Escolar Documentos
Profissional Documentos
Cultura Documentos
1
2
3
4 OBRA
01 AL 31 DE OCTUBRE DE 1998
5 ENTIDAD
02 AL 30 DE NOVIEMBRE DE 1998
6 CONTRATISTA
03 AL 31 DE DICIEMBRE DE 1998
7 P.BASE
878,799.22
04 AL 31 DE ENERO DE 1999
8 P.OFERTA
801,384.29
05 AL 11 DE FEBRERO DE 1999
9 FR
0.911908
06
10 FECHA
31 de agosto de 1998
07
11 PLAZO
120
12 SUPERVISOR
13 VALORIZACION
05
14 FECHA VAL
AL 11 DE FEBRERO DE 1999
15 MES_REAJUSTE Sep-98
16 A_EFECTIVO
160,276.86
17 REL_EFECTIVO
20.00%
18 LUGAR
CALLAO
19 Inicio
15 de octubre de 1998
20 Termino
21
22
23
24
Formula
25
01
26
02
27
03
11 de febrero de 1999
DATOS
Descripcion
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
REHABILITACION
LOSA DEPORTIVA Y REHAB.CERCO PERIMETRICO
Monto
552,670.13
211,905.80
114,223.28
256386149.xls.ms_office
REINTEGROS
01
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
02
REHABILITACION
03
LOSA DEPORTIVA Y REHAB.CERCO PERIMETRICO
566.89
524.96
407.64
54,879.25
1,499.49
VALORIZACION BRUTA
S/56,378.74
(10,975.85)
(842.09)
(11,817.94)
AMORTIZACIONES
Amortizacin del Adelanto en efectivo
Amortizacin del Adelanto de Materiales
VALORIZACION NETA
44,560.80
IGV
8,020.94
TOTAL FACTURABLE
52,581.74
FONDO DE GARANTIA
(2,818.94)
49,762.80
01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
01.05.00
OBRAS PROVISIONALES
OFICINAS PROVISIONALES
CARTEL DE OBRA "CORDELICA"
CISTERNA APOYADA 4M3 DE ALBAILERIA
CERCO DE ESTERA C/PALOS DE EUCALIPTO
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
02.00.00
02.01.00
02.01.01
02.01.02
02.01.03
CONSTRUCCION LABORAT.-BIBLIOTECA-COMPUTO
OBRAS PRELIMINARES
DEMOLICION DE MURO DE ALBAILERIA DE SOGA
TRAZADO Y REPLANTEO C/EQUIPO
LIMPIEZA DE TERRENO MANUAL
Metrado
Precio Unitario
Parcial
Valorizacin Anterior
Metrado
Parcial
Valorizacin Actual
Metrado
Parcial
% Avance
Valorizacin Acumulada
Metrado
Parcial
% Avance
Saldo x Valorizar
Metrado
Parcial
M2
GLB
UND
ML
GLB
50.00
2.00
1.00
85.00
1.00
50.58
2,000.00
539.83
12.00
1,874.24
2,529.00
4,000.00
539.83
1,020.00
1,874.24
50.00
2.00
1.00
85.00
1.00
2,529.00
4,000.00
539.83
1,020.00
1,874.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
50.00
2.00
1.00
85.00
1.00
2,529.00
4,000.00
539.83
1,020.00
1,874.24
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M2
M2
M2
4.90
314.00
314.00
10.01
1.38
1.61
49.05
433.32
505.54
4.90
314.00
314.00
49.05
433.32
505.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
4.90
314.00
314.00
49.05
433.32
505.54
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
02.02.00
02.02.01
02.02.02
02.02.03
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
M3
REFINE, NIVELACION Y COMPACTACION/TERRENO NORMAL C/COMPACTAD
M2
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
M3
140.14
314.00
168.17
18.75
2.04
52.32
2,627.63
640.56
8,798.65
140.14
314.00
168.17
2,627.63
640.56
8,798.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
140.14
314.00
168.17
2,627.63
640.56
8,798.65
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
02.03.00
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
CONCRETO SIMPLE
CIMIENTO CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
SOBRECIMIENTOS,CONCRETO C:H/1:8+25% P.M.
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO
FALSOPISO DE 4" CON MEZC.1:8 C:H
FALSA ZAPATA FC=100KG/CM2 /C:H 1:12+20%P.M.
11.18
5.06
58.80
155.00
43.27
107.85
153.70
18.51
17.94
152.25
1,205.76
777.72
1,088.39
2,780.70
6,587.86
11.18
5.06
58.80
155.00
43.27
1,205.76
777.72
1,088.39
2,780.70
6,587.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
11.18
5.06
58.80
155.00
43.27
1,205.76
777.72
1,088.39
2,780.70
6,587.86
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
02.04.00
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
02.04.06
02.04.07
02.04.08
02.04.09
02.04.10
02.04.11
02.04.12
02.04.13
02.04.14
02.04.15
CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 ZAPATA
ACERO F'Y 4200KG/CM2
CONCRETO SOBRECIMIENTO ARMADO F'C=210KG/CM2
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTOS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 COLUMNA
ENCOFRADO Y DESENCOFRADO PARA COLUMNAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 VIGA
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 LOSA ALIGERADA
ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA
ACERO F'Y 4200KG/CM2
LADRILLO HUECO ARCILLA DE 15X30X30
37.87
830.97
3.25
35.28
500.30
12.67
151.67
2,359.50
29.78
249.53
3,670.60
65.41
383.40
1,964.60
3,110.40
208.99
2.20
253.51
18.80
2.20
294.63
26.83
2.20
230.96
30.70
2.20
220.81
19.34
2.20
1.41
7,914.45
1,828.13
823.91
663.26
1,100.66
3,732.96
4,069.31
5,190.90
6,877.99
7,660.57
8,075.32
14,443.18
7,414.96
4,322.12
4,385.66
37.87
830.97
3.25
35.28
500.30
12.67
151.67
2,359.50
29.78
249.53
3,670.60
65.41
383.40
1,964.60
3,110.40
7,914.45
1,828.13
823.91
663.26
1,100.66
3,732.96
4,069.31
5,190.90
6,877.99
7,660.57
8,075.32
14,443.18
7,414.96
4,322.12
4,385.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
37.87
830.97
3.25
35.28
500.30
12.67
151.67
2,359.50
29.78
249.53
3,670.60
65.41
383.40
1,964.60
3,110.40
7,914.45
1,828.13
823.91
663.26
1,100.66
3,732.96
4,069.31
5,190.90
6,877.99
7,660.57
8,075.32
14,443.18
7,414.96
4,322.12
4,385.66
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
02.05.00
02.05.01
02.05.02
MUROS Y TABIQUES
MURO LAD.KK.ARCILLA CABEZA MEZ.1:5 TIPO IV
MURO LADR.K.K.ARC.SOGA MEZ.1:4 TIPO IV
M2
M2
117.60
165.25
53.14
32.76
6,249.26
5,413.59
117.60
165.25
6,249.26
5,413.59
0.00
0.00
0.00
0.00
0.00%
0.00%
117.60
165.25
6,249.26
5,413.59
100.00%
100.00%
0.00
0.00
0.00
0.00
02.06.00
02.06.01
02.06.02
02.06.03
02.06.04
02.06.05
02.06.06
02.06.07
REVOQUES Y ENLUCIDOS
TARRAJEO MUROS EXT.FROTACHADO MEZ.1:4;E=1.5CM.
TARRAJEO MUROS INT.FROTACHADO MEZ C:A 1:4,E=1.5CM.
TARRAJ.VIGAS/COLUMNAS MEZ.1:5 E=1.5CM.
CIELORASO C/MEZ.1:4; E=1.5CM.
VESTIDURA DE DERRAMES MEZ.1:5; E=1.5CM.
BRUAS 1.0 CM.
TARRAJEO PRIMARIO O RAYADO MUROS INTERIOR
M2
M2
M2
M2
ML
ML
M2
331.00
303.10
219.95
323.30
214.30
113.40
6.85
10.98
10.06
17.62
15.49
6.28
3.20
9.88
3,634.38
3,049.19
3,875.52
5,007.92
1,345.80
362.88
67.68
331.00
303.10
219.95
323.30
214.30
113.40
6.85
3,634.38
3,049.19
3,875.52
5,007.92
1,345.80
362.88
67.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
331.00
303.10
219.95
323.30
214.30
113.40
6.85
3,634.38
3,049.19
3,875.52
5,007.92
1,345.80
362.88
67.68
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M3
M3
M2
M2
M3
M3
KGR
M3
M2
KGR
M3
M2
KGR
M3
M2
KGR
M3
M2
KGR
UND
256386149.xls.ms_office
Pgina 3
Metrado
Precio Unitario
Parcial
Valorizacin Anterior
Metrado
Parcial
Valorizacin Actual
Metrado
Parcial
% Avance
Valorizacin Acumulada
Metrado
Parcial
% Avance
Saldo x Valorizar
Metrado
Parcial
02.07.00
02.07.01
02.07.02
02.07.03
02.07.04
PISOS Y PAVIMENTOS
PISO CEMENTO PULIDO/COLOREADO Y BRUADO E=2"
AFIRMADO DE E=.10M.
VEREDA 140 KG/CM2 E=.10M. INC.SARDINEL/ENCOFRADO
PISO CEMENTO FROTACHADO Y BRUADO E=2"
M2
M2
M2
M2
310.00
109.35
109.35
52.65
23.19
5.08
29.07
19.54
7,188.90
555.50
3,178.80
1,028.78
310.00
109.35
109.35
52.65
7,188.90
555.50
3,178.80
1,028.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
310.00
109.35
109.35
52.65
7,188.90
555.50
3,178.80
1,028.78
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
02.08.00
02.08.01
02.08.02
02.08.03
02.08.04
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO COLOREADO H=.10M.
CONTRAZOCALO DE CEMENTO FROTACHADO C:A/1:4 H=.30CM.
ZOCALO DE MAYOLICA DE 15X15 CM.BLANCA 1RA.
CONTRAZOCALO DE CEMENTO FROTACHADO C:A/1:4 H=.15M.
ML
ML
M2
ML
148.75
21.25
6.85
85.20
5.56
7.07
45.39
5.21
827.05
150.24
310.92
443.89
148.75
21.25
6.85
85.20
827.04
150.24
310.92
443.89
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
148.75
21.25
6.85
85.20
827.05
150.24
310.92
443.89
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
02.09.00
02.09.01
COBERTURA
CUB.LADR.PAST.24X24 ASENT.C/MEZ.1:5 2.5CM;JUNTA 1:5 1.5CM
M2
167.90
21.51
3,611.53
167.90
3,611.53
0.00
0.00
0.00%
167.90
3,611.53
100.00%
0.00
0.00
02.10.00
02.10.01
02.10.02
02.10.03
02.10.04
02.10.05
CARPINTERIA METALICA
PUERTA DE FIERRO C/VARILLA DE SEGURIDAD
VENTANA DE FIERRO C/VARILLA DE SEGURIDAD DE 5/8"
MALLA METALICA
REJA DE SEGURIDAD PARA PUERTA
REJA METALICA CON MALLA EN DEPOSITO DE EQUIPO DE GAS
M2
M2
M2
M2
M2
10.10
76.90
36.05
6.75
6.30
198.81
262.66
92.58
118.13
169.24
2,007.98
20,198.55
3,337.51
797.38
1,066.21
10.10
76.90
36.05
6.75
5.30
2,007.98
20,198.55
3,337.28
797.08
896.97
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.23
0.30
169.24
0.00%
0.00%
0.01%
0.04%
15.87%
10.10
76.90
36.05
6.75
6.30
2,007.98
20,198.55
3,337.51
797.38
1,066.21
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
02.11.00
02.11.01
CARPINTERIA DE MADERA
TAPAS DE TABLERO DE MADERA CEDRO C/TORN 0.50X0.70M
M2
4.90
171.78
841.72
0.00
0.00
4.90
841.72
100.00%
4.90
841.72
100.00%
0.00
0.00
02.12.00
02.12.01
02.12.02
02.12.03
CERRAJERIA
BISAGRA DE F.E. 4" S/CAP. INC. COLOCACION
PZA
CERRADURA P/PUERTA EXTER.TRES GOLPES T/YALE /MANIJA DE BRONCUND
BISAGRA DE FIERRO DE 2 1/2" INC. COLOCACION
PZA
28.00
7.00
360.00
3.47
76.25
3.07
97.16
533.75
1,105.20
20.00
5.00
300.00
69.40
381.25
921.00
8.00
2.00
60.00
27.76
152.50
184.20
28.57%
28.57%
16.67%
28.00
7.00
360.00
97.16
533.75
1,105.20
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
02.13.00
02.13.01
VIDRIOS Y CRISTALES
VIDRIOS Y CRISTALES SEMIDOBLES NACIONALES
P2
936.50
4.10
3,839.65
421.43
1,727.84
515.08
2,111.81
55.00%
936.50
3,839.65
100.00%
0.00
0.00
02.14.00
02.14.01
02.14.02
02.14.03
02.14.04
02.14.05
02.14.06
02.14.07
PINTURA
PINTURA CIELORASOS AL TEMPLE
PINTURA EN MUROS EXTERIORES C/LATEX
PINTURA EN MUROS INTERIORES C/LATEX
PINTURA EN VIGAS Y COLUMNAS
PINTURA EN CARPINTERIA METALICA I/ANTICO RROSIVO
PINTURA EN CONTRAZOCALOS CON ESMALTE-2 MANOS
PINTURA EN MURO DE PIZARRA (03 MANOS)
M2
M2
M2
M2
M2
ML.
M2
328.30
331.00
303.10
219.95
121.60
19.20
18.00
7.69
10.25
9.51
10.22
12.11
2.12
10.38
2,524.63
3,392.75
2,882.48
2,247.89
1,472.58
40.70
186.84
279.06
281.35
257.64
186.96
121.60
16.16
5.40
2,145.93
2,883.84
2,450.11
1,910.71
1,472.58
34.26
56.05
49.25
49.65
45.47
32.99
0.00
3.04
12.60
378.69
508.91
432.37
337.18
0.00
6.44
130.79
15.00%
15.00%
15.00%
15.00%
0.00%
15.82%
70.00%
328.30
331.00
303.10
219.95
121.60
19.20
18.00
2,524.63
3,392.75
2,882.48
2,247.89
1,472.58
40.70
186.84
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
02.15.00
02.15.01
02.15.02
02.15.03
02.15.04
VARIOS
PIZARRA
MARCO PERIMETRAL P/PIZARRA DE MADERA
TICERO DE MADERA
EQUIPO DE GAS 100 LBS
UND
ML
ML
UND
3.00
37.20
15.00
2.00
109.91
21.22
11.82
358.64
329.73
789.38
177.30
717.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
37.20
15.00
2.00
329.73
789.38
177.30
717.28
100.00%
100.00%
100.00%
100.00%
3.00
37.20
15.00
2.00
329.73
789.38
177.30
717.28
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
03.00.00
03.01.00
03.01.01
03.01.02
M2
M2
24.00
24.00
1.38
1.61
33.12
38.64
24.00
24.00
33.12
38.64
0.00
0.00
0.00
0.00
0.00%
0.00%
24.00
24.00
33.12
38.64
100.00%
100.00%
0.00
0.00
0.00
0.00
256386149.xls.ms_office
Pgina 4
Metrado
Precio Unitario
Parcial
Valorizacin Anterior
Metrado
Parcial
Valorizacin Actual
Metrado
Parcial
% Avance
Valorizacin Acumulada
Metrado
Parcial
% Avance
Saldo x Valorizar
Metrado
Parcial
03.02.00
03.02.01
03.02.02
03.02.03
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
M3
REFINE, NIVELACION Y COMPACTACION/TERRENO NORMAL C/COMPACTAD
M2
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
M3
25.96
24.00
31.15
18.75
2.04
52.32
486.75
48.96
1,629.77
25.96
24.00
31.15
486.75
48.96
1,629.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
25.96
24.00
31.15
486.75
48.96
1,629.77
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
03.03.00
03.03.01
03.03.02
03.03.03
CONCRETO SIMPLE
FALSOPISO DE 4" CON MEZC.1:8 C:H
FALSA ZAPATA FC=100KG/CM2 /C:H 1:12+20%P.M.
CIMIENTO CORRIDO MEZCLA 1:10+30% P.G.
M2
M3
M3
24.00
7.13
5.55
17.94
152.25
107.85
430.56
1,085.54
598.57
24.00
7.13
5.55
430.56
1,085.54
598.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
24.00
7.13
5.55
430.56
1,085.54
598.57
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
03.04.00
03.04.01
03.04.02
03.04.03
03.04.04
03.04.05
03.04.06
03.04.07
03.04.08
03.04.09
03.04.10
03.04.11
03.04.12
03.04.13
03.04.14
03.04.15
03.04.16
03.04.17
CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 ZAPATA
ACERO F'Y 4200KG/CM2
CONCRETO SOBRECIMIENTO ARMADO F'C=210KG/CM2
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTOS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 COLUMNA
ENCOFRADO Y DESENCOFRADO PARA COLUMNAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 VIGA
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 LOSA ALIGERADA
ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA
ACERO F'Y 4200KG/CM2
CONCRETO 210KG/CM2 EN ESCALERAS
ENCOFRADO Y DESENCOFRADO DE ESCALERAS
ACERO F'Y 4200KG/CM2
M3
KGR
M3
M2
KGR
M3
M2
KGR
M3
M2
KGR
M3
M2
KGR
M3
M2
KGR
5.56
73.12
2.40
12.00
62.10
3.68
48.64
439.94
2.84
28.20
268.00
1.50
31.62
104.50
3.10
10.20
219.30
208.99
2.20
253.51
18.80
2.20
294.63
26.83
2.20
230.96
30.70
2.20
220.81
19.34
2.20
294.63
39.41
2.20
1,161.98
160.86
608.42
225.60
136.62
1,084.24
1,305.01
967.87
655.93
865.74
589.60
331.22
611.53
229.90
913.35
401.98
482.46
5.56
73.12
2.40
12.00
62.10
3.68
48.64
439.94
2.84
28.20
268.00
1.50
31.62
104.50
3.10
10.20
219.30
1,161.98
160.86
608.42
225.60
136.62
1,084.24
1,305.01
967.87
655.93
865.74
589.60
331.22
611.53
229.90
913.35
401.98
482.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
5.56
73.12
2.40
12.00
62.10
3.68
48.64
439.94
2.84
28.20
268.00
1.50
31.62
104.50
3.10
10.20
219.30
1,161.98
160.86
608.42
225.60
136.62
1,084.24
1,305.01
967.87
655.93
865.74
589.60
331.22
611.53
229.90
913.35
401.98
482.46
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
03.05.00
03.05.01
03.05.02
MUROS Y TABIQUES
MURO LAD.KK.ARCILLA CABEZA MEZ.1:5 TIPO IV
MURO LADR.K.K.ARC.SOGA MEZ.1:4 TIPO IV
M2
M2
37.00
26.00
53.14
32.76
1,966.18
851.76
37.00
26.00
1,966.18
851.76
0.00
0.00
0.00
0.00
0.00%
0.00%
37.00
26.00
1,966.18
851.76
100.00%
100.00%
0.00
0.00
0.00
0.00
03.06.00
03.06.01
03.06.02
03.06.03
03.06.04
03.06.05
03.06.06
REVOQUES Y ENLUCIDOS
TARRAJEO MUROS INT.FROTACHADO MEZ C:A 1:4,E=1.5CM.
TARRAJEO MUROS EXT.FROTACHADO MEZ.1:4;E=1.5CM.
TARRAJ.VIGAS/COLUMNAS MEZ.1:5; E=1.5CM.
VESTIDURA DE DERRAMES MEZ.1:5; E=1.5CM.
CIELORASO C/MEZ.1:4; E=1.5CM.
BRUAS 1.0 CM.
M2
M2
M2
ML
M2
ML
33.18
92.82
17.60
6.00
24.00
87.00
10.06
10.98
17.62
6.28
15.49
3.20
333.79
1,019.16
310.11
37.68
371.76
278.40
33.18
92.82
17.60
6.00
24.00
87.00
333.79
1,019.16
310.11
37.68
371.76
278.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
33.18
92.82
17.60
6.00
24.00
87.00
333.79
1,019.16
310.11
37.68
371.76
278.40
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
03.07.00
03.07.01
03.07.02
03.07.03
03.07.04
03.07.05
PISOS Y PAVIMENTOS
PISO CEMENTO PULIDO/COLOREADO Y BRUADO E=2"
AFIRMADO DE E=.10M.
VEREDA 140 KG/CM2 E=.10M. INC.SARDINEL/ENCOFRADO
FROT. Y REVEST. DE GRAD. Y ESC. DE CEMENTO
REVEST. DE DESCANSO EN ESCALERAS C/CEMENTO PULIDO
M2
M2
M2
M2
M2
15.34
5.10
5.10
31.50
5.10
23.19
5.08
29.07
13.24
13.12
355.73
25.91
148.26
417.06
66.91
15.34
5.10
5.10
31.50
5.10
355.73
25.91
148.26
417.06
66.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
15.34
5.10
5.10
31.50
5.10
355.73
25.91
148.26
417.06
66.91
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
03.08.00
03.08.01
03.08.02
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO C:A/1:5 H=.10M.
CONTRAZOCALO DE CEMENTO FROTACHADO C:A/1:4 H=.30M.
