang) 1,100,000.00 Rp 352,000.00 Rp
3.2 Kg Paku Biasa 2" - 5" 14,500.00 Rp 46,400.00 Rp
1.6 Ltr Minyak Bekistng 10,000.00 Rp 16,000.00 Rp
210 Kg Besi Beton Polos 10,500.00 Rp 2,205,000.00 Rp
3 Kg Kawat Beton 16,000.00 Rp 48,000.00 Rp
336 Kg Portland Sement 1,250.00 Rp 420,000.00 Rp
0.54 m3 Pasir Beton 210,000.00 Rp 113,400.00 Rp
0.81 m3 Kerikil Beton 190,000.00 Rp 153,900.00 Rp
0.14 m3 Kayu Klas II Balok 5,400,000.00 Rp 756,000.00 Rp
2.8 Lbr Plywood 9mm 160,000.00 Rp 448,000.00 Rp
16 Btg Dolken 8 / 4 rm 20,000.00 Rp 320,000.00 Rp
6.31.2 Tenaga 476,010.00 Rp
6.35 OH Pekerja 40,000.00 Rp 254,000.00 Rp
0.275 OH Tukang Batu 55,000.00 Rp 15,125.00 Rp
1.65 OH Tukang Kayu 55,000.00 Rp 90,750.00 Rp
1.4 OH Tukang Besi 55,000.00 Rp 77,000.00 Rp
0.333 OH Kepala Tukang 65,000.00 Rp 21,645.00 Rp
0.318 OH Mandor 55,000.00 Rp 17,490.00 Rp
6.32 1 m3 Membuat Balok Beton Bertulang (150kg Besi + Bekisting) 4,915,625.00 Rp
6.32.1 Bahan 4,527,450.00 Rp
0.32 m3 Kayu Klas III (Terentang) 1,100,000.00 Rp 352,000.00 Rp
3.2 Kg Paku Biasa 2" - 5" 14,500.00 Rp 46,400.00 Rp
1.6 Ltr Minyak Bekistng 10,000.00 Rp 16,000.00 Rp
157.5 Kg Besi Beton Polos 10,500.00 Rp 1,653,750.00 Rp
2.25 Kg Kawat Beton 16,000.00 Rp 36,000.00 Rp
336 Kg Portland Sement 1,250.00 Rp 420,000.00 Rp
0.54 m3 Pasir Beton 210,000.00 Rp 113,400.00 Rp
0.81 m3 Kerikil Beton 190,000.00 Rp 153,900.00 Rp
0.12 m3 Kayu Klas II Balok 5,400,000.00 Rp 648,000.00 Rp
2.8 Lbr Plywood 9mm 160,000.00 Rp 448,000.00 Rp
32 Btg Dolken 8 / 4 rm 20,000.00 Rp 640,000.00 Rp
6.32.2 Tenaga 388,175.00 Rp
5.3 OH Pekerja 40,000.00 Rp 212,000.00 Rp
0.275 OH Tukang Batu 55,000.00 Rp 15,125.00 Rp
1.3 OH Tukang Kayu 55,000.00 Rp 71,500.00 Rp
1.05 OH Tukang Besi 55,000.00 Rp 57,750.00 Rp
0.265 OH Kepala Tukang 65,000.00 Rp 17,225.00 Rp
0.265 OH Mandor 55,000.00 Rp 14,575.00 Rp
6.33 1 m3 Membuat Dinding Beton Bertulang (150kg Besi + Bekisting) 4,883,430.00 Rp
6.33.1 Bahan 4,495,450.00 Rp
0.24 m3 Kayu Klas III (Terentang) 1,100,000.00 Rp 264,000.00 Rp
3.2 Kg Paku Biasa 2" - 5" 14,500.00 Rp 46,400.00 Rp
1.6 Ltr Minyak Bekistng 10,000.00 Rp 16,000.00 Rp
157.5 Kg Besi Beton Polos 10,500.00 Rp 1,653,750.00 Rp
2.25 Kg Kawat Beton 16,000.00 Rp 36,000.00 Rp
336 Kg Portland Sement 1,250.00 Rp 420,000.00 Rp
0.54 m3 Pasir Beton 210,000.00 Rp 113,400.00 Rp
0.81 m3 Kerikil Beton 190,000.00 Rp 153,900.00 Rp
0.16 m3 Kayu Klas II Balok 5,400,000.00 Rp 864,000.00 Rp
2.8 Lbr Plywood 9mm 160,000.00 Rp 448,000.00 Rp
24 Btg Dolken 8 / 4 rm 20,000.00 Rp 480,000.00 Rp
6.33.2 Tenaga 387,980.00 Rp
5.3 OH Pekerja 40,000.00 Rp 212,000.00 Rp
0.275 OH Tukang Batu 55,000.00 Rp 15,125.00 Rp
1.3 OH Tukang Kayu 55,000.00 Rp 71,500.00 Rp
1.05 OH Tukang Besi 55,000.00 Rp 57,750.00 Rp
0.262 OH Kepala Tukang 65,000.00 Rp 17,030.00 Rp
0.265 OH Mandor 55,000.00 Rp 14,575.00 Rp
6.34 1 m3 Membuat Tangga Beton Bertulang (200kg Besi + Bekisting) 4,958,285.00 Rp
6.34.1 Bahan 4,517,800.00 Rp
0.25 m3 Kayu Klas III (Terentang) 1,100,000.00 Rp 275,000.00 Rp
3 Kg Paku Biasa 2" - 5" 14,500.00 Rp 43,500.00 Rp
1.2 Ltr Minyak Bekistng 10,000.00 Rp 12,000.00 Rp
210 Kg Besi Beton Polos 10,500.00 Rp 2,205,000.00 Rp
3 Kg Kawat Beton 16,000.00 Rp 48,000.00 Rp
336 Kg Portland Sement 1,250.00 Rp 420,000.00 Rp
0.54 m3 Pasir Beton 210,000.00 Rp 113,400.00 Rp
0.81 m3 Kerikil Beton 190,000.00 Rp 153,900.00 Rp
0.105 m3 Kayu Klas II Balok 5,400,000.00 Rp 567,000.00 Rp
2.5 Lbr Plywood 9mm 160,000.00 Rp 400,000.00 Rp
14 Btg Dolken 8 / 4 rm 20,000.00 Rp 280,000.00 Rp
6.34.2 Tenaga 440,485.00 Rp
5.65 OH Pekerja 40,000.00 Rp 226,000.00 Rp
0.275 OH Tukang Batu 55,000.00 Rp 15,125.00 Rp
1.56 OH Tukang Kayu 55,000.00 Rp 85,800.00 Rp
1.4 OH Tukang Besi 55,000.00 Rp 77,000.00 Rp
VII 03-7394-2008
0.323 OH Kepala Tukang 65,000.00 Rp 20,995.00 Rp
0.283 OH Mandor 55,000.00 Rp 15,565.00 Rp
6.35 1 m3 Membuat Kolom Penguat Beton Bertulang (11 x 11) cm 53,920.00 Rp
6.35.1 Bahan 42,535.00 Rp
0.002 m3 Kayu Klas III (Terentang) 1,100,000.00 Rp 2,200.00 Rp
0.01 Kg Paku Biasa 2" - 5" 14,500.00 Rp 145.00 Rp
3 Ltr Besi Beton Polos 10,500.00 Rp 31,500.00 Rp
0.045 Kg Kawat Beton 16,000.00 Rp 720.00 Rp
4 Kg Portland Sement 1,250.00 Rp 5,000.00 Rp
0.006 m3 Pasir Beton 210,000.00 Rp 1,260.00 Rp
0.009 m3 Kerikil Beton 190,000.00 Rp 1,710.00 Rp
6.35.2 Tenaga 11,385.00 Rp
0.18 OH Pekerja 40,000.00 Rp 7,200.00 Rp
0.02 OH Tukang Batu 55,000.00 Rp 1,100.00 Rp
0.02 OH Tukang Kayu 55,000.00 Rp 1,100.00 Rp
0.02 OH Tukang Besi 55,000.00 Rp 1,100.00 Rp
0.006 OH Kepala Tukang 65,000.00 Rp 390.00 Rp
0.009 OH Mandor 55,000.00 Rp 495.00 Rp
6.36 1 m3 Membuat Kolom Penguat Beton Bertulang (11 x 11) cm 72,605.00 Rp
6.36.1 Bahan 53,805.00 Rp
0.003 m3 Kayu Klas III (Terentang) 1,100,000.00 Rp 3,300.00 Rp
0.02 Kg Paku Biasa 2" - 5" 14,500.00 Rp 290.00 Rp
3.6 Ltr Besi Beton Polos 10,500.00 Rp 37,800.00 Rp
0.05 Kg Kawat Beton 16,000.00 Rp 800.00 Rp
5.5 Kg Portland Sement 1,250.00 Rp 6,875.00 Rp
0.009 m3 Pasir Beton 210,000.00 Rp 1,890.00 Rp
0.015 m3 Kerikil Beton 190,000.00 Rp 2,850.00 Rp
6.36.2 Tenaga 18,800.00 Rp
0.297 OH Pekerja 40,000.00 Rp 11,880.00 Rp
0.033 OH Tukang Batu 55,000.00 Rp 1,815.00 Rp
0.033 OH Tukang Kayu 55,000.00 Rp 1,815.00 Rp
0.033 OH Tukang Besi 55,000.00 Rp 1,815.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.015 OH Mandor 55,000.00 Rp 825.00 Rp
6 PEKERJAAN PENUTUP ATAP
6.1 1 m2 Pasang Atap Genteng Plentong Kecil 51,085.00 Rp
6.1.1 Bahan 40,000.00 Rp
25 Buah Genteng Plentong 1,600.00 Rp 40,000.00 Rp
6.1.2 Tenaga 11,085.00 Rp
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.075 OH Tukang Kayu 55,000.00 Rp 4,125.00 Rp
0.008 OH Kepala Tukang 65,000.00 Rp 520.00 Rp
0.008 OH Mandor 55,000.00 Rp 440.00 Rp
6.2 1 m2 Pasang Atap Genteng Kodok/ Glasur 79,835.00 Rp
6.2.1 Bahan 68,750.00 Rp
25 Buah Genteng Kodok/ Glasur 2,750.00 Rp 68,750.00 Rp
6.2.2 Tenaga 11,085.00 Rp
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.075 OH Tukang Kayu 55,000.00 Rp 4,125.00 Rp
0.008 OH Kepala Tukang 65,000.00 Rp 520.00 Rp
0.008 OH Mandor 55,000.00 Rp 440.00 Rp
6.3 1 m2 Pasang Atap Genteng Plentong Super/ Besar 67,730.00 Rp
