LITL - EPC - STAGE II - 366 MV CCPP -- KONDAPALLI

VASAVI POWER SERVICES -- GAS TURBINE - PRE-ASSEMBLING DATE :

MAN POWER T&P


Sl.No. Designation S/U DAY NIGHT TOTAL M/C QTY
STAFF S Hydra Crane
FABRICATOR S Trailor
FITTER S Wel Recti
A.FITTER S.S Drill M/c
TACK WEL S.S
GAS CUTTER S
GRINDER S
DRILLER S
RIGGER/FOREM S
KHALASI S.S
HELPER U.S
ASST.ELECTRI S
DRI/OPERATOR S S/S.S/U.S -- workmen
PAINTER U.S STAFF
SKILLED
S.SKILL
UN SKILL
Vasavi

2/2/2009 17 Hydra 2
3/2/2009 21
4/2/2009 21
5/2/2009 16
6/2/2009 18 Hydra 2
7/2/2009 18 Hydra 1
9/2/2009 18
10/2/2009 18
11/2/2009 18 Hydra 1
12/2/2009 18
13/2/2009 20
S/S.S/U.S -- workmen 14/2/2009 18
15/2/2009 20
16/2/2009 18
17/2/2009 18 Welding m/c 1
18/2/2007 18 Welding m/c 1
19/02/2009 25 Welding m/c 1
20/2/2009 24
21/2/2009
23/2/2009
24/2/2009
25/2/2009
26/2/2009
27/2/2009
Trolley 1
MAN POWER
DATE STAFF SKILLED S.SKILLED UN SKILL TOTAL
2/2/2009 17
3/2/2009 21
4/2/2009 21
5/2/2009 16
Xicon INDIRA INDUSTRIES
16/02/2009 5 17/02/2009 4
17/02/2009 4 18/02/2009 4
18/02/2009 4 19/02/2009 3
19/2/2009 4 20/02/2009 3
20/2/2009 4 21/02/2009
21/2/2009 4 23/02/2009 3
23/2/2009 24/02/2009 5
24/2/2009 25/02/2009 2
25/2/2009 26/02/2009 2
26/2/2009 27/02/2009 2
27/2/2009
2/3/2009 16