FORM ID ALT

1
Nozzle No Nozzle Size Result Remarks Nozzle No Nozzle Size Result Remarks
NAME
SIGN
TEST MEDIUM
PRESSURE HOLDING TIME
PSI and a Soap film was Each reinforceing Pad was subjected to a pressure of
AIR LEAK TEST OF REINFORCING PADS
FORM#QA/QC-05 REV-0
ASIA ENGINEERS
APPLICATION SOLUTION
SURFACE TEMPERATURE
PREPARATION OF MEDIUM
REF CODE # DWG #
CONTRACTOR:
TANK #
applied to all attachment welding around reinforcement welding, both inside and outside
DATE:
REPORT NO:
JOB NO:
Prior to Inspection, the Inspector ensure that he has worn the Cover all, Helmet, Safety Shoes, Eye Gogle, & Hand Gloves
PRESSURE GAUGE #
CLIENT:
PROJECT:
VISUAL INSPECTION
TEST PRESSURE
ASIA ENGINEERS
REVIEWED & APPROVED BY
API CERTIFIED ENGINEER (SGS PAKISTAN)
PREPARED BY