CHAPTER 1:-
NECESSITY:-
The central government is primarily responsible for
development and maintenance of national highways.
These are very important as even though these comprise
only 2% of road network but are carrying about 40% of
total road traffic. The prime focus on developing roads of
uninterrupted flow of traffic with enhanced safety
features including better riding surface, better road
geometry, better traffic management, divided
carriageways, grade separators, over bridges,
underpasses, bypass and wayside amenities.
There is an existing bridge on the opposite side of
proposed bridge with a carriageway of 7.55 m. Due to
heavy movement of vehicular traffic, it will become very
difficult in future to withstand these live loads. So, the J &
K govt. intends to construct an integrated long span
bridge with a carriageway of 9 m’s so that the loads on
existing bridge will be minimized. There is no footpath on
the existing bridge which is creating lot of problems to
people while crossing the bridge. For this purpose, the
proposed bridge is provided with a footpath of width 1.5
m over the whole length of bridge on right side. On the
other side of bridge an anti crush barrier of height 1.115
m is provided for the safety purpose.
PROJECT SITE:-
CHAPTER 2:-
➢ Diameter = 9.15m
CHAPTER 3:-
TECHNICAL DETAILS:-
A. Loads transmitted by bridge deck onto the abutments are:-
➢ Vertical loads from self weight of deck.
➢ Vertical loads from live loading conditions.
➢ Horizontal loads from temperature,creep movements
and wind.
➢ Horizontal loads from braking and skidding effects of
vehicles.
A. Loads transmitted by bridge deck onto the piers:-
➢ Vertical loads from self weight of deck.
➢ Vertical loads from live loading conditions.
➢ Horizontal loads from temperature,creep movements
and wind.
➢ Rotations due to deflection of bridge deck.
CHAPTER 4:-
SUB - STRUCTURE
SUB-STRUCTURE:-
The sub-structure of the bridge consists of following
components;
1. Foundation :- The foundation used for the
construction this bridge is well foundation. There are
nine number of wells two of them are under
abutments and remaining seven are under piers. The
wells under abutments are having a total depth of
32.156 m and well cap is having a total depth of 2 m,
the diameter of well and pier is same, as 9.150 m.
The wells under piers are having a total depth of
23.50 m and well cap is having a depth, same as that
in well caps under abutments and also the diameter
of wells under piers is also same as that under
abutments.
2. Abutments:- There is an abutment on either side
of the bridge, both of them are laid. The abutments
are of following dimensions;
Total depth of abutment - 2.850 m
Diameter of abutment - 1.20 m
Total depth of abutment cap - 0.4 + 0.4 =0.8 m
3. Pier:- There are seven number of piers in between
two abutments but one of them is not constructed
remaining six are completely laid. The piers are of
following dimensions;
Total depth of pier – 7.706 m
Diameter of pier – 3.2 m
Total depth of pier cop - 0.8 + 0.8 = 1.60 m
PROJECT SITE:-
CHAPTER 5:-
DRAWING DETAILS
PROJECT SITE:-
CHAPTER 6:-
PHOTOGRAPHS
WELL FOUNDATION
BRIDGE UNDER CONSTRUCTION
DECK SLAB
PIER & PIER CAP
PROJECT SITE:-
CHAPTER 7:-
PROGRESS WORK
PROGRESS REPORT OF
CONSTRUCTION:-