Você está na página 1de 2

Wall Dimensions Length Width Height

Area m
2
Vol. m
3
Half Brick Wall 0.0 m 0.0 m 0.0 m 0.0 0.000
Full Brick Wall 1.0 m 0.2 m 1.0 m 1.0 0.230
C/S Mortar Ratio 1 :6
Dry Mortar Qty 0.07
MATERIAL Qty.
Bricks 490
Cement Bags 0.49
Sand m
3
0.10
LABOUR With Hand Mixing of Mortar Days
MASON 0.94
LABOUR 1.37
BAHISHTI (Water Carrier) 0.20
Prime Cost 2965.36
Scafolding
@2% of prime cost
Sundries
@3% of prime cost
CONTRACTOR PROFIT
Contractor Profit
TOTAL COST (Rs.)
RATE ANALYSIS FOR BRICKWORK
3,736.35
Downloaded from TheConstructor.Org
Rs. /Unit AMT (Rs.)
SUBTOTA
L (Rs.)
4
1960.00
250 123.10
900 92.26
2175.36
350 329
300 411
250 50
790.00
Amount
59.31
59.31
Amount
88.96
88.96
20 % 622.73
RATE ANALYSIS FOR BRICKWORK
3,736.35