Você está na página 1de 1

Testing of Protection Path for Control Communication of Rajkot Division

Dt 19.05.14
Sr
No.

Testing of Protection
Path for Control

E1
Patching

Radio
Patching

In Time

Out Time

RJT-WKR-DAC-MALB
(Rajkot-WankanerDahisara-Maliya Miyana)

CTO
Working

------

------

--------

Rajkot SUNR
(Rajkot- Surendranagr)

------

Testing

12:00
18.05.14

12:30
18.05.14

RJT-VG
(Rajkot-viramgam)

RJT-HM
(Rajkot- Hadmatiya)

Remark
MALB to MU (Maliya Miyana
to Makansar) SEC CTO
continuously working on VG
to MALB (Viramgam to
Maliya MIyana) RCIL 2 Mbps
Channel.
CTO CKT Working normal on
UHF Radio Patching Channel.

Testing

-----

-----

------

Testing

08:45
18.05.14

09:25
18.05.14

JE/T/VG(ADI Division) Sh
Nair reported that No staff is
deputed for Testing or Radio
Patching at VG/UHF.
CTO CKT Working normal on
UHF Radio Patching Channel
with heavy Noise.

RJT- HAPA
(Rajkot-Hapa)

------

Testing

12:20
16.05.14

21:25
16.05.14

CTO CKT Working normal on


UHF Radio Patching Channel
with heavy Noise.

RJT-KMBL
(Rajkot-Khambhaliya)

------

Testing

16:00
17.05.14

16:30
17.05.14

CTO CKT Working normal on


UHF Radio Patching Channel
with heavy Noise.

RJT- DWK
(Rajkot-Dwarka)

------

Testing

08:00
18.05.14

09:00
18.05.14

CTO CKT Working normal on


UHF Radio Patching Channel
with heavy Noise.

------

Você também pode gostar