6.3.1 Bahan 57,600.00 Rp
18 Buah Genteng Plentong Super/ besar 3,200.00 Rp 57,600.00 Rp
6.3.2 Tenaga 10,130.00 Rp
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.06 OH Tukang Kayu 55,000.00 Rp 3,300.00 Rp
0.006 OH Kepala Tukang 65,000.00 Rp 390.00 Rp
0.008 OH Mandor 55,000.00 Rp 440.00 Rp
6.4 1 m' Pasang Genteng Bubung Plentong 70,170.00 Rp
6.4.1 Bahan 41,760.00 Rp
5 Buah Genteng Bubung Plentong 5,200.00 Rp 26,000.00 Rp
8 Kg Portland Sement 1,250.00 Rp 10,000.00 Rp
0.032 m3 Pasir Pasang 180,000.00 Rp 5,760.00 Rp
6.4.2 Tenaga 28,410.00 Rp
0.4 OH Pekerja 40,000.00 Rp 16,000.00 Rp
0.2 OH Tukang Kayu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang 65,000.00 Rp 1,300.00 Rp
0.002 OH Mandor 55,000.00 Rp 110.00 Rp
6.5 1 m' Pasang Genteng Bubung Plentong 81,670.00 Rp
6.5.1 Bahan 53,260.00 Rp
5 Buah Genteng Bubung Plentong Kodok/ Glasur 7,500.00 Rp 37,500.00 Rp
8 Kg Portland Sement 1,250.00 Rp 10,000.00 Rp
0.032 m3 Pasir Pasang 180,000.00 Rp 5,760.00 Rp
6.5.2 Tenaga 28,410.00 Rp
0.4 OH Pekerja 40,000.00 Rp 16,000.00 Rp
0.2 OH Tukang Kayu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang 65,000.00 Rp 1,300.00 Rp
0.002 OH Mandor 55,000.00 Rp 110.00 Rp
6.6 1 m' Pasang Genteng Bubung Plentong Besar 72,570.00 Rp
6.6.1 Bahan 44,160.00 Rp
4 Buah Genteng Bubung Plentong Besar 7,100.00 Rp 28,400.00 Rp
8 Kg Portland Sement 1,250.00 Rp 10,000.00 Rp
0.032 m3 Pasir Pasang 180,000.00 Rp 5,760.00 Rp
VIII
VII 03-7394-2008
03-3436-2002
6.6.2 Tenaga 28,410.00 Rp
0.4 OH Pekerja 40,000.00 Rp 16,000.00 Rp
0.2 OH Tukang Kayu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang 65,000.00 Rp 1,300.00 Rp
0.002 OH Mandor 55,000.00 Rp 110.00 Rp
6.9 1 m2 Pasang Atap Asbes Gelombang (2.25 x 0.92) x 5mm 59,645.00 Rp
6.9.1 Bahan 48,960.00 Rp
0.6 Lbr Asbes Gelombang 78,000.00 Rp 46,800.00 Rp
0.12 Kg Paku Pancing 60 x 230 18,000.00 Rp 2,160.00 Rp
6.9.2 Tenaga 10,685.00 Rp
0.14 OH Pekerja 40,000.00 Rp 5,600.00 Rp
0.075 OH Tukang Kayu 55,000.00 Rp 4,125.00 Rp
0.008 OH Kepala Tukang 65,000.00 Rp 520.00 Rp
0.008 OH Mandor 55,000.00 Rp 440.00 Rp
6.10 1 m2 Pasang Atap Asbes Gelombang (2.00 x 0.92) x 5mm 59,250.00 Rp
6.10.1 Bahan 48,960.00 Rp
0.6 Lbr Asbes Gelombang 78,000.00 Rp 46,800.00 Rp
0.12 Kg Paku Pancing 60 x 230 18,000.00 Rp 2,160.00 Rp
6.10.2 Tenaga 10,290.00 Rp
0.14 OH Pekerja 40,000.00 Rp 5,600.00 Rp
0.07 OH Tukang Kayu 55,000.00 Rp 3,850.00 Rp
0.007 OH Kepala Tukang 65,000.00 Rp 455.00 Rp
0.007 OH Mandor 55,000.00 Rp 385.00 Rp
6.12 1 m2 Pasang Atap Asbes Gelombang (3.00 x 1.05) x 4mm 36,950.00 Rp
6.12.1 Bahan 26,660.00 Rp
0.35 Lbr Asbes Gelombang 70,000.00 Rp 24,500.00 Rp
0.12 Kg Paku Pancing 60 x 230 18,000.00 Rp 2,160.00 Rp
6.12.2 Tenaga 10,290.00 Rp
0.14 OH Pekerja 40,000.00 Rp 5,600.00 Rp
0.07 OH Tukang Kayu 55,000.00 Rp 3,850.00 Rp
0.007 OH Kepala Tukang 65,000.00 Rp 455.00 Rp
0.007 OH Mandor 55,000.00 Rp 385.00 Rp
6.15 1 m2 Pasang Atap Asbes Gelombang (2.10 x 1.05) x 4mm 38,295.00 Rp
6.15.1 Bahan 28,170.00 Rp
0.51 Lbr Asbes Gelombang 51,000.00 Rp 26,010.00 Rp
0.12 Kg Paku Pancing 60 x 230 18,000.00 Rp 2,160.00 Rp
6.15.2 Tenaga 10,125.00 Rp
0.14 OH Pekerja 40,000.00 Rp 5,600.00 Rp
0.067 OH Tukang Kayu 55,000.00 Rp 3,685.00 Rp
0.007 OH Kepala Tukang 65,000.00 Rp 455.00 Rp
0.007 OH Mandor 55,000.00 Rp 385.00 Rp
6.30 1 m2 Pasang Atap Genteng Beton 53,635.00 Rp
6.30.1 Bahan 38,935.00 Rp
11 Lbr Genteng Beton Standart 3,500.00 Rp 38,500.00 Rp
0.03 Kg Paku Biasa 2" - 5" 14,500.00 Rp 435.00 Rp
6.30.2 Tenaga 14,700.00 Rp
0.2 OH Pekerja 40,000.00 Rp 8,000.00 Rp
0.1 OH Tukang Kayu 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.01 OH Mandor 55,000.00 Rp 550.00 Rp
6.33 1 m2 Pasang Atap Sirap 124,355.00 Rp
6.33.1 Bahan 101,900.00 Rp
60 Lbr Genteng Sirap 1,650.00 Rp 99,000.00 Rp
0.2 Kg Paku Biasa 1/2" - 1" 14,500.00 Rp 2,900.00 Rp
6.33.2 Tenaga 22,455.00 Rp
0.166 OH Pekerja 40,000.00 Rp 6,640.00 Rp
0.25 OH Tukang Kayu 55,000.00 Rp 13,750.00 Rp
0.025 OH Kepala Tukang 65,000.00 Rp 1,625.00 Rp
0.008 OH Mandor 55,000.00 Rp 440.00 Rp
6.34 1 m' Pasang Nok Genteng Beton 75,685.00 Rp
6.34.1 Bahan 46,285.00 Rp
3.5 Buah Nok Genteng Beton 4,200.00 Rp 14,700.00 Rp
0.05 Kg Paku Biasa 2" - 5" 14,500.00 Rp 725.00 Rp
10.8 Kg Portland Semen 1,250.00 Rp 13,500.00 Rp
0.032 m3 Pasir Pasang 180,000.00 Rp 5,760.00 Rp
1 Kg Semen Warna 11,600.00 Rp 11,600.00 Rp
6.34.2 Tenaga 29,400.00 Rp
0.4 OH Pekerja 40,000.00 Rp 16,000.00 Rp
0.2 OH Tukang Kayu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang 65,000.00 Rp 1,300.00 Rp
0.02 OH Mandor 55,000.00 Rp 1,100.00 Rp
6.37 1 m' Pasang Nok Sirap 73,225.00 Rp
6.37.1 Bahan 52,520.00 Rp
0.4 Lbr Seng Plat 3" x 6" BJLS 28 36,000.00 Rp 14,400.00 Rp
0.06 Kg Paku Biasa 1/2" - 1" 14,500.00 Rp 870.00 Rp
0.5 Kg Paku Biasa 2" - 5" 14,500.00 Rp 7,250.00 Rp
0.004 m3 Kayu Kamfer Papan Tebal 3cm 7,500,000.00 Rp 30,000.00 Rp
6.37.2 Tenaga 20,705.00 Rp
0.125 OH Pekerja 40,000.00 Rp 5,000.00 Rp
0.25 OH Tukang Kayu 55,000.00 Rp 13,750.00 Rp
0.025 OH Kepala Tukang 65,000.00 Rp 1,625.00 Rp
0.006 OH Mandor 55,000.00 Rp 330.00 Rp
VIII 03-3436-2002
6.38 1 m2 Pasang Atap Seng Gelombang 56,010.00 Rp
6.38.1 Bahan 47,190.00 Rp
0.7 Lbr Seng Gelombang 3" x 6" BJLS 28 67,000.00 Rp 46,900.00 Rp
0.02 Kg Paku Biasa 1/2" - 1" 14,500.00 Rp 290.00 Rp
6.38.2 Tenaga 8,820.00 Rp
0.12 OH Pekerja 40,000.00 Rp 4,800.00 Rp
0.06 OH Tukang Kayu 55,000.00 Rp 3,300.00 Rp
0.006 OH Kepala Tukang 65,000.00 Rp 390.00 Rp
0.006 OH Mandor 55,000.00 Rp 330.00 Rp
6.39 1 m' Pasang Atap Nok Seng 31,380.00 Rp
6.39.1 Bahan 20,680.00 Rp
0.3 Lbr Seng Plat 3" x 6" BJLS 28 67,000.00 Rp 20,100.00 Rp
0.04 Kg Paku Biasa 1/2" - 1" 14,500.00 Rp 580.00 Rp
6.39.2 Tenaga 10,700.00 Rp
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.07 OH Tukang Kayu 55,000.00 Rp 3,850.00 Rp
0.008 OH Kepala Tukang 65,000.00 Rp 520.00 Rp
0.006 OH Mandor 55,000.00 Rp 330.00 Rp
6.42 1 m2 Pasang Alumunium Foil/ Sisalation 16,970.00 Rp
6.42.1 Bahan 7,455.00 Rp
1.05 m2 Alumunium Foil/ Sisalation 7,100.00 Rp 7,455.00 Rp
6.42.2 Tenaga 9,515.00 Rp