ML
ML
18.20
13.60
5.16
7.07
93.91
96.15
18.20
13.60
93.91
96.15
0.00
0.00
0.00
0.00
0.00%
0.00%
18.20
13.60
93.91
96.15
100.00%
100.00%
0.00
0.00
0.00
0.00
03.09.00
03.09.01
03.09.02
CARPINTERIA DE MADERA
PUERTA APANELADA DE MADERA
VENTANA DE FIERRO
M2
M2
3.30
0.60
279.07
78.82
920.93
47.29
1.90
0.60
530.23
47.29
1.40
0.00
390.70
0.00
42.42%
0.00%
3.30
0.60
920.93
47.29
100.00%
100.00%
0.00
0.00
0.00
0.00
256386149.xls.ms_office
Pgina 5
Metrado
Precio Unitario
Parcial
Valorizacin Anterior
Metrado
Parcial
Valorizacin Actual
Metrado
Parcial
% Avance
Valorizacin Acumulada
Metrado
Parcial
% Avance
Saldo x Valorizar
Metrado
Parcial
03.10.00
03.10.01
03.10.02
03.10.03
CERRAJERIA
BISAGRA CAPUCHINA 3.5"X3.5" ALUM.INC.COLOC.
CERRAD.P/PUERTA EXTER.DE TRES GOLPES T/YALE I/MANIJA
BISAGRA DE FIERRO DE 2 1/2" INC. COLOCACION
PZA
UND
PZA
8.00
2.00
2.00
8.83
76.25
3.07
70.64
152.50
6.14
4.00
1.00
1.00
35.32
76.25
3.07
4.00
1.00
1.00
35.32
76.25
3.07
50.00%
50.00%
50.00%
8.00
2.00
2.00
70.64
152.50
6.14
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
03.11.00
03.11.01
03.11.02
03.11.03
03.11.04
03.11.05
03.11.06
03.11.07
PINTURA
PINTURA CIELORASOS AL TEMPLE
PINTURA EN MUROS INTERIORES C/LATEX
PINTURA EN MUROS EXTERIORES C/LATEX
BARNIZ EN CARPINTERIA DE MADERA
PINTURA EN CARPINTERIA METALICA
PINTURA EN CONTRAZOCALOS CON ESMALTE-2 MANOS
PINTURA EN PASAMANOS CON ESMALTE
M2
M2
M2
M2
M2
ML.
ML
24.00
33.18
92.82
6.60
0.60
27.50
12.00
7.69
9.51
10.25
18.30
12.11
2.12
10.99
184.56
315.54
951.41
120.78
7.27
58.30
131.88
20.88
28.87
80.75
0.00
0.60
18.45
3.60
160.57
274.52
827.72
0.00
7.27
39.11
39.56
3.12
4.31
12.07
6.60
0.00
9.05
8.40
23.99
41.02
123.68
120.78
0.00
19.19
92.32
13.00%
13.00%
13.00%
100.00%
0.00%
32.92%
70.00%
24.00
33.18
92.82
6.60
0.60
27.50
12.00
184.56
315.54
951.41
120.78
7.27
58.30
131.88
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
03.12.00
03.12.01
03.12.02
03.12.03
VARIOS
CANTONERAS DE ALUMINIO PARA ARISTAS DE ESCALERA 2"X1/8"
PASAMANOS DE F.G.2" INC.COLOC.
CUB.LADR.PAST.24X24 ASENT.C/MEZ.1:5 2.5CM;JUNTA 1:5 1.5CM
ML
ML
M2
31.50
12.00
23.80
21.24
97.54
21.51
669.06
1,170.48
511.94
31.50
0.00
23.80
669.06
0.00
511.94
0.00
12.00
0.00
0.00
1,170.48
0.00
0.00%
100.00%
0.00%
31.50
12.00
23.80
669.06
1,170.48
511.94
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
04.00.00
04.01.00
04.01.01
M2
1,323.70
1.38
1,826.71
1,323.70
1,826.71
0.00
0.00
0.00%
1,323.70
1,826.71
100.00%
0.00
0.00
04.02.00
04.02.01
04.02.02
04.02.03
04.02.04
MOVIMIENTO DE TIERRAS
EXCAV. ZANJAS P/CIMIENTOS MAT.SUEL.
M3
RELLENO Y COMPACTACION DE ZANJA C/MATERIAL PROPIO
M3
REFINE, NIVELACION Y COMPACTACION/TERRENO NORMAL C/COMPACTAD
M2
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
M3
58.57
20.00
1,323.70
30.48
18.75
28.43
2.04
52.32
1,098.19
568.60
2,700.35
1,594.71
58.57
20.00
1,323.70
30.48
1,098.19
568.60
2,700.35
1,594.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
58.57
20.00
1,323.70
30.48
1,098.19
568.60
2,700.35
1,594.71
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
04.03.00
04.03.01
04.03.02
04.03.03
04.03.04
CONCRETO SIMPLE
CIMIENTO CORRIDO MEZCLA 1:10+30% P.G.
SOBRECIMIENTOS,CONCRETO C:H/1:8+25% P.M.
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO
FALSOPISO DE 4" CON MEZC.1:8 C:H
M3
M3
M2
M2
34.15
0.68
4.80
54.26
107.85
153.70
18.51
17.94
3,683.08
104.52
88.85
973.42
34.15
0.68
4.80
54.26
3,683.08
104.52
88.85
973.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
34.15
0.68
4.80
54.26
3,683.08
104.52
88.85
973.42
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
04.04.00
04.04.01
04.04.02
04.04.03
04.04.04
04.04.05
04.04.06
04.04.07
VEREDAS Y RAMPAS
AFIRMADO DE E=.10M.
VEREDA 140 KG/CM2 E=.10M. INC.SARDINEL/ENCOFRADO
JUNTA DE DILATACION C/ASFALTO
CONCRETO F'C=140KG/CM2 GRADAS Y RAMPAS
ENCOFRADO Y DESENCOFRADO DE GRADAS Y RAMPAS
AFIRMADO DE E=.10M.
PISO CEMENTO FROTACHADO Y BRUADO E=2"
M2
M2
ML
M3
M2
M2
M2
790.60
790.60
201.00
3.18
31.65
31.65
31.65
5.08
29.07
1.88
207.89
30.26
5.08
19.54
4,016.25
22,982.74
377.88
661.09
957.73
160.78
618.44
790.60
714.00
130.35
3.18
31.65
31.65
31.65
4,016.24
20,755.98
245.06
661.09
957.73
160.78
618.44
0.00
76.60
70.65
0.00
0.00
0.00
0.00
0.01
2,226.76
132.82
0.00
0.00
0.00
0.00
0.00%
9.69%
35.15%
0.00%
0.00%
0.00%
0.00%
790.60
790.60
201.00
3.18
31.65
31.65
31.65
4,016.25
22,982.74
377.88
661.09
957.73
160.78
618.44
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
04.05.00
04.05.01
04.05.02
04.05.03
04.05.04
04.05.05
04.05.06
04.05.07
04.05.08
04.05.09
04.05.10
04.05.11
04.05.12
04.05.13
CONCRETO ARMADO
CONCRETO SOBRECIMIENTO ARMADO F'C=210KG/CM2
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTOS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 COLUMNA
ENCOFRADO Y DESENCOFRADO PARA COLUMNAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 VIGA
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 LOSA ALIGERADA
ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA
ACERO F'Y 4200KG/CM2
LADRILLO HUECO ARCILLA DE 15X30X30
M3
M2
KGR
M3
M2
KGR
M3
M2
KGR
M3
M2
KGR
UND
11.83
41.59
358.13
3.49
56.24
402.03
4.06
13.55
596.15
4.61
54.26
273.14
542.63
253.51
18.80
2.20
294.63
26.83
2.20
230.96
30.70
2.20
220.81
19.34
2.20
1.41
2,999.02
781.89
787.89
1,028.26
1,508.92
884.47
937.70
415.99
1,311.53
1,017.93
1,049.39
600.91
765.11
11.83
41.59
358.13
3.49
56.24
402.03
4.06
13.55
596.15
4.61
54.26
273.14
542.63
2,999.02
781.89
787.89
1,028.26
1,508.92
884.47
937.70
415.99
1,311.53
1,017.93
1,049.39
600.91
765.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
11.83
41.59
358.13
3.49
56.24
402.03
4.06
13.55
596.15
4.61
54.26
273.14
542.63
2,999.02
781.89
787.89
1,028.26
1,508.92
884.47
937.70
415.99
1,311.53
1,017.93
1,049.39
600.91
765.11
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
256386149.xls.ms_office
Pgina 6
Metrado
Precio Unitario
Parcial
Valorizacin Anterior
Metrado
Parcial
Valorizacin Actual
Metrado
Parcial
% Avance
Valorizacin Acumulada
Metrado
Parcial
% Avance
Saldo x Valorizar
Metrado
Parcial
04.06.00
04.06.01
04.06.02
04.06.03
04.06.04
04.06.05
04.06.06
04.06.07
VARIOS
REMOCION DE TERRENO
PUNTOS DE NIVEL C/TEODOLITO
SEMBRADO DE JARDINES CON CESPED INC./REGADO
MANTENIMIENTO DE SIEMBRA
APLICACION DE FERTILIZANTES
APLICACION DE HERBISIDAS
CORTE DE CESPED
M2
M2
M2
M2
M2
M2
M2
382.00
382.00
382.00
382.00
382.00
382.00
382.00
2.13
0.11
5.92
0.33
1.11
0.71
1.55
813.66
42.02
2,261.44
126.06
424.02
271.22
592.10
341.00
382.00
0.00
0.00
0.00
0.00
0.00
726.33
42.02
0.00
0.00
0.00
0.00
0.00
41.00
0.00
382.00
382.00
382.00
382.00
382.00
87.33
0.00
2,261.44
126.06
424.02
271.22
592.10
10.73%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
382.00
382.00
382.00
382.00
382.00
382.00
382.00
813.66
42.02
2,261.44
126.06
424.02
271.22
592.10
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.00.00
05.01.00
05.01.01
05.01.02
05.01.03
M3
M2
M3
0.45
45.45
17.00
262.52
10.01
52.32
118.13
454.95
889.44
0.45
45.45
17.00
118.13
454.95
889.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.45
45.45
17.00
118.13
454.95
889.44
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
05.02.00
05.02.01
05.02.02
05.02.03
MUROS Y TABIQUES
MURO LAD.KK.ARCILLA CABEZA MEZ.1:5 TIPO IV
MURO LADR.K.K.ARC.SOGA MEZ.1:4 TIPO IV
MURO LADR.K.K.ARC.CABEZA TIPO IV 1 CARAVISTA
M2
M2
M2
98.95
30.00
8.20
53.14
32.76
72.25
5,258.20
982.80
592.45
98.95
30.00
8.20
5,258.20
982.80
592.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
98.95
30.00
8.20
5,258.20
982.80
592.45
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
05.03.00
05.03.01
05.03.02
05.03.03
05.03.04
05.03.05
05.03.06
REVOQUES Y ENLUCIDOS
CIELORASO C/MEZ.1:4; E=1.5CM.
TARRAJEO MUROS EXT.FROTACHADO MEZ.1:4;E=1.5CM.
TARRAJEO MUROS INT.FROTACHADO MEZ C:A 1:4,E=1.5CM.
TARRAJEO PRIMARIO O RAYADO MUROS INTERIOR
VESTIDURA DE DERRAMES MEZ.1:5; E=1.5CM.
BRUAS 1.0 CM.
M2
M2
M2
M2
ML
ML
40.25
78.05
100.85
87.25
56.80
59.00
15.49
10.98
10.06
9.88
6.28
3.20
623.47
856.99
1,014.55
862.03
356.70
188.80
40.25
78.05
100.85
87.25
56.80
59.00
623.47
856.99
1,014.55
862.03
356.70
188.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
40.25
78.05
100.85
87.25
56.80
59.00
623.47
856.99
1,014.55
862.03
356.70
188.80
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.04.00
05.04.01
05.04.02
05.04.03
05.04.04
05.04.05
PISOS Y CONTRAPISOS
FALSOPISO DE 4" CON MEZC.1:8 C:H
CONTRAPISO E=48MM. BASE 3.8CM.MEZ.1:5,ACAB.1CM.PASTA 1:2
PISO CEMENTO PULIDO/COLOR Y BRUADO E=2"
PISO DE LOSETA VENECIANA 30X30 CM. COLOR GRIS CLARO
PISO DE MAYOLICA BLANCA DE 15X15 DE PRIMERA
M2
M2
M2
M2
M2
38.65
1.35
11.20
27.45
1.35
17.94
18.67
23.19
36.71
41.22
693.38
25.20
259.73
1,007.69
55.65
38.65
1.35
11.20
27.45
1.35
693.38
25.20
259.73
1,007.69
55.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
38.65
1.35
11.20
27.45
1.35
693.38
25.20
259.73
1,007.69
55.65
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.05.00
05.05.01
05.05.02
05.05.03
05.05.04
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO COLOREADO H=0.10M
CONTRAZOCALO DE CEMENTO FROTACHADO C:A/1:4 H=.15M.
CONTRAZOCALO DE CEMENTO FROTACHADO C:A/1:5 H=.30M.
ZOCALO DE MAYOLICA DE 15X15 CM.BLANCA 1RA.
ML
ML
ML
M2
12.35
24.90
3.00
87.25
5.56
5.21
6.51
45.39
68.67
129.73
19.53
3,960.28
12.35
24.90
3.00
87.25
68.67
129.73
19.53
3,960.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.23
0.00%
0.00%
0.00%
0.01%
12.35
24.90
3.00
87.25
68.67
129.73
19.53
3,960.28
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.06.00
05.06.01
CARPINTERIA DE MADERA
PUERTA APANELADA DE MADERA
M2
16.40
279.07
4,576.75
7.43
2,073.49
8.97
2,503.26
54.70%
16.40
4,576.75
100.00%
0.00
0.00
05.07.00
05.07.01
05.07.02
CARPINTERIA METALICA
VENTANA DE FIERRO
VENTANAS TIPO REJAS R-5, R-6
M2
M2
2.75
4.30
78.82
110.54
216.76
475.32
2.75
4.30
216.56
475.32
0.00
0.00
0.20
0.00
0.09%
0.00%
2.75
4.30
216.76
475.32
100.00%
100.00%
0.00
0.00
0.00
0.00
256386149.xls.ms_office
Pgina 7
Metrado
Precio Unitario
Parcial
Valorizacin Anterior
Metrado
Parcial
Valorizacin Actual
Metrado
Parcial
% Avance
Valorizacin Acumulada
Metrado
Parcial
% Avance
Saldo x Valorizar
Metrado
Parcial
05.08.00
05.08.01
05.08.02
05.08.03
05.08.04
05.08.05
05.08.06
05.08.07
CERRAJERIA
CERRADURA P/PUERTA EXTER.TRES GOLPES T/YALE /MANIJA DE BRONCUND
CERRADURA P/PUERTA INTERIOR T/YALE O SIMILAR
UND
BISAGRA CAPUCHINA 3.5"X3.5" ALUM.INC.COLOC.
PZA
BISAGRA CAPUCHINA 3"X3" ALUM.INC.COLOC.
PZA
CERROJO DE ALUMINIO DE 3"
UND
TIRADOR DE ALUMINIO DE 3"
UND
TUBO CROMADO Y CANOPLA P/DUCHA DE 3/4"
UND
4.00
1.00
20.00
18.00
6.00
6.00
1.00
76.25
66.25
8.83
8.76
9.64
10.64
29.47
305.00
66.25
176.60
157.68
57.84
63.84
29.47
4.00
1.00
20.00
18.00
6.00
6.00
0.00
305.00
66.25
176.60
157.68
57.84
63.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
29.47
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
4.00
1.00
20.00
18.00
6.00
6.00
1.00
305.00
66.25
176.60
157.68
57.84
63.84
29.47
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.09.00
05.09.01
VIDRIOS Y CRISTALES
VIDRIOS Y CRISTALES SEMIDOBLES NACIONALES
P2
29.55
4.10
121.16
10.34
42.40
19.21
78.75
65.00%
29.55
121.16
100.00%
0.00
0.00
05.10.00
05.10.01
05.10.02
05.10.03
05.10.04
PINTURA
PINTURA CIELORASOS AL TEMPLE
PINTURA EN MUROS EXTERIORES C/LATEX
PINTURA EN MUROS INTERIORES C/LATEX
PINTURA EN CONTRAZOCALOS CON ESMALTE-2 MANOS
M2
M2
M2
ML.
40.25
81.75
108.50
27.90
7.69
10.25
9.51
2.12
309.52
837.94
1,031.84
59.15
40.25
69.96
94.68
23.35
309.50
717.12
900.36
49.49
0.00
11.79
13.83
4.56
0.02
120.82
131.48
9.66
0.01%
14.42%
12.74%
16.33%
40.25
81.75
108.50
27.90
309.52
837.94
1,031.84
59.15
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.11.00
05.11.01
05.11.02
VARIOS
SARDINEL EN DUCHA
CUB.LADR.PAST.24X24 ASENT.C/MEZ.1:5 2.5CM;JUNTA 1:5 1.5CM
ML
M2
1.80
49.55
133.66
21.51
240.59
1,065.82
1.80
49.55
240.59
1,065.82
0.00
0.00
0.00
0.00
0.00%
0.00%
1.80
49.55
240.59
1,065.82
100.00%
100.00%
0.00
0.00
0.00
0.00
05.12.00
05.12.01
05.12.02
05.12.03
05.12.04
05.12.05
05.12.06
05.12.07
05.12.08
05.12.09
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
6.00
2.00
2.00
1.00
2.00
1.00
2.00
1.00
11.00
174.38
259.38
139.38
88.60
18.50
19.84
23.22
73.60
31.34
1,046.28
518.76
278.76
88.60
37.00
19.84
46.44
73.60
344.74
4.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
11.00
697.52
259.38
139.38
88.60
18.50
19.84
23.22
73.60
344.74
2.00
1.00
1.00
0.00
1.00
0.00
1.00
0.00
0.00
348.76
259.38
139.38
0.00
18.50
0.00
23.22
0.00
0.00
33.33%
50.00%
50.00%
0.00%
50.00%
0.00%
50.00%
0.00%
0.00%
6.00
2.00
2.00
1.00
2.00
1.00
2.00
1.00
11.00
1,046.28
518.76
278.76
88.60
37.00
19.84
46.44
73.60
344.74
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
06.00.00
06.01.00
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
CONSTRUCCION CAMERINOS
MUROS Y TABIQUES
MURO LAD.KK.ARCILLA CABEZA MEZ.1:5 TIPO IV
MURO LADR.K.K.ARC.SOGA MEZ.1:4 TIPO IV
MURO LADR.K.K.ARC.CANTO MEZ.1:4 TIPO IV
MURO LADR.K.K.ARC.CABEZA TIPO IV 1 CARAVISTA
MURO LADR.K.K.ARC.SOGA MEZ.1:4 TIPO IV 1 CARAVISTA
M2
M2
M2
M2
M2
31.80
20.00
1.00
18.50
13.20
53.14
32.76
22.10
72.25
42.82
1,689.85
655.20
22.10
1,336.63
565.22
31.80
20.00
1.00
18.50
13.20
1,689.85
655.20
22.10
1,336.63
565.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
31.80
20.00
1.00
18.50
13.20
1,689.85
655.20
22.10
1,336.63
565.22
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
06.02.00
06.02.01
06.02.02
06.02.03
06.02.04
06.02.05
REVOQUES Y ENLUCIDOS
CIELORASO C/MEZ.1:4; E=1.5CM.
TARRAJEO MUROS EXT.FROTACHADO MEZ.1:4;E=1.5CM.
TARRAJEO MUROS INT.FROTACHADO MEZ C:A 1:4,E=1.5CM.
TARRAJEO PRIMARIO O RAYADO MUROS INTERIOR
BRUAS 1.0 CM.
M2
M2
M2
M2
ML
15.60
30.00
24.00
65.80
28.40
15.49
10.98
10.06
9.88
3.20
241.64
329.40
241.44
650.10
90.88
15.60
30.00
24.00
65.80
28.40
241.64
329.40
241.44
650.10
90.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
15.60
30.00
24.00
65.80
28.40
241.64
329.40
241.44
650.10
90.88
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
06.03.00
06.03.01
06.03.02
06.03.03
06.03.04
PISOS Y CONTRAPISOS
FALSOPISO DE 4" CON MEZC.1:8 C:H
CONTRAPISO E=48MM. BASE 3.8CM.MEZ.1:5,ACAB.1CM.PASTA 1:2
PISO DE LOSETA VENECIANA 30X30 CM. COLOR GRIS OSCURO
PISO DE MAYOLICA BLANCA DE 15X15 DE PRIMERA
M2
M2
M2
M2
18.40
4.90
13.50
4.90
17.94
18.67
36.71
41.22
330.10
91.48
495.59
201.98
18.40
4.90
13.50
4.90
330.10
91.48
495.59
201.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
18.40
4.90
13.50
4.90
330.10
91.48
495.59
201.98
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
256386149.xls.ms_office
Pgina 8
Metrado
Precio Unitario
Parcial
Valorizacin Anterior
Metrado
Parcial
Valorizacin Actual
Metrado
Parcial
% Avance
Valorizacin Acumulada
Metrado
Parcial
% Avance
Saldo x Valorizar
Metrado
Parcial
06.04.00
06.04.01
06.04.02
06.04.03
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO FROTACHADO C:A/1:5 H=.10M.
CONTRAZOCALO DE CEMENTO FROTACHADO C:A/1:5 H=.30M.
ZOCALO DE MAYOLICA DE 15X15 CM.BLANCA 1RA.
