Escolar Documentos
Profissional Documentos
Cultura Documentos
URAIAN
BAHAN TOKO
I SEMEN
1 Semen/PC (50 Kg)
2 Semen Warna Putih/PC (40 Kg)
3 Kapur Pasang
II BAHAN BESI DAN KAWAT
1 Besi Beton D 6', 12 m
2 Besi Beton D 8', 12 m
3 Besi Beton D 10', 12 m
4 Besi Beton D 12', 12 m
5 Besi Beton D 14'
6 Besi Beton D 16'
7 Besi Beton D 19'
8 Besi Beton D 21'
9 Kawat Beton (Kawat Bidrat)
10 Besi Siku 2,2 x 3
11 Besi Siku 3,2 x 40
12 Besi Siku 4,2 x 40
13 Baut/Mur
14 Paku Campur (5,7,10 Cm)
15 Paku Seng
16 Paku Tripleks
17 Paku Sekrup
18 Paku Beton
19 Paku Kalsiboard/Gypsumboard
20 Paku Asbes
III BAHAN KERAMIK
1 Keramik Putih 10 x 20 Cm
2 Keramik Warna 10 x 20 Cm
3 Keramik Putih 20 x 20 Cm
4 Keramik Warna 20 x 20 Cm
SATUAN
WILAYAH
DLM KOTA
(Rp)
Zak
Kg
Kg
72,500
2,450
4,075
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Kg
Batang
Batang
Batang
Kg
Kg
Kg
Kg
Dos
Kg
Kg
Kg
35,100
55,100
79,100
110,100
135,100
175,100
240,100
350,100
25,100
90,750
150,750
250,750
25,100
17,600
35,100
45,100
16,100
25,100
35,100
40,100
Dos
Dos
Dos
Dos
61,000
66,000
66,000
68,000
5
6
7
8
9
10
11
12
IV
1
2
3
4
V
1
2
3
4
5
6
7
8
9
VI
1
2
3
4
VII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Keramik Putih 20 x 25 Cm
Keramik Warna 20 x 25 Cm
Keramik Putih 30 x 30 Cm
Keramik Warna 30 x 30 Cm
Keramik Putih 40 x 40 Cm
Keramik Warna 40 x 40 Cm
Keramik Warna 60 x 60 Cm
Tegel Keramik List 5 x 20 Cm (Putih)
BAHAN KACA
Kaca Bening 3 mm
Kaca Bening 5 mm
Kaca Riben 3 mm
Kaca Riben 5 mm
BAHAN LANGIT-LANGIT
Triplex 2 mm (122x244 Cm)
Triplex 3 mm (122x244 Cm)
Triplex 6 mm (122x244 Cm)
Triplex 9 mm (122x244 Cm)
Melamin Dico
Polywood 9 mm
Gypsum Board (120x240 Cm)
Kalsiboard (240x120 Cm)
Eternit 3 mm
LIST PROFIL PLAFOND
1 x 4 cm panjang 4 m
3 x 3 cm panjang 4 m
4 x 4 cm panjang 4 m
5 x 5 cm panjang 4 m
BAHAN ATAP
Genteng Multi Roof Color (77x100 cm)
Genteng Surya Roof Color (77x80 cm)
Genteng Sakura Roof Clasic (77x80 cm)
Genteng Sakura Roof Royal (77 x 80 cm)
Genteng Soka Abadi (80 x 140 cm)
Paku Genteng
Nok Genteng Multi Roof Color Std (P=100 cm)
Nok Genteng Surya Roof Color Std (P=91 cm)
Nok Genteng Sakura Roof Clasic Std (P=91 cm)
Nok Genteng Sakura Roof Royal Std (P=91 cm)
Nok Genteng Soka Abadi Std (P=110 cm)
Asbes Gelombang 4 mm
Nok Asbes
Seng BWG 34" BJLS 0.20 mm
Seng Plat BWG BJLS 0.20 mm (50x180 Cm)
Seng Plat BWG BJLS 0.22 mm (lebar 30 Cm)
Dos
Dos
Dos
Dos
Dos
Dos
Dos
Buah
66,000
69,000
69,000
71,000
73,000
83,000
226,000
6,000
M2
M2
M2
M2
171,000
201,000
201,000
251,000
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
45,500
55,500
95,500
150,500
75,500
300,500
95,500
75,500
22,500
Batang
Batang
Batang
Batang
15,075
20,075
25,075
27,075
Lembar
Lembar
Lembar
Lembar
Lembar
Kg
Buah
Buah
Buah
Buah
Buah
kk
Buah
kk
Lembar
m
95,750
52,750
35,750
34,750
75,750
35,100
53,150
50,150
33,150
33,150
45,150
5,750
15,100
6,750
50,250
15,250
17
18
VIII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
IX
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
X
1
Karet Talang 50 Cm
Atap Fiber / Seng Plastik
BAHAN CAT DAN MINYAK
Minyak Cat
Thener
Cat Tembok Avitex
Cat Tembok Metrolite
Cat Tembok Aries
Cat Tembok Tiger
Cat Tembok Mowilex
Cat Tembok Aqualastik
Cat Many Kayu/Besi
Cat Kilap Kayu (Sejenis Avian)
Politur/ Vernis
Dempul Kayu
Lem Kayu (Fox)
Plamur Tembok Boyo
Residu
Cat Atap AGA
Amplas Kasar
Amplas Halus
Kuas 3 Cm
Kuas 4 Cm
Kuas 5 Cm
Kuas Rol
KUNCI - KUNCI
Kunci Tanam 2 Kali Putar T
Kunci Tanam Antik
Kunci Gembok Besar
Kunci Gembok Sedang
Kunci Gembok Kecil
Grendel Pintu Biasa
Grendel Pintu Kuningan
Grendel Jendela Biasa
Grendel Jendela Kuningan
Engsel Pintu H Kupu-kupu Biasa
Engsel Pintu H Kupu-kupu Kuningan
Engsel Jendela H Kupu-kupu Biasa
Engsel Jendela H Kupu-kupu Kuningan
Engsel Pintu 3 mm x 4 inch
Hak Angin Biasa
Hak Angin Kuningan
Kunci Lemari 888
BAHAN INSTALASI LISTRIK
Pipa 5/8 inch, panjang 4 m, SNI
m
kk
15,250
12,750
KG
Ltr
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
Lembar
Lembar
Buah
Buah
Buah
Buah
25,100
25,100
18,100
23,100
12,100
10,100
30,100
32,600
20,100
55,100
50,100
20,100
20,100
10,100
25,100
85,100
5,075
5,075
15,075
20,075
25,075
25,075
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Pasang
Pasang
Pasang
Pasang
Pasang
Buah
Buah
Buah
150,100
220,100
45,075
30,075
15,075
20,075
25,075
10,075
20,075
15,075
17,575
5,075
10,075
35,075
5,075
15,075
15,075
Batang
18,500
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
XI
1
2
3
4
5
6
7
8
Batang
Batang
Rol
Rol
Rol
Rol
Rol
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
25,500
40,500
911,500
1,151,500
1,801,500
751,500
951,500
15,075
15,075
15,075
37,075
36,075
84,075
70,075
40,075
50,075
10,075
95,075
200,075
150,075
320,075
34,075
48,075
8,075
9,075
9,075
10,075
28,075
30,075
33,075
35,075
37,075
40,075
110,075
65,075
55,075
Set
Set
Set
Set
Set
Set
Buah
Buah
176,500
601,500
2,951,500
451,500
251,500
351,500
551,500
25,075
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Kaleng
Buah
Rol
30,075
15,075
25,075
15,075
15,075
3,275,000
15,075
15,075
50,075
50,075
190,075
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Buah
Batang
Batang
Buah
Buah
Buah
Buah
22,500
30,500
40,500
70,500
100,500
130,500
165,500
275,500
210,100
150,750
200,750
25,750
4,750
15,750
15,750
M3
M3
63,174
61,674
M3
M3
M3
173,174
198,174
223,174
Biji
M3
M3
M3
M3
M3
M3
M3
M3
625
248,174
423,174
148,174
288,174
248,174
248,174
223,174
223,174
IV
PAVING BLOCK
1 Paving Block Pres Mesin Tek. 150 Kg
2 Paving Blok Cetak Manual
3 Batako Pres Manual
V BAHAN KAYU (DINAS KEHUTANAN)
1 Papan Kayu Klas II A (Sejenis)
2 Papan Kayu Klas II (Sejenis)
3 Papan Perancah
4 Balok Kayu Klas II A (Sejenis)
5 Balok Kayu Klas II (Sejenis)
6 Balok Perancah
7 Dolken 5 Cm
8 Dolken 10 Cm
9 Dolken 15 Cm
10 Bambu Tebal panjang 7 m
11 Bambu Tipis panjang 7 m
12 Batang Kelapa
13 Atap nipa/alang-alang/kulit sagu
14 Ijuk
VI BAHAN ASPAL
1 Aspal RMA
2 Aspal Butur Cell
3 Aspal Cement (AC)
VII ALAT BANTU
1 Alat Bantu
2 Bangker Oli (BO)
HARGA JUAL BBM KEEKONOMIAN (NON SUBSIDI)
1 Minyak Solar HSD (Industri) + PPh
2 Minyak Tanah/Kerosene
3 Premium/Gasolene
UPAH KERJA
1 Mandor
2 Kepala Tukang
3 Tukang
- Tukang Listrik
- Tukang Batu
- Tukang Kayu
- Tukang Besi
- Tukang Cat
4 Pekerja
- Pekerja Terlatih
- Pekerja Agak terlatih
- Pekerja Tak terlatih
5 Sopir
6 Pembantu Sopir
M2
M2
M2
50,674
50,674
51,174
M3
M3
M3
M3
M3
M3
Batang
Batang
Batang
Batang
Batang
Batang
Lembar
Kg
1,825,000
1,725,000
1,275,000
1,825,000
1,325,000
1,325,000
8,500
30,500
40,500
35,500
25,500
30,500
2,100
28,400
Ton
Ton
Liter
1,450,000
1,325,000
12,300
Set
Liter
1,500
1,600
Liter
Liter
Liter
14,025
14,378
13,554
Org/Hari
Org/Hari
100,000
120,000
Org/Hari
Org/Hari
Org/Hari
Org/Hari
Org/Hari
100,000
100,000
100,000
100,000
100,000
Org/Hari
Org/Hari
Org/Hari
Org/Hari
Org/Hari
75,000
75,000
75,000
100,000
75,000
7
8
9
10
Org/Hari
Org/Hari
Org/Hari
Org/Hari
350,000
100,000
150,000
50,000
KETERANGAN :
1. HARGA BBM MERUPAKAN HARGA INDUSTRI (Sumber PERTAMINA)
2. HARGA KAYU DIPEROLEH DARI PENJUAL KAYU
3. HARGA SATUAN INI BELUM TERMASUK KEUNTUNGAN, OVER HEAD DAN PPN
Raha, 30 Januari 2014
Mengetahui
Kepala Dinas Pekerjaan Umum
Kabupaten Muna
Dibuat Oleh
An. Panitia Penyusun Analisa Dan Harga Satuan
Dinas Pekerjaan Umum
ATEN MUNA
AAN UMUM
WILAYAH
SEBERANG
(Rp)
74,000
2,525
4,150
77,000
2,575
4,200
5,075.00
171.50
285.25
77,575.00
35,150
55,150
79,150
110,150
135,150
175,150
240,150
350,150
25,150
91,500
151,500
251,500
25,150
17,650
35,150
45,150
16,150
25,150
35,150
40,150
35,400
55,400
79,400
110,400
135,400
175,400
240,400
350,400
25,300
92,000
152,000
252,000
25,300
17,800
35,300
45,300
16,300
25,300
35,300
40,300
2,457.00
3,857.00
5,537.00
7,707.00
9,457.00
12,257.00
16,807.00
24,507.00
1,757.00
6,352.50
10,552.50
17,552.50
1,757.00
1,232.00
2,457.00
3,157.00
1,127.00
1,757.00
2,457.00
2,807.00
37,557.00
61,500
66,500
66,500
68,500
64,500
69,500
69,500
71,500
4,270.00
4,620.00
4,620.00
4,760.00
2,621.50
4,360.25
200
58,957.00
84,637.00
117,807.00
144,557.00
187,357.00
256,907.00
374,607.00
26,857.00
97,102.50
161,302.50
268,302.50
26,857.00
18,832.00
37,557.00
48,257.00
17,227.00
26,857.00
37,557.00
42,907.00
65,270.00
70,620.00
70,620.00
72,760.00
100
66,500
69,500
69,500
71,500
73,500
83,500
226,500
6,500
69,500
72,500
72,500
74,500
76,500
86,500
229,500
9,500
4,620.00
4,830.00
4,830.00
4,970.00
5,110.00
5,810.00
15,820.00
420.00
171,500
201,500
201,500
251,500
174,500
204,500
204,500
254,500
11,970.00
14,070.00
14,070.00
17,570.00
182,970.00
46,000
56,000
96,000
151,000
76,000
301,000
96,000
76,000
23,000
46,500
56,500
96,500
151,500
76,500
301,500
96,500
76,500
23,500
3,185.00
3,885.00
6,685.00
10,535.00
5,285.00
21,035.00
6,685.00
5,285.00
1,575.00
48,685.00
15,150
20,150
25,150
27,150
15,200
20,200
25,200
27,200
1,055.25
1,405.25
1,755.25
1,895.25
16,130.25
96,000
53,000
36,000
35,000
76,000
35,150
53,250
50,250
33,250
33,250
45,250
6,000
15,150
7,000
50,500
15,500
96,250
53,250
36,250
35,250
76,250
35,300
53,750
50,750
33,750
33,750
45,750
6,750
15,300
7,750
51,250
16,250
6,702.50
3,692.50
2,502.50
2,432.50
5,302.50
2,457.00
3,720.50
3,510.50
2,320.50
2,320.50
3,160.50
402.50
1,057.00
472.50
3,517.50
1,067.50
102,452.50
70,620.00
73,830.00
73,830.00 7666.66667
75,970.00
78,110.00
88,810.00
241,820.00
6,420.00
215,070.00
215,070.00
268,570.00
59,385.00
102,185.00
161,035.00
80,785.00
321,535.00
102,185.00
80,785.00
24,075.00
21,480.25
26,830.25
28,970.25
56,442.50
38,252.50
37,182.50
81,052.50
37,557.00
56,870.50
53,660.50
35,470.50
35,470.50
48,310.50
6,152.50
16,157.00
7,222.50
53,767.50
16,317.50
15,500
13,000
16,250
13,750
1,067.50
892.50
16,317.50
25,150
25,150
18,150
23,150
12,150
10,150
30,150
32,650
20,150
55,150
50,150
20,150
20,150
10,150
25,150
85,150
5,100
5,100
15,100
20,100
25,100
25,100
25,300
25,300
18,300
23,300
12,300
10,300
30,300
32,800
20,300
55,300
50,300
20,300
20,300
10,300
25,300
85,300
5,150
5,150
15,150
20,150
25,150
25,150
1,757.00
1,757.00
1,267.00
1,617.00
847.00
707.00
2,107.00
2,282.00
1,407.00
3,857.00
3,507.00
1,407.00
1,407.00
707.00
1,757.00
5,957.00
355.25
355.25
1,055.25
1,405.25
1,755.25
1,755.25
26,857.00
150,150
220,150
45,100
30,100
15,100
20,100
25,100
10,100
20,100
15,100
17,600
5,100
10,100
35,100
5,100
15,100
15,100
150,300
220,300
45,150
30,150
15,150
20,150
25,150
10,150
20,150
15,150
17,650
5,150
10,150
35,150
5,150
15,150
15,150
10,507.00
15,407.00
3,155.25
2,105.25
1,055.25
1,405.25
1,755.25
705.25
1,405.25
1,055.25
1,230.25
355.25
705.25
2,455.25
355.25
1,055.25
1,055.25
160,607.00
18,750
19,000
1,295.00
19,795.00
13,642.50
26,857.00
19,367.00
24,717.00
12,947.00
10,807.00
32,207.00
34,882.00
21,507.00
58,957.00
53,607.00
21,507.00
21,507.00
10,807.00
26,857.00
91,057.00
5,430.25
5,430.25
16,130.25
21,480.25
26,830.25
26,830.25
235,507.00
48,230.25
32,180.25
16,130.25
21,480.25
26,830.25
10,780.25
21,480.25
16,130.25
18,805.25
5,430.25
10,780.25
37,530.25
5,430.25
16,130.25
16,130.25
25,750
40,750
913,000
1,153,000
1,803,000
753,000
953,000
15,100
15,100
15,100
37,100
36,100
84,100
70,100
40,100
50,100
10,100
95,100
200,100
150,100
320,100
34,100
48,100
8,100
9,100
9,100
10,100
28,100
30,100
33,100
35,100
37,100
40,100
110,100
65,100
55,100
26,000
41,000
915,000
1,155,000
1,805,000
755,000
955,000
15,150
15,150
15,150
37,150
36,150
84,150
70,150
40,150
50,150
10,150
95,150
200,150
150,150
320,150
34,150
48,150
8,150
9,150
9,150
10,150
28,150
30,150
33,150
35,150
37,150
40,150
110,150
65,150
55,150
1,785.00
2,835.00
63,805.00
80,605.00
126,105.00
52,605.00
66,605.00
1,055.25
1,055.25
1,055.25
2,595.25
2,525.25
5,885.25
4,905.25
2,805.25
3,505.25
705.25
6,655.25
14,005.25
10,505.25
22,405.25
2,385.25
3,365.25
565.25
635.25
635.25
705.25
1,965.25
2,105.25
2,315.25
2,455.25
2,595.25
2,805.25
7,705.25
4,555.25
3,855.25
178,000
603,000
2,953,000
453,000
253,000
353,000
553,000
25,100
180,000
605,000
2,955,000
455,000
255,000
355,000
555,000
25,150
12,355.00
42,105.00
206,605.00
31,605.00
17,605.00
24,605.00
38,605.00
1,755.25
27,285.00
43,335.00
975,305.00
1,232,105.00
1,927,605.00
804,105.00
1,018,105.00
16,130.25
16,130.25
16,130.25
39,670.25
38,600.25
89,960.25
74,980.25
42,880.25
53,580.25
10,780.25
101,730.25
214,080.25
160,580.25
342,480.25
36,460.25
51,440.25
8,640.25
9,710.25
9,710.25
10,780.25
30,040.25
32,180.25
35,390.25
37,530.25
39,670.25
42,880.25
117,780.25
69,630.25
58,930.25
188,855.00
643,605.00
3,158,105.00
483,105.00
269,105.00
376,105.00
590,105.00
26,830.25
30,100
15,100
25,100
15,100
15,100
3,300,000
15,100
15,100
50,100
50,100
190,100
30,150
15,150
25,150
15,150
15,150
3,325,000
15,150
15,150
50,150
50,150
190,150
2,105.25
1,055.25
1,755.25
1,055.25
1,055.25
229,250.00
1,055.25
1,055.25
3,505.25
3,505.25
13,305.25
22,750
30,750
40,750
70,750
100,750
130,750
165,750
275,750
210,150
151,500
201,500
26,500
5,500
16,500
16,500
23,000
31,000
41,000
71,000
101,000
131,000
166,000
276,000
210,300
152,000
202,000
27,000
6,000
17,000
17,000
1,575.00
2,135.00
2,835.00
4,935.00
7,035.00
9,135.00
11,585.00
19,285.00
14,707.00
10,552.50
14,052.50
1,802.50
332.50
1,102.50
1,102.50
63,174
61,674
63,174
61,674
4,422.18
4,317.18
67,596.18
173,174
198,174
223,174
173,174
198,174
223,174
12,122.18
13,872.18
15,622.18
185,296.18
650
248,174
423,174
148,174
288,174
248,174
248,174
223,174
223,174
1,075
248,174
423,174
148,174
288,174
248,174
248,174
223,174
223,174
43.75
17,372.18
29,622.18
10,372.18
20,172.18
17,372.18
17,372.18
15,622.18
15,622.18
32,180.25
16,130.25
26,830.25
16,130.25
16,130.25
3,504,250.00
16,130.25
16,130.25
53,580.25
53,580.25
203,380.25
24,075.00
32,635.00
43,335.00
75,435.00
107,535.00
139,635.00
177,085.00
294,785.00
224,807.00
161,302.50
214,802.50
27,552.50
5,082.50
16,852.50
16,852.50
65,991.18
212,046.18
238,796.18
668.75
265,546.18
452,796.18
158,546.18
308,346.18
265,546.18
265,546.18
238,796.18
238,796.18
189,522.00
669,522.00
50,674
50,674
51,174
50,674
50,674
51,174
3,547.18
3,547.18
3,582.18
54,221.18
1,850,000
1,750,000
1,300,000
1,850,000
1,350,000
1,350,000
8,500
30,500
40,500
35,500
25,500
30,500
2,200
28,500
1,850,000
1,750,000
1,300,000
1,850,000
1,350,000
1,350,000
8,500
30,500
40,500
35,500
25,500
30,500
2,200
28,500
127,750.00
120,750.00
89,250.00
127,750.00
92,750.00
92,750.00
595.00
2,135.00
2,835.00
2,485.00
1,785.00
2,135.00
147.00
1,988.00
1,952,750.00
1,550,000
1,425,000
12,350
1,650,000
1,525,000
12,350
101,500.00
92,750.00
861.00
1,551,500.00
1,417,750.00
13,161.00
1,500
1,750
1,500
2,000
105.00
112.00
1,605.00
1,712.00
14,175
14,528
13,704
14,425
14,778
13,954
981.75
1,006.49
948.77
15,006.75
15,384.89
14,502.57
100,000
120,000
100,000
120,000
7,000.00
8,400.00
107,000.00
128,400.00
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
7,000.00
7,000.00
7,000.00
7,000.00
7,000.00
107,000.00
107,000.00
107,000.00
107,000.00
107,000.00
75,000
75,000
75,000
100,000
75,000
75,000
75,000
75,000
100,000
75,000
5,250.00
5,250.00
5,250.00
7,000.00
5,250.00
80,250.00
80,250.00
80,250.00
107,000.00
80,250.00
54,221.18
54,756.18
1,845,750.00
1,364,250.00
1,952,750.00
1,417,750.00
1,417,750.00
9,095.00
32,635.00
43,335.00
37,985.00
27,285.00
32,635.00
2,247.00
30,388.00
350,000
100,000
150,000
50,000
350,000
100,000
150,000
50,000
24,500.00
7,000.00
10,500.00
3,500.00
374,500.00
107,000.00
160,500.00
53,500.00
15
2014
Dibuat Oleh
An. Panitia Penyusun Analisa Dan Harga Satuan
Dinas Pekerjaan Umum
0.15
300
66.66666667
33.33333333
223,174.00
223,174.00
223,174.00
669,522.00
43,500.00
66,250.00
615.00
1,493,500.00
Uraian
Satuan
Harga Satuan
(Rp.)
