Sl No.

Part Name NDE Personnel HT M/c'ed


Qualification PT/MT RT/UT C of C Dimn Report
1 PSL 1 X X X X NA NA NA NA NA NA
2 PSL 2 X X X X X X X X NA NA
3 PSL 3 X X X X X X X
1)
X
2)
X
3)
X
General:
Retension period for all above records is 5 years from the date of Delivery.
For PSL 3 All required records shall reference the specific part serial number.
1)
Major weld record shall include the following data:
- Welder Identification
- Weld procedure (WPS)
- Filler Material Type
- PWHT
2)
MTR shall include the following Heat Treatment data:
- Actual Temperature
- Actual times at temperature
- Temperature of quenching medium prior and after quench.
3)
Hardness test as per ASTM E10 / or E110 - portable method.
RECORDS REQUIRED BY API 6A (Ref CL 7.5)
NDE Records
Major Weld
Record
Hardness
Test Report
Required Records
MTR+Hardness WPS/PQR WPQ