SHAPOORJI PALLONJI CO. LTD.

DAILY CONCRETE PROGRAM


2-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Mr.Nadeem

Cluster A

Floor

Type of Structure

Start Time

Conc. Qty
(m3)

BL

Placing
Method

AL

A1
A2
A3
A4

Mr.Abdul

A5

11F

Staicase

M-25

4.5

A5

14F

Columns

M-25

6.5

2.00 PM
10.00 AM

Mr.Manjunath

11F

Staircase

M-25

4.5

A5

14F

Columns

M-25

5.0

Footing,A3,A4

M-25

10.0

NTA

LGF

Footing,A1,A2

M-25

13.0

NTA

LGF

Footing,A7

M-20

3.5

NTA

LGF

Columns,A4

M-40

0.6

NTA

LGF

Columns,A2

M-40

0.8

5.00PM

TC-3

NTA

LGF

Footing ,A3,A4

M-25

10.0

Pump

NTA

LGF

Footing ,A1,A2

M-25

13.0

Direct

NTA

LGF

C.Wall Footing

M-20

9.00AM

TC-3

NTA

Pod

Slab,A1

M-25

10.00AM

TC-2

NTA
LGF

C.Wall Footing

M-10

B6

17F

Columns

M-25

3.0

5.0

B6

17F

Slab-P3

M-20

41.0

42.0

9.00 AM
2.30 PM

PCC

PCC

B1
B2

B1
B2
17F

Staicase

M-25

9.00AM

3.0

TC-4

Cluster B

Mr.Biradar /
Mr.Chandran

Cluster C

Mr.Arun

Mr.Ramesh
Mr.Biradar /
Mr.Chandran

10

Cluster D

Mr.Prabhakar

12

Shashidhar / Ravi Harikanth

3.0
76.0

60.0

7.5

B3

B5
17F

Columns

M-25

2.00PM

4.0

TC-4

NTB

GF

Columns,B3

M-40

3.0

11.00 AM

TC-4

NTB

GF

Columns,B3

M-40

3.0

NTB

LGF

Footing,B3

M-25

16.0

9.00 AM

Direct

NTB

UGF

Slab,B2

M-25

70.0

PCC

Night

B4

B6

Achi.

A7
LGF

B6

Remarks

A5

B5
Mr.Rajkumar

Plan

TC-3

B4

Type of Structure

A6

NTA

B3

Floor

TC-3

A7

Mr.Jairaj

Tower No.

Today Qty

Concrete
Grade

A1
A2
A3
A4

A6

1-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

75.0

PCC

C1

17F

Slab-P2

M-20

49.0

C2

16F

Staicase

M-25

6.0

C2

17F

Columns

M-25

6.0

C3

17F

Columns

M-25

6.0

Pump

C1

17F

Slab-P2

M-20

49.0

5.00 PM

TC-6

C2

16F

Staircase

M-25

6.0

TC6

C2

17F

Columns

M-25

6.0

2.00PM

TC-6

C3

16F

Columns

M-25

C4

C4

NTC

NTC

PCC

PCC

LGF

UG Tank

M-10

D1

D1

17F

Columns

M-25

2.5

4.0

TC-7

D2

17F

Columns

M-25

5.0

7.0

Pump

NTD

294.0

213.5

0.0

D2

17F

Columns

M-25

3.0

NTD

GF

Slab,D1

M-25

50.0

10.00 AM

9.00 AM

11.00 AM
3.00 PM

PCC

PCC

EXT

EXT

PCC

PP

8.0
2.0

PCC
Target Quantity

Quantity

184.9
Cumulative Planned vs Achieved for Aug 2012

Tower

A1

A2

M. Target

Achieved

A3

A4

A5

A6

A7

331
0

0%

NTA

B1

900

63

7%

B2

B3

B4

B5

74
0

0%

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

47

75

18%

11%

0%

5%

1%

0%

0%

1%

2%

0%

0%

0%

2%

Cum. Planned till July '12

Cum. Achieved till date

135,240

101,686

75%

Item

Planned for August '12

Planned till 1-08-12

Planned
Avg. / day

Achieved till 1-08-12

Achieved
Avg. / day

Cum. Achieved till date

PCC

450

15

15

52%

5,692

RCC

4,368

141

141

206

146%

206

100,180

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
3-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Floor

Type of Structure

Start Time

Conc. Qty
(m3)

BL

Placing
Method

AL

A1
A2
A3
A4

Mr.Abdul

Mr.Nadeem

14F

Columns

M-25

2.00 PM

4.0

TC-3

Cluster A

A6

Mr.Jairaj

Mr.Manjunath

Cluster B

Mr.Biradar /
Mr.Chandran

Cluster C

Mr.Arun

Cluster D

Staicase

M-25

4.5

5.0

14F

Columns

M-25

6.5

6.5

Night

A7
TC-3

NTA

LGF

Footing,A3,A4

M-25

10.0

NTA

LGF

Footing,A1,A2

M-25

13.0

9.00 AM

JCB/Manual

NTA

LGF

Footing,A1,A2

M-25

13.0

NTA

NTA

LGF

Footing,A7

M-25

3.5

2.8

NTA

NTA

LGF

Columns,A4

M-40

0.6

1.0

0.8

0.5

NTA

LGF

Column, A6

M-40

1.5

5.00 PM

TC-3

NTA

LGF

Columns,A2

M-40

NTA

LGF

STP,Columns

M-40

1.0

2.30 PM

TC-2

NTA

LGF

STP

M-40

1.0

PCC

LGF

Footing,A3

M-10

1.0

6.00 PM

TC-2

PCC

PCC

LGF

Basement,PCC

M-10

12.0

3.00 PM

JCB

PCC

LGF

Footing,A3,A4

M-10

3.5

B1
B2

B1
B2

B3

B3

17F

Staicase

M-25

B3

B3

17F

Columns

M-25

B4

B4

3.0

3.0
1.0

B5

B6

17F

Columns

M-25

4.0

NTB

LGF

Columns,B2

M-40

3.0

NTB

LGF

Footing,B2,B3

M-25

3.0

NTB

LGF

Columns

M-25

2.0

NTB

LGF

Comp.Wall

M-25

7.5

C1

17F

Columns

M-25

4.0

C2

17F

Columns

M-25

5.0

2.00 PM

TC-4

B6

17F

Columns

M-25

4.0

9.00 AM

TC-1

NTB

GF

Columns,B3

M-40

3.0

5.0

11.00 AM

TC-1

NTB

LGF

Footing,B3

M-25

16.0

18.0

TC-4

NTB

TC-4

NTB

5.00 PM
9.30 AM

2.30 PM
9.30 AM

17F

Columns

M-25

4.30 PM

5.0

PCC

LGF

Footing,B3

M-10

C1

17F

Slab-P2

M-20

49.0

45.0

TC-6

C2

16F

Staicase

M-25

6.0

3.0

C2

17F

Columns

M-25

6.0

6.0

C3

17F

Columns

M-25

6.0

3.0

LGF

UG-Tank

M-10

TC-6

C4

NTC

NTC
PCC
17F

Columns

M-25

5.0

GF

Columns

M-40

1.5

2.00 PM

5.0

13.5

TC-7

D1
D2

17F

Columns

M-25

3.0

2.5

TC-7

NTD

GF

Slab,D1

M-25

50.0

61.0

Quantity

184.9

187.3

0.0

D2
10.00 AM

1.0

TC-6

C4

NTD

Shashidhar / Ravi Harikanth

11F

A5

9.00 AM

D1

12

A5

10.0

PCC

Mr.Prabhakar

Remarks

M-25

C3

Mr.Biradar /
Mr.Chandran

10

Achi.

Footing,A4

C2
Mr.Ramesh

Plan

LGF

PCC

Type of Structure

NTA

B5

Mr.Rajkumar

Floor

A6

A7

Tower No.

Today Qty

Concrete
Grade

A1
A2
A3
A4

A5
A5

2-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

PCC

PCC

EXT

EXT

PCC

PCC
Target Quantity

82.5
Cumulative Planned vs Achieved for Aug 2012

Tower

A1

A2

M. Target

Achieved

A3

A4

A5

A6

A7

331
0

12

3%

0.00

0.00

0.00

0.00

0.00

NTA

B1

900

68

B2

0.00

Planned for August '12

Planned till 02-08-12

PCC

450

29

0.00

B4

B5

74
0

8%

Item

B3

5%

63.00
0.00
Planned
Avg. / day
15

0.00

0.00

0.00

0.00

Achieved till 02-08-12

30

102%

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

48

98

45

17

10

61

30

19%

14%

16%

10%

2%

0%

0%

1%

3%

31%

0%

0%

7%

75.00
Achieved
Avg. / day

0.00

8.00

2.00

0.00

0.00

4.00

7.00

0.00

0.00

0.00

7.50

47.00

15

Cum. Achieved till date


5,722

Cum. Planned till July '12

Cum. Achieved till date

135,240

101,874

75%

RCC

4,368

282

141

371

132%

186

100,552

135,240

101,874

75%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
4-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

A1
A2
A3
A4

Mr.Abdul

A5

Floor

Type of Structure

Conc. Qty
(m3)

BL

Placing
Method

AL

16F

Staircase

M-25

11.00AM

TC-2

15F

Columns

M-25

6.0

9.00 AM

TC-3

Cluster A

A6

Mr.Jairaj

Mr.Manjunath

Cluster B

Mr.Arun
Cluster C

Mr.Ramesh

Cluster D

Mr.Prabhakar

12

Shashidhar / Ravi Harikanth

Night

A1
A2
A3
A4
A5

14F

Columns

M-25

4.0

4.0

10.0

LGF

Footing,A4

M-25

10.0

NTA

LGF

Raft,A1,A2

M-25

13.0

TC-3

LGF

Raft,A1,A2

M-25

13.0

NTA

LGF

Columns,A6

M-40

2.5

11.00AM

NTA

LGF

Column, A6

M-40

1.5

NTA

NTA

LGF

STP,Columns

M-40

1.0

1.7

PCC

PCC

LGF

Footing,A3

M-10

1.0

4.0

PCC

LGF

Basement, A2

M-10

12.0

LGF

Basement, A2

M-10

12.0

2.00 PM

10.00 AM

JCB

B1
B2
B3
Pod

Staircase

M-25

5.0

9.00 AM

B6

17F

Columns

M-25

3.0

2.00 PM

TC-4

B6

17F

Columns

M-25

4.0

NTB

UGF

Slab,B3

M-25

50.0

3.00 PM

Pump

NTB

LGF

Columns,B2

M-40

3.0

NTB

LGF

Footing,B3

M-25

9.0

Direct

Pump

B4
B5

NTB

LGF

Footing,B2,B3

M-25

3.0

2.5

NTB

LGF

Columns,B3

M-40

2.0

3.0

NTB

NTB

LGF

Comp.Wall

M-25

7.5

11.0

PCC

PCC

LGF

Footing,B3

M-10

TC-6

C1

17F

Columns

M-25

4.0

TC-6

C2

17F

Columns

M-25

5.0

6.0

Pump

C3

17F

Columns

M-25

5.0

6.0

17F

Columns

M-25

5.0

6.5

GF

Columns

M-40

1.5

1.5

Plinth Beam C/Wall

M-20

C1

17F

Columns

M-25

C2

17F

Columns

M-25

6.0

C3

17F

Columns

M-25

12.0

10.00 AM

4.0

NTB

9.00 AM

6.0

2.00 PM
10.30 AM

M-40 Grade Diverted from


NTA B2 column concrete

4.0

C4

NTC

Mr.Biradar /
Mr.Chandran

Remarks

Direct

NTA

C4

10

Achi.

A7

B5

Mr.Biradar /
Mr.Chandran

Plan

NTA

B3

Mr.Rajkumar

Type of Structure

A7

B4
6

Floor

A6

B1
B2
5

Tower No.

Today Qty

Concrete
Grade

NTA

PCC

3-Aug-12

Daily Concreting Achieved for :


Start Time

Conc.
Grade

NTC

PCC

LGF

UG. Tank

M-10

6.0

10.00AM

Direct

PCC

D1

17F

Columns

M-25

4.0

11.00 AM

TC-7

D1

D2

18F

Slab-P1

M-20

42.0

Pump

D2

5.00PM

NTD

NTD

PCC

PCC

EXT

EXT

PCC

PCC
Target Quantity

LGF

Quantity

181.5

4.5

82.5

68.7

0.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

A3

A4

A5

A6

A7

331
0

16

5%

0
Item

Planned for August '12

NTA

B1

900

80

B2

Planned till 03-08-12

B4

B5

74
0

9%

12

B3

5%

68
0
Planned
Avg. / day

Achieved till 03-08-12

0
%

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

52

115

45

23

11

11

10

63

38

20%

16%

16%

13%

4%

0%

0%

4%

3%

31%

0%

23%

8%

45

17

10

61

48

98
Achieved
Avg. / day

Cum. Achieved till date

PCC

450

44

15

38

86%

13

5,726

RCC

4,368

423

141

432

102%

144

100,616

30

Cum. Planned till July '12

Cum. Achieved till date

135,240

101,942

75%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
6-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Floor

Type of Structure

Start Time

Conc. Qty
(m3)

BL

Placing
Method

AL

A1
A2
A3
A4

Mr.Abdul

Cluster A

A5

15F

Columns

M-25

9..00 AM

6.0

TC-3

Mr.Manjunath
Cluster B

Mr.Biradar /
Mr.Chandran

STP Wall

M-30

15.0

10.30 AM

TC-2

Cluster C

Mr.Arun

Mr.Ramesh

Cluster D

Shashidhar / Ravi Harikanth

15F

Columns

M-25

6.0

NTA

LGF

C/Wall, Raft

M-25

NTA

LGF

C/Wall Column

M-25

A5

2.00 PM

TC-3

NTA

LGF

Raft,A1,A2

M-25

NTA

Achi.