4
I UPAH KERJA
Mandor
Pekerja
Kepala Tukang
Tukang Kayu
Tukang Batu
Tukang Cat
Tukang Las Biasa
Tukang las Konstruksi
Tukang Gali
Tukang Besi Konstruksi
Tukang Khusus alluminium
Tukang
Tukang Alluminium/Kaca
Tukang Pipa
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
100,000.00
75,000.00
120,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
Kg
Kg
M3
Kg
Kg
Kg
M3
1,380.00
2,450.00
2,450.00
2,250.00
2,450.00
4,175.00
4,075.00
-
II HARGA BAHAN
Semen Portland
Semen Abu-abu
Semen Merah
Semen Warna
Semen Nat
Kapur Pasang
Kapur Padam
Kapur Sirih
Besi Strip
Besi Beton Ulir
Rangka Metal hollow 40.40.2 mm
Assesoris rangka besi hollow dinding partisi
Assesoris rangka besi hollow plafond
Besi Beton
Besi Profil
Besi strip tebal 5 mm
Besi baja IWF
Besi plat baja
Besi siku L 30.30.3
Besi scuare tube
Besi lis kaca (1 x 1) cm
Baja strip (0,2 x 2) cm
Besi angkur =8 mm
Paku
Paku Biasa
Paku Biasa 2" - 5"
Kg
Kg
Kg
M
Ls
Ls
Kg
Kg
Kg
kg
kg
kg
m
m
kg
kg
Kg
Kg
Kg
9,400.00
15,000.00
15,000.00
15,000.00
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
bh
Kg
Kg
Kg
M2
kg
kg
Kg
Lbr
M1
M1
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
Bh
Bh
15,000.00
25,000.00
25,100.00
25,100.00
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
45,100.00
35,100.00
25,100.00
25,100.00
20,000.00
25,100.00
14,870.00
8,500.00
375.00
350.00
1,500.00
9,700.00
1,320.00
1,220.00
2,640.00
2,640.00
5,400.00
1,320.00
2,720.00
-
Ubin Abu-abu 20 x 20 cm
Ubin Warna 40 x 40 cm
Ubin Warna 30 x 30 cm
Ubin Warna 20 x 20 cm
Ubin Teraso 40 x 40 cm
Ubin Teraso 30 x 30 cm
Ubin Granito 40 x 40 cm
Ubin Granito 30 x 30 cm
Ubin Teralux Kerang 40 x 40 cm
Ubin Teralux Kerang 30 x 30 cm
Ubin Teralux Marmer 60 x 60 cm
Ubin Teralux Marmer 40 x 40 cm
Ubin Teralux Marmer 30 x 30 cm
Plint Ubin 15 x 20 cm
Plint Ubin 10 x 30 cm
Plint Ubin 10 x 40 cm
Plint Ubin PC Warna 10 x 20 cm
Plint Ubin PC Warna 10 x 30 cm
Plint Ubin PC Warna 10 x 40 cm
Plint Ubin Teraso 10 x 30 cm
Plint Ubin Teraso 10 x 40 cm
Plint Ubin Granito 10 x 40 cm
Plint Ubin Granito 10 x 30 cm
Plint Ubin Teralux Kerang 10 x 40 cm
Plint Ubin Teralux Kerang 10 x 30 cm
Plint Ubin Teralux Marmer 10 x 60 cm
Plint Ubin Teralux Marmer 10 x 40 cm
Plint Ubin Teralux Marmer 10 x 30 cm
Marmer
Kaca Polos
Kaca, Tebal 3 mm
Kaca, Tebal 5 mm
Kaca, Tebal 8 mm
Kaca Buram, Tebal 12 mm
Kaca Cermin, Tebal 5 mm
Kaca Cermin, Tebal 6 mm
Kaca Cermin, Tebal 8 mm
Kaca Wireglass, Tebal 5 mm
Kaca Patri, Tebal 5 mm
Triplex 3 mm (122x244 Cm)
Plywood 4 mm
Plywood tebal 4 mm Ukuran (90 x 220) cm
Plywood tebal 4 mm, ukuran 120 cm x 240 cm
Plywood 4" x 8" x 6 mm
Plywood Tebal 9 mm
Teakwood tebal 4 mm ukuran (90 x 220) cm
Teakwood tebal 4 mm, Ukuran 120 cm x 240 cm
Gypsum Board (120x240x9) mm
Tepung gypsum
Akustik Ukuran 30 x 30 cm
Akustik Ukuran 30 x 60 cm
Akustik Ukuran 60 x 120 cm
List gypsum profil
List Kayu Profil
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
kg
Lbr
Lbr
Lbr
m
M'
155,000.00
55,500.00
70,000.00
70,000.00
10,000.00
20,000.00
-
M3
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Lbr
Lbr
Bh
Bh
M2
Lbr
m2
m2
m2
Lbr
Lbr
Lbr
Lbr
M2
Lbr
Bh
Bh
M2
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Kg
Kg
Kg
Kg
Lbr
29,000.00
33,150.00
28,000.00
30,000.00
30,000.00
31,000.00
20,100.00
20,100.00
20,100.00
20,100.00
20,100.00
10,100.00
50,100.00
50,100.00
100,000.00
15,000.00
20,100.00
20,100.00
5,075.00
Kuas
Kalkarium
Alang-Alang
Wall Paper
Residu
Pengencer
air
Teak Oil
Minyak Bekisting
Minyak Cat
Lem
Lem Kayu
Lem Vinyl
Perekat
Vinyl karet
Vernis
Pintu Gulung Besi
Pintu Lipat
Pintu Sunscreen Alluminium
Pintu Alluminium
Door Closer
Door Holder
Door Stop
Rolling door alluminium
Rel Pintu Dorong
Jendela Nako
Jendela nako (rangka + kaca 5 mm)
Kunci Tanam
Kunci Tanam Antik
Kunci Tanam Biasa
Kunci Tanam Kamar Mandi
Kunci Silinder
Kunci Selot
Kunci Lemari
Engsel Pintu
Engsel Jendela
Engsel Angin
Spring Knip
Kait Angin
Kloset Duduk Porselen
Kloset Jongkok Porselen
Kloset Jongkok Teraso
Urinoir
Wastafel
Bak Teraso
Bak Fibreglass
Bak Cuci Stainless Steel
Bak Cuci Teraso
Badkip
Seal Tape
Gymfloor
Floor Drain
Sealent
Floor Hardener
Bh
Kg
Ikat
M3
Ltr
Ltr
Ltr
Ltr
Ltr
Kg
Kg
Kg
Kg
Kg
buah
Ltr
M2
M2
M2
M2
Bh
Bh
Bh
M2
Bh
Bh
m
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Bh
M2
Bh
Kg
20,000.00
2,000.00
25,100.00
25,100.00
100.00
25,000.00
25,100.00
10,000.00
15,000.00
50,100.00
150,100.00
220,100.00
150,100.00
150,100.00
20,075.00
15,075.00
10,000.00
7,000.00
8,000.00
150,000.00
150,000.00
451,500.00
351,500.00
5,000.00
25,000.00
-
Pipa Tanah
Pipa Beton
Pipa Galvanis Diameter 1/2"
Pipa Galvanis Diameter 3/4"
Pipa Galvanis Diameter 1"
Pipa Galvanis Diameter 1 1/2"
Pipa Galvanis Diameter 3"
Pipa Galvanis Diameter 4"
Pipa PVC Tipe AW Diameter 1/2"
Pipa PVC Tipe AW Diameter 3/4"
Pipa PVC Tipe AW Diameter 1"
Pipa PVC Tipe AW Diameter 1 1/2"
Pipa PVC Tipe AW Diameter 2"
Pipa PVC Tipe AW Diameter 2 1/2"
Pipa PVC Tipe AW Diameter 3"
Pipa PVC Tipe AW Diameter 4"
Water Drain + Acsesories
Kran Air 3/4"
Kran Air1/2"
Waterstop Lebar 150 mm
Waterstop Lebar 200 mm
Waterstop Lebar 230 mm
Tanah Liat
Tanah Timbunan
Pasir Urug
Pasir Beton
Pasir Pasang
Pasir Silika
Sirtu
Batu Belah
Batu Pecah
Batu Pecah 5/7
Batu Granito
Batu Teraso
Batu Apung
Kerikil Beton
Batu Merah 5 x 11 x 22 cm
Bata Berongga
Bata Pelapis Dinding
Bata Poros
Bata Tempel Hitam
Kayu 5/7
Kaso 5/7
Kayu Papan 3/20
Kayu papan
Papan kayu kelas I
Papan kayu kelas II
Papan kayu kelas III
Kayu Borneo, Balok
Kayu Borneo, Papan Tebal 3 cm
Kayu Ramin, Papan
Kayu Albasiah
Kayu Profil
Dolken Kayu Dia. 8 - 10/400 cm
Bh
Bh
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
Set
Bh
Bh
M'
M'
M'
M3
M4
M3
M3
M3
kg
M3
M3
5,625.00
7,625.00
8,750.00
17,625.00
25,125.00
32,625.00
41,375.00
68,875.00
15,750.00
10,000.00
61,674.00
47,000.00
100,000.00
175,000.00
170,000.00
125,000.00
M3
Kg
Kg
Kg
M3
Bh
Bh
Bh
Bh
Bh
M3
M3
M3
M3
M3
m3
M3
M2
M3
Lbr
M3
M'
Btg
223,174.00
380,000.00
600.00
1,325,000.00
800,000.00
1,725,000.00
1,725,000.00
5,100,000.00
1,725,000.00
1,400,000.00
1,825,000.00
1,825,000.00
1,725,000.00
1,325,000.00
30,500.00
Kayu Cetakan
Kayu kelas II
Kayu kelas III
Balok kayu kelas II
Balok kayu kelas I
Balok Kayu Kelas III
Balok kayu Kelas II, Ukuran (6 x 12) cm
Reng (2 x 3) cm Kayu Kelas II
Reng (3 x 4) cm Kelas II
Bambu Dia. 6 - 8/600 cm
Bilik Bambu
Formika
Tali Ijuk
Ijuk
Perancah kayu
Panel Beton Pracetak
Kolom Beton Pracetak
Beton 1 : 1 1/2 : 2 1/2
Hollow block (HB.20)
Hollow block (HB.15)
Hollow block (HB.10)
Concrete block (CB.20)
Concrete block (CB.15)
Concrete block (CB.10)
Roster/Terawang
Profil Alluminium T
Profil kaca
Teraso Cor
Interval Cove (5 x 5 x 20) cm
Mosaik 30 x 30 cm
Carpet
Underlyer Tebal 6 mm/Rubber Corrugated
Parquet
Vinyl Karet 30 x 30 cm KL. I
Wall Paper Lantai
Mastercron "S"
Aluminium C
Aluminium B
Strorox 100
Formite/penjaga jarak bekisting/spacer
Pengelasan
Sealant
Alluminium strip
Venetions blinds dan vertical blinds (tirai)
Solar
Minyak pelumas
BBM
Ramset
M3
M3
M3
M3
M3
M3
M3
M3
M3
Btg
M2
Lbr
M3
M3
M3
Ltr
Btg
M3
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M'
m
M3
Bh
Bh
M2
M2
M2
Bh
Bh
Kg
Kg
Kg
Kg
btg
cm
tube
m
m2
Ltr
Ltr
ltr
bh
1,325,000.00
1,325,000.00
1,275,000.00
1,325,000.00
5,100,000.00
1,100,000.00
1,325,000.00
420,000.00
250,000.00
35,500.00
40,000.00
28,400.00
28,400.00
1,275,000.00
30,000.00
-
jam
jam
M2
Ls
Ls
2,350.00
4,500.00
9,000.00
M
M
241,569.00
242,207.25
M
M
M2
M2
M2
M2
M2
M2
M2
M2
M3
M3
M
M
822,658.25
54,596.25
1,184,086.00
875,541.00
950,015.00
14,375.00
824,049.75
97,980.00
406,706.01
133,441.01
1,226,647.50
613,323.75
9,188.50
200,669.25
M2
M3
M3
M3
M3
M3
M2
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
67,562.50
82,800.00
98,267.50
89,930.00
136,275.00
108,675.00
4,887.50
29,612.50
22,517.00
27,600.00
32,752.00
29,966.13
45,425.00
36,225.00
48,875.00
165,025.00
160,156.99
M3
102,667.12
M3
M3
M3
210,622.50
24,437.50
113,735.00
M3
M3
M3
M3
M3
M3
M3
822,491.50
767,441.00
729,284.00
702,454.50
665,689.00
474,865.19
600,798.78
M3
575,042.46
M3
344,172.00
PEKERJAAN TANAH
PEKERJAAN PONDASI
-
M3
2,469,924.00
M3
963,596.50
PEKERJAAN BETON
- Membuat beton mutu fc = 7,4 MPa (K 100), slump (12 2) cm,
w/c = 0,87
- Membuat beton mutu fc = 9,8 MPa (K 125), slump (12 2) cm,
w/c = 0,78
- Membuat beton mutu fc = 12,2 MPa (K 150), slump (12 2)
cm, w/c = 0,72
- Membuat lantai kerja beton mutu fc = 7,4 MPa (K 100), slump
(3-6) cm, w/c = 0,87
- Membuat beton mutu fc = 14,5 MPa (K 175), slump (12 2)
cm, w/c = 0,66
- Membuat beton mutu fc = 16,9 MPa (K 200), slump (12 2)
cm, w/c = 0,61
- Membuat beton mutu fc = 19,3 MPa (K 225), slump (12 2)
cm, w/c = 0,58
- Membuat beton mutu fc = 21,7 MPa (K 250), slump (12 2)
cm, w/c = 0,56
- Membuat beton mutu fc = 24,0 MPa (K 275), slump (12 2)
cm, w/c = 0,53
- Membuat beton mutu fc = 26,4 MPa (K 300), slump (12 2)
cm, w/c = 0,52
- Membuat beton mutu fc = 28,8 MPa (K 325), slump (12 2)
cm, w/c = 0,49
- Membuat beton mutu fc = 31,2 MPa (K 350), slump (12 2)
cm, w/c = 0,48
- Membuat beton kedap air dengan strorox 100
- Memasang PVC Waterstop lebar 150 mm
- Memasang PVC Waterstop lebar 200 mm
- Membuat PVC Waterstop lebar 230 mm 320 mm
- Pembesian 10 kg dengan besi polos
- Pembesian 10 kg dengan besi ulir
- Memasang kabel presstressed polos/strands
- Memasang jaring kawat baja/wire mesh
- Memasang bekisting untuk pondasi
- Memasang bekisting untuk sloof
- Memasang bekisting untuk kolom
- Memasang bekisting untuk balok
- Memasang bekisting untuk plat lantai
- Memasang bekisting untuk dinding
- Memasang bekisting untuk tangga
- Memasang jembatan untuk pengecoran beton
- Membuat pondasi beton bertulang (150 kg besi + bekisting)
- Membuat sloof beton bertulang (200 kg besi + bekisting)
- Membuat kolom beton bertulang (300 kg besi + bekisting)
- Membuat balok beton bertulang (200 kg besi + bekisting)
- Membuat Kolom beton bertulang (150 kg besi + bekisting)
- Membuat dinding beton bertulang (150 kg besi + bekisting)
- Membuat dinding beton bertulang (200 kg besi + bekisting)
- Membuat kolom praktis beton bertulang (11 x 11) cm
- Membuat ring balok beton bertulang (10 x 15) cm
M3
1,052,359.25
M3
1,096,696.65
M3
1,130,647.42
M3
984,982.45
M3
1,171,774.61
M3
1,209,515.27
M3
1,240,103.78
M3
1,257,282.65
M3
1,286,838.50
M3
1,295,897.73
M3
1,381,656.43
M3
1,393,565.95
M3
M
M
M
Kg
Kg
Kg
Kg
M2
M2
M2
M2
M2
M3
M3
M2
M3
M3
M3
M3
M3
M3
M3
M
M
1,343,430.00
9,384.00
11,074.50
12,512.00
132,468.50
18,963.50
126,902.50
9,746.25
148,028.00
155,359.25
295,705.25
900,829.50
436,005.25
323,736.50
279,605.25
90,689.00
3,906,458.00
4,719,071.00
7,596,486.00
5,917,888.50
5,677,297.00
5,339,933.00
5,569,110.75
310,224.00
102,010.75
M2
262,234.50
M2
247,642.15
M2
237,876.35
M2
232,732.40
M2
230,770.50
M2
211,772.74
M2
126,282.65
PEKERJAAN DINDING
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1
bata, campuran spesi 1 PC : 2 PP
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1
bata, campuran spesi 1 PC : 3 PP
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1
bata, campuran spesi 1 PC : 4 PP
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1
bata, campuran spesi 1 PC : 5 PP
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1
bata, campuran spesi 1 PC : 6 PP
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1
bata, campuran spesi 1 PC : 3 KP : 10 PP
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal
bata, campuran spesi 1 PC : 2 PP
M2
119,405.19
M2
115,437.00
M2
112,939.66
M2
111,563.34
M2
108,870.50
M2
105,696.50
M2
92,349.72
M2
94,293.45
M2
55,257.50
M2
77,337.50
M2
M2
M2
M2
M2
M2
M2
242,019.34
241,004.12
188,509.38
187,560.40
135,700.92
135,584.31
64,779.50
M2
64,779.50
M2
75,394.00
M2
M2
533,312.50
466,008.75
M2
129,950.00
M2
109,825.00
M2
123,510.00
M2
147,372.50
M2
M2
334,149.75
12,862.75
M2
M2
97,727.00
97,727.00
PEKERJAAN PLESTERAN
-
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
74,652.85
67,055.49
63,757.01
61,514.88
60,230.01
59,206.69
58,640.43
58,074.17
60,258.62
57,247.00
M2
M2
M2
M2
M2
50,360.86
51,528.22
89,702.48
72,194.52
82,249.84
M2
M2
M2
M2
M
M2
M2
80,601.84
79,172.26
72,360.36
36,896.51
62,215.00
96,381.50
86,376.50
M2
M2
48,508.84
28,518.90
M2
13,613.70
M2
59,327.58
M2
36,437.75
63,576.60
65,331.50
67,656.80
66,940.35
69,212.75
71,848.55
66,940.35
69,212.75
66,940.35
69,212.75
66,940.35
69,212.75
65,449.95
66,940.35
69,212.75
23,330.05
22,483.88
22,483.88
22,583.93
22,583.93
22,583.93
22,583.93
22,583.93
22,583.93
22,583.93
22,583.93
22,583.93
22,583.93
22,583.93
22,583.93
56,562.75
138,390.66
139,555.03
139,555.03
22,389.87
22,454.56
21,160.98
168,311.93
219,428.05
211,741.45
135,466.78
200,003.98
144,735.55
132,956.91
26,496.00
37,593.50
109,480.00
109,480.00
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M2
M2
M2
M2
M'
M'
M'
M'
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
190,003.00
258,051.38
256,829.50
258,051.38
M2
177,985.50
M
M2
M2
M2
M2
M2
M2
M2
M2
M
251,956.38
255,955.50
281,899.16
188,145.41
134,969.75
134,969.75
33,177.50
52,888.50
26,496.00
48,024.00
45,528.50
211,669.00
M2
M3
9,833,362.50
M3
4,731,962.50
M3
4,421,462.50
M2
247,710.00
M2
232,760.00
M2
M2
M2
718,750.00
563,500.00
526,930.00
M2
433,780.00
M2
859,510.00
M2
611,110.00
M2
390,741.25
M2
539,131.50
M2
539,131.50
M2
M2
cm
708,400.00
475,525.00
231,782.50
M2
M2
M2
M2
M
M2
M2
M2
M2
M2
143,462.50
258,750.00
97,152.00
220,800.00
9,488.65
522,462.25
18,923.25
192,226,628.50
53,831.50
215,625.00
M3
8,461,700.00
M3
3,686,325.00
M3
3,401,700.00
M3
M2
M2
M2
M
M
M
M
M'
M2
kg
kg
M3
kg
M
M2
M2
M
10,339,880.00
41,011.30
41,342.50
281,364.75
100,027.00
58,109.50
100,337.50
57,643.75
197,064.00
20,297.50
13,248.00
13,248.00
2,876,035.00
20,838.00
6,256.00
110,400.00
77,337.50
82,110.00
52,670.00
M2
200,244.90
32,832.50
23,586.50
23,586.50
79,442.00
79,442.00
79,442.00
22,413.50
22,724.00
22,724.00
21,896.00
21,896.00
21,896.00
21,896.00
21,896.00
21,896.00
21,896.00
21,896.00
21,896.00
21,896.00
21,896.00
21,896.00
31,797.50
53,831.50
67,712.00
50,887.50
19,575.30
24,258.10
110,917.50
197,064.00
197,064.00
197,064.00
197,064.00
197,064.00
201,319.00
201,319.00
102,695.00
56,421.88
85,174.75
45,568.75
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M'
M2
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M2
143,175.00
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
M2
M2
M2
M2
M2
M2
M2
M2
M2
335,915.00
238,452.50
237,791.25
65,176.25
32,205.75
21,850.00
35,535.00
21,533.75
30,733.75
69,057.50
50,686.25
69,057.50
14,317.50
82,800.00
52,037.50
21,533.75
217,608.75
22,767.13
34,500.00
21,533.75
3,450.00
6,690.13
21,533.75
21,073.75
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
M'
613,755.00
481,827.00
301,507.00
232,277.00
1,007,165.40
886,650.00
1,468,182.00
1,276,845.00
137,568.75
14,982,775.00
538,292.00
14,269.66
72,404.00
PEKERJAAN SANITASI
M'
M'
M'
Buah
41,843.67
96,018.10
1,103,583.70
Buah
662,480.50
Buah
804,367.50
M'
M'
M'
M'
M'
M'
M3
M'
M'
M'
M'
M'
M'
M'
Buah
Buah
Buah
Buah
19,354.50
19,354.50
19,354.50
33,074.00
41,497.75
41,428.75
21,542.38
25,268.38
27,364.25
49,429.88
122,345.63
198,981.63
101,915.88
153,159.88
42,952.50
113,102.50
71,213.75
64,601.25
Buah
43,067.50
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
77,820.50
77,820.50
76,348.50
76,348.50
12,582.15
12,582.15
12,582.15
29,089.25
24,673.25
24,673.25
47,570.33
M2
M2
206,914.90
48,104.50
M
M2
39,123.00
114,729.75
11,270.00
PEKERJAAN LANGIT-LANGIT
-
PEKERJAAN PENGECATAN
1
2
M2
M2
19,032.50
14,145.00
M2
14,720.00
M2
14,087.50
489,900.00
6
7
8
M2
M2
M2
10,622.55
24,926.25
33,042.95
M2
34,836.95
M2
M2
M2
M2
M2
19,734.00
51,200.53
19,417.75
45,364.63
24,064.90
M2
18,726.60
M2
M2
M2
8,169.60
15,215.36
6,826.69
M2
M2
M2
27,772.50
30,314.00
56,879.00
M2
13,249.15
M2
9,937.15
M2
260,418.65
M2
127,248.65
9
10
11
12
13
14
15
No
A
Harga satuan
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
30,000.00
20,000.00
2,400.00
2,000.00
54,400.00
30,500.00
1,380.00
175,000.00
380,000.00
1,325,000.00
15,000.00
25,100.00
38,125.00
6,900.00
875.00
3,420.00
95,400.00
900.00
10,040.00
155,660.00
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Jumlah Harga
(Rp)
210,060.00
31,509.00
241,569.00
Jumlah Harga
(Rp)
15,000.00
40,000.00
2,400.00
2,000.00
59,400.00
38,125.00
3,450.00
875.00
3,420.00
95,400.00
900.00
9,045.00
151,215.00
210,615.00
31,592.25
242,207.25
No
A
Harga satuan
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
15,000.00
30,000.00
2,400.00
2,000.00
49,400.00
30,500.00
1,380.00
25,100.00
175,000.00
380,000.00
15,000.00
30,500.00
2,760.00
627,500.00
875.00
3,420.00
900.00
665,955.00
715,355.00
107,303.25
822,658.25
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Jumlah Harga
(Rp)
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
7,500.00
10,000.00
1,200.00
500.00
19,200.00
1,325,000.00
15,000.00
1,725,000.00
15,900.00
300.00
12,075.00
28,275.00
47,475.00
7,121.25
54,596.25
No
A
Harga satuan
(Rp)
75,000.00
100,000.00
100,000.00
120,000.00
100,000.00
150,000.00
200,000.00
100,000.00
36,000.00
5,000.00
491,000.00
30,500.00
1,725,000.00
15,000.00
1,380.00
170,000.00
175,000.00
380,000.00
600.00
150,100.00
-
38,125.00
310,500.00
1,200.00
48,300.00
25,500.00
17,500.00
57,000.00
18,000.00
22,515.00
538,640.00
1,029,640.00
154,446.00
1,184,086.00
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Jumlah Harga
(Rp)
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
75,000.00
200,000.00
24,000.00
5,000.00
304,000.00
30,500.00
1,725,000.00
15,000.00
1,380.00
175,000.00
380,000.00
-
51,850.00
362,250.00
4,500.00
14,490.00
5,250.00
19,000.00
457,340.00
761,340.00
114,201.00
875,541.00
No
A
Harga satuan
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
75,000.00
150,000.00
18,000.00
5,000.00
248,000.00
30,500.00
1,725,000.00
15,000.00
-
91,500.00
476,100.00
10,500.00
578,100.00
826,100.00
123,915.00
950,015.00
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Harga satuan
(Rp)
75,000.00
100,000.00
Jumlah Harga
(Rp)
7,500.00
5,000.00
12,500.00
-
PERALATAN
Jumlah Harga
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
12,500.00
1,875.00
14,375.00
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Dolken Kayu Dia. 8 - 10/400 cm
Kayu Papan 3/20
Paku Biasa
Semen Portland
Pasir Beton
Kerikil Beton
Seng Gelombang Bjls.32
Plywood 4 mm
Kode
Satuan
Koefisien
Satuan
Harga satuan
(Rp)
L.01
1.000
OH
L.02
2.000
OH
L.03
0.200
OH
L.04
0.050
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
75,000.00
200,000.00
24,000.00
5,000.00
304,000.00
1.250
Btg
0.186
M3
0.300
Kg
18.000
Kg
0.030
M3
0.050
M3
1.500
Lbr
1.350
Lbr
JUMLAH HARGA BAHAN
30,500.00
1,725,000.00
15,000.00
1,380.00
175,000.00
380,000.00
-
38,125.00
320,850.00
4,500.00
24,840.00
5,250.00
19,000.00
412,565.00
PERALATAN
716,565.00
107,484.75
824,049.75
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Jumlah Harga
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Harga satuan
(Rp)
Jumlah Harga
(Rp)
100,000.00
120,000.00
30,000.00
3,600.00
33,600.00
1,400,000.00
15,000.00
50,400.00
1,200.00
51,600.00
85,200.00
12,780.00
97,980.00
No
A
Harga satuan
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
75,000.00
200,000.00
24,000.00
5,000.00
304,000.00
35,500.00
28,400.00
44,375.00
5,282.40
49,657.40
353,657.40
53,048.61
406,706.01
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)
15 %
No
A
Kode
Satuan
TENAGA
Pekerja
Mandor
BAHAN
Batu Belah
Batu Pecah 5/7
Pasir Pasang
Koefisien
Satuan
Harga satuan
(Rp)
L.01
1.000
OH
L.04
0.005
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
75,000.00
500.00
75,500.00
0.150
M3
0.090
M3
0.010
M3
JUMLAH HARGA BAHAN
125,000.00
223,174.00
170,000.00
18,750.00
20,085.66
1,700.00
40,535.66
PERALATAN
116,035.66
17,405.35
133,441.01
Jumlah Harga
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
No
A
TENAGA
Pekerja
Mandor
Kode
Satuan
Koefisien
Satuan
L.01
13.3340
OH
L.04
0.6660
OH
JUMLAH HARGA TENAGA
1,000,050.00
66,600.00
1,066,650.00
-
PERALATAN
75,000.00
100,000.00
Jumlah Harga
(Rp)
BAHAN
Harga satuan
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
1,066,650.00
159,997.50
1,226,647.50
No
A
Harga satuan
(Rp)
75,000.00
100,000.00
PERALATAN
533,325.00
79,998.75
613,323.75
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Harga satuan
(Rp)
3,150.00
400.00
240.00
4,200.00
7,990.00
PERALATAN
7,990.00
1,198.50
9,188.50
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Jumlah Harga
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
500,025.00
33,300.00
533,325.00
-
Jumlah Harga
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
28,125.00
12,500.00
1,440.00
1,900.00
43,965.00
175,000.00
380,000.00
1,380.00
12,950.00
55,480.00
62,100.00
130,530.00
174,495.00
26,174.25
200,669.25
No
A
Kode
Satuan
TENAGA
Pekerja
Mandor
L.01
L.04
Koefisien
Satuan
OH
0.75
OH
0.025
JUMLAH HARGA TENAGA
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
56,250.00
2,500.00
58,750.00
BAHAN
-
PERALATAN
58,750.00
JUMLAH (A+B+C)
No
A
15
8,812.50
67,562.50
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
67,500.00
4,500.00
72,000.00
-
PERALATAN
72,000.00
10,800.00
82,800.00
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Jumlah Harga
(Rp)
75,000.00
100,000.00
78,750.00
6,700.00
85,450.00
-
PERALATAN
Harga satuan
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
85,450.00
12,817.50
98,267.50
No
A
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
75,000.00
3,200.00
78,200.00
-
PERALATAN
78,200.00
11,730.00
89,930.00
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
112,500.00
6,000.00
118,500.00
-
PERALATAN
118,500.00
17,775.00
136,275.00
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Jumlah Harga
(Rp)
75,000.00
100,000.00
90,000.00
4,500.00
94,500.00
-
PERALATAN
Harga satuan
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
94,500.00
14,175.00
108,675.00
No
A
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
3,750.00
500.00
4,250.00
-
PERALATAN
4,250.00
637.50
4,887.50
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
24,750.00
1,000.00
25,750.00
-
PERALATAN
25,750.00
3,862.50
29,612.50
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Jumlah Harga
(Rp)
75,000.00
100,000.00
18,750.00
830.00
19,580.00
-
PERALATAN
Harga satuan
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
19,580.00
2,937.00
22,517.00
No
A
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
22,500.00
1,500.00
24,000.00
-
PERALATAN
24,000.00
3,600.00
27,600.00
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
26,250.00
2,230.00
28,480.00
-
PERALATAN
28,480.00
4,272.00
32,752.00
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Jumlah Harga
(Rp)
75,000.00
100,000.00
24,997.50
1,060.00
26,057.50
-
PERALATAN
Harga satuan
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
26,057.50
3,908.63
29,966.13
No
A
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
37,500.00
2,000.00
39,500.00
-
PERALATAN
39,500.00
5,925.00
45,425.00
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
30,000.00
1,500.00
31,500.00
-
PERALATAN
31,500.00
4,725.00
36,225.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
No
A
Kode
Satuan
TENAGA
Pekerja
Mandor
L.01
L.04
Satuan
OH
0.5
OH
0.05
JUMLAH HARGA TENAGA
75,000.00
100,000.00
37,500.00
5,000.00
42,500.00
-
PERALATAN
Jumlah Harga
(Rp)
BAHAN
Harga satuan
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
42,500.00
6,375.00
48,875.00
No
A
Koefisien
Satuan
0.3
0.01
OH
OH
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
22,500.00
1,000.00
23,500.00
100,000.00
120,000.00
120,000.00
BAHAN
Pasir Urug
M3
1.2
PERALATAN
143,500.00
21,525.00
165,025.00
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
60,000.00
40,000.00
4,800.00
8,000.00
12,800.00
170,000.00
61,674.00
68,000.00
58,466.95
126,466.95
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
139,266.95
20,890.04
160,156.99
SNI 2835 : 2008
Jumlah Harga
(Rp)
60,000.00
40,000.00
4,800.00
8,000.00
12,800.00
76,475.76
76,475.76
89,275.76
13,391.36
102,667.12
No
A
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
11,250.00
1,500.00
12,750.00
28,400.00
170,400.00
170,400.00
PERALATAN
183,150.00
27,472.50
210,622.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
No
A
Kode
Satuan
TENAGA
Pekerja
Mandor
BAHAN
Sirtu
L.01
L.04
Koefisien
Satuan
OH
0.25
OH
0.025
JUMLAH HARGA TENAGA
M3
1.2
Jumlah Harga
(Rp)
75,000.00
100,000.00
18,750.00
2,500.00
21,250.00
PERALATAN
Harga satuan
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15 %
21,250.00
3,187.50
24,437.50
No
A
Harga satuan
(Rp)
Jumlah Harga
(Rp)
1.5
L.01
OH
0.75
L.02
OH
0.075
L.03
OH
0.075
L.04
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
112,500.00
75,000.00
9,000.00
7,500.00
204,000.00
M3
Kg
M3
JUMLAH HARGA BAHAN
125,000.00
1,380.00
170,000.00
150,000.00
278,760.00
82,450.00
511,210.00
Koefisien
Satuan
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
Satuan
BAHAN
Batu Belah
Semen Portland
Pasir Pasang
1.2
202
0.485
PERALATAN
715,210.00
107,281.50
822,491.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Belah
Semen Portland
Pasir Pasang
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
1.5
L.01
OH
0.75
L.02
OH
0.075
L.03
OH
0.075
L.04
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
112,500.00
75,000.00
9,000.00
7,500.00
204,000.00
M3
Kg
M3
JUMLAH HARGA BAHAN
125,000.00
1,380.00
170,000.00
150,000.00
224,940.00
88,400.00
463,340.00
Koefisien
Satuan
1.2
163
0.52
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
667,340.00
100,101.00
767,441.00
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Belah
Semen Portland
Pasir Pasang
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
1.5
L.01
OH
0.75
L.02
OH
0.075
L.03
OH
0.075
L.04
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
112,500.00
75,000.00
9,000.00
7,500.00
204,000.00
M3
Kg
M3
JUMLAH HARGA BAHAN
125,000.00
1,380.00
170,000.00
150,000.00
187,680.00
92,480.00
430,160.00
Koefisien
Satuan
1.2
136
0.544
PERALATAN
634,160.00
95,124.00
729,284.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Belah
Semen Portland
Pasir Pasang
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
1.5
L.01
OH
0.75
L.02
OH
0.075
L.03
OH
0.075
L.04
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
112,500.00
75,000.00
9,000.00
7,500.00
204,000.00
M3
Kg
M3
JUMLAH HARGA BAHAN
125,000.00
1,380.00
170,000.00
150,000.00
161,460.00
95,370.00
406,830.00
Koefisien
Satuan
1.2
117
0.561
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
610,830.00
91,624.50
702,454.50
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Belah
Semen Portland
Pasir Pasang
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
1.5
L.01
OH
0.75
L.02
OH
0.075
L.03
OH
0.075
L.04
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
112,500.00
75,000.00
9,000.00
7,500.00
204,000.00
M3
Kg
M3
JUMLAH HARGA BAHAN
125,000.00
1,380.00
170,000.00
150,000.00
125,580.00
99,280.00
374,860.00
Koefisien
Satuan
1.2
91
0.584
PERALATAN
578,860.00
86,829.00
665,689.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Belah
Kapur Pasang
Semen Merah
Pasir Pasang
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
