Você está na página 1de 13

Tramo: Codigo:

Fecha: Proyecto:
x
x min max min max
x A VALORES de MANO de OBRA
x A1 Canalizacin
x Roturas
x 1 Calzada Hormigon 0,2 espesor m2 236.60 0.464 0.557 109.78 131.79
x 4 Excavacin en TCN m3 6,798.07 0.123 0.148 836.16 1,006.11
x 6 Excavacin zanja en Calzada m3 372.10 0.307 0.368 114.23 136.93
x 13 Retiro de escombros m3 4,777.35 0.215 0.258 1,027.13 1,232.56
x Instalacin
x 14 Ducto 110mm PVC ml 14,996.60 0.103 0.124 1,544.65 1,859.58
x Ducto 90 mm PVC ml 3,374.00 0.085 0.102 286.79 344.15
x Camisa de acero 600 mm mt 91.90 3.500 4.200 321.65 385.98
x Camisa de acero 800 mm mt 65.50 4.000 4.800 262.00 314.40
x Reposicin de Calzada
x 27 Hormigon m2 236.60 1.528 1.834 361.52 433.92
x Camaras
x 31 Acera paso c/u 54.00 9.980 11.976 538.92 646.70
x 32 Acera mediana c/u 8.00 34.416 41.299 275.33 330.39
x 35 Calzada grande c/u 5.00 67.052 80.462 335.26 402.31
x Cajn hormign prefabricado 1,5*2,0*2,0(inst.) mt 596.00 13.000 15.600 7,748.00 9,297.60
x Cajn hormign prefabricado 1,0*0,8*2,0(inst.) mt 14.00 13.000 15.600 182.00 218.40
x Rellenos
x 40 Rellenos y compactacin en TCN m3 2,486.99 0.105 0.126 261.13 313.36
x 14,204.55 17,054.18
x Subtotal Mano de Obra 14,204.55 17,054.18
x
x B VALORES de MATERIALES
x B1 Canalizacin (Desde versin 12b [mar-2006] Insumos PVC se ajusta segn variacin PVC-Polinomico MOP)
x Tubera PVC 90 mm clase II 6 mt tira 562.33 0.687 0.823 386.32 462.80
x 205 Tubera PVC 110 mm clase II 6 mt tira 2,236.93 0.939 1.127 2,100.48 2,521.02
x 207 Tubera PVC 110 mm clase IV 6 mt tira 262.50 0.692 0.830 181.65 217.88
x 216 Caeria de Acero 24" (600mm) e=8-12mm ml 91.90 6.799 8.159 624.83 749.81
x 217 Caeria de Acero 32" (800mm) e=8-12mm ml 65.50 9.065 10.878 593.76 712.51
x 222 Curva de 90 c/u 24.00 0.278 0.334 6.67 8.02
x 223 Curva de 45 c/u 386.00 0.235 0.282 90.71 108.85
x 224 Marco de Calzada c/u 20.00 2.021 2.425 40.42 48.50
x 225 Marco Fierro camara doble tapa c/u 47.00 1.528 1.834 71.82 86.20
x 226 Tapa de calzada c/u 20.00 3.970 4.764 79.40 95.28
x 227 Tapa fierro fundido camara vereda c/u 94.00 2.233 2.680 209.90 251.92
x 231 Material de Aporte para Rellenos m3 1,924.95 0.178 0.214 342.64 411.94
x Cajn hormign prefabricado 1,5*2,0*2,0 mt 596.00 12.829 15.395 7,646.08 9,175.42
x Cajn hormign prefabricado 1,0*0,8*2,0 mt 14.00 5.443 6.532 76.20 91.45
x 12,450.88 14,941.60
x Subtotal Materiales 12,450.88 14,941.60
x
x 26,655.43 31,995.78
x
x Ingenieria y Supervisin
x 700 Proyecto de Ingenieria global 7.00% 10.00% 1,865.88 3,199.58
x 701 Supervisin Ejecucin Obras y Proyectos global 3.50% 5.00% 932.94 1,599.79
x 702 Seguridad Vial global 1.00% 1.50% 266.55 479.94
x 703 Entrega Final - Recepciones- As Built global 2.50% 3.50% 666.39 1,119.85
x 3,731.76 6,399.16
x 30,387.19 38,394.94
x
x 800 Factor Ajuste por Volumen de Obra 30,387.19 38,394.94
x 30,387.19 38,394.94
x Presupuesto Referencial :
x UF 19,706.00 del 598,809,966 756,610,688
x US$ 476.32 del
x Totales Cables Canalizacin
x Aereo: ----- mts
x Subterraneo: 18,371 mts
x Adosada ----- ----- mts
x
Subtotal General UF
Subtotal
677,710,327
34,391.07
21/Jan/2008
Subtotal General $
Total Promedio $
21/Jan/2008
Subtotal Parcial UF
1.00
Total Promedio UF
Promedio Materiales
Subtotal MO + M
Promedio UF
Poliducto
Costanera Sur.
