Você está na página 1de 9

IE673 TQM ASSIGNMENTS

ASSIGNMENT 1
DENTACAM
UNIVERSAL MACHINERY WAREHOUSE
AUTHOR: YOGYA SRI YARAGORLA(ID-313-29-323,YY288)
PROJECT TITLE :DENTACAM.
CLASS : IE673 ONLINE
DATE :OCTOBER 5, 2014
CLASS CODE : IE673-FALL-2014-63-15
COLLABORATIVE COMPANIES :

CANON EOS SYSTEM


TAMRON LENSES
TRI-TECH
EMUGE

AUTHOR STATEMENT:
THIS ENTIRE ASSIGNMENT HAS BEEN DONE BY - YOGYA SRI YARAGORLA
CONTENTS:
- INTRODUCTION AND OBJECTIVES OF THE PROJECT
- A BRIEF DESCRIPTION OF THE METHODOLOGIES APPLIED
- MAIN BODY OF THE PROJECT
- PROCESS MODEL
- COLLABORATION USING GREEN ENGINEERING METHODS
- COLLABORATION WITH FOUR COMPANIES
- PROCESS DESCRIPTION
- DATA DICTIONARIES
- INVENT & MANAGEMENT
- PANORAMA NAVIGATION MAP
- SUMMARY
- FURTHER WORK NEEDED / PROPOSED
- REFERENCES AND BIBLIOGRAPHY
- APPENDIX

INTRODUCTION AND OBJECTIVES OF THE PROJECT:


This assignment is to develop a company's object-oriented TQM system model / process
model related to the services which the company provides. It deal with the Collaboration
with all four companies provided in the eLearning package by sharing Green Engineering
ideas and methods. Its all about inventing and managing a new TQM process and show
how to control it. The objectives are to understand how to start a process, how to implement
it and how to control it using a combination of Quality Engineering and Green Engineering
methods.
APPLIED METHODOLOGY DESCRIPTION:
THE FOLLOWING METHOD THAT WILL BE USED TO MODEL OUR PROCESS IS
BASED ON THE CIMPRG METHOD BY PAUL G. RANKY.
THE CIMPGR METHOD PROVIDES A SET OF INTEGRATED METHODS AND TOOLS
AND TECHNOLOGIES FOR:

Analyzing
Specifying
Designing
Implementing/integrating
Testing/validating
Operating
Maintaining/supporting &
Project managing enterprise modeling developments

The CIMPGR method allows for the modeling of current projects as well as the creation of
new and better quality products, systems and organizations.
The CIMPGR model depicts the relationships between the object, their functions and
entities illustrated through a set of diagrams in a tree-like manner and usually layered in
what is called the CIMPGR parent child layers.
MAIN BODY OF THE PROJECT:
PROCESS MODEL:
BELOW IS THE PROCESS MODEL DIAGRAM FOR OVERALL PROCESS (LAYER A0)

COLLABORATION USING GREEN ENGINEERING METHODS:


Conformance to eco-standards, sustainable green products, or processes or service
systems
During production, running assembling machines in plant with solar power
Installing energy saving lights throughout facility
Minimizing waste and having plastic components be recycled
End of life of product all parts will be recyclable
No paper use, all the data will be entered and stored in Mod book Pro tablets
Manufacturing equipment will automatically power off at rest
COLLABORATION WITH FOUR COMPANIES:
These are the four companies which we are collaborating with:
CANON EOS SYSTEM
TAMRON LENSES
TRI-TECH
EMUGE
WE AS A GROUP ARE TRYING TO GET THE BEST OUT OF EACH OTHER.WE ARE
TRYING OUR LEVEL BEST TO SATISFY THE CUSTOMER AND MAINTAIN THE BEST
QUALITY.

PROCESS DESCRIPTION:

Layer 0
A0
Is the overall system analysis process
And improvising or upgrading the tracker
And makes requirements
And tests the product
And checks the quality standards
And generates customer feedback
layer 1
A1
Is the requirement analysis and planning
And considering the cost, time and green sustainable control
And taking customer and market requirements
And can have project scope and control
A2
Is the design
And use project scope as input for design

And in this process, as consider all of the information we will have a design-to-requirements
feedback loop
And use it to make product
A3
Is the manufacturing
And considering the budget, safety standards and machinery
And handles scheduled output estimation
A4
Is the testing process
And will have input quality standards
And will undergo quality engineering test before production
A5
Is the customer feedback, marketing and sales
And ships the final product to the customers
And handles advertising and finding new customers
And finds new collaboration partners

Layer 2
A3.1
Is in this process, i use the metering technology for cutting the materials
And use the technical expert
a3.2
Is packaging and safety
And use product safety and quality
And we use tools and equipments for packaging.
a3.3
Is customer satisfaction
And input from packaging department
And distribute and promote sale products.

