1 2 3 4 FINISHING 1 Amplas lbr 2 Cat besi kg 3 Cat dasar kg 4 Cat emco kg 5 Cat menie besi kg 6 Cat menie kayu kg 7 Cat tembok Decolith kg 8 Cat tembok Dulux kg 9 Cat tembok Emco kg 10 Cat tembok Paragon kg 11 Cat tembok Toyopaint kg 12 Cat tembok Vinilex kg 13 Cat tembok Vinippaint kg 14 Dempul ltr 15 Kuas bh 16 Mild zak 17 Minyak cat ltr 18 Plamir kayu kg 19 Plamir tembok kg 20 Politur dasar ltr 21 Politur ultra ltr 22 Politur vernis ltr 23 Thiner A Bonanza ltr 24 Thiner B Spesial ltr 25 Masterseal 440 Kg PENUTUP ATAP 26 Alang-alang panjang 2,4 meter lbr 27 Alluminium foil m2 28 Asbes Bubungan lbr 29 Asbes Gelombang 1,80 m x 0,80 m x 5 mm lbr 30 Asbes Gelombang 2,4 m x 1,05 m x 4 mm lbr 31 Asbes Rata 2 m x 1 m x 4 mm lbr 32 Atap metal Toratora 1 x 4 Extra m2 33 Atap metal Toratora 1 x 4 Premium m2 34 Atap metal Toratora 2 x 4 Extra m2 35 Atap metal Toratora 2 x 4 Premium m2 36 Atap metal Toratora 3 x 4 Extra m2 37 Atap metal Toratora 3 x 4 Premium m2 38 Atap metal Toratora 4 x 4 Extra m2 39 Atap metal Toratora 4 x 4 Premium m2 40 Bentala paras bh 41 Bentala tanah liat bh 42 Besi profil WF P.6 m kg 43 Besi profil WF P.12 m kg 44 Besi strip kg 45 Bubungan Biasa bj 46 Bubungan Karang Pilang (glazur) isi 3,5/m bj 47 Bubungan Karang Pilang isi 3,5/m bj 48 Bubungan Ngalayur isi 3,5/m bj 49 Bubungan Plentong bj 50 Bubungan Utama isi 3,5/m bj 51 Genteng Kanmuri (glazur) isi 14/m2 bj 52 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bj 53 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bj 54 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bj 55 Genteng Morando Abadi isi 18/m2 bj 56 Genteng Morando Jatiwangi isi 18/m2 bj 57 Genteng Morando Ngalayur isi 20/m2 bj 58 Genteng Plentong bj DAFTAR HARGA SATUAN BAHAN DAN UPAH NO NAMA BARANG SATUAN HARGA SATUAN Harga Barang dan Upah Hal. 1 1 2 3 4 NO NAMA BARANG SATUAN HARGA SATUAN 59 Genteng plentong dicat bj 60 Genteng Plentong Jatiwangi isi 24/m2 bj 61 Ijuk kg 62 Ikut celedu paras bh 63 Ikut celedu tanah liat bh 64 Murda paras bh 65 Murda tanah liat bh 66 Seng BJLS 0,20 gelombang lbr 67 Seng BJLS 0,25 gelombang lbr 68 Seng BJLS 0,28 gelombang lbr 69 Seng BJLS 0,32 gelombang lbr 70 Seng Plat 3" x 6" BJLS 28 lbr 71 Sirap Jati bh 72 Tali Ijuk kg 73 Tali pengikat alang-alang ikat PENGGANTUNG 74 Engsel kupu-kupu ps 75 Engsel nylon ps 76 Espagnoleth set 77 Grendel biasa bh 78 Grendel hararo bh 79 Kaca 3 mm bening m2 80 Kaca 5 mm bening m2 81 Kaca 6 mm bening m2 82 Kaca 8 mm bening m2 83 Kaca 10 mm bening m2 84 Kaca 12 mm bening m2 85 Kaca Es/Kapur 3 mm m2 86 Kaca Es/Kapur 5 mm m2 87 Kaca nako daun 88 Kaca nako teralis bening m2 89 Kaca ryben 3 mm m2 90 Kaca ryben 5 mm m2 91 Kait angin biasa bh 92 Kunci pintu TOP bh 93 Kunci pintu Union bh 94 Kunci pintu Vanesa bh 95 Kunci pintu Yale bh 96 Kunci pintu YURI bh 97 Kunci slot bh 98 Kunci tanam 2 slag bh KAYU DAN PLAFOND 99 Bambu besar Ukuran 4 m btg 100 Bambu sedang Ukuran 4 m btg 101 Bambu kecil Ukuran 4 m btg 102 Celling teak (0,62 x 2,40) m2 lbr 103 Eternit lbr 104 Formika lbr 105 Gedeg kulit kelas I m2 106 Gypsum Old lbr 107 Hard board MDF lbr 108 Kalsiboard 4,5 mm lbr 109 Kalsiboard 10 mm lbr 110 Kayu bekesting m3 111 Kayu bingkirai m3 112 Kayu bingkirai papan m3 113 Kayu dolken (pekerjaan sementara) btg 114 Kayu jati m3 115 Kayu jati papan m3 116 Kayu kamper balok m3 117 Kayu kamper usuk/reng m3 118 Kayu kamper papan m3 119 Kayu kruing balok m3 120 Kayu kruing usuk/reng m3 121 Kayu kruing papan m3 Harga Barang dan Upah Hal. 2 1 2 3 4 NO NAMA BARANG SATUAN HARGA SATUAN 122 Kayu meranti balok m3 123 Kayu meranti usuk/reng m3 124 Kayu meranti papan m3 125 Kayu merbau m3 126 Kayu merbau papan m3 127 Kayu profil m1 128 Kayu seseh balok m3 129 Kayu seseh dolken m3 130 Lem Aibond kg 131 Lem Kayu ltr 132 List Gypsum standar m' 133 Minyak bekisting ltr 134 Multiplek 12 mm lbr 135 Multiplek 18 mm lbr 136 Multiplek 6 mm lbr 137 Multiplek 9 mm lbr 138 Plywood 12 mm lbr 139 Plywood 3 mm lbr 140 Plywood 4 mm lbr 141 Plywood 6 mm lbr 142 Plywood 9 mm lbr 143 Plywood aluminium lbr 144 Teak wood (0,9x2,20) m2 lbr 145 Teak wood (1,20x2,40) m2 lbr KERAMIK IKAD 146 Ikad (Keramik) Kw. I 10 x 20 cm m2 147 Ikad (Keramik) Kw. I 20 x 20 cm m2 148 Ikad (Keramik) Kw. I 20 x 30 cm m2 149 Ikad (Keramik) Kw. I 30 x 30 cm m2 150 Ikad (Keramik) Kw. I 40 x 40 cm m2 151 Ikad (Keramik) Kw. II 10 x 20 cm m2 152 Ikad (Keramik) Kw. II 20 x 20 cm m2 153 Ikad (Keramik) Kw. II 20 x 30 cm m2 154 Ikad (Keramik) Kw. II 30 x 30 cm m2 155 Ikad (Keramik) Kw. II 40 x 40 cm m2 INESA 156 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P) m2 157 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP) m2 158 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P) m2 159 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP) m2 160 Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R) m2 161 Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P) m2 162 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P) m2 163 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP) m2 164 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P) m2 165 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP) m2 166 Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P) m2 ESSENZA 167 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) m2 168 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) m2 169 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 170 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2 171 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 172 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2 173 Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 174 Keramik Kelas I Domus m2 175 Keramik Kelas I Granity Imperiali m2 176 Keramik Kelas I Lavagna m2 177 Keramik Kelas I Mountain Peak m2 Harga Barang dan Upah Hal. 3 1 2 3 4 NO NAMA BARANG SATUAN HARGA SATUAN GARUDA 178 Keramik 20 x 20 kelas I Emboss Dasar Muda m2 179 Keramik 20 x 20 kelas I Emboss Dasar Tua m2 180 Keramik 20 x 20 kelas I Tesia m2 181 Keramik 20 x 20 kelas II Emboss Dasar Muda m2 182 Keramik 20 x 20 kelas II Emboss Dasar Tua m2 183 Keramik 20 x 20 kelas II Tesia m2 184 Keramik 20 x 25 kelas I Motif Dasar Medium m2 185 Keramik 20 x 25 kelas I Motif Dasar Muda m2 186 Keramik 20 x 25 kelas I Nuri Dark m2 187 Keramik 20 x 25 kelas I Polos m2 188 Keramik 30 x 30 kelas I Granity m2 189 Keramik 30 x 30 kelas I Motif Embose m2 190 Keramik 30 x 30 kelas II Granity m2 191 Keramik 30 x 30 kelas II Motif Embose m2 192 Keramik 40 x 40 kelas I Motif Dasar Muda m2 193 Keramik 40 x 40 kelas I Motif Dasar Muda m2 194 Keramik 40 x 40 kelas I Motif Embose m2 195 Keramik 40 x 40 kelas I Motif Granity Tua m2 196 Keramik 40 x 40 kelas I Motif Medium Color m2 197 Keramik 40 x 40 kelas I Motif Spesial Color m2 198 Keramik 50 x 50 kelas I m2 ROMAN 199 Keramik 20 x 20 tekstur kasar m2 200 Keramik 25 x 33 kelas I m2 201 Keramik 25 x 45 motif halus kelas I m2 202 Keramik 30 x 30 standard m2 203 Keramik 30 x 30 kelas I T. 1cm m2 204 Keramik 20 x 60 kelas I T. 1cm m2 205 Keramik 20 x 40 kelas I Motif standard m2 206 Keramik 30 x 60 kelas I Motif Dasar Muda m2 207 Keramik 40 x 40 kelas I krem m2 208 Keramik 40 x 40 kelas I white m2 209 Keramik 50 x 50 kelas I warna muda m2 PLATINUM 210 Keramik 25 x 33 kelas I m2 211 Keramik 25 x 40 kelas II m2 212 Keramik 30 x 60 kelas II bulgari m2 213 Keramik 40 x 40 kelas I brown m2 GRANIT 214 Granit star white L.60 m2 215 Granit BGYD red L.60 m2 216 Granit crystal pink L. 60 m2 217 Granit mongol black L. 60 m2 218 Granit gold black L. 60 m2 GRANITO 219 Granito Castello Tera 60 x 60 m2 220 Granito Monalisa TD6602 60 x 60 m2 221 Granito Monalisa TD6602 80 x 80 m2 222 Granito Niro FR660IY 60 x 60 m2 223 Granito Essenza Grey 60 x 60 m2 224 Granito Indogress Cristaloo m2 MARMER 225 Marmer cream BA 60 x 60 m2 226 Marmer cream BA 40 x 40 m2 227 Marmer cream BA 30 x 30 m2 MOZAIK 228 Mozaik keramik zehn crystal glass 30 x 30 biji Harga Barang dan Upah Hal. 4 1 2 3 4 NO NAMA BARANG SATUAN HARGA SATUAN 229 Mozaik batu alam 30 x 30 biji ASIA 230 Keramik 20 x 30 kelas I warna muda m2 231 Keramik 30 x 30 kelas I warna muda m2 232 Keramik 30 x 30 kelas I warna tua m2 233 Keramik 40 x 40 kelas I warna muda m2 234 Keramik 10 x 20 kelas II m2 235 Keramik 20 x 20 kelas II m2 236 Keramik 20 x 30 kelas II m2 237 Keramik 30 x 30 kelas II m2 238 Keramik 40 x 40 kelas II m2 MULIA 239 Keramik 10 x 20 cm kelas I m2 240 Keramik 20 x 20 cm kelas I m2 241 Keramik 20 x 30 cm kelas I m2 242 Keramik 30 x 30 cm kelas I m2 243 Keramik 40 x 40 cm kelas I m2 244 Keramik 10 x 20 cm kelas II m2 245 Keramik 20 x 20 cm kelas II m2 246 Keramik 20 x 30 cm kelas II m2 247 Keramik 30 x 30 cm kelas II m2 248 Keramik 40 x 40 cm kelas II m2 SANITAIR 249 Bak mandi fibre glass 70x70x66 cm bh 250 Bak mandi keramik 50x50 bh 251 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh 252 Floor drain plastik bh 253 Floor drain stainless bh 254 Kloset duduk INA Komplit bh 255 Kloset duduk Amerika Standar bh 256 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLITbh 257 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT bh 258 Kloset duduk " TOTO Type AVANTE CW 823 J bh 259 Kloset duduk " TOTO Type CW 660J bh 260 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh 261 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh 262 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh 263 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh 264 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh 265 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh 266 Kloset jongkok " TOTO Type CE 6 COMPLIT bh 267 Kloset jongkok " TOTO Type CE 7 COMPLIT bh 268 Kloset porselin jongkok Kia (standar) bh 269 Kloset porselin jongkok Ina (standar) bh 270 Kran biasa bh 271 Kran SunEi bh 272 Kran TOTO T 205 LCSC bh 273 Kran TOTO T 205 MC bh 274 Kran TOTO T 23 B13 bh 275 Kran TOTO T 23 B13V7N bh 276 Kran TOTO T 26 - 13 bh 277 Kran TOTO TX 109 LH bh 278 Penyekat Urinoir " TOTO " Type A 100 " bh 279 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh 280 Soap holder " TOTO " Type S 6 N " bh 281 Seal tape bh 282 Urinoir " TOTO U 57 M bh 283 Urinoir " TOTO U 57 M BODI bh 284 Urinoir " TOTO UW 447 JT 1 " bh 285 Urinoir " TOTO UW 447 JT 1 BODI bh 286 Urinoir " TOTO UW 447 JT 1,M " bh Harga Barang dan Upah Hal. 5 1 2 3 4 NO NAMA BARANG SATUAN HARGA SATUAN 287 Urinoir " TOTO UW 447 JT 1,M "BODI bh 288 Wastagel KIA Standard bh 289 Wastagel KIA Warna bh 290 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh 291 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh 292 Wastafel TYPE Counter /Komplit LW 521 V1A (ex Toto ) bh 293 Wastafel Toto komplit LW631 JW/F segi 4 bh 294 Wastafel Toto LW 352JW/F bulat bh 295 Wastafel Toto komplit LW645+T6JV5 kotak bh 296 Wastafel Toto LW248JR bh 297 Shower TOTO Tx 401SBZ bh 298 Shower TOTO Tx 471SOBR bh 299 Shower TOTO Tx 471SKBR bh 300 Shower TOTO Tx 449SMBR bh 301 Kloset American standart komplit bh 302 Kloset American Famous bh 303 Kloset TOTO komplit bh 304 Elite cuci piring E - 176 bh 305 Elite cuci piring dobel E - 118 bh PAKU 306 Paku 10 cm kg 307 Paku kalsiboard kg 308 Paku list SQ kg 309 Paku pancing 60 x 230 kg 310 Paku reng/usuk SQ kg 311 Paku seng kg 312 Paku seng import bj 313 Paku skrup 1/2" kg 314 Paku skrup 2" kg 315 Paku skrup 3.5" kg 316 Paku sumbat 1/2" kg PASIR, BATU, KERIKIL, BATA DAN PARAS 317 Bata gosok ex Tulikup bj 318 Bata Merah 5 x 11 x 22 cm bj 319 Batako kelas I bj 320 Batu kali /batu bulat 15/20 cm m3 321 Batu karang m3 322 Batu lahar Singaraja m3 323 Batu pecah 5-7 cm (manual) m3 324 Batu pipih Singaraja m3 325 Bata riyan ( abble ) bj 326 Roster Keramik bh 327 Koral Beton m3 328 Limestone m3 329 Paras Batik bh 330 Paras Buahan bh 331 Paras Karang Bukit bh 332 Paras Kerobokan Tebal 5 bh 333 Paras Malem bh 334 Paras Putih Bukit bh 335 Batu tulung agung bh 336 Paras jogja putih bh 337 Paras Silakarang tebal bh 338 Paras Silakarang tipis bh 339 Paras untuk pondasi bh 278 Batu alam RTM hijau 10 x 20 halus m2 279 Batu alam RTM hijau 20 x 20 halus m2 280 Batu alam RTS hijau 10 x 20 kasar m2 281 Batu pilah Jember 30 x 30 m2 282 Batu pilah Jember 20 x 30 m2 283 Batu pilah Jember 40 x 40 m2 284 Batu pilah Singaraja 30 x 30 m2 Harga Barang dan Upah Hal. 6 1 2 3 4 NO NAMA BARANG SATUAN HARGA SATUAN 285 Batu pilah Singaraja 20 x 20 m2 286 Batu hitam Jember 5 x 20 halus m2 287 Batu hitam Jember 20 x 40 halus m2 288 Batu hitam Jember 15 x 30 halus m2 289 Batu hitam Singaraja 15 x 30 halus m2 290 Batu hitam Singaraja 20 x 40 halus m2 291 Batu AND 60 x 60 abu m2 292 Batu AND 50 x 50 hitam m2 293 Batu AND 40 x 40 hitam bkr m2 294 Batu AND 30 x 60 hitam bkr m2 295 Batu AND 40 x 60 hitam kilap m2 296 Batu AND 30 x 40 abu SS m2 297 Batu marmer kuning 10 x 20 m2 298 Batu marmer kuning PB1 10 x 20 m2 299 Batu marmer kuning PB2 10 x 20 m2 300 Batu marmer kuning 15 x 30 m2 301 Batu kuning serat 30 x 30 m2 302 Batu kuning serat 20 x 30 m2 303 Batu palimanan cirebon 20 x 30 m2 304 Batu palimanan cirebon 20 x 40 m2 305 Batu paras Jogja 60 x 60 m2 306 Batu candi hitam 60 x 60 m2 307 Batu candi hitam 20 x 20 m2 308 Batu candi hitam 30 x 30 m2 309 Batu candi hitam 40 x 40 T.5cm m2 310 Batu candi hitam 20 x 30 m2 311 Batu Bali green gelombang 20 x 40 m2 312 Batu Bali green kombinasi 20 x 40 m2 314 Batu serayu 20 x 60 m2 315 Pasir beton m3 316 Pasir pasang m3 317 Pasir urug m3 318 Sirtu m3 319 Tanah urug m3 320 Batu gunung ex karang asem bj PIPA 321 Pipa Galvanis 1/2" m1 322 Pipa Galvanis 3/4" m1 323 Pipa Galvanis 1 1/4" m1 324 Pipa Galvanis 1 1/2" m1 325 Pipa Galvanis 1" m1 326 Pipa Galvanis 1,5 BSA m1 327 Pipa Galvanis 2" m1 328 Pipa Galvanis 3" m1 329 Pipa Maspion AW 1 ljr 330 Pipa Maspion AW 1/2 ljr 331 Pipa Maspion AW 10 ljr 332 Pipa Maspion AW 1-1/2 ljr 333 Pipa Maspion AW 1-1/4 ljr 334 Pipa Maspion AW 12 ljr 335 Pipa Maspion AW 14 ljr 336 Pipa Maspion AW 16 ljr 337 Pipa Maspion AW 2 ljr 338 Pipa Maspion AW 2-1/2 ljr 339 Pipa Maspion AW 3 ljr 340 Pipa Maspion AW 3/4 ljr 341 Pipa Maspion AW 4 ljr 342 Pipa Maspion AW 5 ljr 343 Pipa Maspion AW 6 ljr 344 Pipa Maspion AW 8 ljr 345 Pipa Maspion C 1 ljr 346 Pipa Maspion C 1-1/2 ljr 347 Pipa Maspion C 1-1/4 ljr Harga Barang dan Upah Hal. 7 1 2 3 4 NO NAMA BARANG SATUAN HARGA SATUAN 348 Pipa Maspion C 2 ljr 349 Pipa Maspion C 2-1/2 ljr 350 Pipa Maspion C 3 ljr 351 Pipa Maspion C 3/4 ljr 352 Pipa Maspion C 4 ljr 353 Pipa Maspion C 5/8 ljr 354 Pipa Maspion D 10 ljr 355 Pipa Maspion D 1-1/2 ljr 356 Pipa Maspion D 1-1/4 ljr 357 Pipa Maspion D 12 ljr 358 Pipa Maspion D 14 ljr 359 Pipa Maspion D 16 ljr 360 Pipa Maspion D 2 ljr 361 Pipa Maspion D 2-1/2 ljr 362 Pipa Maspion D 3 ljr 363 Pipa Maspion D 4 ljr 364 Pipa Maspion D 5 ljr 365 Pipa Maspion D 6 ljr 366 Pipa Maspion D 8 ljr KRAN AIR 367 TOTO T.30AR13V7N bh 368 TOTO T.60N bh 369 TOTO TX-116 LI bh 370 TOTO TX-116 LEBR bh 371 TOTO TX-101 LB bh HANDEL PINTU 372 Gradino Handel Luar HP.6106 bh 373 Gradino Handel Luar HP.99.01 bh 374 