Electricity produced from renewable energy sources in Bosnia and Herzegovina can be sold in
two ways:
1
Produced energy can be sold directly to the Public Power Utilities which are obliged
to overtake whole produced energy according to the valid tariffs. Renewable energy
tariffs are based upon decisions of the entity governments. Herewith these tariffs are
directly linked to the valid tariffs at the 10 KV grid multiplied with corresponding
correction factors for particular renewable energy sources.
Correction factor for small hydro power plants is 0,80.
According to this methodology, valid tariffs in Bosnia and Herzegovina are as follows:
Small Hydro
Federation of B&H
Public utility EP Bill Public uty EP HZ HB
TOKV grid Correction Purchase | 1DKVerid Correction Purchase
toriff factor price tariff factor price
[e-ekWh] et-€/kWh] | [et-€Wh] [ct Wh]
59. os 47 67 8 53.
Republic of Srpska
10KV grid Correction Purchase ‘Suggested new tarif®
tariff factor price | upto MW -10MW
[c-€RWh] eeenwh} | fe-eRWh] _fot-€/k Wh]
32 08 25 35 45
“New tarts eaeutated according tothe new methodology and suggested by the Government of Republic of Srpska,
sill in public consultations.
Due to significant investment in the distribution grid necessary during the construction
of power plants it is possible to get increase in tariffs up to 10% of the valid tariffs.
All tariffs relay to the power plants of maximal 5 MW installed power.
Produced energy can be sold to any eligible consumer acting on the free electricity
‘market according to the mutually agreed price.