13,696.24
34,391.07
15,629.37
Subtotal
Promedio Mano de Obra
29,325.61
Item
21/Jan/2008
Subtotal
Presupuesto Referencial - Telecomunicaciones version 12b
Actualizacin al 01-mar-06: Incorpora Variacin PVC segn Polinomico MOP
Empresa de Servicio:
Parcial
Carta:
Precio Unitario N Unidad
Versin N 8
Cantidad
CABLE PRECIO ($)
649
CABLES AUTOSOPORTADO 12P/24AWG MULTIPAR TELEF. A/S MT 1.08 700.92
CABLES AUTOSOPORTADO 25P/24AWG MULTIPAR TELEF. A/S MT 1.59 1031.91
CABLES AUTOSOPORTADO 50P/24AWG MULITPAR TELEF. A/S MT 2.18 1414.82
CABLES AUTOSOPORTADO 100P/24AWG MULTIPAR TELEF. A/S MT 3.91 2537.59
CABLES AUTOSOPORTADO 200P/24AWG MULTIPAR TELEF. A/S MT 5.99 3887.51
CABLES DUCTO 6P/24AWG MULTIPAR TELEF. DUCTO MT 0.57 369.93
CABLES DUCTO 12P/24AWG MULTIPAR TELEF. DUCTO MT 0.85 551.65
CABLES DUCTO 25P/24AWG MULTIPAR TELEF. DUCTO MT 1.17 759.33
CABLES DUCTO 50P/24AWG MULTIPAR TELEF. DUCTO MT 1.87 1213.63
CABLES DUCTO 100P/24AWG MULTIPAR TELEF. DUCTO MT 3.53 2290.97
CABLES DUCTO 200P/24AWG MULTIPAR TELEF. DUCTO MT 6.68 4335.32
F. OPTICA MULTIMODO F.O. 4 FIBRAS MM DUCTO DIELECTRICO LOOSE TUBE MT 1.23 798.27
F. OPTICA MULTIMODO F.O. 4 FIBRAS MM INTERIOR DISTRIBUCION TIGHT MT 1.50 973.5
F. OPTICA MULTIMODO F.O. 6 FIBRAS MM DUCTO DIELECTRICO MT 1.71 1109.79
F. OPTICA MULTIMODO F.O. 6 FIBRAS MM DUCTO ARMADURA LOOSE TUBE MT 1.84 1194.16
F. OPTICA MULTIMODO F.O. 6 FIBRAS MM AUTOSOP. FIG-8 L.TUBE ALC. MT 2.37 1538.13
F. OPTICA MONOMODO F.O. 6 FIBRAS SM DUCTO DIELECTRICO LOOSE TUBE MT 0.88 571.12
F. OPTICA MONOMODO F.O. 6 FIBRAS SM DUCTO UNIFLEX ARMADO ALCATEL MT 0.93 603.57
F. OPTICA MONOMODO F.O. 6 FIBRAS SM INT/EXT DIELECTRICO UNIFLEX MT 0.72 467.28
F. OPTICA MULTIMODO F.O. 12 FIBRAS MM DUCTO DIELECTRICO UNITUBO MT 2.20 1427.8
F. OPTICA MULTIMODO F.O. 12 FIBRAS MM DUCTO ARMADURA LOOSE TUBE MT 2.56 1661.44
F. OPTICA MULTIMODO F.O. 12 FIBRAS MM AUTOSOP. FIG-8 UNITUBO MT 3.23 2096.27
F. OPTICA MONOMODO F.O. 12 FIBRAS SM DUCTO DIELECTRICO MT 1.03 668.47