Solid HRE 99.14 bh 375 ELT handle pintu dobel P99.62 set 376 ELT handle pintu dobel PR 511.05 set 377 ELT bulat PHB 308SS bh SEMEN & AIR CAMPURAN BETON 378 Semen Bosowa 50 kg zak 379 Semen Gresik 40 kg zak 380 Semen Gresik 50 kg zak 381 Semen Tiga Roga 50 kg zak 382 Semen Tonasa 50 kg zak 383 Semen warna/semen grouting kg 384 Air Campuran Beton ltr BESI BETON DAN PAGAR 385 Besi beton kg 386 Kawat berduri roll 387 Kawat beton RRT kg 388 Pagar BRC asli T.120 diameter 6mm m' 389 Pagar BRC asli T.150 diameter 6mm m' 390 Pagar BRC asli T.175 diameter 7mm m' 391 Pagar BRC asli T.190 diameter 7mm m' 392 Pagar BRC asli T.90 diameter 6mm m' 393 Pagar HotDip Galvanized T.120 diameter 6mm m' 394 Pagar HotDip Galvanized T.150 diameter 7mm m' 395 Pagar HotDip Galvanized T.175 diameter 7mm m' 396 Pagar HotDip Galvanized T.190 diameter 7mm m' 397 Pagar HotDip Galvanized T.90 diameter 6mm m' 398 Tiang BRC asli T. 120 diameter 1 1/2" bh 399 Tiang BRC asli T. 150 diameter 2" bh 400 Tiang BRC asli T. 175 diameter 2" bh 401 Tiang BRC asli T. 190 diameter 2" bh 402 Tiang BRC asli T. 90 diameter 1 1/2" bh 403 Tiang HotDip Galvanized T. 120 diameter 1 1/2" bh Harga Barang dan Upah Hal. 8 1 2 3 4 NO NAMA BARANG SATUAN HARGA SATUAN 404 Tiang HotDip Galvanized T. 150 diameter 2" bh 405 Tiang HotDip Galvanized T. 175 diameter 2" bh 406 Tiang HotDip Galvanized T. 190 diameter 2" bh 407 Tiang HotDip Galvanized T. 90 diameter 1 1/2" bh BAHAN LISTRIK 408 Saklar (Broco) bh 409 Stop Kontak bh 410 Fitting bh 411 Steker bh 412 Coaxial cable 5C - 75 ohm commscof m1 413 Kabel NYM 3 x 2.5 mm ex. Supreme m1 414 Kabel NYM 4 mm m1 415 Kabel telephone m1 416 Lampu pijar 10 Watt (Philip) bh 417 Lampu pijar 15 Watt (Philip) bh 418 Lampu pijar 25 Watt (Philip) bh 419 Lampu TL 10 Watt (10 Watt) bh 420 Lampu TL 20 Watt (10 Watt) bh 421 Lampu TL 25 Watt (10 Watt) bh 422 Pipa clipsal 20 mm bt 423 Pipa flexible clipsal 20 mm m1 424 Sock clipsal 20 mm bj 425 Tee dos clipsal 20 mm bh 426 Klem clipsal 20 mm bj 427 Inbow dos plastik clipsal E 157 P bj BUIS BETON 428 Buis beton 10 x 75 bh 429 Buis beton 15 x 75 bh 430 Buis beton 20 x 75 bh 431 Buis beton 25 x 75 bh 432 Buis beton 30 x 75 bh 433 Buis beton 50 x 75 bh PAVING 434 Paving 10 x 20 cm tebal 6 cm K225 m2 435 Paving 10 x 20 cm tebal 6 cm K350 m2 436 Paving 10 x 20 cm tebal 8 cm K225 m2 437 Paving 10 x 20 cm tebal 8 cm K350 m2 438 Paving 10 x 20 cm tebal 8 cm K425 m2 439 Paving 20 x 20 cm tebal 6 cm K225 m2 440 Paving 20 x 20 cm tebal 6 cm K350 m2 441 Paving 20 x 20 cm tebal 8 cm K225 m2 442 Paving 20 x 20 cm tebal 8 cm K350 m2 443 Paving 20 x 20 cm tebal 8 cm K425 m2 444 Paving 20 x 20 cm tebal 10 cm K225 m2 445 Paving 20 x 20 cm tebal 10 cm K350 m2 446 Paving 20 x 20 cm tebal 10 cm K425 m2 447 Paving Tiga Berlian tebal 6 cm K225 m2 448 Kanstein Bulat (P:50,T:30,La:10,Lb:16 cm K225) m1 449 Kanstein Jumbo (P:50,L:15,T:30 cm K225) m1 450 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) m1 451 Grass Block 36 X 54 cm tebal 9 cm K 225 m2 452 Koral Sikat zak/10 kg LAIN-LAIN 453 Wall papper 29 x 29 lembar 454 Wall papper 70 x 100 lembar 455 Wall papper 50 x 70 lembar 456 Wall papper 30 x 60 lembar 457 Glass block bj 458 Dugul batu hitam 50 x 50 x 200 tempel unit 459 Dugul batu hitam 60 x 70 x 250 tempel unit Harga Barang dan Upah Hal. 9 1 2 3 4 NO NAMA BARANG SATUAN HARGA SATUAN 460 Dugul batu hitam 70 x 70 x 250 tempel unit 461 Padmasari batu hitam 50 x 50 x 200 tempel unit 462 Padmasari batu hitam 65 x 75 x 255 tempel unit 463 Padmasari batu hitam 70 x 70 x 250 tempel unit 464 Dugul batu hitam 50 x 50 x 200 masive unit 465 Dugul batu hitam 60 x 70 x 250 masive unit 466 Dugul batu hitam 70 x 70 x 250 masive unit 467 Padmasari batu hitam 50 x 50 x 200 masive unit 468 Padmasari batu hitam 65 x 75 x 255 masive unit 469 Padmasari batu hitam 70 x 70 x 250 tempel unit
Harga Barang dan Upah Hal. 10 HARGA (Rp.) 1 2 3 4 5 1 Mandor Hari 2 Kepala Tukang Hari 3 Tukang Politur Hari 4 Tukang Batu Hari 5 Tukang kayu Hari 6 Tukang Besi Hari 7 Tukang cat Hari 8 Tukang gali Hari 9 Tukang Listrik Hari 10 Tukang Pipa/ Tukang Ledeng Hari 11 Tukang Aspal Hari 12 Tukang masak Aspal Hari 13 Pekerja Hari 14 Tukang Ukir Hari 15 Operator Hari 16 Pembantu Operator Hari 17 Mekanik Hari 18 Pembantu Mekanik Hari 19 Pasang Atap Alang-Alang Hari 20 Pasang Bata Gosok Dua Muka M2 21 Pasang Bata Gosok Satu Muka M2 22 Pasang Batu Paras Diukir M2 23 Pasang Batu Paras Siap Diukir M2 24 Tukang Bongkar Begesting Hari DAFTAR HARGA SATUAN UPAH NO NAMA BARANG SPESIFIKASI SATUAN HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 I 1 1.2500 btg Bambu Sedang - - 2.5000 kg Semen Portland - - 1.2000 lbr Seng gelombang 3" - 5" - - 0.0050 m3 Pasir Beton - - 0.0090 m3 Koral beton - - 0.0720 m3 Kayu Meranti Usuk 5/7 - - 0.0600 kg Paku biasa 2" - 5" - - 0.4500 kg Meni Besi - - 0.2000 oh Tukang Kayu - - 0.4000 oh Pekerja - - 0.0200 oh Kepala Tukang - - 0.0200 oh Mandor - - Total : - - - 2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK 0.0120 m3 Kayu Usuk Meranti 5/7 - - 0.0200 kg Paku Biasa 2" - 5" - - 0.0070 m3 Kayu Papan Meranti 3/20 - - 0.1000 oh Tukang Kayu - - 0.1000 oh Pekerja - - 0.0100 oh Kepala Tukang - - 0.0050 oh Mandor - - Total : - - - 3 1.2500 btg Dolken Kayu 8 - 10/4m - - 0.1800 m3 Kayu Meranti - - 0.8500 kg Paku Biasa 2" - 5" - - 1.1000 kg Besi Strip - - 35.0000 kg Semen Portland - - 0.1500 m3 Pasir Pasang - - 0.1000 m3 Pasir Beton - - 0.1500 m3 Koral Beton - - 30.0000 bh Bata Merah - - 0.2500 lbr Seng Plat - - 2.0000 bh Jendela Nako - - 0.0800 m2 Kaca Polos - - 0.1500 bh Kunci Tanam - - 0.0600 lbr Plywood 4 mm - - 2.0000 oh Tukang Kayu - - 1.0000 oh Tukang Batu - - 2.0000 oh Pekerja - - 0.3000 oh Kepala Tukang - - 0.0500 oh Mandor - - Total : - - - 4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT 1.7000 btg Bambu Sedang - - 0.2100 m3 Kayu Meranti - - 0.3000 kg Paku Biasa 2" - 5" - - 10.5000 kg Semen Portland - - 0.0300 m3 Pasir Beton - - 0.0500 m3 Koral Beton - - 1.5000 lbr Seng gelombang BJLS 28 - - 2.0000 oh Tukang Kayu - - 1.0000 oh Pekerja - - 0.2000 oh Kepala Tukang - - 0.0500 oh Mandor - - Total : - - - 5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU 3.0000 btg Bambu Sedang - - 0.2760 m3 Kayu Meranti - - 0.7000 kg Paku biasa 2" - 5" - - 1.5000 lbr Seng gelombang BJLS 28 - - 1.5000 oh Tukang Kayu - - 1.0000 oh Pekerja - - 0.1500 oh Kepala Tukang - - 0.0500 oh Mandor - - Total : - - - 6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN 0.1000 oh Pekerja - - 0.0500 oh Mandor - - Total : - - 7 1 M2 PEMBUATAN BEDENG BURUH 1.2500 btg Bambu Sedang - - 0.1860 m3 Kayu Meranti - - 0.3000 kg Paku Biasa 2" - 5" - - 18.0000 kg Semen Portland - - 0.0300 m3 Pasir Beton - - 0.0500 m3 Koral Beton - - 1.5000 lbr Seng gelombang BJLS 28 - - 1.3500 lbr Plywood 4 mm - - 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN DAFTAR ANALISA PEKERJAAN NO URAIAN 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 2.0000 oh Tukang Kayu - - 1.0000 oh Pekerja - - 0.2000 oh Kepala Tukang - - 0.0500 oh Mandor - - Total : - - - 8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM 0.0360 m3 Kayu Terentang - - 0.0800 kg Paku Biasa 2" - 5" - - 1.0000 btg Kaso 5/7 - - 0.3000 oh Tukang kayu - - 0.0015 oh Mandor - - Total : - - - 9 1 M2 PEMBUATAN STEGGER DARI BAMBU 1.0000 btg Bambu - - 0.2500 kg Tali Ijuk - - 0.0170 oh Tukang Kayu - - 0.0020 oh Pekerja - - 0.2500 oh Kepala Tukang - - 0.0130 oh Mandor - - - - - 10 1 M2 PEMBUATAN JALAN SEMENTARA 0.1500 m3 Batu Kali / Batu Bulat 15/20 - - 0.0900 m3 Batu Pecah 5 - 7 - - 0.0100 m3 Pasir Pasang - - 1.0000 oh Pekerja - - 0.0500 oh Mandor - - Total : - - - 11 1 M3 BONGKARAN BETON BERTULANG 6.6670 oh Pekerja - - 0.3330 oh Mandor - - Total : - - 12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH 6.6670 oh Pekerja - - 0.0330 oh Mandor - - Total : - - II 1 1 M3 GALIAN TANAH BIASA DALAM 1 METER 0.7500 oh Pekerja - - 0.0250 oh Mandor - - Total : - - 2 1 M3 GALIAN TANAH BIASA DALAM 2 METER 0.9000 oh Pekerja - - 0.0450 oh Mandor - - Total : - - 3 1 M3 GALIAN TANAH BIASA DALAM 3 METER 1.0500 oh Pekerja - - 0.0670 oh Mandor - - Total : - - 4 1 M3 GALIAN TANAH KERAS DALAM 1METER 1.0000 oh Pekerja - - 0.0320 oh Mandor - - Total : - - 5 1 M3 GALIAN TANAH CADAS DALAM 1 METER 1.5000 oh Pekerja - - 0.0600 oh Mandor - - Total : - - 6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER 1.2000 oh Pekerja - - 0.0450 oh Mandor - - Total : - - 7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER 0.0500 oh Pekerja - - 0.0050 oh Mandor - - Total : - - 8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER 0.3300 oh Pekerja - - 0.0100 oh Mandor - - Total : - - 9 1 M3 URUGAN KEMBALI Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian - 10 1 M3 PEMADATAN TANAH ( Per 20 Cm ) 0.5000 oh Pekerja - - 0.0500 oh Mandor - - Total : - - 11 1 M3 URUGAN PASIR 1.2000 m3 Pasir Urug - - 0.3000 oh Pekerja - - 0.0100 oh Mandor - - Total : - - - PEKERJAAN TANAH (SNI 2835 : 2008) HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM 6.0000 m3 Ijuk - - 0.1500 oh Pekerja - - 0.0150 oh Mandor - - Total : - - - 13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan 1.2000 m3 Sirtu - - 0.2500 oh Pekerja - - 0.0250 oh Mandor - - Total : - - - 14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN 1.2000 m3 Tanah Urug - - 0.5000 oh Pekerja - - 0.0500 oh Mandor - - Total : - - - 15 1 M3 URUGAN LIMESTONE PADAT 1.2000 m3 Limestone - - 0.2500 oh Pekerja - - 0.0250 oh Mandor - - Total : - - - III 1 1 M3 BATU KALI CAMP. 1 PC : 3 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 - - 202.0000 kg Semen Portland - - 0.4850 m3 Pasir Pasang - - 1.5000 oh Pekerja - - 0.7500 oh Tukang Batu - - 0.0750 oh Kepala Tukang - - 0.0750 oh Mandor - - Total : - - - 2 1 M3 BATU KALI CAMP. 1 PC : 4 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 - - 163.0000 kg Semen Portland - - 0.5200 m3 Pasir Pasang - - 1.5000 oh Pekerja - - 0.7500 oh Tukang Batu - - 0.0750 oh Kepala Tukang - - 0.0750 oh Mandor - - Total : - - - 3 1 M3 BATU KALI CAMP. 1 PC : 5 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 - - 136.0000 kg Semen Portland - - 0.5440 m3 Pasir Pasang - - 1.5000 oh Pekerja - - 0.7500 oh Tukang Batu - - 0.0750 oh Kepala Tukang - - 0.0750 oh Mandor - - Total : - - - 4 1 M3 BATU KALI CAMP. 1 PC : 6 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 - - 117.0000 kg Semen Portland - - 0.5610 m3 Pasir Pasang - - 1.5000 oh Pekerja - - 0.7500 oh Tukang Batu - - 0.0750 oh Kepala Tukang - - 0.0750 oh Mandor - - Total : - - - 5 1 M3 BATU KALI CAMP. 1 PC : 8 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 - - 91.0000 kg Semen Portland - - 0.5840 m3 Pasir Pasang - - 1.5000 oh Pekerja - - 0.7500 oh Tukang Batu - - 0.0750 oh Kepala Tukang - - 0.0750 oh Mandor - - Total : - - - 6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI 0.4800 m3 Batu Kali / Batu Bulat 15/20 - - 194.0000 kg Semen Portland - - 0.3120 m3 Pasir Beton - - 0.4680 m3 Koral Beton - - 126.0000 kg Besi Beton - - 1.8000 kg Kawat Beton - - 3.4000 oh Pekerja - - 0.8500 oh Tukang Batu - - 0.0850 oh Kepala Tukang - - 0.1700 oh Mandor - - - - - 7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M 0.4500 m3 Batu Kali / Batu Bulat 15/20 - - 194.0000 kg Semen Portland - - 0.3120 m3 Pasir Beton - - 0.4680 m3 Koral Beton - - PEKERJAAN PONDASI (SNI 2836 : 2008) HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 2.4000 oh Pekerja - - 0.8000 oh Tukang Batu - - 0.0800 oh Kepala Tukang - - 0.1190 oh Mandor - - Total : - - - 8 1 M3 PASANGAN BATU KOSONG 1.2000 m3 Batu Kali / Batu Bulat 15/20 15/20 - - 0.4320 m3 Pasir Urug - - 0.7800 oh Pekerja - - 0.3900 oh Tukang Batu - - 0.0390 oh Kepala Tukang - - 0.0390 oh Mandor - - Total : - - - SNI 03-2836-2002 9 1 M1 PEMBUATAN TIANG PANCANG 35 CM X 35 CM BETON BERTULANG 0.0160 m3 Pasir Urug - - 0.0800 m3 Pasir Beton - - 0.1250 m3 Koral Beton - - 49.0000 kg Semen Portland - - 34.5000 kg Besi Beton - - 0.7000 kg Kawat beton - - 0.0270 m3 Kayu Bekesting - - 0.1200 kg Paku Reng SQ - - 0.2000 kg Plamir Tembok - - 0.0900 lt Minyak Bekisting - - 0.8000 oh Pekerja - - 0.5000 oh Tukang Batu - - 0.0500 oh Kepala Tukang - - 0.0400 oh Mandor - - Total : - - - 10 1 M1 PEMBUATAN TIANG PANCANG 40 CM X 40 CM BETON BERTULANG 0.0190 m3 Pasir Urug - - 0.0940 m3 Pasir Beton - - 0.1500 m3 Koral Beton - - 60.5000 kg Semen Portland - - 45.0000 kg Besi Beton - - 0.9000 kg Kawat beton - - 0.0320 m3 Kayu Bekesting - - 0.1200 kg Paku Reng SQ - - 0.2400 kg Plamir Tembok - - 0.0900 lt Minyak Bekisting - - 1.0000 oh Pekerja - - 0.6700 oh Tukang Batu - - 0.0670 oh Kepala Tukang - - 0.0500 oh Mandor - - Total : - - - IV 1 140.0000 bh Bata Merah 5 x 11 x 22 cm - - 43.5000 kg Semen Portland - - 0.0800 m3 Pasir Pasang - - 0.6000 oh Pekerja - - 0.2000 oh Tukang Batu - - 0.0200 oh Kepala Tukang - - 0.0300 oh Mandor - - - - - 2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm - - 32.9500 kg Semen Portland - - 0.0910 m3 Pasir Pasang - - 0.6000 oh Pekerja - - 0.2000 oh Tukang Batu - - 0.0200 oh Kepala Tukang - - 0.0300 oh Mandor - - - - - 3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm - - 26.5500 kg Semen Portland - - 0.0930 m3 Pasir Pasang - - 0.6000 oh Pekerja - - 0.2000 oh Tukang Batu - - 0.0200 oh Kepala Tukang - - 0.0300 oh Mandor - - - - - 4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm - - 22.2000 kg Semen Portland - - 0.1020 m3 Pasir Pasang - - 0.6000 oh Pekerja - - 0.2000 oh Tukang Batu - - 0.0200 oh Kepala Tukang - - 0.0300 oh Mandor - - - - - 5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm - - 18.5000 kg Semen Portland - - 0.1220 m3 Pasir Pasang - - 0.6000 oh Pekerja - - 0.2000 oh Tukang Batu - - 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS PEKERJAAN DINDING (SNI 6897 : 2008) HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 0.0200 oh Kepala Tukang - - 0.0300 oh Mandor - - - - - 6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm - - 18.9500 kg Semen Portland - - 0.0380 m3 Pasir Pasang - - 0.3000 oh Pekerja - - 0.1000 oh Tukang Batu - - 0.0100 oh Kepala Tukang - - 0.0150 oh Mandor - - - - - 7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm - - 14.3700 kg Semen Portland - - 0.0400 m3 Pasir Pasang - - 0.3000 oh Pekerja - - 0.1000 oh Tukang Batu - - 0.0100 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm - - 11.5000 kg Semen Portland - - 0.0430 m3 Pasir Pasang - - 0.3000 oh Pekerja - - 0.1000 oh Tukang Batu - - 0.0100 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm - - 9.6800 kg Semen Portland - - 0.0450 m3 Pasir Pasang - - 0.3000 oh Pekerja - - 0.1000 oh Tukang Batu - - 0.0100 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm - - 8.3200 kg Semen Portland - - 0.0490 m3 Pasir Pasang - - 0.3000 oh Pekerja - - 0.1000 oh Tukang Batu - - 0.0100 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm - - 6.5000 kg Semen Portland - - 0.0500 m3 Pasir Pasang - - 0.3000 oh Pekerja - - 0.1000 oh Tukang Batu - - 0.0100 