Project
1. Concrete = 150.982m
3
2. Formwork = 1239.040 m
2
3. Lean Concrete = 102.709 m
2
4. Earth excavation = 77.049 m
3
Column
1. Main Bar ( High Yield Steel ) = 668.993m
2. Main Bar ( Weight ) = 1246.783 kg
3. Link Bar (High Yield Steel ) = 1075.500m
4. Link Bar ( Weight ) = 676.776kg
5. Concrete = 12.690 m
3
6. Formwork = 172.800 m
3
Beam
1. High Yield Steel ( Top Bar, Length ) = 1433.591m
2. High Yield Steel ( Top Bar, Weight ) = 2037.914kg
3. High Yield Steel ( Side Bar, Length) = 303.864m
4. High Yield Steel ( Side Bar, Weight) = 489.512kg
5. High Yield Steel ( Stirrup bar, Length ) = 2294.025m
6. High Yield Steel ( Stirrup bar, Weight ) = 1443.582kg
7. Mild Steel ( stirrup bar, Length ) = 465.050m
8. Mild Steel ( stirrup bar, Weight ) = 105.352kg
9. Concrete = 58.114m
3
10. Formwork = 562.298m
3
Slab
1. Concrete = 38.805m
3
2. Formwork = 310.402m
3
Pad Foundation
1. Quantity = 18
2. Concrete = 33.701m
3
3. Formwork = 53.090 m
2
4. Lean Concrete = 90.067 m
2
5. Earth Excavation = 65.223m
3
Pile Foundation
1. Quantity = 18
2. No Pile = 38
3. Concrete = 7.402 m
3
4. Formwork = 32.923 m
2
5. Lean Concrete = 12.642 m
2
6. Earth excavation = 11.826m
3