Night

9.0

LGF

Column,A1

M-40

2.0

4.00 PM

TC-2

11.0
1.0
13.0

15.0

NTA

LGF

Columns,A6

M-40

2.5

4.0

PCC

PCC

LGF

Basement, A2

M-10

12.0

13.5

B1
B2

B1
B2
Pod

Staircase

M-25

5.0

18F

Slab-P1

M-20

5.00 PM

72.0

Pump

B3

B4

B4

B5

B5

B6

17F

Columns

M-25

5.0

9.00 AM

TC-4

B6

17F

Columns

M-25

3.0

2.0

NTB

UGF

Slab-B3

M-25

70.0

12.00 PM

Pump

NTB

UGF

Slab,B3

M-25

50.0

79.2

NTB

LGF

Footing,B3

M-25

12.0

9.00 AM

Direct

NTB

LGF

Footing,B3

M-25

9.0

17F

Columns

M-25

6.0

PCC

C1

17F

Columns

M-25

6.0

9.00 AM

TC-6

C1

C1

17F

Columns

M-25

6.0

2.00 PM

TC-6

C1

6.0

C2

C2

17F

Columns

M-25

6.0

C3

C3

17F

Columns

M-25

12.0

12.0

PCC

LGF

UG. Tank

M-10

6.0

6.0

D1

17F

Columns

M-25

4.0

6.0

D2

D2

18F

Slab-P1

M-20

42.0

42.0

NTD

NTD

LGF

C/Wall Plinth Beam

M-20

D1

12

2.0

14F

Columns

M-25

9.00 AM

6.0

TC-5

C4
NTC

PCC

Mr.Prabhakar

M-25

M-40

NTC

Mr.Biradar /
Mr.Chandran

Staircase

Columns,A4

C4

10

Remarks

16F

LGF

PCC

Plan

NTA

B3

Mr.Rajkumar

Type of Structure

A7
LGF

NTA
Mr.Jairaj

Floor

Today Qty

Concrete
Grade

A6

A7

Tower No.

A1
A2
A3
A4

A6
NTA

4-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

17F

Columns

M-25

3.00 PM

6.0

TC-7

PCC

PCC

EXT

EXT

PCC

PCC
Target Quantity

Quantity

208.0

0.6

181.5

207.3

0.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

A3

A4

A5

A6

A7

331
0

25

7%

0.00

0.00

0.00

0.00

15.50

NTA

B1

900

111

B2

0.00

B4

B5

74
0

12%
0.00

B3

5%

79.95
0.00
Planned
Avg. / day

0.00

4.00

Item

Planned for August '12

Planned till 04-08-12

PCC

450

58

15

57

RCC

4,368

564

141

620

0.00

Achieved till 04-08-12

0.00
%

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

54

194

51

23

23

17

52

63

57

21%

28%

18%

13%

9%

0%

0%

6%

17%

31%

0%

26%

13%

45.00

23.00

11.00

0.00

0.00

10.50

9.50

62.50

0.00

4.50

37.50

52.00

114.50
Achieved
Avg. / day

Cum. Achieved till date

98%

14

5,745

110%

155

100,804

Cum. Planned till August '12

Cum. Achieved till date

135,240

102,150

76%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
7-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Mr.Abdul

Cluster A

A1
A2
A3
A4

2F

A5

15 F

Mr.Jairaj

Columns

M-25

5.0

9.00 AM

M-25

6.0

AL

2.30 PM

Cluster B

Mr.Rajkumar

Mr.Biradar /
Mr.Chandran

A1
A2
A3
A4

TC-3

A5

Cluster C

Mr.Arun

M-25

130.0

NTA

LGF

Footing,A2

M-25

3.5

LGF

STP Wall, A2

M-25

2.5

Columns

M-25

6.0

6.5

24.0

LGF

STP Wall

M-30

15.0

NTA

LGF

Columns,A4

M-40

2.0

NTA

LGF

C.Wall/Column,A1

M-20

4.00 PM

TC-2

NTA

LGF

Column,A1

M-40

2.0

2.0

18F

Slab-P1

M-20

72.0

72.0

B1
B2

B1
B2

B3

B3

B4

B4

B5

Night

B5

1.0

B6

B6

17F

Columns

M-25

5.0

NTB

NTB

UGF

Slab-B3

M-25

70.0

66.0

NTB

NTB

LGF

Footing,B3

M-25

12.0

13.5

PCC

PCC

LGF

UG Tank

M-10

C1

17F

Columns

M-25

6.0

C1

17F

Columns

M-25

6.0

14F

Columns

M-25

6.0

6.0

17F

Columns

M-25

5.0

6.0

207.0

204.0

0.0

17F

Columns

M-25

9.00 AM

6.0

TC-6

18F

Slab-P2

M-20

42.0

2.30 PM

Pump

14F

Columns

M-25

6.0

2.00 PM

TC-5

2.0
5.0

C2
C3
C4
NTC

PCC
D1

Cluster D

15F

TC-2

NTC

Shashidhar / Ravi Harikanth

Remarks

2.30 PM

PCC

C4

Mr.Prabhakar

Achi.

NTA

C3

Mr.Biradar /
Mr.Chandran

Plan

Pump

9.00 AM

PCC

C2

10

Type of Structure

A7
Slab-A3,A4

C1

Mr.Ramesh

Floor

Today Qty

Concrete
Grade

A6
Pod

C1
8

Tower No.

TC-2

NTA

Mr.Manjunath

12

Balcony

BL

Placing
Method

A7

Type of Structure

NTA

NTA

Floor

Conc. Qty
(m3)

A6

6-Aug-12

Daily Concreting Achieved for :


Start Time

Conc.
Grade

PCC
17F

Columns

M-25

2.30 PM

6.0

Pump

D1

D2

D2

NTD

NTD

PCC

PCC

EXT

EXT

PCC

PCC
Target Quantity

Quantity

207.0
Cumulative Planned vs Achieved for Aug 2012

Tower

A1

A2

M. Target

Achieved

A3

A4

A5

A6

A7

331
0

31

9%

0.00

0.00

0.00

0.00

24.50

NTA

B1

900

138

B2

0.00

B4

B5

74
0

15%
0.00

B3

76

103%

110.95
0.00
Planned
Avg. / day

0.00

4.00

Item

Planned for August '12

Planned till 06-08-12

PCC

450

87

15

59

RCC

4,368

845

141

822

0.00

Achieved till 06-08-12

0.00
%

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

54

273

56

23

23

23

52

63

59

21%

39%

20%

13%

9%

2%

0%

8%

17%

31%

0%

26%

13%

51.00

23.00

23.00

0.00

0.00

16.50

51.50

62.50

0.00

5.10

57.00

54.00

193.70
Achieved
Avg. / day

Cum. Achieved till date

68%

10

5,747

97%

137

101,006

Cum. Planned till August '12

Cum. Achieved till date

135,240

102,354

76%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
8-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

A1
A2
A3
A4

Mr.Abdul

Cluster A

A5

Mr.Jairaj

Mr.Biradar /
Mr.Chandran

Mr.Arun
Cluster C

Mr.Ramesh

9.00 AM

16 F

Staircase

M-25

5.0

15F

Columns

M-25

6.0

AL

TC-2

3.00 PM

TC-3

10

Cluster D

Mr.Prabhakar

Shashidhar / Ravi Harikanth

Tower No.

Floor

Type of Structure

Today Qty

Concrete
Grade

Plan

Achi.

Remarks

A1
A2
A3
A4

2F

Balcony

M-25

5.0

5.0

A5

15 F

Columns

M-25

6.0

6.5

Night

A6
A7

NTA

Pod

Slab-A1

M-25

39.0

NTA

LGF

Footing,A2

M-25

3.5

NTA

LGF

Footing,A3,A4

M-25

24.0

NTA

POD

Column,A1/STP

M-40

3.0

PCC

LGF

Grade Slab

M-10

2.0

11.00 AM

Pump

NTA

Pod

Slab-A3,A4

M-25

130.0

130.0

TC-2

NTA

LGF

Footing,A2

M-25

3.5

3.0

TC-3

NTA

LGF

Footing,A4

M-25

TC-2

NTA

LGF

STP Wall, A2

M-25

Direct

PCC

LGF

Comp/Wall, B4

M-25

17F

Columns

M-25

6.0

10.0

18F

Slab-P2

M-20

42.0

45.0

14F

Columns

M-25

6.0

17F

Columns

M-25

6.0

LGF

Columns

M-40

2.00 PM
9.00 AM
3.00 PM
10.00 AM

6.0
2.5

B1
B2
B3
B4
B5

B6

18F

Slab-P1

M-20

40.0

2.00 PM

Pump

B6

17F

Columns

M-25

4.0

2.30 PM

TC-4

B6

NTB

LGF

Footin,B3

M-25

9.0

11.30 AM

Direct

NTB

NTB

GF

Columns

M-40

9.0

10.30 AM

Pump

NTB

PCC

LGF

Basement,B2

M-10

5.0

9.00 AM

Direct

PCC

C1

17F

Columns

M-25

6.0

9.00 AM

TC-6

C1

C1

17F

Columns

M-25

4.0

TC-6

C1

2.30 PM

B6

C2

C2

C3

C3

C4
Mr.Biradar /
Mr.Chandran

12

BL

B5
Mr.Rajkumar

Type of Structure

Placing
Method

B1
B2
B3
B4

Mr.Manjunath

Cluster B

Floor

Conc. Qty
(m3)

A6
A7

7-Aug-12

Daily Concreting Achieved for :


Start Time

Conc.
Grade

14F

Columns

M-25

2.30 PM

6.0

TC-5

C4

NTC

NTC

PCC

PCC

D1

D1

D2

D2

NTD

NTD

PCC

PCC

EXT

LGF

Boundry wall

M-20

0.7

9.00 AM

Direct

EXT

PCC

LGF

Boundry wall

M-10

2.7

10.00 AM

Direct

PCC

Target Quantity

Quantity

168.9

3.0

2.0

207.0

210.5

0.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

A3

A4

A5

A6

A7

331
0

38

11%

0.00

0.00

0.00

0.00

31.00

NTA

B1

900

277

B2

0.00

Planned for August '12

Planned till 07-08-12

PCC

450

102

RCC

4,368

986

0.00

B4

B5

74
0

31%

Item

B3

76

103%

137.95
0.00
Planned
Avg. / day

0.00

76.00

0.00

0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

54

276

66

68

23

23

52

65

59

21%

39%

23%

39%

9%

2%

0%

8%

17%

32%

0%

26%

13%

56.00

23.00

23.00

6.00

0.00

22.50

51.50

62.50

0.00

5.10

59.00

54.00

273.20
Achieved
Avg. / day

Achieved till 07-08-12

Cum. Achieved till date

15

59

58%

5,747

141

1,032

105%

147

101,217

Cum. Planned till August '12

Cum. Achieved till date

135,240

102,564

76%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
9-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Floor

Type of Structure

Start Time

Conc. Qty
(m3)

BL

Placing
Method

AL

A1
A2
A3
A4

Mr.Abdul

Cluster A

Mr.Jairaj

Mr.Manjunath

M-20

46.0

11.00 AM

Pump

Mr.Biradar /
Mr.Chandran

Cluster C

Mr.Ramesh
Mr.Biradar /
Mr.Chandran

10

Cluster D

Staircase

M-25

5.0

5.0

15F

Columns

M-25

6.0

7.0

41.0

M-40

2.5

9.00 AM

TC-2

NTA

Pod

Slab-A1

M-25

39.0

M-25

6.0

11.00 AM

TC-2

NTA

LGF

Footing,A2

M-25

3.5

NTA

LGF

Footing,A4

M-25

9.0

TC-3

NTA

LGF

Footing,A3,A4

M-25

24.0

NTA

NTA

POD

Column,A1/STP

M-40

3.0

PCC

PCC

LGF

Grade Slab

M-10

2.0

2.0

B1
B2
B3
B4

B1
B2
B3
B4
41.0

17F

Staircase

M-25

2.30 PM

2.30 PM

4.0

TC-4

8.5

B5

B6

17F

Columns

M-25

4.0

NTB

GF

Columns

M-40

2.0

4.00 PM

B6

18F

Slab-P1

M-20

40.0

TC-4

B6

17F

Columns

M-25

4.0

9.00 AM

TC-4

Footing,B3

M-25

9.0

Columns

M-40

9.0

NTB

LGF

NTB

NTB

GF

NTB

NTB

LGF

C/Wall Coping

M-20

PCC

LGF

Basement,B2

M-10

5.0

6.0

C1

17F

Columns

M-25

6.0

8.5

C1

C1

17F

Columns

M-25

4.0

C2

C2

C3

C3
14F

Columns

M-25

6.0

17F

Columns

M-25

11.0

LGF

Columns

M-40

1.75

17F

Columns

M-25

9.00 AM

6.0

TC-6

C4

C4

NTC

NTC

NTD

Night

A5

STP,Wall,A2

11.0
7.0
0.55

PCC
17F

Columns

M-25

2.30 PM

6.0

Pump

D2

Shashidhar / Ravi Harikanth

16 F

STP,Column,A1

D1

12

Remarks

LGF

PCC

Mr.Prabhakar

Achi.