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) 12.5000 bh Batako - - 7.5000 kg Semen Portland - - 0.0270 m3 Pasir Pasang - - 1.9500 kg Besi Beton 8 mm - - 0.3200 oh Pekerja - - 0.1000 oh Tukang Batu - - 0.0100 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI 12.5000 bh Batako - - 7.5000 kg Semen Portland - - 0.0270 m3 Pasir Pasang - - 0.3200 oh Pekerja - - 0.1000 oh Tukang Batu - - 0.0100 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 14 1 M2 PASANGAN DINDING TERAWANG/ROSTER (12 x 11 x 24) CM 30.0000 bh Roster Keramik - - 11.0000 kg Semen Portland - - 0.0350 m3 Pasir Pasang - - 0.3000 oh Pekerja - - 0.1000 oh Tukang Batu - - 0.0100 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU 1.5000 m2 Bedeg/Bilik Bambu Kelas I - - 0.0140 m3 Kayu kamper usuk/reng - - 0.0120 kg Paku Biasa - - 0.0030 m3 List Kayu 2/4 - - 0.1000 oh Pekerja - - 0.0500 oh Tukang Kayu - - 0.0050 oh Kepala Tukang - - 0.0020 oh Mandor - - Total : - - - V 1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM 15.5040 kg Semen Portland - - 0.0160 m3 Pasir Pasang - - 0.3000 oh Pekerja - - 0.1500 oh Tukang Batu - - 0.0150 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM 10.2240 kg Semen Portland - - 0.0200 m3 Pasir Pasang - - 0.3000 oh Pekerja - - 0.1500 oh Tukang Batu - - 0.0150 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM 7.7760 kg Semen Portland - - 0.0230 m3 Pasir Pasang - - 0.3000 oh Pekerja - - 0.1500 oh Tukang Batu - - 0.0150 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM 6.2400 kg Semen Portland - - 0.0240 m3 Pasir Pasang - - 0.3000 oh Pekerja - - 0.1500 oh Tukang Batu - - 0.0150 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM 5.1840 kg Semen Portland - - 0.0260 m3 Pasir Pasang - - 0.3000 oh Pekerja - - 0.1500 oh Tukang Batu - - 0.0150 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM 4.4160 kg Semen Portland - - 0.0270 m3 Pasir Pasang - - 0.3000 oh Pekerja - - 0.1500 oh Tukang Batu - - 0.0150 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM 3.4560 kg Semen Portland - - 0.0290 m3 Pasir Pasang - - 0.3000 oh Pekerja - - 0.1500 oh Tukang Batu - - 0.0150 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM 13.6320 kg Semen Portland - - 0.0270 m3 Pasir Pasang - - 0.4000 oh Pekerja - - 0.2000 oh Tukang Batu - - 0.0200 oh Kepala Tukang - - 0.0220 oh Mandor - - Total : - - - 9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM 10.3680 kg Semen Portland - - 0.0310 m3 Pasir Pasang - - 0.4000 oh Pekerja - - 0.2000 oh Tukang Batu - - 0.0200 oh Kepala Tukang - - 0.0220 oh Mandor - - Total : - - - PEKERJAAN PLESTERAN (SNI 2837 : 2008) HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM 8.3200 kg Semen Portland - - 0.0320 m3 Pasir Pasang - - 0.4000 oh Pekerja - - 0.2000 oh Tukang Batu - - 0.0200 oh Kepala Tukang - - 0.0220 oh Mandor - - Total : - - - 11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM 6.9120 kg Semen Portland - - 0.0350 m3 Pasir Pasang - - 0.4000 oh Pekerja - - 0.2000 oh Tukang Batu - - 0.0200 oh Kepala Tukang - - 0.0220 oh Mandor - - Total : - - - 12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM 5.8880 kg Semen Portland - - 0.0360 m3 Pasir Pasang - - 0.4000 oh Pekerja - - 0.2000 oh Tukang Batu - - 0.0200 oh Kepala Tukang - - 0.0220 oh Mandor - - Total : - - - 13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM 0.5000 kg Semen Portland - - 0.0130 m3 Pasir Pasang - - 0.0800 oh Pekerja - - 0.4000 oh Tukang Batu - - 0.0400 oh Kepala Tukang - - 0.0040 oh Mandor - - Total : - - - 14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS 4.3200 kg Semen Portland - - 0.0060 m3 Pasir Pasang - - 0.3000 oh Pekerja - - 0.1000 oh Tukang Batu - - 0.0100 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 15 3.1080 kg Semen Portland - - 0.1500 oh Pekerja - - 0.0750 oh Tukang Batu - - 0.0080 oh Kepala Tukang - - 0.0080 oh Mandor - - Total : - - - 16 1.6000 kg Semen Portland - - 0.0700 oh Pekerja - - 0.0350 oh Tukang Batu - - 0.0040 oh Kepala Tukang - - 0.0040 oh Mandor - - Total : - - - 17 6.3400 kg Semen Portland - - 0.0120 m3 Pasir Pasang - - 0.3000 oh Pekerja - - 0.1500 oh Tukang Batu - - 0.0150 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 18 1 M2 PEKERJAAN ACIAN 3.2500 zak Semen Portland 50 Kg - - 0.2000 oh Pekerja - - 0.1000 oh Tukang Labur/Cat - - 0.0100 oh Kepala Tukang - - 0.0100 oh Mandor - - Total : - - - VI 1 1.1000 m3 Balok Kayu Kamper - - 1.2500 Kg Paku 10 Cm - - 1.0000 Kg Lem Kayu - - 7.0000 oh Pekerja - - 21.0000 oh Tukang Kayu - - 2.1000 oh Kepala Tukang - - 0.3500 oh Mandor - - Total : - - - 2 1.2000 m3 Balok Kayu kruing - - 1.2500 Kg Paku 10 Cm - - MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III PEKERJAAN KAYU (SNI 3434 : 2008) MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M') 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M') 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 1.0000 Kg Lem Kayu - - 6.0000 oh Pekerja - - 18.0000 oh Tukang Kayu - - 1.8000 oh Kepala Tukang - - 0.3000 oh Mandor - - Total : - - - 3 0.0400 m3 Papan Kayu Kamper - - 0.0500 Kg Paku 5-7 Cm - - 0.3500 oh Pekerja - - 1.0500 oh Tukang Kayu - - 0.1050 oh Kepala Tukang - - 0.0180 oh Mandor - - Total : - - - 4 0.0400 m3 Papan Kayu Kruing - - 0.0500 Kg Paku 5-7 Cm - - 0.3500 oh Pekerja - - 1.0500 oh Tukang Kayu - - 0.1050 oh Kepala Tukang - - 0.0180 oh Mandor - - Total : - - - 5 0.0400 m3 Papan Kayu Kamper - - 0.5000 Kg Lem Kayu - - 1.0000 oh Pekerja - - 3.0000 oh Tukang Kayu - - 0.3000 oh Kepala Tukang - - 0.0500 oh Mandor - - Total : - - - 5a 0.0250 m3 Papan Kayu Kamper - - 0.5000 Kg Lem Kayu - - 0.5000 m2 Kaca 5 mm bevel - - 1.0000 oh Pekerja - - 3.0000 oh Tukang Kayu - - 0.3000 oh Kepala Tukang - - 0.0500 oh Mandor - - Total : - - - 0.0350 m3 Papan Kayu Kamper - - 0.5000 Kg Lem Kayu - - 1.0000 m2 Lapis Kulit jeruk - - 1.0000 oh Pekerja - - 3.0000 oh Tukang Kayu - - 0.3000 oh Kepala Tukang - - 0.0500 oh Mandor - - Total : - - - 6 0.0240 m3 Papan Kayu Kamper - - 0.3000 Kg Lem Kayu - - 0.8000 oh Pekerja - - 2.4000 oh Tukang Kayu - - 0.2400 oh Kepala Tukang - - 0.0400 oh Mandor - - Total : - - - 0.0129 m3 Papan Kayu Kamper - - 0.7500 m2 Kaca 5 mm - - 0.3000 Kg Lem Kayu - - 0.8000 oh Pekerja - - 2.4000 oh Tukang Kayu - - 0.2400 oh Kepala Tukang - - 0.0400 oh Mandor - - Total : - - - 7 0.0640 m3 Papan Kayu Kamper - - 0.5000 Kg Lem Kayu - - 1.0000 oh Pekerja - - 3.0000 oh Tukang Kayu - - 0.3000 oh Kepala Tukang - - 0.0500 oh Mandor - - Total : - - - 8 0.0250 m3 Papan Kayu Kamper - - 0.0300 Kg Paku 1-2,5 Cm - - 0.5000 Kg Lem Kayu - - 1.0000 Lbr Plywood 4 mm - - 1.0000 oh Pekerja - - 3.0000 oh Tukang Kayu - - 0.3000 oh Kepala Tukang - - MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II MEMBUAT DAN MEMASANG 1 M2 PINTU , KAYU KELAS I/II 6a 5b MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II KOMBINASI KACA BEVEL MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL + KULIT JERUK KAYU KELAS I/II MEMBUAT DAN MEMASANG 1 M2 JENDELA KACA, KAYU KELAS I/II MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm) HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 0.0500 oh Mandor - - Total : - - - 0.0250 m3 Papan Kayu Kamper - - 0.0300 Kg Paku 1-2,5 Cm - - 0.5000 Kg Lem Kayu - - 1.0000 Lbr Teak wood ( 0,9 x 2,2 ) m2 - - 1.0000 oh Pekerja - - 3.0000 oh Tukang Kayu - - 0.3000 oh Kepala Tukang - - 0.0500 oh Mandor - - Total : - - - 9 0.0256 m3 Papan Kayu Kamper - - 0.0300 Kg Paku 1-2,5 Cm - - 0.5000 Kg Lem Kayu - - 1.0000 Lbr Plywood 4 mm - - 0.8000 oh Pekerja - - 2.4000 oh Tukang Kayu - - 0.2400 oh Kepala Tukang - - 0.0400 oh Mandor - - Total : - - - 10 0.0600 m3 Papan Kayu Kamper - - 0.1500 Kg Paku 1-2,5 Cm - - 0.6700 oh Pekerja - - 2.0000 oh Tukang Kayu - - 0.2000 oh Kepala Tukang - - 0.3350 oh Mandor - - Total : - - - 11 0.0256 m3 Papan Kayu Kamper - - 0.0300 Kg Paku 1-2,5 Cm - - 0.5000 Kg Lem Kayu - - 1.0000 Lbr Teakwood 4 mm uk 90x220 cm - - 0.8000 oh Pekerja - - 2.4000 oh Tukang Kayu - - 0.2400 oh Kepala Tukang - - 0.0400 oh Mandor - - Total : - - - 12 0.0250 m3 Papan Kayu Kamper - - 0.0300 Kg Paku 1-2,5 Cm - - 0.8000 Kg Lem Kayu - - 1.0000 Lbr Teakwood 4 mm uk 90x220 cm - - 0.5000 Lbr Formika - - 0.8000 oh Pekerja - - 2.4000 oh Tukang Kayu - - 0.2400 oh Kepala Tukang - - 0.0400 oh Mandor - - Total : - - - 13 1.1000 m3 Balok Kayu Kamper - - 15.0000 Kg Besi Strip Tebal 5 cm - - 5.6000 Kg Paku 12 Cm - - 4.0000 oh Pekerja - - 12.0000 oh Tukang Kayu - - 1.2000 oh Kepala Tukang - - 0.2000 oh Mandor - - Total : - - - 14 1.2000 m3 Balok Kayu Kamper - - 15.0000 Kg Besi Strip Tebal 5 cm - - 5.6000 Kg Paku 12 Cm - - 6.7000 oh Pekerja - - 20.1000 oh Tukang Kayu - - 2.0100 oh Kepala Tukang - - 0.3350 oh Mandor - - Total : - - - 15 1.1000 m3 Balok Kayu Kamper - - 15.0000 Kg Besi Strip Tebal 5 cm - - 3.0000 Kg Paku 12 Cm - - 2.4000 oh Pekerja - - 7.2000 oh Tukang Kayu - - 0.7200 oh Kepala Tukang - - 0.1200 oh Mandor - - Total : - - - 16 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III Bentang 6 M' MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I/II MEMBUAT 1 M2 DAUN PINTU TEAKWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm) 8a HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm - - 0.0036 m3 Reng ( 2 x 3 ) Cm - - 0.2500 Kg Paku 5 Cm dan 10 Cm - - 0.1000 oh Pekerja - - 0.1000 oh Tukang Kayu - - 0.0100 oh Kepala Tukang - - 0.0050 oh Mandor - - Total : - - - 0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm - - 0.2500 Kg Paku 5 Cm dan 10 Cm - - 0.1000 oh Pekerja - - 0.1000 oh Tukang Kayu - - 0.0100 oh Kepala Tukang - - 0.0050 oh Mandor - - Total : - - - 17 0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm - - 0.0072 m3 Reng ( 2 x 3 ) Cm - - 0.2500 Kg Paku 5 Cm dan 10 Cm - - 0.1000 oh Pekerja - - 0.1000 oh Tukang Kayu - - 0.0100 oh Kepala Tukang - - 0.0050 oh Mandor - - Total : - - - 0.0072 m3 Reng ( 2 x 3 ) Cm - - 0.2500 Kg Paku 5 Cm dan 10 Cm - - 0.1000 oh Pekerja - - 0.1000 oh Tukang Kayu - - 0.0100 oh Kepala Tukang - - 0.0050 oh Mandor - - Total : - - - 18 0.1650 m3 Balok Kayu Kamper - - 0.2000 Kg Paku 5 Cm dan 10 Cm - - 0.1200 oh Pekerja - - 0.1200 oh Tukang Kayu - - 0.0120 oh Kepala Tukang - - 0.0060 oh Mandor - - Total : - - - 19 0.0154 m3 Kaso-Kaso ( 5 x 7 ) Cm - - 0.2000 Kg Paku 7 Cm dan 10 Cm - - 0.1500 oh Pekerja - - 0.3000 oh Tukang Kayu - - 0.0300 oh Kepala Tukang - - 0.0750 oh Mandor - - Total : - - - 20 0.0163 m3 Kaso-Kaso ( 5 x 7 ) Cm - - 0.2500 Kg Paku 7 Cm dan 10 Cm - - 0.2000 oh Pekerja - - 0.3000 oh Tukang Kayu - - 0.0300 oh Kepala Tukang - - 0.0100 oh Mandor - - Total : - - - 21 0.0108 m3 Papan Kayu Kamper - - 0.1000 Kg Paku 5 Cm dan 7 Cm - - 0.1000 oh Pekerja - - 0.2000 oh Tukang Kayu - - 0.0200 oh Kepala Tukang - - 0.0050 oh Mandor - - Total : - - - 22 0.0110 m3 Papan Kayu Kamper - - 0.0500 Kg Paku 5 Cm dan 7 Cm - - 0.1000 oh Pekerja - - 0.2000 oh Tukang Kayu - - 0.0200 oh Kepala Tukang - - 0.0050 oh Mandor - - Total : - - - 0.0055 m3 Papan Kayu Kamper - - 0.0500 Kg Paku 5 Cm dan 7 Cm - - 0.1000 oh Pekerja - - 0.2000 oh Tukang Kayu - - 0.0200 oh Kepala Tukang - - 0.0050 oh Mandor - - Total : - - - MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III MEMASANG 1 M' LISPLANK UKURAN (2 X 20) CM, KAYU KELAS I/II MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II 16a MEMASANG 1 M2 USUK KAYU KAMPER EXPOSE 17a MEMASANG 1 M2 RANGKA ATAP GENTENG , KAYU KELAS II 22a MEMASANG 1 M' LISPLANK UKURAN (3 X 15) CM, KAYU KELAS I/II MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 0.0037 m3 Papan Kayu Kamper - - 0.0500 Kg Paku 5 Cm dan 7 Cm - - 0.1000 oh Pekerja - - 0.2000 oh Tukang Kayu - - 0.0200 oh Kepala Tukang - - 0.0050 oh Mandor - - Total : - - - 23 0.0280 m3 Balok Kayu Kamper - - 0.1500 Kg Paku 5 Cm dan 7 Cm - - 0.1500 oh Pekerja - - 0.4500 oh Tukang Kayu - - 0.0450 oh Kepala Tukang - - 0.0080 oh Mandor - - Total : - - - 24 0.0280 m3 Balok Kayu Kamper - - 0.1500 Kg Paku 5 Cm dan 7 Cm - - 0.8600 Lbr Teakwood 4 mm uk 90x220 cm - - 0.5600 Kg Lem Kayu - - 0.1500 oh Pekerja - - 0.4500 oh Tukang Kayu - - 0.0450 oh Kepala Tukang - - 0.0080 oh Mandor - - Total : - - - 25 0.0280 m3 Balok Kayu Kamper - - 0.1500 Kg Paku 5 Cm dan 7 Cm - - 0.8600 Lbr Plywood tebal 4 mm uk 120 x 240 cm - - 0.5600 Kg Lem Kayu - - 0.2000 oh Pekerja - - 0.6000 oh Tukang Kayu - - 0.0600 oh Kepala Tukang - - 0.0100 oh Mandor - - Total : - - - 3.0000 m3 Rangka metal stud - - 0.2200 Kg Paku skrup - - 0.8600 Lbr Kalsyboard ( 120x240x10) - - 0.2000 oh Pekerja - - 0.6000 oh Tukang Kayu - - 0.0600 oh Kepala Tukang - - 0.0100 oh Mandor - - Total : - - - 3.0000 m3 Rangka metal stud - - 0.2200 Kg Paku skrup - - 0.8600 Lbr Gypsum ( 120x240x9) - - 0.2000 oh Pekerja - - 0.6000 oh Tukang Kayu - - 0.0600 oh Kepala Tukang - - 0.0100 oh Mandor - - Total : - - - 26 0.0070 m3 Papan Kayu Kamper - - 0.1000 Kg Paku 5 Cm dan 10 Cm - - 0.1500 Kg Paku Skrup 10 cm - - 0.6000 oh Pekerja - - 1.8000 oh Tukang Kayu - - 0.1800 oh Kepala Tukang - - 0.0300 oh Mandor - - Total : - - - 27 0.4000 Lbr Plywood tebal 4 mm uk 120 x 240 cm - - 0.0500 Kg Paku 1 Cm dan 2.5 Cm - - 0.0250 oh Pekerja - - 0.0750 oh Tukang Kayu - - 0.0080 oh Kepala Tukang - - 0.0010 oh Mandor - - Total : - - - VII 1 MEMBUAT 1 M BETON MUTU f' C = 7,4 Mpa (K100), Slump (12 2)cm, w/c = 0,87 247.0000 kg Semen Portland - - 869.0000 kg Pasir Beton - - 999.0000 kg Koral Beton - - 215.0000 lt Air - - 1.6500 oh Pekerja - - 0.2750 oh Tukang Batu - - 0.0280 oh Kepala Tukang - - 0.0830 oh Mandor - - PEKERJAAN BETON ( SNI 7394:2008) MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II 25b MEMASANG 1 M2 RANGKA DINDING PEMISAH GYPSUM 9 MM RANGKAP,RANGKA METAL STUD 22b MEMASANG 1 M' LISPLANK UKURAN (3 X 10) CM, KAYU KELAS I/II 25a MEMASANG 1 M2 RANGKA DINDING PEMISAH KALSYBOARD 10 MM RANGKAP,RANGKA METAL STUD HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) - - - 2 MEMBUAT 1 M BETON MUTU f' C = 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78 276.0000 kg Semen Portland - - 828.0000 kg Pasir Beton - - 1,012.0000 kg Koral Beton - - 215.0000 lt Air - - 1.6500 oh Pekerja - - 0.2750 oh Tukang Batu - - 0.0280 oh Kepala Tukang - - 0.0830 oh Mandor - - Total : - - - 3 MEMBUAT 1 M BETON MUTU f' C = 12,2 Mpa (K150), Slump (12 2)cm, w/c = 0,72 299.0000 kg Semen Portland - - 799.0000 kg Pasir Beton - - 1,017.0000 kg Koral Beton - - 215.0000 lt Air - - 1.6500 oh Pekerja - - 0.2750 oh Tukang Batu - - 0.0280 oh Kepala Tukang - - 0.0830 oh Mandor - - Total : - - - 4 MEMBUAT 1 M BETON MUTU f' C = 14,5 Mpa (K175), Slump (12 2)cm, w/c = 0,66 326.0000 kg Semen Portland - - 760.0000 kg Pasir Beton - - 1,029.0000 kg Koral Beton - - 215.0000 lt Air - - 1.6500 oh Pekerja - - 0.2750 oh Tukang Batu - - 0.0280 oh Kepala Tukang - - 0.0830 oh Mandor - - Total : - - - 5 MEMBUAT 1 M BETON MUTU f' C = 16,9 Mpa (K200), Slump (12 2)cm, w/c = 0,61 352.0000 kg Semen Portland - - 731.0000 kg Pasir Beton - - 1,031.0000 kg Koral Beton - - 215.0000 lt Air - - 1.6500 oh Pekerja - - 0.2750 oh Tukang Batu - - 0.0280 oh Kepala Tukang - - 0.0830 oh Mandor - - Total : - - - 