1.5
L.01
OH
0.75
L.02
OH
0.075
L.03
OH
0.075
L.04
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
112,500.00
75,000.00
9,000.00
7,500.00
204,000.00
M3
Kg
M3
M3
JUMLAH HARGA BAHAN
125,000.00
4,175.00
2,450.00
170,000.00
150,000.00
709.75
416.50
57,800.00
208,926.25
Koefisien
Satuan
1.2
0.17
0.17
0.34
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
412,926.25
61,938.94
474,865.19
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Belah
Semen Portland
Kapur Pasang
Pasir Pasang
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
1.5
L.01
OH
0.75
L.02
OH
0.075
L.03
OH
0.075
L.04
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
112,500.00
75,000.00
9,000.00
7,500.00
204,000.00
M3
Kg
M3
M3
JUMLAH HARGA BAHAN
125,000.00
1,380.00
4,175.00
170,000.00
150,000.00
84,180.00
613.73
83,640.00
318,433.73
Koefisien
Satuan
1.2
61
0.147
0.492
PERALATAN
522,433.73
78,365.06
600,798.78
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Belah
Semen Portland
Kapur Pasang
Pasir Pasang
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
1.5
L.01
OH
0.75
L.02
OH
0.075
L.03
OH
0.075
L.04
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
112,500.00
75,000.00
9,000.00
7,500.00
204,000.00
M3
Kg
M3
M3
JUMLAH HARGA BAHAN
125,000.00
1,380.00
4,175.00
170,000.00
150,000.00
56,580.00
546.93
88,910.00
296,036.93
Koefisien
Satuan
1.2
41
0.131
0.523
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
500,036.93
75,005.54
575,042.46
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Belah
Pasir Urug
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.78
L.01
OH
0.39
L.02
OH
0.039
L.03
OH
0.039
L.04
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
58,500.00
39,000.00
4,680.00
3,900.00
106,080.00
M3
M3
JUMLAH HARGA BAHAN
125,000.00
100,000.00
150,000.00
43,200.00
193,200.00
Koefisien
Satuan
1.2
0.432
PERALATAN
299,280.00
44,892.00
344,172.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah
Uraian
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Belah
Semen Portland
Pasir Beton
Kerikil Beton
Besi Beton
Kawat Beton
Kode
Satuan
Koefisien
Satuan
3.4
L.01
OH
0.85
L.02
OH
0.085
L.03
OH
0.17
L.04
OH
JUMLAH HARGA TENAGA
M3
Kg
M3
M3
kg
0.48
194
0.312
0.468
126
1.8
Kg
JUMLAH HARGA BAHAN
Jumlah Harga
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
255,000.00
85,000.00
10,200.00
17,000.00
367,200.00
125,000.00
1,380.00
175,000.00
380,000.00
9,400.00
20,000.00
60,000.00
267,720.00
54,600.00
177,840.00
1,184,400.00
36,000.00
1,780,560.00
PERALATAN
Harga satuan
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
2,147,760.00
322,164.00
2,469,924.00
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Belah
Semen Portland
Pasir Beton
Kerikil Beton
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
2.4
L.01
OH
0.8
L.02
OH
0.08
L.03
OH
0.119
L.04
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
180,000.00
80,000.00
9,600.00
11,900.00
281,500.00
M3
Kg
M3
M3
JUMLAH HARGA BAHAN
125,000.00
1,380.00
175,000.00
380,000.00
56,250.00
267,720.00
54,600.00
177,840.00
556,410.00
Koefisien
Satuan
0.45
194
0.312
0.468
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
837,910.00
125,686.50
963,596.50
Membuat 1 m3 beton mutu fc = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87
Kode
Harga satuan
Uraian
Koefisien Satuan
Satuan
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil Beton
air
Jumlah Harga
(Rp)
L.01
1.65
OH
L.02
0.275
OH
L.03
0.028
OH
L.04
0.083
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
123,750.00
27,500.00
3,360.00
8,300.00
162,910.00
247
kg
869
kg
999
kg
215
Liter
JUMLAH HARGA BAHAN
1,380.00
125.00
281.48
100.00
340,860.00
108,625.00
281,200.00
21,500.00
752,185.00
PERALATAN
-
JUMLAH (A+B+C)
No
A
915,095.00
15
137,264.25
1,052,359.25
Membuat 1 m3 beton mutu fc = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
Kode
Harga satuan
Uraian
Koefisien Satuan
Satuan
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil Beton
air
Jumlah Harga
(Rp)
L.01
1.65
OH
L.02
0.275
OH
L.03
0.028
OH
L.04
0.083
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
123,750.00
27,500.00
3,360.00
8,300.00
162,910.00
276
kg
828
kg
1012
kg
215
Liter
JUMLAH HARGA BAHAN
1,380.00
125.00
281.48
100.00
380,880.00
103,500.00
284,859.26
21,500.00
790,739.26
PERALATAN
JUMLAH (A+B+C)
953,649.26
15
143,047.39
1,096,696.65
No
A
Membuat 1 m3 beton mutu fc = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72
Kode
Harga satuan
Uraian
Koefisien Satuan
Satuan
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil Beton
air
Jumlah Harga
(Rp)
L.01
1.65
OH
L.02
0.275
OH
L.03
0.028
OH
L.04
0.083
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
123,750.00
27,500.00
3,360.00
8,300.00
162,910.00
299
kg
799
kg
1017
kg
215
Liter
JUMLAH HARGA BAHAN
1,380.00
125.00
281.48
100.00
412,620.00
99,875.00
286,266.67
21,500.00
820,261.67
PERALATAN
-
JUMLAH (A+B+C)
No
A
983,171.67
15
147,475.75
1,130,647.42
Membuat 1 m3 lantai kerja beton mutu fc = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
Kode
Harga satuan
Uraian
Koefisien Satuan
Satuan
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil Beton
air
Jumlah Harga
(Rp)
L.01
1.2
OH
L.02
0.2
OH
L.03
0.02
OH
L.04
0.06
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
90,000.00
20,000.00
2,400.00
6,000.00
118,400.00
230
kg
893
kg
1027
kg
200
Liter
JUMLAH HARGA BAHAN
1,380.00
125.00
281.48
100.00
317,400.00
111,625.00
289,081.48
20,000.00
738,106.48
PERALATAN
JUMLAH (A+B+C)
856,506.48
15
128,475.97
984,982.45
No
A
Membuat 1 m3 beton mutu fc = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
Kode
Harga satuan
Uraian
Koefisien Satuan
Satuan
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil Beton
air
Jumlah Harga
(Rp)
L.01
1.65
OH
L.02
0.275
OH
L.03
0.028
OH
L.04
0.083
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
123,750.00
27,500.00
3,360.00
8,300.00
162,910.00
326
kg
760
kg
1029
kg
215
Liter
JUMLAH HARGA BAHAN
1,380.00
125.00
281.48
100.00
449,880.00
95,000.00
289,644.44
21,500.00
856,024.44
PERALATAN
-
JUMLAH (A+B+C)
No
A
1,018,934.44
15
152,840.17
1,171,774.61
Membuat 1 m3 beton mutu fc = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61
Kode
Harga satuan
Uraian
Koefisien Satuan
Satuan
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil Beton
air
Jumlah Harga
(Rp)
L.01
1.65
OH
L.02
0.275
OH
L.03
0.028
OH
L.04
0.083
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
123,750.00
27,500.00
3,360.00
8,300.00
162,910.00
352
kg
731
kg
1031
kg
215
Liter
JUMLAH HARGA BAHAN
1,380.00
125.00
281.48
100.00
485,760.00
91,375.00
290,207.41
21,500.00
888,842.41
PERALATAN
JUMLAH (A+B+C)
1,051,752.41
15
157,762.86
1,209,515.27
No
A
Membuat 1 m3 beton mutu fc = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
Kode
Harga satuan
Uraian
Koefisien Satuan
Satuan
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil Beton
air
Jumlah Harga
(Rp)
L.01
1.65
OH
L.02
0.275
OH
L.03
0.028
OH
L.04
0.083
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
123,750.00
27,500.00
3,360.00
8,300.00
162,910.00
371
kg
698
kg
1047
kg
215
Liter
JUMLAH HARGA BAHAN
1,380.00
125.00
281.48
100.00
511,980.00
87,250.00
294,711.11
21,500.00
915,441.11
PERALATAN
-
JUMLAH (A+B+C)
No
A
1,078,351.11
15
161,752.67
1,240,103.78
Membuat 1 m3 beton mutu fc = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56
Kode
Harga satuan
Uraian
Koefisien Satuan
Satuan
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil Beton
air
Jumlah Harga
(Rp)
L.01
1.65
OH
L.02
0.275
OH
L.03
0.028
OH
L.04
0.083
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
123,750.00
27,500.00
3,360.00
8,300.00
162,910.00
384
kg
692
kg
1039
kg
215
Liter
JUMLAH HARGA BAHAN
1,380.00
125.00
281.48
100.00
529,920.00
86,500.00
292,459.26
21,500.00
930,379.26
PERALATAN
JUMLAH (A+B+C)
1,093,289.26
15
163,993.39
1,257,282.65
No
A
Membuat 1 m3 beton mutu fc = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53
Kode
Harga satuan
Uraian
Koefisien Satuan
Satuan
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil Beton
air
Jumlah Harga
(Rp)
L.01
1.65
OH
L.02
0.275
OH
L.03
0.028
OH
L.04
0.083
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
123,750.00
27,500.00
3,360.00
8,300.00
162,910.00
406
kg
684
kg
1026
kg
215
Liter
JUMLAH HARGA BAHAN
1,380.00
125.00
281.48
100.00
560,280.00
85,500.00
288,800.00
21,500.00
956,080.00
PERALATAN
-
JUMLAH (A+B+C)
No
A
1,118,990.00
15
167,848.50
1,286,838.50
Membuat 1 m3 beton mutu fc = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52
Kode
Harga satuan
Uraian
Koefisien Satuan
Satuan
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil Beton
air
Jumlah Harga
(Rp)
L.01
1.65
OH
L.02
0.275
OH
L.03
0.028
OH
L.04
0.083
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
123,750.00
27,500.00
3,360.00
8,300.00
162,910.00
413
kg
681
kg
1021
kg
215
Liter
JUMLAH HARGA BAHAN
1,380.00
125.00
281.48
100.00
569,940.00
85,125.00
287,392.59
21,500.00
963,957.59
PERALATAN
JUMLAH (A+B+C)
1,126,867.59
15
169,030.14
1,295,897.73
No
A
Membuat 1 m3 beton mutu fc = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49
Kode
Harga satuan
Uraian
Koefisien Satuan
Satuan
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil Beton
air
Jumlah Harga
(Rp)
L.01
2.1
OH
L.02
0.35
OH
L.03
0.035
OH
L.04
0.105
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
157,500.00
35,000.00
4,200.00
10,500.00
207,200.00
439
kg
670
kg
1006
kg
215
Liter
JUMLAH HARGA BAHAN
1,380.00
125.00
281.48
100.00
605,820.00
83,750.00
283,170.37
21,500.00
994,240.37
PERALATAN
-
JUMLAH (A+B+C)
No
A
1,201,440.37
15
180,216.06
1,381,656.43
Membuat 1 m3 beton mutu fc = 31,2 MPa (K 350), slump (12 2) cm, w/c = 0,48
Kode
Harga satuan
Uraian
Koefisien Satuan
Satuan
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil Beton
air
Jumlah Harga
(Rp)
L.01
2.1
OH
L.02
0.35
OH
L.03
0.035
OH
L.04
0.105
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
157,500.00
35,000.00
4,200.00
10,500.00
207,200.00
448
kg
667
kg
1000
kg
215
Liter
JUMLAH HARGA BAHAN
1,380.00
125.00
281.48
100.00
618,240.00
83,375.00
281,481.48
21,500.00
1,004,596.48
PERALATAN
JUMLAH (A+B+C)
1,211,796.48
15
181,769.47
1,393,565.95
No
A
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
2.1
OH
L.02
0.35
OH
L.03
0.035
OH
L.04
0.105
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
157,500.00
35,000.00
4,200.00
10,500.00
207,200.00
400
kg
0.48
m3
0.8
m3
1.2
kg
210
Liter
JUMLAH HARGA BAHAN
1,380.00
175,000.00
380,000.00
100.00
552,000.00
84,000.00
304,000.00
21,000.00
961,000.00
PERALATAN
-
JUMLAH (A+B+C)
No
A
1,168,200.00
15
BAHAN
Waterstop Lebar 150 mm
175,230.00
1,343,430.00
Koefisien Satuan
L.01
0.06
OH
L.02
0.03
OH
L.03
0.003
OH
L.04
0.003
OH
JUMLAH HARGA TENAGA
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
4,500.00
3,000.00
360.00
300.00
8,160.00
1.05
PERALATAN
JUMLAH (A+B+C)
8,160.00
15
1,224.00
9,384.00
No
A
JUMLAH (A+B+C)
L.01
0.07
OH
L.02
0.035
OH
L.03
0.004
OH
L.04
0.004
OH
JUMLAH HARGA TENAGA
Harga satuan
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
5,250.00
3,500.00
480.00
400.00
9,630.00
1.05
Jumlah Harga
(Rp)
PERALATAN
No
Koefisien Satuan
9,630.00
15
11,074.50
1,444.50
L.01
0.08
OH
L.02
0.04
OH
L.03
0.004
OH
L.04
0.004
OH
JUMLAH HARGA TENAGA
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
6,000.00
4,000.00
480.00
400.00
10,880.00
1.05
PERALATAN
JUMLAH (A+B+C)
10,880.00
15
1,632.00
12,512.00
No
A
TENAGA
Pekerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
BAHAN
Besi Beton
Kawat Beton
Kode
Satuan
Koefisien Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.07
OH
L.02
0.07
OH
L.03
0.007
OH
L.04
0.004
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
5,250.00
7,000.00
840.00
400.00
13,490.00
10.5
kg
0.15
kg
JUMLAH HARGA BAHAN
9,400.00
20,000.00
98,700.00
3,000.00
101,700.00
PERALATAN
-
JUMLAH (A+B+C)
115,190.00
15
17,278.50
132,468.50
No
A
TENAGA
Pekerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
BAHAN
Besi Beton Ulir
Kawat Beton
Kode
Satuan
Koefisien Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.07
OH
L.02
0.07
OH
L.03
0.007
OH
L.04
0.004
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
5,250.00
7,000.00
840.00
400.00
13,490.00
10.5
kg
0.15
kg
JUMLAH HARGA BAHAN
20,000.00
3,000.00
3,000.00
PERALATAN
JUMLAH (A+B+C)
16,490.00
15
2,473.50
18,963.50
No
A
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.05
OH
L.02
0.05
OH
L.03
0.005
OH
L.04
0.003
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
3,750.00
5,000.00
600.00
300.00
9,650.00
10.5
kg
0.1
kg
JUMLAH HARGA BAHAN
9,400.00
20,000.00
98,700.00
2,000.00
100,700.00
PERALATAN
-
JUMLAH (A+B+C)
No
A
110,350.00
15
BAHAN
Jaring kawat baja dilas
Kawat Beton
16,552.50
126,902.50
Koefisien Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.025
OH
L.02
0.025
OH
L.03
0.025
OH
L.04
0.001
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
1,875.00
2,500.00
3,000.00
100.00
7,475.00
10.2
kg
0.05
kg
JUMLAH HARGA BAHAN
20,000.00
1,000.00
1,000.00
PERALATAN
JUMLAH (A+B+C)
8,475.00
15
1,271.25
9,746.25
No
A
Koefisien Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.52
OH
L.02
0.26
OH
L.03
0.026
OH
L.04
0.026
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
39,000.00
26,000.00
3,120.00
2,600.00
70,720.00
0.04
m3
0.3
kg
0.1
Liter
JUMLAH HARGA BAHAN
1,275,000.00
15,000.00
25,000.00
51,000.00
4,500.00
2,500.00
58,000.00
PERALATAN
-
JUMLAH (A+B+C)
128,720.00
15
19,308.00
148,028.00
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu kelas III
Paku 5 cm 10 cm
Minyak Bekisting
Kode
Satuan
Koefisien Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.52
OH
L.02
0.26
OH
L.03
0.026
OH
L.04
0.026
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
39,000.00
26,000.00
3,120.00
2,600.00
70,720.00
0.045
m3
0.3
kg
0.1
Liter
JUMLAH HARGA BAHAN
1,275,000.00
15,000.00
25,000.00
57,375.00
4,500.00
2,500.00
64,375.00
PERALATAN
JUMLAH (A+B+C)
135,095.00
15
20,264.25
155,359.25
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu kelas III
Paku 5 cm 12 cm
Minyak Bekisting
Balok kayu kelas II
Plywood Tebal 9 mm
Dolken Kayu Dia. 8 - 10/400 cm
Kode
Satuan
Koefisien Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.66
OH
L.02
0.33
OH
L.03
0.033
OH
L.04
0.033
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
49,500.00
33,000.00
3,960.00
3,300.00
89,760.00
0.04
m3
0.4
kg
0.2
Liter
0.015
m3
0.35
Lbr
2
Batang
JUMLAH HARGA BAHAN
1,275,000.00
15,000.00
25,000.00
1,325,000.00
70,000.00
30,500.00
51,000.00
6,000.00
5,000.00
19,875.00
24,500.00
61,000.00
167,375.00
PERALATAN
-
JUMLAH (A+B+C)
257,135.00
15
38,570.25
295,705.25
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu kelas III
Paku 5 cm 12 cm
Minyak Bekisting
Balok kayu kelas II
Plywood Tebal 9 mm
Dolken Kayu Dia. 8 - 10/400 cm
PERALATAN
JUMLAH (A+B+C)
Kode
Satuan
Koefisien Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.66
OH
L.02
0.33
OH
L.03
0.033
OH
L.04
0.033
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
49,500.00
33,000.00
3,960.00
3,300.00
89,760.00
0.04
m3
0.4
kg
0.2
Liter
0.018
m3
0.35
Lbr
2
Batang
JUMLAH HARGA BAHAN
1,275,000.00
15,000.00
25,000.00
1,325,000.00
70,000.00
30,500.00
51,000.00
6,000.00
5,000.00
23,850.00
24,500.00
61,000.00
171,350.00
522,220.00
783,330.00
15
117,499.50
900,829.50
No
A
Koefisien Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.66
OH
L.02
0.33
OH
L.03
0.033
OH
L.04
0.033
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
49,500.00
33,000.00
3,960.00
3,300.00
89,760.00
0.04
m3
0.4
kg
0.2
Liter
0.015
m3
0.35
Lbr
6
Batang
JUMLAH HARGA BAHAN
1,275,000.00
15,000.00
25,000.00
1,325,000.00
70,000.00
30,500.00
51,000.00
6,000.00
5,000.00
19,875.00
24,500.00
183,000.00
289,375.00
PERALATAN
-
JUMLAH (A+B+C)
379,135.00
15
56,870.25
436,005.25
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu kelas III
Paku 5 cm 12 cm
Minyak Bekisting
Balok kayu kelas II
Plywood Tebal 9 mm
Dolken Kayu Dia. 8 - 10/400 cm
Formite/penjaga jarak bekisting/spacer
Kode
Satuan
Koefisien Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.66
OH
L.02
0.33
OH
L.03
0.033
OH
L.04
0.033
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
49,500.00
33,000.00
3,960.00
3,300.00
89,760.00
0.03
m3
0.4
kg
0.2
Liter
0.02
m3
0.35
Lbr
3
Batang
4
Buah
JUMLAH HARGA BAHAN
1,275,000.00
15,000.00
25,000.00
1,325,000.00
70,000.00
30,500.00
-
38,250.00
6,000.00
5,000.00
26,500.00
24,500.00
91,500.00
191,750.00
PERALATAN
JUMLAH (A+B+C)
281,510.00
15
42,226.50
323,736.50
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu kelas III
Paku 5 cm 12 cm
Minyak Bekisting
Balok kayu kelas II
Plywood Tebal 9 mm
Dolken Kayu Dia. 8 - 10/400 cm
Kode
Satuan
Koefisien Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.66
OH
L.02
0.33
OH
L.03
0.033
OH
L.04
0.033
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
49,500.00
33,000.00
3,960.00
3,300.00
89,760.00
0.03
m3
0.4
kg
0.15
Liter
0.015
m3
0.35
Lbr
2
Batang
JUMLAH HARGA BAHAN
1,275,000.00
15,000.00
25,000.00
1,325,000.00
70,000.00
30,500.00
38,250.00
6,000.00
3,750.00
19,875.00
24,500.00
61,000.00
153,375.00
PERALATAN
-
JUMLAH (A+B+C)
No
A
243,135.00
15
36,470.25
279,605.25
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.15
OH
L.02
0.05
OH
L.03
0.005
OH
L.04
0.008
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
11,250.00
5,000.00
600.00
800.00
17,650.00
0.0264
m3
0.6
kg
0.5
Batang
JUMLAH HARGA BAHAN
1,400,000.00
15,000.00
30,500.00
36,960.00
9,000.00
15,250.00
61,210.00
PERALATAN
JUMLAH (A+B+C)
78,860.00
15
11,829.00
90,689.00
No
A
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
5.3
OH
L.02
0.275
OH
L.02
1.3
OH
L.02
1.05
OH
L.03
0.262
OH
L.04
0.265
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
100,000.00
100,000.00
120,000.00
100,000.00
397,500.00
27,500.00
130,000.00
105,000.00
31,440.00
26,500.00
717,940.00
0.2
m3
1.5
kg
0.4
Liter
157.5
kg
2.25
kg
336
kg
0.54
m3
0.81
m3
JUMLAH HARGA BAHAN
1,275,000.00
15,000.00
25,000.00
9,400.00
20,000.00
1,380.00
175,000.00
380,000.00
255,000.00
22,500.00
10,000.00
1,480,500.00
45,000.00
463,680.00
94,500.00
307,800.00
2,678,980.00
PERALATAN
-
JUMLAH (A+B+C)
No
A
3,396,920.00
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
5.65
OH
L.02
0.275
OH
L.02
1.56
OH
L.02
1.4
OH
L.03
0.323
OH
L.04
0.283
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
100,000.00
100,000.00
120,000.00
100,000.00
423,750.00
27,500.00
156,000.00
140,000.00
38,760.00
28,300.00
814,310.00
0.27
m3
2
kg
0.6
Liter
210
kg
3
kg
336
kg
0.54
m3
0.81
m3
JUMLAH HARGA BAHAN
1,275,000.00
15,000.00
25,000.00
9,400.00
20,000.00
1,380.00
175,000.00
380,000.00
344,250.00
30,000.00
15,000.00
1,974,000.00
60,000.00
463,680.00
94,500.00
307,800.00
3,289,230.00
PERALATAN
509,538.00
3,906,458.00
4,103,540.00
JUMLAH (A+B+C)
15
615,531.00
4,719,071.00
No
A
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
7.05
OH
L.02
0.275
OH
L.02
1.65
OH
L.02
2.1
OH
L.03
0.403
OH
L.04
0.353
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
100,000.00
100,000.00
120,000.00
100,000.00
528,750.00
27,500.00
165,000.00
210,000.00
48,360.00
35,300.00
1,014,910.00
0.4
m3
4
kg
2
Liter
315
kg
4.5
kg
336
kg
0.54
m3
0.81
m3
0.15
m3
3.5
Lembar
20
Batang
JUMLAH HARGA BAHAN
1,275,000.00
15,000.00
25,000.00
9,400.00
20,000.00
1,380.00
175,000.00
380,000.00
1,325,000.00
70,000.00
30,500.00
510,000.00
60,000.00
50,000.00
2,961,000.00
90,000.00
463,680.00
94,500.00
307,800.00
198,750.00
245,000.00
610,000.00
5,590,730.00
PERALATAN
-
JUMLAH (A+B+C)
No
A
6,605,640.00
15
7,596,486.00
990,846.00
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
6.35
OH
L.02
0.275
OH
L.02
1.65
OH
L.02
1.4
OH
L.03
0.333
OH
L.04
0.318
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
100,000.00
100,000.00
120,000.00
100,000.00
476,250.00
27,500.00
165,000.00
140,000.00
39,960.00
31,800.00
880,510.00
0.32
m3
3.2
kg
1.6
Liter
210
kg
3
kg
336
kg
0.54
m3
0.81
m3
0.14
m3
2.8
Lembar
16
Batang
JUMLAH HARGA BAHAN
1,275,000.00
15,000.00
25,000.00
9,400.00
20,000.00
1,380.00
175,000.00
380,000.00
1,325,000.00
70,000.00
30,500.00
408,000.00
48,000.00
40,000.00
1,974,000.00
60,000.00
463,680.00
94,500.00
307,800.00
185,500.00
196,000.00
488,000.00
4,265,480.00
PERALATAN
JUMLAH (A+B+C)
5,145,990.00
15
771,898.50
5,917,888.50
No
A
Harga satuan
(Rp)
Jumlah Harga
(Rp)
5.3
OH
0.275
OH
1.3
OH
1.05
OH
0.265
OH
0.265
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
100,000.00
100,000.00
120,000.00
100,000.00
397,500.00
27,500.00
130,000.00
105,000.00
31,800.00
26,500.00
718,300.00
0.32
m3
3.2
kg
1.6
Liter
157.5
kg
2.25
kg
336
kg
0.54
m3
0.81
m3
0.12
m3
2.8
Lembar
32
Batang
JUMLAH HARGA BAHAN
1,275,000.00
15,000.00
25,000.00
9,400.00
20,000.00
1,380.00
175,000.00
380,000.00
1,325,000.00
70,000.00
30,500.00
408,000.00
48,000.00
40,000.00
1,480,500.00
45,000.00
463,680.00
94,500.00
307,800.00
159,000.00
196,000.00
976,000.00
4,218,480.00
PERALATAN
-
JUMLAH (A+B+C)
No
A
4,936,780.00
15
5,677,297.00
740,517.00
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
5.3
OH
L.02
0.275
OH
L.02
1.3
OH
L.02
1.05
OH
L.03
0.262
OH
L.04
0.265
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
100,000.00
100,000.00
120,000.00
100,000.00
397,500.00
27,500.00
130,000.00
105,000.00
31,440.00
26,500.00
717,940.00
0.24
m3
3.2
kg
1.6
Liter
157.5
kg
2.25
kg
336
kg
0.54
m3
0.81
m3
0.16
m3
2.8
Lembar
24
Batang
JUMLAH HARGA BAHAN
1,275,000.00
15,000.00
25,000.00
9,400.00
20,000.00
1,380.00
175,000.00
380,000.00
1,325,000.00
70,000.00
30,500.00
306,000.00
48,000.00
40,000.00
1,480,500.00
45,000.00
463,680.00
94,500.00
307,800.00
212,000.00
196,000.00
732,000.00
3,925,480.00
PERALATAN
JUMLAH (A+B+C)
4,643,420.00
15
696,513.00
5,339,933.00
No
A
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
5.65
OH
L.02
0.275
OH
L.02
1.56
OH
L.02
1.4
OH
L.03
0.323
OH
L.04
0.283
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
423,750.00
27,500.00
156,000.00
140,000.00
32,300.00
28,300.00
807,850.00
0.25
m3
3
kg
1.2
Liter
210
kg
3
kg
336
kg
0.54
m3
0.81
m3
0.105
m3
2.5
Lembar
14
Batang
JUMLAH HARGA BAHAN
1,275,000.00
15,000.00
25,000.00
9,400.00
20,000.00
1,380.00
175,000.00
380,000.00
1,325,000.00
70,000.00
30,500.00
318,750.00
45,000.00
30,000.00
1,974,000.00
60,000.00
463,680.00
94,500.00
307,800.00
139,125.00
175,000.00
427,000.00
4,034,855.00
PERALATAN
-
JUMLAH (A+B+C)
No
A
4,842,705.00
15
5,569,110.75
726,405.75
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.18
OH
L.02
0.02
OH
L.02
0.02
OH
L.02
0.02
OH
L.03
0.006
OH
L.04
0.009
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
100,000.00
100,000.00
120,000.00
100,000.00
13,500.00
2,000.00
2,000.00
2,000.00
720.00
900.00
21,120.00
0.002
m3
0.01
kg
3
kg
0.45
kg
4
kg
0.006
m3
0.15
m3
0.009
m3
JUMLAH HARGA BAHAN
1,275,000.00
15,000.00
9,400.00
20,000.00
1,380.00
175,000.00
1,325,000.00
380,000.00
2,550.00
150.00
28,200.00
9,000.00
5,520.00
1,050.00
198,750.00
3,420.00
248,640.00
PERALATAN
JUMLAH (A+B+C)
269,760.00
15
40,464.00
310,224.00
No
A
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.297
OH
L.02
0.033
OH
L.02
0.033
OH
L.02
0.033
OH
L.03
0.01
OH
L.04
0.015
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
100,000.00
100,000.00
120,000.00
100,000.00
22,275.00
3,300.00
3,300.00
3,300.00
1,200.00
1,500.00
34,875.00
0.003
m3
0.02
kg
3.6
kg
0.05
kg
5.5
kg
0.009
m3
0.015
m3
JUMLAH HARGA BAHAN
1,275,000.00
15,000.00
9,400.00
20,000.00
1,380.00
175,000.00
380,000.00
3,825.00
300.00
33,840.00
1,000.00
7,590.00
1,575.00
5,700.00
53,830.00
PERALATAN
JUMLAH (A+B+C)
88,705.00
15
13,305.75
102,010.75
Uraian
TENAGA
Pekerja
Tukang las Konstruksi
Kepala Tukang
Mandor
Kode
Satuan
Koefisien Satuan
L.01
0.06
OH
L.02
0.06
OH
L.03
0.006
OH
L.04
0.003
OH
JUMLAH HARGA TENAGA
BAHAN
Besi Profil
1.15
Kg
Harga satuan
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
4,500.00
6,000.00
720.00
300.00
11,520.00
PERALATAN
11,520.00
1,728.00
13,248.00
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Koefisien Satuan
L.01
0.06
OH
L.02
0.06
OH
L.03
0.006
OH
L.04
0.003
OH
JUMLAH HARGA TENAGA
BAHAN
Besi baja IWF
1.15
Kg
Harga satuan
(Rp)
4,500.00
6,000.00
720.00
300.00
11,520.00
PERALATAN
11,520.00
1,728.00
13,248.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Uraian
TENAGA
Pekerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
BAHAN
Solar
Minyak pelumas
PERALATAN
Sewa alat perakitan
Kode
Satuan
Koefisien Satuan
75,000.00
100,000.00
120,000.00
100,000.00
7,500.00
10,000.00
120.00
500.00
18,120.00
1
Liter
0.1
Liter
JUMLAH HARGA BAHAN
18,120.00
2,718.00
20,838.00
0.8
Jam
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
Harga satuan
(Rp)
L.01
0.1
OH
L.02
0.1
OH
L.03
0.001
OH
L.04
0.005
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
15
No
A
Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Kode
Harga satuan
Uraian
Koefisien Satuan
Satuan
(Rp)
TENAGA
Pekerja
Tukang Las Biasa
Kepala Tukang
Mandor
BAHAN
Besi siku L 30.30.3
Besi plat baja
kawat las
L.01
1.05
OH
L.02
1.05
OH
L.03
0.105
OH
L.04
0.052
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
78,750.00
105,000.00
12,600.00
5,200.00
201,550.00
15
Kg
32.8
Kg
0.05
Kg
JUMLAH HARGA BAHAN
PERALATAN
201,550.00
30,232.50
231,782.50
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
L.01
0.04
OH
L.02
0.02
OH
L.03
0.002
OH
L.04
0.002
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
3,000.00
2,000.00
240.00
200.00
5,440.00
0.4
Kg
0.3
Liter
0.04
Liter
JUMLAH HARGA BAHAN
0.017
Jam
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
5,440.00
816.00
6,256.00
SNI 7393 : 2008
Jumlah Harga
(Rp)
L.01
0.65
OH
L.02
0.65
OH
L.03
0.065
OH
L.04
0.032
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
48,750.00
65,000.00
7,800.00
3,200.00
124,750.00
4.76
M
4.522
M
20
Cm
JUMLAH HARGA BAHAN
PERALATAN
PERALATAN
Sewa alat las listrik
D
E
F
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
124,750.00
18,712.50
143,462.50
No
A
Koefisien Satuan
L.01
1.2
OH
L.02
1.2
OH
L.03
0.12
OH
L.04
0.006
OH
JUMLAH HARGA TENAGA
BAHAN
Pintu Gulung Besi
M2
Harga satuan
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
90,000.00
120,000.00
14,400.00
600.00
225,000.00
PERALATAN
225,000.00
33,750.00
258,750.00
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
L.01
0.44
OH
L.02
0.44
OH
L.03
0.044
OH
L.04
0.022
OH
JUMLAH HARGA TENAGA
BAHAN
Pintu Lipat
M2
Harga satuan
(Rp)
33,000.00
44,000.00
5,280.00
2,200.00
84,480.00
PERALATAN
84,480.00
12,672.00
97,152.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
Pintu Sunscreen Alluminium
Kode
Satuan
Koefisien Satuan
L.01
0.08
OH
L.02
0.8
OH
L.03
0.08
OH
L.04
0.004
OH
JUMLAH HARGA TENAGA
1
M2
Harga satuan
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
6,000.00
80,000.00
9,600.00
400.00
96,000.00
PERALATAN
75,000.00
100,000.00
120,000.00
100,000.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
96,000.00
14,400.00
110,400.00
No
A
Koefisien Satuan
L.01
1
OH
L.02
1
OH
L.03
0.1
OH
L.04
0.05
OH
JUMLAH HARGA TENAGA
BAHAN
Rolling door alluminium
m2
Harga satuan
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
75,000.00
100,000.00
12,000.00
5,000.00
192,000.00
PERALATAN
192,000.00