LGF

C1
Mr.Arun

Plan

NTA

PCC

Type of Structure

NTA

B6

Mr.Rajkumar

Floor

Today Qty

Concrete
Grade

A6
A7

B5

Cluster B

A5
Slab-P2

15F

A6
A7

Tower No.

A1
A2
A3
A4

A5
A5

8-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

D1
D2

LGF

Columns

M-40

2.30 PM

2.0

TC-7

NTD

PCC

PCC

EXT

EXT

LGF

Boundry wall(V.K)

M-20

0.7

PCC

PCC

LGF

Boundry wall(V.K)

M-10

2.7

2.0

168.9

155.0

0.0

Target Quantity

Quantity

87.5

2.7

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

A3

A4

A5

A6

A7

331
0

45

13%

5.00

0.00

0.00

0.00

37.50

NTA

B1

900

326

B2

0.00

B4

B5

74
0

36%
0.00

B3

76

103%

276.95
0.00
Planned
Avg. / day

0.00

76.00

Item

Planned for August '12

Planned till 08-08-12

PCC

450

116

15

69

RCC

4,368

1,127

141

1,177

0.00

Achieved till 08-08-12

0.00
%

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

95

295

75

68

23

34

52

66

69

37%

42%

26%

39%

9%

2%

0%

12%

17%

33%

0%

39%

15%

66.00

68.00

23.00

6.00

0.00

22.50

51.50

64.50

0.00

5.10

59.00

54.00

276.20
Achieved
Avg. / day

Cum. Achieved till date

59%

5,757

104%

147

101,362

Cum. Planned till August '12

Cum. Achieved till date

135,240

102,719

76%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
10-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

A5
Cluster A

Mr.Jairaj

Mr.Manjunath

Cluster B

AL

Mr.Ramesh
Mr.Biradar /
Mr.Chandran

10

Cluster D

Mr.Prabhakar

Shashidhar / Ravi Harikanth

Floor

Type of Structure

Plan

Achi.

Remarks

Columns

15F

M-25

4.0

10.00 AM

TC-3

A5

Night

15F

Slab-P2

M-20

46.0

46.0

2.5

A6
A7

NTA

LGF,A4

Column/Pedes

M-40

3.5

3.00 PM

TC-3

NTA

LGF

STP,Column,A1

M-40

2.5

NTA

LGF,A1

Columns/STP

M-40

2.0

2.00 PM

TC-2

NTA

LGF

STP,Wall,A2

M-25

6.0

6.0

NTA

NTA

LGF

Footing,A4

M-25

9.0

12.0

NTA

NTA

LGF

Pedestal,A4

M-40

2.3

NTA

NTA

LGF

Retaing wall,A1,A2

M-25

2.0

PCC

PCC

B1
B2
B3
B4

B1
B2
B3
B4

17F

Staircase

M-25

4.0

17F

Staircase

M-25

9.00 AM

4.0

TC-4

B5
B6

17F

Columns

M-25

4.0

7.5

NTB

GF

Columns,B2

M-40

6.0

9.00 AM

Pump

NTB

GF

Columns

M-40

2.0

1.5

NTB

LGF

Footing,B1,2

M-25

18.0

10.00 AM

Direct

NTB

NTB

UGF

Slab,B3,4

M-25

25.0

Pump

NTB

3.30 PM

PCC

PCC

LGF

Footing,B3

M-10

PCC

PCC

LGF

C/Wall,B4

M-10

C1

17F

Columns

M-25

6.0

8.3

17F

Columns

M-25

6.0

9.5

2.0

C1

Mr.Arun
Cluster C

Tower No.

Today Qty

Concrete
Grade

A1
A2
A3
A4

B6

Mr.Biradar /
Mr.Chandran

12

BL

B5

Mr.Rajkumar

Type of Structure

Placing
Method

A6
A7

Floor

Start Time

Conc. Qty
(m3)

A1
A2
A3
A4

Mr.Abdul

9-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

17F

Columns

M-25

9.00 AM

6.0

TC-6

C2

C2

C3

C3

C4

C4

NTC

NTC

PCC

PCC

D1

D1

D2

D2

4.50
5.0

NTD

LGF

Columns,D1

M-40

2.0

10.00 AM

TC-7

NTD

LGF

Columns

M-40

PCC

LGF

Footing,D1

M-10

2.0

2.30 PM

TC-7

PCC

LGF

Footing,D1

M-10

LGF

Boundry wall

M-20

2.5

Fire Station

M-20

52.0

EXT

EXT

PCC

7.5

PCC
Target Quantity

Quantity

72.5

87.5

169.1

0.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

A3

A4

5.00

A6

A7

331
0

91

0.00

27%
44.50

5.00

A5

0.00

0
0.00

Item

Planned for August '12

Planned till 09-08-12

PCC

450

131

RCC

4,368

1,268

0
0.00

NTA

B1

900

351

39%
326.45
0.00
Planned
Avg. / day

B2

B3

B4

B5

74
0

76

0.00

103%
76.00

0
0.00

0
0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

103

296

83

68

23

43

52

66

62

86

29%
74.50

39%
68.00

9%
23.00

2%
6.00

0%
0.00

15%
33.50

17%
51.50

33%
66.25

0%
0.00

312%
7.80

19%
69.00

40%
42%
95.00
294.75
Achieved
Avg. / day

Achieved till 09-08-12

15

86

66%

10

Cum. Achieved till date


5,774

141

1,329

105%

148

101,514

Cum. Planned till August '12

Cum. Achieved till date

135,240

102,888

76%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
11-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

2
Cluster A

A5

Mr.Jairaj

Mr.Manjunath

Cluster B

Mr.Biradar /
Mr.Chandran

Mr.Arun

AL

Columns

15F

M-25

3.30 PM

5.0

A5

Cluster C

10

Cluster D

Plan

Achi.

M-25

4.0

4.0

Remarks

15F

Columns

NTA

LGF,A4 Column/Pedes

M-40

3.5

2.5

TC-3

NTA

LGF,A1 Columns/STP

M-40

2.0

1.5

NTA

NTA

LGFA7 Columns

M-40

PCC

PCC

B1
B2
B3
B4

B1
B2
B3
B4

17F

Staircase

M-25

Slab-A1

M-25

22.0

LGF

Columns

M-40

1.5

9.30 AM
2.30 PM

Night

1.2

4.0

4.5

B5

B6

17F

Columns

M-25

3.0

9.00 AM

TC-4

B6

17F

Columns

M-25

NTB

LGF

Retaining/wall

M-25

5.0

10.00 AM

Hydra

NTB

GF

Columns,B2

M-40

6.0

NTB

LGF

Footing,B3,4

M-25

9.0

9.00 AM

Direct

NTB

LGF

Footing,B1,2

M-25

18.0

9.0

NTB

NTB

UGF

Slab,B3,4

M-25

25.0

25.5

PCC

PCC

LGF

Footing,B4

M-10

C1

C1

17F

Columns

M-25

6.0

NTD

LGF

Columns,D1

M-40

2.0

TC-7

PCC

LGF

Footing,D1

M-10

2.0

Direct

EXT
Quantity

72.5

18F

Slab-P1

M-20

9.30 AM

72.0

Pump

6.0
7.0

TC-4 Footing Extension

3.0

C2
C3

C4

C4

NTC

NTC
PCC

D1

17F

Columns

M-25

3.0

10.00 AM

Pump

D2

18F

Columns

M-25

6.0

11.30 AM

Pump

NTD

Shashidhar / Ravi Harikanth

Type of Structure

TC-2

Pod

NTA

PCC

Mr.Prabhakar

Floor

A6
A7

C3

Mr.Ramesh

Tower No.

Today Qty

Concrete
Grade

A1
A2
A3
A4

NTA

C2

Mr.Biradar /
Mr.Chandran

12

BL

B5

Mr.Rajkumar

Type of Structure

Placing
Method

A6
A7

Floor

Start Time

Conc. Qty
(m3)

A1
A2
A3
A4

Mr.Abdul

10-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

PCC

LGF

Footing,D1

M-10

5.0

EXT

LGF

Retaining/wall

M-20

2.0

3.00 PM
9.00 AM

PCC

D1
D2
1.5

PCC
Target Quantity

133.5

65.7

0.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

A3

A4

A5

A6

A7

331
0

95

29%

5.00

5.00

0.00

0.00

90.50

NTA

B1

900

356

B2

0.00

Planned for August '12

Planned till 10-08-12

PCC

450

145

RCC

4,368

1,409

4,818

1,554

0.00

B4

B5

74
0

40%

Item

B3

81

109%

351.25
0.00
Planned
Avg. / day

0.00

76.00

0.00

0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

109

338

83

68

23

43

52

68

62

89

42%

48%

29%

39%

9%

2%

0%

15%

17%

34%

0%

312%

20%

82.75

68.00

23.00

6.00

0.00

43.00

51.50

66.25

0.00

62.30

86.00

102.50
296.25
Achieved
Avg. / day

Achieved till 10-08-12

15

89

61%

5,777

141

1,392

99%

139

101,576

1,481

Cum. Achieved till date

107,354

Cum. Planned till August '12

Cum. Achieved till date

135,240

102,954

76%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
13-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Cluster A

A5
Mr.Manjunath

Mr.Jairaj

5
Mr.Rajkumar

BL

AL

Mr.Biradar /
Mr.Chandran

Columns

15F

M-25

2.00 PM

6.0

TC-3

Cluster C

Cluster D
12

Shashidhar / Ravi Harikanth

Remarks

A5

15F

Columns

M-25

5.0

2.0

Columns,A3

11.00 AM

22.0

Pod

Slab-A1

M-25

22.0

LGF

Columns,A4

M-40

1.5

PCC

PCC

B1
B2
B3
B4

B1
B2
B3
B4
17F

Columns

M-25

3.0

2.5

M-40

3.0

TC-3

Night

B5

B6

17F

Columns

M-25

6.5

B6

4F

Staircase

M-25

4.5

NTB

LGF

Footing,B3

M-25

4.5

NTB

GF

Columns,B2

M-40

3.0

4.00 PM

NTB

LGF

Comp Wall,B5

M-25

30.0

2.30 PM

17F

Columns

M-25

6.0

9.00 AM

Pump

B6

Pump

B6

Direct

NTB

LGF

Retaining/wall

M-25

5.0

6.5

Pump

NTB

LGF

Footing,B3,4

M-25

9.0

9.5

Direct

NTB

18F

Slab-P1

M-20

72.0

70.0

2.00 PM
9.00 AM

PCC
9.00 AM

TC-6

C1
C2

17F

Slab-P2

M-20

70.0

10.00 AM

Pump

C3

C4

C4

NTC

NTC

PCC

Mr.Prabhakar

Achi.

NTA

C3

10

Plan

NTA

LGF

C2

Mr.Biradar /
Mr.Chandran

Type of Structure

NTA

C1
Mr.Ramesh

Floor

A6
A7

PCC
8

Tower No.