6 MEMBUAT 1 M BETON MUTU f' C = 19,3 Mpa (K225), Slump (12 2)cm, w/c = 0,58 371.0000 kg Semen Portland - - 698.0000 kg Pasir Beton - - 1,047.0000 kg Koral Beton - - 215.0000 lt Air - - 1.6500 oh Pekerja - - 0.2750 oh Tukang Batu - - 0.0280 oh Kepala Tukang - - 0.0830 oh Mandor - - Total : - - - 7 MEMBUAT 1 M BETON MUTU f' C = 21,7 Mpa (K250), Slump (12 2)cm, w/c =0,56 384.0000 kg Semen Portland - - 692.0000 kg Pasir Beton - - 1,039.0000 kg Koral Beton - - 215.0000 lt Air - - 1.6500 oh Pekerja - - 0.2750 oh Tukang Batu - - 0.0280 oh Kepala Tukang - - 0.0830 oh Mandor - - Total : - - - 8 MEMBUAT 1 M BETON MUTU f' C = 24,0 Mpa (K275), Slump (12 2)cm, w/c =0,53 406.0000 kg Semen Portland - - 684.0000 kg Pasir Beton - - 1,026.0000 kg Koral Beton - - 215.0000 lt Air - - 1.6500 oh Pekerja - - 0.2750 oh Tukang Batu - - 0.0280 oh Kepala Tukang - - 0.0830 oh Mandor - - Total : - - - 9 MEMBUAT 1 M BETON MUTU f' C = 26,4 Mpa (K300), Slump (12 2)cm, w/c =0,52 413.0000 kg Semen Portland - - 681.0000 kg Pasir Beton - - 1,021.0000 kg Koral Beton - - 215.0000 lt Air - - 1.6500 oh Pekerja - - 0.2750 oh Tukang Batu - - 0.0280 oh Kepala Tukang - - 0.0830 oh Mandor - - Total : - - - 10 MEMBUAT 1 M BETON MUTU f' C = 28,8 Mpa (K325), Slump (12 2)cm, w/c =0,49 439.0000 kg Semen Portland - - 670.0000 kg Pasir Beton - - 1,006.0000 kg Koral Beton - - 215.0000 lt Air - - 1.6500 oh Pekerja - - 0.2750 oh Tukang Batu - - 0.0280 oh Kepala Tukang - - 0.0830 oh Mandor - - Total : - - - 11 MEMBUAT 1 M BETON MUTU f' C = 31,2 Mpa (K350), Slump (12 2)cm, w/c =0,48 448.0000 kg Semen Portland - - HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 667.0000 kg Pasir Beton - - 1,000.0000 kg Koral Beton - - 215.0000 lt Air - - 1.6500 oh Pekerja - - 0.2750 oh Tukang Batu - - 0.0280 oh Kepala Tukang - - 0.0830 oh Mandor - - Total : - - - 12 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR 10.5000 kg Besi Beton (Polos/ Ulir) - - 0.1500 kg Kawat Beton - - 0.0700 oh Pekerja - - 0.0700 oh Tukang Besi - - 0.0070 oh Kepala Tukang - - 0.0040 oh Mandor - - Total : - - - 12a PEMBESIAN 1 KG DENGAN BESI POLOS ATAU BESI ULIR Total : - - - 13 1 M2 PASANG BEKISTING UNTUK PONDASI 0.0400 m3 Kayu Kelas III - - 0.3000 kg Paku Biasa 5' - 10' - - 0.1000 ltr Minyak Bekisting - - 0.5200 oh Pekerja - - 0.2600 oh Tukang Kayu - - 0.0260 oh Kepala Tukang - - 0.0260 oh Mandor - - Total : - - - 14 1 M2 PASANG BEKISTING UNTUK SLOOF 0.0400 m3 Kayu Kelas III - - 0.3000 kg Paku Biasa 5' - 10' - - 0.1000 ltr Minyak Bekisting - - 0.5200 oh Pekerja - - 0.2600 oh Tukang Kayu - - 0.0260 oh Kepala Tukang - - 0.0260 oh Mandor - - Total : - - - 15 1 M2 PASANG BEKISTING UNTUK KOLOM 0.0400 m3 Kayu Kelas III - - 0.4000 kg Paku Biasa 5' - 12' - - 0.2000 ltr Minyak Bekisting - - 0.0150 m3 Kayu Usuk 4/6 - - 0.3500 lbr Plywood 9 mm - - 2.0000 btg Dolken Kayu 8" - 10"/4 m - - 0.6600 oh Pekerja - - 0.3300 oh Tukang Kayu - - 0.0330 oh Kepala Tukang - - 0.0330 oh Mandor - - Total : - - - 15a 1 M2 PASANG BEKISTING UNTUK KOLOM 0.0400 m3 Kayu Kelas III - - 0.4000 kg Paku Biasa 5' - 12' - - 0.2000 ltr Minyak Bekisting - - 0.0150 m3 Kayu Usuk 4/6 - - 0.3500 lbr Plywood 9 mm - - 0.6600 oh Pekerja - - 0.3300 oh Tukang Kayu - - 0.0330 oh Kepala Tukang - - 0.0330 oh Mandor - - Total : - - - 16 1 M2 PASANG BEKISTING UNTUK BALOK 0.0400 m3 Kayu Kelas III - - 0.4000 kg Paku Biasa 5' - 12' - - 0.2000 ltr Minyak Bekisting - - 0.0180 m3 Kayu Usuk 4/6 - - 0.3500 lbr Plywood 9 mm - - 2.0000 btg Dolken Kayu 8" - 10"/4m - - 0.6600 oh Pekerja - - 0.3300 oh Tukang Kayu - - 0.0330 oh Kepala Tukang - - 0.0330 oh Mandor - - Total : - - - 16a 1 M2 PASANG BEKISTING UNTUK BALOK 0.0400 m3 Kayu Kelas III - - 0.4000 kg Paku Biasa 5' - 12' - - 0.2000 ltr Minyak Bekisting - - 0.0180 m3 Kayu Usuk 4/6 - - 0.3500 lbr Plywood 9 mm - - 0.3100 m2 Scafolding - - 0.6600 oh Pekerja - - 0.3300 oh Tukang Kayu - - 0.0330 oh Kepala Tukang - - 0.0330 oh Mandor - - Total : - - - HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 17 1 M2 PASANG BEKISTING UNTUK LANTAI 0.0400 m3 Kayu Kelas III - - 0.4000 kg Paku Biasa 5' - 12' - - 0.2000 ltr Minyak Bekisting - - 0.0150 m3 Kayu Usuk 4/6 - - 0.3500 lbr Plywood 9 mm - - 6.0000 btg Dolken Kayu 8" - 10"/4m - - 0.6600 oh Pekerja - - 0.3300 oh Tukang Kayu - - 0.0330 oh Kepala Tukang - - 0.0330 oh Mandor - - Total : - - - 17a 1 M2 PASANG BEKISTING UNTUK LANTAI 0.0400 m3 Kayu Kelas III - - 0.4000 kg Paku Biasa 5' - 12' - - 0.2000 ltr Minyak Bekisting - - 0.0150 m3 Kayu Usuk 4/6 - - 0.3400 lbr Plywood 9 mm - - 1.0000 m2 Scafolding - - 0.6600 oh Pekerja - - 0.3300 oh Tukang Kayu - - 0.0330 oh Kepala Tukang - - 0.0330 oh Mandor - - Total : - - - 17b 1 M2 PASANG BEKISTING UNTUK PLAT PERAFET / MEJA PANTRY 0.0400 m3 Kayu Kelas III - - 0.4000 kg Paku Biasa 5' - 12' - - 0.2000 ltr Minyak Bekisting - - 0.0150 m3 Kayu Usuk 4/6 - - 0.3500 lbr Plywood 9 mm - - 0.6600 oh Pekerja - - 0.3300 oh Tukang Kayu - - 0.0330 oh Kepala Tukang - - 0.0330 oh Mandor - - Total : - - - 18 1 M2 PASANG BEKISTING UNTUK DINDING 0.0300 M 3 Kayu Kelas III - - 0.4000 Kg Paku Biasa 5' - 12' - - 0.2000 Ltr Minyak Bekisting - - 0.0200 M 3 Kayu Usuk 4/6 - - 0.3500 Lbr Plywood 9 mm - - 3.0000 Btng Dolken Kayu 8" - 10"/4m - - 4.0000 Bh Formite/penjaga jarak bekisting/spacer - - 0.6600 Oh Pekerja - - 0.3300 Oh Tukang Kayu - - 0.0330 Oh Kepala Tukang - - 0.0330 Oh Mandor - - - - - 19 1 M2 PASANG BEKISTING UNTUK TANGGA 0.0300 m3 Kayu Kelas III - - 0.4000 kg Paku Biasa 5' - 12' - - 0.1500 ltr Minyak Bekisting - - 0.0150 m3 Kayu Usuk 4/6 - - 0.3500 lbr Plywood 9 mm - - 2.0000 btg Dolken Kayu 8" - 10"/4m - - 0.6600 oh Pekerja - - 0.3300 oh Tukang Kayu - - 0.0330 oh Kepala Tukang - - 0.0330 oh Mandor - - Total : - - - 19a 1 M2 PASANG BEKISTING UNTUK TANGGA 0.0300 m3 Kayu Kelas III - - 0.4000 kg Paku Biasa 5' - 12' - - 0.1500 ltr Minyak Bekisting - - 0.0150 m3 Kayu Usuk 4/6 - - 0.3500 lbr Plywood 9 mm - - 1.0000 m2 Scafolding - - 0.6600 oh Pekerja - - 0.3300 oh Tukang Kayu - - 0.0330 oh Kepala Tukang - - 0.0330 oh Mandor - - Total : - - - 20 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON 0.0264 m3 Kayu Kelas III (Papan) - - 0.6000 kg Paku Biasa 5' - 12' - - 0.5000 btg Dolken Kayu 8" - 10"/4m - - 0.1500 oh Pekerja - - 0.0500 oh Tukang Kayu - - 0.0050 oh Kepala Tukang - - 0.0080 oh Mandor - - Total : - - - 21 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING) 0.2000 m3 Kayu Kelas III - - 1.5000 kg Paku Biasa 5' - 12' - - 0.4000 ltr Minyak Bekisting - - 157.0000 kg Besi Beton - - 2.2500 kg Kawat Beton - - 336.0000 kg Semen Portland - - 0.5400 m3 Pasir Beton - - 0.8100 m3 Koral Beton - - 5.3000 oh Pekerja - - 0.2750 oh Tukang Batu - - 1.3000 oh Tukang Kayu - - 1.0500 oh Tukang Besi - - HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 0.2620 oh Kepala Tukang - - 0.2650 oh Mandor - - Total : - - - 22 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING) 0.2700 m3 Kayu Kelas III - - 2.0000 kg Paku Biasa 5' - 12' - - 0.6000 ltr Minyak Bekisting - - 210.0000 kg Besi Beton - - 3.0000 kg Kawat Beton - - 336.0000 kg Semen Portland - - 0.5400 m3 Pasir Beton - - 0.8100 m3 Koral Beton - - 5.6500 oh Pekerja - - 0.2750 oh Tukang Batu - - 1.5600 oh Tukang Kayu - - 1.4000 oh Tukang Besi - - 0.3230 oh Kepala Tukang - - 0.2830 oh Mandor - - Total : - - - 23 0.4000 m3 Kayu Kelas III - - 4.0000 kg Paku Biasa 5' - 12' - - 2.0000 ltr Minyak Bekisting - - 315.0000 kg Besi Beton - - 4.5000 kg Kawat Beton - - 336.0000 kg Semen Portland - - 0.5400 m3 Pasir Beton - - 0.8100 m3 Koral Beton - - 0.1500 m3 Kayu Kelas II balok - - 3.5000 lbr Plywood 9 mm - - 20.0000 btg Dolken Kayu 8" /4 m - - 7.0500 oh Pekerja - - 0.2750 oh Tukang Batu - - 1.6500 oh Tukang Kayu - - 2.1000 oh Tukang Besi - - 0.4030 oh Kepala Tukang - - 0.3530 oh Mandor - - Total : - - - 24 0.3200 m3 Kayu Kelas III - - 3.2000 kg Paku Biasa 5' - 12' - - 1.6000 ltr Minyak Bekisting - - 210.0000 kg Besi Beton - - 3.0000 kg Kawat Beton - - 336.0000 kg Semen Portland - - 0.5400 m3 Pasir Beton - - 0.8100 m3 Koral Beton - - 0.1400 m3 Kayu Kelas II balok - - 2.8000 lbr Plywood 9 mm - - 16.0000 btg Dolken Kayu 8" /4 m - - 6.3500 oh Pekerja - - 0.2750 oh Tukang Batu - - 1.6500 oh Tukang Kayu - - 1.4000 oh Tukang Besi - - 0.3330 oh Kepala Tukang - - 0.3180 oh Mandor - - Total : - - - 25 0.3200 m3 Kayu Kelas III - - 3.2000 kg Paku Biasa 5' - 12' - - 1.6000 ltr Minyak Bekisting - - 157.5000 kg Besi Beton - - 2.2500 kg Kawat Beton - - 336.0000 kg Semen Portland - - 0.5400 m3 Pasir Beton - - 0.8100 m3 Koral Beton - - 0.1200 m3 Kayu Kelas II balok - - 2.8000 lbr Plywood 9 mm - - 32.0000 btg Dolken Kayu 8" /4 m - - 5.3000 oh Pekerja - - 0.2750 oh Tukang Batu - - 1.3000 oh Tukang Kayu - - 1.0500 oh Tukang Besi - - 0.2650 oh Kepala Tukang - - 0.2650 oh Mandor - - - - - 26 0.2400 m3 Kayu Kelas III - - 3.2000 kg Paku Biasa 5' - 12' - - 1.6000 ltr Minyak Bekisting - - 157.0000 kg Besi Beton - - 2.2500 kg Kawat Beton - - 336.0000 kg Semen Portland - - 0.5400 m3 Pasir Beton - - 0.8100 m3 Koral Beton - - 0.1600 m3 Kayu Kelas II balok - - 2.8000 lbr Plywood 9 mm - - 24.0000 btg Dolken Kayu 8" /4 m - - 5.3000 oh Pekerja - - 0.2750 oh Tukang Batu - - 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING) 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING) 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING) 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 1.3000 oh Tukang Kayu - - 1.0500 oh Tukang Besi - - 0.2620 oh Kepala Tukang - - 0.2650 oh Mandor - - - - - 27 0.2500 m3 Kayu Kelas III - - 3.0000 kg Paku Biasa 5' - 12' - - 1.2000 ltr Minyak Bekisting - - 210.0000 kg Besi Beton - - 3.0000 kg Kawat Beton - - 336.0000 kg Semen Portland - - 0.5400 m3 Pasir Beton - - 0.8100 m3 Koral Beton - - 0.1050 m3 Kayu Kelas II balok - - 2.5000 lbr Plywood 9 mm - - 14.0000 btg Dolken Kayu 8" /4 m - - 5.6500 oh Pekerja - - 0.2750 oh Tukang Batu - - 1.5600 oh Tukang Kayu - - 1.4000 oh Tukang Besi - - 0.3230 oh Kepala Tukang - - 0.2830 oh Mandor - - - - - 28 0.0020 m3 Kayu Kelas III - - 0.0100 kg Paku Biasa 5' - 12' - - 3.0000 kg Besi Beton - - 0.0450 kg Kawat Beton - - 4.0000 kg Semen Portland - - 0.0060 m3 Pasir Beton - - 0.0090 m3 Koral Beton - - 0.1800 oh Pekerja - - 0.0200 oh Tukang Batu - - 0.0200 oh Tukang Kayu - - 0.0200 oh Tukang Besi - - 0.0060 oh Kepala Tukang - - 0.0090 oh Mandor - - Total : - - - 29 0.0030 m3 Kayu Kelas III - - 0.0200 kg Paku Biasa 5' - 12' - - 3.6000 kg Besi Beton - - 0.0500 kg Kawat Beton - - 5.5000 kg Semen Portland - - 0.0090 m3 Pasir Beton - - 0.0150 m3 Koral Beton - - 0.2970 oh Pekerja - - 0.0330 oh Tukang Batu - - 0.0330 oh Tukang Kayu - - 0.0330 oh Tukang Besi - - 0.0100 oh Kepala Tukang - - 0.0150 oh Mandor - - Total : - - - 30 1 M2 PEKERJAAN BESI BETON WIREMESH BRC TYPE M5 1.1500 m2 Besi Beton wiremesh M5 - - 1.0000 ls Upah setting & penempatan - - Total : - - - 31 1 M2 PEKERJAAN BESI BETON WIREMESH BRC TYPE M6 1.1500 m2 Besi Beton wiremesh M6 - - 1.0000 ls Upah setting & penempatan - - Total : - - - 32 1 M2 PEKERJAAN BESI BETON WIREMESH BRC TYPE M7 1.1500 m2 Besi Beton wiremesh M7 - - 1.0000 ls Upah setting & penempatan - - Total : - - - 33 PASANG BAUT BAJA HTB A325 16 MM 1.0000 bh Baut HTB A325 + mur & ring - - 1.0000 ls upah pasang baut - - Total : - - - 34 PASANG BAUT BAJA 12 MM 1.0000 bh Baut Baja + mur & ring - - 1.0000 ls upah pasang baut - - Total : - - - 35 PASANG ANGKUR D 19 MM PANJANG 50 CM 1.0000 bh besi dim 19 mm panjang 50 cm - - 1.0000 ls upah pasang angkur - - Total : - - - VIII 1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG 25.0000 bh Genteng Plentong - - 20.0000 BH Genteng kodok karang pilang ( setara Good year ) - - 0.1500 oh Pekerja - - 0.0600 oh Tukang Kayu - - PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002) 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING) 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM) 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM) HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 0.0060 oh Kepala Tukang - - 0.0080 oh Mandor - - Total : - - - 1a 1 M2 PEKERJAAN ATAP GENTENG KODOK KARANG PILANG Total : - - - 2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT 25.0000 bh Genteng Plentong Dicat - - 0.1500 oh Pekerja - - 0.0600 oh Tukang Kayu - - 0.0060 oh Kepala Tukang - - 0.0080 oh Mandor - - Total : - - - 3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG 3.5000 bh Bubungan Plentong - - 4.0000 bh Bubungan Karang pilang isi 4/m' - - 8.0000 kg Semen Portland - - 0.0320 m3 Pasir Pasang - - 0.4000 oh Pekerja - - 0.2000 oh Tukang Kayu - - 0.0200 oh Kepala Tukang - - 0.0020 oh Mandor - - Total : - - - 3a 1 M1 PASANG BUBUNGAN GENTENG KARANG PILANG Total : - - - 4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM 0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm - - 0.1200 kg Paku Pancing 60 x 230 - - 0.1400 oh Pekerja - - 0.0700 oh Tukang Kayu - - 0.0070 oh Kepala Tukang Kayu - - 0.0070 oh Mandor - - Total : - - - 5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M 2.4000 lbr Bubungan Stel Gelombang - - 6.0000 kg Paku Skrup 3,5" - - 0.0840 oh Pekerja - - 0.1250 oh Tukang Kayu - - 0.0130 oh Kepala Tukang - - 0.0040 oh Mandor - - Total : - - - 6 1 M2 PEKERJAAN ATAP SIRAP 60.0000 bh Genteng Sirap - - 0.2000 kg Paku Biasa 1/2" - 1" - - 0.1660 oh Pekerja - - 0.2500 oh Tukang Kayu - - 0.0250 oh Kepala Tukang - - 0.0080 oh Mandor - - Total : - - - 7 1 M2 PEKERJAAN ATAP NOK SIRAP 0.4000 lbr Seng plat 3" x 6" BJLS 28 - - 0.0600 kg Paku biasa 1/2" - 1" - - 0.0500 kg Paku biasa 2" - 5" - - 0.0040 m3 Kayu papan 3 cm - - 0.1250 oh Pekerja - - 0.2500 oh Tukang kayu - - 0.0250 oh Kepala Tukang - - 0.0080 oh Mandor - - Total : - - - 8 1 M2 PASANG ATAP ALANG-ALANG 3 M1 6.5000 lbr Alang - alang - - 0.5000 glg Tali pengikat - - 0.2000 oh Pekerja - - 0.0100 oh Mandor - - Total : - - - 9 1 M2 PEKERJAAN ATAP SENG GELOMBANG 0.7000 lbr Seng Gelombang 3" x 6" BJLS 28 - - 0.0200 kg Paku Biasa 1/2" - 1" - - 0.1200 oh Pekerja - - 0.0600 oh Tukang Kayu - - 0.0060 oh Kepala Tukang - - 0.0060 oh Mandor - - Total : - - - 10 1 M2 PASANGAN LAPISAN ALUMINIUM FOIL 1.0500 m2 Aluminium Foil - - 0.1500 oh Pekerja - - 0.0500 oh Tukang Kayu - - 0.0050 oh Kepala Tukang - - 0.0080 oh Mandor - - Total : - - - 11 1 M1 PASANG NOK SENG GELOMBANG 0.3000 lbr Seng Plat 3" x 6" BJLS 28 - - 0.0400 kg Paku biasa 1/2" - 1" - - 0.1500 oh Pekerja - - 0.0700 oh Tukang Kayu - - 0.0080 oh Kepala Tukang - - 0.0060 oh Mandor - - Total : - - - HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) IX 1 1.1000 lbr Asbes semen - - 0.0100 kg Paku Biasa 1/2" - 1" - - 0.0300 oh Pekerja - - 0.0700 oh Tukang Kayu - - 0.0070 oh Kepala Tukang - - 0.0040 oh Mandor - - Total : - - - 2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM 0.3750 lbr TRIPLEKS - - 0.0300 kg Paku Biasa 1/2" - 1" - - 0.1000 oh Pekerja - - 0.1000 oh Tukang Kayu - - 0.0100 oh Kepala Tukang - - 0.0050 oh Mandor - - Total : - - - 3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING 0.0150 m3 Kayu