EST NUMBER: WEB04200

RUN DATE..: 08/05/09 08:32am


DATA DATE.: SEPT 2009

MASONRY ESTIMATE
ANYTOWN, ANYWHERE
ESTIMATE SUMMARY

PREPARED FOR: ALL OF OUR CLIENTS


PREPARED BY.: TEMPEST COMPANY
PAGE: 1

LABOR
MANHOURS

LABOR
DOLLARS

MATERIAL
DOLLARS

EQUIPMENT
DOLLARS

SUBCONTRACT
DOLLARS

TOTAL
DOLLARS

BUILDING - RENOVATION

6,446.2

286,143

109,071

967

396,181

*** TOTAL ESTIMATED COST ***

6,446.2

286,143

109,071

967

396,181

DESCRIPTION

EST NUMBER: WEB04200


RUN DATE..: 08/05/09 08:32am
DATA DATE.: SEPT 2009

MASONRY ESTIMATE
ANYTOWN, ANYWHERE
BUILDING - RENOVATION SUMMARY - BUILDING - RENOVATION

PREPARED FOR: ALL OF OUR CLIENTS


PREPARED BY.: TEMPEST COMPANY
PAGE: 2

LABOR
MANHOURS

LABOR
DOLLARS

MATERIAL
DOLLARS

EQUIPMENT
DOLLARS

SUBCONTRACT
DOLLARS

TOTAL
DOLLARS

MASONRY

6,446.2

286,143

109,071

967

396,181

*** BUILDING - RENOVATION ESTIMATED COST ***

6,446.2

286,143

109,071

967

396,181

DESCRIPTION

EST NUMBER: WEB04200


RUN DATE..: 08/05/09 08:32am
DATA DATE.: SEPT 2009

MASONRY ESTIMATE
ANYTOWN, ANYWHERE
MASONRY SUMMARY - BUILDING - RENOVATION

PREPARED FOR: ALL OF OUR CLIENTS


PREPARED BY.: TEMPEST COMPANY
PAGE: 3

LABOR
MANHOURS

LABOR
DOLLARS

MATERIAL
DOLLARS

EQUIPMENT
DOLLARS

SUBCONTRACT
DOLLARS

TOTAL
DOLLARS

UNIT MASONRY

6,446.2

286,143

109,071

967

396,181

*** MASONRY ESTIMATED COST ***

6,446.2

286,143

109,071

967

396,181

DESCRIPTION

EST NUMBER: WEB04200


RUN DATE..: 08/05/09 08:32am
DATA DATE.: SEPT 2009
DESCRIPTION

MASONRY ESTIMATE
ANYTOWN, ANYWHERE
ESTIMATE DETAIL - BUILDING - RENOVATION
QUANTITY

UNIT
MEAS

LABOR MAN HOURS


UNIT
TOTAL

PREPARED FOR: ALL OF OUR CLIENTS


PREPARED BY.: TEMPEST COMPANY
PAGE: 4

LABOR DOLLARS
UNIT
TOTAL

MATERIAL DOLLARS
UNIT
TOTAL

EQUIPMENT DOLLARS
UNIT
TOTAL

SUBCONTRACT DOLLARS
UNIT
TOTAL

TOTAL
DOLLARS

UNIT MASONRY
Pier - 4" CMU Standard Weight
Square Foot of Surface Area
(Information Only)
4" CMU Bond Beam 4" x 8" x 16"
Standard Weight
4" CMU Standard Block Standard Weight
4" x 8" x 16"
Mortar - CMU

0.0

83 Sq Ft
0

0.063

0.2

44.39

1.2

13

Each

0.063

6.2

44.39

275

0.78

76

351

Cu Ft

N/A

0.0

3.4

20

20

Grout Bond Beams

Cu Ft

0.04

0.1

44.39

3.19

Regular Flange Control Joint

Lin Ft

0.013

0.1

44.39

0.22

74

Lin Ft

0.003

0.2

44.39

0.11

17

Lbs

0.004

0.1

44.39

0.45

Sq Ft

0.005

0.9

44.39

40

0.055

10

50

471

4" Dur-O-Wall Galvanized Truss


Steel Reinforcing - Horizontal
Clean Masonry

83

Sq Ft

Each

98

9
174

QUANTITY:
0

Pier - 4" CMU Standard Weight


Pier - 6" CMU Std Weight, Grouted
Square Foot of Surface Area
(Information Only)
6" CMU Bond Beam 6" x 8" x 16"
Standard Weight
6" CMU Standard 6" x 8" x 16"
Standard Weight
Mortar - CMU