28,800.00
220,800.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Khusus alluminium
Kepala Tukang
Mandor
BAHAN
Profil Alluminium T
Skrup fixer
Sealant
Kode
Satuan
Koefisien Satuan
Harga satuan
(Rp)
No
A
75,000.00
100,000.00
120,000.00
100,000.00
3,225.00
4,300.00
516.00
210.00
8,251.00
1.1
m
2
Buah
0.06
Tube
JUMLAH HARGA BAHAN
PERALATAN
8,251.00
1,237.65
9,488.65
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
L.01
0.085
OH
L.02
0.085
OH
L.03
0.0085
OH
L.04
0.0042
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,375.00
8,500.00
1,020.00
420.00
16,315.00
4.4
m
14.6
m
JUMLAH HARGA BAHAN
30,000.00
438,000.00
438,000.00
PERALATAN
L.01
0.043
OH
L.02
0.043
OH
L.03
0.0043
OH
L.04
0.0021
OH
JUMLAH HARGA TENAGA
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
454,315.00
68,147.25
522,462.25
No
A
Harga satuan
(Rp)
L.01
0.085
OH
L.02
0.085
OH
L.03
0.009
OH
L.04
0.005
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,375.00
8,500.00
1,080.00
500.00
16,455.00
4.4
m
4.5
m
0.27
Tube
JUMLAH HARGA BAHAN
PERALATAN
16,455.00
2,468.25
18,923.25
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
L.01
0.35
OH
L.02
0.35
OH
L.03
0.035
OH
L.04
0.018
OH
JUMLAH HARGA TENAGA
BAHAN
Venetions blinds dan vertical blinds (tirai)
m2
Harga satuan
(Rp)
26,250.00
35,000.00
4,200.00
1,800.00
67,250.00
PERALATAN
67,250.00
10,087.50
77,337.50
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Koefisien Satuan
Harga satuan
(Rp)
L.01
1.67
OH
L.02
1,670
OH
L.03
0.167
OH
L.04
0.083
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
125,250.00
167,000,000.00
20,040.00
8,300.00
167,153,590.00
6.177
kg
27.08
cm
JUMLAH HARGA BAHAN
PERALATAN
75,000.00
100,000.00
120,000.00
100,000.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
167,153,590.00
25,073,038.50
192,226,628.50
No
A
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
Kawat Nyamuk
Pengelasan
Baja strip (0,2 x 2) cm
Kode
Satuan
Koefisien Satuan
Harga satuan
(Rp)
L.01
0.1
OH
L.02
0.1
OH
L.03
0.01
OH
L.04
0.005
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
7,500.00
10,000.00
1,200.00
500.00
19,200.00
1.1
m2
11.11
cm
1.716
kg
JUMLAH HARGA BAHAN
25,100.00
-
27,610.00
27,610.00
PERALATAN
46,810.00
7,021.50
53,831.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
Jendela nako (rangka + kaca 5 mm)
Paku skrup 1 cm 2,5 cm
Besi Strip
Kode
Satuan
Koefisien Satuan
Harga satuan
(Rp)
No
A
75,000.00
100,000.00
120,000.00
100,000.00
15,000.00
20,000.00
2,400.00
100.00
37,500.00
1.1
m2
10
Buah
7
m
JUMLAH HARGA BAHAN
15,000.00
-
150,000.00
150,000.00
PERALATAN
187,500.00
28,125.00
215,625.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
L.01
0.2
OH
L.02
0.2
OH
L.03
0.02
OH
L.04
0.01
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
15,000.00
20,000.00
2,400.00
1,000.00
38,400.00
1.05
m
0.015
kg
0.019
m3
JUMLAH HARGA BAHAN
15,000.00
1,725,000.00
225.00
32,775.00
33,000.00
PERALATAN
L.01
0.2
OH
L.02
0.2
OH
L.03
0.02
OH
L.04
0.001
OH
JUMLAH HARGA TENAGA
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
71,400.00
10,710.00
82,110.00
No
A
L.01
0.15
OH
L.02
0.3
OH
L.03
0.03
OH
L.04
0.008
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
11,250.00
30,000.00
3,600.00
800.00
45,650.00
1.05
m
0.01
kg
0.5
kg
JUMLAH HARGA BAHAN
15,000.00
-
150.00
150.00
PERALATAN
45,800.00
6,870.00
52,670.00
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
Kode
Harga satuan
Jumlah Harga
Uraian
Koefisien Satuan
Satuan
(Rp)
(Rp)
TENAGA
Pekerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
BAHAN
Rangka Metal hollow 40.40.2 mm
Assesoris rangka besi hollow dinding partisi
L.01
0.25
OH
L.02
0.25
OH
L.03
0.025
OH
L.04
0.013
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
18,750.00
25,000.00
3,000.00
1,300.00
48,050.00
3.5
m
1
LS
JUMLAH HARGA BAHAN
PERALATAN
48,050.00
7,207.50
55,257.50
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Jumlah Harga
(Rp)
L.01
0.35
OH
L.02
0.35
OH
L.03
0.035
OH
L.04
0.018
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
26,250.00
35,000.00
4,200.00
1,800.00
67,250.00
4
m
1
LS
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
67,250.00
10,087.50
77,337.50
PEKERJAAN DINDING
1
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP
Uraian
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.6
L.02
OH
0.2
L.03
OH
0.02
L.04
OH
0.03
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
45,000.00
20,000.00
2,400.00
3,000.00
140
43.5
0.08
600.00
1,380.00
170,000.00
Koefisien
Satuan
Bh
Kg
M3
JUMLAH HARGA BAHAN
70,400.00
84,000.00
60,030.00
13,600.00
157,630.00
PERALATAN
228,030.00
34,204.50
262,234.50
JUMLAH (A+B+C)
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP
Kode
Harga satuan
Jumlah Harga
Uraian
Koefisien Satuan
Satuan
(Rp)
(Rp)
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
15
L.01
OH
0.6
L.02
OH
0.2
L.03
OH
0.02
L.04
OH
0.03
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
140
32.95
0.091
600.00
1,380.00
170,000.00
Bh
Kg
M3
JUMLAH HARGA BAHAN
45,000.00
20,000.00
2,400.00
3,000.00
70,400.00
84,000.00
45,471.00
15,470.00
144,941.00
PERALATAN
215,341.00
32,301.15
247,642.15
JUMLAH (A+B+C)
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP
Kode
Harga satuan
Jumlah Harga
Uraian
Koefisien Satuan
Satuan
(Rp)
(Rp)
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
15
L.01
OH
0.6
L.02
OH
0.2
L.03
OH
0.02
L.04
OH
0.03
JUMLAH HARGA TENAGA
140
26.55
Bh
Kg
75,000.00
100,000.00
120,000.00
100,000.00
45,000.00
20,000.00
2,400.00
3,000.00
70,400.00
600.00
1,380.00
84,000.00
36,639.00
M3
JUMLAH HARGA BAHAN
0.093
Pasir Pasang
C
170,000.00
15,810.00
136,449.00
PERALATAN
206,849.00
31,027.35
237,876.35
JUMLAH (A+B+C)
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP
Kode
Harga satuan
Jumlah Harga
Uraian
Koefisien Satuan
Satuan
(Rp)
(Rp)
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
15
L.01
OH
0.6
L.02
OH
0.2
L.03
OH
0.02
L.04
OH
0.03
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
140
22.2
0.102
600.00
1,380.00
170,000.00
Bh
Kg
M3
JUMLAH HARGA BAHAN
45,000.00
20,000.00
2,400.00
3,000.00
70,400.00
84,000.00
30,636.00
17,340.00
131,976.00
PERALATAN
202,376.00
30,356.40
232,732.40
JUMLAH (A+B+C)
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP
Kode
Harga satuan
Jumlah Harga
Uraian
Koefisien Satuan
Satuan
(Rp)
(Rp)
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
15
L.01
OH
0.6
L.02
OH
0.2
L.03
OH
0.02
L.04
OH
0.03
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
140
18.5
0.122
600.00
1,380.00
170,000.00
Bh
Kg
M3
JUMLAH HARGA BAHAN
45,000.00
20,000.00
2,400.00
3,000.00
70,400.00
84,000.00
25,530.00
20,740.00
130,270.00
PERALATAN
200,670.00
30,100.50
230,770.50
JUMLAH (A+B+C)
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 KP : 10 PP
Uraian
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
15
Kode
Satuan
Koefisien
Satuan
L.01
L.02
L.03
0.6
0.2
0.02
OH
OH
OH
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
120,000.00
45,000.00
20,000.00
2,400.00
Mandor
B
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
Kapur Pasang
Pasir Pasang
L.04
OH
0.03
JUMLAH HARGA TENAGA
100,000.00
140
10.08
0.0275
0.0925
600.00
1,380.00
4,175.00
170,000.00
Bh
Kg
M3
M3
JUMLAH HARGA BAHAN
3,000.00
70,400.00
84,000.00
13,910.40
114.81
15,725.00
113,750.21
PERALATAN
184,150.21
27,622.53
211,772.74
JUMLAH (A+B+C)
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 2 PP
Kode
Harga satuan
Jumlah Harga
Uraian
Koefisien Satuan
Satuan
(Rp)
(Rp)
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
15
L.01
OH
0.3
L.02
OH
0.1
L.03
OH
0.01
L.04
OH
0.015
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
70
18.95
0.038
600.00
1,380.00
170,000.00
Bh
Kg
M3
JUMLAH HARGA BAHAN
22,500.00
10,000.00
1,200.00
1,500.00
35,200.00
42,000.00
26,151.00
6,460.00
74,611.00
PERALATAN
109,811.00
16,471.65
126,282.65
JUMLAH (A+B+C)
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 3 PP
Kode
Harga satuan
Jumlah Harga
Uraian
Koefisien Satuan
Satuan
(Rp)
(Rp)
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
15
L.01
OH
0.3
L.02
OH
0.1
L.03
OH
0.01
L.04
OH
0.015
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
70
14.37
0.04
600.00
1,380.00
170,000.00
Bh
Kg
M3
JUMLAH HARGA BAHAN
22,500.00
10,000.00
1,200.00
1,500.00
35,200.00
42,000.00
19,830.60
6,800.00
68,630.60
PERALATAN
103,830.60
15,574.59
119,405.19
D
E
F
JUMLAH (A+B+C)
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 4 PP
15
Uraian
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.3
L.02
OH
0.1
L.03
OH
0.01
L.04
OH
0.015
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
10,000.00
1,200.00
1,500.00
70
11.5
0.043
600.00
1,380.00
170,000.00
Koefisien
Satuan
Bh
Kg
M3
JUMLAH HARGA BAHAN
35,200.00
42,000.00
15,870.00
7,310.00
65,180.00
PERALATAN
100,380.00
15,057.00
115,437.00
JUMLAH (A+B+C)
10
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 5 PP
Kode
Harga satuan
Jumlah Harga
Uraian
Koefisien Satuan
Satuan
(Rp)
(Rp)
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
15
L.01
OH
0.3
L.02
OH
0.1
L.03
OH
0.01
L.04
OH
0.015
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
70
9.68
0.045
600.00
1,380.00
170,000.00
Bh
Kg
M3
JUMLAH HARGA BAHAN
22,500.00
10,000.00
1,200.00
1,500.00
35,200.00
42,000.00
13,358.40
7,650.00
63,008.40
PERALATAN
98,208.40
14,731.26
112,939.66
JUMLAH (A+B+C)
11
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 6 PP
Kode
Harga satuan
Jumlah Harga
Uraian
Koefisien Satuan
Satuan
(Rp)
(Rp)
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
15
L.01
OH
0.3
L.02
OH
0.1
L.03
OH
0.01
L.04
OH
0.015
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
70
8.32
0.049
600.00
1,380.00
170,000.00
Bh
Kg
M3
JUMLAH HARGA BAHAN
22,500.00
10,000.00
1,200.00
1,500.00
35,200.00
42,000.00
11,481.60
8,330.00
61,811.60
PERALATAN
D
E
F
JUMLAH (A+B+C)
12
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) tebal bata, campuran spesi 1 PC : 8 PP
Kode
Harga satuan
Jumlah Harga
Uraian
Koefisien Satuan
Satuan
(Rp)
(Rp)
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
15
97,011.60
14,551.74
111,563.34
L.01
OH
0.3
L.02
OH
0.1
L.03
OH
0.01
L.04
OH
0.015
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
70
6.5
0.05
600.00
1,380.00
170,000.00
Bh
Kg
M3
JUMLAH HARGA BAHAN
22,500.00
10,000.00
1,200.00
1,500.00
35,200.00
42,000.00
8,970.00
8,500.00
59,470.00
PERALATAN
94,670.00
14,200.50
108,870.50
JUMLAH (A+B+C)
13
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 3 KP : 10 PP
Uraian
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
Kapur Padam
Pasir Pasang
15
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.3
L.02
OH
0.1
L.03
OH
0.01
L.04
OH
0.015
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
10,000.00
1,200.00
1,500.00
70
4.5
0.015
0.05
600.00
1,380.00
170,000.00
Koefisien
Satuan
Bh
Kg
M3
M3
JUMLAH HARGA BAHAN
35,200.00
42,000.00
6,210.00
8,500.00
56,710.00
PERALATAN
91,910.00
13,786.50
105,696.50
JUMLAH (A+B+C)
14
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 KP : 1 SM : 1 PP
Uraian
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Merah
15
Kode
Satuan
Koefisien
Satuan
L.01
OH
0.3
L.02
OH
0.1
L.03
OH
0.01
L.04
OH
0.015
JUMLAH HARGA TENAGA
70
0.018
Bh
Kg
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
10,000.00
1,200.00
1,500.00
35,200.00
600.00
2,450.00
42,000.00
44.10
M3
M3
JUMLAH HARGA BAHAN
0.018
0.018
Kapur Padam
Pasir Pasang
C
170,000.00
3,060.00
45,104.10
PERALATAN
80,304.10
12,045.62
92,349.72
JUMLAH (A+B+C)
15
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 KP : 1 SM : 2 PP
Uraian
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Merah
Kapur Padam
Pasir Pasang
15
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.3
L.02
OH
0.1
L.03
OH
0.01
L.04
OH
0.015
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
10,000.00
1,200.00
1,500.00
70
0.014
0.014
0.028
600.00
2,450.00
170,000.00
Koefisien
Satuan
Bh
Kg
M3
M3
JUMLAH HARGA BAHAN
35,200.00
PERALATAN
81,994.30
12,299.15
94,293.45
JUMLAH (A+B+C)
16
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Hollow block (HB.20)
Semen Portland
Pasir Pasang
Besi angkur =8 mm
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.35
L.02
OH
0.15
L.03
OH
0.015
L.04
OH
0.018
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
26,250.00
15,000.00
1,800.00
1,800.00
12.5
30.32
0.728
0.28
1,380.00
170,000.00
-
Bh
Kg
M3
Kg
JUMLAH HARGA BAHAN
44,850.00
210,451.60
31,567.74
242,019.34
17
41,841.60
123,760.00
165,601.60
PERALATAN
D
E
F
No
42,000.00
34.30
4,760.00
46,794.30
TENAGA
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
Pekerja
Tukang Batu
Kepala Tukang
Mandor
B
BAHAN
Hollow block (HB.20)
Semen Portland
Pasir Pasang
Besi angkur =8 mm
L.01
OH
0.35
L.02
OH
0.15
L.03
OH
0.015
L.04
OH
0.018
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
12.5
24.26
0.772
0.28
1,380.00
170,000.00
-
Bh
Kg
M3
Kg
JUMLAH HARGA BAHAN
44,850.00
D
E
F
JUMLAH (A+B+C)
18
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Hollow block (HB.15)
Semen Portland
Pasir Pasang
Besi angkur =8 mm
15
209,568.80
31,435.32
241,004.12
Harga satuan
(Rp)
L.01
OH
0.32
L.02
OH
0.12
L.03
OH
0.012
L.04
OH
0.016
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
12.5
22.74
0.55
0.28
1,380.00
170,000.00
-
Bh
Kg
M3
Kg
JUMLAH HARGA BAHAN
19
24,000.00
12,000.00
1,440.00
1,600.00
39,040.00
31,381.20
93,500.00
124,881.20
163,921.20
24,588.18
188,509.38
PERALATAN
D
E
F
No
33,478.80
131,240.00
164,718.80
PERALATAN
No
26,250.00
15,000.00
1,800.00
1,800.00
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Hollow block (HB.15)
Semen Portland
Pasir Pasang
Besi angkur =8 mm
15
Harga satuan
(Rp)
L.01
OH
0.32
L.02
OH
0.12
L.03
OH
0.012
L.04
OH
0.016
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
12.5
18.2
0.582
0.28
1,380.00
170,000.00
-
Bh
Kg
M3
Kg
JUMLAH HARGA BAHAN
PERALATAN
D
E
F
JUMLAH (A+B+C)
20
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Hollow block (HB.10)
Semen Portland
Pasir Pasang
Besi angkur =8 mm
15
163,096.00
24,464.40
187,560.40
Harga satuan
(Rp)
L.01
OH
0.3
L.02
OH
0.1
L.03
OH
0.01
L.04
OH
0.015
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
12.5
15.16
0.364
0.28
1,380.00
170,000.00
-
Bh
Kg
M3
Kg
JUMLAH HARGA BAHAN
JUMLAH (A+B+C)
21
20,920.80
61,880.00
82,800.80
PERALATAN
D
E
F
22,500.00
10,000.00
1,200.00
1,500.00
35,200.00
118,000.80
17,700.12
135,700.92
No
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Concrete block (CB.20)
Semen Portland
Pasir Pasang
Besi angkur =8 mm
15
Harga satuan
(Rp)
L.01
OH
0.3
L.02
OH
0.1
L.03
OH
0.01
L.04
OH
0.015
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
12.5
12.13
0.388
0.28
1,380.00
170,000.00
-
Bh
Kg
M3
Kg
JUMLAH HARGA BAHAN
PERALATAN
117,899.40
17,684.91
135,584.31
JUMLAH (A+B+C)
28
Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
Kode
Harga satuan
Jumlah Harga
Uraian
Koefisien Satuan
Satuan
(Rp)
(Rp)
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Roster/Terawang
15
L.01
0.3
OH
L.02
0.1
OH
L.03
0.01
OH
L.04
0.015
OH
JUMLAH HARGA TENAGA
30
Buah
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
10,000.00
1,200.00
1,500.00
35,200.00
Semen Portland
Pasir Pasang
C
11
kg
0.035
m3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
15,180.00
5,950.00
21,130.00
PERALATAN
56,330.00
8,449.50
64,779.50
JUMLAH (A+B+C)
29
Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP
Kode
Harga satuan
Jumlah Harga
Uraian
Koefisien Satuan
Satuan
(Rp)
(Rp)
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Roster/Terawang
Semen Portland
Pasir Pasang
15
L.01
0.3
OH
L.02
0.1
OH
L.03
0.01
OH
L.04
0.015
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
10,000.00
1,200.00
1,500.00
35,200.00
30
Buah
11
kg
0.035
m3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
15,180.00
5,950.00
21,130.00
PERALATAN
56,330.00
8,449.50
64,779.50
JUMLAH (A+B+C)
30
Memasang 1 m2 dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
Uraian
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Bata Berongga
Semen Portland
Pasir Pasang
15
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.3
L.02
OH
0.15
L.03
OH
0.015
L.04
OH
0.015
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
15,000.00
1,800.00
1,500.00
70
14
0.032
1,380.00
170,000.00
Koefisien
Satuan
Bh
Kg
M3
JUMLAH HARGA BAHAN
19,320.00
5,440.00
24,760.00
PERALATAN
40,800.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
65,560.00
9,834.00
75,394.00
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.3
OH
L.02
0.15
OH
L.03
0.015
OH
L.04
0.015
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
15,000.00
1,800.00
1,500.00
40,800.00
15.504
Kg
0.016
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
21,395.52
2,720.00
24,115.52
BAHAN
Semen Portland
Pasir Pasang
Koefisien
Satuan
PERALATAN
64,915.52
9,737.33
74,652.85
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Pasang
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.3
OH
L.02
0.15
OH
L.03
0.015
OH
L.04
0.015
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
15,000.00
1,800.00
1,500.00
40,800.00
10.224
Kg
0.02
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
14,109.12
3,400.00
17,509.12
Koefisien
Satuan
PERALATAN
58,309.12
8,746.37
67,055.49
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.3
OH
L.02
0.15
OH
L.03
0.015
OH
L.04
0.015
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
15,000.00
1,800.00
1,500.00
40,800.00
7.776
Kg
0.023
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
10,730.88
3,910.00
14,640.88
Koefisien
Satuan
PERALATAN
JUMLAH (A+B+C)
55,440.88
E
F
No
A
15
8,316.13
63,757.01
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.3
OH
L.02
0.15
OH
L.03
0.015
OH
L.04
0.015
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
15,000.00
1,800.00
1,500.00
40,800.00
6.24
Kg
0.024
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
8,611.20
4,080.00
12,691.20
Koefisien
Satuan
PERALATAN
53,491.20
8,023.68
61,514.88
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.3
OH
L.02
0.15
OH
L.03
0.015
OH
L.04
0.015
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
15,000.00
1,800.00
1,500.00
40,800.00
5.184
Kg
0.026
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
7,153.92
4,420.00
11,573.92
Koefisien
Satuan
PERALATAN
52,373.92
7,856.09
60,230.01
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.3
OH
L.02
0.15
OH
L.03
0.015
OH
L.04
0.015
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
15,000.00
1,800.00
1,500.00
40,800.00
4.416
Kg
0.027
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
6,094.08
4,590.00
10,684.08
Koefisien
Satuan
PERALATAN
JUMLAH (A+B+C)
51,484.08
E
F
No
A
15
7,722.61
59,206.69
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.3
OH
L.02
0.15
OH
L.03
0.015
OH
L.04
0.015
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
15,000.00
1,800.00
1,500.00
40,800.00
3.936
Kg
0.028
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
5,431.68
4,760.00
10,191.68
Koefisien
Satuan
PERALATAN
50,991.68
7,648.75
58,640.43
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.3
OH
L.02
0.15
OH
L.03
0.015
OH
L.04
0.015
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
15,000.00
1,800.00
1,500.00
40,800.00
3.456
Kg
0.029
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
4,769.28
4,930.00
9,699.28
Koefisien
Satuan
PERALATAN
50,499.28
7,574.89
58,074.17
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.36
OH
L.02
0.12
OH
L.03
0.012
OH
L.04
0.018
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
27,000.00
12,000.00
1,440.00
1,800.00
42,240.00
5.76
Kg
0.003
M3
0.013
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
7,948.80
2,210.00
10,158.80
Satuan
PERALATAN
D
E
F
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
52,398.80
7,859.82
60,258.62
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.36
OH
L.02
0.12
OH
L.03
0.012
OH
L.04
0.018
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
27,000.00
12,000.00
1,440.00
1,800.00
42,240.00
3
Kg
0.005
M3
0.02
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
4,140.00
3,400.00
7,540.00
Satuan
PERALATAN
49,780.00
7,467.00
57,247.00
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.36
OH
L.02
0.12
OH
L.03
0.012
OH
L.04
0.018
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
27,000.00
12,000.00
1,440.00
1,800.00
42,240.00
0.009
M3
0.009
M3
0.009
M3
JUMLAH HARGA BAHAN
2,450.00
170,000.00
22.05
1,530.00
1,552.05
Satuan
PERALATAN
43,792.05
6,568.81
50,360.86
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.36
OH
L.02
0.12
OH
L.03
0.012
OH
L.04
0.018
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
27,000.00
12,000.00
1,440.00
1,800.00
42,240.00
0.007
M3
0.007
M3
0.015
M3
JUMLAH HARGA BAHAN
2,450.00
170,000.00
17.15
2,550.00
2,567.15
Satuan
PERALATAN
-
44,807.15
6,721.07
51,528.22
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.4
OH
L.02
0.2
OH
L.03
0.02
OH
L.04
0.022
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
30,000.00
20,000.00
2,400.00
2,200.00
54,600.00
13.632
Kg
0.027
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
18,812.16
4,590.00
23,402.16
Koefisien
Satuan
PERALATAN
78,002.16
11,700.32
89,702.48
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.26
OH
L.02
0.2
OH
L.03
0.02
OH
L.04
0.013
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
19,500.00
20,000.00
2,400.00
1,300.00
43,200.00
10.368
Kg
0.031
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
14,307.84
5,270.00
19,577.84
Koefisien
Satuan
PERALATAN
62,777.84
9,416.68
72,194.52
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.4
OH
L.02
0.2
OH
L.03
0.02
OH
L.04
0.022
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
30,000.00
20,000.00
2,400.00
2,200.00
54,600.00
8.32
Kg
0.032
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
11,481.60
5,440.00
16,921.60
Koefisien
Satuan
PERALATAN
-
71,521.60
10,728.24
82,249.84
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.4
OH
L.02
0.2
OH
L.03
0.02
OH
L.04
0.022
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
30,000.00
20,000.00
2,400.00
2,200.00
54,600.00
6.912
Kg
0.035
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
9,538.56
5,950.00
15,488.56
Koefisien
Satuan
PERALATAN
70,088.56
10,513.28
80,601.84
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.4
OH
L.02
0.2
OH
L.03
0.02
OH
L.04
0.022
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
30,000.00
20,000.00
2,400.00
2,200.00
54,600.00
5.888
Kg
0.036
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
8,125.44
6,120.00
14,245.44
Koefisien
Satuan
PERALATAN
68,845.44
10,326.82
79,172.26
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.44
OH
L.02
0.22
OH
L.03
0.022
OH
L.04
0.022
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
33,000.00
22,000.00
2,640.00
2,200.00
59,840.00
0.009
M3
0.009
M3
0.018
M3
JUMLAH HARGA BAHAN
2,450.00
170,000.00
22.05
3,060.00
3,082.05
Satuan
62,922.05
9,438.31
72,360.36
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.15
OH
L.02
0.075
OH
L.03
0.008
OH
L.04
0.008
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
11,250.00
7,500.00
960.00
800.00
20,510.00
5.184
Kg
0.026
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
7,153.92
4,420.00
11,573.92
Koefisien
Satuan
PERALATAN
32,083.92
4,812.59
36,896.51
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.08
OH
L.02
0.4
OH
L.03
0.04
OH
L.04
0.004
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,000.00
40,000.00
4,800.00
400.00
51,200.00
0.5
Kg
0.013
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
690.00
2,210.00
2,900.00
Satuan
PERALATAN
54,100.00
8,115.00
62,215.00
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.45
OH
L.02
0.225
OH
L.03
0.023
OH
L.04
0.023
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
33,750.00
22,500.00
2,760.00
2,300.00
61,310.00
10
Kg
15
Kg
JUMLAH HARGA BAHAN
2,250.00
-
22,500.00
22,500.00
Satuan
83,810.00
12,571.50
96,381.50
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.45
OH
L.02
0.225
OH
L.03
0.023
OH
L.04
0.023
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
33,750.00
22,500.00
2,760.00
2,300.00
61,310.00
10
Kg
15
Kg
JUMLAH HARGA BAHAN
1,380.00
-
13,800.00
13,800.00
PERALATAN
75,110.00
11,266.50
86,376.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Pasang
Kode
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.3
OH
L.02
0.1
OH
L.03
0.01
OH
L.04
0.015
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
10,000.00
1,200.00
1,500.00
35,200.00
4.32
Kg
0.006
M3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
5,961.60
1,020.00
6,981.60
Koefisien
Satuan
PERALATAN
42,181.60
6,327.24
48,508.84
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Satuan
L.01
0.15
OH
L.02
0.075
OH
L.03
0.008
OH
L.04
0.008
OH
JUMLAH HARGA TENAGA
3.108
kg
PERALATAN
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
11,250.00
7,500.00
960.00
800.00
20,510.00
1,380.00
4,289.04
4,289.04
24,799.04
3,719.86
28,518.90
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Satuan
L.01
0.07
OH
L.02
0.035
OH
L.03
0.004
OH
L.04
0.004
OH
JUMLAH HARGA TENAGA
BAHAN
Semen Portland
1.6
kg
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
5,250.00
3,500.00
480.00
400.00
9,630.00
1,380.00
2,208.00
2,208.00
PERALATAN
11,838.00
1,775.70
13,613.70
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.3
OH
L.02
0.15
OH
L.03
0.015
OH
L.04
0.015
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
22,500.00
15,000.00
1,800.00
1,500.00
40,800.00
6.34
kg
0.012
m3
JUMLAH HARGA BAHAN
1,380.00
170,000.00
8,749.20
2,040.00
10,789.20
PERALATAN
51,589.20
7,738.38
59,327.58
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Memasang 1 m2 acian
Uraian
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Kode
Satuan
Koefisien
Satuan
L.01
0.2
OH
L.02
0.1
OH
L.03
0.01
OH
L.04
0.01
OH
JUMLAH HARGA TENAGA
3.25
kg
PERALATAN
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
15,000.00
10,000.00
1,200.00
1,000.00
27,200.00
1,380.00
4,485.00
4,485.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
31,685.00
4,752.75
36,437.75
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Abu-abu 40 x 40 cm
Semen Portland
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.25
L.02
OH
0.125
L.03
OH
0.013
L.04
OH
0.013
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
18,750.00
12,500.00
1,560.00
1,300.00
34,110.00
Bh
6.63
Kg
9.8
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
170,000.00
13,524.00
7,650.00
21,174.00
PERALATAN
55,284.00
8,292.60
63,576.60
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Abu-abu 30 x 30 cm
Semen Portland
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.26
L.02
OH
0.13
L.03
OH
0.013
L.04
OH
0.013
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
19,500.00
13,000.00
1,560.00
1,300.00
35,360.00
Bh
11.87
Kg
10
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
170,000.00
13,800.00
7,650.00
21,450.00
PERALATAN
56,810.00
8,521.50
65,331.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Abu-abu 20 x 20 cm
Semen Portland
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.27
L.02
OH
0.135
L.03
OH
0.014
L.04
OH
0.014
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
20,250.00
13,500.00
1,680.00
1,400.00
36,830.00