DATA DICTIONARIES:
R1A0: Four Collaborative Companies- The four collaborative companies include:
CANON EOS SYSTEM
TAMRON LENSES
TRI-TECH
EMUGE

R2A0: Infrastructure and Equipment- the Infrastructure refers to the equipment needed to
build the denta-cam, with minimum wastage and follow the green sustainability. The burs
that can be used along with the denta-cam hand piece,for cutting the tooth surfaces..The
resolution of the camera that will be used,and how apt is it to clearly view the intra-oral
parts.
R4A0: Management- When referring to the Management or Management Team as a
resource, the CIMpgr model is referring to anyone in a leadership position.
R5A0: Trained Employees- When referring to Trained SOP employees, the workers will
have to be trained on how to act according to the Standard Operating Procedures that the
management has carefully drawn up and approved with the lawyers. The SOP must be
written in plain English so the workers will be able to understand the document and follow it
carefully if any problem arises.

O1A0: Recycled Materials- These will include any sorted and separated metals or plastic
that are in a form that is ready to sell to outside companies that will be able to reuse it and
provide it to the globe again as a replacement for a raw material.
O5A0: Reusable Materials- These will include any plastics that are ready to be sold directly
to companies to reuse them. This could also directly be sold to artists who are
commissioned to create works with recycled materials.
INVENT & MANAGEMENT
The Denta-Cam team is constantly trying to enhance the process to attain green
sustainability.There is still room for improvements in our products. By using DR.
Ranky'sCIMprg technology we can split the tasks and processes according to the needs of
our customers. Even though after putting alot of efforts in improving the quality of our
product, we are still trying to improve our quality process. We will adapt new techniques for
improving our quality process.
PANORAMA NAVIGATION MAP
The panoramas of the small town in New Jersey created by Dr. Ranky and his brother are
highly impressive. Around the map, there were links to click through to pictures, video
segments or full 360-degree panoramas that provided a look at a wooded stream as well as
a snowy neighborhood. The pictures of the stream were beautiful, especially the shots
through the fisheye lens, which captured a wider look at the serene snowy forest area that
is near this neighborhood. The only negative portion could have been the noise pollution of
the cars but that is to be expected of a residential.
The interactive panorama portions were also interesting because Dr. Ranky explains how
the neighborhoods houses could have been created using sustainable practices. A big
example of this is the use of solar roofs on these houses, which should be facing the sun as
much as possible. Though trees are naturally useful in the environment to convert carbon
dioxide to oxygen for us, they could also be in the way of the direct sunlight to the solar
panels if they are not trimmed. This type of panorama tour technology can be used to fully
understand a process within a plant, just like the CIMpgr process models are currently used
for.

SOCIAL NETWORKING:
Re: NC Man Gets 7 Years for Selling Fake Airbags
After reading the article, the conclusion I drew is, It is evident that these airbags do not meet
the dimensions of a quality product. The supplier in china and Chinese products as whole
has a bad reputation for product quality.
In addition, the features of these airbags compared to others are likely to have a low
performance standard. The supplier equally failed to display warnings on the bags before
they were shipped from china means that it doesn't meet the required safety standards
which could cause passengers causalities. I think the decision was correct to maintain the
quality and standards.

Re: Brazil Judge Dismisses Case against Chevron


Oil spills in oceans has significant negative effect on the marine ecosystem. Oil cannot be
degraded and hence it stays there for long periods of time. This in turn disturbs the eco
system of that area and aquatic animals habitat would be threatened.$150 million is very
less as cleaning oil spills is extremely costly and time consuming. I do accept that spill
happen unintentionally, but the fines should be very high or the company which is
responsible for the spill should be asked to clean the spill.

SUMMARY
The Process Modeling using CIMpgr models has allowed us to effectively incorporate all the
resources, methods, controls and constraints of the process in order to deliver the green
and sustainable final product desired. The Parent Process of the Process Model has been
further broken down into different processes (children processes) depicting the creation of

the product. The process model clearlyshows our customers and collaborating companies
that we follow a Total Quality Management Process with a green and sustainable focus.
The significantcollaboration receivedfrom thefour companies make the development of the
TQM process possible and help create our companies product. Our process model clearly
shows that we monitor quality at all times. We make full use ofour valuable resources to
deliver the desired green and sustainable engineered product.
FURTHER WORK NEEDED
More collaboration partners will be identified so that we can improve our marketing and
promotion of our product, Our development team will also try to improve our customer
services based on feedback which we will get from our customers. Our company will strive
to enhance the quality of our present product and produce a better one.

REFERENCE
1. TQM eLearning Pack by Prof Paul G Ranky.
2. http://www.cimwareukandusa.com/All-Green/Ranky-GreenEngineering.html
3.https://www.google.com/search?q=PANORAMA+NAVIGATION+MAP&biw=1280&bih=90
8&source=lnms&tbm=isch&sa=X&ei=MNuEVKPUL5KPyATFooCQBA&ved=0CAcQ_AUoA
g#imgdii=_

SELFGRADE:
I would give myself 10 on 10 as I have covered all the components required for this
Assignment and I think worked hard and spent a lot of time for doing it. Working with
CIMpgr has improved my understanding in terms of System modelling.

Você também pode gostar