Papan - - 0.0100 kg Paku Biasa 1/2" - 1" - - 0.8000 oh Pekerja - - 0.8000 oh Tukang Kayu - - 0.0800 oh Kepala Tukang - - 0.0400 oh Mandor - - Total : - - - 4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL 1.0500 m1 List Kayu Profil - - 0.1000 kg Paku list SQ - - 0.0500 oh Pekerja - - 0.0500 oh Tukang Kayu - - 0.0050 oh Kepala Tukang - - 0.0030 oh Mandor - - Total : - - - 5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA 0.0120 m3 Kamper Usuk 4/6 cm - - 0.0600 kg Paku Biasa 2" - 5" - - 1.1000 lbr Asbes - - 0.1800 oh Pekerja - - 0.3200 oh Tukang Kayu - - 0.0320 oh Kepala Tukang - - 0.0090 oh Mandor - - Total : - - - 6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM 0.1100 kg Paku Sekrup - - 0.3640 lbr Gypsum Board (120x240x9) - - 0.3640 lbr Kalsyboard (120x240x4,5) - - 0.1000 oh Pekerja - - 0.0500 oh Tukang Kayu - - 0.0050 oh Kepala Tukang - - 0.0050 oh Mandor - - Total : - - - 2.4000 m' Hollow galvalum 4x4 - - 3.3000 m' Hollow galvalum 2x4 - - 6a 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM RANGKA HOLLOW GALVALUM - - 6b 1 M2 PASANG LANGIT-LANGIT KALSYBOARD UKURAN (1200X2400X4,5) MM RANGKA HOLLOW GALVALUM - - 7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM 0.1100 kg Paku Sekrup - - 0.3640 lbr Kalsiboard 4.5 mm - - 0.1000 oh Pekerja - - 0.0500 oh Tukang Kayu - - 0.0050 oh Kepala Tukang - - 0.0050 oh Mandor - - Total : - - - 8 1 M' PASANG LIST PLAPOND GYPSUM 2/6 CM 1.1000 m1 List Plapond Gypsum 25/25 - - 1.1000 m1 List Plapond Gypsum 9/9 - - 1.1000 m1 List Plapond Gypsum 7/7 - - 1.1000 m1 List Plapond Gypsum 2/6 - - 0.0020 kg Paku Gypsum - - 0.0200 oh Tukang Kayu - - 0.0020 oh Kepala Tukang Kayu - - 0.0500 oh Pekerja - - 0.0050 oh Mandor - - List Plapond Gypsum 2/6 Total : - - - 8a List Plapond Gypsum 25/25 - 8b List Plapond Gypsum 9/9 - 8c List Plapond Gypsum 7/7 - X 1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK 1.0000 bh Kloset duduk/ monoblok - - 6% x harga kloset Perlengkapan - 3.3000 oh Pekerja - - 1.1000 oh Tukang batu - - 0.0010 oh Kepala Tukang - - PEKERJAAN SANITASI ( SNI 2002 ) MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM PEKERJAAN LANGIT - LANGIT (SNI 2839-2008) HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 0.1600 oh Mandor - - Total : - - - 2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN 1.0000 bh Kloset jongkok porselen - - 6.0000 kg Semen Portland - - 0.0100 m3 Pasir Pasang - - 1.0000 oh Pekerja - - 1.5000 oh Tukang batu - - 1.5000 oh Kepala Tukang - - 0.1600 oh Mandor - - Total : - - - 3 MEMASANG 1 BUAH URINOIR 1.0000 bh Urinoir - - 6% x harga Urin Perlengkapan - 6.0000 kg Semen Portland - - 0.0100 m3 Pasir Pasang - - 1.0000 oh Pekerja - - 1.0000 oh Tukang batu - - 0.1000 oh Kepala Tukang - - 0.1000 oh Mandor - - Total : - - - 4 MEMASANG 1 BUAH WASHTAFEL Wastafel TYPE Counter /Komplit LW 521 V1A (ex Toto ) 1.0000 bh Washtafel - - 12% x harga wast Perlengkapan - 6.0000 kg Semen Portland - - 0.0100 m3 Pasir Pasang - - 1.2000 oh Pekerja - - 1.4500 oh Tukang batu - - 0.1500 oh Kepala Tukang - - 0.1000 oh Mandor - - Total : - - - 5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3 1.0000 bh Bak Fibreglass - - 18% x harga wast Perlengkapan - 1.8000 oh Pekerja - - 2.7000 oh Tukang batu - - 0.5400 oh Kepala Tukang - - 0.1100 oh Mandor - - Total : - - - 6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 " 1.2000 m1 Pipa galvanis - - 35% x harga pipa Perlengkapan - 0.0540 oh Pekerja - - 0.0900 oh Tukang Pipa - - 0.0090 oh Kepala Tukang - - 0.0270 oh Mandor - - Total : - - - 7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3" 1.2000 M' Pipa galvanis - - 35% x harga pipa Perlengkapan - 0.1080 Oh Pekerja - - 0.1800 Oh Tukang Pipa - - 0.0180 Oh Kepala Tukang - - 0.0054 Oh Mandor - - Total : - - - 8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" 1.2000 m1 Pipa PVC - - 35% x harga pipa Perlengkapan - 0.0360 oh Pekerja - - 0.0600 oh Tukang Pipa - - 0.0060 oh Kepala Tukang - - 0.0018 oh Mandor - - Total : - - - 8a MEMASANG 1 M1 PIPA PVC TYPE AW f 0,75" 1.2000 m1 Pipa PVC - - 35% x harga pipa Perlengkapan - 0.0360 oh Pekerja - - 0.0600 oh Tukang Pipa - - 0.0060 oh Kepala Tukang - - 0.0018 oh Mandor - - Total : - - - 8b MEMASANG 1 M1 PIPA PVC TYPE AW f 1" 1.2000 m1 Pipa PVC - - 35% x harga pipa Perlengkapan - 0.0360 oh Pekerja - - 0.0600 oh Tukang Pipa - - 0.0060 oh Kepala Tukang - - 0.0018 oh Mandor - - Total : - - - 9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2" 1.2000 m1 Pipa PVC - - 35% x harga pipa Perlengkapan - 0.0540 oh Pekerja - - 0.0900 oh Tukang Pipa - - 0.0090 oh Kepala Tukang - - 0.0027 oh Mandor - - Total : - - - 10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 1.2000 m1 Pipa PVC - - 35% x harga pipa Perlengkapan - 0.0810 oh Pekerja - - 0.1350 oh Tukang Pipa - - 0.0135 oh Kepala Tukang - - 0.0041 oh Mandor - - Total : - - - 10a MEMASANG 1 M1 PIPA PVC TYPE AW f 4" 1.2000 m1 Pipa PVC - - 35% x harga pipa Perlengkapan - 0.0810 oh Pekerja - - 0.1350 oh Tukang Pipa - - 0.0135 oh Kepala Tukang - - 0.0041 oh Mandor - - Total : - - - 11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5" 1.0000 bh Kran air - - 0.0250 bh Seal tape - - 0.0100 oh Pekerja - - 0.1000 oh Tukang Pipa - - 0.0100 oh Kepala Tukang - - 0.0050 oh Mandor - - Total : - - - XI 1 1 KG PASANG RANGKA ATAP BAJA 1.1500 kg Besi Profil WF - - 0.0060 oh Pekerja - - 0.0600 oh Tukang besi - - 0.0060 oh Kepala Tukang - - 0.0003 oh Mandor - - Total : - - - 2 1 M2 PASANG JENDELA NAKO 1.1000 m2 Rangka + Kaca Nako - - 10.0000 bh Paku biasa 1 cm - 2,5 cm - - 7.0000 m' Besi strip - - 0.2000 oh Pekerja - - 0.2000 oh Tukang besi - - 0.0200 oh Kepala Tukang - - 0.0010 oh Mandor - - Total : - - - 3 1 M1 PASANG TALANG DATAR, SENG BJLS 28 1.0500 lbr Seng plat - - 0.0150 kg Paku biasa 0,5" - 1" - - 0.0190 m3 Kayu papan kelas II/III - - 0.1500 oh Pekerja - - 0.4000 oh Tukang besi - - 0.0250 oh Kepala Tukang - - 0.0013 oh Mandor - - Total : - - - XII PEKERJAAN KUNCI DAN KACA (SNI 2002) 1 1 BH PASANG KUNCI PINTU UTAMA SETARA SOLID 1.0000 bh Kunci tanam biasa Setara Solid - - 0.0100 oh Pekerja - - 0.5000 oh Tukang besi - - 0.0100 oh Kepala Tukang - - 0.0050 oh Mandor - - Total : - - - 1a 1 BH PASANG KUNCI PINTU BIASA SETARA SOLID 1.0000 bh Kunci tanam biasa - - 0.0100 oh Pekerja - - 0.5000 oh Tukang besi - - 0.0100 oh Kepala Tukang - - 0.0050 oh Mandor - - Total : - - - 2 1 PS PASANG ENGSEL PINTU SETARA SOLID 1.0000 ps Engsel pintu - - 0.0150 oh Pekerja - - 0.1500 oh Tukang besi - - 0.0150 oh Kepala Tukang - - 0.0008 oh Mandor - - Total : - - - 3 1 PS PASANG ENGSEL JENDELA SETARA SOLID 1.0000 ps Engsel jendela - - 0.0100 oh Pekerja - - 0.1000 oh Tukang besi - - 0.0100 oh Kepala Tukang - - 0.0005 oh Mandor - - Total : - - - 4 1 BH PASANG KAIT ANGIN SETARA SOLID 1.0000 ps Kait angin - - 0.0150 oh Pekerja - - PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008) HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 0.1500 oh Tukang besi - - 0.0150 oh Kepala Tukang - - 0.0008 oh Mandor - - Total : - - - 5 1 BH PASANG KUNCI SLOT 1.0000 bh Kunci slot - - 0.0200 oh Pekerja - - 0.2000 oh Tukang besi - - 0.0200 oh Kepala Tukang - - 0.0010 oh Mandor - - Total : - - - 6 1 M2 PASANG KACA, TEBAL 5 MM 1.1000 bh Kaca 5 mm - - 0.0150 oh Pekerja - - 0.1500 oh Tukang besi - - 0.0150 oh Kepala Tukang - - 0.0008 oh Mandor - - Total : - - - 7 1 BH PASANGAN ESPAGNOLET 1.0000 bh Espagnolet - - 0.0150 oh Pekerja - - 0.1500 oh Tukang besi - - 0.0150 oh Kepala Tukang - - 0.0008 oh Mandor - - Total : - - - 8 1 BH PASANGAN HENDLE PINTU 1.0000 bh Espagnolet - - 0.0150 oh Pekerja - - 0.1500 oh Tukang besi - - 0.0150 oh Kepala Tukang - - 0.0008 oh Mandor - - Total : - - - XIII 1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM 11.8700 bh Keramik 30 x 30 cm - - 10.0000 kg Semen Portland - - 0.0450 m3 Pasir Pasang - - 1.5000 kg Semen warna/semen grouting - - 0.7000 oh Pekerja - - 0.3500 oh Tukang batu - - 0.0350 oh Kepala Tukang - - 0.0350 oh Mandor - - Total : - - - 1a 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM 6.5625 bh Keramik 40 x 40 cm 6.5625 bh Keramik 40 x 40 cm Anti Slip 10.0000 kg Semen Portland 0.0450 m3 Pasir Pasang 1.5000 kg Semen warna/semen grouting 0.7000 oh Pekerja 0.3500 oh Tukang batu 0.0350 oh Kepala Tukang 0.0350 oh Mandor Total : 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM ANTI SLIP Total : 2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM 26.5000 bh Keramik 20 x 20 cm - - 10.4000 kg Semen Portland - - 0.0450 m3 Pasir Pasang - - 1.6200 kg Semen warna/semen grouting - - 0.7000 oh Pekerja - - 0.3500 oh Tukang batu - - 0.0350 oh Kepala Tukang - - 0.0350 oh Mandor - - Total : - - - 3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM 1.3000 bh Keramik 30 x 30 cm - - 1.1400 kg Semen Portland - - 0.0030 m3 Pasir Pasang - - 0.1000 kg Semen warna/semen grouting - - 0.0900 oh Pekerja - - 0.0900 oh Tukang batu - - 0.0090 oh Kepala Tukang - - 0.0050 oh Mandor - - Total : - - - 3a 1 M1 PASANG PLIN KERAMIK 10 X 40 CM 0.7500 bh Keramik 40 x 40 cm - - 1.1400 kg Semen Portland - - 0.0030 m3 Pasir Pasang - - 0.1000 kg Semen warna/semen grouting - - 0.0900 oh Pekerja - - 0.0900 oh Tukang batu - - 0.0090 oh Kepala Tukang - - 0.0050 oh Mandor Total : #VALUE! Total : #VALUE! - #VALUE! 4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM 26.5000 bh Keramik 20 x 20 cm - - PEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008) HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 9.3000 kg Semen Portland - - 0.0180 m3 Pasir Pasang - - 1.9400 kg Semen warna/semen grouting - - 0.9000 oh Pekerja - - 0.4500 oh Tukang batu - - 0.0450 oh Kepala Tukang - - 0.0450 oh Mandor - - Total : - - - 4a 1 M2 PASANG DINDING KERAMIK 20 X 25 CM 17.5000 bh Keramik 20 x 25 cm - - 9.3000 kg Semen Portland - - 0.0180 m3 Pasir Pasang - - 1.9400 kg Semen warna/semen grouting - - 0.9000 oh Pekerja - - 0.4500 oh Tukang batu - - 0.0450 oh Kepala Tukang - - 0.0450 oh Mandor Total : #VALUE! Total : #VALUE! - #VALUE! 4b 1 M2 PASANG DINDING KERAMIK 40 X 40 CM MOTIF KAYU 10.0000 bh Keramik 40 x 40 cm - - 0.0450 kg Semen Portland - - 0.0180 m3 Pasir Pasang - - 1.9400 kg Semen warna/semen grouting - - 0.9000 oh Pekerja - - 0.4500 oh Tukang batu - - 0.0450 oh Kepala Tukang - - 0.0450 oh Mandor Total : #VALUE! Total : #VALUE! - #VALUE! 5 1 M2 PASANG BATU ALAM 30 X 30 CM 11.8700 bh Batu alam 30 x 30 cm - - 10.0000 kg Semen Portland - - 0.0450 m3 Pasir Pasang - - 1.5000 kg Semen warna/semen grouting - - 0.7000 oh Pekerja - - 0.3500 oh Tukang batu - - 0.0350 oh Kepala Tukang - - 0.0350 oh Mandor Total : #VALUE! Total : #VALUE! - #VALUE! 6 1 M1 PASANG PLIN KAYU 2 X 10 CM 0.0030 m3 Papan Kayu Kelas II - - 0.0500 kg Paku sekrup 3,5' - - 0.1200 oh Pekerja - - 0.1200 oh Tukang kayu - - 0.0120 oh Kepala Tukang - - 0.0060 oh Mandor - - Total : - - - XIV PEKERJAAN PENGECATAN (SNI 2002) 1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) 0.2000 kg Cat meni - - 0.1500 kg Dempul - - 0.1700 kg Cat dasar - - 0.2600 kg Cat Penutup 2x - - 0.0700 oh Pekerja - - 0.0090 oh Tukang cat - - 0.0060 oh Kepala Tukang - - 0.0025 oh Mandor - - Total : - - - 2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS 0.1500 kg Vernis - - 0.0500 kg Dempul - - 0.1000 lbr Amplas - - 0.0100 bh Kuas - - 0.1600 oh Pekerja - - 0.1600 oh Tukang cat - - 0.0160 oh Kepala Tukang - - 0.0025 oh Mandor - - Total : - - - 3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) EX. VINILEX 0.1000 kg Plamir - - 0.1000 kg Cat dasar - - 0.2600 kg Cat Penutup 2x - - 0.0200 oh Pekerja - - 0.0630 oh Tukang cat - - 0.0063 oh Kepala Tukang - - 0.0025 oh Mandor - - Total : - - - 4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) 0.1200 kg Cat dasar - - 0.1800 kg Cat Penutup 2x - - 0.0280 oh Pekerja - - 0.0420 oh Tukang cat - - 0.0042 oh Kepala Tukang - - 0.0025 oh Mandor - - Total : - - - 5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI 0.1000 kg Meni besi - - 0.0100 lbr Kuas - - 0.0200 oh Pekerja - - 0.2000 oh Tukang cat - - HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 0.0200 oh Kepala Tukang - - 0.0100 oh Mandor - - Total : - - - 6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI 0.3000 kg Cat besi - - 0.0060 oh Pekerja - - 0.0600 oh Tukang cat - - 0.0120 oh Kepala Tukang - - 0.0060 oh Mandor - - Total : - - - 7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR 0.5220 ltr Politur - - 2.0000 lbr Amplas - - 0.0600 oh Pekerja - - 0.0600 oh Tukang cat - - 0.0160 oh Kepala Tukang - - 0.0025 oh Mandor - - Total : - - - 7a 1 M2 PEKERJAAN POLITURAN ULTRAN 0.1500 ltr Politur dasar ( ultran penetran ) - - 0.3720 ltr Politur finish ( ultran lasur ) - - 0.1500 kg Clear ( natural / dop ) - - 2.0000 lbr Amplas - - 0.0100 bh Kuas - - 0.0600 oh Pekerja - - 0.0600 oh Tukang cat - - 0.0160 oh Kepala Tukang - - 0.0025 oh Mandor - - Total : - - - 8 1 M2 PEKERJAAN WATERPROFING 1.0000 Kg Masterseal 440 - - 0.0400 oh Pekerja - - 0.0400 oh Tukang cat - - 0.0160 oh Kepala Tukang - - 0.0040 oh Mandor - - Total : - - - XV PEKERJAAN TETEMPELAN STYLE BALI 1 1 M2 PASANGAN BATA GOSOK 2 MUKA 110.0000 bh Bata Gosok - - 8.4000 kg Semen 50 Kg - - Upah Kerja ( Lumpsum) - - Total : - - - 2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA 13.7500 bh Paras Kerobokan - - 8.4000 kg Semen 50 Kg - - Upah Kerja ( Lumpsum) - - Total : - - - 2a 1 M2 PASANGAN BATU TULUNG AGUNG 1 MUKA 13.7500 bh Batu tulung agung - - 8.4000 kg Semen 50 Kg - - Upah Kerja ( Lumpsum) - - Total : - - - 2b 1 M2 PASANGAN BATU BALI GREEN 1 MUKA 13.7500 bh Batu bali green - - 8.4000 kg Semen 50 Kg - - Upah Kerja ( Lumpsum) - - Total : - - - 2c 1 M2 PASANGAN PARAS JOGJA PUTIH 1 MUKA 13.7500 bh Paras jogja putih - - 8.4000 kg Semen 50 Kg - - Upah Kerja ( Lumpsum) - - Total : - - - 2d 1 M2 PASANGAN BATU TULUNG AGUNG 2 MUKA 2.7000 m2 Batu tulung agung - - 0.2950 m3 Pek. Beton pengresek, K.100 - - 0.0450 m3 Ring balok - - 2.7000 m2 Pek. Coating anti lumut - - Total : - - - 3 1 M2 PASANGAN BATA GOSOK 1 MUKA 55.0000 bh Paras Kerobokan - - 4.2000 kg Semen 50 Kg - - Upah Kerja ( Lumpsum) - - Total : - - - 4 1 M2 PASANGAN PARAS 1 MUKA 18.3333 bh Batu paras - - 4.2000 kg Semen 50 Kg - - Upah Kerja ( Lumpsum) - - Total : - - - 5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA 55.0000 bh Bata gosok - - 4.4917 bh Batu paras - - 5.2500 kg Semen 50 Kg - - Upah Kerja ( Lumpsum) - - Total : - - - HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 6 1 M2 PASANGAN BATA GOSOK DIUKIR 55.0000 bh Bata gosok - - 4.2000 kg Semen 50 Kg - - Upah Kerja ( Lumpsum) - - Total : - - - 7 1 M2 PASANGAN PARAS DIUKIR 18.3333 bh Batu paras - - 4.2000 kg Semen 50 Kg - - Upah Kerja ( Lumpsum) - - Total : - - - 8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR 55.0000 bh Bata gosok - - 4.4917 bh Batu paras - - 5.2500 kg Semen 50 Kg - - Upah Kerja ( Lumpsum) - - Total : - - - 9 1 M2 PASANGAN PARAS JOGJA PUTIH 1 MUKA DIUKIR 13.7500 bh Paras jogja putih - - 8.4000 kg Semen 50 Kg - - Upah Kerja ( Lumpsum) - - Total : - - - 10 