Bh
26.5
Kg
10.4
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
170,000.00
14,352.00
7,650.00
22,002.00
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
58,832.00
8,824.80
67,656.80
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Warna 40 x 40 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.25
L.02
OH
0.125
L.03
OH
0.013
L.04
OH
0.013
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
18,750.00
12,500.00
1,560.00
1,300.00
34,110.00
Bh
6.63
Kg
9.8
Kg
1.3
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
13,524.00
2,925.00
7,650.00
24,099.00
PERALATAN
58,209.00
8,731.35
66,940.35
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Warna 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.26
L.02
OH
0.13
L.03
OH
0.013
L.04
OH
0.013
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
19,500.00
13,000.00
1,560.00
1,300.00
35,360.00
Bh
11.87
Kg
10
M3
0.045
Kg
1.5
JUMLAH HARGA BAHAN
1,380.00
170,000.00
2,250.00
13,800.00
7,650.00
3,375.00
24,825.00
PERALATAN
60,185.00
9,027.75
69,212.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Warna 20 x 20 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.27
L.02
OH
0.135
L.03
OH
0.014
L.04
OH
0.014
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
20,250.00
13,500.00
1,680.00
1,400.00
36,830.00
Bh
26.5
Kg
10.4
Kg
1.62
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
14,352.00
3,645.00
7,650.00
25,647.00
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
62,477.00
9,371.55
71,848.55
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Teraso 40 x 40 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.25
L.02
OH
0.125
L.03
OH
0.013
L.04
OH
0.013
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
18,750.00
12,500.00
1,560.00
1,300.00
34,110.00
Bh
6.63
Kg
9.8
Kg
1.3
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
13,524.00
2,925.00
7,650.00
24,099.00
PERALATAN
58,209.00
8,731.35
66,940.35
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Teraso 30 x 30 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.26
L.02
OH
0.13
L.03
OH
0.013
L.04
OH
0.013
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
19,500.00
13,000.00
1,560.00
1,300.00
35,360.00
Bh
11.87
Kg
10
Kg
1.5
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
13,800.00
3,375.00
7,650.00
24,825.00
PERALATAN
60,185.00
9,027.75
69,212.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Granito 40 x 40 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.25
L.02
OH
0.125
L.03
OH
0.013
L.04
OH
0.013
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
18,750.00
12,500.00
1,560.00
1,300.00
34,110.00
Bh
6.63
Kg
9.8
Kg
1.3
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
13,524.00
2,925.00
7,650.00
24,099.00
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
58,209.00
8,731.35
66,940.35
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Granito 30 x 30 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.26
L.02
OH
0.13
L.03
OH
0.013
L.04
OH
0.013
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
19,500.00
13,000.00
1,560.00
1,300.00
35,360.00
Bh
11.87
Kg
10
Kg
1.5
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
13,800.00
3,375.00
7,650.00
24,825.00
PERALATAN
60,185.00
9,027.75
69,212.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Teralux Kerang 40 x 40 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.25
L.02
OH
0.125
L.03
OH
0.013
L.04
OH
0.013
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
18,750.00
12,500.00
1,560.00
1,300.00
34,110.00
Bh
6.63
Kg
9.8
Kg
1.3
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
13,524.00
2,925.00
7,650.00
24,099.00
PERALATAN
58,209.00
8,731.35
66,940.35
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Teralux Kerang 30 x 30 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.26
L.02
OH
0.13
L.03
OH
0.013
L.04
OH
0.013
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
19,500.00
13,000.00
1,560.00
1,300.00
35,360.00
Bh
11.87
Kg
10
Kg
1.5
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
13,800.00
3,375.00
7,650.00
24,825.00
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
60,185.00
9,027.75
69,212.75
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Teralux Marmer 60 x 60 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.24
L.02
OH
0.12
L.03
OH
0.012
L.04
OH
0.012
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
18,000.00
12,000.00
1,440.00
1,200.00
32,640.00
Bh
3.1
Kg
9.6
Kg
1.5
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
13,248.00
3,375.00
7,650.00
24,273.00
PERALATAN
56,913.00
8,536.95
65,449.95
JUMLAH (A+B+C)
14
Uraian
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Teralux Marmer 40 x 40 cm
Semen Portland
Semen Warna
Pasir Pasang
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.25
L.02
OH
0.125
L.03
OH
0.013
L.04
OH
0.013
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
18,750.00
12,500.00
1,560.00
1,300.00
34,110.00
Bh
6.63
Kg
9.8
Kg
1.3
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
13,524.00
2,925.00
7,650.00
24,099.00
PERALATAN
58,209.00
8,731.35
66,940.35
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Teralux Marmer 30 x 30 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.26
L.02
OH
0.13
L.03
OH
0.013
L.04
OH
0.013
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
19,500.00
13,000.00
1,560.00
1,300.00
35,360.00
Bh
11.87
Kg
10
Kg
1.5
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
13,800.00
3,375.00
7,650.00
24,825.00
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
60,185.00
9,027.75
69,212.75
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin 15 x 20 cm
Semen Portland
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
5.3
Kg
1.65
M3
0.004
JUMLAH HARGA BAHAN
1,380.00
170,000.00
2,277.00
680.00
2,957.00
PERALATAN
20,287.00
3,043.05
23,330.05
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin 10 x 30 cm
Semen Portland
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
3.53
Kg
1.24
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
170,000.00
1,711.20
510.00
2,221.20
PERALATAN
19,551.20
2,932.68
22,483.88
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin 10 x 40 cm
Semen Portland
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
2.65
Kg
1.24
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
170,000.00
1,711.20
510.00
2,221.20
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
19,551.20
2,932.68
22,483.88
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin PC Warna 10 x 20 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
5.3
Kg
1.14
Kg
0.1
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
1,573.20
225.00
510.00
2,308.20
PERALATAN
19,638.20
2,945.73
22,583.93
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin PC Warna 10 x 30 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
3.53
Kg
1.14
Kg
0.1
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
1,573.20
225.00
510.00
2,308.20
PERALATAN
19,638.20
2,945.73
22,583.93
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin PC Warna 10 x 40 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
2.65
Kg
1.14
Kg
0.1
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
1,573.20
225.00
510.00
2,308.20
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
19,638.20
2,945.73
22,583.93
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin Teraso 10 x 30 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
3.53
Kg
1.14
Kg
0.1
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
1,573.20
225.00
510.00
2,308.20
PERALATAN
19,638.20
2,945.73
22,583.93
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin Teraso 10 x 40 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
2.65
Kg
1.14
Kg
0.1
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
1,573.20
225.00
510.00
2,308.20
PERALATAN
19,638.20
2,945.73
22,583.93
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin Granito 10 x 40 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
2.65
Kg
1.14
Kg
0.1
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
1,573.20
225.00
510.00
2,308.20
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
19,638.20
2,945.73
22,583.93
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin Granito 10 x 30 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
3.53
Kg
1.14
Kg
0.1
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
1,573.20
225.00
510.00
2,308.20
PERALATAN
19,638.20
2,945.73
22,583.93
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin Teralux Kerang 10 x 40 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
2.65
Kg
1.14
Kg
0.1
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
1,573.20
225.00
510.00
2,308.20
PERALATAN
19,638.20
2,945.73
22,583.93
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin Teralux Kerang 10 x 30 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
3.53
Kg
1.14
Kg
0.1
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
1,573.20
225.00
510.00
2,308.20
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
19,638.20
2,945.73
22,583.93
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin Teralux Marmer 10 x 60 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
1.7
Kg
1.14
Kg
0.1
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
1,573.20
225.00
510.00
2,308.20
PERALATAN
19,638.20
2,945.73
22,583.93
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin Teralux Marmer 10 x 40 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
2.65
Kg
1.14
Kg
0.1
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
1,573.20
225.00
510.00
2,308.20
PERALATAN
19,638.20
2,945.73
22,583.93
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin Teralux Marmer 10 x 30 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
3.53
Kg
1.14
Kg
0.1
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
1,573.20
225.00
510.00
2,308.20
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
19,638.20
2,945.73
22,583.93
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Teraso Cor
Semen Warna
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.36
L.02
OH
0.18
L.03
OH
0.018
L.04
OH
0.018
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
27,000.00
18,000.00
2,160.00
1,800.00
48,960.00
M3
0.036
Kg
0.1
JUMLAH HARGA BAHAN
2,250.00
225.00
225.00
PERALATAN
49,185.00
7,377.75
56,562.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Keramik Artistik 10x20 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.7
L.02
OH
0.35
L.03
OH
0.035
L.04
OH
0.035
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
52,500.00
35,000.00
4,200.00
3,500.00
95,200.00
Bh
53
Kg
8.19
Kg
2.75
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
11,302.20
6,187.50
7,650.00
25,139.70
PERALATAN
120,339.70
18,050.96
138,390.66
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Keramik Artistik 10 x 10 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.7
L.02
OH
0.35
L.03
OH
0.035
L.04
OH
0.035
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
52,500.00
35,000.00
4,200.00
3,500.00
95,200.00
Bh
106
Kg
8.19
Kg
3.2
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
11,302.20
7,200.00
7,650.00
26,152.20
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
121,352.20
18,202.83
139,555.03
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.7
L.02
OH
0.35
L.03
OH
0.035
L.04
OH
0.035
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
52,500.00
35,000.00
4,200.00
3,500.00
95,200.00
Bh
106
Kg
8.19
Kg
3.2
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
11,302.20
7,200.00
7,650.00
26,152.20
BAHAN
Ubin Keramik Artistik 5 x 20 cm
Semen Portland
Semen Warna
Pasir Pasang
PERALATAN
121,352.20
18,202.83
139,555.03
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.7
L.02
OH
0.35
L.03
OH
0.035
L.04
OH
0.035
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
52,500.00
35,000.00
4,200.00
3,500.00
95,200.00
Bh
10
Kg
8.19
Kg
1.62
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
11,302.20
3,645.00
7,650.00
22,597.20
BAHAN
Ubin Keramik 33 x 33 cm
Semen Portland
Semen Warna
Pasir Pasang
PERALATAN
117,797.20
17,669.58
135,466.78
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin keramik (30 X 30) cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.7
OH
L.02
0.35
OH
L.03
0.035
OH
L.04
0.035
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
52,500.00
35,000.00
4,200.00
3,500.00
95,200.00
11.87
Buah
10
kg
1.5
kg
0.045
m3
JUMLAH HARGA BAHAN
5,400.00
1,380.00
2,250.00
170,000.00
64,098.00
13,800.00
3,375.00
7,650.00
88,923.00
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
184,123.00
27,618.45
211,741.45
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Keramik 20 x 20 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.7
L.02
OH
0.35
L.03
OH
0.035
L.04
OH
0.035
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
52,500.00
35,000.00
4,200.00
3,500.00
95,200.00
Bh
26.5
Kg
10.4
Kg
1.62
M3
0.045
JUMLAH HARGA BAHAN
2,640.00
1,380.00
2,250.00
170,000.00
69,960.00
14,352.00
3,645.00
7,650.00
95,607.00
PERALATAN
190,807.00
28,621.05
219,428.05
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Ubin Keramik 10 x 33 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
1.05
L.02
OH
0.525
L.03
OH
0.053
L.04
OH
0.053
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
78,750.00
52,500.00
6,360.00
5,300.00
142,910.00
Bh
33
Kg
9.8
Kg
4.37
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
13,524.00
9,832.50
7,650.00
31,006.50
PERALATAN
173,916.50
26,087.48
200,003.98
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Mosaik 30 x 30 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.7
L.02
OH
0.35
L.03
OH
0.035
L.04
OH
0.035
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
52,500.00
35,000.00
4,200.00
3,500.00
95,200.00
Bh
11.87
Kg
14.15
Kg
2
M3
0.039
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
19,527.00
4,500.00
6,630.00
30,657.00
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
125,857.00
18,878.55
144,735.55
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
5.3
Kg
1.14
Kg
0.025
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
1,573.20
56.25
510.00
2,139.45
BAHAN
Plint Keramik Artistik 10 x 20 cm
Semen Portland
Semen Warna
Pasir Pasang
PERALATAN
19,469.45
2,920.42
22,389.87
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
10.6
Kg
1.14
Kg
0.05
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
1,573.20
112.50
510.00
2,195.70
BAHAN
Plint Keramik Artistik 10 x 10 cm
Semen Portland
Semen Warna
Pasir Pasang
PERALATAN
19,525.70
2,928.86
22,454.56
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Keramik Artistik 5 x 20 cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.09
L.02
OH
0.09
L.03
OH
0.009
L.04
OH
0.005
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
6,750.00
9,000.00
1,080.00
500.00
17,330.00
Bh
5.3
Kg
0.57
Kg
0.013
M3
0.0015
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
786.60
29.25
255.00
1,070.85
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
18,400.85
2,760.13
21,160.98
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Interval Cove (5 x 5 x 20) cm
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.75
L.02
OH
0.75
L.03
OH
0.075
L.04
OH
0.038
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
56,250.00
75,000.00
9,000.00
3,800.00
144,050.00
Bh
5.3
Kg
1.14
Kg
0.1
M3
0.003
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
1,573.20
225.00
510.00
2,308.20
PERALATAN
146,358.20
21,953.73
168,311.93
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Marmer
Semen Portland
Semen Warna
Pasir Pasang
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.7
L.02
OH
0.35
L.03
OH
0.035
L.04
OH
0.035
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
52,500.00
35,000.00
4,200.00
3,500.00
95,200.00
Bh
1.06
Kg
8.19
Kg
0.65
M3
0.045
JUMLAH HARGA BAHAN
1,380.00
2,250.00
170,000.00
11,302.20
1,462.50
7,650.00
20,414.70
PERALATAN
115,614.70
17,342.21
132,956.91
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Underlyer Tebal 6 mm/Rubber Corrugated
Lem
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.12
L.02
OH
0.12
L.03
OH
0.012
L.04
OH
0.006
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
9,000.00
12,000.00
1,440.00
600.00
23,040.00
M2
1.05
kg
0.35
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
23,040.00
3,456.00
26,496.00
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Carpet
Lem Vinyl
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.17
L.02
OH
0.17
L.03
OH
0.017
L.04
OH
0.009
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
12,750.00
17,000.00
2,040.00
900.00
32,690.00
M2
1.05
Kg
0.35
JUMLAH HARGA BAHAN
PERALATAN
32,690.00
4,903.50
37,593.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Parquet
Lem Vinyl
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.7
L.02
OH
0.35
L.03
OH
0.035
L.04
OH
0.035
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
52,500.00
35,000.00
4,200.00
3,500.00
95,200.00
M2
1.05
Kg
0.6
JUMLAH HARGA BAHAN
PERALATAN
95,200.00
14,280.00
109,480.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Gymfloor
Lem Vinyl
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.7
L.02
OH
0.35
L.03
OH
0.035
L.04
OH
0.035
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
52,500.00
35,000.00
4,200.00
3,500.00
95,200.00
M2
1.05
Kg
0.6
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
95,200.00
14,280.00
109,480.00
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Porselin 11 x 11 cm
Semen Abu-abu
Pasir Pasang
Semen Warna
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
1
L.02
OH
0.5
L.03
OH
0.05
L.04
OH
0.05
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
75,000.00
50,000.00
6,000.00
5,000.00
136,000.00
Bh
86
Kg
9.3
M3
0.018
Kg
1.5
JUMLAH HARGA BAHAN
2,450.00
170,000.00
2,250.00
22,785.00
3,060.00
3,375.00
29,220.00
PERALATAN
165,220.00
24,783.00
190,003.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Porselin 10 x 20 cm
Semen Abu-abu
Pasir Pasang
Semen Warna
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.9
L.02
OH
0.45
L.03
OH
0.045
L.04
OH
0.045
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
67,500.00
45,000.00
5,400.00
4,500.00
122,400.00
Bh
53
Kg
9.3
M3
0.018
Kg
2.75
JUMLAH HARGA BAHAN
1,320.00
2,450.00
170,000.00
2,250.00
69,960.00
22,785.00
3,060.00
6,187.50
101,992.50
PERALATAN
224,392.50
33,658.88
258,051.38
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Porselin 20 x 20 cm
Semen Abu-abu
Pasir Pasang
Semen Warna
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.9
L.02
OH
0.45
L.03
OH
0.045
L.04
OH
0.045
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
67,500.00
45,000.00
5,400.00
4,500.00
122,400.00
Bh
26
Kg
9.3
M3
0.018
Kg
1.94
JUMLAH HARGA BAHAN
2,720.00
2,450.00
170,000.00
2,250.00
70,720.00
22,785.00
3,060.00
4,365.00
100,930.00
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
223,330.00
33,499.50
256,829.50
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Keramik Artistik 10 x 20 cm
Semen Abu-abu
Pasir Pasang
Semen Warna
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.9
L.02
OH
0.45
L.03
OH
0.045
L.04
OH
0.045
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
67,500.00
45,000.00
5,400.00
4,500.00
122,400.00
Bh
53
Kg
9.3
M3
0.018
Kg
2.75
JUMLAH HARGA BAHAN
1,320.00
2,450.00
170,000.00
2,250.00
69,960.00
22,785.00
3,060.00
6,187.50
101,992.50
PERALATAN
224,392.50
33,658.88
258,051.38
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Keramik Artistik 5 x 20 cm
Semen Abu-abu
Pasir Pasang
Semen Warna
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.9
L.02
OH
0.45
L.03
OH
0.045
L.04
OH
0.045
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
67,500.00
45,000.00
5,400.00
4,500.00
122,400.00
Bh
106
Kg
9.3
M3
0.018
Kg
2.9
JUMLAH HARGA BAHAN
2,450.00
170,000.00
2,250.00
22,785.00
3,060.00
6,525.00
32,370.00
PERALATAN
154,770.00
23,215.50
177,985.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Keramik 10 x 20 cm
Semen Abu-abu
Pasir Pasang
Semen Warna
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.9
L.02
OH
0.45
L.03
OH
0.045
L.04
OH
0.045
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
67,500.00
45,000.00
5,400.00
4,500.00
122,400.00
Bh
53
Kg
9.3
M3
0.018
Kg
2.75
JUMLAH HARGA BAHAN
1,220.00
2,450.00
170,000.00
2,250.00
64,660.00
22,785.00
3,060.00
6,187.50
96,692.50
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
219,092.50
32,863.88
251,956.38
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Keramik 20 x 20 cm
Semen Abu-abu
Pasir Pasang
Semen Warna
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.9
L.02
OH
0.45
L.03
OH
0.045
L.04
OH
0.045
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
67,500.00
45,000.00
5,400.00
4,500.00
122,400.00
Bh
26.5
Kg
9.3
M3
0.018
Kg
1.94
JUMLAH HARGA BAHAN
2,640.00
2,450.00
170,000.00
2,250.00
69,960.00
22,785.00
3,060.00
4,365.00
100,170.00
PERALATAN
222,570.00
33,385.50
255,955.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Marmer
Paku 12 cm
Semen Portland
Pasir Pasang
Semen Warna
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
1.3
L.02
OH
0.65
L.03
OH
0.065
L.04
OH
0.065
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
97,500.00
65,000.00
7,800.00
6,500.00
176,800.00
M2
1.06
Bh
3.03
Kg
12.44
M3
0.025
Kg
0.65
JUMLAH HARGA BAHAN
15,000.00
1,380.00
170,000.00
2,250.00
45,450.00
17,167.20
4,250.00
1,462.50
68,329.70
PERALATAN
245,129.70
36,769.46
281,899.16
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Bata Pelapis Dinding
Semen Portland
Pasir Pasang
Semen Warna
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
1
L.02
OH
0.5
L.03
OH
0.05
L.04
OH
0.05
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
75,000.00
50,000.00
6,000.00
5,000.00
136,000.00
Bh
63
Kg
12.44
M3
0.025
Kg
2.75
JUMLAH HARGA BAHAN
1,380.00
170,000.00
2,250.00
17,167.20
4,250.00
6,187.50
27,604.70
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
163,604.70
24,540.71
188,145.41
No
A
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.7
L.02
OH
0.35
L.03
OH
0.035
L.04
OH
0.035
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
52,500.00
35,000.00
4,200.00
3,500.00
95,200.00
M2
1.1
Kg
11.75
M3
0.035
JUMLAH HARGA BAHAN
1,380.00
170,000.00
16,215.00
5,950.00
22,165.00
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Bata Poros
Semen Portland
Pasir Pasang
PERALATAN
117,365.00
17,604.75
134,969.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.7
L.02
OH
0.35
L.03
OH
0.035
L.04
OH
0.035
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
52,500.00
35,000.00
4,200.00
3,500.00
95,200.00
M2
1.1
Kg
11.75
M3
0.035
JUMLAH HARGA BAHAN
1,380.00
170,000.00
16,215.00
5,950.00
22,165.00
BAHAN
Bata Tempel Hitam
Semen Portland
Pasir Pasang
PERALATAN
117,365.00
17,604.75
134,969.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
Vinyl Karet 30 x 30 cm KL. I
Lem Vinyl
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.15
L.02
OH
0.15
L.03
OH
0.015
L.04
OH
0.008
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
11,250.00
15,000.00
1,800.00
800.00
28,850.00
Bh
11.87
Kg
0.35
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
28,850.00
4,327.50
33,177.50
No
A
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
Wall Paper Lantai
Lem
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
OH
0.35
L.02
OH
0.175
L.03
OH
0.017
L.04
OH
0.002
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
26,250.00
17,500.00
2,040.00
200.00
45,990.00
M2
2.2
Kg
0.25
JUMLAH HARGA BAHAN
PERALATAN
45,990.00
6,898.50
52,888.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
L.01
OH
0.12
L.02
OH
0.12
L.03
OH
0.012
L.04
OH
0.006
JUMLAH HARGA TENAGA
BAHAN
Floor Hardener
Kg
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000.00
100,000.00
120,000.00
100,000.00
9,000.00
12,000.00
1,440.00
600.00
23,040.00
PERALATAN
23,040.00
3,456.00
26,496.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
L.01
0.08
OH
L.02
0.08
OH
L.03
0.008
OH
L.04
0.004
OH
JUMLAH HARGA TENAGA
1.76
0.08
Buah
kg
75,000.00
100,000.00
120,000.00
100,000.00
6,000.00
8,000.00
960.00
400.00
15,360.00
15,000.00
-
26,400.00
26,400.00
PERALATAN
Jumlah Harga
(Rp)
BAHAN
Vinyl karet
Perekat
Harga satuan
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
41,760.00
6,264.00
48,024.00
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Papan kayu kelas I
Paku Sekrup
Harga satuan
(Rp)
Jumlah Harga
(Rp)
L.01
0.12
OH
L.02
0.12
OH
L.03
0.012
OH
L.04
0.006
OH
JUMLAH HARGA TENAGA
75,000.00
100,000.00
120,000.00
100,000.00
9,000.00
12,000.00
1,440.00
600.00
23,040.00
0.003
M3
0.05
kg
JUMLAH HARGA BAHAN
5,100,000.00
25,000.00
15,300.00
1,250.00
16,550.00
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
39,590.00
5,938.50
45,528.50
No
Uraian
TENAGA
Pekerja
L.01
Tukang
L.02
Kepala Tukang
L.03
Mandor
L.04
Kode
BAHAN
Panel
pracetak
Kolom
Semen PC
Pasir beton
Koral
Satuan
beton Lbr
beton pracetak
Batang
Kg
m3
m3
Harga
Koefisien Satuan
(Rp)
Jumlah
Harga
(Rp)
0.375
0.125
0.012
0.019
JUMLAH TENAGA KERJA
0.986
0.525
45
0.074
0.146
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %) 15% x D
Harga Satuan Pekerjaan (D+E)
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Kode
Harga satuan
Uraian
Koefisien Satuan
Satuan
(Rp)
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
7
21
2.1
0.35
OH
OH
OH
OH
75,000
100,000
120,000
100,000
525,000.00
2,100,000.00
252,000.00
35,000.00
2,912,000.00
5,100,000
15,000
10,000
5,610,000.00
18,750.00
10,000.00
5,638,750.00
BAHAN
Balok kayu kelas I
Paku 10 cm
Lem Kayu
1.1
1.25
1
M
Kg
Kg
PERALATAN
8,550,750.00
1,282,612.50
9,833,362.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II
Kode
Harga satuan
Uraian
Koefisien Satuan
Satuan
(Rp)
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
6
18
1.8
0.3
OH
OH
OH
OH
450,000.00
1,800,000.00
216,000.00
30,000.00
2,496,000.00
1,325,000
15,000
10,000
1,590,000.00
18,750.00
10,000.00
1,618,750.00
BAHAN
Balok kayu kelas II
Paku 10 cm
Lem Kayu
M3
Kg
Kg
1.2
1.25
1
PERALATAN
4,114,750.00
617,212.50
4,731,962.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas III
Kode
Harga satuan
Uraian
Koefisien Satuan
Satuan
(Rp)
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
6
18
1.8
0.3
OH
OH
OH
OH
75,000
100,000
120,000
100,000
450,000.00
1,800,000.00
216,000.00
30,000.00
2,496,000.00
1,100,000
15,000
10,000
1,320,000.00
18,750.00
10,000.00
75,000
100,000
120,000
100,000
BAHAN
Balok Kayu Kelas III
Paku 10 cm
Lem Kayu
1.2
1.25
1
M
Kg
Kg
1,348,750.00
PERALATAN
3,844,750.00
576,712.50
4,421,462.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.35
1.05
0.105
0.018
OH
OH
OH
OH
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
26,250.00
105,000.00
12,600.00
1,800.00
145,650.00
1,725,000
15,000
69,000.00
750.00
69,750.00
BAHAN
Papan kayu kelas II
Paku 5 cm 7 cm
0.04
0.05
M
Kg
PERALATAN
215,400.00
32,310.00
247,710.00
5
No
A
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
0.35
1.05
0.105
0.018
OH
OH
OH
OH
75,000
100,000
120,000
100,000
26,250.00
105,000.00
12,600.00
1,800.00
145,650.00
1,400,000
15,000
56,000.00
750.00
56,750.00
BAHAN
Papan kayu kelas III
Paku 5 cm 7 cm
0.04
0.05
M
Kg
PERALATAN
202,400.00
30,360.00