Today Qty

Concrete
Grade

A1
A2
A3
A4

B5

Cluster B

Type of Structure

Placing
Method

A6
A7
NTA

Floor

Start Time

Conc. Qty
(m3)

A1
A2
A3
A4

Mr.Abdul

11-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

LGF

UG -Tank

M-10

9.00 AM

6.0

Direct

PCC

D1

D1

17F

Columns

M-25

3.0

4.0

D2

D2

18F

Columns

M-25

6.0

7.0

NTD

LGF

Column,D1

M-40

2.0

PCC

LGF

Footing,D1

M-10

5.0

11.00 AM

TC-7

PCC

LGF

Footing,D1

M-10

5.0

4.5

EXT

EXT

LGF

Retaining/wall

M-20

2.0

2.0

PCC

PCC
133.5

130.0

0.0

Target Quantity

4.00 PM

NTD

TC-7

Quantity

146.5
Cumulative Planned vs Achieved for Aug 2012

Tower

A1

A2

M. Target

Achieved

A3

A4

A5

A6

A7

331
0

97

29%

5.00

5.00

0.00

0.00

94.50

NTA

B1

900

378

B2

0.00

Planned for August '12

Planned till 11-08-12

PCC

450

160

RCC

4,368

1,550

4,818

1,710

0.00

B4

B5

74
0

42%

Item

B3

81

109%

356.45
0.00
Planned
Avg. / day

0.00

80.50

0.00

0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

111

354

83

138

23

47

59

68

64

94

43%

51%

29%

79%

9%

2%

0%

17%

20%

34%

0%

322%

21%

82.75

68.00

23.00

6.00

0.00

43.00

51.50

67.75

0.00

62.30

89.00

108.50
337.75
Achieved
Avg. / day

Achieved till 11-08-12

15

94

59%

5,782

141

1,518

98%

138

101,702

1,611

Cum. Achieved till date

107,484

Cum. Planned till August '12

Cum. Achieved till date

135,240

103,084

76%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
14-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Cluster A

Mr.Manjunath

Mr.Jairaj

5
Mr.Rajkumar

BL

AL

A5

16F

Slab-P3

M-20

38.0

A5

16F

Columns

M-25

6.0

2.30 PM

Pump

A5

TC-3

A5

9.00 AM

Cluster B
Cluster C

3.0

M-40

2.5

2.30 PM

TC-3

NTA

LGF

Columns,A3,A4

M-40

40.0

2.30 PM

Pump

NTA

LGF

UG -Tank, A5

M-30

B6

17F

Columns

M-25

6.5

1.5

B6

4F

Staircase

M-25

4.5

4.5
4.5

PCC

PCC

B1
B2
B3
B4

B1
B2
B3
B4

2.0

B5
17F

Columns

M-25

9.00 AM

6.5

TC-5

GF

Columns,B2

M-40

5.0

9.00 AM

Pump

NTB

LGF

Footing,B3

M-25

4.5

NTB

GF

Columns,B3

M-40

2.0

11.30AM

TC-4

NTB

GF

Columns,B2

M-40

3.0

NTB

NTB

LGF

Comp Wall,B5

M-25

30.0

PCC

PCC
17F

Columns

M-25

6.0

9.0

C3

17F

Slab-P2

M-20

70.0

68.0

C4

14F

Columns

M-25

LGF

UG -Tank

M-10

NTD

LGF

Footing, D1

M-25

NTD

LGF

Column,D1

M-40

2.0

PCC

PCC

LGF

Footing,D1

M-10

5.0

EXT

EXT

LGF

Boundry Wall

M-20

PCC

PCC

PCC

17F

Columns

M-25

9.00 AM

6.0

TC-6

C1
C2

15F

Slab-P1

M-20

41.0

10.30 AM

Pump

6.0

NTC
LGF

UG-Tank

M-10

12.0

10.00 AM

Direct

PCC

6.0

D1
18F

Columns

M-25

6.0

11.00 AM

Pump

NTD
NTD

Night

31.5

NTB

D2
Cluster D

6.0

M-25

NTC

Shashidhar / Ravi Harikanth

M-25

Slab-A1

D1

12

Columns

Columns

C3

Mr.Prabhakar

15F

LGF

C4

10

Remarks
Achi.

POD

C2

Mr.Biradar /
Mr.Chandran

Plan

NTA

C1
Mr.Ramesh

Type of Structure

A6
A7

B6

Floor

NTA

B6

Mr.Biradar /
Mr.Chandran

Tower No.

Today Qty

Concrete
Grade

A1
A2
A3
A4

B5

Type of Structure

Placing
Method

A6
A7

Floor

Start Time

Conc. Qty
(m3)

A1
A2
A3
A4

Mr.Abdul

13-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

LGF

Retaing/Wall

M-25

Target Quantity

9.00 AM

40.0

TC-7

D2

Quantity

205.0

6.0
1.5

8.6

146.5

143.1

0.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

A3

A4

A5

A6

A7

331
0

97

29%

5.00

5.00

0.00

0.00

96.50

NTA

B1

900

412

B2

0.00

Planned for August '12

Planned till 13-08-12

PCC

450

189

RCC

4,368

1,832

4,818

2,020

0.00

B4

B5

74
0

46%

Item

B3

81

109%

378.45
0.00
Planned
Avg. / day

0.00

80.50

0.00

0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

117

358

92

138

91

12

47

59

75

73

94

45%

51%

32%

79%

34%

4%

0%

17%

20%

38%

0%

365%

21%

82.75

138.00

23.00

6.00

0.00

47.00

58.50

67.75

0.00

64.30

93.50

111.00
353.75
Achieved
Avg. / day

Achieved till 13-08-12

15

94

50%

5,782

141

1,661

91%

128

101,845

1,754

Cum. Achieved till date

107,627

Cum. Planned till August '12

Cum. Achieved till date

135,240

103,227

76%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
16-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Mr.Abdul

Cluster A

Mr.Manjunath

Mr.Jairaj

5
Mr.Rajkumar

Floor

Type of Structure

Start Time

Conc. Qty
(m3)

BL

Placing
Method

AL

16F

Slab-P3

M-20

38.0

40.0

15F

Columns

M-25

6.0

4.0

A6
A7

A6
A7

NTA

Pod

Columns

M-25

2.0

10.00AM

TC-3

NTA

LGF

Columns

M-40

2.5

NTA

POD

Slab-A1

M-25

40.0

9.00AM

Pump

NTA

POD

Slab-A1

M-25

40.0

17F

Columns

M-25

6.5

6.5

PCC

PCC

B1
B2
B3
B4

B1
B2
B3
B4

1F

Staircase

M-25

4.0

17F

Columns

M-25

5.0

9.00AM

Pump

Cluster B

TC-5

B6
UGF

Columas

M-40

3.0

9.30Am

TC-4

NTB

GF

Columns,B2

M-40

5.0

5.0

LGF

Comp Wall

M-25

3.0

11.00AM

Direct

NTB

GF

Columns,B3

M-40

2.0

3.5

NTB

LGF

Comp Wall,B4

M-25

1.0

NTB

LGF

Comp Wall,B5 Raft

M-25

27.5

NTB

NTB

UGF

Slab,B2

M-25

56.5

PCC

PCC
17F

Columns

M-25

6.0

2.5

15F

Slab-P1

M-20

41.0

42.0

LGF

UG-Tank

M-10

12.0

12.0

6.0

9.0

40.0

30.0

18F

Slab-p3

M-20

42.0

10.30AM

Pump

Cluster C

C3
Pod

Staircase

M-25

5.0

C4

1F

Staircase

M-25

5.0

C4

14F

Columns

M-25

6.0

2.00PM

Pump

5.00PM

Pump

9.00AM

TC-5

NTC
LGF

UG-Tank

M-10

9.30Am

12.0

Direct

Cluster D
12

Columns

UGF

M-40

2.0

10.00AM

TC-7

NTD

Shashidhar / Ravi Harikanth

PCC
D1

D2

PCC

C4
NTC

D1

NTD

C1
C2

C3

Mr.Prabhakar

B6

NTB

PCC

Night

B5
2.00PM

NTB

C4

10

Remarks

A5

C1

Mr.Biradar /
Mr.Chandran

Achi.

A5

C2

Plan

A5

Mr.Biradar /
Mr.Chandran

Mr.Ramesh

Type of Structure

A5

B6

Floor

A1
A2
A3
A4

B6

Tower No.

Today Qty

Concrete
Grade

A1
A2
A3
A4

B5
6

14-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

LGF

Footing

M-10

4.00PM

2.0

TC-7

D2

18F

Columns

M-25

NTD

LGF

Footing D1

M-25

NTD

LGF

Retaing/Wall

M-25

LGF

Boundry Wall A1

M-20

Mockup

M-10

PCC

EXT

EXT

PCC

PCC
Target Quantity

9.5

Quantity

131.0

2.0
2.0
205.0

253.0

0.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

A3

A4

5.00

A6

A7

331
0

141

0.00

42%
96.50

5.00

A5

0.00

0
0.00

Item

Planned for August '12

Planned till 14-08-12

PCC

450

203

RCC

4,368

1,973

4,818

2,176

0
0.00

NTA

B1

900

412

46%
411.95
0.00
Planned
Avg. / day

B2

B3

B4

B5

74
0

81

0.00

109%
80.50

0
0.00

0
0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

124

452

94

138

91

54

47

68

115

75

108

33%
91.75

79%
138.00

34%
91.00

16%
12.00

0%
0.00

17%
47.00

23%
58.50

57%
75.25

0%
0.00

375%
72.90

24%
93.50

48%
65%
117.00
358.25
Achieved
Avg. / day

Achieved till 14-08-12

15

108

53%

5,796

141

1,900

96%

136

102,056

2,007

Cum. Achieved till date

107,852

Cum. Planned till August '12

Cum. Achieved till date

135,240

103,480

77%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
17-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Cluster A

Mr.Manjunath

Type of Structure

BL

Placing
Method

AL

A5

15F

Column

M-25

3.0

A5

7F

Staircase

M-25

4.5

NTA
Mr.Jairaj

4.00PM
9.00AM

Cluster B

Mr.Rajkumar

Mr.Biradar /
Mr.Chandran

Cluster C

10

UGF

Column

M-40

2.00PM

2.5

TC-3

LGF

Grade Slab

M-10

9.00AM

16.0

Manually

Cluster D

Shashidhar / Ravi Harikanth

3.0

6.0

Pod

Columns

M-25

2.0

POD

Slab-A1

M-25

40.0

Night

1F

Staircase

M-25

4.0

17F

Columns

M-25

5.0

4.5

B5

B5

B6

1F

Staircase

M-25

4.0

B6

17-18F

Column

M-25

3.0

NTB

UGF

Column

M-40

6.0

NTB

UGF

Column

M-40

3.0

9.00AM

Pump

B6

TC-5

B6

Pump

NTB

UGF

Columas

M-40

3.0

4.0

TC-4

NTB

LGF

Comp Wall

M-25

3.0

4.0

NTB

LGF

R/Wall

M-40

18F

Slab-P3

M-20

42.0

2.00PM
9.30AM

PCC

LGF

Footing

M-10

5.0

2.00PM

C1

17F

Column

M-25

4.0

2.00PM

40.0

PCC
B1
B2
B3
B4

Direct

PCC

TC-6

C1

9.30AM

2.5

40.0

C2
C3

C4

14F

Column

M-25

6.0

C4

1-2F

Staircase

M25

5.0

TC-5

C4

Pod

Staircase

M-25

5.0

Pump

C4

1F

Staircase

M-25

5.0

C4

C4

14F

Columns

M-25

6.0

6.0

NTC

NTC
LGF

UG-Tank

M-10

12.0

6.0

2.0

2.0

LGF

UGT

M-10

10.00AM
2.00PM

9.00AM

6.0

Direct

D1

12

M-25

Remarks

NTA

B1
B2
B3
B4

PCC

Mr.Prabhakar

Achi.

A6
A7

C3

Mr.Biradar /
Mr.Chandran

Plan

NTA

A5

C2
Mr.Ramesh

Type of Structure

Column

A5

TC-3

NTB

Floor

15F

TC-3

NTA
PCC

Tower No.

Today Qty

Concrete
Grade

A1
A2
A3
A4

A6
A7

Floor

Start Time

Conc. Qty
(m3)

A1
A2
A3
A4

Mr.Abdul

16-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

PCC
D1

D2

18-19F

Column

M-25

6.0

NTD

LGF

Column

M-40

1.5

11.00AM

Pump

D2

TC-7

NTD

UGF

Columns

M-40

NTD

NTD

LGF

Raft

M-25

PCC

PCC

LGF

Footing

M-10

EXT

EXT

LGF

Boundry Wall

M-20

PCC

PCC

Mockup

M-10

Target Quantity

4.00PM

Quantity

75.5

7.0
2.0

3.0
1.7
1.0

134.0

127.7

0.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

%
Achieved

5.00

5.00

A3

A4

A5

A6

A7

331
0
0.00

147

0.00

44%
140.50

0
0.00

Item

Planned for August '12

Planned till 16-08-12

PCC

450

232

RCC

4,368

2,254

4,818

2,487

0
0.00

NTA

B1

900

452

50%
411.95
0.00
Planned
Avg. / day

B2

B3

B4

B5

74
0

81

0.00

109%
80.50

0
0.00

0
0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

128

462

134

138

91

60

47

68

124

77

118

47%
94.25

79%
138.00

34%
91.00

18%
54.00

0%
0.00

17%
47.00

23%
67.50

62%
114.75

0%
0.00

383%
74.90

26%
107.50

50%
66%
123.50
451.75
Achieved
Avg. / day

Achieved till 16-08-12

15

118

51%

5,796

141

2,017

89%

126

102,056

2,135

Cum. Achieved till date

107,852

Cum. Planned till August '12

Cum. Achieved till date

135,240

103,608

77%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
Daily Concreting Planned for :
S. No.

Cluster /
In-charge

Engineer

Tower No.

Cluster A

Mr.Manjunath

Mr.Jairaj

Mr.Rajkumar

AL

15F

Column

M-25

2.0

16F

Slab-P1

M-20

39.0

11.00AM
2.00PM

Cluster B
Cluster C

Mr.Ramesh

Mr.Biradar /
Mr.Chandran

10

Cluster D

Plan

Achi.