1 M2 TEMPELAN BATU GUNUNG ( EX KARANGASEM ) 20.0000 Bj Bj Batu gunung - - 2.4000 kg Zak semen 50 kg - - Upah Kerja ( Lumpsum) - - - - - 11 1 UNIT PEMBUATAN PAPAN NAMA KANTOR 1.9600 M3 Pek.galian Tanah Pondasi - - - 0.1225 M3 Pek.Pasir Urug - - - 0.4900 M3 Pek. Batu Kosong - - - 1.4131 M3 Pek. Pondasi Batu kali 1 : 5 - - - 0.1725 M3 Pek. Beton Pengresek K.175 - - - 2.0000 bh Pilar Padurakse ex. Batu tulung agung - - - 2.7459 M2 Pek.Batu tulung agung - - - 0.9500 M2 Pek.Paras jogja Putih - - - 1.8370 m2 Granit hitam - - - 1.8370 m2 Ongkos kerja (memotong dan memahat) - - - 1.0000 ls Ongkos pasang - - - Total : - - - 11a 1 UNIT PEMBUATAN ALING ALING 1.9600 M3 Pek.galian Tanah Pondasi - - - 0.1225 M3 Pek.Pasir Urug - - - 0.4900 M3 Pek. Batu Kosong - - - 1.4131 M3 Pek. Pondasi Batu kali 1 : 5 - - - 0.1725 M3 Pek. Beton Pengresek K.175 - - - 2.0000 bh Pilar Padurakse ex. Batu tulung agung - - - 5.2259 M2 Pek.Batu tulung agung - - - 0.9500 M2 Pek.Paras jogja Putih - - - Total : - - 12 I UNIT CANDI BENTAR EX. BATU KARANG ASEM TINGGI 2,50M 0.532 m3 Beton tumbuk ( pengeresek ) K.175 - - 0.113 m3 Beton kolom K.225 - - 16.088 Kg Pek. Pembesian kolom fe = 143 kg - - 15.241 m2 Tempelan batu gunung ex karangasem - - 1.000 unit Steger - - - 13 I UNIT CANDI BENTAR EX. BATU TULUNG AGUNG TINGGI 4,25 M 0.9580 m3 Beton tumbuk ( pengeresek ) K.175 - - 0.1913 m3 Beton kolom K.225 - - 27.349 Kg Pek. Pembesian kolom fe = 143 kg - - 27.7930 m2 Pek.Batu tulung agung - - 2.3700 m2 Pek.Paras jogja Putih - - 1.0000 unit Steger - - - 13.a 1 UNIT CANDI BENTAR, T= 4,00 M 62.7750 m2 Batu Tulung Agung - - - 0.3218 m3 Pek. Beton kolom 15/15 cm, K.225 - - - 68.5328 kg Pek. Besi kolom 12/12 cm ( Fe = 213 kg/m3 ) - - - 8.1000 m3 Pek. Beton pengresek, K.100 - - - 62.7750 m2 Pek. Coating anti lumut style bali - - - - 14 1 UNIT PEKERJAAN PINTU PAGAR TYPE 1 22.6000 m1 Piva Galvanis 1 1/4" - - 13.1600 m1 Piva Galvanis 1" - - 49.5504 kg Besi kotak 10/10 - - 20.0000 bh Besi tuang motif tombak - - 20.0000 bh Besi tuang motif spiral - - 120.0000 bh Besi tuang motif lingkaran - - 0.0689 m3 Papan bingkirai - - 30.0000 bh Kawat las - - 1.0000 set Engsel Piva - - 8.7800 m1 Plat siku - - 4.3900 m1 Plat strip - - 80.0000 bh bout - - 1.0000 bh kunci - - 6.6000 oh Tukang las - - 0.6600 oh Kepala tukang las - - 1.2000 oh Pekerja - - 0.0800 oh mandor - - HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 6.4600 m2 Pengecatan besi - - 6.2900 m2 Polituran - - - - - 15 1 UNIT PEKERJAAN PINTU PAGAR TYPE 2 7.6500 m1 Piva Galvanis 1" - - 2.1595 kg Besi kotak 10/10 - - 3.0000 bh Besi tuang motif tombak - - 18.0000 bh Besi tuang motif lingkaran - - 0.0064 m3 Papan bingkirai - - 10.0000 bh Kawat las - - 2.0000 bh Engsel Piva - - 1.0000 bh Grendel besi - - 1.6200 m1 Plat siku - - 0.8100 m1 Plat setrip - 12.0000 bh bout - - 2.5000 oh Tukang las - - 0.2500 oh Kepala tukang las - - 0.6600 oh Pekerja - - 0.0600 oh mandor - - 0.9900 m2 Pengecatan besi - - 0.6400 m2 Polituran - - - - - 16 1 UNIT PEKERJAAN PADMASARI 0.8500 m3 Galian tanah pondasi - - 0.0800 m3 Urugan pasir - - 0.3200 m3 Pasangan batu kosong - - 0.9000 m3 Pasangan batu kali - - 0.2805 m3 Urugan tanah kembali - - 1.7950 m2 Plesteran - - 1.7950 m2 Acian - - 5.3900 m2 Tempelan batu gunung ex karangasem - - 4.0000 bh Karang gajah - - 16.0000 bh Karang simbar - - 4.0000 bh Karang tapel - - 1.0000 bh Ulon - - 2.0000 bh Tabing ulon motif naga - - 1.0000 bh Karang garuda - - 1.0000 bh karang wisnu - - 1.0000 bh Karang angsa - - 15.8200 kg Pek. Pembesian kolom fe = 113 Kg - - 0.1400 m3 Beton kolom K.225 - - 0.2500 m3 Beton tumbuk ( pengeresek ) K.175 - - - 17 1 UNIT PEKERJAAN PENUNGGU KARANG 0.7300 m3 Galian tanah pondasi - - 0.1200 m3 Urugan pasir - - 0.2400 m3 Pasangan batu kosong - - 0.6100 m3 Pasangan batu kali - - 0.2920 m3 Urugan tanah kembali - - 0.2420 m2 Plesteran - - 0.2420 m2 Acian - - 3.8500 m2 Tempelan batu gunung ex karangasem - - 4.0000 bh Karang gajah - - 4.0000 bh ikut celedu - - 1.0000 bh murda - - 24.0000 bh Karang simbar - - 28.0000 bh Karang tapel - - 0.0563 m3 Beton kolom K.225 - - 7.8750 Kg Pek. Pembesian kolom fe = 140 Kg - - 0.3200 m3 Beton tumbuk ( pengeresek ) K.175 - - - 18 1 UNIT PEKERJAAN PILAR PADURAKSA ( EX BATU TULUNG AGUNG ) 0.0371 m3 Beton kolom K.225 - - 5.1975 Kg Pek. Pembesian kolom fe = 188 Kg - - 1.5200 m3 Beton tumbuk ( pengeresek ) K.175 - - 2.3688 m2 Tempelan paras ex batu tulung agung - - 0.0616 m2 Tempelan paras jogja - - 16.0000 bh Karang simbar - - 8.0000 bh Karang tapel - - 1.0000 bh Murda - - 4.0000 bh Ikut celedu - - - 19 1 M1 PEKERJAAN TEMBOK PARAS ( EX TULUNG AGUNG ) 0.0400 m3 Beton tumbuk ( pengeresek ) K.175 - - 4.6134 m2 Tempelan paras ex batu tulung agung - - 0.1200 m2 Tempelan paras jogja - - - 20 1 UNIT PEKERJAAN PILAR PADURAKSA ( BATU GUNUNG EX KARANGASEM ) 0.0371 m3 Beton kolom K.225 - - 5.1975 Kg Pek. Pembesian kolom fe = 188 Kg - - 1.5200 m3 Beton tumbuk ( pengeresek ) K.175 - - 2.4304 m2 Tempelan batu gunung ex karangasem - - 16.0000 bh Karang simbar - - 8.0000 bh Karang tapel - - 1.0000 bh Murda - - 4.0000 bh Ikut celedu - - - HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 20.a 1 UNIT PEKERJAAN PADURAKSAT, = 2.10 M( EX BATU TULUNG AGUNG ) 5.5100 m2 Batu Tulung Agung - - 0.0164 m3 Pek. Beton kolom 12/12 cm, K.225 - - 3.4843 kg Pek. Besi kolom 12/12 cm ( Fe = 213 kg/m3 ) - - 0.3213 m3 Pek. Beton pengresek, K.100 - - 1.0000 bh Murda - - 5.5100 m2 Pek. Coating anti lumut - - - 21 1 M1 PEKERJAAN TEMBOK ( BATU GUNUNG EX KARANGASEM ) 0.0400 m3 Beton tumbuk ( pengeresek ) K.175 - - 4.7334 m2 Tempelan batu gunung ex karangasem - - - XVI PEKERJAAN LANDSCAPE 1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225 1.0000 m2 Paving 10 x 20 cm tebal 8 cm K225 - - 0.1000 m3 Pasir urug - - 0.2500 oh Tukang Batu - - 0.0250 oh Kepala Tukang - - 0.5000 oh Pekerja - - 0.0250 oh Mandor - - Total : - - - 2 Paving 10 x 20 cm tebal 6 cm K350 - - - - 3 Paving 10 x 20 cm tebal 8 cm K225 - - - - 4 Paving 10 x 20 cm tebal 8 cm K350 - - - - 5 Paving 10 x 20 cm tebal 8 cm K425 - - - - 6 Paving 20 x 20 cm tebal 6 cm K225 - - - - 7 Paving 20 x 20 cm tebal 6 cm K350 - - - - 8 Paving 20 x 20 cm tebal 8 cm K225 - - - - 9 Paving 20 x 20 cm tebal 8 cm K350 - - - - 10 Paving 20 x 20 cm tebal 8 cm K425 - - - - 11 Paving 20 x 20 cm tebal 10 cm K225 - - - - 12 Paving 20 x 20 cm tebal 10 cm K350 - - - - 13 Paving 20 x 20 cm tebal 10 cm K425 - - - - 14 Paving Tiga Berlian tebal 6 cm K225 - - - - 15 1 M2 PASANGAN GRASS BLOCK 1.0000 m2 Grass Block - - 0.0690 m3 Pasir Urug - - 0.5000 oh Tukang Batu - - 0.0500 oh Kepala Tukang - - 1.0000 oh Pekerja - - 0.0500 oh Mandor - - Total : - - - 16 1 M2 PASANGAN KORAL SIKAT 1.5000 zak Koral Sikat - - 9.2800 zak Semen - - 0.2000 m3 Pasir pasang - - 0.2500 oh Tukang Batu - - 0.0100 oh Kepala Tukang - - 0.6250 oh Pekerja - - 0.0310 oh Mandor - - Total : - - - 17 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225 1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225 - - 0.4500 zak Semen 50 Kg - - 0.0023 m3 Pasir Pasang - - 0.3500 oh Tukang Batu - - 0.0350 oh Kepala Tukang - - 0.9500 oh Pekerja - - 0.0950 oh Mandor - - Total : - - - 18 Kanstein Jumbo (P:50,L:15,T:30 cm K225) - - - - 19 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) - - - - 20 1 M2 PENGECATAN KANSTEIN 0.2840 kg Cat - - 0.0710 kg Thiner - - 0.0300 oh Tukang Cat - - 0.0030 oh Kep. Tukang - - 0.1500 oh Pekerja - - 0.0150 oh Mandor - - Total : - - - XVII PEKERJAAN ELEKTRIKAL 1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN 8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme - - 3.0000 bt Pipa Clipsal 20 mm hitam - - 2.0000 bh Tee dos clipsal 20 mm hitam - - 15.0000 bj Klem clipsal 20 mm hitam - - 3.0000 bj Sock clipsal 20 mm hitam - - 1.0000 bj Inbow dos plastik clipsal E 157 P - - 1.0000 ttk Biaya pasang - - Total : - - - 2 1 TITIK INSTALASI AC 10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme - - 3.0000 bt Pipa Clipsal 20 mm hitam - - 1.0000 bh Tee dos clipsal 20 mm hitam - - 15.0000 bj Klem clipsal 20 mm hitam - - 4.0000 bj Sock clipsal 20 mm hitam - - 1.0000 bj Inbow dos plastik clipsal E 157 P - - HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 1.0000 m1 Pipa flexible clipsal 20 mm hitam - - 1.0000 ttk Biaya pasang - - - Total : - - - 3 1 TITIK INSTALASI TELEPHONE 25.0000 m1 Kabel telephone - - 8.0000 bt Pipa Clipsal 20 mm putih - - 1.0000 bh Tee dos clipsal 20 mm putih - - 25.0000 bj Klem clipsal 20 mm putih - - 5.0000 bj Sock clipsal 20 mm putih - - 1.0000 bj Inbow dos plastik clipsal E 157 P - - 1.0000 ttk Biaya pasang - - Total : - - - 4 1 TITIK INSTALASI MATV 20.0000 m1 Coaxial cable 5C-75 ohm commscof - - 6.0000 bt Pipa Clipsal 20 mm putih - - 2.0000 bh Tee dos clipsal 20 mm putih - - 20.0000 bj Klem clipsal 20 mm putih - - 6.0000 bj Sock clipsal 20 mm putih - - 1.0000 bj Inbow dos plastik clipsal E 157 P - - 1.0000 ttk Biaya pasang - - Total : - - - 5 1 UNIT INSTALASI PENANGKAL PETIR (1 BLITZEM +3 TOMBAK) 4.0000 bh Blacksem 1" - - 4.0000 bh Sok Galvanis 1" - - 3.0000 bt GIP Galvanis 1" - - 42.5000 m1 Kawat BC 50 mm2 - - 6.0000 bh Klem Begel 1" - - 3.0000 bh Klem sisir 50 mm2 - - 1.0000 bh Kotak Kontrol 10 cm x 15 cm - - 1.0000 bh Perluv sok 1" - - 10.0000 bt Pipa Conduit PVC 3/4" - - 1.0000 ls Biaya pasang instalasi - - 6.0000 m1 Biaya pengeboran - - Total : - - - 6 1 UNIT MDP UKURAN 900 X 600 X 250 1.0000 bh MCCB 40A 3P - - 1.0000 bh MCB 25A 3P - - 2.0000 bh MCB16A 1P - - 9.0000 bh MCB10A 1P - - 4.0000 bh MCB 6A 1P - - 1.0000 bh Pilot lamp / indikator lamp 220 V - - 1.0000 bh Voltmeter 0 - 500V - - 3.0000 bh Ampere meter 0 - 200A - - 3.0000 bh Travo Arus / CT - - 1.0000 bh selector Volt 7 position - - 1.0000 bh Wiring material - - 1.0000 bh Box indoor 900 x 600 x 250 - - 1.0000 bh CU bars + asesoris - - - 7 1 UNIT SDP I UKURAN 700 X 500 X 200 1.0000 bh MCCB 25A 3P - - 2.0000 bh MCB 6A 1P - - 6.0000 bh MCB 10A 1P - - 7.0000 bh MCB 16A 1P - - 1.0000 bh Pilot lamp / indikator lamp 220 V - - 1.0000 bh Voltmeter 0 - 500V - - 3.0000 bh Ampere meter 0 - 200A - - 3.0000 bh Travo Arus / CT - - 1.0000 bh selector Volt 7 position - - 1.0000 bh Wiring material - - 1.0000 bh Box indoor 700 x 500 x 200 - - 1.0000 bh CU bars + asesoris - - - INSTALASI LISTRIK 6 Instalasi titik lampu 8 m' NYM 3 x 2.5 mm2 - - 7 m' Conduit high impact - - 3 No socket - - 4 No cleam + Fisher ulir - - 1 Ls Labor cost - - Total : - - - 7 Instalasi titik Saklar 10 m' NYM 3 x 2.5 mm2 - - 9 m' Conduit high impact - - 3 No socket - - 4 No cleam + Fisher ulir - - 1 Ls Labor cost - - Total : - - - 8 Instalasi titik Stop Kontak 12 m' NYM 3 x 2.5 mm2 - - 11 m' Conduit high impact - - 3 No socket - - 5 No cleam + Fisher ulir - - 1 Ls Labor cost - - Total : - - - 9 Instalasi Power AC 12 m' NYM 3 x 2.5 mm2 - - 11 m' Conduit high impact - - HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 3 No socket - - - 5 No cleam + Fisher ulir - - 1 Ls Labor cost - - Total : - - - 10 Instalasi Titik Lampu Taman 12 m' NYY 3 x 2.5 mm2 - - 11 m' Conduit high impact - - 3 No socket - - 5 No cleam + Fisher ulir - - 1 Ls Labor cost - 28,000 Total : - 28,000 28,000 11 Instalasi Power Kabel 1 m' NYM 4 x 2.5 mm2 - - 1 m' Conduit high impact - - 1 No socket - - 1 No cleam + Fisher ulir - - 1 Ls Labor cost - - Total : - - - 12 Instalasi Power Kabel kontrol AC 25 m' NYM 4 x 2.5 mm2 - - 24 m' Conduit high impact - - 7 No socket - - 15 No cleam + Fisher ulir - - 1 Ls Labor cost - - Total : - - - 13 Feeder cable 1 m' NYY 4 X10 mm2 - - 1 m' Bc 6 mm - - 1 Ls material bantu - - 1 Ls Labor cost - - Total : - - - 14 Feeder cable 1 m' NYY 4 X6 mm2 - - 1 m' Bc 6 mm - - 1 Ls material bantu - - 1 Ls Labor cost - - Total : - - - 15 Feeder cable 1 m' NYY 4 X16 mm2 - - 1 m' Bc 16 mm - - 1 Ls material bantu - - 1 Ls Labor cost - - Total : - - - 16 Feeder cable 1 m' NYFGBY 4 X 70 mm2 - - 1 Ls material bantu/Galian - - 1 Ls Labor cost - - - Total : - - - 17 Feeder cable 1 m' NYY 4 X 35 mm2 - - 1 m' Bc 35 mm - - 1 Ls material bantu - - 1 Ls Labor cost - - - Total : - - - 18 Feeder cable 1 m' NYY 4 X4 mm2 - - 1 Ls material bantu - - 1 Ls Labor cost - - - Total : - - - 19 Feeder cable 1 m' NYY 3 X2.5 mm2 - - 1 Ls material bantu - - 1 Ls Labor cost - - - Total : - - - 20 Panel MDP 1 unit Box Panel - - 1 Lot Komponen - - 1 set Arde Pentanahan - - 1 set Material Bantu - - 1 Unit Labour Cost Total : - - - 21 PP.LT -1 1 unit Box Panel - - 1 Lot Komponen - - 1 set Arde Pentanahan - - 1 Unit Labour Cost Total : - - - 22 PP LT-2 1 unit Box Panel - - 1 Lot Komponen - - 1 set Arde Pentanahan - - 1 Unit Labour Cost Total : - - - 23 SDP -2 1 unit Box Panel - - 1 Lot Komponen - - HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 1 set Arde Pentanahan - - 1 Unit Labour Cost Total : - - - 24 DP-AC 1 unit Box Panel - - 1 Lot Komponen - - 1 set Arde Pentanahan - - 1 Unit Labour Cost Total : - - - 25 DP-Transfer Pump 1 unit Box Panel - - 1 Lot Komponen - - 1 set Arde Pentanahan - - 1 Unit Labour Cost Total : - - - 26 C0S (100A) 1 unit COS - - 1 set Material bantu - - 1 Unit Labour Cost Total : - - - 27 Saklar Tunggal 1 Bh 1 way 1 gang switch /engkel - - 1 Bh bok mk - - 1 Bh Labor cost - Total : - - - 28 Saklar Serie 1 Bh 1 way 2 gang switch /Serie - - 1 Bh bok mk - - 1 Bh Labor cost Total : - - - 29 Saklar Tukar 1 Bh 1 way 2 gang switch /engkel - - 1 Bh bok mk - - 1 Bh Labor cost Total : - - - 30 Saklar Triple 1 Bh 1 way 3 gang switch /Serie - - 1 Bh bok mk - - 1 Bh Labor cost Total : - - - 31 Stop Kontak 1 Bh Stop Kontak - - 1 Bh bok mk - - 1 Bh Labor cost Total : - - - 32 Stop Kontak double 1 Bh Stop Kontak - - 1 Bh bok mk - - 1 Bh Labor cost Total : - - - 33 Stop Kontak AC 1 Bh Stop Kontak - - 1 Bh bok mk - - 1 Bh Labor cost Total : - - - ARMATURE 34 Lampu TBS 218 W ICM2 2 x TLD 18 W 1 Bh TBS 218 W ICM2 2 x TLD 18 W - - 1 Bh Material bantu - - 1 bh Labour cost Total : - - - 35 Down Light 1X Genie 11 W FBS 10/118-E27 220-240V 1 Bh FBS 10 /118 E 27 220-240 V - - 1 Bh Material bantu - - 1 bh Labour cost Total : - - - 36 Down light 1 x 18 W FBH 058 1.18I 1 Bh FBH 058 118 W - - 1 Bh Material bantu - - 1 bh Labour cost Total : - - - 37 Down Light FBS 110 G 14 GENIE 14 W CDES 1 Bh Down Light FBS 110 G 14 GENIE 14 W CDES - - 2 Bh Material bantu - - 1 bh Labour cost - Total : - - - 38 Down Light 1 x PLC 26 W FBH 145 1126 I H 1 Bh Down Light 1 x PLC 26 W FBH 145 1126 I H - - 1 Bh Material bantu - - 1 bh Labour cost HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) Total : - - - 39 Down Light 1 x PLC 18 W FBH 145 118W I WH - 1 Bh Down Light 1 x PLC 18 W FBH 145 118W I WH - - 1 Bh Material bantu - - 1 bh Labour cost Total : - - - 40 Lampu Dinding Tangga 1 Bh FWG 300 Nikel, E 27 1 x Genie 18 W - - 1 Bh Material bantu - - 1 bh Labour cost Total : - - - 41 TMS 012 118 Batten 2x TLD 18 Watt w 1 Bh TMS 012 118 Batten 1 x TLD 18 Watt w - - 1 Bh Material bantu - - 1 bh Labour cost Total : - - - 42 TMS 012 118 Batten 1 x TLD 18 Watt w 1 Bh TMS 012 118 Batten 1 x TLD 18 Watt w - - 1 