F. OPTICA MONOMODO F.O. 12 FIBRAS SM DUCTO ARMADURA LOOSE TUBE MT 1.45 941.05
F. OPTICA MONOMODO F.O. 12 FIBRAS SM ARMADURA LSZH LOOSE TUBE MT 1.57 1018.93
F. OPTICA MONOMODO F.O. 12 FIBRAS SM FIG-8 LOOSE TUBE MT 1.64 1064.36
F. OPTICA MONOMODO F.O. 24 FIBRAS SM DUCTO ARMADURA LOOSE TUBE MT 1.34 869.66
F. OPTICA MONOMODO F.O. 24 FIBRAS SM FIG-8 LOOSE TUBE MT 1.95 1265.55
TIPO NOMBRE UNID PRECIO (US$)
MOP Indices Polinomicos
25 TUBERIA PVC 110 mm CLASE 10 (CON UNION) m
Mes Indice
Jan/2001 3,123.00
Feb/2001 3,123.00
Mar/2001 3,123.00
Apr/2001 3,123.00
May/2001 3,420.00
Jun/2001 3,220.00
Jul/2001 3,220.00
Aug/2001 3,220.00
Sep/2001 3,220.00
Oct/2001 3,220.00
Nov/2001 3,220.00
Dec/2001 3,220.00
Jan/2002 3,220.00
Feb/2002 3,220.00
Mar/2002 3,220.00
Apr/2002 3,220.00
May/2002 3,220.00
Jun/2002 3,220.00
Jul/2002 3,626.00
Aug/2002 3,626.00
Sep/2002 3,626.00
Oct/2002 3,626.00
Nov/2002 3,626.00
Dec/2002 3,626.00
Jan/2003 3,626.00
Feb/2003 3,626.00
Mar/2003 3,626.00
Apr/2003 3,550.00
May/2003 3,550.00
Jun/2003 3,550.00
Jul/2003 2,383.00
Aug/2003 2,383.00
Sep/2003 2,383.00
Oct/2003 2,663.00
Nov/2003 2,876.00
Dec/2003 2,876.00
Jan/2004 2,876.00
Feb/2004 2,876.00
Mar/2004 3,353.00
Apr/2004 3,353.00
May/2004 3,353.00
Jun/2004 3,353.00 Ultima Actualizacin PVC con Cotizacin - v11
Jul/2004 3,353.00
Aug/2004 3,353.00
Sep/2004 3,542.00
Oct/2004 3,542.00
Nov/2004 3,542.00
Dec/2004 3,542.00
Jan/2005 3,542.00
Feb/2005 3,542.00
Mar/2005 3,542.00
Apr/2005 3,542.00
May/2005 3,542.00
Jun/2005 3,542.00
Jul/2005 3,542.00
Aug/2005 4,487.00
Sep/2005 4,487.00
Oct/2005 4,487.00
Nov/2005 4,487.00
Dec/2005 4,487.00
Jan/2006 4,487.00 1.338204593
Feb/2006 4,487.00
Mar/2006 4,487.00
Apr/2006 4,487.00
May/2006 4,487.00
Jun/2006 4,487.00
Jul/2006 4,487.00
Aug/2006 4,487.00
Sep/2006 4,487.00
Oct/2006 4,487.00
Nov/2006 4,487.00
Dec/2006 4,487.00
Jan/2007 4,487.00
Feb/2007 4,487.00
Mar/2007 4,487.00
Apr/2007 4,487.00
May/2007 4,487.00
Jun/2007 4,700.00