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.05 OH Tukang Kayu 55,000.00 Rp 2,750.00 Rp
0.005 OH Kepala Tukang 65,000.00 Rp 325.00 Rp
0.008 OH Mandor 55,000.00 Rp 440.00 Rp
PEKERJAAN LANGIT-LANGIT
6.1 1 m2 Memasang Langit-Langit Asbes (1.00 x 1.00) m, tebal 4mm, 5mm dan 6mm 22,920.00 Rp
6.1.1 Bahan 17,195.00 Rp
1.1 Lbr Plat Asbes 15,500.00 Rp 17,050.00 Rp
0.01 Kg Paku 14,500.00 Rp 145.00 Rp
6.1.2 Tenaga 5,725.00 Rp
0.03 OH Pekerja 40,000.00 Rp 1,200.00 Rp
0.07 OH Tukang Kayu 55,000.00 Rp 3,850.00 Rp
0.007 OH Kepala Tukang 65,000.00 Rp 455.00 Rp
0.004 OH Mandor 55,000.00 Rp 220.00 Rp
6.2 1 m2 Memasang Langit-Langit Akustik Ukuran ( 30x30) cm 73,235.00 Rp
6.2.1 Bahan 60,725.00 Rp
12 Lbr Akustik Uk 30 x 30 cm 5,000.00 Rp 60,000.00 Rp
0.05 Kg Paku 14,500.00 Rp 725.00 Rp
6.2.2 Tenaga 12,510.00 Rp
0.12 OH Pekerja 40,000.00 Rp 4,800.00 Rp
0.12 OH Tukang Kayu 55,000.00 Rp 6,600.00 Rp
0.012 OH Kepala Tukang 65,000.00 Rp 780.00 Rp
0.006 OH Mandor 55,000.00 Rp 330.00 Rp
6.3 1 m2 Memasang Langit-Langit Akustik Ukuran ( 30x60) cm 80,750.00 Rp
6.3.1 Bahan 70,325.00 Rp
5.8 Lbr Akustik 12,000.00 Rp 69,600.00 Rp
0.05 Kg Paku 14,500.00 Rp 725.00 Rp
6.3.2 Tenaga 10,425.00 Rp
0.1 OH Pekerja 40,000.00 Rp 4,000.00 Rp
0.1 OH Tukang Kayu 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.5 1 m2 Memasang Langit-langit Tripleks Uk (120 x 240) cm, tebal 3m, 4mm dan 6mm 33,360.00 Rp
6.5.1 Bahan 22,935.00 Rp
0.375 Lbr Tripleks (4 mm) 60,000.00 Rp 22,500.00 Rp
0.03 Kg Paku 14,500.00 Rp 435.00 Rp
6.5.2 Tenaga 10,425.00 Rp
0.1 OH Pekerja 40,000.00 Rp 4,000.00 Rp
0.1 OH Tukang Kayu 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.6 1 m2 Memasang Langit-langit Lambrizing Kayu Jati, tebal 6mm 413,545.00 Rp
6.6.1 Bahan 330,145.00 Rp
0.015 m3 Kayu Jati, Papan 22,000,000.00 Rp 330,000.00 Rp
0.01 Kg Paku 14,500.00 Rp 145.00 Rp
6.6.2 Tenaga 83,400.00 Rp
0.8 OH Pekerja 40,000.00 Rp 32,000.00 Rp
0.8 OH Tukang Kayu 55,000.00 Rp 44,000.00 Rp
0.08 OH Kepala Tukang 65,000.00 Rp 5,200.00 Rp
0.04 OH Mandor 55,000.00 Rp 2,200.00 Rp
6.7 1 m2 Memasang Langit-langit Gypsu Board Uk (120x240) tebal 9mm 28,855.00 Rp
6.7.1 Bahan 21,505.00 Rp
0.364 m3 Gypsu Board 55,000.00 Rp 20,020.00 Rp
0.11 Kg Paku Skrup 13,500.00 Rp 1,485.00 Rp
6.7.2 Tenaga 7,350.00 Rp
0.1 OH Pekerja 40,000.00 Rp 4,000.00 Rp
0.05 OH Tukang Kayu 55,000.00 Rp 2,750.00 Rp
0.005 OH Kepala Tukang 65,000.00 Rp 325.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.9 1 m2 Memasang Langit-angit akuatik Uk (60x120) cm & rangka alluminium 147,675.00 Rp
VIII
IX
03-3436-2002
03-2839-2008
6.9.1 Bahan 95,550.00 Rp
3.6 m' Profil Aluminium "T" 4,000.00 Rp 14,400.00 Rp
0.15 Kg Kawat 4mm 7,000.00 Rp 1,050.00 Rp
1.05 Bh Ramset 22,000.00 Rp 23,100.00 Rp
1.5 Lmb Akuatik 60 x 120 cm 38,000.00 Rp 57,000.00 Rp
6.9.2 Tenaga 52,125.00 Rp
0.5 OH Pekerja 40,000.00 Rp 20,000.00 Rp
0.5 OH Tukang Kayu 55,000.00 Rp 27,500.00 Rp
0.05 OH Kepala Tukang 65,000.00 Rp 3,250.00 Rp
0.025 OH Mandor 55,000.00 Rp 1,375.00 Rp
6.10 1 m' List langit-langit Kayu Profil 10,635.00 Rp
6.10.1 Bahan 5,395.00 Rp
1.05 m3 List Kayu Profil 5,000.00 Rp 5,250.00 Rp
0.01 Kg Paku 14,500.00 Rp 145.00 Rp
6.10.2 Tenaga 5,240.00 Rp
0.05 OH Pekerja 40,000.00 Rp 2,000.00 Rp
0.05 OH Tukang Kayu 55,000.00 Rp 2,750.00 Rp
0.005 OH Kepala Tukang 65,000.00 Rp 325.00 Rp
0.003 OH Mandor 55,000.00 Rp 165.00 Rp
PEKERJAAN SANITASI
6.1 1 Unit Memasang Kloset Duduk/ Mono blok 1,738,365.00 Rp
6.1.1 Bahan 1,537,000.00 Rp
1 Buah Kloset Duduk/ Monoblok 1,450,000.00 Rp 1,450,000.00 Rp
0.06 - Kelengkapan 6% Dari Harga Kloset 1,450,000.00 Rp 87,000.00 Rp
6.1.2 Tenaga 201,365.00 Rp
3.3 OH Pekerja 40,000.00 Rp 132,000.00 Rp
1.1 OH Tukang Batu 55,000.00 Rp 60,500.00 Rp
0.001 OH Kepala Tukang 65,000.00 Rp 65.00 Rp
0.16 OH Mandor 55,000.00 Rp 8,800.00 Rp
6.2 1 Unit Memasang Kloset Jongkok Porselen 388,100.00 Rp
6.2.1 Bahan 159,300.00 Rp
1 Buah Kloset Jongkok 150,000.00 Rp 150,000.00 Rp
6 Kg Portland Semen 1,250.00 Rp 7,500.00 Rp
0.01 m3 180,000.00 Rp 1,800.00 Rp
6.2.2 Tenaga 228,800.00 Rp
1 OH Pekerja 40,000.00 Rp 40,000.00 Rp
1.5 OH Tukang Batu 55,000.00 Rp 82,500.00 Rp
1.5 OH Kepala Tukang 65,000.00 Rp 97,500.00 Rp
0.16 OH Mandor 55,000.00 Rp 8,800.00 Rp
6.4 1 Unit Memasang Urinoir 519,300.00 Rp
6.4.1 Bahan 412,300.00 Rp
1 Buah Urinoir 310,000.00 Rp 310,000.00 Rp
0.3 - Perlengkapan 30% dari Urinoir 310,000.00 Rp 93,000.00 Rp
6 Kg Portland Semen 1,250.00 Rp 7,500.00 Rp
0.01 m3 Pasir Pasang 180,000.00 Rp 1,800.00 Rp
6.4.2 Tenaga 107,000.00 Rp
1 OH Pekerja 40,000.00 Rp 40,000.00 Rp
1 OH Tukang Batu 55,000.00 Rp 55,000.00 Rp
0.1 OH Kepala Tukang 65,000.00 Rp 6,500.00 Rp
0.1 OH Mandor 55,000.00 Rp 5,500.00 Rp
6.5 1 Unit Memasang Wastafel 1,120,525.00 Rp
6.5.1 Bahan 1,049,300.00 Rp
1 Buah Wastafel Meja Oval 800,000.00 Rp 800,000.00 Rp
0.3 - Perlengkapan 30% dari Harga Wastafel 800,000.00 Rp 240,000.00 Rp
6 Kg Portland Semen 1,250.00 Rp 7,500.00 Rp
0.01 m3 Pasir Pasang 180,000.00 Rp 1,800.00 Rp
6.5.2 Tenaga 71,225.00 Rp
1.2 OH Pekerja 40,000.00 Rp 48,000.00 Rp
0.145 OH Tukang Batu 55,000.00 Rp 7,975.00 Rp
0.15 OH Kepala Tukang 65,000.00 Rp 9,750.00 Rp
0.1 OH Mandor 55,000.00 Rp 5,500.00 Rp
6.8 1 Unit Memasang Bak Mandi Batu Bata Vol 0.30 m3 984,598.80 Rp
6.8.1 Bahan 543,598.80 Rp
0.4 Buah Batu Bata 375,000.00 Rp 150,000.00 Rp
120 Kg Portland Semen 1,250.00 Rp 150,000.00 Rp
0.3 m3 Pasir Pasang 180,000.00 Rp 54,000.00 Rp
360 Buah Porselen 11 x 11 cm 333.33 Rp 119,998.80 Rp
6 Kg Semen Nat 11,600.00 Rp 69,600.00 Rp
6.8.2 Tenaga 441,000.00 Rp
6 OH Pekerja 40,000.00 Rp 240,000.00 Rp
3 OH Tukang Batu 55,000.00 Rp 165,000.00 Rp
0.3 OH Kepala Tukang 65,000.00 Rp 19,500.00 Rp
0.3 OH Mandor 55,000.00 Rp 16,500.00 Rp
6.14 1 m' Memasang Pipa Beton 15 - 20 cm 70,045.00 Rp
6.14.1 Bahan 59,755.00 Rp
1.1 Buah Pipa Beton 33,000.00 Rp 36,300.00 Rp
0.027 m3 Batu Bata 375,000.00 Rp 10,125.00 Rp
0.68 Kg Portland Semen 1,250.00 Rp 850.00 Rp
0.056 m3 Pasir Pasang 180,000.00 Rp 10,080.00 Rp
0.024 m3 Pasir Urug 100,000.00 Rp 2,400.00 Rp
6.14.2 Tenaga 10,290.00 Rp
0.14 OH Pekerja 40,000.00 Rp 5,600.00 Rp
0.07 OH Tukang Batu 55,000.00 Rp 3,850.00 Rp