ML
ML
M2
19.60
6.55
65.80
4.95
6.51
45.39
97.02
42.64
2,986.66
19.60
6.55
65.80
97.02
42.64
2,986.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
19.60
6.55
65.80
97.02
42.64
2,986.66
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
06.05.00
06.05.01
CARPINTERIA DE MADERA
PUERTA APANELADA DE MADERA
M2
3.80
279.07
1,060.47
3.80
1,060.47
0.00
0.00
0.00%
3.80
1,060.47
100.00%
0.00
0.00
06.06.00
06.06.01
CARPINTERIA METALICA
VENTANA DE FIERRO TIPO C-6
M2
3.70
106.21
392.98
3.70
392.98
0.00
0.00
0.00%
3.70
392.98
100.00%
0.00
0.00
06.07.00
06.07.01
06.07.02
06.07.03
CERRAJERIA
CERRADURA P/PUERTA EXTER.TRES GOLPES T/YALE /MANIJA DE BRONCUND
BISAGRA CAPUCHINA 3.5"X3.5" ALUM.INC.COLOC.
PZA
TUBO CROMADO Y CANOPLA P/DUCHA DE 3/4"
UND
2.00
8.00
6.00
76.25
8.83
29.47
152.50
70.64
176.82
2.00
8.00
6.00
152.50
70.64
176.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
2.00
8.00
6.00
152.50
70.64
176.82
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
06.08.00
06.08.01
06.08.02
06.08.03
06.08.04
06.08.05
06.08.06
PINTURA
PINTURA CIELORASOS AL TEMPLE
PINTURA EN CONTRAZOCALOS CON ESMALTE-2 MANOS
PINTURA EN CARPINTERIA METALICA
BARNIZ EN CARPINTERIA DE MADERA
PINTURA EN MUROS EXTERIORES C/LATEX
PINTURA EN MUROS INTERIORES C/LATEX
M2
ML.
M2
M2
M2
M2
15.60
19.60
3.70
7.60
30.80
24.00
7.69
2.12
12.11
18.30
10.25
9.51
119.96
41.55
44.81
139.08
315.70
228.24
15.60
15.78
3.70
0.00
23.86
16.00
119.96
33.45
44.81
0.00
244.57
152.16
0.00
3.82
0.00
7.60
6.94
8.00
0.00
8.10
0.00
139.08
71.14
76.08
0.00%
19.49%
0.00%
100.00%
22.53%
33.33%
15.60
19.60
3.70
7.60
30.80
24.00
119.96
41.55
44.81
139.08
315.70
228.24
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
06.09.00
06.09.01
06.09.02
06.09.03
VARIOS
JUNTAS DE DILATACION 1"
SARDINEL EN DUCHA
CUB.LADR.PAST.24X24 ASENT.C/MEZ.1:5 2.5CM;JUNTA 1:5 1.5CM
ML
ML
M2
6.00
5.40
20.40
14.52
15.88
21.51
87.12
85.75
438.80
6.00
5.40
20.40
87.12
85.75
438.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
6.00
5.40
20.40
87.12
85.75
438.80
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
06.10.00
06.10.01
06.10.02
06.10.03
06.10.04
06.10.05
06.10.06
BANCAS DE CONCRETO
BASE DE CONCRETO P/MUEBLES BAJOS E=10CM
ENCOFRADO Y DESENCOFRADO DE 0.75 DE ALTO
ACERO GRADO 60 PROMEDIO
TARRAJEO INTERIOR/EXTER. MORTERO C:A/1:5 INC.DERRAMES
LADRILLO KK DE CANTO/C:A 1:4
MAYOLICA NACIONAL BLANCA DE PRIMERA 15 X 15 CM.
M2
M2
KG
M2
M2
M2
2.90
2.90
31.00
3.92
2.00
1.60
22.78
21.18
2.20
12.75
25.26
45.39
66.06
61.42
68.20
49.98
50.52
72.62
2.90
2.90
31.00
3.92
2.00
1.60
66.06
61.42
68.20
49.98
50.52
72.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2.90
2.90
31.00
3.92
2.00
1.60
66.06
61.42
68.20
49.98
50.52
72.62
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
06.11.00
06.11.01
06.11.02
06.11.03
06.11.04
06.11.05
06.11.06
APARATOS SANITARIOS/ACCESORIOS
DUCHAS CROMADAS DE CABEZA GIRATORIA
TOALLERA DE LOZA BLANCO DOBLE
JABONER.DE LOSA COLOR BLANCO SIMPLE DE 15X15CM.C/AGARRA.1/2"
GRIFERIA PARA DUCHAS
COLOCACION DE ACCESORIOS PARA SS.HH.
COLOCACION DE APARATOS SANITARIOS
PZA
PZA
PZA
PZA
UND
UND
6.00
6.00
7.00
7.00
20.00
6.00
88.60
23.22
19.84
73.60
10.88
54.38
531.60
139.32
138.88
515.20
217.60
326.28
6.00
3.00
5.00
7.00
10.00
6.00
531.60
69.66
99.20
515.20
108.80
326.28
0.00
3.00
2.00
0.00
10.00
0.00
0.00
69.66
39.68
0.00
108.80
0.00
0.00%
50.00%
28.57%
0.00%
50.00%
0.00%
6.00
6.00
7.00
7.00
20.00
6.00
531.60
139.32
138.88
515.20
217.60
326.28
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
07.00.00
07.01.00
07.01.01
07.01.02
07.01.03
07.01.04
07.01.05
07.01.06
07.01.07
07.01.08
07.01.09
07.01.10
07.01.11
PTO
ML
ML
ML
ML
PTO
PZA
PZA
UND
UND
UND
34.00
58.00
17.00
40.00
5.00
16.00
8.00
4.00
1.00
1.00
2.00
76.26
24.38
17.31
18.94
40.60
62.46
33.62
27.45
161.84
166.09
189.69
2,592.84
1,414.04
294.27
757.60
203.00
999.36
268.96
109.80
161.84
166.09
379.38
34.00
58.00
17.00
40.00
5.00
16.00
0.00
0.00
1.00
1.00
2.00
2,592.84
1,414.04
294.27
757.60
203.00
999.36
0.00
0.00
161.84
166.09
379.38
0.00
0.00
0.00
0.00
0.00
0.00
8.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
268.96
109.80
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
0.00%
0.00%
34.00
58.00
17.00
40.00
5.00
16.00
8.00
4.00
1.00
1.00
2.00
2,592.84
1,414.04
294.27
757.60
203.00
999.36
268.96
109.80
161.84
166.09
379.38
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
256386149.xls.ms_office
Pgina 9
Metrado
Precio Unitario
Parcial
Valorizacin Anterior
Metrado
Parcial
Valorizacin Actual
Metrado
Parcial
% Avance
Valorizacin Acumulada
Metrado
Parcial
% Avance
Saldo x Valorizar
Metrado
Parcial
07.01.12
07.01.13
07.01.14
07.01.15
07.01.16
07.01.17
07.01.18
07.01.19
07.01.20
07.01.21
UND
UND
UND
UND
UND
UND
UND
PZA
UND
ML
10.00
4.00
6.00
3.00
4.00
2.00
2.00
2.00
12.00
125.00
24.53
13.45
19.32
26.03
21.61
17.23
19.89
44.08
30.79
1.51
245.30
53.80
115.92
78.09
86.44
34.46
39.78
88.16
369.48
188.75
10.00
4.00
6.00
3.00
4.00
2.00
2.00
0.00
12.00
125.00
245.30
53.80
115.92
78.09
86.44
34.46
39.78
0.00
369.48
188.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
88.16
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
10.00
4.00
6.00
3.00
4.00
2.00
2.00
2.00
12.00
125.00
245.30
53.80
115.92
78.09
86.44
34.46
39.78
88.16
369.48
188.75
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
07.02.00
07.02.01
07.02.02
07.02.03
07.02.04
07.02.05
07.02.06
07.02.07
07.02.08
07.02.09
07.02.10
07.02.11
07.02.12
07.02.13
07.02.14
07.02.15
07.02.16
07.02.17
07.02.18
07.02.19
07.02.20
07.02.21
07.02.22
PTO
PZA
PZA
PZA
UND
UND
ML
ML
ML
ML
ML
UND
UND
UND
UND
UND
UND
UND
UND
UND
ML
ML
43.00
5.00
14.00
5.00
9.00
15.00
4.00
73.00
17.00
5.00
35.00
10.00
10.00
30.00
1.00
1.00
8.00
9.00
2.00
3.00
2.00
145.00
35.87
51.03
34.50
34.70
84.56
71.54
9.30
10.14
11.28
12.60
15.92
15.62
21.32
9.80
15.06
25.53
6.18
7.87
11.00
21.17
13.90
1.80
1,542.41
255.15
483.00
173.50
761.04
1,073.10
37.20
740.22
191.76
63.00
557.20
156.20
213.20
294.00
15.06
25.53
49.44
70.83
22.00
63.51
27.80
261.00
43.00
5.00
14.00
5.00
0.00
0.00
4.00
73.00
17.00
5.00
35.00
10.00
10.00
30.00
1.00
1.00
8.00
9.00
2.00
3.00
2.00
145.00
1,542.41
255.15
483.00
173.50
0.00
0.00
37.20
740.22
191.76
63.00
557.20
156.20
213.20
294.00
15.06
25.53
49.44
70.83
22.00
63.51
27.80
261.00
0.00
0.00
0.00
0.00
9.00
15.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
761.04
1,073.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
43.00
5.00
14.00
5.00
9.00
15.00
4.00
73.00
17.00
5.00
35.00
10.00
10.00
30.00
1.00
1.00
8.00
9.00
2.00
3.00
2.00
145.00
1,542.41
255.15
483.00
173.50
761.04
1,073.10
37.20
740.22
191.76
63.00
557.20
156.20
213.20
294.00
15.06
25.53
49.44
70.83
22.00
63.51
27.80
261.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
08.00.00
08.01.00
08.01.01
08.01.02
08.01.03
08.01.04
08.01.05
08.01.06
PTO
PTO
UND
PTO
PTO
UND
UND
24.00
18.00
1.00
2.00
38.00
1.00
1.00
69.19
68.59
99.97
113.58
81.65
647.61
407.06
1,660.56
1,234.62
99.97
227.16
3,102.70
647.61
407.06
24.00
18.00
1.00
2.00
38.00
1.00
1.00
1,660.56
1,234.62
99.97
227.16
3,102.70
647.61
407.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
24.00
18.00
1.00
2.00
38.00
1.00
1.00
1,660.56
1,234.62
99.97
227.16
3,102.70
647.61
407.06
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
08.02.00
08.02.01
08.02.02
08.02.03
08.02.04
08.02.05
UND
UND
UND
UND
UND
18.00
6.00
9.00
7.00
2.00
151.87
171.87
106.87
46.87
17.25
2,733.66
1,031.22
961.83
328.09
34.50
14.00
4.00
6.00
4.00
1.00
2,126.18
687.48
641.22
187.48
17.25
4.00
2.00
3.00
3.00
1.00
607.48
343.74
320.61
140.61
17.25
22.22%
33.33%
33.33%
42.86%
50.00%
18.00
6.00
9.00
7.00
2.00
2,733.66
1,031.22
961.83
328.09
34.50
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
09.00.00
09.01.01
09.01.02
09.01.03
UND
PTO
PTO
1.00
7.00
7.00
112.04
82.51
91.79
112.04
577.57
642.53
1.00
7.00
7.00
112.04
577.57
642.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
7.00
7.00
112.04
577.57
642.53
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
09.02.00
09.02.01
ARTEFACTOS DE ALUMBRADO
EQUIPO FLUORESCENTE TIPO BE-1/40W
UND
4.00
111.87
447.48
2.00
223.74
2.00
223.74
50.00%
4.00
447.48
100.00%
0.00
0.00
256386149.xls.ms_office
Pgina 10
15.00%
10.00%
Metrado
2.00
3.00
5.00
3.00
2.00
1.00
1.00
Precio Unitario
106.87
17.25
46.87
43.54
78.99
566.29
382.12
Parcial
Valorizacin Anterior
Metrado
Parcial
213.74
51.75
234.35
130.62
157.98
566.29
382.12
374,691.62
56,203.74
37,469.16
468,364.52
427,105.35
256386149.xls.ms_office
1.00
1.00
3.00
3.00
2.00
1.00
1.00
106.87
17.25
140.61
130.62
157.98
566.29
382.12
#########
52,621.79
35,081.19
#########
#########
Valorizacin Actual
Metrado
Parcial
% Avance
1.00
2.00
2.00
0.00
0.00
0.00
0.00
106.87
34.50
93.74
0.00
0.00
0.00
0.00
50.00%
66.67%
40.00%
0.00%
0.00%
0.00%
0.00%
23,879.67
3,581.95
2,387.97
29,849.59
27,220.08
6.37%
Valorizacin Acumulada
Metrado
Parcial
% Avance
2.00
3.00
5.00
3.00
2.00
1.00
1.00
213.74
51.75
234.35
130.62
157.98
566.29
382.12
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
374,691.62
56,203.74
37,469.16
468,364.52
427,105.35
100.00%
Saldo x Valorizar
Metrado
Parcial
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Pgina 11
Metrado
Precio
Unitario
Parcial
Valorizacin Anterior
Metrado
Parcial
Valorizacin Actual
Metrado
Parcial
% Avance
Valorizacin Acumulada
Metrado
Parcial
% Avance
Saldo x Valorizar
Metrado
Parcial
01.00.00
01.01.00
01.01.01
01.01.02
M2
M2
662.00
662.00
6.64
1.38
4,395.68
913.56
662.00
662.00
4,395.68
913.56
0.00
0.00
0.00
0.00
0.00%
0.00%
662.00
662.00
4,395.68
913.56
100.00%
100.00%
0.00
0.00
0.00
0.00
01.02.00
01.02.01
MOVIMIENTO DE TIERRAS
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
M3
175.50
52.32
9,182.16
175.50
9,182.16
0.00
0.00
0.00%
175.50
9,182.16
100.00%
0.00
0.00
01.03.00
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
PISOS Y PAVIMENTOS
PREPARACION DE SUBRASANTE
AFIRMADO DE E=.10M.
LOSA DE CONCRETO F'C=175KG/CM2 E=0.10M
VEREDA 140 KG/CM2 E=.10M. INC.SARDINEL/ENCOFRADO
AFIRMADO DE E=.10M.
M2
M2
M2
M2
M2
675.00
675.00
675.00
77.80
77.80
2.63
5.08
39.83
29.07
5.08
1,775.25
3,429.00
26,885.25
2,261.65
395.22
675.00
675.00
675.00
77.80
77.80
1,775.25
3,429.00
26,885.25
2,261.65
395.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
675.00
675.00
675.00
77.80
77.80
1,775.25
3,429.00
26,885.25
2,261.65
395.22
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
M2
M2
M2
P2
51.80
37.20
10.50
85.00
21.01
5.72
10.01
18.44
1,088.32
212.78
105.11
1,567.40
51.80
37.20
10.50
85.00
1,088.32
212.78
105.11
1,567.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
51.80
37.20
10.50
85.00
1,088.32
212.78
105.11
1,567.40
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
03.00.00
03.01.00
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
03.01.08
03.01.09
03.01.10
03.01.11
03.01.12
03.01.13
03.01.14
VARIOS
MURO LADR.K.K.ARC.SOGA MEZ.1:4 TIPO IV
CONTRAPISO E=48MM. BASE 3.8CM.MEZ.1:5,ACAB.1CM.PASTA 1:2
PISO DE CERAMICA T/CELIMA DE 20X20
TARRAJEO PRIMARIO O RAYADO MUROS INTERIOR
TARRAJEO MUROS EXT.FROTACHADO MEZ.1:4;E=1.5CM.
TARRAJEO MUROS INT.FROTACHADO MEZ.1:4;E=1.5CM.
ZOCALO DE MAYOLICA DE 15X15 CM.BLANCA 1RA.
VIDRIOS Y CRISTALES SEMIDOBLES NACIONALES
CERRADURA P/PUERTA INTERIOR T/YALE O SIMILAR
PINTURA CIELORASOS AL TEMPLE
PINTURA EN MUROS EXTERIORES C/LATEX
PINTURA EN MUROS INTERIORES C/LATEX
PINTURA ESMALTE CON BASEANTICORROSIVA EN CARP. METALICA
PINTURA ESMALTE EN CARPINTERIA DE MADERA
M2
M2
M2
M2
M2
M2
M2
P2
UND
M2
M2
M2
M2
M2
10.50
51.80
51.80
54.20
10.50
10.50
54.20
85.00
15.00
1,419.00
1,644.00
1,930.00
166.00
251.50
32.76
18.67
52.98
9.88
10.98
10.06
45.39
4.10
66.25
7.69
10.25
9.51
12.11
10.97
343.98
967.11
2,744.36
535.50
115.29
105.63
2,460.14
348.50
993.75
10,912.11
16,851.00
18,354.30
2,010.26
2,758.96
10.50
51.80
51.80
54.20
10.50
10.50
54.20
25.00
2.00
1,349.78
1,452.00
1,774.40
121.50
79.50
343.98
967.11
2,744.36
535.50
115.29
105.63
2,460.14
102.50
132.50
10,379.81
14,883.00
16,874.54
1,471.37
872.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.00
13.00
69.22
192.00
155.60
44.50
172.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
246.00
861.25
532.30
1,968.00
1,479.76
538.90
1,886.84
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
70.59%
86.67%
4.88%
11.68%
8.06%
26.81%
68.39%
10.50
51.80
51.80
54.20
10.50
10.50
54.20
85.00
15.00
1,419.00
1,644.00
1,930.00
166.00
251.50
343.98
967.11
2,744.36
535.50
115.29
105.63
2,460.14
348.50
993.75
10,912.11
16,851.00
18,354.30
2,010.26
2,758.96
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
04.00.00
04.01.00
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.01.11
04.01.12
INSTALACIONES ELECTRICAS
DESMONTAJE DE ACCESORIOS ELECTRICOS
DESMONTAJE DE TOMACORRIENTES MONOFASICOS DOBLES
UND
DESMONTAJE DE INTERRUPTORES UNIPOLAR SIMPLE
UND
DESMONTAJE DE INTERRUPTORES UNIPOLAR DOBLE
UND
DESMONTAJE DE INTERRUPTORES DE CONMUTACION
UND
DESMONTAJE DE TIMBRE C/PULSADOR
UND
DESMONTAJE DE WALL SOCKET
UND
DESMONTAJE DE FLUORESCENTE BE 1/40W
UND
DESMONTAJE DE FLUORESCENTE BE 2/40W
UND
DESMONTAJE DE FLUORESCENTE BE 3/40W
UND
DESMONTAJE DE FLUORESCENTE JCM 1/40W
UND
DESMONTAJE DE GLOBO DE VIDRIO GV -110 C/LAMPARA
UND
DESMONTAJE DE REFLECTOR RLM-D C/LAMPARA VAPOR DE MERC.400WUND
9.00
5.00
3.00
2.00
1.00
1.00
9.00
60.00
3.00
3.00
3.00
2.00
12.21
12.21
12.21
12.21
24.41
9.78
19.53
19.53
19.53
19.53
19.53
19.53
109.89
61.05
36.63
24.42
24.41
9.78
175.77
1,171.80
58.59
58.59
58.59
39.06
9.00
5.00
3.00
2.00
1.00
1.00
9.00
60.00
3.00
3.00
3.00
2.00
109.89
61.05
36.63
24.42
24.41
9.78
175.77
1,171.80
58.59
58.59
58.59
39.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
9.00
5.00
3.00
2.00
1.00
1.00
9.00
60.00
3.00
3.00
3.00
2.00
109.89
61.05
36.63
24.42
24.41
9.78
175.77
1,171.80
58.59
58.59
58.59
39.06
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
256386149.xls.ms_office
Pgina 12
Metrado
Precio
Unitario
Parcial
Valorizacin Anterior
Metrado
Parcial
Valorizacin Actual
Metrado
Parcial
% Avance
Valorizacin Acumulada
Metrado
Parcial
% Avance
Saldo x Valorizar
Metrado
Parcial
05.00.00
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.01.08
05.01.09
05.01.10
05.01.11
05.01.12
UND
UND
UND
UND
UND
ML
ML
UND
UND
UND
UND
UND
54.00
26.00
5.00
23.00
3.00
32.00
21.00
9.00
5.00
3.00
2.00
1.00
23.76
25.67
12.67
12.67
16.47
14.43
15.03
28.32
22.45
26.11
31.24
135.20
1,283.04
667.42
63.35
291.41
49.41
461.76
315.63
254.88
112.25
78.33
62.48
135.20
54.00
26.00
5.00
15.00
1.00
32.00
21.00
9.00
5.00
3.00
2.00
0.60
1,283.04
667.42
63.35
190.05
16.47
461.76
315.63
254.88
112.25
78.33
62.48
81.12
0.00
0.00
0.00
8.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.40
0.00
0.00
0.00
101.36
32.94
0.00
0.00
0.00
0.00
0.00
0.00
54.08
0.00%
0.00%
0.00%
34.78%
66.67%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
40.00%
54.00
26.00
5.00
23.00
3.00
32.00
21.00
9.00
5.00
3.00
2.00
1.00
1,283.04
667.42
63.35
291.41
49.41
461.76
315.63
254.88
112.25
78.33
62.48
135.20
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.02.00
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.02.06
05.02.07
ARTEFACTOS DE ILUMINACION
ARTEFACTO WALL SOCKET WS-150 P/PARED C/LAMPARA 100W
EQUIPO FLUORESCENTE TIPO BE-1/40W
EQUIPO FLUORESCENTE TIPO BE-2/40W
EQUIPO FLUORESCENTE TIPO BE-3/40W
EQUIPO FLUORESCENTE JCM 1/40W
ARTEFACTO COMPLETO GV-110 C/LAMPARA 100W
REFLECTOR T/RLM-D C/LAMPARA DE VAPOR DE MERCURIO DE 400W
UND
UND
UND
UND
UND
UND
UND
1.00
9.00
60.00
3.00
3.00
3.00
2.00
17.25
111.87
151.87
171.87
111.87
46.87
116.87
17.25
1,006.83
9,112.20
515.61
335.61
140.61
233.74
0.00
6.15
43.00
2.05
2.05
2.05
1.00
0.00
688.00
6,530.41
352.33
229.33
96.08
116.87
1.00
2.85
17.00
0.95
0.95
0.95
1.00
17.25
318.83
2,581.79
163.28
106.28
44.53
116.87
100.00%
31.67%
28.33%
31.67%
31.67%
31.67%
50.00%
1.00
9.00
60.00
3.00
3.00
3.00
2.00
17.25
1,006.83
9,112.20
515.61
335.61
140.61
233.74
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
06.00.00
06.01.00
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.01.08
06.01.09
06.01.10
06.01.11
06.01.12
06.01.13
06.01.14
ALIMENTADORES
ALIMENTACION TG 3-1X50MM2NYY
TRAZO Y REPLANTEO P/ALUMBRADO PUBLICO
EXCAVACION DE ZANJA 0.50X0.65M
RELLENO Y COMPACTACION DE ZANJA 0.50X0.65M
RESANE DE PISOS
MEDIDOR Y CAJA F3
POZO DE TIERRA FUERZA P/TABLERO GENERAL
TABLERO DE DISTRIBUCION TD-1 S/PLANO
ALIMENTADOR 3-1X35MM2 NYY (P/TD1,TD2,TD3)
TRAZADO Y REPLANTEO C/EQUIPO
EXCAVACION DE ZANJA 0.50X0.65M
RELLENO Y COMPACTACION DE ZANJA 0.50X0.65M
RESANE DE VEREDAS
TABLERO GENERAL S/DETALLE (REHABILIT.)