Remarks

15F

Column

M-25

3.0

2.5

7F

Staircase

M-25

4.5

4.5

UGF

Column

M-40

2.5

3.5

LGF

Grade Slab

M-10

16.0

1.5

Staircase

NTA

NTA

NTA

NTA
LGF

Grade Slab

M-10

9.00AM

16.0

Manually

PCC
B1
B2
B3
B4

1F

Staircase

M-25

4.0

9.00AM

Pump

17-18F

Column

M-25

3.0

9.00AM

TC-5

Night

B5
B6
B6

NTB

POD

Slab

M-25

40.0

NTB

UGF

Column

M-40

4.0

4.00PM

M-25

4.0

17-18F Column

1F

M-25

3.0

Pump

NTB

UGF

Column

M-40

6.0

6.0

Pump

NTB

UGF

Column

M-40

3.0

3.0

12.00PM

NTB

NTB

PCC

PCC

LGF

Footing

M-10

5.0

5.0

C1

C1

17F

Column

M-25

4.0

3.5

C2

C2

C3

17F

Column

M-25

6.0

C4

14F

Column

M-26

6.0

TC-5

C3

17F

Column

M-25

TC-5

C4

14F

Column

M-25

6.0

6.0

C4

C4

1-2F

Staircase

M25

5.0

6.0

C4

C4

NTC

NTC

PCC

PCC

LGF

UGT

M-10

6.0

6.0

D1

D1

D2

D2

M-25

6.0

8.5

NTD

17-Aug-12

Today Qty

A5
A6
A7

Mr.Prabhakar
LGF

R/wall

M-25

30.0

11.00PM
3.00PM

12.00PM

TC-7

NTD

Shashidhar / Ravi Harikanth

Type of Structure

A5

B6

Floor

TC-3

A6
A7

B6

Mr.Biradar /
Mr.Chandran

Tower No.

Concrete
Grade

Pump

B5

12

BL

Placing
Method

A1
A2
A3
A4

A5

B1
B2
B3
B4

Type of Structure

Start Time

Conc. Qty
(m3)

A5

PCC

Floor

Conc.
Grade

A1
A2
A3
A4

Mr.Abdul

Daily Concreting Achieved for :

18-Aug-12

18-19F Column

D2

Pod

Staircase

M-25

NTD

LGF

Column

M-40

LGF

Boundry Wall

6.0

3.5
1.5

3.0

75.5

71.0

0.0

NTD

PCC

PCC

EXT

EXT

PCC

PCC
Target Quantity

M-10
Quantity

150.0

2.5

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

A3

A4

5.00

5.00

A6

154

0.00

46%
146.50

%
Achieved

A5

A7

331

0.00

0
0.00

Item

Planned for August '12

Planned till 17-08-12

PCC

450

247

RCC

4,368

2,395

4,818

2,642

0
0.00

NTA

B1

900

455

51%
451.95
0.00
Planned
Avg. / day

B2

B3

B4

B5

74
0

81

0.00

109%
80.50

0
0.00

0
0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

128

471

138

138

97

72

47

80

127

77

133

48%
134.25

79%
138.00

36%
91.00

21%
60.00

0%
0.00

17%
47.00

27%
67.50

63%
123.75

0%
0.00

383%
76.60

29%
117.50

50%
67%
128.00
462.25
Achieved
Avg. / day

Achieved till 17-08-12

15

133

54%

5,796

141

2,073

87%

122

102,056

2,206

Cum. Achieved till date

107,852

Cum. Planned till August '12

Cum. Achieved till date

135,240

103,679

77%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
20-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

2
Cluster A

Conc.
Grade

Mr.Jairaj

AL

Cluster B

Mr.Rajkumar

Mr.Biradar /
Mr.Chandran

Cluster C

Mr.Ramesh

Cluster D
12

Achi.

M-25

2.0

M-20

39.0

41.0

A6
A7

A6
A7

Grade Slab

M-10

16.0

17.0

Staircase

M-25

4.0

4.5

M-25

3.0

M-40

TC-3

9.00AM

2.0

TC-2

NTA
PCC

LGF

B1
B2
B3
B4

1F

B5

B5

B6

17-18F

Column

M-25

3.0

B6

18F

Slab-P2

M-20

49.0

NTB

LGF

Column

M-40

6.0

NTB

LGF

Footing

M-25

18.0

9.00AM

17-18F Column

TC-5

B6

Pump

B6

9.00AM

Pump

NTB

POD

Slab

M-25

40.0

10.00AM

Direct

NTB

UGF

Column

M-40

4.0

2.00PM

NTB

NTB

PCC

PCC

C1

C1

65.5

C2

C3

17F

Column

M-25

6.0

C4

16F

Staircase

M25

4.0

C4

14F

Column

M-26

6.0

LGF

UG-Tank

M-10

4.0

11.00PM

TC-5

C3

17F

Column

M-25

6.0

6.5

2.00PM

TC-5

C4

14F

Column

M-26

6.0

6.5

5.00PM

TC-5

C4

Direct

NTC
LGF

UGT

M-10

LGF

R/wall

M-25

30.0

32.0

Quantity

150.0

177.0

0.0

C4
9.00AM

PCC

PCC

D1

D1

4.0

D2
LGF

Column

M-40

2.0

10.00AM

TC-7

NTD
PCC

Night

NTA

B1
B2
B3
B4

NTD

Shashidhar / Ravi Harikanth

Remarks
Plan

Slab-P1

Column

2.00PM

4.0

D2
Mr.Prabhakar

Today Qty

Column

M-25

C4
10

Concrete
Grade

15F

NTC

Mr.Biradar /
Mr.Chandran

Type of Structure

16F

LGF

Column

C2

Floor

A5

15F

NTA

Tower No.

A1
A2
A3
A4

PCC

BL

Placing
Method

A5

NTA

Start Time

Conc. Qty
3
(m )

A5

A5
Mr.Manjunath

Type of Structure

A1
A2
A3
A4

Mr.Abdul

18-Aug-12

Daily Concreting Achieved for :


Floor

NTD
NTD

LGF

Footing

M-10

2.00PM

3.0

TC-7

EXT

PCC
EXT

PCC

PCC
Target Quantity

107.0
Cumulative Planned vs Achieved for Aug 2012

Tower

A1

A2

M. Target

Achieved

A3

A4

5.00

5.00

A6

195

0.00

59%
153.50

%
Achieved

A5

A7

331

0.00

0
0.00

Item

Planned for August '12

Planned till 18-08-12

PCC

450

261

RCC

4,368

2,536

4,818

2,798

0
0.00

NTA

B1

900

455

51%
455.45
0.00
Planned
Avg. / day

B2

B3

B4

B5

74
0

81

0.00

109%
80.50

5
0.00

0
0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

128

537

138

138

104

79

47

80

159

77

154

48%
137.75

79%
138.00

38%
97.00

23%
72.00

0%
0.00

17%
47.00

27%
79.50

79%
126.75

0%
0.00

383%
76.60

34%
132.50

50%
77%
128.00
471.25
Achieved
Avg. / day

Achieved till 18-08-12

15

154

59%

5,796

141

2,229

88%

124

102,056

2,383

Cum. Achieved till date

107,852

Cum. Planned till August '12

Cum. Achieved till date

135,240

103,856

77%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
21-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Mr.Abdul

Cluster A

Mr.Manjunath

Mr.Jairaj

Cluster B

Mr.Rajkumar

Floor

Type of Structure

Start Time

Conc. Qty
3
(m )

BL

Placing
Method

AL

Mr.Biradar /
Mr.Chandran

A1
A2
A3
A4

A5

A5

A5

A5

A6
A7

A6
A7

NTA

LGF

Footing

M-25

5.5

NTA

LGF

R/wall

M-25

8.0

9.00AM
2.00PM

PCC

LGF

Footing,A4

M-10

2.5

PCC

LGF

Grade Slab

M-10

20.0

Direct

NTA

Pump

NTA

4.30PM

Direct

PCC

2.00PM

Manualy

PCC

B1
B2
B3
B4

B1
B2
B3
B4

B5

B5
18F

Staircase

M-25

4.0

NTB

UGF

Slab

M-25

40.0

Cluster C

Cluster D

5.0

LGF

Column

M-40

2.0

0.7

LGF

Column,B3

M-40

6.0

5.0

NTB

LGF

Column,B2

M-40

Direct

NTB

LGF

Footing

M-25

LGF

C/wall

M-25

M-25

12.0

9.00AM

NTB

LGF

Footing

M-25

4.0

11.00AM

TC-4

NTB

PCC

LGF

Footing

M-25

4.0

2.00PM

Direct

PCC

C1

18F

Slab-P1

M-20

41.0

2.00PM

Pump

C1

C3

17F

Column

M-25

6.0

C3

16F

Staircase

M-25

4.0

C4

14F

Column

M-25

6.0

Night

NTB

Pump

1.5
18.0
2.0

C2
9.00AM

TC-5

C3

17F

Column

M-25

6.0

4.00PM

TC-5

C4

16F

Staircase

M25

4.0

6.00PM

TC-5

C4

14F

Column

M-26

6.0

LGF

UG-Tank

M-10

4.0

2.0

NTD

LGF

Column

M-40

2.0

1.7

NTD

LGF

R/wall

M-25

PCC

LGF

Footing

M-10

6.0

C4
NTC
LGF

Basement, C3

M-10

2.00PM

4.5

TC-6

PCC
D1
D2

LGF

Column

M-40

2.00PM

1.5

TC-7

NTD

Shashidhar / Ravi Harikanth

4.0

4.5

D2

12

M-25

46.5

Footing

PCC

Column

3.0

LGF

NTD

15F

49.0

D1

Mr.Prabhakar

Remarks

M-25

NTB

PCC

Achi.

M-20

B6

NTC

Mr.Biradar /
Mr.Chandran

Plan

Slab-P2

TC-5

C4
10

Type of Structure

18F

2.00PM
9.00AM

Floor

Today Qty

Concrete
Grade

17-18F Column

B6

B6

C2
Mr.Ramesh

Tower No.

A1
A2
A3
A4

B6

20-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

LGF

Footing

M-10

2.0

10.00AM

TC-7

EXT

6.0
3.0

6.0

107.0

86.9

0.0

EXT

PCC

PCC
Target Quantity

Quantity

165.0
Cumulative Planned vs Achieved for Aug 2012

Tower

A1

A2

M. Target

Achieved

A3

A4

5.00

5.00

A6

A7

331
0

200

0.00

60%
194.50

%
Achieved

A5

0.00

0
0.00

Item

Planned for August '12

Planned till 20-08-12

PCC

450

290

RCC

4,368

2,818

4,818

3,108

0
0.00

NTA

B1

900

456

51%
455.45
0.00
Planned
Avg. / day

B2

B3

B4

B5

74
0

81

0.00

109%
80.50

5
4.50

0
0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

179

545

138

138

110

79

47

80

166

77

162

48%
137.75

79%
138.00

41%
103.50

23%
78.50

0%
0.00

17%
47.00

27%
79.50

83%
158.75

0%
0.00

383%
76.60

36%
153.50

70%
78%
128.00
536.75
Achieved
Avg. / day

Achieved till 20-08-12

15

162

56%

5,796

141

2,308

82%

115

102,056

2,470

Cum. Achieved till date

107,852

Cum. Planned till August '12

Cum. Achieved till date

135,240

103,943

77%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
22-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Cluster A

A5
Mr.Manjunath

Mr.Jairaj

Cluster B

Mr.Rajkumar
6

Type of Structure

BL

Placing
Method

AL

Mr.Biradar /
Mr.Chandran

Cluster C

Mr.Ramesh

16F

Column

M-25

9.00AM

6.0

TC-3

A5

A6
A7

A6
A7

NTA

STP

Column

M-25

1.0

NTA

LGF

R/wall

M-25

8.0

PCC

LGF

Footing, A4

M-10

2.0

PCC

LGF

Grade Slab

M-10

20.0

2.30PM

Remarks

Column

M-25

4.0

6.5

5.5

Footing

M-25

5.5

LGF

R/wall

M-25

8.0

TC-3

PCC

LGF

Footing,A4

M-10

2.5

Manually

PCC

LGF

Grade Slab

M-10

20.0

3.00PM
9.00AM

16F

LGF

B5

B5

Night

B6

B6

18F

Staircase

M-25

4.0

NTB

UGF

Slab, B3

M-25

70.0

NTB

UGF

Column

M-40

5.0

NTB

LGF

Comp Wall

M-25

3.5

2.00PM

TC-5

B6

18F

Staircase

M-25

4.0

Pump

NTB

UGF

Slab

M-25

40.0

42.0

2.30PM

TC-4

NTB

2.00PM

Direct

10.00AM

NTB

LGF

Footing

M-25

12.0

12.0

NTB

NTB

LGF

Footing

M-25

4.0

5.0

PCC

PCC

LGF

Footing

M-25

4.0

5.0

C1

C1

18F

Slab-P1

M-20

41.0

42.0

C2

17F

Staircase

M25

4.0

C3

17F

Column

M-25

6.0

2.00PM

TC-6

C2

TC-5

C3

17F

Column

M-25

6.0

C3

C3

16F

Staircase

M-25

4.0

C3

C3

17F

Staircase

M-25

C4

14F

Column

M-25

6.0

6.5

LGF

Basement, C3

M-10

4.5

4.5

NTD

LGF

Column

M-40

1.5

NTD

LGF

R/wall

M-25

PCC

PCC

LGF

Footing

M-10

EXT

EXT

14F

Column

M-25

9.30AM

2.00PM

6.0

TC-5

4.0
2.5

NTC
LGF

Footing

M-10

4.00PM

3.0

TC-6

PCC
D1

D2
Cluster D

Achi.

NTA

B1
B2
B3
B4

NTD

D2
LGF

Column

M-40

2.00PM

2.0

TC-7

NTD

Shashidhar / Ravi Harikanth

Plan

NTA

D1

12

Type of Structure

TC-2

B1
B2
B3
B4

PCC

Mr.Prabhakar

Floor

Pump

9.00AM

NTC

Mr.Biradar /
Mr.Chandran

A5

A5

C4
10

Tower No.

