Escolar Documentos
Profissional Documentos
Cultura Documentos
SAIC NUMBER
DATE APPROVED
SAIC-G-2005
PROJECT TITLE
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
QR NUMBER
25-May-05
MECH-
CONTRACTOR / SUBCONTRACTOR
EQPT CODE
SYSTEM ID.
PLANT NO.
MH's SPENT
TRAVEL TIME
ITEM
No.
A.
ACCEPTANCE CRITERIA
REFERENCE
PASS
FAIL
N/A
RE-INSP DATE
General Requirements
A1
Suction Piping shall have a straight length of pipe at least 5 times the
suction nozzle diameter immediately upstream of the nozzle.
Note: The above requirement does not apply to horizontal self priming
pumps and vertically suspended double casing pumps.
SAES-G-005,
Para. 5.2.3
A3
SAES-G-005,
Para. 5.2.4
A4
Reducers in suction piping shall be of the eccentric type with the flat
uppermost and shall be located upstream of the straight pipe length
immediately upstream of the suction nozzle of the pump.
SAES-G-005,
Para. 5.2.4
A5
SAES-G-005,
Para. 5.2.6
A6
SAES-G-005,
Para. 5.2.2
A7
Suction & Discharge nozzles shall be flanged, (API 610 Para. 2.3.2.1).
31-SAMSS-004,
Section 1.1.1
A8
31-SAMSS-004,
Para. 2.3.2.3
REMARKS:
REFERENCE DOCUMENTS:
1. 31-SAMSS-004 -- Centrifugal Pumps, 30 September, 2003
2. SAES-G-005 -- Centrifugal Pumps, 29 September, 2003
3. API 610 -- Centrifugal Pumps for Petroleum, Heavy Duty Chemicals, and Gas Industry Services, August 1995
Contractor / Third-Party
Saudi Aramco
Construction Representative*
PMT Representative
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
QC Inspector
PID Representative
Performed Inspection
QC Supervisor
Name, Organization,
Initials and Date:
Y = YES
Page 1 of 1
N = NO F = FAILED