IX
X
03-2839-2008
0.007 OH Kepala Tukang 65,000.00 Rp 455.00 Rp
0.007 OH Mandor 55,000.00 Rp 385.00 Rp
6.15 1 m' Memasang Pipa Beton 30 - 100 cm 311,135.00 Rp
6.15.1 Bahan 283,205.00 Rp
1.1 Buah Pipa Beton 42,000.00 Rp 46,200.00 Rp
0.55 m3 Batu Bata 375,000.00 Rp 206,250.00 Rp
10.3 Kg Portland Semen 1,250.00 Rp 12,875.00 Rp
0.061 m3 Pasir Pasang 180,000.00 Rp 10,980.00 Rp
0.069 m3 Pasir Urug 100,000.00 Rp 6,900.00 Rp
6.15.2 Tenaga 27,930.00 Rp
0.38 OH Pekerja 40,000.00 Rp 15,200.00 Rp
0.19 OH Tukang Batu 55,000.00 Rp 10,450.00 Rp
0.019 OH Kepala Tukang 65,000.00 Rp 1,235.00 Rp
0.019 OH Mandor 55,000.00 Rp 1,045.00 Rp
6.20 1 m' Memasang Pipa Galvanis 3/4 " 40,696.66 Rp
6.20.1 Bahan 31,516.66 Rp
1.2 Buah Pipa Galvanis 20,333.33 Rp 24,400.00 Rp
0.35 - Perlengkapan 35% Harga Pipa 20,333.33 Rp 7,116.67 Rp
6.20.2 Tenaga 9,180.00 Rp
0.054 OH Pekerja 40,000.00 Rp 2,160.00 Rp
0.09 OH Tukang Ledeng 55,000.00 Rp 4,950.00 Rp
0.009 OH Kepala Tukang 65,000.00 Rp 585.00 Rp
0.027 OH Mandor 55,000.00 Rp 1,485.00 Rp
6.23 1 m' Memasang Pipa Galvanis 3 " 144,853.66 Rp
6.23.1 Bahan 129,166.66 Rp
1.2 Buah Pipa Galvanis 83,333.33 Rp 100,000.00 Rp
0.35 - Perlengkapan 35% Harga Pipa 83,333.33 Rp 29,166.67 Rp
6.23.2 Tenaga 15,687.00 Rp
0.108 OH Pekerja 40,000.00 Rp 4,320.00 Rp
0.18 OH Tukang Ledeng 55,000.00 Rp 9,900.00 Rp
0.018 OH Kepala Tukang 65,000.00 Rp 1,170.00 Rp
0.0054 OH Mandor 55,000.00 Rp 297.00 Rp
6.24 1 m' Memasang Pipa Galvanis 4 " 177,194.84 Rp
6.24.1 Bahan 157,583.34 Rp
1.2 Buah Pipa Galvanis 101,666.67 Rp 122,000.00 Rp
0.35 - Perlengkapan 35% Harga Pipa 101,666.67 Rp 35,583.33 Rp
6.24.2 Tenaga 19,611.50 Rp
0.135 OH Pekerja 40,000.00 Rp 5,400.00 Rp
0.225 OH Tukang Ledeng 55,000.00 Rp 12,375.00 Rp
0.0225 OH Kepala Tukang 65,000.00 Rp 1,462.50 Rp
0.0068 OH Mandor 55,000.00 Rp 374.00 Rp
6.25 1 m' Memasang Pipa PVC Type AW 1/2 " 12,979.00 Rp
6.25.1 Bahan 7,750.00 Rp
1.2 Buah Pipa PVC 5,000.00 Rp 6,000.00 Rp
0.35 - Perlengkapan 35% Harga Pipa 5,000.00 Rp 1,750.00 Rp
6.25.2 Tenaga 5,229.00 Rp
0.036 OH Pekerja 40,000.00 Rp 1,440.00 Rp
0.06 OH Tukang Ledeng 55,000.00 Rp 3,300.00 Rp
0.006 OH Kepala Tukang 65,000.00 Rp 390.00 Rp
0.0018 OH Mandor 55,000.00 Rp 99.00 Rp
6.29 1 m' Memasang Pipa PVC Type AW 2" 27,580.16 Rp
6.29.1 Bahan 19,736.66 Rp
1.2 Buah Pipa PVC 12,733.33 Rp 15,280.00 Rp
0.35 - Perlengkapan 35% Harga Pipa 12,733.33 Rp 4,456.67 Rp
6.29.2 Tenaga 7,843.50 Rp
0.054 OH Pekerja 40,000.00 Rp 2,160.00 Rp
0.09 OH Tukang Ledeng 55,000.00 Rp 4,950.00 Rp
0.009 OH Kepala Tukang 65,000.00 Rp 585.00 Rp
0.0027 OH Mandor 55,000.00 Rp 148.50 Rp
6.31 1 m' Memasang Pipa PVC Type AW 3" 44,092.16 Rp
6.31.1 Bahan 32,291.66 Rp
1.2 Buah Pipa PVC 20,833.33 Rp 25,000.00 Rp
0.35 - Perlengkapan 35% Harga Pipa 20,833.33 Rp 7,291.67 Rp
6.31.2 Tenaga 11,800.50 Rp
0.081 OH Pekerja 40,000.00 Rp 3,240.00 Rp
0.135 OH Tukang Ledeng 55,000.00 Rp 7,425.00 Rp
0.014 OH Kepala Tukang 65,000.00 Rp 910.00 Rp
0.0041 OH Mandor 55,000.00 Rp 225.50 Rp
6.33 1 Buah Memasang Bak Cuci Piring Stainless Steel 359,732.50 Rp
6.33.1 Bahan 340,000.00 Rp
1 Buah Bak Cuci Stainles Steel 170,000.00 Rp 170,000.00 Rp
1 Set Water Drain & Asesoris 170,000.00 Rp 170,000.00 Rp
6.33.2 Tenaga 19,732.50 Rp
0.03 OH Pekerja 40,000.00 Rp 1,200.00 Rp
0.3 OH Tukang Ledeng 55,000.00 Rp 16,500.00 Rp
0.03 OH Kepala Tukang 65,000.00 Rp 1,950.00 Rp
0.0015 OH Mandor 55,000.00 Rp 82.50 Rp
6.35 1 Buah Memasang Kran 3/4" atau 1/2" 21,900.00 Rp
6.35.1 Bahan 15,075.00 Rp
1 Buah Kran Air 15,000.00 Rp 15,000.00 Rp
0.025 Set Seal Tape 3,000.00 Rp 75.00 Rp
6.35.2 Tenaga 6,825.00 Rp
X
0.01 OH Pekerja 40,000.00 Rp 400.00 Rp
0.1 OH Tukang Ledeng 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.36 1 Buah Memasang Floor Drain 31,825.00 Rp
6.36.1 Bahan 25,000.00 Rp
1 Buah Floor Drain 25,000.00 Rp 25,000.00 Rp
6.31.2 Tenaga 6,825.00 Rp
0.01 OH Pekerja 40,000.00 Rp 400.00 Rp
0.1 OH Tukang Batu 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6 PEKERJAAN BESI & ALUMINIUM
6.1 1 Kg Memasang Besi Profil 23,842.50 Rp
6.1.1 Bahan 17,587.50 Rp
1.15 Kg Besi Profil 14,250.00 Rp 16,387.50 Rp
0.06 Kg Mini Besi 20,000.00 Rp 1,200.00 Rp
6.1.2 Tenaga 6,255.00 Rp
0.06 OH Pekerja 40,000.00 Rp 2,400.00 Rp
0.06 OH Tukang Besi 55,000.00 Rp 3,300.00 Rp
0.006 OH Kepala Tukang 65,000.00 Rp 390.00 Rp
0.003 OH Mandor 55,000.00 Rp 165.00 Rp
6.2 1 Kg Memasang Rangka Kuda- kuda Baja IWF 22,642.50 Rp
6.2.1 Bahan 16,387.50 Rp
1.15 Kg Besi Baja IWF 14,250.00 Rp 16,387.50 Rp
6.2.2 Tenaga 6,255.00 Rp
0.06 OH Pekerja 40,000.00 Rp 2,400.00 Rp
0.06 OH Tukang Besi 55,000.00 Rp 3,300.00 Rp
0.006 OH Kepala Tukang 65,000.00 Rp 390.00 Rp
0.003 OH Mandor 55,000.00 Rp 165.00 Rp
6.3 1 Kg Mengerjakan Pekerjaan Perakitan (Kuda- kuda Baja) 25,280.00 Rp
6.3.1 Bahan 14,800.00 Rp
1 Ltr Solar 11,300.00 Rp 11,300.00 Rp
0.1 Ltr Minyak Pelumas 35,000.00 Rp 3,500.00 Rp
6.3.2 Tenaga 10,480.00 Rp
0.1 OH Pekerja 40,000.00 Rp 4,000.00 Rp
0.1 OH Tukang Besi 55,000.00 Rp 5,500.00 Rp
0.001 OH Kepala Tukang 65,000.00 Rp 65.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
0.008 Jam Sewa Alat 80,000.00 Rp 640.00 Rp
6.4 1 m2 Membuat Pintu Besi Plat Baja Tebal 2mm Rangkap, Rangka Baja Siku 804,804.00 Rp
6.4.1 Bahan 675,950.00 Rp
15 Kg Besi Siku L.30.30.3 14,250.00 Rp 213,750.00 Rp
32.8 Kg Besi Plat Baja 14,000.00 Rp 459,200.00 Rp
0.05 Kg Kawat Las 60,000.00 Rp 3,000.00 Rp
6.4.2 Tenaga 128,854.00 Rp
1.05 OH Pekerja 40,000.00 Rp 42,000.00 Rp
1.05 OH Tukang Besi 55,000.00 Rp 57,750.00 Rp
0.105 OH Kepala Tukang 65,000.00 Rp 6,825.00 Rp
0.052 OH Mandor 55,000.00 Rp 2,860.00 Rp
6.5 10 Cm Mengerjakan Pengelasan Dengan Las Listrik 19,419.00 Rp
6.5.1 Bahan 2,879.00 Rp
0.04 Kg Kawat Las 60,000.00 Rp 2,400.00 Rp
0.03 Ltr Solar 11,300.00 Rp 339.00 Rp
0.004 Ltr Minyak Pelumas 35,000.00 Rp 140.00 Rp
6.5.2 Tenaga 16,540.00 Rp
0.04 OH Pekerja 40,000.00 Rp 1,600.00 Rp
0.02 OH Tukang Besi 55,000.00 Rp 1,100.00 Rp
0.002 OH Kepala Tukang 65,000.00 Rp 130.00 Rp
0.002 OH Mandor 55,000.00 Rp 110.00 Rp
0.17 Jam Sewa Alat 80,000.00 Rp 13,600.00 Rp