PRUEBAS DE CONTINUIDAD Y C/EQUIPOS ENCENDIDOS
ML
ML
ML
ML
ML
UND
UND
UND
ML
M2
ML
ML
ML
UND
GLB
25.00
17.00
17.00
17.00
17.00
1.00
1.00
1.00
65.00
60.00
60.00
60.00
60.00
1.00
2.00
63.93
1.08
6.56
4.69
16.02
1,311.30
465.15
749.74
69.66
1.38
6.56
4.69
16.02
1,733.80
1,200.00
1,598.25
18.36
111.52
79.73
272.34
1,311.30
465.15
749.74
4,527.90
82.80
393.60
281.40
961.20
1,733.80
2,400.00
25.00
17.00
17.00
17.00
17.00
0.30
1.00
1.00
65.00
60.00
60.00
60.00
60.00
1.00
1.00
1,598.25
18.36
111.52
79.73
272.34
393.39
465.15
749.74
4,527.90
82.80
393.60
281.40
961.20
1,733.80
1,200.00
0.00
0.00
0.00
0.00
0.00
0.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
917.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,200.00
0.00%
0.00%
0.00%
0.00%
0.00%
70.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
50.00%
25.00
17.00
17.00
17.00
17.00
1.00
1.00
1.00
65.00
60.00
60.00
60.00
60.00
1.00
2.00
1,598.25
18.36
111.52
79.73
272.34
1,311.30
465.15
749.74
4,527.90
82.80
393.60
281.40
961.20
1,733.80
2,400.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13,168.17
1,975.23
1,316.82
16,460.22
15,010.21
9.17%
143,664.95
21,549.74
14,366.50
179,581.19
163,761.52
100.00%
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
COSTO TOTAL
COSTO TOTAL X FACTOR DE RELACION
15.00%
10.00%
143,664.95
21,549.74
14,366.50
179,581.19
163,761.52
256386149.xls.ms_office
130,496.79
19,574.52
13,049.68
163,120.99
148,751.34
0.00
0.00
0.00
0.00
0.00
Pgina 13
01.00.00
01.01.00
01.01.01
LOSA DEPORTIVA
OBRAS PROVISIONALES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO P/LOSA DEPORTIVA
01.02.00
01.02.01
01.02.02
OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO EN LOSAS
01.03.00
01.03.01
01.03.02
01.03.03
GLB
Metrado
Precio
Unitario
Parcial
Valorizacin Anterior
Metrado
Parcial
Valorizacin Actual
Metrado
Parcial
% Avance
Valorizacin Acumulada
Metrado
Parcial
% Avance
Saldo x Valorizar
Metrado
Parcial
1.00
2,337.20
2,337.20
1.00
2,337.20
0.00
0.00
0.00%
1.00
2,337.20
100.00%
0.00
0.00
M2
M2
608.00
608.00
1.61
0.58
978.88
352.64
608.00
608.00
978.88
352.64
0.00
0.00
0.00
0.00
0.00%
0.00%
608.00
608.00
978.88
352.64
100.00%
100.00%
0.00
0.00
0.00
0.00
MOVIMIENTO DE TIERRAS
CORTE HASTA NIVEL DE SUBRASANTE EN LOSAS
EXCAVACION DE SARDINELES
ELIMINACION DE EXCEDENTES D=5KM
M3
M3
M3
182.40
3.60
218.60
15.21
9.56
22.00
2,774.30
34.42
4,809.20
182.40
3.60
218.60
2,774.30
34.42
4,809.16
0.00
0.00
0.00
0.00
0.00
0.04
0.00%
0.00%
0.00%
182.40
3.60
218.60
2,774.30
34.42
4,809.20
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
01.04.00
01.04.01
01.04.02
01.04.03
01.04.04
01.04.05
PISOS Y PAVIMENTOS
PREPARACION DE SUBRASANTE
BASE E=0.15
LOSA DE CONCRETO DE F'C=210KG/CM2
SARDINEL DE CONCRETO DE F'C=140KG/CM2 10X30
ACERO GRADO 60- 3/8" EN MALLA DE CIMIENTO DE ARCOS
M2
M2
M2
ML
KG
608.00
608.00
608.00
102.00
15.00
2.63
6.35
40.57
19.20
2.53
1,599.04
3,860.80
24,666.56
1,958.40
37.95
608.00 1,599.04
608.00 3,860.80
608.00 24,666.56
102.00 1,958.40
15.00
37.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
608.00
608.00
608.00
102.00
15.00
1,599.04
3,860.80
24,666.56
1,958.40
37.95
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
01.05.00
01.05.01
01.05.02
01.05.03
01.05.04
VARIOS
ARCOS DE FULBITO CON TABLERO DE BASQUET
PARANTES DE NET DE VOLEY INC. INST. NET Y REGISTROS
JUNTAS DE DILATACION
JUNTAS DE CONTRACCION
PAR
PAR
ML
ML
1.00
1.00
70.00
120.00
3,100.00
670.00
1.88
0.95
3,100.00
670.00
131.60
114.00
0.00
0.10
0.00
120.00
0.00
67.00
0.00
114.00
1.00
0.90
70.00
0.00
3,100.00
603.00
131.60
0.00
100.00%
90.00%
100.00%
0.00%
1.00
1.00
70.00
120.00
3,100.00
670.00
131.60
114.00
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
01.06.00
01.06.01
PINTURA
PINTURA LINEAL AL ESMALTE EN LOSAS DEPORTIVAS
ML
316.38
0.87
275.25
0.00
0.00
316.38
275.25
100.00%
316.38
275.25
100.00%
0.00
0.00
02.00.00
02.01.00
02.01.01
02.01.02
GRADERIAS
OBRAS PRELIMINARES
TRAZO DE NIVELES Y REPLANTEO PRELIMINARES C/EQUIPO
LIMPIEZA DE TERRENO MANUAL
M2
M2
62.50
62.50
1.38
1.61
86.25
100.63
62.50
62.50
86.25
100.63
0.00
0.00
0.00
0.00
0.00%
0.00%
62.50
62.50
86.25
100.63
100.00%
100.00%
0.00
0.00
0.00
0.00
02.02.00
02.02.01
02.02.03
02.02.04
MOVIMIENTO DE TIERRAS
EXCAV. ZANJAS P/CIMIENTOS MAT.SUEL.
RELLENO APISONADO C/MAT.PREST.
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
M3
M3
M3
8.00
49.80
9.60
18.75
45.28
52.32
150.00
2,254.94
502.27
8.00
49.80
9.60
150.00
2,254.94
502.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.00
49.80
9.60
150.00
2,254.94
502.27
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
02.03.00
02.03.01
CONCRETO SIMPLE
CIMIENTO CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
M3
8.00
107.85
862.80
8.00
862.80
0.00
0.00
0.00%
8.00
862.80
100.00%
0.00
0.00
02.04.00
02.04.01
02.04.02
02.04.03
CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 EN GRADERIAS
ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERIAS
ACERO F'Y 4200KG/CM2
M3
M2
KGR
7.75
29.90
306.55
236.80
30.26
2.20
1,835.20
904.77
674.41
3.13
20.93
190.00
741.18
633.34
418.00
4.62
8.97
116.55
1,094.02
271.43
256.41
59.61%
30.00%
38.02%
7.75
29.90
306.55
1,835.20
904.77
674.41
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
02.05.00
02.05.01
ACABADOS
ACABADOS PASOS Y CONTRAPASOS C/ CEMENTO FROTACHADO
M2
101.30
33.17
3,360.12
40.52
1,344.05
60.78
2,016.07
60.00%
101.30
3,360.12
100.00%
0.00
0.00
03.00.00
03.01.00
03.01.01
03.01.02
03.01.03
03.01.04
ML
ML
ML
UND
123.00
123.00
123.00
1.00
1.08
6.56
4.69
188.75
132.84
806.88
576.87
188.75
123.00
123.00
123.00
1.00
132.84
806.88
576.87
188.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
123.00
123.00
123.00
1.00
132.84
806.88
576.87
188.75
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
03.02.00
03.02.01
03.02.02
03.02.03
03.02.05
03.02.06
03.02.07
ALUMBRADO
CONDUCTOR 2-1 X6MM2 NYY + 2.5MM2 NYY/T
POSTE DE 13M/400/180/380 C.A.C.
CRUZETA C.A.V. ASIMETRICO 1.50M-78KG
REFLECTOR C/LAMPARA 400W
EMPALME 3M-0 ( P/SUBTERRANEA)
HOYO PARA POSTE DE 13M/400/180/380
ML
UND
UND
UND
UND
UND
110.00
4.00
4.00
4.00
12.00
4.00
23.92
1,013.72
82.97
589.28
43.91
16.10
2,631.20
4,054.88
331.88
2,357.12
526.92
64.40
110.00
4.00
4.00
0.00
12.00
4.00
2,631.20
4,054.88
331.88
0.00
526.92
64.40
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
2,357.12
0.00
0.00
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
110.00
4.00
4.00
4.00
12.00
4.00
2,631.20
4,054.88
331.88
2,357.12
526.92
64.40
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
256386149.xls.ms_office
Pgina 14
Metrado
Precio
Unitario
Parcial
Valorizacin Anterior
Metrado
Parcial
Valorizacin Actual
Metrado
Parcial
% Avance
Valorizacin Acumulada
Metrado
Parcial
% Avance
Saldo x Valorizar
Metrado
Parcial
03.02.08
UND
4.00
12.39
49.56
4.00
49.56
0.00
0.00
0.00%
4.00
49.56
100.00%
0.00
0.00
04.00.00
04.01.00
04.02.00
04.03.00
04.04.00
04.05.00
04.06.00
ALUMBRADO PUBLICO
CONDUCTOR 2-1X6MM2 NYY
POSTE DE 8M/200/120/240/C.A.C.
PASTORAL PS 0.50/0.25/125 C.A.V.
LUMINARIA C/LAMPARA DE 70W
HOYO PARA POSTE DE 8M/120/240
SOLADO DE CONCRETO P/POSTE
ML
UND
UND
UND
UND
UND
80.00
3.00
3.00
3.00
3.00
3.00
19.42
537.32
171.50
330.59
12.88
12.39
1,553.60
1,611.96
514.50
991.77
38.64
37.17
80.00
3.00
3.00
0.00
3.00
3.00
1,553.60
1,611.96
514.50
0.00
38.64
37.17
0.00
0.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
991.77
0.00
0.00
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
80.00
3.00
3.00
3.00
3.00
3.00
1,553.60
1,611.96
514.50
991.77
38.64
37.17
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.00.00
05.01.00
05.01.01
M2
45.60
10.01
456.46
45.60
456.46
0.00
0.00
0.00%
45.60
456.46
100.00%
0.00
0.00
05.02.00
05.02.01
05.02.02
05.02.03
MOVIMIENTO DE TIERRAS
EXCAV. ZANJAS P/CIMIENTOS MAT.SUEL.H=0.70M.
REFINE, NIVELACION Y COMPACTACION/TERRENO NORMAL MANUAL
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
M3
M2
M3
3.60
3.00
4.32
18.75
11.52
52.32
67.50
34.56
226.02
3.60
3.00
4.32
67.50
34.56
226.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
3.60
3.00
4.32
67.50
34.56
226.02
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
05.03.00
05.03.01
05.03.02
05.03.03
CONCRETO SIMPLE
CIMIENTO CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
SOBRECIMIENTOS,CONCRETO C:H/1:8+25% P.M.
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO
M3
M3
M2
2.10
0.89
10.80
107.85
153.70
18.51
226.49
136.79
199.91
2.10
0.89
10.80
226.49
136.79
199.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
2.10
0.89
10.80
226.49
136.79
199.91
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
05.04.00
05.04.01
05.04.02
05.04.03
05.04.04
05.04.05
05.04.06
CONCRETO ARMADO
CONCRETO F'C 210 KG/CM2 VIGA
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 COLUMNA
ENCOFRADO Y DESENCOFRADO PARA COLUMNAS
ACERO F'Y 4200KG/CM2
M3
M2
KGR
M3
M2
KGR
0.11
1.44
10.20
0.30
4.50
32.40
230.96
30.70
2.20
294.63
26.83
2.20
25.41
44.21
22.44
88.39
120.74
71.28
0.11
1.44
10.20
0.30
4.50
32.40
25.41
44.21
22.44
88.39
120.74
71.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.11
1.44
10.20
0.30
4.50
32.40
25.41
44.21
22.44
88.39
120.74
71.28
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.05.00
05.05.01
MUROS Y TABIQUES
MURO LADR.K.K.ARC.SOGA MEZ.1:4 TIPO IV 1 CARAVISTA
M2
15.50
42.82
663.71
15.50
663.71
0.00
0.00
0.00%
15.50
663.71
100.00%
0.00
0.00
05.06.00
05.06.01
REVOQUES Y ENLUCIDOS
TARRAJ.COLUMNAS/VIGAS/SOBREC. MEZ.C:A 1:5, E=1.5CM
M2
8.10
19.14
155.03
8.10
155.03
0.00
0.00
0.00%
8.10
155.03
100.00%
0.00
11,096.71
1,664.51
1,109.67
13,870.89
12,648.98
14.33%
77,439.51
11,615.93
7,743.95
96,799.39
88,272.14
100.00%
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
COSTO TOTAL
COSTO TOTAL X FACTOR DE RELACION
15.00%
10.00%
77,439.51
11,615.93
7,743.95
96,799.39
88,272.14
256386149.xls.ms_office
66,342.80
9,951.42
6,634.28
82,928.50
75,623.16
0.00
0.00
0.00
0.00
0.00
0.00
Pgina 15
MONTO
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
REHABILITACION
LOSA DEPORTIVA Y REHAB.CERCO PERIMETRICO
374,691.62
143,664.95
77,439.51
COSTO DIRECTO
GASTOS GENERALES 15%
UTILIDAD 10%
COSTO TOTAL
IGV 18%
PRESUPUESTO TOTAL
595,796.08
89,369.41
59,579.61
744,745.10
134,054.12
878,799.22
Presupuesto Oferta
MONTO
348,370.02
138,647.34
67,443.93
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
COSTO TOTAL
IGV
PRESUPUESTO TOTAL
12.49%
10.00%
18.00%
554,461.29
69,231.81
55,446.13
679,139.23
122,245.06
801,384.29
Resumen
1.22%
11.27%
12.49%
10.00%
256386149.xls.ms_office
500.00
1,200.00
6,751.81
1,318.20
768.95
1,464.67
1,000.00
500.00
1.22%
2,000.00
1,500.00
800.00
1,200.00
1,000.00
26,000.00
1,500.00
190.00
500.00
4,200.00
4.00
4.00
4.00
4.00
4.00
42.00%
4.00
4.00
4.00
4.00
8,000.00
6,000.00
3,200.00
4,800.00
4,000.00
10,920.00
6,000.00
760.00
2,000.00
16,800.00
62,480.00
11.27%
55,446.13
12.49%
10.00%
Gastos Generales
256386149.xls.ms_office
PRESUPUESTO BASE
Obra
Supervisor
Contratista
Formula 01
Item
Presupuesto 01
01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
01.05.00
OBRAS PROVISIONALES
OFICINAS PROVISIONALES
CARTEL DE OBRA "CORDELICA"
CISTERNA APOYADA 4M3 DE ALBAILERIA
CERCO DE ESTERA C/PALOS DE EUCALIPTO
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
02.00.00
02.01.00
02.01.01
02.01.02
02.01.03
Unidad
Metrado
Precio
Unitario
Parcial
Subtotal
M2
GLB
UND
ML
GLB
50.00
2.00
1.00
85.00
1.00
50.58
2,000.00
539.83
12.00
1,874.24
2,529.00
4,000.00
539.83
1,020.00
1,874.24
9,963.07
CONSTRUCCION LABORAT.-BIBLIOTECA-COMPUTO
OBRAS PRELIMINARES
DEMOLICION DE MURO DE ALBAILERIA DE SOGA
TRAZADO Y REPLANTEO C/EQUIPO
LIMPIEZA DE TERRENO MANUAL
M2
M2
M2
4.90
314.00
314.00
10.01
1.38
1.61
49.05
433.32
505.54
987.91
02.02.00
02.02.01
02.02.02
02.02.03
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
REFINE, NIVELACION Y COMPACTACION/TERRENO NORMAL C/COMPACTAD
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
M3
M2
M3
140.14
314.00
168.17
18.75
2.04
52.32
2,627.63
640.56
8,798.65
12,066.84
02.03.00
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
CONCRETO SIMPLE
CIMIENTO CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
SOBRECIMIENTOS,CONCRETO C:H/1:8+25% P.M.
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO
FALSOPISO DE 4" CON MEZC.1:8 C:H
FALSA ZAPATA FC=100KG/CM2 /C:H 1:12+20%P.M.
M3
M3
M2
M2
M3
11.18
5.06
58.80
155.00
43.27
107.85
153.70
18.51
17.94
152.25
1,205.76
777.72
1,088.39
2,780.70
6,587.86
12,440.43
02.04.00
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
02.04.06
02.04.07
02.04.08
02.04.09
02.04.10
02.04.11
02.04.12
02.04.13
02.04.14
02.04.15
CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 ZAPATA
ACERO F'Y 4200KG/CM2
CONCRETO SOBRECIMIENTO ARMADO F'C=210KG/CM2
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTOS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 COLUMNA
ENCOFRADO Y DESENCOFRADO PARA COLUMNAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 VIGA
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 LOSA ALIGERADA
ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA
ACERO F'Y 4200KG/CM2
LADRILLO HUECO ARCILLA DE 15X30X30
37.87
830.97
3.25
35.28
500.30
12.67
151.67
2,359.50
29.78
249.53
3,670.60
65.41
383.40
1,964.60
3,110.40
208.99
2.20
253.51
18.80
2.20
294.63
26.83
2.20
230.96
30.70
2.20
220.81
19.34
2.20
1.41
7,914.45
1,828.13
823.91
663.26
1,100.66
3,732.96
4,069.31
5,190.90
6,877.99
7,660.57
8,075.32
14,443.18
7,414.96
4,322.12
4,385.66
78,503.38
02.05.00
02.05.01
02.05.02
MUROS Y TABIQUES
MURO LAD.KK.ARCILLA CABEZA MEZ.1:5 TIPO IV
MURO LADR.K.K.ARC.SOGA MEZ.1:4 TIPO IV
M2
M2
117.60
165.25
53.14
32.76
6,249.26
5,413.59
11,662.85
02.06.00
02.06.01
02.06.02
02.06.03
02.06.04
02.06.05
02.06.06
02.06.07
REVOQUES Y ENLUCIDOS
TARRAJEO MUROS EXT.FROTACHADO MEZ.1:4;E=1.5CM.
TARRAJEO MUROS INT.FROTACHADO MEZ C:A 1:4,E=1.5CM.
TARRAJ.VIGAS/COLUMNAS MEZ.1:5 E=1.5CM.
CIELORASO C/MEZ.1:4; E=1.5CM.
VESTIDURA DE DERRAMES MEZ.1:5; E=1.5CM.
BRUAS 1.0 CM.
TARRAJEO PRIMARIO O RAYADO MUROS INTERIOR
M2
M2
M2
M2
ML
ML
M2
331.00
303.10
219.95
323.30
214.30
113.40
6.85
10.98
10.06
17.62
15.49
6.28
3.20
9.88
3,634.38
3,049.19
3,875.52
5,007.92
1,345.80
362.88
67.68
17,343.37
02.07.00
02.07.01
02.07.02
02.07.03
02.07.04
PISOS Y PAVIMENTOS
PISO CEMENTO PULIDO/COLOREADO Y BRUADO E=2"
AFIRMADO DE E=.10M.
VEREDA 140 KG/CM2 E=.10M. INC.SARDINEL/ENCOFRADO
PISO CEMENTO FROTACHADO Y BRUADO E=2"
M2
M2
M2
M2
310.00
109.35
109.35
52.65
23.19
5.08
29.07
19.54
7,188.90
555.50
3,178.80
1,028.78
11,951.98
02.08.00
02.08.01
02.08.02
02.08.03
02.08.04
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO COLOREADO H=.10M.