7.8

126

0.0

960 Sq Ft
0

0.066

12.5

44.39

555

1.34

253

808

Each

0.066

74.8

44.39

3,320

1.03

1,168

4,488

85

Cu Ft

N/A

0.0

3.4

289

289

Grout Bond Beams

19

Cu Ft

0.04

0.8

44.39

36

3.19

61

97

Grout Concrete Block Cores

90

Cu Ft

0.04

3.6

44.39

160

3.19

287

0.3

27

474

Regular Flange Control Joint

34

Lin Ft

0.013

0.4

44.39

18

0.22

25

6" Dur-O-Wall Galvanized Truss

864

Lin Ft

0.003

2.6

44.39

115

0.12

104

219

Steel Reinforcing - Horizontal

549

Lbs

0.004

2.2

44.39

98

0.45

247

345

Steel Reinforcing - Vertical

561

Lbs

0.005

2.8

44.39

124

0.45

252

376

Sq Ft

0.005

10.1

44.39

448

0.055

111

559

7,680

Clean Masonry

960

Sq Ft

189

Each

1,134

2,016

QUANTITY:
0

345

Pier - 6" CMU Std Weight, Grouted


Pier - 8" CMU Std Weight, Grouted
Square Foot of Surface Area
(Information Only)

109.8
3,357

Sq Ft

QUANTITY:
0

0.0

4,874
3,357 Sq Ft
0

2,779
0

27
0

EST NUMBER: WEB04200


RUN DATE..: 08/05/09 08:32am
DATA DATE.: SEPT 2009

MASONRY ESTIMATE
ANYTOWN, ANYWHERE
ESTIMATE DETAIL - BUILDING - RENOVATION

PREPARED FOR: ALL OF OUR CLIENTS


PREPARED BY.: TEMPEST COMPANY
PAGE: 5

UNIT
MEAS

LABOR MAN HOURS


UNIT
TOTAL

LABOR DOLLARS
UNIT
TOTAL

151

Each

0.072

10.9

44.39

484

1.64

248

732

3,966

Each

0.072

285.6

44.39

12,678

1.31

5,195

17,873

317

Cu Ft

N/A

0.0

3.4

1,078

1,078

30

Cu Ft

0.04

1.2

44.39

53

3.19

96

149

Grout Concrete Block Cores

532

Cu Ft

0.04

21.3

44.39

946

3.19

1,697

0.3

160

2,803

Wide Flange Control Joint

135

Lin Ft

0.017

2.3

44.39

102

0.42

57

159

3,021

Lin Ft

0.003

9.1

44.39

404

0.14

423

827

437

Lbs

0.004

1.7

44.39

75

0.45

197

272

Steel Reinforcing - Vertical

1,961

Lbs

0.005

9.8

44.39

435

0.45

882

1,317

Clean Masonry

7,050

Sq Ft

0.005

35.3

44.39

1,567

0.055

388

1,955

27,165

DESCRIPTION

QUANTITY

8" CMU Bond Beam 8" x 8" x 16"


Standard Weight
8" CMU Standard 8" x 8" x 16"
Standard Weight
Mortar - CMU
Grout Bond Beams

8" Dur-O-Wall Galvanized Truss


Steel Reinforcing - Horizontal

Pier - 8" CMU Std Weight, Grouted

377.2

Block Wall - 8" CMU Std Weight, Grouted


Square Foot of Surface Area
7,682
(Information Only)
8" CMU Bond Beam 8" x 8" x 16"
303
Standard Weight
8" CMU Standard 8" x 8" x 16"
9,075
Standard Weight
Mortar - CMU
726
Grout Bond Beams
Grout Concrete Block Cores
Wide Flange Control Joint
8" Dur-O-Wall Galvanized Truss
Steel Reinforcing - Horizontal
Steel Reinforcing - Vertical
Clean Masonry