Today Qty

Concrete
Grade

A1
A2
A3
A4

B6

Floor

Start Time

Conc. Qty
(m3)

A1
A2
A3
A4

Mr.Abdul

21-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

PCC

1.5
15.0

2.0

2.0

169.0

154.0

0.0

PCC
Target Quantity

Quantity

140.5
Cumulative Planned vs Achieved for Aug 2012

Tower

A1

A2

M. Target

Achieved

A3

A4

5.00

5.00

A6

A7

331
0

206

0.00

62%
199.50

%
Achieved

A5

0.00

0
0.00

0
0.00

NTA

B1

900

462

51%
456.15
0.00
Planned
Avg. / day

B2

B3

B4

B5

74
0

81

0.00

109%
80.50

Item

Planned for August '12

Planned till 21-08-12

PCC

450

305

15

173

RCC

4,368

2,959

141

2,451

4,818

3,264

5
4.50

Achieved till 21-08-12

2,624

0
0.00
%

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

179

604

180

138

116

85

47

80

183

77

173

63%
137.75

79%
138.00

43%
109.50

25%
78.50

0%
0.00

17%
47.00

27%
79.50

91%
166.45

0%
0.00

383%
76.60

38%
161.50

70%
86%
179.00
545.25
Achieved
Avg. / day

Cum. Achieved till date

57%

5,796

83%

117

102,056
107,852

Cum. Planned till August '12

Cum. Achieved till date

135,240

104,097

77%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
23-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Cluster A

Mr.Manjunath

AL

Mr.Jairaj

Cluster B

Mr.Rajkumar

Column

2.00PM

Cluster C

Mr.Ramesh

STP

Column

M-25

1.0

LGF

R/wall

M-25

8.0

NTA

NTA

LGF

Column Pedestral

M-40

PCC

PCC

LGF

Footing, A4

M-10

2.0

4.0

PCC

PCC

M-10

20.0

24.0

B1
B2
B3
B4

B1
B2
B3
B4

B5

B5

A6
A7
POD

Slab-A2

M-25

50.0

Cluster D

Shashidhar / Ravi Harikanth

Night

11.00 AM

Pump

Basement Grade Slab

8.0
1.0

B6
18F

Staircase

M-25

2.00PM

4.0

NTB

LGF

Comp Wall

M-25

6.0

NTB

LGF

Footing

M-25

9.0

NTB

LGF

Column

M-40

4.0

PCC

LGF

Footing

M-25

4.0

C1

18F

Slab-P2

M-20

45.0

B6

18F

Staircase

M-25

4.0

NTB

UGF

Slab, B3

M-25

70.0

81.0

Direct

NTB

UGF

Column

M-40

5.0

5.0

Direct

NTB

LGF

Comp Wall

M-25

3.5

2.5

Pump

NTB

Direct

PCC

Pump

C1
5.0

TC-5

4.00PM
11.00AM
2.00PM
2.00PM
10.00AM

C2

C2

17F

Staircase

M25

4.0

C3

C3

17F

Column

M-25

6.0

14F

Column

M-25

6.0

6.0

LGF

Footing

M-10

3.0

3.0

LGF

Column

M-40

2.0

1.2

140.5

146.7

0.0

C3
14F

Column

M-25

6.0

10.00AM

TC-5

C4

C4

C3

NTC

NTC

PCC

PCC

D1

D1

D2
Mr.Prabhakar

6.0

Remarks

NTA

A5

A6
A7

C4

Mr.Biradar /
Mr.Chandran

Achi.

NTA

TC-3

C3

10

Plan

6.0

6.0

NTB

Today Qty

M-25

M-25

A5

B6

Mr.Biradar /
Mr.Chandran

Type of Structure

Column

16F

B6

Floor

Concrete
Grade

A1
A2
A3
A4

NTA

12

BL

Tower No.

A5

NTA

Type of Structure

Placing
Method

16F

A5

Floor

Start Time

Conc. Qty
(m3)

A1
A2
A3
A4

Mr.Abdul

22-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

LGF

Staircase

M-25

2.00PM

3.0

Manually

D2

NTD

NTD

NTD

NTD

PCC

PCC

EXT

EXT

PCC

LGF

Boundry Wall

M-10

Target Quantity

2.00PM

2.0

Direct

PCC
Quantity

139.0
Cumulative Planned vs Achieved for Aug 2012

Tower

A1

A2

M. Target

Achieved

A3

A4

5.00

5.00

A6

212

0.00

64%
206.00

%
Achieved

A5

A7

331

0.00

0
0.00

Item

Planned for August '12

Planned till 21-08-12

PCC

450

319

RCC

4,368

3,100

4,818

3,419

0
0.00

NTA

B1

900

471

52%
461.65
0.00
Planned
Avg. / day

B2

B3

B4

B5

74
0

81

0.00

109%
80.50

5
4.50

0
0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

179

693

180

143

116

91

47

80

184

77

204

63%
179.75

82%
138.00

43%
116.00

27%
85.00

0%
0.00

17%
47.00

27%
79.50

92%
182.95

0%
0.00

383%
76.60

45%
173.00

70%
99%
179.00
604.25
Achieved
Avg. / day

Achieved till 21-08-12

15

204

64%

5,892

141

2,567

83%

117

102,056

2,771

Cum. Achieved till date

107,948

Cum. Planned till August '12

Cum. Achieved till date

135,240

104,243

77%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
24-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Cluster A

Mr.Manjunath

Cluster B

Mr.Rajkumar

8
Mr.Ramesh

BL

AL

Mr.Biradar /
Mr.Chandran

10

A5

16F

Slab-P2

M-20

45.0

10.30 AM

Pump

A5

A5

16F

Columns

M-25

6.0

10.00 AM

TC-3

A5

NTA

GF

PCC

LGF

STP,Column

M-40

1.0

Footing,A5

M-10

4.0

10.00 AM
2.30 PM

TC-2

NTA

TC-3

PCC

B1
B2
B3
B4

B1
B2
B3
B4

B5

B5

Remarks
Achi.

16F

Column

M-25

6.0

POD

Slab-A2

M-25

50.0

42.5

4.0

B6

18F

Staircase

M-25

4.0

NTB

LGF

Comp Wall

M-25

6.0

3.0

NTB

NTB

LGF

Footing

M-25

9.0

13.0

NTB

NTB

LGF

Column

M-40

4.0

PCC

PCC

LGF

Footing

M-25

4.0

2.5

C1

C1

18F

Slab-P2

M-20

45.0

47.0

C2

C2

15F

Column

M-25

6.0

4.0

PCC

LGF

UG-Tank

M-10

8.5

PCC

LGF

Footing

M-10

5.5

LGF

Staircase

M-25

15F

Slab-P2

M-20

45.0

NTC

LGF

Footing

M-25

8.0

NTC

LGF

UG Tank- Raft

M-30

LGF

Footing

M-10

10.00 AM

Pump

C4

4.00 PM

TC-6

NTC

90.0

2.30 PM

Pump

NTC

3.0

2.00 PM

TC-6

D1
LGF

Staircase

M-25

3.0

10.00 AM

Manual

NTD
PCC

Night

C3

C4

D2

Cluster D

Plan

NTB

D1

Shashidhar / Ravi Harikanth

Type of Structure

B6

PCC

12

Floor

A6
A7

PCC

Mr.Prabhakar

Tower No.

Today Qty

Concrete
Grade

A1
A2
A3
A4

C3
Cluster C

Type of Structure

Placing
Method

A6
A7

Floor

Start Time

Conc. Qty
(m3)

A1
A2
A3
A4

Mr.Abdul

23-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

D2

3.0

NTD
LGF

Footing

M-10

3.00PM

2.5

TC-7

PCC

EXT

EXT

LGF

Boundry Wall, A1

M-20

EXT

EXT

LGF

Phase 2 C/ Wall,Raft

M-25

PCC

PCC

LGF

Phase 2 Boundry Wall

M-10

Target Quantity

Quantity

207.5

4.5
7.0
2.0

1.5

139.0

143.0

0.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

A3

A4

5.00

5.00

A6

A7

331
0

212

0.00

64%
212.00

%
Achieved

A5

0.00

0
0.00

Item

Planned for August '12

Planned till 23-08-12

PCC

450

334

RCC

4,368

3,241

4,818

3,575

0
0.00

NTA

B1

900

513

57%
470.65
0.00
Planned
Avg. / day

B2

B3

B4

B5

74
0

81

0.00

109%
80.50

5
4.50

0
0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

183

709

227

143

116

95

47

80

184

88

222

79%
179.75

82%
143.00

43%
116.00

28%
91.00

0%
0.00

17%
47.00

27%
79.50

92%
184.15

0%
0.00

441%
76.60

49%
204.00

71%
101%
179.00
692.75
Achieved
Avg. / day

Achieved till 21-08-12

15

222

66%

10

5,914

141

2,692

83%

117

102,872

2,914

Cum. Achieved till date

Cum. Planned till August '12

Cum. Achieved till date

135,240

104,386

77%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
25-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

A1
A2
A3
A4

Mr.Abdul

Cluster A

Mr.Manjunath

AL

13F

Staircase

M-25

5.0

11.00 AM

A5

16F

Columns

M-25

6.5

9.00 AM

A5

14F

Staircase

M-25

4.5

TC-2

2.00 PM

Cluster C
Cluster D

Shashidhar / Ravi Harikanth

Plan

Achi.

Remarks
Night

A1
A2
A3
A4
A5

16F

Slab-P2

M-20

45.0

47.0

TC-3

A5

16F

Columns

M-25

6.0

5.0

1.0

A6
A7
Pod

Slab-A2

M-25

40.0

3.00 PM

Pump

NTA

GF

STP,Column

M-40

1.0

LGF

Footing

M-10

2.5

5.00 PM

TC-2

PCC

LGF

Footing,A5

M-10

4.0

LGF

Comp/Wall B4

M-25

C4

15F

Slab-P2

M-20

C4

C4

15F

Columns

M-25

NTC

NTC

LGF

Footing

M-25

8.0

NTC

NTC

LGF

UG Tank- Raft

M-30

90.0

PCC

PCC

LGF

Footing

M-10

3.0

LGF

Staircase

M-25

3.0

LGF

Footing

M-10

2.5

LGF

Phase 2 Boundry Wall

B1
B2
B3
B4
B5
18F

Slab-P3

M-20

41.0

11.00 AM

Pump

B6

NTB

NTB

PCC

PCC

C1

C1

C2

C2

D1
Mr.Prabhakar

Type of Structure

TC-3

C3

Mr.Biradar /
Mr.Chandran

Floor

PCC

C4

10

Tower No.

Today Qty

Concrete
Grade

NTA

B6

Mr.Ramesh

12

BL

B5

Type of Structure

Placing
Method

B1
B2
B3
B4

Mr.Rajkumar

Cluster B

Floor

Conc. Qty
3
(m )

A6
A7

24-Aug-12

Daily Concreting Achieved for :


Start Time

Conc.
Grade

4.0

C3
15F

18F

Columns

M-25

Slab-P1

M-20

2.00PM

4.0

TC-5

4.00 PM

41.0

Pump

D2

NTD

NTD

PCC

PCC

EXT

EXT
PCC
Target Quantity

49.5
4.0

93.0

D1

D2

PCC

45.0

M-10
Quantity

144.5

3.0

1.8
207.5

208.3

0.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

A3

A4

5.00

5.00

A6

A7

331
0

264

0.00

80%
212.00

%
Achieved

A5

0.00

0
0.00

Item

Planned for August '12

Planned till 23-08-12

PCC

450

334

RCC

4,368

3,241

4,818

3,575

0
0.00

NTA

B1

900

514

57%
513.15
0.00
Planned
Avg. / day

B2

B3

B4

B5

74
0

81

0.00

109%
80.50

5
4.50

0
0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

183

713

227

143

116

149

93

47

83

184

88

224

79%
226.75

82%
143.00

43%
116.00

44%
95.00

47%
0.00

17%
47.00

28%
79.50

92%
184.15

0%
0.00

441%
88.10

50%
222.00

71%
102%
183.00
708.75
Achieved
Avg. / day

Achieved till 23-08-12

15

224

67%

5,914

141

2,898

89%

121

102,872

3,122

Cum. Achieved till date

Cum. Planned till August '12

Cum. Achieved till date

135,240

104,595

77%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
27-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

A1
A2
A3
A4

Mr.Abdul

Cluster A

Mr.Manjunath

Cluster B

Mr.Rajkumar
6

Floor

Type of Structure

Start Time

Conc. Qty
(m3)

BL

Placing
Method

AL

13F

Staircase

M-25

5.5

9.00 AM

A5

16F

Columns

M-25

6.5

2.00PM

TC-3

A5

LGF

Footing,A5

M-10

2.5

5.00PM

TC-3

TC-2

A6
A7

NTA

Pod

Slab-A2

M-25

40.0

NTA

LGF

R/wall

M-25

6.0

9.00 AM

Cluster C

Mr.Biradar /
Mr.Chandran

10

Cluster D
12

Type of Structure

Plan

Remarks
Achi.