CONTRAZOCALO DE CEMENTO FROTACHADO C:A/1:4 H=.30CM.
ZOCALO DE MAYOLICA DE 15X15 CM.BLANCA 1RA.
CONTRAZOCALO DE CEMENTO FROTACHADO C:A/1:4 H=.15M.
ML
ML
M2
ML
148.75
21.25
6.85
85.20
5.56
7.07
45.39
5.21
827.05
150.24
310.92
443.89
1,732.10
02.09.00
02.09.01
COBERTURA
CUB.LADR.PAST.24X24 ASENT.C/MEZ.1:5 2.5CM;JUNTA 1:5 1.5CM
M2
167.90
21.51
3,611.53
3,611.53
02.10.00
02.10.01
02.10.02
02.10.03
02.10.04
02.10.05
CARPINTERIA METALICA
PUERTA DE FIERRO C/VARILLA DE SEGURIDAD
VENTANA DE FIERRO C/VARILLA DE SEGURIDAD DE 5/8"
MALLA METALICA
REJA DE SEGURIDAD PARA PUERTA
REJA METALICA CON MALLA EN DEPOSITO DE EQUIPO DE GAS
M2
M2
M2
M2
M2
10.10
76.90
36.05
6.75
6.30
198.81
262.66
92.58
118.13
169.24
2,007.98
20,198.55
3,337.51
797.38
1,066.21
27,407.63
02.11.00
02.11.01
CARPINTERIA DE MADERA
TAPAS DE TABLERO DE MADERA CEDRO C/TORN 0.50X0.70M
M2
4.90
171.78
841.72
841.72
M3
KG
M3
M2
KG
M3
M2
KG
M3
M2
KG
M3
M2
KG
UND
256386149.xls.ms_office
PRESUPUESTO BASE
Obra
Supervisor
Contratista
Formula 01
Item
Presupuesto 01
02.12.00
02.12.01
02.12.02
02.12.03
CERRAJERIA
BISAGRA DE F.E. 4" S/CAP. INC. COLOCACION
CERRADURA P/PUERTA EXTER.TRES GOLPES T/YALE /MANIJA DE BRONC
BISAGRA DE FIERRO DE 2 1/2" INC. COLOCACION
02.13.00
02.13.01
Unidad
Metrado
Precio
Unitario
Parcial
Subtotal
PZA
UND
PZA
28.00
7.00
360.00
3.47
76.25
3.07
97.16
533.75
1,105.20
1,736.11
VIDRIOS Y CRISTALES
VIDRIOS Y CRISTALES SEMIDOBLES NACIONALES
P2
936.50
4.10
3,839.65
3,839.65
02.14.00
02.14.01
02.14.02
02.14.03
02.14.04
02.14.05
02.14.06
02.14.07
PINTURA
PINTURA CIELORASOS AL TEMPLE
PINTURA EN MUROS EXTERIORES C/LATEX
PINTURA EN MUROS INTERIORES C/LATEX
PINTURA EN VIGAS Y COLUMNAS
PINTURA EN CARPINTERIA METALICA I/ANTICO RROSIVO
PINTURA EN CONTRAZOCALOS CON ESMALTE-2 MANOS
PINTURA EN MURO DE PIZARRA (03 MANOS)
M2
M2
M2
M2
M2
ML.
M2
328.30
331.00
303.10
219.95
121.60
19.20
18.00
7.69
10.25
9.51
10.22
12.11
2.12
10.38
2,524.63
3,392.75
2,882.48
2,247.89
1,472.58
40.70
186.84
12,747.87
02.15.00
02.15.01
02.15.02
02.15.03
02.15.04
VARIOS
PIZARRA
MARCO PERIMETRAL P/PIZARRA DE MADERA
TICERO DE MADERA
EQUIPO DE GAS 100 LBS
UND
ML
ML
UND
3.00
37.20
15.00
2.00
109.91
21.22
11.82
358.64
329.73
789.38
177.30
717.28
2,013.69
03.00.00
03.01.00
03.01.01
03.01.02
M2
M2
24.00
24.00
1.38
1.61
33.12
38.64
71.76
03.02.00
03.02.01
03.02.02
03.02.03
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
REFINE, NIVELACION Y COMPACTACION/TERRENO NORMAL C/COMPACTAD
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
M3
M2
M3
25.96
24.00
31.15
18.75
2.04
52.32
486.75
48.96
1,629.77
2,165.48
03.03.00
03.03.01
03.03.02
03.03.03
CONCRETO SIMPLE
FALSOPISO DE 4" CON MEZC.1:8 C:H
FALSA ZAPATA FC=100KG/CM2 /C:H 1:12+20%P.M.
CIMIENTO CORRIDO MEZCLA 1:10+30% P.G.
M2
M3
M3
24.00
7.13
5.55
17.94
152.25
107.85
430.56
1,085.54
598.57
2,114.67
03.04.00
03.04.01
03.04.02
03.04.03
03.04.04
03.04.05
03.04.06
03.04.07
03.04.08
03.04.09
03.04.10
03.04.11
03.04.12
03.04.13
03.04.14
03.04.15
03.04.16
03.04.17
CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 ZAPATA
ACERO F'Y 4200KG/CM2
CONCRETO SOBRECIMIENTO ARMADO F'C=210KG/CM2
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTOS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 COLUMNA
ENCOFRADO Y DESENCOFRADO PARA COLUMNAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 VIGA
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 LOSA ALIGERADA
ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA
ACERO F'Y 4200KG/CM2
CONCRETO 210KG/CM2 EN ESCALERAS
ENCOFRADO Y DESENCOFRADO DE ESCALERAS
ACERO F'Y 4200KG/CM2
M3
KG
M3
M2
KG
M3
M2
KG
M3
M2
KG
M3
M2
KG
M3
M2
KG
5.56
73.12
2.40
12.00
62.10
3.68
48.64
439.94
2.84
28.20
268.00
1.50
31.62
104.50
3.10
10.20
219.30
208.99
2.20
253.51
18.80
2.20
294.63
26.83
2.20
230.96
30.70
2.20
220.81
19.34
2.20
294.63
39.41
2.20
1,161.98
160.86
608.42
225.60
136.62
1,084.24
1,305.01
967.87
655.93
865.74
589.60
331.22
611.53
229.90
913.35
401.98
482.46
10,732.31
03.05.00
03.05.01
03.05.02
MUROS Y TABIQUES
MURO LAD.KK.ARCILLA CABEZA MEZ.1:5 TIPO IV
MURO LADR.K.K.ARC.SOGA MEZ.1:4 TIPO IV
M2
M2
37.00
26.00
53.14
32.76
1,966.18
851.76
2,817.94
03.06.00
03.06.01
03.06.02
03.06.03
03.06.04
03.06.05
03.06.06
REVOQUES Y ENLUCIDOS
TARRAJEO MUROS INT.FROTACHADO MEZ C:A 1:4,E=1.5CM.
TARRAJEO MUROS EXT.FROTACHADO MEZ.1:4;E=1.5CM.
TARRAJ.VIGAS/COLUMNAS MEZ.1:5; E=1.5CM.
VESTIDURA DE DERRAMES MEZ.1:5; E=1.5CM.
CIELORASO C/MEZ.1:4; E=1.5CM.
BRUAS 1.0 CM.
M2
M2
M2
ML
M2
ML
33.18
92.82
17.60
6.00
24.00
87.00
10.06
10.98
17.62
6.28
15.49
3.20
333.79
1,019.16
310.11
37.68
371.76
278.40
2,350.90
03.07.00
03.07.01
03.07.02
03.07.03
03.07.04
03.07.05
PISOS Y PAVIMENTOS
PISO CEMENTO PULIDO/COLOREADO Y BRUADO E=2"
AFIRMADO DE E=.10M.
VEREDA 140 KG/CM2 E=.10M. INC.SARDINEL/ENCOFRADO
FROT. Y REVEST. DE GRAD. Y ESC. DE CEMENTO
REVEST. DE DESCANSO EN ESCALERAS C/CEMENTO PULIDO
M2
M2
M2
M2
M2
15.34
5.10
5.10
31.50
5.10
23.19
5.08
29.07
13.24
13.12
355.73
25.91
148.26
417.06
66.91
1,013.87
03.08.00
03.08.01
03.08.02
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO C:A/1:5 H=.10M.
CONTRAZOCALO DE CEMENTO FROTACHADO C:A/1:4 H=.30M.
ML
ML
18.20
13.60
5.16
7.07
93.91
96.15
190.06
256386149.xls.ms_office
PRESUPUESTO BASE
Obra
Supervisor
Contratista
Formula 01
Item
Presupuesto 01
03.09.00
03.09.01
03.09.02
CARPINTERIA DE MADERA
PUERTA APANELADA DE MADERA
VENTANA DE FIERRO
03.10.00
03.10.01
03.10.02
03.10.03
Unidad
Metrado
Precio
Unitario
Parcial
Subtotal
M2
M2
3.30
0.60
279.07
78.82
920.93
47.29
968.22
CERRAJERIA
BISAGRA CAPUCHINA 3.5"X3.5" ALUM.INC.COLOC.
CERRAD.P/PUERTA EXTER.DE TRES GOLPES T/YALE I/MANIJA
BISAGRA DE FIERRO DE 2 1/2" INC. COLOCACION
PZA
UND
PZA
8.00
2.00
2.00
8.83
76.25
3.07
70.64
152.50
6.14
229.28
03.11.00
03.11.01
03.11.02
03.11.03
03.11.04
03.11.05
03.11.06
03.11.07
PINTURA
PINTURA CIELORASOS AL TEMPLE
PINTURA EN MUROS INTERIORES C/LATEX
PINTURA EN MUROS EXTERIORES C/LATEX
BARNIZ EN CARPINTERIA DE MADERA
PINTURA EN CARPINTERIA METALICA
PINTURA EN CONTRAZOCALOS CON ESMALTE-2 MANOS
PINTURA EN PASAMANOS CON ESMALTE
M2
M2
M2
M2
M2
ML.
ML
24.00
33.18
92.82
6.60
0.60
27.50
12.00
7.69
9.51
10.25
18.30
12.11
2.12
10.99
184.56
315.54
951.41
120.78
7.27
58.30
131.88
1,769.74
03.12.00
03.12.01
03.12.02
03.12.03
VARIOS
CANTONERAS DE ALUMINIO PARA ARISTAS DE ESCALERA 2"X1/8"
PASAMANOS DE F.G.2" INC.COLOC.
CUB.LADR.PAST.24X24 ASENT.C/MEZ.1:5 2.5CM;JUNTA 1:5 1.5CM
ML
ML
M2
31.50
12.00
23.80
21.24
97.54
21.51
669.06
1,170.48
511.94
2,351.48
04.00.00
04.01.00
04.01.01
M2
1,323.70
1.38
1,826.71
1,826.71
04.02.00
04.02.01
04.02.02
04.02.03
04.02.04
MOVIMIENTO DE TIERRAS
EXCAV. ZANJAS P/CIMIENTOS MAT.SUEL.
RELLENO Y COMPACTACION DE ZANJA C/MATERIAL PROPIO
REFINE, NIVELACION Y COMPACTACION/TERRENO NORMAL C/COMPACTAD
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
M3
M3
M2
M3
58.57
20.00
1,323.70
30.48
18.75
28.43
2.04
52.32
1,098.19
568.60
2,700.35
1,594.71
5,961.85
04.03.00
04.03.01
04.03.02
04.03.03
04.03.04
CONCRETO SIMPLE
CIMIENTO CORRIDO MEZCLA 1:10+30% P.G.
SOBRECIMIENTOS,CONCRETO C:H/1:8+25% P.M.
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO
FALSOPISO DE 4" CON MEZC.1:8 C:H
M3
M3
M2
M2
34.15
0.68
4.80
54.26
107.85
153.70
18.51
17.94
3,683.08
104.52
88.85
973.42
4,849.87
04.04.00
04.04.01
04.04.02
04.04.03
04.04.04
04.04.05
04.04.06
04.04.07
VEREDAS Y RAMPAS
AFIRMADO DE E=.10M.
VEREDA 140 KG/CM2 E=.10M. INC.SARDINEL/ENCOFRADO
JUNTA DE DILATACION C/ASFALTO
CONCRETO F'C=140KG/CM2 GRADAS Y RAMPAS
ENCOFRADO Y DESENCOFRADO DE GRADAS Y RAMPAS
AFIRMADO DE E=.10M.
PISO CEMENTO FROTACHADO Y BRUADO E=2"
M2
M2
ML
M3
M2
M2
M2
790.60
790.60
201.00
3.18
31.65
31.65
31.65
5.08
29.07
1.88
207.89
30.26
5.08
19.54
4,016.25
22,982.74
377.88
661.09
957.73
160.78
618.44
29,774.91
04.05.00
04.05.01
04.05.02
04.05.03
04.05.04
04.05.05
04.05.06
04.05.07
04.05.08
04.05.09
04.05.10
04.05.11
04.05.12
04.05.13
CONCRETO ARMADO
CONCRETO SOBRECIMIENTO ARMADO F'C=210KG/CM2
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTOS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 COLUMNA
ENCOFRADO Y DESENCOFRADO PARA COLUMNAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 VIGA
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 LOSA ALIGERADA
ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA
ACERO F'Y 4200KG/CM2
LADRILLO HUECO ARCILLA DE 15X30X30
M3
M2
KG
M3
M2
KG
M3
M2
KG
M3
M2
KG
UND
11.83
41.59
358.13
3.49
56.24
402.03
4.06
13.55
596.15
4.61
54.26
273.14
542.63
253.51
18.80
2.20
294.63
26.83
2.20
230.96
30.70
2.20
220.81
19.34
2.20
1.41
2,999.02
781.89
787.89
1,028.26
1,508.92
884.47
937.70
415.99
1,311.53
1,017.93
1,049.39
600.91
765.11
14,089.01
04.06.00
04.06.01
04.06.02
04.06.03
04.06.04
04.06.05
04.06.06
04.06.07
VARIOS
REMOCION DE TERRENO
PUNTOS DE NIVEL C/TEODOLITO
SEMBRADO DE JARDINES CON CESPED INC./REGADO
MANTENIMIENTO DE SIEMBRA
APLICACION DE FERTILIZANTES
APLICACION DE HERBISIDAS
CORTE DE CESPED
M2
M2
M2
M2
M2
M2
M2
382.00
382.00
382.00
382.00
382.00
382.00
382.00
2.13
0.11
5.92
0.33
1.11
0.71
1.55
813.66
42.02
2,261.44
126.06
424.02
271.22
592.10
4,530.52
05.00.00
05.01.00
05.01.01
05.01.02
05.01.03
M3
M2
M3
0.45
45.45
17.00
262.52
10.01
52.32
118.13
454.95
889.44
1,462.52
05.02.00
05.02.01
MUROS Y TABIQUES
MURO LAD.KK.ARCILLA CABEZA MEZ.1:5 TIPO IV
M2
98.95
53.14
5,258.20
256386149.xls.ms_office
PRESUPUESTO BASE
Obra
Supervisor
Contratista
Formula 01
Item
Presupuesto 01
Descripcin de la Partida
Unidad
Metrado
Precio
Unitario
Parcial
Subtotal
05.02.02
05.02.03
M2
M2
30.00
8.20
32.76
72.25
982.80
592.45
6,833.45
05.03.00
05.03.01
05.03.02
05.03.03
05.03.04
05.03.05
05.03.06
REVOQUES Y ENLUCIDOS
CIELORASO C/MEZ.1:4; E=1.5CM.
TARRAJEO MUROS EXT.FROTACHADO MEZ.1:4;E=1.5CM.
TARRAJEO MUROS INT.FROTACHADO MEZ C:A 1:4,E=1.5CM.
TARRAJEO PRIMARIO O RAYADO MUROS INTERIOR
VESTIDURA DE DERRAMES MEZ.1:5; E=1.5CM.
BRUAS 1.0 CM.
M2
M2
M2
M2
ML
ML
40.25
78.05
100.85
87.25
56.80
59.00
15.49
10.98
10.06
9.88
6.28
3.20
623.47
856.99
1,014.55
862.03
356.70
188.80
3,902.54
05.04.00
05.04.01
05.04.02
05.04.03
05.04.04
05.04.05
PISOS Y CONTRAPISOS
FALSOPISO DE 4" CON MEZC.1:8 C:H
CONTRAPISO E=48MM. BASE 3.8CM.MEZ.1:5,ACAB.1CM.PASTA 1:2
PISO CEMENTO PULIDO/COLOR Y BRUADO E=2"
PISO DE LOSETA VENECIANA 30X30 CM. COLOR GRIS CLARO
PISO DE MAYOLICA BLANCA DE 15X15 DE PRIMERA
M2
M2
M2
M2
M2
38.65
1.35
11.20
27.45
1.35
17.94
18.67
23.19
36.71
41.22
693.38
25.20
259.73
1,007.69
55.65
2,041.65
05.05.00
05.05.01
05.05.02
05.05.03
05.05.04
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO COLOREADO H=0.10M
CONTRAZOCALO DE CEMENTO FROTACHADO C:A/1:4 H=.15M.
CONTRAZOCALO DE CEMENTO FROTACHADO C:A/1:5 H=.30M.
ZOCALO DE MAYOLICA DE 15X15 CM.BLANCA 1RA.
ML
ML
ML
M2
12.35
24.90
3.00
87.25
5.56
5.21
6.51
45.39
68.67
129.73
19.53
3,960.28
4,178.21
05.06.00
05.06.01
CARPINTERIA DE MADERA
PUERTA APANELADA DE MADERA
M2
16.40
279.07
4,576.75
4,576.75
05.07.00
05.07.01
05.07.02
CARPINTERIA METALICA
VENTANA DE FIERRO
VENTANAS TIPO REJAS R-5, R-6
M2
M2
2.75
4.30
78.82
110.54
216.76
475.32
692.08
05.08.00
05.08.01
05.08.02
05.08.03
05.08.04
05.08.05
05.08.06
05.08.07
CERRAJERIA
CERRADURA P/PUERTA EXTER.TRES GOLPES T/YALE /MANIJA DE BRONC
CERRADURA P/PUERTA INTERIOR T/YALE O SIMILAR
BISAGRA CAPUCHINA 3.5"X3.5" ALUM.INC.COLOC.
BISAGRA CAPUCHINA 3"X3" ALUM.INC.COLOC.
CERROJO DE ALUMINIO DE 3"
TIRADOR DE ALUMINIO DE 3"
TUBO CROMADO Y CANOPLA P/DUCHA DE 3/4"
UND
UND
PZA
PZA
UND
UND
UND
4.00
1.00
20.00
18.00
6.00
6.00
1.00
76.25
66.25
8.83
8.76
9.64
10.64
29.47
305.00
66.25
176.60
157.68
57.84
63.84
29.47
856.68
05.09.00
05.09.01
VIDRIOS Y CRISTALES
VIDRIOS Y CRISTALES SEMIDOBLES NACIONALES
P2
29.55
4.10
121.16
121.16
05.10.00
05.10.01
05.10.02
05.10.03
05.10.04
PINTURA
PINTURA CIELORASOS AL TEMPLE
PINTURA EN MUROS EXTERIORES C/LATEX
PINTURA EN MUROS INTERIORES C/LATEX
PINTURA EN CONTRAZOCALOS CON ESMALTE-2 MANOS
M2
M2
M2
ML.
40.25
81.75
108.50
27.90
7.69
10.25
9.51
2.12
309.52
837.94
1,031.84
59.15
2,238.45
05.11.00
05.11.01
05.11.02
VARIOS
SARDINEL EN DUCHA
CUB.LADR.PAST.24X24 ASENT.C/MEZ.1:5 2.5CM;JUNTA 1:5 1.5CM
ML
M2
1.80
49.55
133.66
21.51
240.59
1,065.82
1,306.41
05.12.00
05.12.01
05.12.02
05.12.03
05.12.04
05.12.05
05.12.06
05.12.07
05.12.08
05.12.09
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
6.00
2.00
2.00
1.00
2.00
1.00
2.00
1.00
11.00
174.38
259.38
139.38
88.60
18.50
19.84
23.22
73.60
31.34
1,046.28
518.76
278.76
88.60
37.00
19.84
46.44
73.60
344.74
2,454.02
06.00.00
06.01.00
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
CONSTRUCCION CAMERINOS
MUROS Y TABIQUES
MURO LAD.KK.ARCILLA CABEZA MEZ.1:5 TIPO IV
MURO LADR.K.K.ARC.SOGA MEZ.1:4 TIPO IV
MURO LADR.K.K.ARC.CANTO MEZ.1:4 TIPO IV
MURO LADR.K.K.ARC.CABEZA TIPO IV 1 CARAVISTA
MURO LADR.K.K.ARC.SOGA MEZ.1:4 TIPO IV 1 CARAVISTA
M2
M2
M2
M2
M2
31.80
20.00
1.00
18.50
13.20
53.14
32.76
22.10
72.25
42.82
1,689.85
655.20
22.10
1,336.63
565.22
4,269.00
06.02.00
06.02.01
06.02.02
06.02.03
06.02.04
06.02.05
REVOQUES Y ENLUCIDOS
CIELORASO C/MEZ.1:4; E=1.5CM.
TARRAJEO MUROS EXT.FROTACHADO MEZ.1:4;E=1.5CM.
TARRAJEO MUROS INT.FROTACHADO MEZ C:A 1:4,E=1.5CM.
TARRAJEO PRIMARIO O RAYADO MUROS INTERIOR
BRUAS 1.0 CM.