Bh Material bantu - - 1 bh Labour cost Total : - - - 43 Lampu pond 50 12 V LP50003 FT 1 Bh Lampu pond 50 12 V LP5 003 FT - - 1 Bh Material bantu - - 1 bh Labour cost Total : - - - 44 Down Light Halogen 50W 12 V QBS 058 1 Bh Down Light Halogen 50W 12 V MR 11 - - 1 Bh Material bantu - - 1 bh Labour cost Total : - - - 45 Lampu gantung Antique 1 Bh Lampu gantung Antique - - 1 Bh Material bantu - - 1 bh Labour cost Total : - - - 46 Lampu Taman 1 Bh LampuTaman 18 W - - 2 Bh Material bantu - - 1 bh Labour cost Total : - - - 47 Ceiling fan 1 Bh Ceiling fan - - 1 Bh Material bantu - - 1 bh Labour cost Total : - - - 48 Exhaust fan 1 Bh Ex fan Monnic - - 1 Bh Material bantu - - 1 bh Labour cost Total : - - - 49 Kwh Meter 3 Phase 1 Bh Kwh Meter 3 Phase - - 1 Bh Material bantu - - 1 bh Labour cost Total : - - - TATA SUARA 50 DVD Player,TOA 1 Bh DVD Player,TOA - - 1 Bh Labor cost Total : - - - 51 Pre Amplifier RU-2002 1 Bh Pre Amplifier RU-2002 - - 1 Bh Labor cost Total : - - - 52 Paging Mic PM-660D 1 Bh Paging Mic PM-660D - - 1 Bh Labor cost Total : - - - 53 Mixer Paging V-1000 1 Bh Mixer Paging V-1000 - - 1 Bh Labor cost Total : - - - 54 Power Amplifier 240W VP-1241 1 Bh Power Amplifier 240W VP-1241 - - 1 Bh Labor cost Total : - - - 55 Volume Control ZV-303 1 Bh Volume Control ZV-303 - - 1 Bh Labor cost Total : - - - 56 JBS 20x30x10cm HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 1 Bh JBS 20x30x10cm - - 1 Bh Labor cost Total : - - - 57 HornSpeaker 25 W 1 Bh HornSpeaker 20W - - 1 Bh Labor cost Total : - - - 58 Column Speaker20W 1 Bh Column Speaker 6W - - 1 Bh Labor cost Total : - - - 59 Ceilling Speaker ZS-646 R,6W 1 Bh Column Speaker ZS-102C - - 1 Bh Labor cost Total : - - - XVIII INSTALASI TTK SOUND SYSTEM 1 INSTALASI TTK SOUND SYSTEM 6 Mtr KABEL NYM 3x2.5 MM EX.SUPREME - - 2 Btg PIPA CLIPSAL 20 MM HITAM - - 1 Bh TEE DOS CLIPSAL 20 MM HITAM - - 10 Bh KLEM CLIPSAL 20 MM HITAM - - 3 Bh SOCK CLIPSAL 20 MM HITAM - - 1 Bh INBOW DOS PLASTIK CLIPSAL E 157 P - - 1 Bh PIPA FLEXIBLE CLIPSAL 20 MM HITAM - - 1 Ttk BIAYA PEMASANGAN INSTALASI - - Total : - - - XIX PENANGKAL PETIR Batang Penerima 1 1 bh black siem 1" - - 1 bh Reducer 3/4 x 1" - - 3 m bc 50mm - - 3 m Pipa GIV 1" - - 3 m counduit 3/4" - - 1 ls material bantu - - 1 ls Laubor cost - - Total : - - - 2 Kawat Pengahantar 1 mtr bc 50mm - - 1 mtr counduit - - 1 Lot Labour - - Total : - - - 3 Grounding 1 bh black siem 1" - - 1 bh Socket 1" - - 12 m bc 70mm - - 12 m Pipa GIV 1" - - 8 m counduit 3/4" - - 1 m material bantu - - 1 m Labour - - Total : - - - XX INSTALASI PLUMBING A Pipa Air bersih Class AW Abu Maspion A,1 1 m Dia. 15 mm (1/2") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - A,2 1 m Dia. 20 mm (3/4") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - A,3 1 m Dia. 25 mm (1") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - A,4 1 m Dia. 32 mm (1 1/4") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - A,5 1 m Dia. 40 mm (1 1/2") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - A,6 1 m Dia. 50 mm (2 ") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) B Pipa Air Kotor Class AW Putih Maspion B,1 1 m Dia. 15 mm (1/2") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - B,2 1 m Dia. 20 mm (3/4") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - B,3 1 m Dia. 25 mm (1") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - B,4 1 m Dia. 32 mm (1 1/4") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - B,5 1 m Dia. 40 mm (1 1/2") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - B,6 1 m Dia. 50 mm (2 ") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - B,7 1 m Dia. 65 mm (2,5") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - B,8 1 m Dia. 80 mm (3 ") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - B,9 1 m Dia. 100 mm (4 ") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - B,10 1 m Dia. 125 mm (5 ") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - B,11 1 m Dia. 150 mm (6 ") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - B,12 1 m Dia. 200 mm (8 ") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - B,13 1 m Pipa Giv 3/4" med - - 1 ls material bantu - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - B,14 CLEAN OUT 1 m Dia. 80 mm (3 ") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - B,15 CLEAN OUT 1 m Dia. 100 mm (4 ") - - 1 ls Glue - - 1 ls Galian dan urugan/Gantungan - - 1 ls LABOUR - - Total : - - - B,16 VALVE 1 no Ball valve 2-1/2" kitz - - 1 ls Material Bantu - - 1 no Labour - - - Total : - - - B,17 VALVE 1 no Ball valve 2" kitz - - 1 ls Material Bantu - - 1 no Labour - - Total : - - - HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) B,18 VALVE 1 no Ball valve 1-1/2" kitz - - 1 ls Material Bantu - - 1 no Labour - - Total : - - - B,19 VALVE 1 no Ball valve 1-1/4" kitz - - 1 ls Material Bantu - - 1 no Labour - - - - - B,20 VALVE 1 no Ball valve 1" kitz - - 1 ls Material Bantu - - 1 no Labour - - - Total : - - - B,21 VALVE 1 no Check valve 2" kitz - - 1 ls Material Bantu - - 1 no Labour - - Total : - - - B,22 VALVE 1 no Check valve 1 1/4" kitz - - 1 ls Material Bantu - - 1 no Labour - - Total : - - - B,23 VALVE 1 no Foot valve 1 1/2" kitz - - 1 ls Material Bantu - - 1 no Labour - - Total : - - - B,24 VALVE 1 no Foot valve 1 1/4" kitz - - 1 ls Material Bantu - - 1 no Labour - - Total : - - - B,25 VALVE 1 no Foot valve 2" kitz - - 1 ls Material Bantu - - 1 no Labour - - Total : - - - B,26 Floating Valve 1 no Floating Valve 1" - - 1 ls Material Bantu - - 1 no Labour - - Total : - - - B,27 Y Strainer 1 no Y Strainer dia 1 1/4" - - 1 ls Material Bantu - - 1 no Labour - - Total : - - - B,28 Auto Air Release Valve 3/4" + isolating valve 3/4" 1 no Automatic Air Vent - - 1 ls Material Bantu - - 1 no Labour - - Total : - - - B,29 HEADER PIPA Transfer 1.2 m Pipe Giv dia 3" - - 0.5 m Pipe Giv dia 1 1/4" - - 2 set Pange - - 1 set Material Bantu - - 1 lot Labour - - Total : - - - B,30 HEADER PIPA Roof Tank 2 m Pipe Giv dia 3" - - 1 m Pipe Giv dia 2" - - 2 m Pipe Giv dia 11/2" - - 2 set Pange - - 1 set Material Bantu - - 1 lot Labour - - Total : - - - B,31 Transfer Pump 1 Unit JP Basic 5 - - 1 ls Panel WLC - - 1 lot Labour - - Total : - - - B,32 Water Tank Cap. 1500 Ltr 1 Unit Water Tank Cap. 2200 Ltr - - 1 ls Material Bantu - - 1 lot Labour - - - Total : - - - B,33 Roof Drain HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 1 Bh Cas iron 4 " - - 1 Bh Material bantu - - 1 bh Labour cost - - Total : - - - B,34 Roof Drain 1 Bh Cas iron 6 " - - 1 Bh Material bantu - - 1 bh Labour cost - - Total : - - - XXI SANITARE WARE 1 Closet duduk type CW420 / S516 Standar 1 Bh Closet duduk type CW420 / S516 Standar - - 1 Bh Material bantu - - 1 bh Labour cost - - Total : - - - 2 Wastafel 1 Bh Wastafel type LW 821 J - - 1 Bh Material bantu - - 1 bh Labour cost - - Total : - - - 3 Floor drain type TX1B 1 Bh Floor drain type TX1B - - 1 bh Labour cost - - Total : - - - 4 Shower Spray TB19CSNPIV 1 Bh Shower Spray TB19CSNPIV - - 1 bh Labour cost - - Total : - - - 5 Tempat Sabun type TX2C 1 Bh Tempat Sabun type TX2C - - 1 bh Labour cost - - Total : - - - 6 Kran air type T23B13 1 Bh Kran air type T23B13 - - 1 bh Labour cost - - Total : - - - 7 Paper Holder type TX11B 1 Bh Paper Holder type TX11B - - 1 bh Labour cost - - Total : - - - 8 Urinoir type U57M - 1 Bh Urinoir type U57M - - 1 bh Labour cost - - Total : - - - 9 Stop Valve TGB9 MZ 1 Bh Stop Valve TGB9 MZ - - 1 bh Labour cost - - Total : - - - 10 Flexible Hose 1 Bh Flexible Hose - - 1 bh Labour cost - - Total : - - - 11 Closet Jongkok 1 Bh closet jongkok - - 1 bh Labour cost - - Total : - - - XXII INSTALASI AC 1 Pipa Refrigerant 1 no Pipa ac 1/4" - - 1 no isulaton thermaflex 19mm - - 1 no isolasi - - - 1 no material bantu - - 1 ls labour - - Total : - - - 2 1 no Pipa ac 3/8" - - 1 no isulaton thermaflex 19mm - - 1 no isolasi - - - 1 no material bantu - - 1 ls labour - - Total : - - - 3 1 no Pipa ac 1/2" - - 1 no isulaton thermaflex 19mm - - 1 no isolasi - - - 1 no material bantu - - 1 ls labour - - Total : - - - 4 1 no Pipa ac 5/8" - - 1 no isulaton thermaflex 19mm - - 1 no isolasi - - - 1 no material bantu - - 1 ls labour - - Total : - - - 5 1 no Pipa ac 3/4" - - 1 no isulaton thermaflex 19mm - - 1 no isolasi - - - 1 no material bantu - - 1 ls labour - - Total : - - - 6 Pipa Drain AC 1 no Drain AC AW 3/4" ex Maspion - - 1 no Isolasi - - 1 no Isolasi luar - - - 1 ls labour - - HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) Total : - - - 7 Pipa Drain AC 1 no Drain AC AW 1" ex Maspion - - 1 no Isolasi - - 1 no Isolasi luar - - - 1 ls labour - - Total : - - - 8 Kabel Kontrol NYM 3 x 2,5 mm2 1 no Nym 3 x 2,5 mm2 - - 1 no material bantu - - 1 ls labour - - Total : - - - 9 Unit AC 1 no AC 3/4 Pk Daikin - - 1 no material bantu - - 1 ls labour - - Total : - - - 10 1 no AC 1Pk Daikin - - 1 no material bantu - - 1 ls labour - - Total : - - - 11 1 no AC 1 1/2 Pk Daikin - - 1 no material bantu - - 1 ls labour - - Total : - - - 12 1 no AC 2 Pk Daikin - - 1 no material bantu - - 1 ls labour - - Total : - - - 13 1 no AC 5 Pk Floor Standing Daikin - - 1 no material bantu - - 1 ls labour - - Total : - - - 14 1 no AC 2 1/2 Pk Daikin - - 1 no material bantu - - 1 ls labour - - Total : - - - 15 1 no AC11/2 Pk Portable LG - - 1 no material bantu - - 1 ls labour - - Total : - - - 16 Exhaust fan 1 Bh Ex fan Monnic - - 1 Bh Material bantu - - 1 bh Labour cost - - Total : - - - XXIII HYDRANT 1 ELECTRIC MAIN FIRE PUMP 1 unit Electrical Main Pump LF 2595-7 - - 1 unit panel control EFP - - 1 Ls Support - - - 1 Ls labour/Ongkos - - Total : - - - 2 JOCKEY PUMP - 1 Ls Jocky Pump CR 5-16 - - 1 Ls panel control JFP - - 1 Ls Support - - 1 Ls labour - - Total : - - - 3 Pressure Tank 1 unit Pressure tank 500 ltr - - 1 bh Valve 1 1/4" - - 1 Ls Support - - 1 unit labour - - - Total : - - - 4 Feeder cable 1 m' NYY 4 X10 mm2 - - 1 Ls material bantu - - 1 Ls Labor cost - - - Total Total : - - - 5 Box Hydrant Type Out door (Type A2) 1 unit Hydrant Box Apron - - 1 Bh Fire Hose 2.5 x 30m - - 1 Bh Jet Nozzel 2.5" - - 1 Bh Stop Valve 1.5" - - 1 Bh Stop Valve 2.5" - - 1 Ls Support - - 1 Ls labour/ongkos - - - Total : - - - 6 Box Hydrant Type Out door (Type c) 1 unit Hydrant Box Apron - - 1 Bh Fire Hose 2.5 x 30m - - 1 Bh Jet Nozzel 2.5" - - 1 Ls Support - - 1 Ls labour/ongkos - - - Total : - - - 7 Pilar Hydrant HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 1 unit Pilar Hydrant - - 1 Bh Flange 4 " - - 1 Ls Support - - 1 Ls labour/ongkos - - - Total : - - - 8 PIPA BLACK STEEL SCH. 40 1 m' Dia. 4" - - 1 Ls Las - - 1 m' Cat Anti karat - - 1 Ls Support - - 1 Ls Ongkos Pasang - - - Total : - - - 9 1 m' Dia. 3" - - 1 m' Las - - - 1 m' Cat Anti karat - - 1 Ls Support - - 1 Ls Ongkos Pasang - - Total : - - - 10 1 m' Dia. 2-1/2" - - 1 m' Las - - - 1 m' Cat Anti karat - - 1 No Support - - 1 Ls LABOUR - - - Total : - - - 11 1 m' Dia. 1-1/2" - - 1 m' Las - - - 1 m' Cat Anti karat - - 1 No Support - - 1 Ls LABOUR - - Total : - - - 12 1 m' Dia. 1-1/4" - - 1 m' Las - - - 1 m' Cat Anti karat - - 1 No Support - - 1 Ls LABOUR - - Total : - - - 13 Header 6 " 1.5 m' Pipa Dia. 6" - - 1 Ls Las - - - 1 Ls Cat Anti karat - - 6 bh Flange - - 1 bh Presure Gauge - - 6 m' pipa Dia 1 1/4" - - 1 m' Pipa Dia 1/2" - - 2 bh Gate Valve 1/2" - - 32 bh Mur baut - - 1 Ls Support - - 1 Ls Ongkos Pasang - - - Total : - - - 14 VALVE 1 No Gate valve 4" kitz - - 1 No Plange - - 1 No Mur baut - - 1 No LABOUR - - - Total : - - - 15 VALVE 1 No Gate valve 3" kitz - - 2 No Plange - - 16 No Mur baut - - 1 No LABOUR - - - Total : - - - 16 1 No Gate valve 2.5" kitz - - 2 No Plange - - 16 No Mur baut - - 1 No Material Bantu - - 1 Ls Labour cost - - Total : - - - 17 1 No Gate valve 1.1/4" kitz - - 1 Ls Material bantu - - 1 No LABOUR - - - Total : - - - 18 1 No Gate valve 1.1/2" kitz - - 1 Ls Material bantu - - 1 No LABOUR - - - Total : - - - 19 Safety Valve 1 No Safety valve 1.1/2" kitz - - 1 Ls Material bantu - - 1 No LABOUR - - - Total : - - - 20 Strainer 1 No. Strainer 2.5" kitz - - 2 Bh Plange - - HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 NO URAIAN 2 PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 16 no Mur baut - - 1 no Labour - - - Total : - - - 21 1 No Strainer 1.1/4" kitz - - 1 Ls Material bantu - - 1 No LABOUR - - - Total : - - - 22 Check Valve 1 No. Check Valve 4" kitz - - 1 Bh Plange - - 1 no Mur baut - - 1 no Labour - - - Total : - - - 23 Check Valve 1 No. Check Valve 2.5" kitz - - 2 Bh Plange - - 16 no Mur baut - - 1 no Labour - - - Total : - - - 24 1 No Check Valve 1.1/4" kitz - - 1 Ls Material bantu - - 1 No LABOUR - - - Total : - - - 25 Flexible Joint 1 No Flexible Joint 1.1/4" kitz - - 1 Ls Material bantu - - 1 No LABOUR - - - Total : - - - 26 Flexible Joint 1 No Flexible Joint 3" kitz - - 2 Bh Plange - - 16 no Mur baut - - 1 Ls Material bantu - - 1 No LABOUR - - - Total : - - - 27 1 No Flexible Joint 2.1/2" kitz - - 2 Bh Plange - - 16 no Mur baut - - 1 No LABOUR - - - Total : - - - 28 Foot Valve 1 No Foot Valve 1.1/4" kitz - - 1 Ls Material bantu - - 1 No LABOUR - - - Total : - - - 29 1 No Foot Valve 2.1/2" kitz - - 2 Bh Plange - - 8 no Mur baut - - 1 No LABOUR - - - Total : - - - 30 1 No Foot Valve 3" kitz - - 2 Bh Plange - - 8 no Mur baut - - 1 No LABOUR - - - Total : - - - 31 SIAMESE CONNECTION 1 No Siames Connection - - 1 Bh Plange - - 1 no Mur baut - - 1 No LABOUR - - - Total : - - - 32 FIRE EXTINGUISHER 1 Bh 5 KG CO 2 TYPE ( SERVVO) - - 1 Bh Support - - 1 Bh Labor cost - - - Total : - - - XXIV TELEPHONE 1 STOP KONTAK TELEPHONE 1 unit Telephone Socket outlet, Clipsal Mega 2000 - - 1 unit Box MK - - 1 unit Labourcost - - Total : - - - - 1 unit PABX 3 PTT, 8 Ext - - 1 No Material bantu - - 1 Ls Labour cost - - Total : - - - 2 INSTALASI TITIK TELEPHONE 2 m ITC 2 X 2 X0,6MM2 - - 2 Conduit 20 mm2 - - 3 No socket - - 4 No Cleam - - 1 Ls Labor cost - - Total : - - - NO URAIAN PEKERJAAN 1 2 I PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER Rp. 2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK Rp. 3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN Rp. 4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT Rp. 5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU Rp. 6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN Rp. 7 1 M2 PEMBUATAN BEDENG BURUH Rp. 8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM Rp. 9 1 M2 PEMBUATAN STEGGER DARI BAMBU Rp. 10 1 M2 PEMBUATAN JALAN SEMENTARA Rp. 11 1 M3 BONGKARAN BETON BERTULANG Rp. 12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH Rp. II PEKERJAAN TANAH (SNI 2835 : 2008) 1 1 M3 GALIAN TANAH BIASA DALAM 1 METER Rp. 2 1 M3 GALIAN TANAH BIASA DALAM 2 METER Rp. 3 1 M3 GALIAN TANAH BIASA DALAM 3 METER Rp. 4 1 M3 GALIAN TANAH KERAS DALAM 1METER Rp. 5 1 M3 GALIAN TANAH CADAS DALAM 1 METER Rp. 6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER Rp. 7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER Rp. 8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER Rp. 9 1 M3 URUGAN KEMBALI Rp. 10 1 M3 PEMADATAN TANAH ( Per 20 Cm ) Rp. 11 1 M3 URUGAN PASIR Rp. 12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM Rp. 13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan Rp. 14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN Rp. 15 1 M3 URUGAN LIMESTONE PADAT Rp. III PEKERJAAN PONDASI (SNI 2836 : 2008) 1 1 M3 BATU KALI CAMP. 1 PC : 3 PS Rp. 2 1 M3 BATU KALI CAMP. 1 PC : 4 PS Rp. 3 1 M3 BATU KALI CAMP. 1 PC : 5 PS Rp. 4 1 M3 BATU KALI CAMP. 1 PC : 6 PS Rp. 5 1 M3 BATU KALI CAMP. 1 PC : 8 PS Rp. 6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI Rp. 7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M Rp. 8 1 M3 PASANGAN BATU KOSONG Rp. 9 1 M1 PEMBUATAN TIANG PANCANG 35 CM X 35 CM BETON BERTULANG Rp. 10 1 M1 PEMBUATAN TIANG PANCANG 40 CM X 40 CM BETON BERTULANG Rp. IV PEKERJAAN DINDING (SNI 6897 : 2008) 1 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS Rp. 2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS Rp. 3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS Rp. 4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS Rp. 5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS Rp. 6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS Rp. 7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS Rp. 8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS Rp. 9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS Rp. 10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS Rp. 11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS Rp. 12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) Rp. 13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI Rp. 14 1 M2 PASANGAN DINDING TERAWANG/ROSTER (12 x 11 x 24) CM Rp. 15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU Rp. REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN HARGA 3 NO URAIAN PEKERJAAN 1 2 HARGA 3 V PEKERJAAN PLESTERAN (SNI 2837 : 2008) 1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM Rp. 2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM Rp. 3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM Rp. 4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM Rp. 5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM Rp. 6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM Rp. 7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM Rp. 8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM Rp. 9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM Rp. 10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM Rp. 11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM Rp. 12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM Rp. 13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM Rp. 14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS Rp. 15 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M') Rp. 16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M') Rp. 17 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS Rp. 18 1 M2 PEKERJAAN ACIAN Rp. VI PEKERJAAN KAYU (SNI 3434 : 2008) 1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I Rp. 2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III Rp. 3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II Rp. 4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III Rp. 5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II Rp. 5a MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II KOMBINASI KACA BEVEL Rp. 5b MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL + KULIT JERUK KAYU KELAS I/II Rp. 6 MEMBUAT DAN MEMASANG 1 M2 PINTU , KAYU KELAS I/II Rp. 6a MEMBUAT DAN MEMASANG 1 M2 JENDELA KACA, KAYU KELAS I/II Rp. 7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II Rp. 8 Rp. 8a Rp. 9 Rp. 10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II Rp. 11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I Rp. 12 Rp. 13 Rp. 14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I Rp. 15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II Rp. 16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II Rp. 16a MEMASANG 1 M2 USUK KAYU KAMPER EXPOSE Rp. 17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II Rp. 17a MEMASANG 1 M2 RANGKA ATAP GENTENG , KAYU KELAS II Rp. 18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II Rp. 19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III Rp. 20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III Rp. 21 MEMASANG 1 M' LISPLANK UKURAN (2 X 20) CM, KAYU KELAS I/II Rp. 22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II Rp. 22a MEMASANG 1 M' LISPLANK UKURAN (3 X 15) CM, KAYU KELAS I/II Rp. 22b MEMASANG 1 M' LISPLANK UKURAN (3 X 10) CM, KAYU KELAS I/II Rp. 23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III Rp. 24 Rp. 25 Rp. 25a Rp. 25b Rp. MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm) MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I/II MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III Bentang 6 M' MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II MEMBUAT 1 M2 DAUN PINTU TEAKWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm) MEMASANG 1 M2 RANGKA DINDING PEMISAH KALSYBOARD 10 MM RANGKAP,RANGKA METAL STUD MEMASANG 1 M2 RANGKA DINDING PEMISAH GYPSUM 9 MM RANGKAP,RANGKA METAL STUD NO URAIAN PEKERJAAN 1 2 HARGA 3 26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I Rp. 27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM Rp. VII PEKERJAAN BETON ( SNI 7394:2008) 1 MEMBUAT 1 M BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 2)cm, w/c = 0,87 Rp. 2 MEMBUAT 1 M BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78 Rp. 3 MEMBUAT 1 M BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 2)cm, w/c = 0,72 Rp. 4 MEMBUAT 1 M BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 2)cm, w/c = 0,66 Rp. 5 MEMBUAT 1 M BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 2)cm, w/c = 0,61 Rp. 6 MEMBUAT 1 M BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 2)cm, w/c = 0,58 Rp. 7 MEMBUAT 1 M BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 2)cm, w/c =0,56 Rp. 8 MEMBUAT 1 M BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 2)cm, w/c =0,53 Rp. 9 MEMBUAT 1 M BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 2)cm, w/c =0,52 Rp. 10 MEMBUAT 1 M BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 2)cm, w/c =0,49 Rp. 11 MEMBUAT 1 M BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 2)cm, w/c =0,48 Rp. 12 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR Rp. 12a PEMBESIAN 1 KG DENGAN BESI POLOS ATAU BESI ULIR Rp. 13 1 M2 PASANG BEKISTING UNTUK PONDASI Rp. 14 1 M2 PASANG BEKISTING UNTUK SLOOF Rp. 15 1 M2 PASANG BEKISTING UNTUK KOLOM Rp. 15a 1 M2 PASANG BEKISTING UNTUK KOLOM Rp. 16 1 M2 PASANG BEKISTING UNTUK BALOK Rp. 16a 1 M2 PASANG BEKISTING UNTUK BALOK Rp. 17 1 M2 PASANG BEKISTING UNTUK LANTAI Rp. 17a 1 M2 PASANG BEKISTING UNTUK LANTAI Rp. 17b 1 M2 PASANG BEKISTING UNTUK PLAT PERAFET / MEJA PANTRY Rp. 18 1 M2 PASANG BEKISTING UNTUK DINDING Rp. 19 1 M2 PASANG BEKISTING UNTUK TANGGA Rp. 19a 1 M2 PASANG BEKISTING UNTUK TANGGA Rp. 20 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON Rp. 21 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING) Rp. 22 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING) Rp. 23 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING) Rp. 24 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING) Rp. 25 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING Rp. 26 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING) Rp. 27 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING) Rp. 28 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM) Rp. 29 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM) Rp. 30 1 M2 PEKERJAAN BESI BETON WIREMESH BRC TYPE M5 Rp. 31 1 M2 PEKERJAAN BESI BETON WIREMESH BRC TYPE M6 Rp. 32 1 M2 PEKERJAAN BESI BETON WIREMESH BRC TYPE M7 Rp. 33 PASANG BAUT BAJA HTB A325 16 MM Rp. 34 PASANG BAUT BAJA 12 MM Rp. 35 PASANG ANGKUR D 19 MM PANJANG 50 CM Rp. VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002) 1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG Rp. 1a 1 M2 PEKERJAAN ATAP GENTENG KODOK KARANG PILANG Rp. 2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT Rp. 3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG Rp. 3a 1 M1 PASANG BUBUNGAN GENTENG KARANG PILANG Rp. 4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM Rp. 5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M Rp. 6 1 M2 PEKERJAAN ATAP SIRAP Rp. 7 1 M2 PEKERJAAN ATAP NOK SIRAP Rp. 8 1 M2 PASANG ATAP ALANG-ALANG 3 M1 Rp. 9 1 M2 PEKERJAAN ATAP SENG GELOMBANG Rp. 10 1 M2 PASANGAN LAPISAN ALUMINIUM FOIL Rp. 11 1 M1 PASANG NOK SENG GELOMBANG Rp. NO URAIAN PEKERJAAN 1 2 HARGA 3 IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008) 1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM Rp. 2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM Rp. 3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING Rp. 4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL Rp. 5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA Rp. 6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM Rp. 6a 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM RANGKA HOLLOW GALVALUM Rp. 6b 1 M2 PASANG LANGIT-LANGIT KALSYBOARD UKURAN (1200X2400X4,5) MM RANGKA HOLLOW GALVALUM Rp. 7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM Rp. 8 1 M' PASANG LIST PLAPOND GYPSUM 2/6 CM Rp. 8a 1 M' PASANG LIST PLAPOND GYPSUM 25/25 CM Rp. 8b 1 M' PASANG LIST PLAPOND GYPSUM 9/9 CM Rp. 8c 1 M' PASANG LIST PLAPOND GYPSUM 7/7 CM Rp. X PEKERJAAN SANITASI ( SNI 2002 ) 1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK Rp. 2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN Rp. 3 MEMASANG 1 BUAH URINOIR Rp. 4 MEMASANG 1 BUAH WASHTAFEL Wastafel TYPE Counter /Komplit LW 521 V1A (ex Toto ) Rp. 5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3 Rp. 6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 " Rp. 7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3" Rp. 8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" Rp. 8a MEMASANG 1 M1 PIPA PVC TYPE AW f 0,75" Rp. 8b MEMASANG 1 M1 PIPA PVC TYPE AW f 1" Rp. 9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2" Rp. 10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" Rp. 10a MEMASANG 1 M1 PIPA PVC TYPE AW f 4" Rp. 11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5" Rp. XI PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008) 1 1 KG PASANG RANGKA ATAP BAJA Rp. 2 1 M2 PASANG JENDELA NAKO Rp. 3 1 M1 PASANG TALANG DATAR, SENG BJLS 28 Rp. XII PEKERJAAN KUNCI DAN KACA (SNI 2002) 1 1 BH PASANG KUNCI PINTU UTAMA SETARA SOLID Rp. 1a 1 BH PASANG KUNCI PINTU BIASA SETARA SOLID Rp. 2 1 PS PASANG ENGSEL PINTU SETARA SOLID Rp. 3 1 PS PASANG ENGSEL JENDELA SETARA SOLID Rp. 4 1 BH PASANG KAIT ANGIN SETARA SOLID Rp. 5 1 BH PASANG KUNCI SLOT Rp. 6 1 M2 PASANG KACA, TEBAL 5 MM Rp. XIII PEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008) 1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM Rp. 1a 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM Rp. 2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM Rp. 3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM Rp. 3a 1 M1 PASANG PLIN KERAMIK 10 X 40 CM Rp. 4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM Rp. 4a 1 M2 PASANG DINDING KERAMIK 20 X 25 CM Rp. 4b 1 M2 PASANG DINDING KERAMIK 40 X 40 CM MOTIF KAYU Rp. 5 1 M2 PASANG BATU ALAM 30 X 30 CM Rp. 6 1 M1 PASANG PLIN KAYU 2 X 10 CM Rp. XIV PEKERJAAN PENGECATAN (SNI 2002) 1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR, Rp. 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) 2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS Rp. 3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, Rp. NO URAIAN PEKERJAAN 1 2 HARGA 3 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) EX. VINILEX 4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) Rp. 5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI Rp. 6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI Rp. 7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR Rp. 7a 1 M2 PEKERJAAN POLITURAN ULTRAN Rp. 8 1 M2 PEKERJAAN WATERPROFING Rp. XV PEKERJAAN TETEMPELAN STYLE BALI 1 1 M2 PASANGAN BATA GOSOK 2 MUKA Rp. 2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA Rp. 2a 1 M2 PASANGAN BATU TULUNG AGUNG 1 MUKA Rp. 2b 1 M2 PASANGAN PARAS JOGJA PUTIH 1 MUKA Rp. 3 1 M2 PASANGAN BATA GOSOK 1 MUKA Rp. 4 1 M2 PASANGAN PARAS 1 MUKA Rp. 5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA Rp. 6 1 M2 PASANGAN BATA GOSOK DIUKIR Rp. 7 1 M2 PASANGAN PARAS DIUKIR Rp. 8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR Rp. 9 1 M2 PASANGAN PARAS JOGJA PUTIH 1 MUKA DIUKIR Rp. 10 1 M2 TEMPELAN BATU GUNUNG ( EX KARANGASEM ) Rp. 11 1 UNIT PEMBUATAN PAPAN NAMA KANTOR Rp. 11a 1 UNIT PEMBUATAN ALING ALING Rp. 12 I UNIT CANDI BENTAR EX. BATU KARANG ASEM TINGGI 2,50M Rp. 13 I UNIT CANDI BENTAR EX. BATU TULUNG AGUNG TINGGI 4,25 M Rp. 14 1 UNIT PEKERJAAN PINTU PAGAR TYPE 1 Rp. 15 1 UNIT PEKERJAAN PINTU PAGAR TYPE 2 Rp. 16 1 UNIT PEKERJAAN PADMASARI Rp. 17 1 UNIT PEKERJAAN PENUNGGU KARANG Rp. 18 1 UNIT PEKERJAAN PILAR PADURAKSA ( EX BATU TULUNG AGUNG ) Rp. 19 1 M1 PEKERJAAN TEMBOK PARAS ( EX TULUNG AGUNG ) Rp. 20 1 UNIT PEKERJAAN PILAR PADURAKSA ( BATU GUNUNG EX KARANGASEM ) Rp. 21 1 M1 PEKERJAAN TEMBOK ( BATU GUNUNG EX KARANGASEM ) Rp. XVI PEKERJAAN LANDSCAPE 1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225 Rp. 2 Paving 10 x 20 cm tebal 6 cm K350 Rp. 3 Paving 10 x 20 cm tebal 8 cm K225 Rp. 4 Paving 10 x 20 cm tebal 8 cm K350 Rp. 5 Paving 10 x 20 cm tebal 8 cm K425 Rp. 6 Paving 20 x 20 cm tebal 6 cm K225 Rp. 7 Paving 20 x 20 cm tebal 6 cm K350 Rp. 8 Paving 20 x 20 cm tebal 8 cm K225 Rp. 9 Paving 20 x 20 cm tebal 8 cm K350 Rp. 10 Paving 20 x 20 cm tebal 8 cm K425 Rp. 11 Paving 20 x 20 cm tebal 10 cm K225 Rp. 12 Paving 20 x 20 cm tebal 10 cm K350 Rp. 13 Paving 20 x 20 cm tebal 10 cm K425 Rp. 14 Paving Tiga Berlian tebal 6 cm K225 Rp. 15 1 M2 PASANGAN GRASS BLOCK Rp. 16 1 M2 PASANGAN KORAL SIKAT Rp. 17 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225 Rp. 18 Kanstein Jumbo (P:50,L:15,T:30 cm K225) Rp. 19 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) Rp. 20 1 M2 PENGECATAN KANSTEIN Rp. NO URAIAN PEKERJAAN 1 2 HARGA 3 XVII PEKERJAAN ELEKTRIKAL 1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN Rp. 2 1 TITIK INSTALASI AC Rp. 3 1 TITIK INSTALASI TELEPHONE Rp. 4 1 TITIK INSTALASI MATV Rp. 5 1 UNIT INSTALASI PENANGKAL PETIR (1 BLITZEM +3 TOMBAK) Rp. 6 1 UNIT MDP UKURAN 900 X 600 X 250 Rp. 7 1 UNIT SDP I UKURAN 700 X 500 X 200 Rp. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN HARGA 3 HARGA 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HARGA 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HARGA 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #VALUE! - #VALUE! #VALUE! #VALUE! - - - - HARGA 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HARGA 3 - - - - - - -