13F

Staircase

M-25

5.0

A5

16F

Columns

M-25

6.5

6.0

A5

14F

Staircase

M-25

4.5

6.0

40.0

NTA

Pod

Slab-A2

M-25

NTA

LGF

Footing

M-25

PCC

PCC

LGF

Footing

M-10

2.5

B1
B2
B3
B4

B1
B2
B3
B4

B5

B5
18F

Slab-P3

M-20

41.0

44.0

15F

Columns

M-25

4.0

6.0

18F

Slab-P1

M-20

41.0

43.0

UGF

UG Tank Slab

M-25

B6

NTB

LGF

R/wall

M-25

6.0

11.00AM

Pump

NTB

Night

UGF

Column

M-40

6.0

9.00AM

Pump

2.5

NTB

PCC

PCC

C1

C1
C2

C3

18F

Slab-P1

M-20

41.0

6.00 PM

Pump

C3

C4

15F

Columns

M-25

3.0

2.00PM

TC-5

C4

C4

1F

Staircase

M-25

5.0

Pump

C4

9.30AM

NTC

NTC

NTC

NTC

PCC

PCC

D2

Shashidhar / Ravi Harikanth

Floor

Pump

D1
Mr.Prabhakar

A1
A2
A3
A4

Pump
2.30PM

C2
Mr.Ramesh

Tower No.

Today Qty

Concrete
Grade

A6
A7

B6

25-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

D1
18F

Slab-P2

M-20

5.00 PM

52.0

Pump

D2

NTD

NTD

PCC

PCC

EXT

EXT

PCC

1.7

PCC
Target Quantity

Quantity

173.5

144.5

109.2

0.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

A3

A4

5.00

5.00

A6

A7

331
0

276

0.00

83%
264.00

%
Achieved

A5

0.00

0
0.00

Item

Planned for August '12

Planned till 23-08-12

PCC

450

334

RCC

4,368

3,241

4,818

3,575

0
0.00

NTA

B1

900

517

57%
514.15
0.00
Planned
Avg. / day

B2

B3

B4

B5

74
0

81

0.00

109%
80.50

5
4.50

0
0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

227

713

227

143

116

155

93

90

83

186

88

224

79%
226.75

82%
143.00

43%
116.00

46%
148.50

47%
93.00

32%
47.00

28%
82.50

93%
184.15

0%
0.00

441%
88.10

50%
223.75

88%
102%
183.00
712.75
Achieved
Avg. / day

Achieved till 23-08-12

15

224

67%

5,914

141

3,007

93%

120

102,872

3,231

Cum. Achieved till date

Cum. Planned till August '12

Cum. Achieved till date

135,240

104,704

77%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
28-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Type of Structure

BL

Placing
Method

AL

Mr.Manjunath

A1
A2
A3
A4
Columns

Cluster B

Cluster C

Mr.Biradar /
Mr.Chandran

Cluster D

Mr.Prabhakar

12

Shashidhar / Ravi Harikanth

Staircase

M-25

5.5

4.5

5.0

M-25

6.5

M-10

2.5

A6
A7

A6
A7
NTA

Pod

Slab-A2

M-25

40.0

NTA

LGF

R/wall

M-25

6.0

LGF

R/wall

M-25

3.00PM

6.0

Pump

PCC

PCC

B1
B2
B3
B4

B1
B2
B3
B4

14F

Staircase

M-25

4.5

3.00PM

TC-4

B6

5F

Staircase

M-25

4.5

5.00PM

TC-5

B6

NTB

LGF

R/wall

M-25

6.0

11.00AM

Pump

NTB

LGF

R/wall

M-25

6.0

NTB

UGF

Column

M-40

6.0

9.00AM

Pump

NTB

UGF

Column

M-40

6.0

Night

43.0

B5

PCC
GF

Staircase

M-25

7.0

C3

17F

Columns

M-25

2.0

C4

15F

Slab-P3

M-20

42.0

C4

15F

Columns

M-25

6.0

C1

10

13F

Footing,A5

2.00PM

Pump

C1
C2

17F-18F

Staircase

M-25

TC-5

C3

18F

Slab-P1

M-20

41.0

50.0

Pump

C4

15F

Columns

M-25

3.0

4.0

TC-5

C4

1F

Staircase

M-25

5.0

5.0

18F

Slab-P2

M-20

52.0

50.0

C2
9

Remarks

Columns

TC-3

PCC

Mr.Ramesh

Achi.

16F

6.0

B5

Plan

LGF

NTA

Mr.Rajkumar

Type of Structure

A5

M-25

2.00PM

Floor

A5

16F

NTA

Tower No.

Today Qty

Concrete
Grade

A5

A5

Cluster A

Floor

Start Time

Conc. Qty
(m3)

A1
A2
A3
A4

Mr.Abdul

27-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

9.00AM
2.30PM
11.00AM

NTC

NTC

NTC

NTC

PCC

PCC

D1

D1

D2

D2

NTD

NTD

PCC

PCC

EXT

EXT

LGF

Boundry Wall, A1

M-20

PCC

PCC

LGF

Phase 2 C/Wall

M-10

Target Quantity

Quantity

90.0

7.0

2.3
3.5
173.5

174.3

0.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

10

A3

A4

5.00

5.00

A6

A7

331
0

281

0.00

85%
276.00

%
Achieved

A5

0.00

0
0.00

Item

Planned for August '12

Planned till 23-08-12

PCC

450

334

RCC

4,368

3,241

4,818

3,575

0
0.00

NTA

B1

900

560

62%
516.65
0.00
Planned
Avg. / day

B2

B3

B4

B5

74
0

81

0.00

109%
80.50

5
4.50

0
0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

227

713

227

150

166

164

93

90

133

186

90

227

79%
226.75

86%
143.00

61%
116.00

49%
154.50

47%
93.00

32%
90.00

45%
82.50

93%
185.85

0%
0.00

452%
88.10

51%
223.75

88%
102%
227.00
712.75
Achieved
Avg. / day

Achieved till 23-08-12

15

227

68%

5,914

141

3,178

98%

118

102,872

3,405

Cum. Achieved till date

Cum. Planned till August '12

Cum. Achieved till date

135,240

104,878

78%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
29-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Cluster A

Mr. Prasath

BL

AL

16F

Columns

M-25

6.0

A5

17F

Slab-P3

M-20

40.5

2.00PM
10.30 AM

Cluster B

Mr.Rajkumar

Mr. Arun

Mr.Ramesh
Cluster C
Cluster D

12

5.0

Columns

M-25

8F

Staircase

M-25

LGF

UG tank wall

M-30

10.0

LGF

Footing ,A3

M-10

2.0

LGF

R/wall

M-25

6.0

6.0

14F

Staircase

M-25

4.5

4.5

10.30 AM

TC-3

4.5

NTA
NTA

5.00PM

TC-3

PCC

B5

B5
TC-5

B6

5F

Staircase

M-25

4.5

Pump

NTB

LGF

R/wall

M-25

6.0

6.0

NTB

NTB

UGF

Column

M-40

6.0

7.5

NTB

NTB

LGF

C/wall, B5

M-25

GF

Staircase

M-25

B6

5F

NTB

POD

LGF

Staircase

M-25

4.5

Slab

M-25

100.0

Footing , B1

M-10

5.00PM
11.00AM

2.30PM

4.0

Direct

2.0

PCC

C1

C1

C2

C2

7.0

C3

17F

Columns

M-25

2.0

C4

15F

Slab-P3

M-20

42.0

42.0

C4

C4

15F

Columns

M-25

6.0

4.5

NTC

NTC

NTC

NTC

EXT

LGF

Boundry Wall, A1

M-20

PCC

LGF

Phase 2, C/wall

M-10

15F

Columns

M-25

2.00PM

6.0

TC-5

PCC

D1

18F

Slab-P3

M-20

42.0

2.00 PM

Pump

D2

17-18F

Staircase

M-25

4.0

5.00PM

Pump

D1

D2

D2

NTD

NTD

EXT

Night

A6
A7

PCC
Shashidhar / Ravi Harikanth

6.0

Remarks

16F

PCC

Mr.Prabhakar

Achi.

A5

C3

Mr.Biradar /
Mr.Chandran

Plan

A5

B1
B2
B3
B4

C4

10

Type of Structure

TC-3

B1
B2
B3
B4

PCC
8

Floor

Pump

NTA
PCC

Tower No.

Today Qty

Concrete
Grade

A1
A2
A3
A4

A5

NTA

Type of Structure

Placing
Method

A6
A7
Mr. Jairaj

Floor

Start Time

Conc. Qty
(m3)

A1
A2
A3
A4

Mr.Abdul

28-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

PCC
LGF

Phase 2, C/wall

M-25

4.00PM

3.0

Direct

PCC
Target Quantity

Quantity

222.0

2.0
2.5
90.0

86.5

0.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

10

A3

A4

5.00

9.50

A6

A7

331
0

291

0.00

88%
281.00

%
Achieved

A5

0.00

0
0.00

Item

Planned for August '12

Planned till 28-08-12

PCC

450

406

RCC

4,368

3,945

4,818

4,352

0
0.00

NTA

B1

900

566

63%
559.65
0.00
Planned
Avg. / day

B2

B3

B4

B5

74
0

81

0.00

109%
80.50

9
4.50

0
0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

227

728

227

150

166

210

93

90

133

186

92

230

79%
226.75

86%
150.00

61%
166.00

63%
163.50

47%
93.00

32%
90.00

45%
132.50

93%
185.85

0%
0.00

462%
90.40

51%
227.25

88%
104%
227.00
712.75
Achieved
Avg. / day

Achieved till 28-08-12

15

230

57%

5,914

141

3,262

83%

117

102,872

3,492

Cum. Achieved till date

Cum. Planned till August '12

Cum. Achieved till date

135,240

104,965

78%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
30-Aug-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Mr.Abdul

Cluster A

Type of Structure

BL

Placing
Method

AL

A1
A2

A3
A4

A3
A4

A6
A7

Cluster B

Mr.Rajkumar

16F

Columns

M-25

9.30AM

6.0

TC-3

1F

Balcony

M-25

3.0

9.00AM

NTA

LGF

Columns

M-40

2.0

11.00AM

NTA

UGF

STP Slab

M-25

5.0

NTA

LGF

R/wall, A2

M-25

6.0

PCC

LGF

Fotting, A5

M-10

2.0

2.00PM
10.00AM

PCC

Mr.Biradar /
Mr.Chandran

Cluster D
12

LGF

UG tank wall

M-30

10.0

14.0

LGF

Footing ,A3

M-10

2.0

1.0

NTA

1.5

TC-3

PCC

11.00AM

Direct

2.5

B6

5F

Staircase

M-25

4.5

NTB

POD

Slab

M-25

100.0

LGF

Footing , B1

M-10

4.0

15F

Columns

M-25

6.0

94.0

NTB
NTB
LGF

Footing, B1

M-10

6.0

10.00AM

Direct

PCC
C1

C2

C2
C3
15F

Columns

M-25

6.0

11.00AM

TC-5

C4

C4

C4

NTC

NTC

NTC

NTC

5.5

PCC

D1

18F

Slab-P3

M-20

42.0

D2

18F

Column

M-25

6.0

9.30AM
2.30PM

Pump

D1

18F

Slab-P3

M-20

42.0

Pump

D2

17-18F

Staircase

M-25

4.0

Phase 2, C/wall

M-25

3.0

D2

D2

NTD

NTD

EXT

M-25

Night

Pump
3.00PM

PCC
Shashidhar / Ravi Harikanth

42.0

NTA

PCC

Mr.Prabhakar

2.0

40.5

C1

C4

10

6.0

M-20

TC-2

C3

Cluster C

M-25

Slab-P3

TC-2

NTB

Mr.Ramesh

Columns

A6
A7

NTB

16F
17F

B5
M-25

Achi.

A5

B5
C/wall ,B6

Remarks
Plan

A5

B1
B2
B3
B4

LGF

Type of Structure

Today Qty

Balcony

B1
B2
B3
B4

NTB

Floor

Concrete
Grade

2F

TC-2

B6

Mr. Arun

Tower No.

A2

A5

Mr. Jairaj

Floor

Start Time

Conc. Qty
(m3)

A1

A5
Mr. Prasath

29-Aug-12

Daily Concreting Achieved for :


Conc.
Grade

PP

PCC
Phase 2

C/wall Raft

M-25

22.0

11.00AM

Direct

PCC

EXT

LGF

PCC
Target Quantity

Quantity

107.5

222.0

161.0

0.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

12

A3

A4

5.00

9.50

A6

335

0.00

101%
290.50

%
Achieved

A5

A7

331

0.00

0
0.00

Item

Planned for August '12

Planned till 29-08-12

PCC

450

421

RCC

4,368

4,086

4,818

4,507

0
0.00

NTA

B1

900

580

64%
565.65
0.00
Planned
Avg. / day

B2

B3

B4

B5

74
0

81

0.00

109%
80.50

9
9.00

0
0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

227

822

227

150

166

216

93

90

133

186

92

231

79%
226.75

86%
150.00

61%
166.00

64%
210.00

47%
93.00

32%
90.00

45%
132.50

93%
185.85

0%
0.00

462%
92.40

51%
229.75

88%
117%
227.00
728.25
Achieved
Avg. / day

Achieved till 29-08-12

15

231

55%

5,914

141

3,422

84%

118

102,872

3,653

Cum. Achieved till date

Cum. Planned till August '12

Cum. Achieved till date

135,240

105,126

78%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
Daily Concreting Planned for :
S. No.