6.7 1 m2 Memasang Pintu Rolling Door Besi 367,130.00 Rp
6.7.1 Bahan 245,000.00 Rp
1 m2 Pintu Gulung Besi 245,000.00 Rp 245,000.00 Rp
6.7.2 Tenaga 122,130.00 Rp
1.2 OH Pekerja 40,000.00 Rp 48,000.00 Rp
1.2 OH Tukang Besi 55,000.00 Rp 66,000.00 Rp
0.12 OH Kepala Tukang 65,000.00 Rp 7,800.00 Rp
0.006 OH Mandor 55,000.00 Rp 330.00 Rp
6.8 1 m2 Memasang Pintu Lipat (Folding Door) 445,870.00 Rp
6.8.1 Bahan 400,000.00 Rp
1 m2 Pintu Lipat 400,000.00 Rp 400,000.00 Rp
6.8.2 Tenaga 45,870.00 Rp
0.44 OH Pekerja 40,000.00 Rp 17,600.00 Rp
0.44 OH Tukang Besi 55,000.00 Rp 24,200.00 Rp
0.044 OH Kepala Tukang 65,000.00 Rp 2,860.00 Rp
0.022 OH Mandor 55,000.00 Rp 1,210.00 Rp
6.9 1 m2 Sunscreen Alumunium 362,620.00 Rp
6.9.1 Bahan 310,000.00 Rp
1 m2 Sunscreen Alumunium 310,000.00 Rp 310,000.00 Rp
6.9.2 Tenaga 52,620.00 Rp
0.08 OH Pekerja 40,000.00 Rp 3,200.00 Rp
X
XI 03-7393-2008
0.8 OH Tukang Besi 55,000.00 Rp 44,000.00 Rp
0.08 OH Kepala Tukang 65,000.00 Rp 5,200.00 Rp
0.004 OH Mandor 55,000.00 Rp 220.00 Rp
6.10 1 m2 Memasang Rolling Door Aluminium 334,250.00 Rp
6.10.1 Bahan 230,000.00 Rp
1 m2 Rolling Door Aluminium 230,000.00 Rp 230,000.00 Rp
6.10.2 Tenaga 104,250.00 Rp
1 OH Pekerja 40,000.00 Rp 40,000.00 Rp
1 OH Tukang Besi 55,000.00 Rp 55,000.00 Rp
0.1 OH Kepala Tukang 65,000.00 Rp 6,500.00 Rp
0.05 OH Mandor 55,000.00 Rp 2,750.00 Rp
6.11 1 m' Memasang Kusen Pintu Alumunium 92,530.00 Rp
6.11.1 Bahan 88,050.00 Rp
1.1 m' Profil Aluminium 75,000.00 Rp 82,500.00 Rp
2 Buah Skrup Fixer 825.00 Rp 1,650.00 Rp
0.06 Tube Sealant 65,000.00 Rp 3,900.00 Rp
6.11.2 Tenaga 4,480.00 Rp
0.043 OH Pekerja 40,000.00 Rp 1,720.00 Rp
0.043 OH Tukang Besi 55,000.00 Rp 2,365.00 Rp
0.0043 OH Kepala Tukang 65,000.00 Rp 279.50 Rp
0.0021 OH Mandor 55,000.00 Rp 115.50 Rp
6.12 1 m2 Memasang Pintu Alumunium Strip Lebar 8 cm 922,858.50 Rp
6.12.1 Bahan 914,000.00 Rp
4.4 m' Profil Aluminium 75,000.00 Rp 330,000.00 Rp
14.6 m' Aluminium Strip 40,000.00 Rp 584,000.00 Rp
6.12.2 Tenaga 8,858.50 Rp
0.085 OH Pekerja 40,000.00 Rp 3,400.00 Rp
0.085 OH Tukang Besi 55,000.00 Rp 4,675.00 Rp
0.0085 OH Kepala Tukang 65,000.00 Rp 552.50 Rp
0.0042 OH Mandor 55,000.00 Rp 231.00 Rp
6.13 1 m2 Memasang Pintu Kaca Rangka Alumunium 247,485.00 Rp
6.13.1 Bahan 238,550.00 Rp
4.4 m' Profil Aluminium 40,000.00 Rp 176,000.00 Rp
4.5 m' Profil Kaca 10,000.00 Rp 45,000.00 Rp
0.27 Tube Sealant 65,000.00 Rp 17,550.00 Rp
6.13.2 Tenaga 8,935.00 Rp
0.085 OH Pekerja 40,000.00 Rp 3,400.00 Rp
0.085 OH Tukang Besi 55,000.00 Rp 4,675.00 Rp
0.009 OH Kepala Tukang 65,000.00 Rp 585.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.14 1 m2 Memasang Venetions Blinds & Vertical Blinds 141,515.00 Rp
6.14.1 Bahan 105,000.00 Rp
1 m' Venetions Blinds atau Vertical Blinds (tirai) 105,000.00 Rp 105,000.00 Rp
6.14.2 Tenaga 36,515.00 Rp
0.35 OH Pekerja 40,000.00 Rp 14,000.00 Rp
0.35 OH Tukang Besi 55,000.00 Rp 19,250.00 Rp
0.035 OH Kepala Tukang 65,000.00 Rp 2,275.00 Rp
0.018 OH Mandor 55,000.00 Rp 990.00 Rp
6.15 1 m2 Memasang Teralli Besi Strip (2x3) cm 313,134.65 Rp
6.15.1 Bahan 139,064.65 Rp
6.177 m' Besi Strip 2 x 3 14,000.00 Rp 86,478.00 Rp
27.08 cm Pengelasan 1,941.90 Rp 52,586.65 Rp
6.15.2 Tenaga 174,070.00 Rp
1.67 OH Pekerja 40,000.00 Rp 66,800.00 Rp
1.67 OH Tukang Las 55,000.00 Rp 91,850.00 Rp
0.167 OH Kepala Tukang 65,000.00 Rp 10,855.00 Rp
0.083 OH Mandor 55,000.00 Rp 4,565.00 Rp
6.16 1 m2 Memasang Kawat Nyamuk 67,023.51 Rp
6.16.1 Bahan 56,598.51 Rp
1.1 m2 Kwat Nyamuk Nylon 10,000.00 Rp 11,000.00 Rp
11.11 cm Pengelasan 1,941.90 Rp 21,574.51 Rp
1.716 Kg Baja Strip (0.2 x 2) cm 14,000.00 Rp 24,024.00 Rp
6.16.2 Tenaga 10,425.00 Rp
0.1 OH Pekerja 40,000.00 Rp 4,000.00 Rp
0.1 OH Tukang Kayu 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.17 1 m2 Memasang Jendela Nako & Tralis 36,555.00 Rp
6.17.1 Bahan 16,200.00 Rp
1.1 m2 Jendela Nako 11,000.00 Rp 12,100.00 Rp
10 Buah Paku Skrup 60.00 Rp 600.00 Rp
7 m' Besi Strip 500.00 Rp 3,500.00 Rp
6.17.2 Tenaga 20,355.00 Rp
0.2 OH Pekerja 40,000.00 Rp 8,000.00 Rp
0.2 OH Tukang Kayu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang 65,000.00 Rp 1,300.00 Rp
0.001 OH Mandor 55,000.00 Rp 55.00 Rp
6.18 1 m' Memasang Talang Datar/ Jurai, Seng BJLS 28 Lebar 90 cm 161,392.50 Rp
6.18.1 Bahan 129,217.50 Rp
1.05 Lbr Seng Plaat 36,000.00 Rp 37,800.00 Rp
0.015 Kg Paku Biasa 1 - 2.5 cm 14,500.00 Rp 217.50 Rp
0.019 m3 Papan Kayu Klas II atau III 4,800,000.00 Rp 91,200.00 Rp
XI 03-7393-2008
6.18.2 Tenaga 32,175.00 Rp
0.2 OH Pekerja 40,000.00 Rp 8,000.00 Rp
0.4 OH Tukang Kayu 55,000.00 Rp 22,000.00 Rp
0.025 OH Kepala Tukang 65,000.00 Rp 1,625.00 Rp
0.01 OH Mandor 55,000.00 Rp 550.00 Rp
6.19 1 m' Memasang Talang 1/2 Lingkaran 15cm, Seng Plat BJLS 30 Lebar 45 cm 75,085.00 Rp
6.19.1 Bahan 50,195.00 Rp
1.05 Lbr Seng Plaat 41,000.00 Rp 43,050.00 Rp
0.01 Kg Paku Biasa 1 - 2.5 cm 14,500.00 Rp 145.00 Rp
0.5 m3 Besi Strip 14,000.00 Rp 7,000.00 Rp
6.19.2 Tenaga 24,890.00 Rp
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.3 OH Tukang Kayu 55,000.00 Rp 16,500.00 Rp
0.03 OH Kepala Tukang 65,000.00 Rp 1,950.00 Rp
0.008 OH Mandor 55,000.00 Rp 440.00 Rp
PEKERJAAN KUNCI DAN KACA
6.2 1 Buah Memasang Kunci Tanam Biasa 168,825.00 Rp
6.2.1 Bahan 140,000.00 Rp
1 Buah Kunci Tanam Biasa 140,000.00 Rp 140,000.00 Rp
6.2.2 Tenaga 28,825.00 Rp
0.01 OH Pekerja 40,000.00 Rp 400.00 Rp
0.5 OH Tukang Kayu 55,000.00 Rp 27,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.3 1 Buah Memasang Kunci Kamar Mandi 83,162.50 Rp
6.3.1 Bahan 55,000.00 Rp
1 Buah Kunci Tanam Kamar Mandi 55,000.00 Rp 55,000.00 Rp
6.3.2 Tenaga 28,162.50 Rp
0.005 OH Pekerja 40,000.00 Rp 200.00 Rp
0.5 OH Tukang Kayu 55,000.00 Rp 27,500.00 Rp
0.005 OH Kepala Tukang 65,000.00 Rp 325.00 Rp
0.0025 OH Mandor 55,000.00 Rp 137.50 Rp
6.4 1 Buah Mamasang Kunci Silinder 168,162.50 Rp
6.4.1 Bahan 140,000.00 Rp
1 Buah Kunci Silinder 140,000.00 Rp 140,000.00 Rp
6.4.2 Tenaga 28,162.50 Rp
0.005 OH Pekerja 40,000.00 Rp 200.00 Rp
0.5 OH Tukang Kayu 55,000.00 Rp 27,500.00 Rp
0.005 OH Kepala Tukang 65,000.00 Rp 325.00 Rp
0.0025 OH Mandor 55,000.00 Rp 137.50 Rp