Sq Ft

QUANTITY:
0

MATERIAL DOLLARS
UNIT
TOTAL

16,744

EQUIPMENT DOLLARS
UNIT
TOTAL

10,261

SUBCONTRACT DOLLARS
UNIT
TOTAL

160

TOTAL
DOLLARS

0.0

7,682 Sq Ft
0

Each

0.072

21.8

44.39

968

1.64

497

1,465

Each

0.072

653.4

44.39

29,004

1.31

11,888

40,892

Cu Ft

N/A

0.0

3.4

2,468

2,468

61

Cu Ft

0.04

2.4

44.39

107

3.19

195

302

1,217

Cu Ft

0.04

48.7

44.39

2,162

3.19

3,882

0.3

365

6,409

269

Lin Ft

0.017

4.6

44.39

204

0.42

113

317

6,914

Lin Ft

0.003

20.7

44.39

919

0.14

968

1,887

879

Lbs

0.004

3.5

44.39

155

0.45

396

551

4,488

Lbs

0.005

22.4

44.39

994

0.45

2,020

3,014

Sq Ft

0.005

80.7

44.39

3,582

0.055

887

4,469

61,774

16,133

Block Wall - 8" CMU Std Weight, Grouted


Block Wall - 12" CMU Std Weight, Grouted
Square Foot of Surface Area
49
(Information Only)

858.2
Sq Ft

QUANTITY:
0

0.0

38,095
49 Sq Ft
0

23,314
0

365
0

EST NUMBER: WEB04200


RUN DATE..: 08/05/09 08:32am
DATA DATE.: SEPT 2009
DESCRIPTION

MASONRY ESTIMATE
ANYTOWN, ANYWHERE
ESTIMATE DETAIL - BUILDING - RENOVATION
QUANTITY

PREPARED FOR: ALL OF OUR CLIENTS


PREPARED BY.: TEMPEST COMPANY
PAGE: 6

UNIT
MEAS

LABOR MAN HOURS


UNIT
TOTAL

LABOR DOLLARS
UNIT
TOTAL

MATERIAL DOLLARS
UNIT
TOTAL

EQUIPMENT DOLLARS
UNIT
TOTAL

SUBCONTRACT DOLLARS
UNIT
TOTAL

TOTAL
DOLLARS

12" CMU Bond Beam 12" x 8" x 16"


Standard Weight
12" CMU Standard 12" x 8" x 16"
Standard Weight
Mortar - CMU

58

Each

0.089

5.2

44.39

231

2.34

136

367

58

Each

0.089

5.2

44.39

231

1.75

102

333

Cu Ft

N/A

0.0

3.4

17

17

Grout Bond Beams

18

Cu Ft

0.04

0.7

44.39

31

3.19

57

88

Grout Concrete Block Cores

13

Cu Ft

0.04

0.5

44.39

22

3.19

41

0.3

67

Lin Ft

0.017

0.1

44.39

0.42

44

Lin Ft

0.004

0.2

44.39

0.18

17

167

Lbs

0.004

0.7

44.39

31

0.45

75

106

29

Lbs

0.005

0.1

44.39

0.45

13

17

Sq Ft

0.005

0.5

44.39

22

0.055

28

1,045

Wide Flange Control Joint


12" Dur-O-Wall Galvanized Truss
Steel Reinforcing - Horizontal
Steel Reinforcing - Vertical
Clean Masonry

103

Block Wall - 12" CMU Std Weight, Grouted

13.2

Block Wall - 12" CMU Std Weight, Grouted


Square Foot of Surface Area
5,190
(Information Only)
12" CMU Bond Beam 12" x 8" x 16"
51
Standard Weight
12" CMU Standard 12" x 8" x 16"
6,131
Standard Weight
Mortar - CMU
552
Grout Bond Beams
Grout Concrete Block Cores
Wide Flange Control Joint
12" Dur-O-Wall Galvanized Truss
Steel Reinforcing - Horizontal
Steel Reinforcing - Vertical
Clean Masonry