232,760.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
1
3
0.3
0.05
OH
OH
OH
OH
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
BAHAN
Papan kayu kelas I
Lem Kayu
M3
kg
0.04
0.5
5,100,000
10,000
PERALATAN
625,000.00
93,750.00
718,750.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
1
3
0.3
0.05
OH
OH
OH
OH
Harga satuan
(Rp)
75,000.00
300,000.00
36,000.00
5,000.00
416,000.00
1,725,000
10,000
69,000.00
5,000.00
74,000.00
BAHAN
Papan kayu kelas II
Lem Kayu
M3
kg
0.04
0.5
PERALATAN
490,000.00
73,500.00
563,500.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.8
2.4
0.24
0.04
OH
OH
OH
OH
Harga satuan
(Rp)
60,000.00
240,000.00
28,800.00
4,000.00
332,800.00
5,100,000
10,000
122,400.00
3,000.00
125,400.00
BAHAN
Papan kayu kelas I
Lem Kayu
0.024
0.3
M
kg
PERALATAN
458,200.00
68,730.00
526,930.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
75,000
100,000
120,000
100,000
75,000
100,000
120,000
100,000
204,000.00
5,000.00
209,000.00
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
15
0.8
2.4
0.24
OH
OH
OH
75,000
100,000
120,000
0.04
Mandor
OH
100,000
4,000.00
332,800.00
1,725,000
10,000
41,400.00
3,000.00
44,400.00
BAHAN
3
0.024
0.3
M
kg
PERALATAN
377,200.00
56,580.00
433,780.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
10
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1
3
0.3
0.05
OH
OH
OH
OH
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
75,000.00
300,000.00
36,000.00
5,000.00
416,000.00
5,100,000
10,000
326,400.00
5,000.00
331,400.00
BAHAN
M3
kg
0.064
0.5
PERALATAN
747,400.00
112,110.00
859,510.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
11
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1
3
0.3
0.05
OH
OH
OH
OH
75,000.00
300,000.00
36,000.00
5,000.00
416,000.00
1,725,000
10,000
110,400.00
5,000.00
115,400.00
BAHAN
M3
kg
0.064
0.5
75,000
100,000
120,000
100,000
PERALATAN
531,400.00
79,710.00
611,110.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
12
Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm)
15
No
A
TENAGA
Kode
Satuan
Koefisien
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.7
2.1
0.21
0.035
OH
OH
OH
OH
75,000
100,000
120,000
100,000
52,500.00
210,000.00
25,200.00
3,500.00
291,200.00
1,725,000
15,000
10,000
-
43,125.00
450.00
5,000.00
48,575.00
BAHAN
Papan kayu kelas II
Paku 1 cm - 2,5 cm
Lem Kayu
Plywood tebal 4 mm Ukuran (90 x 220) cm
0.025
0.03
0.5
1
M
kg
kg
Lembar
PERALATAN
339,775.00
50,966.25
390,741.25
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
13
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.8
2.4
0.24
0.04
OH
OH
OH
OH
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
60,000.00
240,000.00
28,800.00
4,000.00
332,800.00
5,100,000
15,000
10,000
-
130,560.00
450.00
5,000.00
136,010.00
BAHAN
Papan kayu kelas I
Paku 1 cm - 2,5 cm
Lem Kayu
Plywood tebal 4 mm Ukuran (90 x 220) cm
0.0256
0.03
0.5
1
M3
kg
kg
Lembar
PERALATAN
468,810.00
70,321.50
539,131.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
13
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.8
2.4
0.24
0.04
OH
OH
OH
OH
60,000.00
240,000.00
28,800.00
4,000.00
332,800.00
5,100,000
15,000
10,000
-
130,560.00
450.00
5,000.00
136,010.00
BAHAN
Papan kayu kelas I
Paku 1 cm - 2,5 cm
Lem Kayu
Plywood tebal 4 mm Ukuran (90 x 220) cm
75,000
100,000
120,000
100,000
0.0256
0.03
0.5
1
M3
kg
kg
Lembar
PERALATAN
D
E
F
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
14
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
468,810.00
70,321.50
539,131.50
Koefisien
Satuan
0.67
2
0.2
0.335
OH
OH
OH
OH
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
50,250.00
200,000.00
24,000.00
33,500.00
307,750.00
5,100,000
15,000
306,000.00
2,250.00
308,250.00
BAHAN
3
0.06
0.15
M
kg
PERALATAN
616,000.00
92,400.00
708,400.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
Koefisien
Satuan
0.67
2
0.2
0.335
OH
OH
OH
OH
Harga satuan
(Rp)
50,250.00
200,000.00
24,000.00
33,500.00
307,750.00
1,725,000
15,000
103,500.00
2,250.00
105,750.00
BAHAN
Papan kayu kelas II
Paku 1 cm - 2,5 cm
M3
kg
0.06
0.15
PERALATAN
413,500.00
62,025.00
475,525.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
16
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.8
2.4
0.24
0.04
OH
OH
OH
OH
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
60,000.00
240,000.00
28,800.00
4,000.00
332,800.00
5,100,000
15,000
10,000
-
127,500.00
450.00
3,000.00
130,950.00
75,000
100,000
120,000
100,000
BAHAN
Papan kayu kelas I
0.025
M3
Paku 1 cm - 2,5 cm
0.03
kg
Lem Kayu
0.3
kg
Teakwood tebal 4 mm ukuran (90 x 220) cm
1
Lembar
JUMLAH HARGA BAHAN
PERALATAN
463,750.00
69,562.50
533,312.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
17
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.85
2.55
0.255
0.043
OH
OH
OH
OH
75,000
100,000
120,000
100,000
63,750.00
255,000.00
30,600.00
4,300.00
353,650.00
1,725,000
15,000
10,000
-
43,125.00
450.00
8,000.00
51,575.00
BAHAN
405,225.00
60,783.75
466,008.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
18
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
4
12
1.2
0.2
OH
OH
OH
OH
300,000.00
1,200,000.00
144,000.00
20,000.00
1,664,000.00
5,100,000
15,000
5,610,000.00
84,000.00
5,694,000.00
BAHAN
Balok kayu kelas I
Besi strip tebal 5 mm
Paku 12 cm
M3
kg
kg
1.1
15
5.6
PERALATAN
7,358,000.00
1,103,700.00
8,461,700.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
19
No
A
75,000
100,000
120,000
100,000
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
15
4
12
1.2
OH
OH
OH
75,000
100,000
120,000
Mandor
0.2
OH
100,000
20,000.00
1,664,000.00
1,325,000
15,000
1,457,500.00
84,000.00
1,541,500.00
BAHAN
Balok kayu kelas II
Besi strip tebal 5 mm
Paku 12 cm
1.1
15
5.6
M
kg
kg
PERALATAN
3,205,500.00
480,825.00
3,686,325.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
20
Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas III bentang 6 meter SNI 3434 : 2008
Kode
Harga satuan
Jumlah Harga
Uraian
Koefisien Satuan
Satuan
(Rp)
(Rp)
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
4
12
1.2
0.2
OH
OH
OH
OH
75,000
100,000
120,000
100,000
300,000.00
1,200,000.00
144,000.00
20,000.00
1,664,000.00
1,100,000
15,000
1,210,000.00
84,000.00
1,294,000.00
BAHAN
Balok Kayu Kelas III
Besi strip tebal 5 mm
Paku 12 cm
M3
kg
kg
1.1
15
5.6
PERALATAN
2,958,000.00
443,700.00
3,401,700.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
21
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
6.7
20.1
2.01
0.335
OH
OH
OH
OH
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
502,500.00
2,010,000.00
241,200.00
33,500.00
2,787,200.00
5,100,000
15,000
6,120,000.00
84,000.00
6,204,000.00
BAHAN
Balok kayu kelas I
Besi strip tebal 5 mm
Paku 12 cm
M3
kg
kg
1.2
15
5.6
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
22
15
8,991,200.00
1,348,680.00
10,339,880.00
SNI 3434 : 2008
Uraian
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
Satuan
Koefisien
Satuan
2.4
7.2
0.72
0.12
OH
OH
OH
OH
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
180,000.00
720,000.00
86,400.00
12,000.00
998,400.00
1,325,000
15,000
1,457,500.00
45,000.00
1,502,500.00
BAHAN
Balok kayu kelas II
Besi strip tebal 5 mm
Paku 12 cm
1.1
15
3
M
kg
kg
PERALATAN
2,500,900.00
375,135.00
2,876,035.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
23
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.1
0.1
0.01
0.005
OH
OH
OH
OH
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
7,500.00
10,000.00
1,200.00
500.00
19,200.00
800,000
11,200.00
420,000
15,000
1,512.00
3,750.00
16,462.00
BAHAN
Kaso 5/7
Reng (2 x 3) cm Kayu Kelas II
Paku 5 cm dan 10 cm
0.014
0.0036
0.25
M3
3
M
kg
PERALATAN
35,662.00
5,349.30
41,011.30
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
24
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.1
0.1
0.01
0.005
OH
OH
OH
OH
Harga satuan
(Rp)
7,500.00
10,000.00
1,200.00
500.00
19,200.00
800,000
11,200.00
250,000
15,000
1,800.00
3,750.00
16,750.00
BAHAN
Kaso 5/7
Reng (3 x 4) cm Kelas II
Paku 5 cm dan 10 cm
75,000
100,000
120,000
100,000
0.014
0.0072
0.25
M
M3
kg
PERALATAN
D
E
F
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
25
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.12
0.12
0.012
0.006
35,950.00
5,392.50
41,342.50
Satuan
OH
OH
OH
OH
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
9,000.00
12,000.00
1,440.00
600.00
23,040.00
1,325,000
15,000
218,625.00
3,000.00
221,625.00
BAHAN
Kayu kelas II
Paku 5 cm 10 cm
0.165
0.2
M
kg
PERALATAN
244,665.00
36,699.75
281,364.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
26
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.15
0.3
0.03
0.075
OH
OH
OH
OH
Harga satuan
(Rp)
11,250.00
30,000.00
3,600.00
7,500.00
52,350.00
800,000
15,000
12,320.00
3,000.00
15,320.00
BAHAN
Kaso 5/7
Paku 7 cm 10 cm
0.0154
0.2
M3
kg
PERALATAN
67,670.00
10,150.50
77,820.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
27
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.15
0.3
0.03
0.075
OH
OH
OH
OH
Harga satuan
(Rp)
11,250.00
30,000.00
3,600.00
7,500.00
52,350.00
800,000
15,000
12,320.00
3,000.00
15,320.00
BAHAN
Kaso 5/7
Paku 7 cm 10 cm
0.0154
0.2
M3
kg
75,000
100,000
120,000
100,000
75,000
100,000
120,000
100,000
PERALATAN
-
67,670.00
10,150.50
77,820.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
28
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.2
0.3
0.03
0.01
OH
OH
OH
OH
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
15,000.00
30,000.00
3,600.00
1,000.00
49,600.00
800,000
15,000
13,040.00
3,750.00
16,790.00
BAHAN
Kaso 5/7
Paku 7 cm 10 cm
0.0163
0.25
M
kg
PERALATAN
66,390.00
9,958.50
76,348.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
29
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.2
0.3
0.03
0.01
OH
OH
OH
OH
Harga satuan
(Rp)
BAHAN
Kaso 5/7
Paku 7 cm 10 cm
0.0163
0.25
M3
kg
15,000.00
30,000.00
3,600.00
1,000.00
49,600.00
800,000
15,000
13,040.00
3,750.00
16,790.00
PERALATAN
66,390.00
9,958.50
76,348.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
30
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.1
0.2
0.02
0.005
OH
OH
OH
OH
Harga satuan
(Rp)
7,500.00
20,000.00
2,400.00
500.00
30,400.00
5,100,000
15,000
55,080.00
1,500.00
56,580.00
BAHAN
Papan kayu kelas I
Paku 5 cm dan 7 cm
0.0108
0.1
M
kg
75,000
100,000
120,000
100,000
75,000
100,000
120,000
100,000
PERALATAN
86,980.00
13,047.00
100,027.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
31
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.1
0.2
0.02
0.005
Satuan
OH
OH
OH
OH
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
0.0108
0.1
M3
kg
1,725,000
15,000
50,530.00
7,579.50
58,109.50
32
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.1
0.2
0.02
0.005
OH
OH
OH
OH
Harga satuan
(Rp)
7,500.00
20,000.00
2,400.00
500.00
30,400.00
5,100,000
15,000
56,100.00
750.00
56,850.00
BAHAN
Papan kayu kelas I
Paku 5 cm dan 7 cm
M3
kg
0.011
0.05
PERALATAN
87,250.00
13,087.50
100,337.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
33
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.1
0.2
0.02
0.005
OH
OH
OH
OH
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
7,500.00
20,000.00
2,400.00
500.00
30,400.00
1,725,000
18,975.00
75,000
100,000
120,000
100,000
18,630.00
1,500.00
20,130.00
PERALATAN
D
E
F
No
7,500.00
20,000.00
2,400.00
500.00
30,400.00
BAHAN
Papan kayu kelas II
Paku 5 cm dan 7 cm
BAHAN
Papan kayu kelas II
0.011
Paku 5 cm dan 7 cm
0.05
kg
15,000
PERALATAN
50,125.00
7,518.75
57,643.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
34
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.15
0.45
0.045
0.008
OH
OH
OH
OH
11,250.00
45,000.00
5,400.00
800.00
62,450.00
1,725,000
15,000
48,300.00
2,250.00
50,550.00
BAHAN
Papan kayu kelas II
Paku 5 cm dan 7 cm
0.028
0.15
M
kg
PERALATAN
113,000.00
16,950.00
129,950.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
35
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.15
0.45
0.045
0.008
OH
OH
OH
OH
11,250.00
45,000.00
5,400.00
800.00
62,450.00
1,100,000
15,000
30,800.00
2,250.00
33,050.00
BAHAN
Balok Kayu Kelas III
Paku 5 cm dan 7 cm
0.028
0.15
M
kg
PERALATAN
95,500.00
14,325.00
109,825.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
36
No
A
75,000
100,000
120,000
100,000
75,000
100,000
120,000
100,000
750.00
19,725.00
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.15
0.45
0.045
0.008
OH
OH
OH
OH
75,000
100,000
120,000
100,000
BAHAN
1,325,000
15,000
10,000
107,400.00
16,110.00
123,510.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
37
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.2
0.6
0.06
0.01
OH
OH
OH
OH
BAHAN
15,000.00
60,000.00
7,200.00
1,000.00
83,200.00
1,325,000
15,000
10,000
37,100.00
2,250.00
5,600.00
44,950.00
128,150.00
19,222.50
147,372.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
38
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.6
1.8
0.18
0.03
Harga satuan
(Rp)
OH
OH
OH
OH
45,000.00
180,000.00
21,600.00
3,000.00
249,600.00
5,100,000
15,000
25,100
35,700.00
1,500.00
3,765.00
40,965.00
BAHAN
Papan kayu kelas I
Paku 5 cm dan 10 cm
Paku skrup 10 cm
M3
kg
kg
0.007
0.1
0.15
75,000
100,000
120,000
100,000
75,000
100,000
120,000
100,000
37,100.00
2,250.00
5,600.00
44,950.00
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
39
15
290,565.00
43,584.75
334,149.75
SNI 3434 : 2008
Uraian
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
Satuan
Koefisien
Satuan
0.025
0.075
0.008
0.001
OH
OH
OH
OH
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
1,875.00
7,500.00
960.00
100.00
10,435.00
15,000
750.00
750.00
BAHAN
Plywood 4 mm
Paku 1 cm - 2,5 cm
0.4
0.05
Lembar
kg
PERALATAN
11,185.00
1,677.75
12,862.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
40
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.1
0.05
0.005
0.005
Satuan
OH
OH
OH
OH
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
7,500.00
5,000.00
600.00
500.00
13,600.00
BAHAN
Bilik Bambu
Kaso 5/7
Paku
List kayu 2/4 Kelas III
1.5
0.014
0.012
0.003
m2
M3
kg
M3
40,000
60,000.00
800,000
15,000
11,200.00
180.00
71,380.00
PERALATAN
84,980.00
12,747.00
97,727.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
41
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
15
0.1
0.05
0.005
0.005
Satuan
OH
OH
OH
OH
Harga satuan
(Rp)
BAHAN
Bilik Bambu
Kaso 5/7
Paku
List kayu 2/4 Kelas III
1.5
0.014
0.012
0.003
m2
3
M
kg
M3
75,000
100,000
120,000
100,000
7,500.00
5,000.00
600.00
500.00
13,600.00
40,000
60,000.00
800,000
15,000
11,200.00
180.00
71,380.00
PERALATAN
-
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
84,980.00
12,747.00
97,727.00
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes semen tebal 6 mm
Paku tripleks
Kode Satuan
Koefisien
Satuan
0.03
OH
0.07
OH
0.007
OH
0.004
OH
JUMLAH HARGA TENAGA
1.1
m2
0.01
kg
JUMLAH HARGA BAHAN
Harga satuan
(Rp)
75000
100000
120000
100000
45,100.00
D
E
F
JUMLAH (A+B+C)
Uraian
No
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes semen tebal 5 mm
Paku tripleks
15
Kode Satuan
Koefisien
Satuan
0.03
OH
0.07
OH
0.007
OH
0.004
OH
JUMLAH HARGA TENAGA
1.1
m2
0.01
kg
JUMLAH HARGA BAHAN
Harga satuan
(Rp)
75000
100000
120000
100000
45,100.00
JUMLAH (A+B+C)
Uraian
No
PERALATAN
D
E
F
451.00
451.00
10,941.00
1,641.15
12,582.15
10,941.00
1,641.15
12,582.15
2,250.00
7,000.00
840.00
400.00
10,490.00
PERALATAN
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes semen tebal4 mm
Paku tripleks
15
Kode Satuan
Koefisien
Satuan
0.03
OH
0.07
OH
0.007
OH
0.004
OH
JUMLAH HARGA TENAGA
1.1
m2
0.01
kg
JUMLAH HARGA BAHAN
Harga satuan
(Rp)
75000
100000
120000
100000
45,100.00
PERALATAN
-
10,941.00
1,641.15
12,582.15
JUMLAH (A+B+C)
Uraian
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Akustik Ukuran 30 x 30 cm
Paku tripleks
15
Kode Satuan
Koefisien
Satuan
0.12
OH
0.12
OH
0.012
OH
0.006
OH
JUMLAH HARGA TENAGA
12
Lembar
0.05
kg
JUMLAH HARGA BAHAN
Harga satuan
(Rp)
75000
100000
120000
100000
45,100.00
Uraian
No
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Akustik Ukuran 30 x 60 cm
Paku tripleks
15
Kode Satuan
Koefisien
Satuan
0.1
OH
0.1
OH
0.01
OH
0.005
OH
JUMLAH HARGA TENAGA
5.8
Lembar
0.05
kg
JUMLAH HARGA BAHAN
45,100.00
2,255.00
2,255.00
21,455.00
3,218.25
24,673.25
7,500.00
10,000.00
1,200.00
500.00
19,200.00
PERALATAN
D
E
F
No
2,255.00
2,255.00
25,295.00
3,794.25
29,089.25
9,000.00
12,000.00
1,440.00
600.00
23,040.00
PERALATAN
D
E
F
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Akustik Ukuran 60 x 120 cm
Paku tripleks
15
Kode Satuan
Koefisien
Satuan
0.1
OH
0.1
OH
0.01
OH
0.005
OH
JUMLAH HARGA TENAGA
1.5
Lembar
0.05
kg
JUMLAH HARGA BAHAN
45,100.00
7,500.00
10,000.00
1,200.00
500.00
19,200.00
2,255.00
2,255.00
PERALATAN
21,455.00
3,218.25
24,673.25
JUMLAH (A+B+C)
Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm
Uraian
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Triplex 3 mm (122x244 Cm)
Paku tripleks
15
Kode Satuan
Koefisien
Satuan
0.1
OH
0.1
OH
0.01
OH
0.005
OH
JUMLAH HARGA TENAGA
0.375
Lembar
0.03
kg
JUMLAH HARGA BAHAN
55,500.00
45,100.00
41,365.50
6,204.83
47,570.33
Uraian
No
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu papan
Paku tripleks
15
Kode Satuan
Koefisien
Satuan
0.8
OH
0.8
OH
0.08
OH
0.04
OH
JUMLAH HARGA TENAGA
0.015
m3
0.01
kg
JUMLAH HARGA BAHAN
1,725,000.00
45,100.00
25,875.00
451.00
26,326.00
179,926.00
26,988.90
206,914.90
60,000.00
80,000.00
9,600.00
4,000.00
153,600.00
PERALATAN
D
E
F
No
20,812.50
1,353.00
22,165.50
PERALATAN
D
E
F
7,500.00
10,000.00
1,200.00
500.00
19,200.00
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Gypsum Board (120x240x9) mm
15
Kode Satuan
Koefisien
Satuan
0.1
OH
0.05
OH
0.005
OH
0.005
OH
JUMLAH HARGA TENAGA
0.364
Lembar
70,000.00
7,500.00
5,000.00
600.00
500.00
13,600.00
25,480.00
Paku Sekrup
C
0.11
kg
JUMLAH HARGA BAHAN
25,000.00
PERALATAN
41,830.00
6,274.50
48,104.50
JUMLAH (A+B+C)
10
Uraian
No
A
2,750.00
28,230.00
15
Kode Satuan
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Koefisien
Satuan
0.06
OH
0.06
OH
0.006
OH
0.003
OH
JUMLAH HARGA TENAGA
BAHAN
List gypsum profil
Tepung gypsum
1.05
m
0.15
kg
JUMLAH HARGA BAHAN
20,000.00
10,000.00
4,500.00
6,000.00
720.00
300.00
11,520.00
21,000.00
1,500.00
22,500.00
PERALATAN
34,020.00
5,103.00
39,123.00
JUMLAH (A+B+C)
11
No
A
15
TENAGA
Pekerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
0.5
OH
0.5
OH
0.05
OH
0.025
OH
JUMLAH HARGA TENAGA
BAHAN
Profil Alluminium T
Kawat diameter 4 mm
Ramset
Akustik Ukuran 60 x 120 cm
3.6
m
0.15
kg
1.05
Buah
1.5
Lembar
JUMLAH HARGA BAHAN
75000
100000
120000
100000
25,100.00
-
99,765.00
14,964.75
114,729.75
12
3,765.00
3,765.00
PERALATAN
D
E
F
No
37,500.00
50,000.00
6,000.00
2,500.00
96,000.00
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
15
Kode Satuan
Koefisien
Satuan
0.05
0.05
0.005
OH
OH
OH
Harga satuan
(Rp)
75000
100000
120000
Mandor
B
BAHAN
List Kayu Profil
Paku
0.003
OH
JUMLAH HARGA TENAGA
1.05
m
0.01
kg
JUMLAH HARGA BAHAN
15,000.00
300.00
9,650.00
150.00
150.00
PERALATAN
100000
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
9,800.00
1,470.00
11,270.00
No
A
SNI 03-3436-1994
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.150
OH
0.075
OH
0.075
OH
0.008
OH
JUMLAH HARGA TENAGA
BAHAN
Genteng Palentong
25.000
Bh
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
11,250.00
7,500.00
9,000.00
800.00
28,550.00
PERALATAN
28,550.00
4,282.50
32,832.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
SNI 03-3436-1994
0.150
OH
0.075
OH
0.008
OH
0.008
OH
JUMLAH HARGA TENAGA
BAHAN
Genteng Kodok
25.000
Bh
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
11,250.00
7,500.00
960.00
800.00
20,510.00
PERALATAN
20,510.00
3,076.50
23,586.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Genteng Palentong Super
SNI 03-3436-1994
0.150
OH
0.075
OH
0.008
OH
0.008
OH
JUMLAH HARGA TENAGA
12.000
Bh
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
11,250.00
7,500.00
960.00
800.00
20,510.00
PERALATAN
-
15
No
A
20,510.00
3,076.50
23,586.50
JUMLAH (A+B+C)
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.400
OH
0.200
OH
0.020
OH
0.002
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
30,000.00
20,000.00
2,400.00
200.00
52,600.00
5.000
Bh
8.000
Kg
0.032
M3
JUMLAH HARGA BAHAN
1,380
170,000
11,040.00
5,440.00
16,480.00
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Genteng Bubung Palentong
Semen Portland
Pasir Pasang
PERALATAN
69,080.00
10,362.00
79,442.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.400
OH
0.200
OH
0.020
OH
0.002
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
30,000.00
20,000.00
2,400.00
200.00
52,600.00
5.000
Bh
8.000
Kg
0.032
M3
JUMLAH HARGA BAHAN
1,380
170,000
11,040.00
5,440.00
16,480.00
BAHAN
Genteng Bubung Kodok Glazzur
Semen Portland
Pasir Pasang
PERALATAN
69,080.00
10,362.00
79,442.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Genteng Bubung Palentong
Semen Portland
Pasir Pasang
SNI 03-3436-1994
0.400
OH
0.200
OH
0.020
OH
0.002
OH
JUMLAH HARGA TENAGA
4.000
8.000
0.032
Bh
Kg
M3
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
30,000.00
20,000.00
2,400.00
200.00
52,600.00
1,380
170,000
11,040.00
5,440.00
16,480.00
PERALATAN
69,080.00
10,362.00
79,442.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Roof Light Fibreglass
Paku Biasa 1/2" - 1"
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.140
OH
0.067
OH
0.007
OH
0.007
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
10,500.00
6,700.00
840.00
700.00
18,740.00
0.600
Lbr
0.050
Kg
JUMLAH HARGA BAHAN
15,000
750.00
750.00
PERALATAN
19,490.00
2,923.50
22,413.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes Gelombang
Paku 12 cm
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.140
OH
0.075
OH
0.008
OH
0.008
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
10,500.00
7,500.00
960.00
800.00
19,760.00
0.500
Lbr
0.120
Kg
JUMLAH HARGA BAHAN
PERALATAN
19,760.00
2,964.00
22,724.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
0.140
OH
0.075
OH
0.008
OH
0.008
OH
JUMLAH HARGA TENAGA
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
10,500.00
7,500.00
960.00
800.00
19,760.00
Asbes Gelombang
Paku 12 cm
C
0.600
Lbr
0.120
Kg
JUMLAH HARGA BAHAN
PERALATAN
19,760.00
2,964.00
22,724.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes Gelombang
Paku 12 cm
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.140
OH
0.070
OH
0.007
OH
0.007
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
10,500.00
7,000.00
840.00
700.00
19,040.00
0.600
Lbr
0.120
Kg
JUMLAH HARGA BAHAN
PERALATAN
19,040.00
2,856.00
21,896.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes Gelombang
Paku 12 cm
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.140
OH
0.070
OH
0.007
OH
0.007
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
10,500.00
7,000.00
840.00
700.00
19,040.00
0.750
Lbr
0.120
Kg
JUMLAH HARGA BAHAN
PERALATAN
19,040.00
2,856.00
21,896.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
SNI 03-3436-1994
0.140
0.070
0.007
0.007
OH
OH
OH
OH
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
10,500.00
7,000.00
840.00
700.00
BAHAN
Asbes Gelombang
Paku Pancing
0.350
Lbr
0.120
Kg
JUMLAH HARGA BAHAN
19,040.00
-
PERALATAN
19,040.00
2,856.00
21,896.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes Gelombang
Paku Pancing
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.140
OH
0.070
OH
0.007
OH
0.007
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
10,500.00
7,000.00
840.00
700.00
19,040.00
0.420
Lbr
0.120
Kg
JUMLAH HARGA BAHAN
PERALATAN
19,040.00
2,856.00
21,896.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes Gelombang
Paku Pancing
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.140
OH
0.070
OH
0.007
OH
0.007
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
10,500.00
7,000.00
840.00
700.00
19,040.00
0.440
Lbr
0.120
Kg
JUMLAH HARGA BAHAN
PERALATAN
19,040.00
2,856.00
21,896.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
SNI 03-3436-1994
0.140
0.070
OH
OH
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
10,500.00
7,000.00
Kepala Tukang
Mandor
B
BAHAN
Asbes Gelombang
Paku Pancing
0.007
OH
0.007
OH
JUMLAH HARGA TENAGA
120,000
100,000
840.00
700.00
19,040.00
0.510
Lbr
0.120
Kg
JUMLAH HARGA BAHAN
PERALATAN
19,040.00
2,856.00
21,896.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes Gelombang
Paku Pancing
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.140
OH
0.070
OH
0.007
OH
0.007
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
10,500.00
7,000.00
840.00
700.00
19,040.00
0.800
Lbr
0.120
Kg
JUMLAH HARGA BAHAN
PERALATAN
19,040.00
2,856.00
21,896.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes Gelombang
Paku Pancing
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.140
OH
0.070
OH
0.007
OH
0.007
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
10,500.00
7,000.00
840.00
700.00
19,040.00
0.370
Lbr
0.120
Kg
JUMLAH HARGA BAHAN
PERALATAN
19,040.00
2,856.00
21,896.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
B
BAHAN
Asbes Gelombang
Paku Pancing
0.140
OH
0.070
OH
0.007
OH
0.007
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
10,500.00
7,000.00
840.00
700.00
19,040.00
0.380
Lbr
0.120
Kg
JUMLAH HARGA BAHAN
PERALATAN
19,040.00
2,856.00
21,896.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes Gelombang
Paku Pancing
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.140
OH
0.070
OH
0.007
OH
0.007
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
10,500.00
7,000.00
840.00
700.00
19,040.00
0.460
Lbr
0.120
Kg
JUMLAH HARGA BAHAN
PERALATAN
19,040.00
2,856.00
21,896.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes Gelombang
Paku Pancing
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.140
OH
0.070
OH
0.007
OH
0.007
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
10,500.00
7,000.00
840.00
700.00
19,040.00
0.490
Lbr
0.120
Kg
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
1 m2 Pasang Atap Asbes Gelombang (1,80 x 1,08 m) x 6 mm
15
19,040.00
2,856.00
21,896.00
SNI 03-3436-1994
Uraian
No
A
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.140
OH
0.070
OH
0.007
OH
0.007
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
10,500.00
7,000.00
840.00
700.00
19,040.00
0.570
Lbr
0.120
Kg
JUMLAH HARGA BAHAN
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes Gelombang
Paku Pancing
PERALATAN
19,040.00
2,856.00
21,896.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Bubung Stel Gelombang
Paku Sekrup 3,5"
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.084
OH
0.125
OH
0.013
OH
0.004
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
6,300.00
12,500.00
1,560.00
400.00
20,760.00
2.400
Lbr
6.000
Bh
JUMLAH HARGA BAHAN
25,100
150,600.00
150,600.00
PERALATAN
171,360.00
25,704.00
197,064.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Nok Stel Gelombang
Paku Sekrup 3,5"
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.084
OH
0.125
OH
0.013
OH
0.004
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
6,300.00
12,500.00
1,560.00
400.00
20,760.00
2.100
Lbr
6.000
Bh
JUMLAH HARGA BAHAN
25,100
150,600.00
150,600.00
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
171,360.00
25,704.00
197,064.00
6.24.