6.5 1 Buah Memasang Engsel Pintu 19,237.50 Rp
6.5.1 Bahan 9,000.00 Rp
1 Buah Engsel Pintu 9,000.00 Rp 9,000.00 Rp
6.5.2 Tenaga 10,237.50 Rp
0.015 OH Pekerja 40,000.00 Rp 600.00 Rp
0.15 OH Tukang Kayu 55,000.00 Rp 8,250.00 Rp
0.015 OH Kepala Tukang 65,000.00 Rp 975.00 Rp
0.0075 OH Mandor 55,000.00 Rp 412.50 Rp
6.6 1 Buah Pasang Engsel Jendela Kupu- kupu 9,325.00 Rp
6.6.1 Bahan 2,500.00 Rp
1 Buah Engsel Jendela 2,500.00 Rp 2,500.00 Rp
6.6.2 Tenaga 6,825.00 Rp
0.01 OH Pekerja 40,000.00 Rp 400.00 Rp
0.1 OH Tukang Kayu 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.7 1 Buah Pasang Engsel Angin 29,650.00 Rp
6.7.1 Bahan 16,000.00 Rp
1 Buah Engsel Angin 16,000.00 Rp 16,000.00 Rp
6.7.2 Tenaga 13,650.00 Rp
0.02 OH Pekerja 40,000.00 Rp 800.00 Rp
0.2 OH Tukang Kayu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang 65,000.00 Rp 1,300.00 Rp
0.01 OH Mandor 55,000.00 Rp 550.00 Rp
6.9 1 Buah Pasang Kait Angin 24,866.25 Rp
6.9.1 Bahan 15,000.00 Rp
1 Buah Kait Angin 15,000.00 Rp 15,000.00 Rp
6.9.2 Tenaga 9,866.25 Rp
0.015 OH Pekerja 40,000.00 Rp 600.00 Rp
0.15 OH Tukang Kayu 55,000.00 Rp 8,250.00 Rp
0.015 OH Kepala Tukang 65,000.00 Rp 975.00 Rp
0.00075 OH Mandor 55,000.00 Rp 41.25 Rp
6.10 1 Buah Pasang Door Closer 382,887.50 Rp
6.10.1 Bahan 350,000.00 Rp
1 Buah Door Closer 350,000.00 Rp 350,000.00 Rp
6.10.2 Tenaga 32,887.50 Rp
0.05 OH Pekerja 40,000.00 Rp 2,000.00 Rp
0.5 OH Tukang Kayu 55,000.00 Rp 27,500.00 Rp
0.05 OH Kepala Tukang 65,000.00 Rp 3,250.00 Rp
0.0025 OH Mandor 55,000.00 Rp 137.50 Rp
6.11 1 Buah Pasang Kunci Selot 23,155.00 Rp
6.11.1 Bahan 10,000.00 Rp
XI
XII
03-7393-2008
1 Buah Kunci Selot 10,000.00 Rp 10,000.00 Rp
6.11.2 Tenaga 13,155.00 Rp
0.02 OH Pekerja 40,000.00 Rp 800.00 Rp
0.2 OH Tukang Kayu 55,000.00 Rp 11,000.00 Rp
0.02 OH Kepala Tukang 65,000.00 Rp 1,300.00 Rp
0.001 OH Mandor 55,000.00 Rp 55.00 Rp
6.13 1 Buah Pasang Door Stop 356,577.50 Rp
6.13.1 Bahan 350,000.00 Rp
1 Buah Door Stop 350,000.00 Rp 350,000.00 Rp
6.13.2 Tenaga 6,577.50 Rp
0.01 OH Pekerja 40,000.00 Rp 400.00 Rp
0.1 OH Tukang Kayu 55,000.00 Rp 5,500.00 Rp
0.01 OH Kepala Tukang 65,000.00 Rp 650.00 Rp
0.0005 OH Mandor 55,000.00 Rp 27.50 Rp
6.14 1 Buah Pasang Rel Pintu Dorong 249,465.00 Rp
6.14.1 Bahan 210,000.00 Rp
1 Buah Rel Pintu Dorong 210,000.00 Rp 210,000.00 Rp
6.14.2 Tenaga 39,465.00 Rp
0.06 OH Pekerja 40,000.00 Rp 2,400.00 Rp
0.6 OH Tukang Kayu 55,000.00 Rp 33,000.00 Rp
0.06 OH Kepala Tukang 65,000.00 Rp 3,900.00 Rp
0.003 OH Mandor 55,000.00 Rp 165.00 Rp
6.15 1 Buah Pasang Kunci Lemari 26,443.75 Rp
6.15.1 Bahan 10,000.00 Rp
1 Buah Kunci Lemari 10,000.00 Rp 10,000.00 Rp
6.15.2 Tenaga 16,443.75 Rp
0.025 OH Pekerja 40,000.00 Rp 1,000.00 Rp
0.25 OH Tukang Kayu 55,000.00 Rp 13,750.00 Rp
0.025 OH Kepala Tukang 65,000.00 Rp 1,625.00 Rp
0.00125 OH Mandor 55,000.00 Rp 68.75 Rp
6.16 1 Buah Pasang Kaca tebal 3mm 75,866.25 Rp
6.16.1 Bahan 66,000.00 Rp
1.1 Buah Kaca tebal 3mm 60,000.00 Rp 66,000.00 Rp
6.16.2 Tenaga 9,866.25 Rp
0.015 OH Pekerja 40,000.00 Rp 600.00 Rp
0.15 OH Tukang Kayu 55,000.00 Rp 8,250.00 Rp
0.015 OH Kepala Tukang 65,000.00 Rp 975.00 Rp
0.00075 OH Mandor 55,000.00 Rp 41.25 Rp
6.17 1 Buah Pasang Kaca Tebal 5mm 89,616.25 Rp
6.17.1 Bahan 79,750.00 Rp
1.1 Buah Kaca tebal 5mm 72,500.00 Rp 79,750.00 Rp
6.17.2 Tenaga 9,866.25 Rp
0.015 OH Pekerja 40,000.00 Rp 600.00 Rp
0.15 OH Tukang Kayu 55,000.00 Rp 8,250.00 Rp
0.015 OH Kepala Tukang 65,000.00 Rp 975.00 Rp
0.00075 OH Mandor 55,000.00 Rp 41.25 Rp
6.20 1 Buah Pasang Kaca Cermin tebal 5mm 240,866.25 Rp
6.20.1 Bahan 231,000.00 Rp
1.1 Buah Kaca Cermin 210,000.00 Rp 231,000.00 Rp
6.20.2 Tenaga 9,866.25 Rp
0.015 OH Pekerja 40,000.00 Rp 600.00 Rp
0.15 OH Tukang Kayu 55,000.00 Rp 8,250.00 Rp
0.015 OH Kepala Tukang 65,000.00 Rp 975.00 Rp
0.00075 OH Mandor 55,000.00 Rp 41.25 Rp
6 PEKERJAAN PENUTUP LANTAI & DINDING
6.3 1 m2 Memasang Lantai Ubin PC Abu-abu Uk. 20 x 20 cm 74,925.00 Rp
6.3.1 Bahan 55,020.00 Rp
26.5 Buah Ubin Abu- abu 20x20 cm 1,280.00 Rp 33,920.00 Rp
10.4 Kg Portland Semen 1,250.00 Rp 13,000.00 Rp
0.045 m3 Pasir Pasang 180,000.00 Rp 8,100.00 Rp
6.3.2 Tenaga 19,905.00 Rp
0.27 OH Pekerja 40,000.00 Rp 10,800.00 Rp
0.135 OH Tukang Batu 55,000.00 Rp 7,425.00 Rp
0.014 OH Kepala Tukang 65,000.00 Rp 910.00 Rp
0.014 OH Mandor 55,000.00 Rp 770.00 Rp
6.9 1 m2 Memasang Lantai Ubin Granito Uk. 40 x 40 cm 276,633.00 Rp
6.9.1 Bahan 258,198.00 Rp
6.63 Buah Ubin Granito Uk. 40 x 40 cm 33,600.00 Rp 222,768.00 Rp
9.8 Kg Portland Semen 1,250.00 Rp 12,250.00 Rp
0.045 m3 Pasir Pasang 180,000.00 Rp 8,100.00 Rp
1.3 Kg Semen Warna 11,600.00 Rp 15,080.00 Rp
6.9.2 Tenaga 18,435.00 Rp
0.25 OH Pekerja 40,000.00 Rp 10,000.00 Rp
0.125 OH Tukang Batu 55,000.00 Rp 6,875.00 Rp
0.013 OH Kepala Tukang 65,000.00 Rp 845.00 Rp
0.013 OH Mandor 55,000.00 Rp 715.00 Rp
6.19 1 m2 Pasang Plint Ubin PC Warna Uk. 10 x 20 cm 41,685.00 Rp
6.19.1 Bahan 32,275.00 Rp
5.3 Buah Plint Ubin PC Warna Uk. 10 x 20 cm 5,500.00 Rp 29,150.00 Rp
1.14 Kg Portland Semen 1,250.00 Rp 1,425.00 Rp
0.003 m3 Pasir Pasang 180,000.00 Rp 540.00 Rp
0.1 Kg Semen Warna 11,600.00 Rp 1,160.00 Rp
XIII
XII
03-7395-2008
6.19.2 Tenaga 9,410.00 Rp
0.09 OH Pekerja 40,000.00 Rp 3,600.00 Rp
0.09 OH Tukang Batu 55,000.00 Rp 4,950.00 Rp
0.009 OH Kepala Tukang 65,000.00 Rp 585.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.34 1 m2 Memasang Lantai Keramik 33 x 33 cm 135,246.20 Rp
6.34.1 Bahan 83,796.20 Rp
10 Buah Ubin Keramik 33 x 33 cm 4,666.67 Rp 46,666.70 Rp
8.19 Kg Portland Semen 1,250.00 Rp 10,237.50 Rp
0.045 m3 Pasir Pasang 180,000.00 Rp 8,100.00 Rp
1.62 Kg Semen Warna 11,600.00 Rp 18,792.00 Rp
6.34.2 Tenaga 51,450.00 Rp
0.7 OH Pekerja 40,000.00 Rp 28,000.00 Rp
0.35 OH Tukang Batu 55,000.00 Rp 19,250.00 Rp
0.035 OH Kepala Tukang 65,000.00 Rp 2,275.00 Rp
0.035 OH Mandor 55,000.00 Rp 1,925.00 Rp
6.35 1 m2 Memasang Lantai Keramik 30 x 30 cm 134,771.80 Rp
6.35.1 Bahan 83,321.80 Rp
11.87 Buah Ubin Keramik 30 x 30 cm 3,818.18 Rp 45,321.80 Rp
10 Kg Portland Semen 1,250.00 Rp 12,500.00 Rp
0.045 m3 Pasir Pasang 180,000.00 Rp 8,100.00 Rp
1.5 Kg Semen Warna 11,600.00 Rp 17,400.00 Rp