M2
M2
M2
M2
ML
15.60
30.00
24.00
65.80
28.40
15.49
10.98
10.06
9.88
3.20
241.64
329.40
241.44
650.10
90.88
1,553.46
06.03.00
PISOS Y CONTRAPISOS
256386149.xls.ms_office
PRESUPUESTO BASE
Obra
Supervisor
Contratista
Formula 01
Item
Presupuesto 01
Unidad
Metrado
Precio
Unitario
Parcial
Subtotal
06.03.01
06.03.02
06.03.03
06.03.04
M2
M2
M2
M2
18.40
4.90
13.50
4.90
17.94
18.67
36.71
41.22
330.10
91.48
495.59
201.98
1,119.15
06.04.00
06.04.01
06.04.02
06.04.03
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO FROTACHADO C:A/1:5 H=.10M.
CONTRAZOCALO DE CEMENTO FROTACHADO C:A/1:5 H=.30M.
ZOCALO DE MAYOLICA DE 15X15 CM.BLANCA 1RA.
ML
ML
M2
19.60
6.55
65.80
4.95
6.51
45.39
97.02
42.64
2,986.66
3,126.32
06.05.00
06.05.01
CARPINTERIA DE MADERA
PUERTA APANELADA DE MADERA
M2
3.80
279.07
1,060.47
1,060.47
06.06.00
06.06.01
CARPINTERIA METALICA
VENTANA DE FIERRO TIPO C-6
M2
3.70
106.21
392.98
392.98
06.07.00
06.07.01
06.07.02
06.07.03
CERRAJERIA
CERRADURA P/PUERTA EXTER.TRES GOLPES T/YALE /MANIJA DE BRONC
BISAGRA CAPUCHINA 3.5"X3.5" ALUM.INC.COLOC.
TUBO CROMADO Y CANOPLA P/DUCHA DE 3/4"
UND
PZA
UND
2.00
8.00
6.00
76.25
8.83
29.47
152.50
70.64
176.82
399.96
06.08.00
06.08.01
06.08.02
06.08.03
06.08.04
06.08.05
06.08.06
PINTURA
PINTURA CIELORASOS AL TEMPLE
PINTURA EN CONTRAZOCALOS CON ESMALTE-2 MANOS
PINTURA EN CARPINTERIA METALICA
BARNIZ EN CARPINTERIA DE MADERA
PINTURA EN MUROS EXTERIORES C/LATEX
PINTURA EN MUROS INTERIORES C/LATEX
M2
ML.
M2
M2
M2
M2
15.60
19.60
3.70
7.60
30.80
24.00
7.69
2.12
12.11
18.30
10.25
9.51
119.96
41.55
44.81
139.08
315.70
228.24
889.34
06.09.00
06.09.01
06.09.02
06.09.03
VARIOS
JUNTAS DE DILATACION 1"
SARDINEL EN DUCHA
CUB.LADR.PAST.24X24 ASENT.C/MEZ.1:5 2.5CM;JUNTA 1:5 1.5CM
ML
ML
M2
6.00
5.40
20.40
14.52
15.88
21.51
87.12
85.75
438.80
611.67
06.10.00
06.10.01
06.10.02
06.10.03
06.10.04
06.10.05
06.10.06
BANCAS DE CONCRETO
BASE DE CONCRETO P/MUEBLES BAJOS E=10CM
ENCOFRADO Y DESENCOFRADO DE 0.75 DE ALTO
ACERO GRADO 60 PROMEDIO
TARRAJEO INTERIOR/EXTER. MORTERO C:A/1:5 INC.DERRAMES
LADRILLO KK DE CANTO/C:A 1:4
MAYOLICA NACIONAL BLANCA DE PRIMERA 15 X 15 CM.
M2
M2
KG
M2
M2
M2
2.90
2.90
31.00
3.92
2.00
1.60
22.78
21.18
2.20
12.75
25.26
45.39
66.06
61.42
68.20
49.98
50.52
72.62
368.80
06.11.00
06.11.01
06.11.02
06.11.03
06.11.04
06.11.05
06.11.06
APARATOS SANITARIOS/ACCESORIOS
DUCHAS CROMADAS DE CABEZA GIRATORIA
TOALLERA DE LOZA BLANCO DOBLE
JABONER.DE LOSA COLOR BLANCO SIMPLE DE 15X15CM.C/AGARRA.1/2"
GRIFERIA PARA DUCHAS
COLOCACION DE ACCESORIOS PARA SS.HH.
COLOCACION DE APARATOS SANITARIOS
PZA
PZA
PZA
PZA
UND
UND
6.00
6.00
7.00
7.00
20.00
6.00
88.60
23.22
19.84
73.60
10.88
54.38
531.60
139.32
138.88
515.20
217.60
326.28
1,868.88
07.00.00
07.01.00
07.01.01
07.01.02
07.01.03
07.01.04
07.01.05
07.01.06
07.01.07
07.01.08
07.01.09
07.01.10
07.01.11
07.01.12
07.01.13
07.01.14
07.01.15
07.01.16
07.01.17
07.01.18
07.01.19
07.01.20
07.01.21
PTO
ML
ML
ML
ML
PTO
PZA
PZA
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
PZA
UND
ML
34.00
58.00
17.00
40.00
5.00
16.00
8.00
4.00
1.00
1.00
2.00
10.00
4.00
6.00
3.00
4.00
2.00
2.00
2.00
12.00
125.00
76.26
24.38
17.31
18.94
40.60
62.46
33.62
27.45
161.84
166.09
189.69
24.53
13.45
19.32
26.03
21.61
17.23
19.89
44.08
30.79
1.51
2,592.84
1,414.04
294.27
757.60
203.00
999.36
268.96
109.80
161.84
166.09
379.38
245.30
53.80
115.92
78.09
86.44
34.46
39.78
88.16
369.48
188.75
8,647.36
07.02.00
07.02.01
07.02.02
07.02.03
07.02.04
07.02.05
PTO
PZA
PZA
PZA
UND
43.00
5.00
14.00
5.00
9.00
35.87
51.03
34.50
34.70
84.56
1,542.41
255.15
483.00
173.50
761.04
256386149.xls.ms_office
PRESUPUESTO BASE
Obra
Supervisor
Contratista
Formula 01
Item
Descripcin de la Partida
Metrado
Precio
Unitario
Parcial
Subtotal
07.02.06
07.02.07
07.02.08
07.02.09
07.02.10
07.02.11
07.02.12
07.02.13
07.02.14
07.02.15
07.02.16
07.02.17
07.02.18
07.02.19
07.02.20
07.02.21
07.02.22
UND
ML
ML
ML
ML
ML
UND
UND
UND
UND
UND
UND
UND
UND
UND
ML
ML
15.00
4.00
73.00
17.00
5.00
35.00
10.00
10.00
30.00
1.00
1.00
8.00
9.00
2.00
3.00
2.00
145.00
71.54
9.30
10.14
11.28
12.60
15.92
15.62
21.32
9.80
15.06
25.53
6.18
7.87
11.00
21.17
13.90
1.80
1,073.10
37.20
740.22
191.76
63.00
557.20
156.20
213.20
294.00
15.06
25.53
49.44
70.83
22.00
63.51
27.80
261.00
7,076.15
08.00.00
08.01.00
08.01.01
08.01.02
08.01.03
08.01.04
08.01.05
08.01.06
PTO
PTO
UND
PTO
PTO
UND
UND
24.00
18.00
1.00
2.00
38.00
1.00
1.00
69.19
68.59
99.97
113.58
81.65
647.61
407.06
1,660.56
1,234.62
99.97
227.16
3,102.70
647.61
407.06
7,379.68
08.02.00
08.02.01
08.02.02
08.02.03
08.02.04
08.02.05
UND
UND
UND
UND
UND
18.00
6.00
9.00
7.00
2.00
151.87
171.87
106.87
46.87
17.25
2,733.66
1,031.22
961.83
328.09
34.50
5,089.30
09.00.00
09.01.01
09.01.02
09.01.03
UND
PTO
PTO
1.00
7.00
7.00
112.04
82.51
91.79
112.04
577.57
642.53
1,332.14
09.02.00
09.02.01
09.02.02
09.02.03
09.02.04
09.02.05
09.02.06
09.02.07
09.02.08
ARTEFACTOS DE ALUMBRADO
EQUIPO FLUORESCENTE TIPO BE-1/40W
EQUIPO FLUORESCENTE CIRCULAR CIR-1/22W
ARTEFACTO WALL SOCKET WS-150 P/PARED C/LAMPARA 100W
ARTEFACTO COMPLETO GV-110 C/LAMPARA 100W
SALIDA PARA TOMACORRIENTES
SALIDA PARA TOMACORRIENTES TOMA A TIERRA
TABLERO DE DISTRIBUCION TD-2 S/PLANO
POZO DE TIERRA
UND
UND
UND
UND
PTO
PTO
UND
UND
4.00
2.00
3.00
5.00
3.00
2.00
1.00
1.00
111.87
106.87
17.25
46.87
43.54
78.99
566.29
382.12
447.48
213.74
51.75
234.35
130.62
157.98
566.29
382.12
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
COSTO TOTAL
IGV
PRESUPUESTO TOTAL
Presupuesto 01
Unidad
CD_01
15.00%
10.00%
18.00%
2,184.33
374,691.62
56,203.74
37,469.16
468,364.52
84,305.61
552,670.13
256386149.xls.ms_office
PRESUPUESTO BASE
Obra
Supervisor
Contratista
Formula 02
Item
Presupuesto 02
Descripcin de la Partida
Unidad
Metrado
Precio
Unitario
Parcial
Subtotal
01.00.00
01.01.00
01.01.01
01.01.02
M2
M2
662.00
662.00
6.64
1.38
4,395.68
913.56
5,309.24
01.02.00
01.02.01
MOVIMIENTO DE TIERRAS
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
M3
175.50
52.32
9,182.16
9,182.16
01.03.00
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
PISOS Y PAVIMENTOS
PREPARACION DE SUBRASANTE
AFIRMADO DE E=.10M.
LOSA DE CONCRETO F'C=175KG/CM2 E=0.10M
VEREDA 140 KG/CM2 E=.10M. INC.SARDINEL/ENCOFRADO
AFIRMADO DE E=.10M.
M2
M2
M2
M2
M2
675.00
675.00
675.00
77.80
77.80
2.63
5.08
39.83
29.07
5.08
1,775.25
3,429.00
26,885.25
2,261.65
395.22
34,746.37
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
M2
M2
M2
P2
51.80
37.20
10.50
85.00
21.01
5.72
10.01
18.44
1,088.32
212.78
105.11
1,567.40
2,973.61
03.00.00
03.01.00
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
03.01.08
03.01.09
03.01.10
03.01.11
03.01.12
03.01.13
03.01.14
VARIOS
MURO LADR.K.K.ARC.SOGA MEZ.1:4 TIPO IV
CONTRAPISO E=48MM. BASE 3.8CM.MEZ.1:5,ACAB.1CM.PASTA 1:2
PISO DE CERAMICA T/CELIMA DE 20X20
TARRAJEO PRIMARIO O RAYADO MUROS INTERIOR
TARRAJEO MUROS EXT.FROTACHADO MEZ.1:4;E=1.5CM.
TARRAJEO MUROS INT.FROTACHADO MEZ.1:4;E=1.5CM.
ZOCALO DE MAYOLICA DE 15X15 CM.BLANCA 1RA.
VIDRIOS Y CRISTALES SEMIDOBLES NACIONALES
CERRADURA P/PUERTA INTERIOR T/YALE O SIMILAR
PINTURA CIELORASOS AL TEMPLE
PINTURA EN MUROS EXTERIORES C/LATEX
PINTURA EN MUROS INTERIORES C/LATEX
PINTURA ESMALTE CON BASEANTICORROSIVA EN CARP. METALICA
PINTURA ESMALTE EN CARPINTERIA DE MADERA
M2
M2
M2
M2
M2
M2
M2
P2
UND
M2
M2
M2
M2
M2
10.50
51.80
51.80
54.20
10.50
10.50
54.20
85.00
15.00
1,419.00
1,644.00
1,930.00
166.00
251.50
32.76
18.67
52.98
9.88
10.98
10.06
45.39
4.10
66.25
7.69
10.25
9.51
12.11
10.97
343.98
967.11
2,744.36
535.50
115.29
105.63
2,460.14
348.50
993.75
10,912.11
16,851.00
18,354.30
2,010.26
2,758.96
59,500.89
04.00.00
04.01.00
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.01.11
04.01.12
INSTALACIONES ELECTRICAS
DESMONTAJE DE ACCESORIOS ELECTRICOS
DESMONTAJE DE TOMACORRIENTES MONOFASICOS DOBLES
DESMONTAJE DE INTERRUPTORES UNIPOLAR SIMPLE
DESMONTAJE DE INTERRUPTORES UNIPOLAR DOBLE
DESMONTAJE DE INTERRUPTORES DE CONMUTACION
DESMONTAJE DE TIMBRE C/PULSADOR
DESMONTAJE DE WALL SOCKET
DESMONTAJE DE FLUORESCENTE BE 1/40W
DESMONTAJE DE FLUORESCENTE BE 2/40W
DESMONTAJE DE FLUORESCENTE BE 3/40W
DESMONTAJE DE FLUORESCENTE JCM 1/40W
DESMONTAJE DE GLOBO DE VIDRIO GV -110 C/LAMPARA
DESMONTAJE DE REFLECTOR RLM-D C/LAMPARA VAPOR DE MERC.400W
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
9.00
5.00
3.00
2.00
1.00
1.00
9.00
60.00
3.00
3.00
3.00
2.00
12.21
12.21
12.21
12.21
24.41
9.78
19.53
19.53
19.53
19.53
19.53
19.53
109.89
61.05
36.63
24.42
24.41
9.78
175.77
1,171.80
58.59
58.59
58.59
39.06
1,828.58
05.00.00
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.01.08
05.01.09
05.01.10
05.01.11
05.01.12
UND
UND
UND
UND
UND
ML
ML
UND
UND
UND
UND
UND
54.00
26.00
5.00
23.00
3.00
32.00
21.00
9.00
5.00
3.00
2.00
1.00
23.76
25.67
12.67
12.67
16.47
14.43
15.03
28.32
22.45
26.11
31.24
135.20
1,283.04
667.42
63.35
291.41
49.41
461.76
315.63
254.88
112.25
78.33
62.48
135.20
3,775.16
05.02.00
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.02.06
05.02.07
ARTEFACTOS DE ILUMINACION
ARTEFACTO WALL SOCKET WS-150 P/PARED C/LAMPARA 100W
EQUIPO FLUORESCENTE TIPO BE-1/40W
EQUIPO FLUORESCENTE TIPO BE-2/40W
EQUIPO FLUORESCENTE TIPO BE-3/40W
EQUIPO FLUORESCENTE JCM 1/40W
ARTEFACTO COMPLETO GV-110 C/LAMPARA 100W
REFLECTOR T/RLM-D C/LAMPARA DE VAPOR DE MERCURIO DE 400W
UND
UND
UND
UND
UND
UND
UND
1.00
9.00
60.00
3.00
3.00
3.00
2.00
17.25
111.87
151.87
171.87
111.87
46.87
116.87
17.25
1,006.83
9,112.20
515.61
335.61
140.61
233.74
11,361.85
06.00.00
ALIMENTADORES
256386149.xls.ms_office
PRESUPUESTO BASE
Obra
Supervisor
Contratista
Formula 02
Item
06.01.00
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.01.08
06.01.09
06.01.10
06.01.11
06.01.12
06.01.13
06.01.14
Descripcin de la Partida
ALIMENTACION TG 3-1X50MM2NYY
TRAZO Y REPLANTEO P/ALUMBRADO PUBLICO
EXCAVACION DE ZANJA 0.50X0.65M
RELLENO Y COMPACTACION DE ZANJA 0.50X0.65M
RESANE DE PISOS
MEDIDOR Y CAJA F3
POZO DE TIERRA FUERZA P/TABLERO GENERAL
TABLERO DE DISTRIBUCION TD-1 S/PLANO
ALIMENTADOR 3-1X35MM2 NYY (P/TD1,TD2,TD3)
TRAZADO Y REPLANTEO C/EQUIPO
EXCAVACION DE ZANJA 0.50X0.65M
RELLENO Y COMPACTACION DE ZANJA 0.50X0.65M
RESANE DE VEREDAS
TABLERO GENERAL S/DETALLE (REHABILIT.)
PRUEBAS DE CONTINUIDAD Y C/EQUIPOS ENCENDIDOS
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
COSTO TOTAL
IGV
PRESUPUESTO TOTAL
Presupuesto 02
Unidad
ML
ML
ML
ML
ML
UND
UND
UND
ML
M2
ML
ML
ML
UND
GLB
Metrado
Precio
Unitario
25.00
17.00
17.00
17.00
17.00
1.00
1.00
1.00
65.00
60.00
60.00
60.00
60.00
1.00
2.00
63.93
1.08
6.56
4.69
16.02
1,311.30
465.15
749.74
69.66
1.38
6.56
4.69
16.02
1,733.80
1,200.00
Parcial
1,598.25
18.36
111.52
79.73
272.34
1,311.30
465.15
749.74
4,527.90
82.80
393.60
281.40
961.20
1,733.80
2,400.00
CD_02
15.00%
10.00%
18.00%
Subtotal
14,987.09
143,664.95
21,549.74
14,366.50
179,581.19
32,324.61
211,905.80
256386149.xls.ms_office
PRESUPUESTO BASE
Obra
Supervisor
Contratista
Formula 03
Item
Descripcin de la Partida
Unidad Metrado
01.00.00
01.01.00
01.01.01
LOSA DEPORTIVA
OBRAS PROVISIONALES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO P/LOSA DEPORTIVA
GLB
01.02.00
01.02.01
01.02.02
OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO EN LOSAS
01.03.00
01.03.01
01.03.02
01.03.03
Precio
Unitario
Parcial
Subtotal
1.00
2,337.20
2,337.20
2,337.20
M2
M2
608.00
608.00
1.61
0.58
978.88
352.64
1,331.52
MOVIMIENTO DE TIERRAS
CORTE HASTA NIVEL DE SUBRASANTE EN LOSAS
EXCAVACION DE SARDINELES
ELIMINACION DE EXCEDENTES D=5KM
M3
M3
M3
182.40
3.60
218.60
15.21
9.56
22.00
2,774.30
34.42
4,809.20
7,617.92
01.04.00
01.04.01
01.04.02
01.04.03
01.04.04
01.04.05
PISOS Y PAVIMENTOS
PREPARACION DE SUBRASANTE
BASE E=0.15
LOSA DE CONCRETO DE F'C=210KG/CM2
SARDINEL DE CONCRETO DE F'C=140KG/CM2 10X30
ACERO GRADO 60- 3/8" EN MALLA DE CIMIENTO DE ARCOS
M2
M2
M2
ML
KG
608.00
608.00
608.00
102.00
15.00
2.63
6.35
40.57
19.20
2.53
1,599.04
3,860.80
24,666.56
1,958.40
37.95
32,122.75
01.05.00
01.05.01
01.05.02
01.05.03
01.05.04
VARIOS
ARCOS DE FULBITO CON TABLERO DE BASQUET
PARANTES DE NET DE VOLEY INC. INST. NET Y REGISTROS
JUNTAS DE DILATACION
JUNTAS DE CONTRACCION
PAR
PAR
ML
ML
1.00
1.00
70.00
120.00
3,100.00
670.00
1.88
0.95
3,100.00
670.00
131.60
114.00
4,015.60
01.06.00
01.06.01
PINTURA
PINTURA LINEAL AL ESMALTE EN LOSAS DEPORTIVAS
ML
316.38
0.87
275.25
275.25
02.00.00
02.01.00
02.01.01
02.01.02
GRADERIAS
OBRAS PRELIMINARES
TRAZO DE NIVELES Y REPLANTEO PRELIMINARES C/EQUIPO
LIMPIEZA DE TERRENO MANUAL
M2
M2
62.50
62.50
1.38
1.61
86.25
100.63
186.88
02.02.00
02.02.01
02.02.03
02.02.04
MOVIMIENTO DE TIERRAS
EXCAV. ZANJAS P/CIMIENTOS MAT.SUEL.
RELLENO APISONADO C/MAT.PREST.
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
M3
M3
M3
8.00
49.80
9.60
18.75
45.28
52.32
150.00
2,254.94
502.27
2,907.21
02.03.00
02.03.01
CONCRETO SIMPLE
CIMIENTO CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
M3
8.00
107.85
862.80
862.80
02.04.00
02.04.01
02.04.02
02.04.03
CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 EN GRADERIAS
ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERIAS
ACERO F'Y 4200KG/CM2
7.75
29.90
306.55
236.80
30.26
2.20
1,835.20
904.77
674.41
3,414.38
02.05.00
02.05.01
ACABADOS
ACABADOS PASOS Y CONTRAPASOS C/ CEMENTO FROTACHADO
M2
101.30
33.17
3,360.12
3,360.12
03.00.00
03.01.00
03.01.01
03.01.02
03.01.03
03.01.04
ML
ML
ML
UND
123.00
123.00
123.00
1.00
1.08
6.56
4.69
188.75
132.84
806.88
576.87
188.75
1,705.34
03.02.00
03.02.01
03.02.02
03.02.03
ALUMBRADO
CONDUCTOR 2-1 X6MM2 NYY + 2.5MM2 NYY/T
POSTE DE 13M/400/180/380 C.A.C.
CRUZETA C.A.V. ASIMETRICO 1.50M-78KG
ML
UND
UND
110.00
4.00
4.00
23.92
1,013.72
82.97
2,631.20
4,054.88
331.88
Presupuesto 03
M3
M2
KGR
256386149.xls.ms_office
PRESUPUESTO BASE
Obra
Supervisor
Contratista
Formula 03
Item
Descripcin de la Partida
Unidad Metrado
Precio
Unitario
Parcial
Subtotal
03.02.05
03.02.06
03.02.07
03.02.08
UND
UND
UND
UND
4.00
12.00
4.00
4.00
589.28
43.91
16.10
12.39
2,357.12
526.92
64.40
49.56
10,015.96
04.00.00
04.01.00
04.02.00
04.03.00
04.04.00
04.05.00
04.06.00
ALUMBRADO PUBLICO
CONDUCTOR 2-1X6MM2 NYY
POSTE DE 8M/200/120/240/C.A.C.