Sq Ft

QUANTITY:
0

456

0.0

5,190 Sq Ft
0

Each

0.089

4.5

44.39

200

2.34

119

319

Each

0.089

545.7

44.39

24,224

1.75

10,729

34,953

Cu Ft

N/A

0.0

3.4

1,877

1,877

16

Cu Ft

0.04

0.6

44.39

27

3.19

51

78

1,371

Cu Ft

0.04

54.8

44.39

2,433

3.19

4,373

0.3

411

7,217

182

Lin Ft

0.017

3.1

44.39

138

0.42

76

214

4,671

Lin Ft

0.004

18.7

44.39

830

0.18

841

1,671

149

Lbs

0.004

0.6

44.39

27

0.45

67

94

3,032

Lbs

0.005

15.2

44.39

675

0.45

1,364

2,039

Sq Ft

0.005

54.5

44.39

2,419

0.055

599

3,018

51,480

11,054

10,899

Block Wall - 12" CMU Std Weight, Grouted


Facebrick Flashings
26 Gauge TWF SS - 20" Wide w/Drip

585

697.7
800

Lin Ft

QUANTITY:
0.2

160.0

30,973
1 L Sum
44.39

7,102

20,096
4.94

3,952

411
0

EST NUMBER: WEB04200


RUN DATE..: 08/05/09 08:32am
DATA DATE.: SEPT 2009
DESCRIPTION
Adhesive

MASONRY ESTIMATE
ANYTOWN, ANYWHERE
ESTIMATE DETAIL - BUILDING - RENOVATION
QUANTITY

UNIT
MEAS

Gallon

LABOR MAN HOURS


UNIT
TOTAL

PREPARED FOR: ALL OF OUR CLIENTS


PREPARED BY.: TEMPEST COMPANY
PAGE: 7

LABOR DOLLARS
UNIT
TOTAL

MATERIAL DOLLARS
UNIT
TOTAL

EQUIPMENT DOLLARS
UNIT
TOTAL

SUBCONTRACT DOLLARS
UNIT
TOTAL

TOTAL
DOLLARS

0.0

15

75

75

Weeps - HB 341 WS

400

Each

0.04

16.0

44.39

710

0.92

368

1,078

Vents - TOW

400

Each

0.04

16.0

44.39

710

0.34

136

846

Term Bar - Aluminum

504

Lin Ft

0.09

45.4

44.39

2,015

0.51

257

2,272

Mortar Net

504

Lin Ft

0.065

32.8

44.39

1,456

1.65

832

2,288

17,613

Facebrick Flashings
Type 1 Modular Facebrick
Type 1 - Piers
Type 1 - Recessed

270.2
250

Each

QUANTITY:
0.053

18

Each

0.053

Type 1 Modular Facebrick


Type 3 Modular Facebrick
Type 3 - Veneer
Type 3 - Piers

Type 4 - Veneer
Type 4 - Patch
Type 4 Modular Facebrick

1 L Sum
44.39

590

0.6

150

740

1.0

44.39

44

0.6

11

55

795

634

161

20,200

Each

QUANTITY:
0.043

868.6

1 L Sum
44.39

38,557

0.45

9,090

47,647

5,450

Each

0.053

288.9

44.39

12,824

0.45

2,453

15,277

62,924

20,251

20,251

1,157.5
950

Lin Ft

QUANTITY:
0.3

Slate
Type 4 Modular Facebrick
Type 4 - Infills

5,620

13.3

14.3

Type 3 Modular Facebrick


Slate
4 7/8" Slate (Recessed)