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Nok Stel Gelombang
Paku Sekrup 3,5"
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.084
OH
0.125
OH
0.013
OH
0.004
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
6,300.00
12,500.00
1,560.00
400.00
20,760.00
2.050
Lbr
6.000
Bh
JUMLAH HARGA BAHAN
25,100
150,600.00
150,600.00
PERALATAN
171,360.00
25,704.00
197,064.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Nok Paten
Paku Sekrup 3,5"
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.084
OH
0.125
OH
0.013
OH
0.004
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
6,300.00
12,500.00
1,560.00
400.00
20,760.00
1.200
Lbr
6.000
Bh
JUMLAH HARGA BAHAN
25,100
150,600.00
150,600.00
PERALATAN
171,360.00
25,704.00
197,064.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Nok Paten
Paku Sekrup 3,5"
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.084
OH
0.125
OH
0.013
OH
0.004
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
6,300.00
12,500.00
1,560.00
400.00
20,760.00
1.200
Lbr
6.000
Bh
JUMLAH HARGA BAHAN
25,100
150,600.00
150,600.00
PERALATAN
JUMLAH (A+B+C)
171,360.00
E
F
6.27.
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Nok Paten
Paku Sekrup 3,5"
15
25,704.00
197,064.00
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.084
OH
0.125
OH
0.013
OH
0.004
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
6,300.00
12,500.00
1,560.00
400.00
20,760.00
1.200
Lbr
6.000
Bh
JUMLAH HARGA BAHAN
25,100
150,600.00
150,600.00
PERALATAN
171,360.00
25,704.00
197,064.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Nok Stel Rata
Paku Sekrup 3,5"
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.100
OH
0.150
OH
0.013
OH
0.004
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
7,500.00
15,000.00
1,560.00
400.00
24,460.00
1.100
Lbr
6.000
Bh
JUMLAH HARGA BAHAN
25,100
150,600.00
150,600.00
PERALATAN
175,060.00
26,259.00
201,319.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Nok Stel Rata
Paku Sekrup 3,5"
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.100
OH
0.150
OH
0.013
OH
0.004
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
7,500.00
15,000.00
1,560.00
400.00
24,460.00
1.100
Lbr
6.000
Bh
JUMLAH HARGA BAHAN
25,100
150,600.00
150,600.00
PERALATAN
-
15
No
A
175,060.00
26,259.00
201,319.00
JUMLAH (A+B+C)
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Genteng Beton
Paku Biasa 2" - 5"
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.200
OH
0.100
OH
0.010
OH
0.010
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
15,000.00
10,000.00
1,200.00
1,000.00
27,200.00
11.000
Bh
0.030
Bh
JUMLAH HARGA BAHAN
15,000
450.00
450.00
PERALATAN
27,650.00
4,147.50
31,797.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Genteng Aspal
Paku Biasa 1/2" - 1"
Plywood 4" x 8" x 6 mm
Plastic Aerator
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.200
OH
0.300
OH
0.003
OH
0.010
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
15,000.00
30,000.00
360.00
1,000.00
46,360.00
6.900
Lbr
0.030
Kg
0.350
Lbr
0.500
Bh
JUMLAH HARGA BAHAN
15,000
-
450.00
450.00
PERALATAN
46,810.00
7,021.50
53,831.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Genteng Metal Sakura Roof
Paku Biasa 2" - 5"
SNI 03-3436-1994
0.200
OH
0.100
OH
0.010
OH
0.001
OH
JUMLAH HARGA TENAGA
1.020
0.200
Lbr
Kg
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
15,000.00
10,000.00
1,200.00
100.00
26,300.00
29,000
15,000
29,580.00
3,000.00
32,580.00
PERALATAN
58,880.00
8,832.00
67,712.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Genteng Sirap
Paku Biasa 1/2" - 1"
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.166
OH
0.250
OH
0.025
OH
0.008
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
12,450.00
25,000.00
3,000.00
800.00
41,250.00
30.00
Bh
0.200
Kg
JUMLAH HARGA BAHAN
15,000
3,000.00
3,000.00
PERALATAN
44,250.00
6,637.50
50,887.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Nok Genteng Beton
Paku Biasa 2" - 5"
Semen Abu-abu
Pasir Pasang
Semen Warna
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.400
OH
0.200
OH
0.020
OH
0.020
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
30,000.00
20,000.00
2,400.00
2,000.00
54,400.00
3.500
Bh
0.050
Kg
10.800
Kg
0.032
M3
1.000
Kg
JUMLAH HARGA BAHAN
15,000
2,450
170,000
2,250
750.00
26,460.00
5,440.00
2,250.00
34,900.00
PERALATAN
89,300.00
13,395.00
102,695.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
SNI 03-3436-1994
0.125
0.250
0.060
0.0035
OH
OH
OH
OH
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
9,375.00
25,000.00
7,200.00
350.00
BAHAN
Genteng Aspal
Paku Biasa 1/2" - 1"
Kayu Borneo, Balok
2.000
Bh
0.050
Kg
0.0035
M3
JUMLAH HARGA BAHAN
41,925.00
15,000
1,825,000
PERALATAN
49,062.50
7,359.38
56,421.88
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Genteng Decra Bond
Paku Biasa 1/2" - 1"
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.250
OH
0.150
OH
0.015
OH
0.013
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
18,750.00
15,000.00
1,800.00
1,300.00
36,850.00
1.100
Bh
0.050
Kg
JUMLAH HARGA BAHAN
33,150
15,000
36,465.00
750.00
37,215.00
PERALATAN
74,065.00
11,109.75
85,174.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Seng Plat 3' x 6" Bjls. 28
Paku Biasa 1/2" - 1"
Paku Biasa 2" - 5"
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.125
OH
0.250
OH
0.025
OH
0.006
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
9,375.00
25,000.00
3,000.00
600.00
37,975.00
0.400
Lbr
0.060
Kg
0.050
Kg
JUMLAH HARGA BAHAN
15,000
15,000
900.00
750.00
1,650.00
PERALATAN
39,625.00
5,943.75
45,568.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
750.00
6,387.50
7,137.50
TENAGA
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
B
BAHAN
Seng Gelombang 3' x 6" Bjls. 28
Paku Seng
0.120
OH
0.060
OH
0.006
OH
0.006
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
9,000.00
6,000.00
720.00
600.00
16,320.00
0.700
Lbr
0.020
Kg
JUMLAH HARGA BAHAN
35,100
702.00
702.00
PERALATAN
17,022.00
2,553.30
19,575.30
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Seng Plat 3' x 6" Bjls. 28
Paku Seng
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.150
OH
0.070
OH
0.007
OH
0.006
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
11,250.00
7,000.00
840.00
600.00
19,690.00
0.300
Lbr
0.040
Kg
JUMLAH HARGA BAHAN
35,100
1,404.00
1,404.00
PERALATAN
21,094.00
3,164.10
24,258.10
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Atap Alluminium Gelombang Tebal 0,55
Paku Hak Panjang 15 cm
SNI 03-3436-1994
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.150
OH
0.750
OH
0.080
OH
0.006
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
11,250.00
75,000.00
9,600.00
600.00
96,450.00
1.050
M2
0.020
Kg
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
1 m2 Pasang Nok Alluminium
15
96,450.00
14,467.50
110,917.50
SNI 03-3436-1994
Uraian
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Nok Standar 40 cm 18, swg 22
Paku Hak Panjang 15 cm
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.100
OH
1.000
OH
0.100
OH
0.050
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
7,500.00
100,000.00
12,000.00
5,000.00
124,500.00
1.200
M2
0.040
Kg
JUMLAH HARGA BAHAN
PERALATAN
124,500.00
18,675.00
143,175.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Sisalation/Alluminium Foil
SNI 03-3436-1994
0.150
OH
0.050
OH
0.005
OH
0.008
OH
JUMLAH HARGA TENAGA
1.050
M2
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
11,250.00
5,000.00
600.00
800.00
17,650.00
PERALATAN
Harga satuan
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
17,650.00
2,647.50
20,297.50
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kloset Duduk Porselen
Perlengkapan
Koefisien
Satuan
Harga satuan
(Rp)
OH
3.300
OH
1.100
OH
0.010
OH
0.1600
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
247,500.00
110,000.00
1,200.00
16,000.00
374,700.00
Bh
1.000
6%
x Harga Kloset
JUMLAH HARGA BAHAN
150,000
150,000.00
9,000.00
159,000.00
PERALATAN
533,700.00
80,055.00
613,755.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kloset Jongkok Porselen
Semen Portland
Pasir Pasang
15
Koefisien
Satuan
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
75,000.00
150,000.00
18,000.00
16,000.00
259,000.00
Bh
1.000
Kg
6.000
M3
0.010
JUMLAH HARGA BAHAN
150,000
1,380
170,000
150,000.00
8,280.00
1,700.00
159,980.00
PERALATAN
418,980.00
62,847.00
481,827.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
1.000
OH
1.500
OH
0.150
OH
0.1600
JUMLAH HARGA TENAGA
RSNIT 15-2002
Jumlah Harga
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kloset Jongkok Teraso
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
15
Koefisien
Satuan
Harga satuan
(Rp)
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
1.000
OH
1.500
OH
0.150
OH
0.050
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
75,000.00
150,000.00
18,000.00
5,000.00
248,000.00
Bh
1.000
Bh
7.000
Kg
6.000
M3
0.010
JUMLAH HARGA BAHAN
600
1,380
170,000
4,200.00
8,280.00
1,700.00
14,180.00
PERALATAN
262,180.00
39,327.00
301,507.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
Kode
Satuan
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Urinoir
Perlengkapan
Semen Portland
Pasir Pasang
Koefisien
Satuan
Harga satuan
(Rp)
OH
1.000
OH
1.000
OH
0.100
OH
0.050
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
75,000.00
100,000.00
12,000.00
5,000.00
192,000.00
Bh
1.000
x Harga Urinoir
30%
Kg
6.000
M3
0.010
JUMLAH HARGA BAHAN
8,280.00
1,700.00
9,980.00
1,380
170,000
PERALATAN
201,980.00
30,297.00
232,277.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
Kode
Satuan
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Wastafel
Perlengkapan
Semen Portland
Pasir Pasang
Koefisien
Satuan
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
90,000.00
145,000.00
18,000.00
6,000.00
259,000.00
Bh
1.200
x Harga Wastafel
12%
Kg
6.000
M3
0.010
JUMLAH HARGA BAHAN
451,500
541,800.00
65,016.00
8,280.00
1,700.00
616,796.00
1,380
170,000
PERALATAN
875,796.00
131,369.40
1,007,165.40
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
1.200
OH
1.450
OH
0.150
OH
0.060
JUMLAH HARGA TENAGA
RSNIT 15-2002
Jumlah Harga
(Rp)
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
Satuan
Koefisien
0.075
0.750
0.075
0.300
Satuan
OH
OH
OH
OH
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
RSNIT 15-2002
Jumlah Harga
(Rp)
5,625.00
75,000.00
9,000.00
30,000.00
BAHAN
Badkip
Perlengkapan
Unit
1.000
x Harga Badkip
20%
JUMLAH HARGA BAHAN
119,625.00
-
119,625.00
17,943.75
137,568.75
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Wastafel
Perlengkapan
Satuan
Harga satuan
(Rp)
OH
3.000
OH
4.500
OH
0.050
OH
0.900
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
225,000.00
450,000.00
6,000.00
90,000.00
771,000.00
Bh
1.000
x Harga Bak
12%
JUMLAH HARGA BAHAN
451,500
451,500.00
54,180.00
505,680.00
PERALATAN
1,276,680.00
191,502.00
1,468,182.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
Porselin 11 x 11 cm
Semen Nat
Satuan
Harga satuan
(Rp)
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
6.000
OH
3.000
OH
0.300
OH
0.030
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
450,000.00
300,000.00
36,000.00
3,000.00
789,000.00
Bh
150.000
Kg
120.000
M3
0.300
Bh
360.000
Kg
6.000
JUMLAH HARGA BAHAN
600
1,380
170,000
2,450
90,000.00
165,600.00
51,000.00
14,700.00
321,300.00
PERALATAN
1,110,300.00
166,545.00
1,276,845.00
RSNIT 15-2002
Jumlah Harga
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Satuan
Harga satuan
(Rp)
RSNIT 15-2002
Jumlah Harga
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Bak Teraso
Perlengkapan
OH
3.000
OH
4.500
OH
0.050
OH
0.900
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
225,000.00
450,000.00
6,000.00
90,000.00
771,000.00
Bh
1.000
x Harga bak teraso
12%
JUMLAH HARGA BAHAN
PERALATAN
771,000.00
115,650.00
886,650.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
10
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Bak Fibreglass
Perlengkapan
Satuan
OH
0.300
OH
0.450
OH
0.045
OH
0.015
JUMLAH HARGA TENAGA
1.000
12%
Bh
x Harga Bak
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
22,500.00
45,000.00
5,400.00
1,500.00
74,400.00
351,500
351,500.00
42,180.00
393,680.00
PERALATAN
468,080.00
70,212.00
538,292.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
11
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Beton 1 : 1 1/2 : 2 1/2
Besi Beton
Kayu Cetakan
Perlengkapan
Ubin Porselen
Koefisien
Satuan
Harga satuan
(Rp)
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
3.500
OH
4.500
OH
0.050
OH
0.180
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
262,500.00
450,000.00
6,000.00
18,000.00
736,500.00
M3
0.900
Kg
180.000
M3
8.000
x Harga Beton
10%
M2
5.000
JUMLAH HARGA BAHAN
9,400
1,325,000
1,692,000.00
10,600,000.00
12,292,000.00
PERALATAN
JUMLAH HARGA ALAT
D
E
RSNIT 15-2002
Jumlah Harga
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
15
13,028,500.00
1,954,275.00
14,982,775.00
12
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Bak Cuci Stainless Steel
Water Drain + Acsesories
Satuan
Harga satuan
(Rp)
OH
0.030
OH
0.300
OH
0.030
OH
0.015
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
2,250.00
30,000.00
3,600.00
1,500.00
37,350.00
Bh
1.000
Set
1.000
JUMLAH HARGA BAHAN
PERALATAN
37,350.00
5,602.50
42,952.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
13
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Bak Cuci Teraso
Water Drain + Acsesories
Semen Portland
Pasir Pasang
Koefisien
Satuan
Harga satuan
(Rp)
14
75,000
100,000
120,000
100,000
3,750.00
50,000.00
6,000.00
2,500.00
62,250.00
Bh
1.000
Bh
1.000
Kg
20.000
M3
0.050
JUMLAH HARGA BAHAN
1,380
170,000
27,600.00
8,500.00
36,100.00
PERALATAN
98,350.00
14,752.50
113,102.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Floor Drain
Kode
Satuan
Koefisien
Satuan
OH
0.010
OH
0.100
OH
0.010
OH
0.005
JUMLAH HARGA TENAGA
1.000
Bh
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
0.050
OH
0.500
OH
0.050
OH
0.025
JUMLAH HARGA TENAGA
RSNIT 15-2002
Jumlah Harga
(Rp)
Harga satuan
(Rp)
RSNIT 15-2002
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
750.00
10,000.00
1,200.00
500.00
12,450.00
25,000
25,000.00
25,000.00
PERALATAN
-
37,450.00
5,617.50
43,067.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
15
Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran 30 x 30 Cm, Tinggi 35 Cm
Kode
Harga satuan
Uraian
No
Koefisien
Satuan
Satuan
(Rp)
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
Kerikil Beton
Besi Beton
Pasir Beton
OH
2.160
OH
0.720
OH
0.073
OH
0.011
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
162,000.00
72,000.00
8,760.00
1,100.00
243,860.00
Bh
40.000
Kg
44.000
M3
0.070
M3
0.070
Kg
1.600
M3
0.060
JUMLAH HARGA BAHAN
600
1,380
170,000
9,400
380,000
175,000
24,000.00
60,720.00
11,900.00
658.00
608,000.00
10,500.00
715,778.00
PERALATAN
959,638.00
143,945.70
1,103,583.70
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
16
Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran 45 x 45 Cm, Tinggi 50 Cm
Kode
Harga satuan
Uraian
No
Koefisien
Satuan
Satuan
(Rp)
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
Kerikil Beton
Besi Beton
Pasir Beton
75,000
100,000
120,000
100,000
240,000.00
115,000.00
1,320.00
1,600.00
357,920.00
M3
70.000
Kg
77.000
M3
0.130
M3
0.020
Kg
2.600
M3
0.090
JUMLAH HARGA BAHAN
600
1,380
170,000
380,000
9,400
175,000
42,000.00
106,260.00
22,100.00
7,600.00
24,440.00
15,750.00
218,150.00
PERALATAN
576,070.00
86,410.50
662,480.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
17
Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran 60 x 60 Cm, Tinggi 65 Cm
Kode
Harga satuan
Uraian
No
Koefisien
Satuan
Satuan
(Rp)
A
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
3.200
OH
1.150
OH
0.011
OH
0.016
JUMLAH HARGA TENAGA
RSNIT 15-2002
Jumlah Harga
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
3.200
1.150
0.011
OH
OH
OH
75,000
100,000
120,000
RSNIT 15-2002
Jumlah Harga
(Rp)
240,000.00
115,000.00
1,320.00
Mandor
B
BAHAN
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
Kerikil Beton
Besi Beton
Pasir Beton
OH
0.016
JUMLAH HARGA TENAGA
100,000
1,600.00
357,920.00
Bh
123.000
Kg
114.000
M3
0.184
M3
0.033
Kg
4.850
M3
0.120
JUMLAH HARGA BAHAN
600
1,380
170,000
380,000
9,400
175,000
73,800.00
157,320.00
31,280.00
12,540.00
45,590.00
21,000.00
341,530.00
PERALATAN
699,450.00
104,917.50
804,367.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
18
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa Galvanis Diameter 1/2"
Perlengkapan
Koefisien
Satuan
Harga satuan
(Rp)
OH
0.054
OH
0.090
OH
0.009
OH
0.027
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
4,050.00
9,000.00
1,080.00
2,700.00
16,830.00
M'
1.200
x Harga Pipa
35%
JUMLAH HARGA BAHAN
PERALATAN
16,830.00
2,524.50
19,354.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kran Air 3/4"
Seal Tape
Kode
Satuan
Koefisien
Satuan
20
Harga satuan
(Rp)
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
0.010
OH
0.400
OH
0.040
OH
0.0050
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
750.00
40,000.00
4,800.00
500.00
46,050.00
Bh
1.000
Bh
0.025
JUMLAH HARGA BAHAN
15,750
5,000
15,750.00
125.00
15,875.00
PERALATAN
RSNIT 15-2002
Jumlah Harga
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
Memasang 1 Buah Kran Diameter 1/2"
15
61,925.00
9,288.75
71,213.75
RSNIT 15-2002
Uraian
No
A
Kode
Satuan
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kran Air1/2"
Seal Tape
Koefisien
Satuan
Harga satuan
(Rp)
OH
0.010
OH
0.400
OH
0.040
OH
0.0050
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
750.00
40,000.00
4,800.00
500.00
46,050.00
Bh
1.000
Bh
0.025
JUMLAH HARGA BAHAN
10,000
5,000
10,000.00
125.00
10,125.00
PERALATAN
56,175.00
8,426.25
64,601.25
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
21
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa Galvanis Diameter 3/4"
Perlengkapan
Koefisien
Satuan
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
4,050.00
9,000.00
1,080.00
2,700.00
16,830.00
M'
1.200
x Harga Pipa
35%
JUMLAH HARGA BAHAN
PERALATAN
16,830.00
2,524.50
19,354.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
22
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa Galvanis Diameter 1"
Perlengkapan
Koefisien
Satuan
Harga satuan
(Rp)
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
0.054
OH
0.090
OH
0.009
OH
0.027
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
4,050.00
9,000.00
1,080.00
2,700.00
16,830.00
M'
1.200
x Harga Pipa
35%
JUMLAH HARGA BAHAN
PERALATAN
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
0.054
OH
0.090
OH
0.009
OH
0.0270
JUMLAH HARGA TENAGA
Jumlah Harga
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
16,830.00
2,524.50
19,354.50
23
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa Galvanis Diameter 1 1/2"
Perlengkapan
Koefisien
Satuan
Harga satuan
(Rp)
OH
0.108
OH
0.180
OH
0.018
OH
0.005
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
8,100.00
18,000.00
2,160.00
500.00
28,760.00
M'
1.200
x Harga Pipa
35%
JUMLAH HARGA BAHAN
PERALATAN
28,760.00
4,314.00
33,074.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
24
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa Galvanis Diameter 3"
Perlengkapan
Koefisien
Satuan
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
10,125.00
22,500.00
2,760.00
700.00
36,085.00
M'
1.200
x Harga Pipa
35%
JUMLAH HARGA BAHAN
PERALATAN
36,085.00
5,412.75
41,497.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
25
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa Galvanis Diameter 4"
Perlengkapan
Koefisien
Satuan
Harga satuan
(Rp)
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
0.135
OH
0.225
OH
0.023
OH
0.007
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
10,125.00
22,500.00
2,700.00
700.00
36,025.00
M'
1.200
x Harga Pipa
35%
JUMLAH HARGA BAHAN
PERALATAN
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
0.135
OH
0.225
OH
0.023
OH
0.007
JUMLAH HARGA TENAGA
RSNIT 15-2002
Jumlah Harga
(Rp)
JUMLAH (A+B+C)
36,025.00
E
F
26
5,403.75
41,428.75
No
A
15
Kode
Satuan
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa PVC Tipe AW Diameter 1/2"
Perlengkapan
Koefisien
Satuan
Harga satuan
(Rp)
OH
0.036
OH
0.060
OH
0.006
OH
0.002
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
2,700.00
6,000.00
720.00
200.00
9,620.00
M'
1.200
x Harga Pipa
35%
JUMLAH HARGA BAHAN
5,625
6,750.00
2,362.50
9,112.50
PERALATAN
18,732.50
2,809.88
21,542.38
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
Kode
Satuan
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa PVC Tipe AW Diameter 3/4"
Perlengkapan
Koefisien
Satuan
Harga satuan
(Rp)
28
75,000
100,000
120,000
100,000
2,700.00
6,000.00
720.00
200.00
9,620.00
M'
1.200
x Harga Pipa
35%
JUMLAH HARGA BAHAN
7,625
9,150.00
3,202.50
12,352.50
PERALATAN
21,972.50
3,295.88
25,268.38
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
0.036
OH
0.060
OH
0.006
OH
0.002
JUMLAH HARGA TENAGA
RSNIT 15-2002
Jumlah Harga
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa PVC Tipe AW Diameter 1"
Perlengkapan
Kode
Satuan
Koefisien
Satuan
Harga satuan
(Rp)
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
0.036
OH
0.060
OH
0.006
OH
0.002
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
2,700.00
6,000.00
720.00
200.00
9,620.00
M'
1.200
x Harga Pipa
35%
JUMLAH HARGA BAHAN
8,750
10,500.00
3,675.00
14,175.00
PERALATAN
-
23,795.00
3,569.25
27,364.25
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
29
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa PVC Tipe AW Diameter 1 1/2"
Perlengkapan
Koefisien
Satuan
Harga satuan
(Rp)
OH
0.054
OH
0.090
OH
0.009
OH
0.003
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
4,050.00
9,000.00
1,080.00
300.00
14,430.00
M'
1.200
x Harga Pipa
35%
JUMLAH HARGA BAHAN
17,625
21,150.00
7,402.50
28,552.50
PERALATAN
42,982.50
6,447.38
49,429.88
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
Kode
Satuan
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa PVC Tipe AW Diameter 2"
Perlengkapan
Koefisien
Satuan
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
4,050.00
9,000.00
1,080.00
300.00
14,430.00
M'
1.200
x Harga Pipa
35%
JUMLAH HARGA BAHAN
25,125
30,150.00
10,552.50
40,702.50
PERALATAN
51,255.00
106,387.50
15,958.13
122,345.63
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
31
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
0.054
OH
0.090
OH
0.009
OH
0.003
JUMLAH HARGA TENAGA
RSNIT 15-2002
Jumlah Harga
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa PVC Tipe AW Diameter 2 1/2"
Perlengkapan
PERALATAN
Koefisien
Satuan
Harga satuan
(Rp)
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
0.081
OH
0.135
OH
0.014
OH
0.004
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
6,075.00
13,500.00
1,620.00
400.00
21,595.00
M'
1.200
x Harga Pipa
35%
JUMLAH HARGA BAHAN
41,375
49,650.00
17,377.50
67,027.50
84,405.00
173,027.50
25,954.13
198,981.63
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
Kode
Satuan
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa PVC Tipe AW Diameter 3"
Perlengkapan
Koefisien
Satuan
Harga satuan
(Rp)
OH
0.081
OH
0.135
OH
0.0135
OH
0.004
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
6,075.00
13,500.00
1,620.00
400.00
21,595.00
M'
1.200
x Harga Pipa
35%
JUMLAH HARGA BAHAN
41,375
49,650.00
17,377.50
67,027.50
PERALATAN
88,622.50
13,293.38
101,915.88
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa PVC Tipe AW Diameter 4"
Perlengkapan
Kode
Satuan
Koefisien
Satuan
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
6,075.00
13,500.00
1,620.00
410.00
21,605.00
M'
1.200
x Harga Pipa
35%
JUMLAH HARGA BAHAN
68,875
82,650.00
28,927.50
111,577.50
PERALATAN
Perlengkapan
133,182.50
19,977.38
153,159.88
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
34
Memasang 1 m' Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 20 Cm
Kode
Uraian
No
Koefisien
Satuan
Satuan
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa Tanah
Semen Portland
Pasir Pasang
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
0.081
OH
0.135
OH
0.0135
OH
0.0041
JUMLAH HARGA TENAGA
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
0.080
OH
0.040
OH
0.004
OH
0.004
JUMLAH HARGA TENAGA
1.600
35.000
0.014
Bh
Kg
M3
Harga satuan
(Rp)
RSNIT 15-2002
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
6,000.00
4,000.00
480.00
400.00
10,880.00
1,380
170,000
48,300.00
2,380.00
Pasir Urug
C
M3
0.014
JUMLAH HARGA BAHAN
100,000
PERALATAN
62,960.00
9,444.00
72,404.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
35
Memasang 1 m' Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 15 Cm
Kode
Uraian
No
Koefisien
Satuan
Satuan
A
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa Tanah
Semen Portland
Pasir Pasang
Pasir Urug
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
4,500.00
3,000.00
360.00
300.00
8,160.00
Bh
1.600
Kg
0.680
M3
0.013
M3
0.011
JUMLAH HARGA BAHAN
1,380
170,000
100,000
938.40
2,210.00
1,100.00
4,248.40
PERALATAN
12,408.40
1,861.26
14,269.66
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
36
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa Beton
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
Pasir Urug
Satuan
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
10,500.00
7,000.00
840.00
700.00
19,040.00
Bh
1.100
M3
0.027
Kg
3.920
M3
0.056
M3
0.024
JUMLAH HARGA BAHAN
600
1,380
170,000
100,000
16.20
5,409.60
9,520.00
2,400.00
17,345.80
PERALATAN
36,385.80
5,457.87
41,843.67
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
37
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
0.140
OH
0.070
OH
0.007
OH
0.0070
JUMLAH HARGA TENAGA
RSNIT 15-2002
Jumlah Harga
(Rp)
OH
0.060
OH
0.030
OH
0.003
OH
0.003
JUMLAH HARGA TENAGA
1,400.00
52,080.00
TENAGA
Pekerja
0.380
Satuan
OH
Harga satuan
(Rp)
75,000
RSNIT 15-2002
Jumlah Harga
(Rp)
28,500.00
Tukang Batu
Kepala Tukang
Mandor
B
BAHAN
Pipa Beton
Batu Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
Pasir Urug
OH
0.190
OH
0.019
OH
0.0190
JUMLAH HARGA TENAGA
100,000
120,000
100,000
19,000.00
2,280.00
1,900.00
51,680.00
Bh
1.100
M3
0.550
Kg
10.300
M3
0.061
M3
0.069
JUMLAH HARGA BAHAN
600
1,380
170,000
100,000
330.00
14,214.00
10,370.00
6,900.00
31,814.00
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
83,494.00
12,524.10
96,018.10
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.060
OH
0.600
OH
0.060
OH
0.0030
OH
JUMLAH HARGA TENAGA
BAHAN
Kunci Tanam Antik
1.000
Bh
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
4,500.00
60,000.00
7,200.00
300.00
72,000.00
220,100
220,100.00
220,100.00
PERALATAN
292,100.00
43,815.00
335,915.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.010
OH
0.500
OH
0.050
OH
0.005
OH
JUMLAH HARGA TENAGA
BAHAN
Kunci Tanam Biasa
1.000
Bh
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
750.00
50,000.00
6,000.00
500.00
57,250.00
150,100
150,100.00
150,100.00
PERALATAN
207,350.00
31,102.50
238,452.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.005
OH
0.500
OH
0.050
OH
0.003
OH
JUMLAH HARGA TENAGA
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
375.00
50,000.00
6,000.00
300.00
56,675.00
BAHAN
Kunci Tanam Kamar Mandi
150,100.00
150,100.00
1.000
Bh
150,100
PERALATAN
D
E
F
6.4.