PASTORAL PS 0.50/0.25/125 C.A.V.
LUMINARIA C/LAMPARA DE 70W
HOYO PARA POSTE DE 8M/120/240
SOLADO DE CONCRETO P/POSTE
ML
UND
UND
UND
UND
UND
80.00
3.00
3.00
3.00
3.00
3.00
19.42
537.32
171.50
330.59
12.88
12.39
1,553.60
1,611.96
514.50
991.77
38.64
37.17
4,747.64
05.00.00
05.01.00
05.01.01
M2
45.60
10.01
456.46
456.46
05.02.00
05.02.01
05.02.02
05.02.03
MOVIMIENTO DE TIERRAS
EXCAV. ZANJAS P/CIMIENTOS MAT.SUEL.H=0.70M.
M3
REFINE, NIVELACION Y COMPACTACION/TERRENO NORMAL MANUAL
M2
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
M3
3.60
3.00
4.32
18.75
11.52
52.32
67.50
34.56
226.02
328.08
05.03.00
05.03.01
05.03.02
05.03.03
CONCRETO SIMPLE
CIMIENTO CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
M3
SOBRECIMIENTOS,CONCRETO C:H/1:8+25% P.M.
M3
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO
M2
2.10
0.89
10.80
107.85
153.70
18.51
226.49
136.79
199.91
563.19
05.04.00
05.04.01
05.04.02
05.04.03
05.04.04
05.04.05
05.04.06
CONCRETO ARMADO
CONCRETO F'C 210 KG/CM2 VIGA
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 COLUMNA
ENCOFRADO Y DESENCOFRADO PARA COLUMNAS
ACERO F'Y 4200KG/CM2
M3
M2
KGR
M3
M2
KGR
0.11
1.44
10.20
0.30
4.50
32.40
230.96
30.70
2.20
294.63
26.83
2.20
25.41
44.21
22.44
88.39
120.74
71.28
372.47
05.05.00
05.05.01
MUROS Y TABIQUES
MURO LADR.K.K.ARC.SOGA MEZ.1:4 TIPO IV 1 CARAVISTA
M2
15.50
42.82
663.71
663.71
05.06.00
05.06.01
REVOQUES Y ENLUCIDOS
TARRAJ.COLUMNAS/VIGAS/SOBREC. MEZ.C:A 1:5, E=1.5CM
M2
8.10
19.14
155.03
155.03
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
COSTO TOTAL
IGV
PRESUPUESTO TOTAL
Presupuesto 03
CD_03
15.00%
10.00%
18.00%
77,439.51
11,615.93
7,743.95
96,799.39
17,423.89
114,223.28
256386149.xls.ms_office
CRONOGRAMA REPROGRAMADO
DE ACUERDO A FECHA DE INICIO DE OBRA
Obra
Supervisin
Contratista
Fecha
Plazo
ITEM
MONTO
30
15/10/98
#NAME?
#NAME?
30
#NAME?
#NAME?
#NAME?
30
#NAME?
#NAME?
#NAME?
30
#NAME?
#NAME?
#NAME?
30
#NAME?
11/02/99
#NAME?
OBRAS PROVISIONALES
9,963.07
CONSTRUCCION LABORAT.-BIBLIOTECA-COMPUTO
OBRAS PRELIMINARES
987.91
MOVIMIENTO DE TIERRAS
12,066.84
CONCRETO SIMPLE
12,440.43
CONCRETO ARMADO
78,503.38
MUROS Y TABIQUES
11,662.85
REVOQUES Y ENLUCIDOS
17,343.37
PISOS Y PAVIMENTOS
11,951.98
ZOCALOS Y CONTRAZOCALOS
1,732.10
COBERTURA
3,611.53
CARPINTERIA METALICA
27,407.63
CARPINTERIA DE MADERA
841.72
CERRAJERIA
1,736.11
VIDRIOS Y CRISTALES
3,839.65
PINTURA
12,747.87
VARIOS
2,013.69
CONSTRUCCION ESCALERA Y DEPOSITO
OBRAS PRELIMINARES
71.76
MOVIMIENTO DE TIERRAS
2,165.48
CONCRETO SIMPLE
2,114.67
CONCRETO ARMADO
10,732.31
MUROS Y TABIQUES
2,817.94
REVOQUES Y ENLUCIDOS
2,350.90
PISOS Y PAVIMENTOS
1,013.87
ZOCALOS Y CONTRAZOCALOS
190.06
CARPINTERIA DE MADERA
968.22
CERRAJERIA
229.28
PINTURA
1,769.74
VARIOS
2,351.48
VEREDAS EXTERIORES, CAMERINOS, SSHH., Y GUARDIANIA
TRABAJOS PRELIMINARES
1,826.71
MOVIMIENTO DE TIERRAS
5,961.85
CONCRETO SIMPLE
4,849.87
VEREDAS Y RAMPAS
29,774.91
CONCRETO ARMADO
14,089.01
VARIOS
4,530.52
CONSTRUCCION SSHH Y GUARDIANIA
OBRAS PRELIMINARES
1,462.52
MUROS Y TABIQUES
6,833.45
REVOQUES Y ENLUCIDOS
3,902.54
PISOS Y CONTRAPISOS
2,041.65
ZOCALOS Y CONTRAZOCALOS
4,178.21
CARPINTERIA DE MADERA
4,576.75
CARPINTERIA METALICA
692.08
CERRAJERIA
856.68
VIDRIOS Y CRISTALES
121.16
PINTURA
2,238.45
VARIOS
1,306.41
APARATOS Y ACCESORIOS SANITARIOS
2,454.02
CONSTRUCCION CAMERINOS
MUROS Y TABIQUES
4,269.00
REVOQUES Y ENLUCIDOS
1,553.46
PISOS Y CONTRAPISOS
1,119.15
ZOCALOS Y CONTRAZOCALOS
3,126.32
CARPINTERIA DE MADERA
1,060.47
CARPINTERIA METALICA
392.98
CERRAJERIA
399.96
PINTURA
889.34
VARIOS
611.67
BANCAS DE CONCRETO
368.80
APARATOS SANITARIOS/ACCESORIOS
1,868.88
INSTALACIONES SANITARIAS LABORAT.SSHH. Y CAMERINOS
SISTEMA DE DESAGUE
8,647.36
SALIDA DE AGUA FRIA
7,076.15
INSTALAC.ELECTRICAS LABORAT.,AULA DE COMPUTO Y BIBLIOTECA7,379.68
ARTEFACTOS DE ALUMBRADO (AMPLIACION)
5,089.30
INSTALACIONES ELECTRICAS CAMERINOS, SSHH Y GUARDIANIA
1,332.14
ARTEFACTOS DE ALUMBRADO
2,184.33
TOTAL AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
Cronograma Base
374,691.62
5,645.74
4,317.33
0.00
0.00
0.00
559.82
6,837.88
5,639.66
2,224.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
428.09
5,228.96
5,722.60
32,840.58
1,321.79
491.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,078.17
35,588.20
6,608.95
8,700.59
2,509.91
363.74
0.00
5,755.60
176.76
156.25
345.57
382.43
0.00
0.00
0.00
0.00
7,850.34
3,732.11
7,197.50
6,593.51
955.54
2,287.30
15,119.88
464.35
1,038.77
2,297.39
7,924.93
1,275.34
0.00
0.00
0.00
0.00
0.00
953.88
2,848.56
412.82
1,324.23
6,532.15
200.61
541.09
1,196.69
4,440.51
738.35
40.66
1,227.11
958.65
304.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31.10
938.37
972.75
4,489.69
319.37
66.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
183.27
4,865.31
1,596.83
1,179.37
212.91
39.91
203.33
20.63
0.00
0.00
0.00
0.00
0.00
1,073.23
901.74
975.62
559.32
104.85
534.13
137.19
1,120.84
1,489.27
0.00
0.00
0.00
0.00
0.00
129.30
241.64
45.30
230.76
71.46
648.90
862.21
0.00
0.00
0.00
0.00
0.00
0.00
828.11
675.68
549.65
1,687.24
0.00
0.00
852.46
3,378.38
2,748.26
10,222.72
4,226.71
0.00
146.14
1,907.79
1,551.96
13,497.96
7,279.32
2,869.33
0.00
0.00
0.00
4,366.99
2,582.98
1,661.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
828.76
774.46
110.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
633.76
3,872.29
1,957.77
428.75
877.42
961.12
145.34
0.00
0.00
0.00
0.00
0.00
0.00
2,186.70
1,619.55
1,126.31
2,304.98
2,524.84
381.80
542.56
76.73
1,417.69
827.39
1,554.21
0.00
0.00
214.64
486.59
995.81
1,090.79
164.95
314.12
44.43
820.77
479.02
899.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
483.82
44.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,419.10
779.32
235.02
656.53
222.70
82.52
0.00
0.00
0.00
0.00
0.00
1,366.08
644.69
617.40
1,724.69
585.03
216.79
253.31
563.25
387.39
233.57
1,183.62
0.00
85.44
266.73
745.11
252.75
93.66
146.65
326.09
224.28
135.23
685.26
0.00
0.00
0.00
0.00
0.00
0.00
490.02
400.98
418.18
0.00
75.49
0.00
1,412.40
1,155.77
1,205.35
0.00
217.58
0.00
4,525.45
3,703.18
3,862.03
3,223.22
697.16
1,383.41
2,219.49
1,816.21
1,894.12
1,866.08
341.92
800.92
23,437.86
64,535.62
108,659.03
130,618.67
47,440.44
256386149.xls.ms_office
CRONOGRAMA REPROGRAMADO
DE ACUERDO A FECHA DE INICIO DE OBRA
Obra
Supervisin
Contratista
Fecha
Plazo
ITEM
DESCRIPCION
MONTO
30
15/10/98
#NAME?
#NAME?
30
#NAME?
#NAME?
#NAME?
30
#NAME?
#NAME?
#NAME?
30
#NAME?
#NAME?
#NAME?
30
#NAME?
11/02/99
#NAME?
Formula 02 REHABILITACION
01.00.00
01.01.00
01.02.00
01.03.00
02.00.00
03.00.00
04.00.00
04.01.00
05.00.00
05.02.00
06.00.00
5,309.24
9,182.16
34,746.37
3,008.57
2,081.29
0.00
2,300.67
4,713.51
11,813.76
0.00
2,387.36
17,373.19
0.00
0.00
5,559.42
0.00
0.00
0.00
2,973.61
59,500.89
1,828.58
3,775.16
11,361.85
14,987.09
168.50
3,371.72
103.62
213.93
643.84
849.27
465.86
9,321.81
286.48
591.44
1,780.03
2,347.98
971.38
19,436.96
597.34
1,233.22
3,711.54
4,895.79
1,040.77
20,825.31
640.00
1,321.31
3,976.64
5,245.48
327.10
6,545.10
201.14
415.27
1,249.80
1,648.58
143,664.95
10,440.74
33,621.54
50,606.76
38,608.92
10,386.98
2,337.20
1,331.52
7,617.92
32,122.75
4,015.60
275.25
264.88
0.00
0.00
0.00
0.00
0.00
1,262.09
754.53
2,590.09
3,640.58
0.00
0.00
810.23
576.99
3,808.96
16,275.53
481.87
0.00
0.00
0.00
1,218.87
11,028.82
2,355.82
174.33
0.00
0.00
0.00
1,177.84
1,177.91
100.93
186.88
2,907.21
862.80
3,414.38
3,360.12
0.00
0.00
0.00
0.00
0.00
105.90
988.45
97.78
0.00
0.00
80.98
1,453.60
488.92
1,638.90
0.00
0.00
465.15
276.10
1,525.09
2,128.08
0.00
0.00
0.00
250.39
1,232.04
1,705.34
10,015.96
0.00
0.00
0.00
0.00
511.60
0.00
881.09
6,343.44
312.65
3,672.52
4,747.64
456.46
328.08
563.19
372.47
663.71
155.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
538.07
51.73
37.18
63.83
42.21
75.22
17.57
1,693.33
162.81
117.02
200.87
132.85
236.72
55.29
1,906.97
183.35
131.78
226.22
149.61
266.59
62.27
609.28
58.58
42.10
72.28
47.80
85.18
19.90
77,439.51
264.88
10,265.24
28,726.48
29,323.55
8,859.38
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
REHABILITACION
LOSA DEPORTIVA Y REHAB.CERCO PERIMETRICO
374,691.62
143,664.95
77,439.51
23,437.86
10,440.74
264.88
64,535.62
33,621.54
10,265.24
108,659.03
50,606.76
28,726.48
130,618.67
38,608.92
29,323.55
47,440.44
10,386.98
8,859.38
COSTO DIRECTO
GASTOS GENERALES 15%
UTILIDAD 10%
COSTO TOTAL
COSTO TOTAL x FACTOR DE RELACION
% AVANCE
% AVANCE ACUMULADO
595,796.08
89,369.41
59,579.61
744,745.10
679,139.01
34,143.48
5,121.52
3,414.35
42,679.35
38,919.64
5.73%
5.73%
108,422.40
16,263.36
10,842.24
135,528.00
123,589.07
18.20%
23.93%
187,992.27 198,551.15
28,198.84
29,782.67
18,799.23
19,855.11
234,990.34 248,188.93
214,289.57 226,325.47
31.55%
33.33%
55.48%
88.81%
66,686.80
10,003.02
6,668.68
83,358.50
76,015.29
11.19%
100.00%
TOTAL REHABILITACION
Formula 03 LOSA DEPORTIVA Y REHAB.CERCO PERIMETRICO
01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
01.05.00
01.06.00
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
03.00.00
03.01.00
03.02.00
04.00.00
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
05.06.00
LOSA DEPORTIVA
OBRAS PROVISIONALES
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
PISOS Y PAVIMENTOS
VARIOS
PINTURA
GRADERIAS
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
CONCRETO ARMADO
ACABADOS
ALUMBRADO LOSA DEPORTIVA
OBRAS PRELIMINARES
ALUMBRADO
ALUMBRADO PUBLICO
REHABILITACION CERCO PERIMETRICO
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
CONCRETO ARMADO
MUROS Y TABIQUES
REVOQUES Y ENLUCIDOS
TOTAL LOSA DEPORTIVA Y REHAB.CERCO PERIMETRICO
RESUMEN
01
02
03
Prog01_01
Prog01_02
Prog01_03
Prog01_04
Prog01_05
26,716.47
73,563.18 123,858.80 148,890.26
54,076.65
Prog02_01 Prog02_02 Prog02_03 Prog02_04 Prog02_05
11,901.24
38,324.69
57,685.89
44,009.73
11,839.97
Prog03_01 Prog03_02 Prog03_03 Prog03_04 Prog03_05
301.94
11,701.19
32,744.88
33,425.48
10,098.67
Cronograma Base
256386149.xls.ms_office
FORMULAS POLINOMICAS
Obra
Supervisin
Contratista
P.Base
Plazo
Costo al
Formula 01
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
SIMB
MO
DAT
PROMEDIO PONDERADO
CBP
MM
GGU
IU
INCIDENCIA
Coef .
%
47
0.293
100.00%
0.155
100.00%
65
11.61%
03
38.07%
30
50.32%
PROMEDIO PONDERADO
0.228
100.00%
PINTURA LATEX
54
10.09%
BLOQUE Y LADRILLO
17
21.93%
21
67.98%
PROMEDIO PONDERADO
0.124
100.00%
48
49.19%
43
50.81%
39
0.200
100.00%
1.000
Pgina 30
FORMULAS POLINOMICAS
Obra
Supervisin
Contratista
P.Base
Plazo
Costo al
Formula 02
REHABILITACION
SIMB
IU
INCIDENCIA
Coef .
MO
AC
PROMEDIO PONDERADO
CM
PDM
GGU
47
0.243
0.103
100%
100.00%
19
32.04%
12
67.96%
PROMEDIO PONDERADO
0.212
100.00%
48
41.04%
21
58.96%
PROMEDIO PONDERADO
0.242
100%
43
7.85%
30
20.66%
PINTURA LATEX
54
71.49%
39
0.200
100.00%
1.000
Pgina 31
FORMULAS POLINOMICAS
Obra
Supervisin
Contratista
P.Base
Plazo
Costo al
Formula 03
SIMB
IU
INCIDENCIA
Coef .
MO
CA
PROMEDIO PONDERADO
MD
PCA
GGU
47
0.202
100.00%
0.269
100.00%
AGREGADO GRUESO
05
43.12%
21
56.88%
PROMEDIO PONDERADO
0.205
100.00%
30
28.29%
48
71.71%
PROMEDIO PONDERADO
0.124
100.00%
11
28.23%
19
31.45%
POSTE DE CONCRETO
62
40.32%
39
0.200
100.00%
1.000
Pgina 32
FORMULAS POLINOMICAS
Obra
Supervisin
Contratista
P.Base
P.Oferta
Plazo
Costo al
Formula 01
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
SIMB
MO
DAT
PROMEDIO PONDERADO
CBP
MM
GGU
IU
47
INCIDENCIA
Io
Ir
Aug-98
Sep-98
0.293
100.00%
258.94
258.94
0.293
0.155
100.00%
233.39
242.95
0.161
65
11.61%
204.15
205.97
03
38.07%
187.00
194.87
30
50.32%
275.23
287.86
100.00%
265.66
271.41
PROMEDIO PONDERADO
0.228
PINTURA LATEX
54
10.09%
279.57
280.34
BLOQUE Y LADRILLO
17
21.93%
286.47
289.49
21
67.98%
256.88
264.25
PROMEDIO PONDERADO
Ki
Coef .
0.124
0.233
100.00%
292.50
297.90
48
49.19%
269.99
280.95
43
50.81%
314.29
314.31
39
100.00%
263.21
262.49
0.199
K01_0998
1.012
0.200
1.000
0.126
FORMULAS POLINOMICAS
Obra
Supervisin
Contratista
P.Base
P.Oferta
Plazo
Costo al
Formula 02
REHABILITACION
SIMB
IU
INCIDENCIA
Coef .
MO
AC
PROMEDIO PONDERADO
CM
PDM
GGU
47
0.243
0.103
Io
Ir
Aug-98
Sep-98
100%
258.94
258.94
0.243
100.00%
236.70
246.66
0.107
19
32.04%
263.05
274.12
12
67.96%
224.28
233.72
100.00%
262.26
271.10
PROMEDIO PONDERADO
0.212
48
41.04%
269.99
280.95
21
58.96%
256.88
264.25
100%
281.40
284.56
PROMEDIO PONDERADO
0.242
43
7.85%
314.29
314.31
30
20.66%
275.23
287.86
PINTURA LATEX
54
71.49%
279.57
280.34
39
100.00%
263.21
262.49
0.200
1.000
Ki
K02_0998
0.219
0.245
0.199
1.013
FORMULAS POLINOMICAS
Obra
Supervisin
Contratista
P.Base
P.Oferta
Plazo
Costo al
Formula 03
SIMB
MO
CA
PROMEDIO PONDERADO
MD
PCA
GGU
IU
47
INCIDENCIA
Io
Ir
Aug-98
Sep-98
0.202
100.00%
258.94
258.94
0.202
0.269
100.00%
218.09
222.29
0.274
AGREGADO GRUESO
05
43.12%
166.93
166.93
21
56.88%
256.88
264.25
100.00%
271.47
282.90
PROMEDIO PONDERADO
0.205
30
28.29%
275.23
287.86
48
71.71%
269.99
280.95
100.00%
218.49
226.03
PROMEDIO PONDERADO
Ki
Coef .
0.124
0.214
0.128
11
28.23%
204.20
212.79
19
31.45%
263.05
274.12
POSTE DE CONCRETO
62
40.32%
193.74
197.80
39
100.00%
263.21
262.49
0.199
K03_0998
1.017
0.200
1.000
Formula 01
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
SIMB
IU
INCIDENCIA
Coef .
%
47
0.293
100.00%
258.94
258.94
0.293
258.94
0.293
258.94
0.293
258.94
0.293
258.94
0.293
0.000
0.000
0.000
0.000
0.155
100.00%
11.61%
38.07%
50.32%
233.39
204.15
187.00
275.23
242.95
205.97
194.87
287.86
0.161
242.70
194.89
195.39
289.53
0.161
245.27
191.37
198.14
293.37
0.163
247.61
193.88
198.13
297.45
0.164
249.99
200.13
187.08
309.08
0.166
0.000
0.000
0.000
0.000
0.228
100.00%
10.09%
21.93%
67.98%
265.66
279.57
286.47
256.88
271.41
280.34
289.49
264.25
0.233
271.81
282.79
290.20
264.25
0.233
275.07
289.39
287.01
269.09
0.236
276.42
289.41
285.96
271.41
0.237
280.77
291.60
285.90
277.51
0.241
0.000
0.000
0.000
0.000
0.124
100.00%
49.19%
50.81%
292.50
269.99
314.29
297.90
280.95
314.31
0.126
298.41
281.97
314.33
0.127
303.19
285.38
320.44
0.129
305.16
289.69
320.14
0.129
310.08
298.92
320.88
0.131
0.000
0.000
0.000
0.000
0.200
100.00%
263.21
262.49
0.199
261.61
0.199
261.69
0.199
263.31
0.200
263.35
0.200
0.000
0.000
0.000
0.000
K01_0998
1.012
K01_1098
1.013
K01_1198
1.020
K01_1298
1.023
K01_0199
1.031
MO
DAT
PROMEDIO PONDERADO
TUBO DE ACERO NEGRO Y/O GALVANIZADO
ACERO DE CONSTRUCCION CORRUGADO
DOLAR (GENERAL PONDERADO)
65
03
30
PROMEDIO PONDERADO
PINTURA LATEX
BLOQUE Y LADRILLO
CEMENTO PORTLAND TIPO I
54
17
21
PROMEDIO PONDERADO
MAQUINARIA Y EQUIPO NACIONAL
MADERA NACIONAL PARA ENCOF. Y CARPINT.