Jul/2007 4,700.00
Aug/2007 4,700.00
Sep/2007 4,700.00
Oct/2007 4,700.00
Nov/2007 4,700.00
Dec/2007 4,700.00
Jan/2008 4,700.00
Feb/2008 4,700.00
Mar/2008 4,700.00
Apr/2008 4,700.00
May/2008 4,700.00
Jun/2008 4,700.00
Jul/2008 4,700.00
Aug/2008 4,700.00
Sep/2008 4,700.00
Oct/2008 4,700.00
Nov/2008 4,700.00
Dec/2008 4,700.00
Jun/2004
Especificacines Dim: Long. Clase Unidad Unitario PR-10
Item Descripcin mm mt. Medida Neto min
1 TUBERIA TELEFONICA 110 6 II c/u 11,936 8000
2 TUBERIA TELEFONICA 110 10 II c/u 19,712 14000
3 TUBERIA TELEFONICA 110 10 I c/u 8,440
4 TUBERIA PVC HIDRAULICA 110 6 4 c/u 8,803
5 TUBERIA PVC HIDRAULICA 110 6 6 c/u 12,450
6 TUBERIA PVC HIDRAULICA 200 6 4 c/u 29,196
4 TUBERIA PVC HIDRAULICA 110 6 4 c/u 8,803
5 TUBERIA PVC HIDRAULICA 110 6 6 c/u 12,450
1 TUBERIA PVC HIDRAULICA 200 6 4 c/u 29,196
2 TUBERIA PVC HIDRAULICA 160 6 4 c/u 18,385
3 TUBERIA PVC HIDRAULICA 140 6 4 c/u 14,008
4 TUBERIA PVC HIDRAULICA 125 6 4 c/u 11,251
6 TUBERIA PVC HIDRAULICA 90 6 4 c/u 5,860
7 TUBERIA PVC HIDRAULICA 75 6 4 c/u 4,859
8 TUBERIA PVC HIDRAULICA 63 6 6 c/u 4,241
9 TUBERIA PVC HIDRAULICA 50 6 6 c/u 3,079
10 TUBERIA PVC HIDRAULICA 40 6 6 c/u 2,439
11 TUBERIA PVC HIDRAULICA 32 6 10 c/u 1,920
CDI Ingenieros Consultores At.
2859275 Mail
Ref. TUBERIA PVC
SANTIAGO Fecha Santiago; 11 de Junio 2004
Estimados Seores
De acuerdo con lo solicitado, tenemos el agrado de cotizarles los siguientes productos:
Especificacines Dim: Long. Clase Unidad Precio
Item Descripcin mm mt. Cantidad Medida Lista
1 TUBERIA TELEFONICA 110 6 II 1 c/u 20,723
2 TUBERIA TELEFONICA 110 10 I 1 c/u 14,652
3 TUBERIA TELEFONICA 110 10 II 1 c/u 34,222
4 TUBERIA PVC HIDRAULICA 110 6 4 1 c/u 15,283
5 TUBERIA PVC HIDRAULICA 110 6 6 1 c/u 21,615
Ciudad
COTIZACION N 1106/01
Empresa Giselle Morales
Fono esp-vial@cdi-vs.tie.cl
Fax
PLAZO DE ENTREGA: (STOCK DISPONIBLE)
LUGAR DE ENTREGA:
CONDICIONES DE PAGO:
PLAZO DE PAGO:
VALIDEZ DE LA COTIZACION:
IGNACIO At.