6.35.2 Tenaga 51,450.00 Rp
0.7 OH Pekerja 40,000.00 Rp 28,000.00 Rp
0.35 OH Tukang Batu 55,000.00 Rp 19,250.00 Rp
0.035 OH Kepala Tukang 65,000.00 Rp 2,275.00 Rp
0.035 OH Mandor 55,000.00 Rp 1,925.00 Rp
6.36 1 m2 Memasang Lantai Keramik 20 x 20 cm 134,802.00 Rp
6.36.1 Bahan 83,352.00 Rp
26.5 Buah Ubin Keramik 20 x 20 cm 1,640.00 Rp 43,460.00 Rp
10.4 Kg Portland Semen 1,250.00 Rp 13,000.00 Rp
0.045 m3 Pasir Pasang 180,000.00 Rp 8,100.00 Rp
1.62 Kg Semen Warna 11,600.00 Rp 18,792.00 Rp
6.36.2 Tenaga 51,450.00 Rp
0.7 OH Pekerja 40,000.00 Rp 28,000.00 Rp
0.35 OH Tukang Batu 55,000.00 Rp 19,250.00 Rp
0.035 OH Kepala Tukang 65,000.00 Rp 2,275.00 Rp
0.035 OH Mandor 55,000.00 Rp 1,925.00 Rp
6.39 1 m2 Memasang Plint Keramik Ukuran 10 x 20 cm 18,212.04 Rp
6.39.1 Bahan 8,802.04 Rp
5.3 Buah Ubin Keramik Ukuran 10 x 20 cm 1,235.29 Rp 6,547.04 Rp
1.14 Kg Portland Semen 1,250.00 Rp 1,425.00 Rp
0.003 m3 Pasir Pasang 180,000.00 Rp 540.00 Rp
0.025 Kg Semen Warna 11,600.00 Rp 290.00 Rp
6.39.2 Tenaga 9,410.00 Rp
0.09 OH Pekerja 40,000.00 Rp 3,600.00 Rp
0.09 OH Tukang Batu 55,000.00 Rp 4,950.00 Rp
0.009 OH Kepala Tukang 65,000.00 Rp 585.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.40 1 m2 Memasang Plint Keramik Ukuran 10 x 10 cm 25,049.07 Rp
6.40.1 Bahan 15,639.07 Rp
10.6 Buah Ubin Keramik Ukuran 10 x 10 cm 1,235.29 Rp 13,094.07 Rp
1.14 Kg Portland Semen 1,250.00 Rp 1,425.00 Rp
0.003 m3 Pasir Pasang 180,000.00 Rp 540.00 Rp
0.05 Kg Semen Warna 11,600.00 Rp 580.00 Rp
6.40.2 Tenaga 9,410.00 Rp
0.09 OH Pekerja 40,000.00 Rp 3,600.00 Rp
0.09 OH Tukang Batu 55,000.00 Rp 4,950.00 Rp
0.009 OH Kepala Tukang 65,000.00 Rp 585.00 Rp
0.005 OH Mandor 55,000.00 Rp 275.00 Rp
6.43 1 m2 Memasang Lantai Marmer Ukuran 1.00 x 1.00 cm 421,827.50 Rp
6.43.1 Bahan 370,377.50 Rp
1.06 Buah Marmer Ukuran 1.00 x 1.00 cm 325,000.00 Rp 344,500.00 Rp
8.19 Kg Portland Semen 1,250.00 Rp 10,237.50 Rp
0.045 m3 Pasir Pasang 180,000.00 Rp 8,100.00 Rp
0.65 Kg Semen Warna 11,600.00 Rp 7,540.00 Rp
6.43.2 Tenaga 51,450.00 Rp
0.7 OH Pekerja 40,000.00 Rp 28,000.00 Rp
0.35 OH Tukang Batu 55,000.00 Rp 19,250.00 Rp
0.035 OH Kepala Tukang 65,000.00 Rp 2,275.00 Rp
0.035 OH Mandor 55,000.00 Rp 1,925.00 Rp
6.44 1 m2 Memasang Lantai Karpet 86,875.00 Rp
6.44.1 Bahan 69,125.00 Rp
1.05 m2 Karpet 54,166.67 Rp 56,875.00 Rp
0.35 Kg Lem 35,000.00 Rp 12,250.00 Rp
6.44.2 Tenaga 17,750.00 Rp
0.17 OH Pekerja 40,000.00 Rp 6,800.00 Rp
0.17 OH Tukang Batu 55,000.00 Rp 9,350.00 Rp
0.017 OH Kepala Tukang 65,000.00 Rp 1,105.00 Rp
0.009 OH Mandor 55,000.00 Rp 495.00 Rp
6.46 1 m2 Memasang Lantai Parquet Jati 256,200.00 Rp
6.46.1 Bahan 204,750.00 Rp
1.05 m2 Parquet Jati 175,000.00 Rp 183,750.00 Rp
XIII 03-7395-2008
0.6 Kg Lem Vynil 35,000.00 Rp 21,000.00 Rp
6.46.2 Tenaga 51,450.00 Rp
0.7 OH Pekerja 40,000.00 Rp 28,000.00 Rp
0.35 OH Tukang Batu 55,000.00 Rp 19,250.00 Rp
0.035 OH Kepala Tukang 65,000.00 Rp 2,275.00 Rp
0.035 OH Mandor 55,000.00 Rp 1,925.00 Rp
6.53 1 m2 Memasang Dinding Keramik 10 x 20 cm 153,195.00 Rp
6.53.1 Bahan 87,045.00 Rp
53 Buah Keramik 10 x 20 cm 760.00 Rp 40,280.00 Rp
9.3 Kg Portland Semen 1,250.00 Rp 11,625.00 Rp
0.018 m3 Pasir Pasang 180,000.00 Rp 3,240.00 Rp
2.75 Kg Semen Warna 11,600.00 Rp 31,900.00 Rp
6.53.2 Tenaga 66,150.00 Rp
0.9 OH Pekerja 40,000.00 Rp 36,000.00 Rp
0.45 OH Tukang Batu 55,000.00 Rp 24,750.00 Rp
0.045 OH Kepala Tukang 65,000.00 Rp 2,925.00 Rp
0.045 OH Mandor 55,000.00 Rp 2,475.00 Rp
6.54 1 m2 Memasang Dinding Keramik 20 x 20 cm 148,039.00 Rp
6.54.1 Bahan 81,889.00 Rp
26.5 Buah Keramik 20 x 20 cm 1,680.00 Rp 44,520.00 Rp
9.3 Kg Portland Semen 1,250.00 Rp 11,625.00 Rp
0.018 m3 Pasir Pasang 180,000.00 Rp 3,240.00 Rp
1.94 Kg Semen Warna 11,600.00 Rp 22,504.00 Rp
6.54.2 Tenaga 66,150.00 Rp
0.9 OH Pekerja 40,000.00 Rp 36,000.00 Rp
0.45 OH Tukang Batu 55,000.00 Rp 24,750.00 Rp
0.045 OH Kepala Tukang 65,000.00 Rp 2,925.00 Rp
0.045 OH Mandor 55,000.00 Rp 2,475.00 Rp
6.55 1 m2 Memasang Dinding Marmer Ukuran 1.00 x 1.00 cm 467,745.11 Rp
6.55.1 Bahan 372,195.11 Rp
1.06 Buah Marmer Ukuran 1.00 x 1.00 cm 325,000.00 Rp 344,500.00 Rp
3.003 Buah Paku 12 cm 35.00 Rp 105.11 Rp
12.44 Kg Portland Semen 1,250.00 Rp 15,550.00 Rp
0.025 m3 Pasir Pasang 180,000.00 Rp 4,500.00 Rp
0.65 Kg Semen Warna 11,600.00 Rp 7,540.00 Rp
6.55.2 Tenaga 95,550.00 Rp
1.3 OH Pekerja 40,000.00 Rp 52,000.00 Rp
0.65 OH Tukang Batu 55,000.00 Rp 35,750.00 Rp
0.065 OH Kepala Tukang 65,000.00 Rp 4,225.00 Rp
0.065 OH Mandor 55,000.00 Rp 3,575.00 Rp
6.57 1 m2 Memasang Dinding Batu Paros/ Batu Tempel Hitam 158,237.50 Rp
6.57.1 Bahan 106,787.50 Rp
1.1 Buah Batu Paros/ Batu Tempel Hitam 78,000.00 Rp 85,800.00 Rp
11.75 Kg Portland Semen 1,250.00 Rp 14,687.50 Rp
0.035 m3 Pasir Pasang 180,000.00 Rp 6,300.00 Rp
7.57.2 Tenaga 51,450.00 Rp
0.7 OH Pekerja 40,000.00 Rp 28,000.00 Rp
0.35 OH Tukang Batu 55,000.00 Rp 19,250.00 Rp
0.035 OH Kepala Tukang 65,000.00 Rp 2,275.00 Rp
0.035 OH Mandor 55,000.00 Rp 1,925.00 Rp
6.60 1 m2 Memasang Wall Paper Lebar 50 cm 132,590.00 Rp
6.60.1 Bahan 107,750.00 Rp
2.2 m' Wall Paper Lebar 50 cm 45,000.00 Rp 99,000.00 Rp
0.25 Kg Lem 35,000.00 Rp 8,750.00 Rp
6.60.2 Tenaga 24,840.00 Rp
0.35 OH Pekerja 40,000.00 Rp 14,000.00 Rp
0.175 OH Tukang Batu 55,000.00 Rp 9,625.00 Rp
0.017 OH Kepala Tukang 65,000.00 Rp 1,105.00 Rp
0.002 OH Mandor 55,000.00 Rp 110.00 Rp
6.63 1 m' Memasang Plint Kayu Klas II Ukuran 20 x 10 cm 35,015.50 Rp
6.63.1 Bahan 22,505.50 Rp
0.003 m3 Papan Kayu Klas II 7,500,000.00 Rp 22,500.00 Rp
0.05 Kg Paku Skrup 5cm 110.00 Rp 5.50 Rp
6.63.2 Tenaga 12,510.00 Rp
0.12 OH Pekerja 40,000.00 Rp 4,800.00 Rp
0.12 OH Tukang Batu 55,000.00 Rp 6,600.00 Rp
0.012 OH Kepala Tukang 65,000.00 Rp 780.00 Rp
0.006 OH Mandor 55,000.00 Rp 330.00 Rp
6 PENGERJAAN PENGECATAN
6.1 1 m2 Mengikis/ mengerok Permukaan Cat Tembok Lama 6,787.50 Rp
6.1.1 Bahan 650.00 Rp
0.05 Kg Soda Api 13,000.00 Rp 650.00 Rp
6.1.2 Tenaga 6,137.50 Rp
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.0025 OH Mandor 55,000.00 Rp 137.50 Rp
6.2 1 m2 Mencuci Bidang Permukaan tembok yg Pernah Dicat 6,787.50 Rp