11,993

285.0

51,381
1 L Sum
44.39

285.0
2,200

Each

17,550

Each

600

Each

QUANTITY:
0.05

12,651

11,543
8

12,651

7,600

0
0

7,600

110.0

1 L Sum
44.39

4,883

0.45

990

5,873

0.043

754.7

44.39

33,501

0.45

7,898

41,399

0.095

57.0

44.39

2,530

0.45

270

2,800

50,072

921.7

40,914

9,158

EST NUMBER: WEB04200


RUN DATE..: 08/05/09 08:32am
DATA DATE.: SEPT 2009
DESCRIPTION

MASONRY ESTIMATE
ANYTOWN, ANYWHERE
ESTIMATE DETAIL - BUILDING - RENOVATION
QUANTITY

UNIT
MEAS

LABOR MAN HOURS


UNIT
TOTAL
QUANTITY:
0.018

Facebrick - Other
Washdown Brick

7,250

Each

Veneer Anchors

2,025

Each

Textro Seals

2,025

Screws - Polymer Coated


Ramsets
Ties
1 1/2" Cavity Insulation
Mastic

PREPARED FOR: ALL OF OUR CLIENTS


PREPARED BY.: TEMPEST COMPANY
PAGE: 8

LABOR DOLLARS
UNIT
TOTAL

MATERIAL DOLLARS
UNIT
TOTAL

EQUIPMENT DOLLARS
UNIT
TOTAL

SUBCONTRACT DOLLARS
UNIT
TOTAL

TOTAL
DOLLARS

130.5

1 L Sum
44.39

5,793

0.01

73

5,866

0.05

101.3

44.39

4,497

0.77

1,559

6,056

Each

0.056

113.4

44.39

5,034

0.13

263

5,297

4,050

Each

0.01

40.5

44.39

1,798

0.075

304

2,102

870

Each

0.077

67.0

44.39

2,974

1,740

4,714

2,025

Each

0.0

0.2

405

405

700

Sq Ft

0.0175

12.3

44.39

546

0.3

210

756

Quarts

0.0

20

20

Expansion Joint

210

Lin Ft

0.056

11.8

44.39

524

210

734

Expansion Joint-- Stabilizers

160

Each

0.02

3.2

44.39

142

3.97

635

777

0.0

170

6,800

6,800

33,527

Mortar - Brick

40

Cu Yds

Facebrick - Other

480.0

21,308

12,219

Patch Brick/CMU
Tooth/Patch Brick

321

Lin Ft

QUANTITY:
2.5

802.5

1 L Sum
44.39

35,623

642

36,265

Tooth/Patch CMU

175

Lin Ft

1.5

262.5

44.39

11,652

350

12,002

Patch CMU Heads

62

Lin Ft

1.5

93.0

44.39

4,128

1.5

93

4,221

52,488

Patch Brick/CMU
Limestone Trim
Sills - 8" x 5"

1,158.0
226

Lin Ft

QUANTITY:
0.35

Lin Ft

Coping 9" x 5"

28

Lin Ft

Dowel Pins SS

132

Pilaster Caps 13" x 5"

Mortar - Limestone
Limestone Trim

51,403

1,085

79.1

1 L Sum
44.39

3,511

17

3,842

7,353

0.47

3.3

44.39

146

17

119

265

0.47

13.2

44.39

586

17

476

1,062

Each

0.0

0.35

46

46

Cu Yds

0.0

170

170

170

8,896

95.6

4,243

4,653

EST NUMBER: WEB04200


RUN DATE..: 08/05/09 08:32am
DATA DATE.: SEPT 2009
DESCRIPTION

MASONRY ESTIMATE
ANYTOWN, ANYWHERE
ESTIMATE DETAIL - BUILDING - RENOVATION
QUANTITY

*** UNIT MASONRY ESTIMATED COST ***

UNIT
MEAS

PREPARED FOR: ALL OF OUR CLIENTS


PREPARED BY.: TEMPEST COMPANY
PAGE: 9

LABOR MAN HOURS


UNIT
TOTAL

LABOR DOLLARS
UNIT
TOTAL

MATERIAL DOLLARS
UNIT
TOTAL

EQUIPMENT DOLLARS
UNIT
TOTAL

SUBCONTRACT DOLLARS
UNIT
TOTAL

TOTAL
DOLLARS

6,446.2

286,143

109,071

967

396,181