Mail
Ref. TUBERIA PVC
SANTIAGO Fecha Santiago; 03 de Mayo 2004
Estimados Seores
De acuerdo con lo solicitado, tenemos el agrado de cotizarles los siguientes productos:
Especificacines Dim: Long. Clase Unidad Precio
Item Descripcin mm mt. Cantidad Medida Lista
1 TUBERIA PVC HIDRAULICA 200 6 4 187 c/u 50,688
2 TUBERIA PVC HIDRAULICA 160 6 4 9 c/u 31,918
3 TUBERIA PVC HIDRAULICA 140 6 4 50 c/u 24,319
4 TUBERIA PVC HIDRAULICA 125 6 4 56 c/u 19,533
5 TUBERIA PVC HIDRAULICA 110 6 4 134 c/u 15,283
6 TUBERIA PVC HIDRAULICA 90 6 4 109 c/u 10,174
7 TUBERIA PVC HIDRAULICA 75 6 4 45 c/u 8,436
8 TUBERIA PVC HIDRAULICA 63 6 6 48 c/u 7,362
9 TUBERIA PVC HIDRAULICA 50 6 6 27 c/u 5,345
10 TUBERIA PVC HIDRAULICA 40 6 6 19 c/u 4,234
11 TUBERIA PVC HIDRAULICA 32 6 10 12 c/u 3,333
PLAZO DE ENTREGA: (STOCK DISPONIBLE)
LUGAR DE ENTREGA:
CONDICIONES DE PAGO:
PLAZO DE PAGO:
VALIDEZ DE LA COTIZACION:
COMPRADOR
Inmediato
Puesto en Obra
Sub Gerente Ventas
felipebaranao@tigre.cl
Documento adjunto O/Compra
30 das fecha factura
10 das
Sr. Felipe Baraao G.
10 das
COTIZACION N 1702/01
Empresa
Fono
Fax
Ciudad
Inmediato
Puesto en Obra
Documento adjunto O/Compra
30 das fecha factura
Tigre Chile S.A. Av. Amrico Vespucio 2021 Huechuraba Fono 52-2-4443910
PR-11
min
11,936
19,712
8,440
8,803
12,450
29,196
Dcto. Dcto. Dscto. Dcto. Unitario Neto
Base Producto Especial Volmen Neto Total
28.00 20 0.00 0.00 11,936 11,936
28.00 20 0.00 0.00 8,440 8,440
28.00 20 0.00 0.00 19,712 19,712
28.00 20 0.00 0.00 8,803 8,803
28.00 20 0.00 0.00 12,450 12,450
0 0
0 0
COTIZACION N 1106/01
Total Neto 61,341
IVA 11,655
Total 72,996
(STOCK DISPONIBLE)
Dcto. Dcto. Dscto. Dcto. Unitario Neto
Base Producto Especial Volmen Neto Total
28.00 20 0.00 0.00 29,196 5,459,706
28.00 20 0.00 0.00 18,385 165,463
28.00 20 0.00 0.00 14,008 700,387
28.00 20 0.00 0.00 11,251 630,056
28.00 20 0.00 0.00 8,803 1,179,603
28.00 20 0.00 0.00 5,860 638,764
28.00 20 0.00 0.00 4,859 218,661
28.00 20 0.00 0.00 4,241 203,545
28.00 20 0.00 0.00 3,079 83,125
28.00 20 0.00 0.00 2,439 46,337
28.00 20 0.00 0.00 1,920 23,038
Total Neto 9,348,686
IVA 1,776,250
Total 11,124,936
(STOCK DISPONIBLE)
COTIZACION N 1702/01
Tigre Chile S.A. Av. Amrico Vespucio 2021 Huechuraba Fono 52-2-4443910 www.tigre.cl Santiago - Chile
D= pulg D= mm e= mm
metalcav
(15/06/04)
metalcav
(05/07/04)
caeria de Acero 16 406 6 48,924
caeria de Acero 16 406 8 64,881
caeria de Acero 16 406 10 82,539
caeria de Acero 16 406 12
caeria de Acero 16 406 9.5
caeria de Acero 20 508 6 61,317
caeria de Acero 20 508 8 81,101
caeria de Acero 20 508 10 103,174
caeria de Acero 20 508 12
caeria de Acero 20 508 9.5
caeria de Acero 24 610 6 73,726 74,154
caeria de Acero 24 610 8 97,322
caeria de Acero 24 610 10 123,809
caeria de Acero 24 610 12
caeria de Acero 32 813 6 98,545
caeria de Acero 32 813 8 129,762
caeria de Acero 32 813 10 165,078
precios para tunleras Belfi Brotec
Dimetro pulgEspesor mm $ ml Fecha
20 9.5 $ 62,508 5/7/2004
16 9.5 $ 49,612 5/25/2004
Belfi Brotec
(15/05/04) PR-10 PR-11
68790
100000
49,612
125000
62,508
150000
73,710
92,138
110,566
147,420

Você também pode gostar