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
206,775.00
31,016.25
237,791.25
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.005
OH
0.500
OH
0.050
OH
0.003
OH
JUMLAH HARGA TENAGA
BAHAN
Kunci Silinder
1.000
Bh
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
375.00
50,000.00
6,000.00
300.00
56,675.00
PERALATAN
56,675.00
8,501.25
65,176.25
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.015
OH
0.150
OH
0.015
OH
0.0008
OH
JUMLAH HARGA TENAGA
BAHAN
Engsel Pintu
1.000
Bh
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
1,125.00
15,000.00
1,800.00
80.00
18,005.00
10,000
10,000.00
10,000.00
PERALATAN
28,005.00
4,200.75
32,205.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Engsel Jendela
0.010
OH
0.100
OH
0.010
OH
0.0005
OH
JUMLAH HARGA TENAGA
1.000
Bh
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
750.00
10,000.00
1,200.00
50.00
12,000.00
7,000
7,000.00
7,000.00
PERALATAN
Harga satuan
(Rp)
JUMLAH (A+B+C)
19,000.00
E
F
6.7.
15
2,850.00
21,850.00
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.100
OH
0.200
OH
0.020
OH
0.010
OH
JUMLAH HARGA TENAGA
BAHAN
Engsel Angin
1.000
Bh
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
7,500.00
20,000.00
2,400.00
1,000.00
30,900.00
PERALATAN
30,900.00
4,635.00
35,535.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.015
OH
0.150
OH
0.015
OH
0.008
OH
JUMLAH HARGA TENAGA
BAHAN
Spring Knip
1.000
Bh
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
1,125.00
15,000.00
1,800.00
800.00
18,725.00
PERALATAN
18,725.00
2,808.75
21,533.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kait Angin
0.015
OH
0.150
OH
0.015
OH
0.008
OH
JUMLAH HARGA TENAGA
1.000
Bh
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
1,125.00
15,000.00
1,800.00
800.00
18,725.00
8,000
8,000.00
8,000.00
PERALATAN
Harga satuan
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
15
26,725.00
4,008.75
F
6.10.
No
A
30,733.75
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.050
OH
0.500
OH
0.050
OH
0.003
OH
JUMLAH HARGA TENAGA
BAHAN
Door Closer
1.000
Bh
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
3,750.00
50,000.00
6,000.00
300.00
60,050.00
PERALATAN
60,050.00
9,007.50
69,057.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.020
OH
0.200
OH
0.020
OH
0.001
OH
JUMLAH HARGA TENAGA
BAHAN
Kunci Selot
1.000
Bh
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
1,500.00
20,000.00
2,400.00
100.00
24,000.00
20,075
20,075.00
20,075.00
PERALATAN
44,075.00
6,611.25
50,686.25
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Door Holder
0.050
OH
0.500
OH
0.050
OH
0.003
OH
JUMLAH HARGA TENAGA
1.000
Bh
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
3,750.00
50,000.00
6,000.00
300.00
60,050.00
PERALATAN
Harga satuan
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
60,050.00
9,007.50
69,057.50
6.13.
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.010
OH
0.100
OH
0.010
OH
0.005
OH
JUMLAH HARGA TENAGA
BAHAN
Door Stop
1.000
Bh
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
750.00
10,000.00
1,200.00
500.00
12,450.00
PERALATAN
12,450.00
1,867.50
14,317.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.060
OH
0.600
OH
0.060
OH
0.00300
OH
JUMLAH HARGA TENAGA
BAHAN
Rel Pintu Dorong
1.000
Bh
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
4,500.00
60,000.00
7,200.00
300.00
72,000.00
PERALATAN
72,000.00
10,800.00
82,800.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kunci Lemari
0.025
OH
0.250
OH
0.025
OH
0.003
OH
JUMLAH HARGA TENAGA
1.000
Bh
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
1,875.00
25,000.00
3,000.00
300.00
30,175.00
15,075
15,075.00
15,075.00
PERALATAN
Harga satuan
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
45,250.00
6,787.50
52,037.50
6.16.
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kaca, Tebal 3 mm
Sealent
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.015
OH
0.150
OH
0.015
OH
0.008
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
1,125.00
15,000.00
1,800.00
800.00
18,725.00
1.100
M2
0.050
kg
JUMLAH HARGA BAHAN
PERALATAN
18,725.00
2,808.75
21,533.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kaca, Tebal 5 mm
Sealent
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.015
OH
0.150
OH
0.015
OH
0.008
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
1,125.00
15,000.00
1,800.00
800.00
18,725.00
1.100
M2
0.050
kg
JUMLAH HARGA BAHAN
155,000
-
170,500.00
170,500.00
PERALATAN
189,225.00
28,383.75
217,608.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kaca, Tebal 8 mm
Sealent
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.017
OH
0.165
OH
0.017
OH
0.00080
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
1,237.50
16,500.00
1,980.00
80.00
19,797.50
1.100
M2
0.070
kg
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
1 M2 Pasang Kaca Buram, Tebal 12 mm
15
19,797.50
2,969.63
22,767.13
Uraian
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kaca Buram, Tebal 12 mm
Sealent
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.025
OH
0.250
OH
0.025
OH
0.00125
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
1,875.00
25,000.00
3,000.00
125.00
30,000.00
1.100
M2
0.050
Kg
JUMLAH HARGA BAHAN
PERALATAN
30,000.00
4,500.00
34,500.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.015
OH
0.150
OH
0.015
OH
0.008
OH
JUMLAH HARGA TENAGA
BAHAN
Kaca Cermin, Tebal 5 mm
1.100
M2
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
1,125.00
15,000.00
1,800.00
800.00
18,725.00
PERALATAN
18,725.00
2,808.75
21,533.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
15
Harga satuan
(Rp)
TENAGA
Pekerja
Kepala Tukang
Mandor
0.015
0.015
0.00075
OH
OH
OH
75,000
120,000
100,000
1.100
M2
PERALATAN
1,125.00
1,800.00
75.00
3,000.00
BAHAN
Kaca Cermin, Tebal 6 mm
Jumlah Harga
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
3,000.00
450.00
3,450.00
6.22.
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.017
OH
0.017
OH
0.017
OH
0.009
OH
JUMLAH HARGA TENAGA
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
1,237.50
1,700.00
1,980.00
900.00
5,817.50
BAHAN
Kaca Cermin, Tebal 8 mm
1.100
M2
PERALATAN
5,817.50
872.63
6,690.13
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.015
OH
0.150
OH
0.015
OH
0.008
OH
JUMLAH HARGA TENAGA
BAHAN
Kaca Wireglass, Tebal 5 mm
1.100
M2
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
1,125.00
15,000.00
1,800.00
800.00
18,725.00
PERALATAN
18,725.00
2,808.75
21,533.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
No
A
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kaca Patri, Tebal 5 mm
Sealant
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.015
OH
0.150
OH
0.015
OH
0.004
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
1,125.00
15,000.00
1,800.00
400.00
18,325.00
1.100
M2
0.050
kg
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
18,325.00
2,748.75
21,073.75
Satuan
Harga satuan
(Rp)
0.150
OH
0.0030
OH
JUMLAH HARGA TENAGA
75,000
100,000
11,250.00
300.00
11,550.00
0.050
100,000
5,000.00
5,000.00
Kg
PERALATAN
16,550.00
2,482.50
19,032.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
TENAGA
Pekerja
Mandor
BAHAN
Sabun
15
Harga satuan
(Rp)
75,000
100,000
11,250.00
300.00
11,550.00
0.050
15,000
750.00
750.00
Kg
PERALATAN
12,300.00
1,845.00
14,145.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
No
A
TENAGA
Pekerja
Mandor
BAHAN
Sabun
15
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.150
OH
0.0080
OH
JUMLAH HARGA TENAGA
75,000
100,000
11,250.00
800.00
12,050.00
0.050
15,000
750.00
750.00
Kg
Jumlah Harga
(Rp)
0.150
OH
0.0030
OH
JUMLAH HARGA TENAGA
Jumlah Harga
(Rp)
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
12,800.00
1,920.00
14,720.00
Uraian
No
A
Kode
Satuan
TENAGA
Pekerja
Mandor
Koefisien
Satuan
Harga satuan
(Rp)
0.150
OH
0.0025
OH
JUMLAH HARGA TENAGA
75,000
100,000
11,250.00
250.00
11,500.00
0.050
15,000
750.00
750.00
BAHAN
Sabun
Kg
PERALATAN
12,250.00
1,837.50
14,087.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Uraian
Kode
Satuan
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
BAHAN
Dempul Jadi
Minyak Cat
Batu Apung
Harga satuan
(Rp)
Jumlah Harga
(Rp)
120,000.00
160,000.00
96,000.00
50,000.00
426,000.00
40.000
Kg
10.000
Ltr
JUMLAH HARGA BAHAN
426,000.00
63,900.00
489,900.00
Sewa/Hari
JUMLAH HARGA ALAT
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
Uraian
Satuan
75,000
100,000
120,000
100,000
PERALATAN
Kompressor, Blasting Pot,
Selang dan Nozzle
No
Koefisien
1.600
OH
1.600
OH
0.800
OH
0.500
OH
JUMLAH HARGA TENAGA
BAHAN
Pasir Silika
BBM
D
E
F
1 m2 Mengerok Karat atau Cat Lama Permukaan Baja dengan Pancar Pasir (sanblasting) dengan
tingkat Kebersihan Sa. 2 1/2
No
A
Jumlah Harga
(Rp)
15
Kode
Satuan
Koefisien
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.040
OH
0.040
OH
0.004
OH
0.0025
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
3,000.00
4,000.00
480.00
250.00
7,730.00
0.050
Kg
0.020
Kg
0.010
Kg
JUMLAH HARGA BAHAN
20,100
25,100
-
1,005.00
502.00
1,507.00
PERALATAN
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
9,237.00
1,385.55
10,622.55
Uraian
No
A
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
BAHAN
Plamir Kayu
Cat Dasar Kayu
Cat Penutup Kayu
Kode
Satuan
Koefisien
Satuan
Harga satuan
(Rp)
0.070
OH
0.075
OH
0.0075
OH
0.0025
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
5,250.00
7,500.00
900.00
250.00
13,900.00
0.150
Kg
0.170
Kg
0.170
Kg
JUMLAH HARGA BAHAN
20,100
28,000
-
3,015.00
4,760.00
7,775.00
PERALATAN
21,675.00
3,251.25
24,926.25
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
1 m2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar 2 Lapis Cat Penutup
Kode
Harga satuan
Jumlah Harga
Uraian
Koefisien
Satuan
Satuan
(Rp)
(Rp)
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
BAHAN
Cat Meni
Plamir Kayu
Cat Dasar Kayu
Cat Penutup Kayu (2 Kali)
Kuas
Pengencer
Ampelas
0.070
OH
0.009
OH
0.006
OH
0.0030
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
5,250.00
900.00
720.00
300.00
7,170.00
0.200
Kg
0.150
Kg
0.170
Kg
0.260
Kg
0.010
Bh
0.030
Kg
0.200
Lbr
JUMLAH HARGA BAHAN
20,100
20,100
28,000
30,000
20,000
25,100
5,075
4,020.00
3,015.00
4,760.00
7,800.00
200.00
753.00
1,015.00
21,563.00
PERALATAN
28,733.00
4,309.95
33,042.95
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
1 m2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar 3 Lapis Cat Penutup
Kode
Harga satuan
Jumlah Harga
Uraian
Koefisien
Satuan
Satuan
(Rp)
(Rp)
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.070
0.105
0.004
0.0030
75,000
100,000
120,000
100,000
5,250.00
10,500.00
480.00
300.00
16,530.00
20,100
20,100
28,000
20,000
25,100
4,020.00
3,015.00
4,760.00
200.00
753.00
Jumlah Harga
(Rp)
BAHAN
Cat Meni
Plamir Kayu
Cat Dasar Kayu
Cat Penutup Kayu (3 Kali)
Kuas
Pengencer
0.200
0.150
0.170
0.350
0.010
0.030
Kg
Kg
Kg
Kg
Bh
Kg
0.200
Lbr
JUMLAH HARGA BAHAN
Ampelas
C
5,075
PERALATAN
30,293.00
4,543.95
34,836.95
1,015.00
13,763.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Koefisien
Satuan
0.040
OH
0.063
OH
0.063
OH
0.0030
OH
JUMLAH HARGA TENAGA
BAHAN
Teak Oil
0.360
Ltr
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
3,000.00
6,300.00
7,560.00
300.00
17,160.00
PERALATAN
17,160.00
2,574.00
19,734.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Koefisien
Satuan
Harga satuan
(Rp)
0.040
OH
0.060
OH
0.016
OH
0.0030
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
0.150
Ltr
0.372
Ltr
2.000
Lbr
JUMLAH HARGA BAHAN
50,100
50,100
5,075
6.12.
No
A
6,000.00
1,920.00
300.00
8,220.00
7,515.00
18,637.20
10,150.00
36,302.20
PERALATAN
44,522.20
6,678.33
51,200.53
Jumlah Harga
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.100
OH
0.006
OH
JUMLAH HARGA TENAGA
75,000
100,000
7,500.00
600.00
8,100.00
0.350
25,100
8,785.00
-
Ltr
8,785.00
PERALATAN
16,885.00
2,532.75
19,417.75
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Koefisien
Satuan
Harga satuan
(Rp)
0.160
OH
0.160
OH
0.016
OH
0.0030
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
12,000.00
16,000.00
1,920.00
300.00
30,220.00
0.150
Ltr
0.050
Kg
0.100
Lbr
0.010
Bh
JUMLAH HARGA BAHAN
50,100
20,100
5,075
20,000
7,515.00
1,005.00
507.50
200.00
9,227.50
PERALATAN
39,447.50
5,917.13
45,364.63
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
1 m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 lapis Cat Penutup)
Kode
Harga satuan
Uraian
Koefisien
Satuan
Satuan
(Rp)
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
BAHAN
Plamir Tembok
Cat Dasar Tembok
Cat Penutup Tembok (2 Kali)
6.15.
No
A
Jumlah Harga
(Rp)
0.020
OH
0.063
OH
0.0063
OH
0.0030
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
1,500.00
6,300.00
756.00
300.00
8,856.00
0.100
Kg
0.100
Kg
0.260
Kg
JUMLAH HARGA BAHAN
10,100
30,000
31,000
1,010.00
3,000.00
8,060.00
12,070.00
PERALATAN
20,926.00
3,138.90
24,064.90
Jumlah Harga
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
0.028
OH
0.042
OH
0.0042
OH
0.0030
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
Jumlah Harga
(Rp)
2,100.00
4,200.00
504.00
300.00
7,104.00
BAHAN
- Cat Dasar Tembok
- Cat Penutup Tembok (2 Kali)
0.120
Kg
0.180
Kg
JUMLAH HARGA BAHAN
30,000
31,000
PERALATAN
16,284.00
2,442.60
18,726.60
3,600.00
5,580.00
9,180.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Koefisien
Satuan
0.028
OH
0.042
OH
0.0042
OH
0.0030
OH
JUMLAH HARGA TENAGA
BAHAN
Kalkarium
0.100
Kg
Harga satuan
(Rp)
Jumlah Harga
(Rp)
75,000
100,000
120,000
100,000
2,100.00
4,200.00
504.00
300.00
7,104.00
PERALATAN
7,104.00
1,065.60
8,169.60
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Koefisien
Satuan
Harga satuan
(Rp)
0.150
OH
0.001
OH
0.0001
OH
0.0025
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
11,250.00
100.00
12.00
250.00
11,612.00
0.100
Lbr
0.250
Ikat
0.150
Kg
JUMLAH HARGA BAHAN
5,075
2,000
4,075
507.50
500.00
611.25
1,618.75
PERALATAN
13,230.75
1,984.61
15,215.36
Jumlah Harga
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
0.040
0.005
0.0005
0.0025
OH
OH
OH
OH
Harga satuan
(Rp)
75,000
100,000
120,000
100,000
Jumlah Harga
(Rp)
3,000.00
500.00
60.00
250.00
BAHAN
Kapur Sirih
Ampelas
Alang-Alang
0.150
Kg
0.200
Kg
0.250
Ikat
JUMLAH HARGA BAHAN
3,810.00
4,075
5,075
2,000
PERALATAN
5,936.25
890.44
6,826.69
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
6.19.
No
A
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
BAHAN
Wall Paper
Perekat
15
Kode
Satuan
Koefisien
Satuan
Harga satuan
(Rp)
6.20.
No
A
75,000
100,000
120,000
100,000
1,500.00
20,000.00
2,400.00
250.00
24,150.00
1.200
M3
0.200
Kg
JUMLAH HARGA BAHAN
PERALATAN
24,150.00
3,622.50
27,772.50
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
Satuan
Harga satuan
(Rp)
6.21.
No
A
Jumlah Harga
(Rp)
0.020
OH
0.200
OH
0.020
OH
0.0025
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
1,500.00
20,000.00
2,400.00
250.00
24,150.00
0.100
Kg
0.010
Bh
JUMLAH HARGA BAHAN
20,100
20,000
2,010.00
200.00
2,210.00
PERALATAN
26,360.00
3,954.00
30,314.00
Jumlah Harga
(Rp)
0.020
OH
0.200
OH
0.0200
OH
0.0025
OH
JUMLAH HARGA TENAGA
611.25
1,015.00
500.00
2,126.25
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
0.250
0.225
0.0225
OH
OH
OH
Harga satuan
(Rp)
75,000
100,000
120,000
Jumlah Harga
(Rp)
18,750.00
22,500.00
2,700.00
Mandor
B
0.0075
OH
JUMLAH HARGA TENAGA
100,000
750.00
44,700.00
0.100
Kg
0.010
Bh
0.002
M3
JUMLAH HARGA BAHAN
20,100
20,000
1,275,000
2,010.00
200.00
2,550.00
4,760.00
BAHAN
Meni Besi
Kuas
Perancah kayu
PERALATAN
49,460.00
7,419.00
56,879.00
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
1 m2 Pengecatan Permukaan Baja Lapis Seng (Galbani) secara Manual sistem 4 Lapis Cat
Uraian
No
A
15
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Kode
Satuan
Koefisien
Satuan
Harga satuan
(Rp)
0.006
OH
0.006
OH
0.0225
OH
0.0075
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
450.00
600.00
2,700.00
750.00
4,500.00
0.100
Kg
0.100
Kg
0.010
Ltr
0.002
M3
0.010
Bh
0.010
Ltr
JUMLAH HARGA BAHAN
20,100
20,100
25,100
1,275,000
20,000
2,010.00
2,010.00
251.00
2,550.00
200.00
7,021.00
BAHAN
Meni (Read Lead) A
Meni (Read Lead) B
Pengencer
Perancah kayu
Cat Baja
Kuas
PERALATAN
11,521.00
1,728.15
13,249.15
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
1 m2 Pengecatan Permukaan Baja Lapis Seng (Galbani) secara Manual sistem 1 Lapis Cat Mutakhir
Uraian
No
A
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
BAHAN
Cat Permukaan Baja
Kuas
Pengencer
Kode
Satuan
Koefisien
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.006
OH
0.060
OH
0.012
OH
0.003
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
450.00
6,000.00
1,440.00
300.00
8,190.00
0.300
Kg
0.010
Bh
0.010
Ltr
JUMLAH HARGA BAHAN
20,000
25,100
200.00
251.00
451.00
PERALATAN
Jumlah Harga
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
8,641.00
1,296.15
9,937.15
6.24.
1 m2 Pengecatan Permukaan Baja Lapis Seng (Galbani) secara Manual sistem 3 Lapis Cat
Konvensional
Uraian
No
A
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Kode
Satuan
Koefisien
Satuan
Harga satuan
(Rp)
0.400
OH
0.800
OH
0.800
OH
0.200
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
30,000.00
80,000.00
96,000.00
20,000.00
226,000.00
0.110
Kg
0.170
Kg
0.080
Kg
0.010
Bh
0.010
Ltr
JUMLAH HARGA BAHAN
20,000
25,100
200.00
251.00
451.00
BAHAN
Cat Dasar Baja
Cat Antara Baja
Cat Penutup Baja
Kuas
Pengencer
PERALATAN
226,451.00
33,967.65
260,418.65
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
1 m2 Pengecatan Permukaan Baja Lapis Seng (Galbani) secara Semprot (airless) dengan sistem 1
Lapis Cat Mutakhir
Uraian
No
A
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
BAHAN
Cat Dasar Baja
Pengencer
Kode
Satuan
Koefisien
Satuan
Harga satuan
(Rp)
Jumlah Harga
(Rp)
0.400
OH
0.700
OH
0.070
OH
0.020
OH
JUMLAH HARGA TENAGA
75,000
100,000
120,000
100,000
30,000.00
70,000.00
8,400.00
2,000.00
110,400.00
0.300
Kg
0.010
Ltr
JUMLAH HARGA BAHAN
25,100
251.00
251.00
PERALATAN
Jumlah Harga
(Rp)
JUMLAH (A+B+C)
Overhead dan Provit
Harga Satuan Pekerjaan (D+E)
15
110,651.00
16,597.65
127,248.65