6.2.1 Bahan 650.00 Rp
0.05 Kg Sabun 13,000.00 Rp 650.00 Rp
6.2.2 Tenaga 6,137.50 Rp
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.0025 OH Mandor 55,000.00 Rp 137.50 Rp
6.3 1 m2 Mengerok Karat Cat Lama Permukaan Baja Dengan Cara Manual 6,787.50 Rp
XIII 03-7395-2008
03 24
XIV
6.3.1 Bahan 650.00 Rp
0.05 Kg Sabun 13,000.00 Rp 650.00 Rp
6.3.2 Tenaga 6,137.50 Rp
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.0025 OH Mandor 55,000.00 Rp 137.50 Rp
6.4 1 m2 Penyabun Permukaan Tembok Lama 6,787.50 Rp
6.4.1 Bahan 650.00 Rp
0.05 Kg Sabun 13,000.00 Rp 650.00 Rp
6.4.2 Tenaga 6,137.50 Rp
0.15 OH Pekerja 40,000.00 Rp 6,000.00 Rp
0.0025 OH Mandor 55,000.00 Rp 137.50 Rp
6.6 1 m2 Mendempul dan Menggosok Kayu 5,752.50 Rp
6.6.1 Bahan 1,555.00 Rp
0.08 Kg Dempul Jati 12,000.00 Rp 960.00 Rp
0.02 Kg Minyak Cat 11,250.00 Rp 225.00 Rp
0.1 Lbr Amplas 3,700.00 Rp 370.00 Rp
6.6.2 Tenaga 4,197.50 Rp
0.04 OH Pekerja 40,000.00 Rp 1,600.00 Rp
0.04 OH Tukang Cat 55,000.00 Rp 2,200.00 Rp
0.004 OH Kepala Tukang 65,000.00 Rp 260.00 Rp
0.0025 OH Mandor 55,000.00 Rp 137.50 Rp
6.7 1 m2 Pengecatan Bidang Lama 19,805.00 Rp
6.7.1 Bahan 12,255.00 Rp
0.15 Kg Plamir 12,000.00 Rp 1,800.00 Rp
0.17 Kg Cat dasar 15,000.00 Rp 2,550.00 Rp
0.17 Lbr Penutup 46,500.00 Rp 7,905.00 Rp
6.7.2 Tenaga 7,550.00 Rp
0.07 OH Pekerja 40,000.00 Rp 2,800.00 Rp
0.075 OH Tukang Cat 55,000.00 Rp 4,125.00 Rp
0.0075 OH Kepala Tukang 65,000.00 Rp 487.50 Rp
0.0025 OH Mandor 55,000.00 Rp 137.50 Rp
6.8 1 m2 Pengecatan Bidang Kayu Baru (1 lap. Plamir) 1 lap. Cat dasar & 2 lap. Cat penutup 23,432.50 Rp
6.8.1 Bahan 19,610.00 Rp
0.2 Kg Cat Meni 15,000.00 Rp 3,000.00 Rp
0.15 Kg Plamir 12,000.00 Rp 1,800.00 Rp
0.17 Kg Cat dasar 16,000.00 Rp 2,720.00 Rp
0.26 Lbr Penutup 2 kali 46,500.00 Rp 12,090.00 Rp
6.8.2 Tenaga 3,822.50 Rp
0.07 OH Pekerja 40,000.00 Rp 2,800.00 Rp
0.009 OH Tukang Cat 55,000.00 Rp 495.00 Rp
0.006 OH Kepala Tukang 65,000.00 Rp 390.00 Rp
0.0025 OH Mandor 55,000.00 Rp 137.50 Rp
6.9 1 m2 Pengecatan Bidang Kayu Baru (1 lap. Plamir) 1 lap. Cat dasar & 3 lap. Cat penutup 32,767.50 Rp
6.9.1 Bahan 23,795.00 Rp
0.2 Kg Cat Meni 15,000.00 Rp 3,000.00 Rp
0.15 Kg Plamir 12,000.00 Rp 1,800.00 Rp
0.17 Kg Cat dasar 16,000.00 Rp 2,720.00 Rp
0.35 Lbr Penutup 2 kali 46,500.00 Rp 16,275.00 Rp
6.9.2 Tenaga 8,972.50 Rp
0.07 OH Pekerja 40,000.00 Rp 2,800.00 Rp
0.105 OH Tukang Cat 55,000.00 Rp 5,775.00 Rp
0.004 OH Kepala Tukang 65,000.00 Rp 260.00 Rp
0.0025 OH Mandor 55,000.00 Rp 137.50 Rp
6.10 1 m2 Pelaburan Bidang Kayu Dengan Teak Oil 31,617.50 Rp
6.10.1 Bahan 22,320.00 Rp
0.36 Kg Teak Oil 62,000.00 Rp 22,320.00 Rp
6.10.2 Tenaga 9,297.50 Rp
0.04 OH Pekerja 40,000.00 Rp 1,600.00 Rp
0.063 OH Tukang Cat 55,000.00 Rp 3,465.00 Rp
0.063 OH Kepala Tukang 65,000.00 Rp 4,095.00 Rp
0.0025 OH Mandor 55,000.00 Rp 137.50 Rp
6.11 1 m2 Pelaburan Bidang Kayu Dengan Politur 44,241.50 Rp
6.11.1 Bahan 39,764.00 Rp
0.15 Ltr Politur 62,000.00 Rp 9,300.00 Rp
0.372 Ltr Politur Jadi 62,000.00 Rp 23,064.00 Rp
2 Lbr Ampelas 3,700.00 Rp 7,400.00 Rp
6.11.2 Tenaga 4,477.50 Rp
0.06 OH Tukang Cat 55,000.00 Rp 3,300.00 Rp
0.016 OH Kepala Tukang 65,000.00 Rp 1,040.00 Rp
0.0025 OH Mandor 55,000.00 Rp 137.50 Rp
6.12 1 m2 Pelaburan Bidang Kayu dengan Cat Residu & Ter 5,467.50 Rp
6.12.1 Bahan 1,137.50 Rp
0.35 Ltr Residu/ Ter 3,250.00 Rp 1,137.50 Rp
6.12.2 Tenaga 4,330.00 Rp
0.1 OH Pekerja 40,000.00 Rp 4,000.00 Rp
0.006 OH Mandor 55,000.00 Rp 330.00 Rp
6.13 1 m2 Pelaburan Bidang Kayu dengan Vernis 26,672.50 Rp
6.13.1 Bahan 10,295.00 Rp
0.15 Ltr Vernis 62,000.00 Rp 9,300.00 Rp
0.05 Ltr Dempul 12,000.00 Rp 600.00 Rp
0.1 Lbr Ampelas 3,700.00 Rp 370.00 Rp
03 24
XIV
0.01 Buah Kuas 2,500.00 Rp 25.00 Rp
6.13.2 Tenaga 16,377.50 Rp
0.16 OH Pekerja 40,000.00 Rp 6,400.00 Rp
0.16 OH Tukang Cat 55,000.00 Rp 8,800.00 Rp
0.016 OH Kepala Tukang 65,000.00 Rp 1,040.00 Rp
0.0025 OH Mandor 55,000.00 Rp 137.50 Rp
6.14 1 m2 Pengecat Tembok Baru (1 lap. Plamir, 1 lap. Cat dasar, 2 lap. Cat penutup) 13,008.00 Rp
6.14.1 Bahan 8,196.00 Rp
0.1 Kg Plamir 12,000.00 Rp 1,200.00 Rp
0.1 Kg Cat Dasar 19,000.00 Rp 1,900.00 Rp
0.26 Kg Cat Penutup 2 Kali 19,600.00 Rp 5,096.00 Rp
6.14.2 Tenaga 4,812.00 Rp
0.02 OH Pekerja 40,000.00 Rp 800.00 Rp
0.063 OH Tukang Cat 55,000.00 Rp 3,465.00 Rp
0.0063 OH Kepala Tukang 65,000.00 Rp 409.50 Rp
0.0025 OH Mandor 55,000.00 Rp 137.50 Rp
6.15 1 m2 Pengecat Tembok Baru (1 lap. Plamir, 2 lap. Cat penutup) 9,268.50 Rp
6.15.1 Bahan 5,428.00 Rp
0.1 Kg Cat Dasar 19,000.00 Rp 1,900.00 Rp
0.18 Kg Cat Penutup 2 Kali 19,600.00 Rp 3,528.00 Rp
6.15.2 Tenaga 3,840.50 Rp
0.028 OH Pekerja 40,000.00 Rp 1,120.00 Rp
0.042 OH Tukang Cat 55,000.00 Rp 2,310.00 Rp
0.0042 OH Kepala Tukang 65,000.00 Rp 273.00 Rp
0.0025 OH Mandor 55,000.00 Rp 137.50 Rp
6.20 1 m2 Pengecatan Permukaan Baja Dengan Meni Besi 14,830.00 Rp
6.20.1 Bahan 2,350.00 Rp
0.1 Kg Meni Besi 20,000.00 Rp 2,000.00 Rp
0.01 Kg Perekat/ Lem 35,000.00 Rp 350.00 Rp
6.20.2 Tenaga 12,480.00 Rp
0.02 OH Pekerja 40,000.00 Rp 800.00 Rp
0.2 OH Tukang Cat 55,000.00 Rp 11,000.00 Rp
0.002 OH Kepala Tukang 65,000.00 Rp 130.00 Rp
0.01 OH Mandor 55,000.00 Rp 550.00 Rp
6.21 1 m2 Pengecatan Permukaan Baja Dengan Meni Besi & Perancah 28,800.00 Rp
6.21.1 Bahan 4,550.00 Rp
0.1 Kg Meni Besi 20,000.00 Rp 2,000.00 Rp
0.01 Kg Perekat/ Lem 35,000.00 Rp 350.00 Rp
0.002 m3 Perancah Kayu 1,100,000.00 Rp 2,200.00 Rp
6.21.2 Tenaga 24,250.00 Rp
0.25 OH Pekerja 40,000.00 Rp 10,000.00 Rp
0.225 OH Tukang Cat 55,000.00 Rp 12,375.00 Rp
0.0225 OH Kepala Tukang 65,000.00 Rp 1,462.50 Rp
0.0075 OH Mandor 55,000.00 Rp 412.50 Rp
6.24 1 m2 Pengecatan Permukaan BJLS (Galvanis) Secara Manual sistem 3 lap. Cat Konvensional dg Tebal 200 1/4m 103,140.00 Rp
6.24.1 Bahan 8,640.00 Rp
0.11 Kg Cat Dasar 16,000.00 Rp 1,760.00 Rp
0.17 Kg Cat Antara 16,000.00 Rp 2,720.00 Rp
0.08 Kg Cat Penutup 52,000.00 Rp 4,160.00 Rp
6.24.2 Tenaga 94,500.00 Rp
0.5 OH Pekerja 40,000.00 Rp 20,000.00 Rp
0.8 OH Tukang Cat 55,000.00 Rp 44,000.00 Rp
0.3 OH Kepala Tukang 65,000.00 Rp 19,500.00 Rp
0.2 OH Mandor 55,000.00 Rp 11,000.00 Rp
03 24
XIV

Você também pode gostar