Cluster /
In-charge

Engineer

Tower No.

Mr.Abdul

Cluster A

Mr. Prasath

Floor

Type of Structure

Conc.
Grade

Start Time

Conc. Qty
(m3)

BL

Placing
Method

AL

A1

A2

A2

A3
A4

A3
A4

A5

17F

Columns

M-25

6.0

9.30AM

TC-3

A5

A5

13F

Staircase

M-25

4.0

12.00AM

TC-3

A5

A6

Cluster B

Mr.Rajkumar

Cluster C

Mr.Ramesh

Mr.Biradar /
Mr.Chandran

Cluster D

16F

Columns

M-25

6.0

6.0

3.0

3.0

M-40

2.0

1.5

NTA

NTA

UGF

STP Slab

M-25

5.0

6.0

NTA

NTA

LGF

R/wall, A2

M-25

6.0

6.0

PCC

LGF

Fotting, A5

M-10

2.0

1.0

B1
B2
B3
B4

B1
B2
B3
B4

14F

Staircase

M-25

B5

B5

LGF

Footing , A5

M-10

4.30PM

2.0

TC-3

B6

5F

Staircase

M-25

NTB

LGF

C/wall ,B6

M-25

2.5

11.00AM

Direct

NTB

LGF

C/wall ,B6

M-25

NTB

LGF

Columns

M-40

6.0

10.00AM

Pump

NTB

0.6
4.0
1.5

NTB
PCC

LGF

C/wall ,B6

M-10

PCC

LGF

Footing , B3

M-10

6.0

11.00AM

Direct

PCC

LGF

Footing, B1

M-10

C1

LGF

Staircase

M-25

4.5

10.00AM

TC-6

C1

13F

Staircase

M-25

15F

Columns

M-25

6.0

5.0

42.0

42.0

1.5
6.0

6.5
2.5

C2

C3

18F

Slab-P2

M-20

68.0

Pump

C3

C4

15F

Columns

M-25

6.0

2.00PM

TC-5

C4

C4

16F

Slab-P1

M-25

42.0

2.00PM

Pump

C4

C4

2F

Staircase

M-25

4.5

2.00PM

Pump

9.30AM

C4
NTC
NTC

PCC

LGF

UG Tank

M-10

6.0

D1

18F

Slab-P2

M-20

52.0

D2

Night

4.5

M-25

900AM
4.00PM

Direct

PCC

Pump

D1

18F

Slab-P3

M-20

D1

17-18F

Staircase

M-25

D2

18F

Column

M-25

6.0

22.0

D1

12

M-25

Columns

TC-3

NTC

Mr.Prabhakar

Staircase

Balcony

2.30PM

8.0

NTC
10

GF

1F

M-25

C2
9

Achi.

LGF

Footing , A5

NTB

Remarks
Plan

A7
LGF

B6

Mr. Arun

Type of Structure

30-Aug-12

Today Qty

NTA

PCC

Floor

Concrete
Grade

A6

A7

Mr. Jairaj

Tower No.

A1

NTA

Daily Concreting Achieved for :

31-Aug-12

19F

Columns

M-25

4.5

11.00AM

TC-7

NTD

6.0

NTD

PCC

PCC

EXT

EXT

Phase 2

C/wall Raft

M-25

EXT

Phase 2

C/wall

M-25

Shashidhar / Ravi Harikanth


PCC

17.0
3.5

PCC
Target Quantity

Quantity

222.0

107.5

116.6

0.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

17

A3

A4

5.00

12.00

A6

341

0.00

103%
334.50

%
Achieved

A5

A7

331

0.00

0
0.00

Item

Planned for August '12

Planned till 30-08-12

PCC

450

435

RCC

4,368

4,227

4,818

4,663

3
0.00

NTA

B1

900

593

66%
579.65
0.00
Planned
Avg. / day

B2

B3

B4

B5

74
0

81

0.00

109%
80.50

10
9.00

0
0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

231

822

229

150

166

221

93

138

133

186

113

240

80%
226.75

86%
150.00

61%
166.00

66%
215.50

47%
93.00

49%
90.00

45%
132.50

93%
185.85

0%
0.00

565%
92.40

53%
230.75

90%
117%
227.00
822.25
Achieved
Avg. / day

Achieved till 30-08-12

15

240

55%

5,914

141

3,530

83%

118

102,872

3,769

Cum. Achieved till date

Cum. Planned till August '12

Cum. Achieved till date

135,240

105,242

78%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
1-Sep-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Tower No.

Floor

Type of Structure

Conc. Qty
(m3)

BL

11.00AM

Placing
Method

AL

A1

Mr.Manjunath

Cluster A

Mr. Prasath

3F

Balcony

M-25

2.0

A2
A3
A4

3F

Staircase

M-25

4.0

A5

17F

Columns

M-25

6.0

A5

14F

Staircase

M-25

4.0

2.00PM

A5

17F

Slab-P1

M-20

41.0

3.00PM

4
Mr.Rajkumar
5

A2
A3
A4

TC-3

A5

17F

Columns

M-25

6.0

TC-3

A5

13F

Staircase

M-25

4.0

Pump

A5

9.30AM

LGF

Footing , A5

M-25

8.0

6.0

LGF

Footing , A5

M-10

2.0

1.5

B1
B2
B3
B4

B1
B2
B3
B4

B5

B5

LGF

Columns

M-40

9.30AM

1.5

TC-2

Cluster B

B6

NTB

LGF

C/wall ,B6

M-25

2.5

10.00AM

Direct

NTB

LGF

C/wall ,B6

M-25

2.5

NTB

LGF

C/wall Raft

M-25

2.8

12.00AM

Direct

NTB

LGF

Columns

M-40

6.0

5.0

NTB

POD

Slab, B3

M-25

62.0

11.00AM

Pump

NTB

NTB

LGF

Footing, B1

M-25

8.0

10.00AM

Direct

NTB

NTB

LGF

Footing, B4

M-25

8.0

Direct

NTB

NTA

UGF

Columns

M-40

2.5

TC-4

NTB

2.30PM
9.30AM

PCC

PCC

LGF

Footing , B3

M-10

6.0

4.5

C1

C1

LGF

Staircase

M-25

4.5

4.5

C2

C2
C3

18F

Slab-P2

M-20

68.0

66.0

C4

15F

Columns

M-25

6.0

C4

16F

Slab-P1

M-20

42.0

C4

2F

Staircase

M-25

4.5

PCC

LGF

UG Tank

M-10

6.0

6.0

D1

18F

Slab-P2

M-20

52.0

52.0

4.5

7.5

15F

Columns

M-25

5.0

2.00PM

2F

Staircase

M-25

4.5

10.00AM

Pump

LGF

UG Tank

M-10

4.0

9.00AM

Direct

TC-5

NTC
PCC

Cluster D

10

D2

19F

Columns

M-25

NTD

NTD

LGF

Columns

M-40

1.2

PCC

PCC

EXT

EXT

LGF

Phase 2 C/wall Starter

M-25

1.0

PCC

PCC

D2

Shashidhar / Ravi Harikanth

42.0

NTC

D1
Mr.Prabhakar

Night

A6
A7

PCC

C4

5.0

Remarks

A2

C4

Mr.Biradar /
Mr.Chandran

Achi.

NTA

C4

Plan

TC-2

3.00PM

C3

Mr.Ramesh

Cluster C

Mr. Arun

Type of Structure

TC-2

B6

Floor

PCC

NTA

Mr. Jairaj

Tower No.

Today Qty

Concrete
Grade

A1

A2

A6
A7
3

31-Aug-12

Daily Concreting Achieved for :


Start Time

Conc.
Grade

19F

Columns

M-25

Target Quantity

2.00PM

6.0

TC-7

Quantity

163.8

222.0

202.2

0.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A2

M. Target

Achieved

17

A3

A4

5.00

16.50

A6

A7

331
0

346

0.00

104%
340.50

%
Achieved

A5

0.00

0
0.00

Item

Planned for August '12

Planned till 31-08-12

PCC

450

450

RCC

4,368

4,368

4,818

4,818

3
3.00

NTA

B1

900

599

67%
593.15
0.00
Planned
Avg. / day

B2

B3

B4

B5

74
0

81

0.00

109%
80.50

10
9.60

0
0.00

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

257

700

285

174

270

335

200

282

296

200

20

20

450

231

827

234

150

232

263

93

190

140

187

114

252

82%
229.25

86%
150.00

86%
166.00

78%
220.50

47%
93.00

67%
138.00

47%
132.50

94%
185.85

0%
0.00

570%
112.90

56%
239.75

90%
118%
231.00
822.25
Achieved
Avg. / day

Achieved till 31-08-12

15

252

56%

5,914

141

3,720

85%

120

102,872

3,972

Cum. Achieved till date

Cum. Planned till August '12

Cum. Achieved till date

135,240

105,444

78%

SHAPOORJI PALLONJI CO. LTD.


DAILY CONCRETE PROGRAM
3-Sep-12

Daily Concreting Planned for :


S. No.

Cluster /
In-charge

Engineer

Floor

Type of Structure

Start Time

Conc. Qty
(m3)

BL

Placing
Method

AL

A1
A2
A2
A3
A4

Mr.Manjunath

Mr. Prasath

Mr. Jairaj

4
Mr.Rajkumar
5
Cluster B

Mr. Arun

Cluster C

Mr.Ramesh

Mr.Prabhakar

Cluster D

10

2.0
4.0

6.0

M-25
M-25

4.0

5.0

A5

A5

17F

Slab-P1

M-20

41.0

42.0

LGF

Columns

M-40

1.5

1.5

6.0

Night

A6
A7

NTA

LGF

Ret/Wall,A2

NTA

LGF

Footing,A5

M-25

12.0

M-25

10.0

10.00 AM

Pump

NTA

TC-3

NTA

2.30 PM

PCC

PCC

B1
B2
B3
B4

B1
B2
B3
B4

B5

B5
B6

NTB

LGF

Footing,B1,3

M-25

24.0

NTB

LGF

Ret/Wall,B2

M-25

7.0

Direct

NTB

LGF

C/wall ,B6

M-25

2.5

Pump

NTB

LGF

C/wall Raft

M-25

2.8

NTB

NTB

POD

Slab, B3

M-25

62.0

NTB

NTB

LGF

Footing, B1

M-25

8.0

NTB

NTB

LGF

Footing, B4

M-25

8.0

NTB

NTB

UGF

Columns

M-40

2.5

LGF

Footing,B1,3

M-10

9.00 AM
2.30 PM

4.00 PM

4.5

Direct

61.5

PCC

C1

C1

C2

C2
C3
C4

15F

Columns

M-25

5.0

6.5

C4

C4

2F

Staircase

M-25

4.5

4.5

NTC

NTC

LGF

Columns

M-40

PCC

PCC

LGF

UG Tank

M-10

4.0

2.5

D1

D1
19F

Columns

M-25

6.0

6.0

LGF

Boundry Wall

163.8

138.5

0.0

15F

Columns

M-25

9.00 AM

5.0

D2

18F

Columns

M-25

6.0

D2

19F

Slab-P3

M-20

42.0

TC-5

9.00 AM
4.30 PM

TC-7

D2

Pump

D2

NTD

Shashidhar / Ravi Harikanth

M-25
M-25

Staircase

TC-3

C3

Mr.Biradar /
Mr.Chandran

Balcony
Staircase

Columns

C4

3F
3F

14F

PCC

Remarks
Achi.

17F

6.5

B6

Plan

A5

M-25

9.00 AM

Type of Structure

A5

17F

Columns

Floor

Today Qty

Concrete
Grade

A5
A6
A7

Tower No.

A1
A2
A2
A3
A4

A5

Cluster A

Tower No.

1-Sep-12

Daily Concreting Achieved for :


Conc.
Grade

2.0

NTD

PCC

PCC

EXT

EXT

PCC

PCC
Target Quantity

M-10
Quantity

117.0

1.0

Cumulative Planned vs Achieved for Aug 2012


Tower

A1

A3

A4

11

M. Target
Achieved

A2

A5

A6

A7

307
0

47

15%

NTA

B1

595

0%

B2

B3

B4

B5

B6

NTB

C1

C2

C3

C4

NTC

D1

D2

NTD

INF

EXT

PCC

11

23

610

79

412

150

350

350

150

250

68

11

0%

11%

0%

#DIV/0!

#DIV/0!

3%

1%

0%

2%

0%

#DIV/0!

#DIV/0!

1%

#DIV/0!

Item

Planned for September '12

Planned till 1-09-12

Planned
Avg. / day

Achieved till 1-09-12

Achieved
Avg. / day

Cum. Achieved till date

PCC

250

37%

5,917

RCC

3,046

98

98

136

138%

136

103,008

3,296

106

139

Cum. Planned till September '12

Cum. Achieved till date

138,536

105,583

76%

Tower
NTA
STP/UG
C/W
EXT
Basement

RCC
PCC
553.25
654.00
28.50
35.2
21.5
32.55
12.5
10.3
2
21.5
52

211

211
1837