48
43
CBP
MM
GGU
Io
Aug-98
1.000
Formula 02
SIMB
IU
AC
PROMEDIO PONDERADO
CABLE NYY Y NKY
ARTEFACTOS DE ALUMBTRADO INTERIOR
19
12
PROMEDIO PONDERADO
MAQUINARIA Y EQUIPO NACIONAL
CEMENTO PORTLAND TIPO I
48
21
PROMEDIO PONDERADO
MADERA NACIONAL PARA ENCOF. Y CARPINT.
DOLAR (GENERAL PONDERADO)
PINTURA LATEX
43
30
54
PDM
GGU
47
INCIDENCIA
Coef .
%
Ir
Oct-98
Ki
Ir
Nov-98
Ki
Ir
Dec-98
Ki
Ir
Jan-99
Ki
Ir
Feb-99
K01_0299
Ki
0.000
Ir
Mar-99
K01_0399
Ki
0.000
Ir
Apr-99
K01_0499
Ki
0.000
Ir
May-99
K01_0599
Ki
0.000
0.243
Io
Aug-98
Ir
Sep-98
Ki
Ir
Oct-98
Ki
Ir
Nov-98
Ki
Ir
Dec-98
Ki
Ir
Jan-99
Ki
Ir
Feb-99
Ki
Ir
Mar-99
Ki
Ir
Apr-99
Ki
Ir
May-99
Ki
100%
258.94
258.94
0.243
258.94
0.243
258.94
0.243
258.94
0.243
258.94
0.243
0.000
0.000
0.000
0.000
0.103
100.00%
32.04%
67.96%
236.70
263.05
224.28
246.66
274.12
233.72
0.107
247.32
274.84
234.34
0.108
250.80
278.72
237.64
0.109
254.28
282.58
240.94
0.111
263.60
292.93
249.77
0.115
0.000
0.000
0.000
0.000
0.212
100.00%
41.04%
58.96%
262.26
269.99
256.88
271.10
280.95
264.25
0.219
271.52
281.97
264.25
0.219
275.78
285.38
269.09
0.223
278.91
289.69
271.41
0.225
286.30
298.92
277.51
0.231
0.000
0.000
0.000
0.000
0.242
100%
7.85%
20.66%
71.49%
281.40
314.29
275.23
279.57
284.56
314.31
287.86
280.34
0.245
286.66
314.33
289.53
282.79
0.247
292.65
320.44
293.37
289.39
0.252
293.48
320.14
297.45
289.41
0.252
297.51
320.88
309.08
291.60
0.256
0.000
0.000
0.000
0.000
0.200
100.00%
263.21
262.49
0.199
261.61
0.199
261.69
0.199
263.31
0.200
263.35
0.200
0.000
0.000
0.000
0.000
K02_0998
1.013
K02_1098
1.016
K02_1198
1.026
K02_1298
1.031
K02_0199
1.045
1.000
FORPOL
Ki
REHABILITACION
MO
CM
Ir
Sep-98
K02_0299
K02_0399
K02_0499
K02_0599
256386149.xls.ms_office
Formula 03
SIMB
IU
INCIDENCIA
Coef .
%
0.202
100.00%
258.94
258.94
0.202
258.94
0.202
258.94
0.202
258.94
0.202
258.94
0.202
0.000
0.000
0.000
0.000
0.269
100.00%
43.12%
56.88%
218.09
166.93
256.88
222.29
166.93
264.25
0.274
225.28
173.88
264.25
0.278
228.04
173.88
269.09
0.281
229.36
173.88
271.41
0.283
232.82
173.88
277.51
0.287
0.000
0.000
0.000
0.000
0.205
100.00%
28.29%
71.71%
271.47
275.23
269.99
282.90
287.86
280.95
0.214
284.11
289.53
281.97
0.215
287.64
293.37
285.38
0.217
291.89
297.45
289.69
0.220
301.79
309.08
298.92
0.228
0.000
0.000
0.000
0.000
0.124
100.00%
28.23%
31.45%
40.32%
218.49
204.20
263.05
193.74
226.03
212.79
274.12
197.80
0.128
228.76
221.28
274.84
198.05
0.130
231.42
224.39
278.72
199.45
0.131
234.08
227.51
282.58
200.84
0.133
241.43
235.85
292.93
205.16
0.137
0.000
0.000
0.000
0.000
0.200
100.00%
263.21
262.49
0.199
261.61
0.199
261.69
0.199
263.31
0.200
263.35
0.200
0.000
0.000
0.000
0.000
K03_0998
1.017
K03_1098
1.024
K03_1198
1.030
K03_1298
1.038
K03_0199
1.054
MO
47
CA
PROMEDIO PONDERADO
AGREGADO GRUESO
CEMENTO PORTLAND TIPO I
05
21
PROMEDIO PONDERADO
DOLAR (GENERAL PONDERADO)
MAQUINARIA Y EQUIPO NACIONAL
30
48
PROMEDIO PONDERADO
ARTEFACTO DE ALUMBRADO EXTERIOR
CABLE NYY Y NKY
POSTE DE CONCRETO
11
19
62
MD
PCA
GGU
1.000
FORPOL
Io
Aug-98
Ir
Sep-98
Ki
Ir
Oct-98
Ki
Ir
Nov-98
Ki
Ir
Dec-98
Ki
Ir
Jan-99
Ki
Ir
Feb-99
K03_0299
Ki
0.000
Ir
Mar-99
K03_0399
Ki
0.000
Ir
Apr-99
K03_0499
Ki
0.000
Ir
May-99
K03_0599
Ki
0.000
256386149.xls.ms_office
15.00%
10.00%
0.91191
20.00%
18.00%
MONTO
374,691.61
143,664.95
77,439.51
595,796.07
89,369.41
59,579.61
744,745.09
679,139.01
135,827.80
135,827.85
24,449.01
160,276.86
INCIDENCIA
Coef .
%
Costo al
Io
Aug-98
Ir
Sep-98
Monto
Maximo
8/31/1998
Adelanto
Solicitado
Saldo
11.61%
38.07%
50.32%
10.09%
21.93%
67.98%
50.81%
204.15
187.00
275.23
279.57
286.47
256.88
314.29
205.97
194.87
287.86
280.34
289.49
264.25
314.31
7,071.39
23,949.92
31,771.95
8,984.76
19,679.49
62,099.31
24,540.57
7,071.39
23,949.92
31,771.95
8,984.76
19,679.49
62,099.31
24,540.57
FORMULA N 02 REHABILITACION
19
CABLE NYY Y NKY
12
ARTEFACTOS DE ALUMBTRADO INTERIOR
21
CEMENTO PORTLAND TIPO I
43
MADERA NACIONAL PARA ENCOF. Y CARPINT.
30
DOLAR (GENERAL PONDERADO)
54
PINTURA LATEX
32.04%
67.96%
58.96%
7.85%
20.66%
71.49%
263.05
224.28
256.88
314.29
275.23
279.57
274.12
233.72
264.25
314.31
287.86
280.34
5,135.65
10,893.28
19,201.76
2,837.11
7,808.98
25,907.06
5,135.65
10,893.28
19,201.76
2,837.11
7,808.98
25,907.06
43.12%
56.88%
28.29%
28.23%
31.45%
40.32%
166.93
256.88
275.23
204.20
263.05
193.74
166.93
264.25
287.86
212.79
274.12
197.80
9,336.96
12,669.84
4,882.55
2,936.32
3,271.29
4,108.88
9,336.96
12,669.84
4,882.55
2,936.32
3,271.29
4,108.88
0.103
0.103
0.212
0.242
0.242
0.242
287,087.07
287,087.07
For
IU
01
17
Monto
Maximo
19,679.49
Adelanto
Solicitado
17,836.48
19,679.49
17,836.48
17,836.48
3,210.57
21,047.05
Saldo
1,843.01
1,843.01
INCIDENCIA
Coef .
%
Costo al
Io
Aug-98
Ir
Sep-98
Monto
Maximo
Adelanto
Solicitado
8/31/1998
Saldo
11.61%
38.07%
50.32%
10.09%
21.93%
67.98%
50.81%
204.15
187.00
275.23
279.57
286.47
256.88
314.29
205.97
194.87
287.86
280.34
289.49
264.25
314.31
7,071.39
23,949.92
31,771.95
8,984.76
19,679.49
62,099.31
24,540.57
FORMULA N 02 REHABILITACION
19
CABLE NYY Y NKY
12
ARTEFACTOS DE ALUMBTRADO INTERIOR
21
CEMENTO PORTLAND TIPO I
43
MADERA NACIONAL PARA ENCOF. Y CARPINT.
30
DOLAR (GENERAL PONDERADO)
54
PINTURA LATEX
0.103
0.103
0.212
0.242
0.242
0.242
32.04%
67.96%
58.96%
7.85%
20.66%
71.49%
263.05
224.28
256.88
314.29
275.23
279.57
274.12
233.72
264.25
314.31
287.86
280.34
5,135.65
10,893.28
19,201.76
2,837.11
7,808.98
25,907.06
5,135.65
10,893.28
19,201.76
2,837.11
7,808.98
25,907.06
43.12%
56.88%
28.29%
28.23%
31.45%
40.32%
166.93
256.88
275.23
204.20
263.05
193.74
166.93
264.25
287.86
212.79
274.12
197.80
9,336.96
12,669.84
4,882.55
2,936.32
3,271.29
4,108.88
9,336.96
12,669.84
4,882.55
2,936.32
3,271.29
4,108.88
17,836.48
287,087.07
17,836.48
Monto
Maximo
62,099.31
19,201.76
9,336.96
12,669.84
Adelanto
Solicitado
56,751.65
16,317.50
4,304.16
11,067.84
103,307.87
88,441.15
7,071.39
23,949.92
31,771.95
8,984.76
1,843.01
62,099.31
24,540.57
269,250.59
For
01
02
03
03
IU
21
21
05
21
88,441.15
15,919.41
104,360.56
Saldo
5,347.66
2,884.26
5,032.80
1,602.00
14,866.72
INCIDENCIA
Coef .
%
Costo al
Io
Aug-98
Ir
Sep-98
Monto
Maximo
Adelanto
Solicitado
8/31/1998
Saldo
11.61%
38.07%
50.32%
10.09%
21.93%
67.98%
50.81%
204.15
187.00
275.23
279.57
286.47
256.88
314.29
205.97
194.87
287.86
280.34
289.49
264.25
314.31
7,071.39
23,949.92
31,771.95
8,984.76
19,679.49
62,099.31
24,540.57
FORMULA N 02 REHABILITACION
19
CABLE NYY Y NKY
12
ARTEFACTOS DE ALUMBTRADO INTERIOR
21
CEMENTO PORTLAND TIPO I
43
MADERA NACIONAL PARA ENCOF. Y CARPINT.
30
DOLAR (GENERAL PONDERADO)
54
PINTURA LATEX
32.04%
67.96%
58.96%
7.85%
20.66%
71.49%
263.05
224.28
256.88
314.29
275.23
279.57
274.12
233.72
264.25
314.31
287.86
280.34
5,135.65
10,893.28
19,201.76
2,837.11
7,808.98
25,907.06
43.12%
56.88%
28.29%
28.23%
31.45%
40.32%
166.93
256.88
275.23
204.20
263.05
193.74
166.93
264.25
287.86
212.79
274.12
197.80
9,336.96
12,669.84
4,882.55
2,936.32
3,271.29
4,108.88
4,304.16
11,067.84
5,032.80
1,602.00
4,882.55
2,936.32
3,271.29
4,108.88
287,087.07
106,277.63
180,809.44
Monto
Maximo
23,949.92
Adelanto
Solicitado
14,545.33
23,949.92
14,545.33
0.103
0.103
0.212
0.242
0.242
0.242
17,836.48
56,751.65
16,317.50
7,071.39
23,949.92
31,771.95
8,984.76
1,843.01
5,347.66
24,540.57
5,135.65
10,893.28
2,884.26
2,837.11
7,808.98
25,907.06
Material
ACERO DE CONSTRUCCION CORRUGADO
01
IU
03
14,545.33
2,618.16
17,163.49
Saldo
9,404.59
9,404.59
INCIDENCIA
Coef .
%
Costo al
Io
Aug-98
Ir
Sep-98
Monto
Maximo
Adelanto
Solicitado
8/31/1998
Saldo
11.61%
38.07%
50.32%
10.09%
21.93%
67.98%
50.81%
204.15
187.00
275.23
279.57
286.47
256.88
314.29
205.97
194.87
287.86
280.34
289.49
264.25
314.31
7,071.39
23,949.92
31,771.95
8,984.76
19,679.49
62,099.31
24,540.57
FORMULA N 02 REHABILITACION
19
CABLE NYY Y NKY
12
ARTEFACTOS DE ALUMBTRADO INTERIOR
21
CEMENTO PORTLAND TIPO I
43
MADERA NACIONAL PARA ENCOF. Y CARPINT.
30
DOLAR (GENERAL PONDERADO)
54
PINTURA LATEX
32.04%
67.96%
58.96%
7.85%
20.66%
71.49%
263.05
224.28
256.88
314.29
275.23
279.57
274.12
233.72
264.25
314.31
287.86
280.34
5,135.65
10,893.28
19,201.76
2,837.11
7,808.98
25,907.06
43.12%
56.88%
28.29%
28.23%
31.45%
40.32%
166.93
256.88
275.23
204.20
263.05
193.74
166.93
264.25
287.86
212.79
274.12
197.80
9,336.96
12,669.84
4,882.55
2,936.32
3,271.29
4,108.88
4,304.16
11,067.84
5,032.80
1,602.00
4,882.55
2,936.32
3,271.29
4,108.88
287,087.07
120,822.96
166,264.11
0.103
0.103
0.212
0.242
0.242
0.242
14,545.33
17,836.48
56,751.65
16,317.50
7,071.39
9,404.59
31,771.95
8,984.76
1,843.01
5,347.66
24,540.57
5,135.65
10,893.28
2,884.26
2,837.11
7,808.98
25,907.06
Material
ACERO DE CONSTRUCCION CORRUGADO
TUBO DE ACERO NEGRO Y/O GALVANIZADO
01
01
IU
03
65
Monto
Maximo
9,404.59
7,071.39
16,475.98
Adelanto
Solicitado
Saldo
5,154.53
9,404.59
1,916.86
5,154.53
11,321.45
5,154.53
927.82
6,082.35
INCIDENCIA
Coef .
%
Costo al
Io
Aug-98
Ir
Sep-98
Monto
Maximo
Adelanto
Solicitado
8/31/1998
Saldo
11.61%
38.07%
50.32%
10.09%
21.93%
67.98%
50.81%
204.15
187.00
275.23
279.57
286.47
256.88
314.29
205.97
194.87
287.86
280.34
289.49
264.25
314.31
7,071.39
23,949.92
31,771.95
8,984.76
19,679.49
62,099.31
24,540.57
FORMULA N 02 REHABILITACION
19
CABLE NYY Y NKY
12
ARTEFACTOS DE ALUMBTRADO INTERIOR
21
CEMENTO PORTLAND TIPO I
43
MADERA NACIONAL PARA ENCOF. Y CARPINT.
30
DOLAR (GENERAL PONDERADO)
54
PINTURA LATEX
32.04%
67.96%
58.96%
7.85%
20.66%
71.49%
263.05
224.28
256.88
314.29
275.23
279.57
274.12
233.72
264.25
314.31
287.86
280.34
5,135.65
10,893.28
19,201.76
2,837.11
7,808.98
25,907.06
43.12%
56.88%
28.29%
28.23%
31.45%
40.32%
166.93
256.88
275.23
204.20
263.05
193.74
166.93
264.25
287.86
212.79
274.12
197.80
9,336.96
12,669.84
4,882.55
2,936.32
3,271.29
4,108.88
4,304.16
11,067.84
5,032.80
1,602.00
4,882.55
2,936.32
3,271.29
4,108.88
287,087.07
125,977.49
161,109.58
Monto
Maximo
5,347.66
2,884.26
1,602.00
Adelanto
Solicitado
5,292.62
2,884.26
1,602.00
9,833.92
9,778.88
0.103
0.103
0.212
0.242
0.242
0.242
5,154.53
14,545.33
17,836.48
56,751.65
16,317.50
1,916.86
9,404.59
31,771.95
8,984.76
1,843.01
5,347.66
24,540.57
5,135.65
10,893.28
2,884.26
2,837.11
7,808.98
25,907.06
For
01
02
03
IU
21
21
21
9,778.88
1,760.20
11,539.08
Saldo
55.04
55.04
ORDEN DE COMPRA
Proveedor
Nombre
Direccin
Ciudad
Telfono
Cantidad
34.500
3.850
4.450
5.100
Enviar a
MILLAR
MILLAR
MILLAR
MILLAR
Nombre
Direccin
Ciudad
Telfono
Descripcin
Precio unitario
TOTAL
S/
S/
S/
S/
10,233.05
3,540.04
2,066.61
1,996.78
Subtotal (1) S/
Descuento Especial 0%
Subtotal (2) S/
Impuesto general a las Ventas 18% S/
17,836.48
S/
S/
S/
S/
296.61
919.49
464.41
391.53
CONDICIONES
MATERIAL PUESTO EN OBRA DE ACUERDO A CRONOGRAMA
CONTADO CONTRA CARTA FIANZA A FAVOR DE
CORDELICA
CONDICIONES DE LA FIANZA: SOLIDARIA, INCODICIONAL,
IRREVOCABLE Y DE REALIZACION AUTOMATICA PARA
GARANTIZAR EL SUMINISTRO DE LADRILLO PARA LA
OBRA " C.E. 5033 - 200 MILLAS - AMPLIACION Y
REHABILITACION QUE CONSTRUCTORA VALORIZA SAC
VIENE EJECUTANDO PARA CORDELICA
SE HACE RENUNCIA EXPRESA AL BENEFICIO DE EXCUSION DE
ACUERDO AL ART. 1883 INC. 1 DEL CODIGO CIVIL
EL MONTO AFIANZADO DEBERA SER REAJUSTADO
DE ACUERDO AL INDICES DE PRECIOS AL CONSUMIDOR PARA
LIMA METROPOLITANA QUE DA EL INEI (IU=39)
Detalles de pago
Cheque
En efectivo
Cuenta
Nm.
Tarjeta de crdito
TOTAL
Otras Condiciones
Caduca
Fecha de envo
Aprobado por
Fecha
Pedido nm.
Representante
Enviar por
Notas o comentarios
8/25/1998
S/
17,836.48
3,210.57
21,047.05
ORDEN DE COMPRA
Proveedor
Nombre
Direccin
Ciudad
Telfono
Cantidad
250.000
70.000
105.000
Enviar a
M3
M3
M3
Nombre
Direccin
Ciudad
Telfono
Descripcin
Precio unitario
TOTAL
S/
S/
S/
54,425.00
13,932.80
20,083.35
Subtotal (1) S/
Descuento Especial 0%
Subtotal (2) S/
Impuesto general a las Ventas 18% S/
88,441.15
S/
S/
S/
217.70
199.04
191.27
CONDICIONES
MATERIAL PUESTO EN OBRA DE ACUERDO A CRONOGRAMA
CONTADO CONTRA CARTA FIANZA A FAVOR DE
CORDELICA
CONDICIONES DE LA FIANZA: SOLIDARIA, INCODICIONAL,
IRREVOCABLE Y DE REALIZACION AUTOMATICA PARA
GARANTIZAR EL SUMINISTRO DE CONCRETO PARA LA
OBRA " C.E. 5033 - 200 MILLAS - AMPLIACION Y
REHABILITACION QUE CONSTRUCTORA VALORIZA SAC
VIENE EJECUTANDO PARA CORDELICA
SE HACE RENUNCIA EXPRESA AL BENEFICIO DE EXCUSION DE
ACUERDO AL ART. 1883 INC. 1 DEL CODIGO CIVIL
EL MONTO AFIANZADO DEBERA SER REAJUSTADO
DE ACUERDO AL INDICES DE PRECIOS AL CONSUMIDOR PARA
LIMA METROPOLITANA QUE DA EL INEI (IU=39)
Detalles de pago
Cheque
En efectivo
Cuenta
Nm.
Tarjeta de crdito
TOTAL
Otras Condiciones
Caduca
Fecha de envo
Aprobado por
11/10/1998
Fecha
Pedido nm.
Representante JUAN CORDERO
Enviar por
Notas o comentarios
S/
88,441.15
15,919.41
104,360.56
ORDEN DE COMPRA
Proveedor
Nombre
Direccin
Ciudad
Telfono
Cantidad
0.700
460.000
200.000
355.000
156.000
0.250
0.500
80.000
80.000
120.000
80.000
Enviar a
Nombre
Direccin
Ciudad
Telfono
Descripcin
Precio unitario
TOTAL
S/
S/
S/
S/
S/
S/
S/
S/
S/
S/
S/
765.15
2,410.40
2,914.00
3,351.20
3,346.20
396.53
793.05
126.40
126.40
189.60
126.40
Subtotal (1) S/
Descuento Especial 0%
Subtotal (2) S/
Impuesto general a las Ventas 18% S/
14,545.33
S/
S/
S/
S/
S/
S/
S/
S/
S/
S/
S/
1,093.07
5.24
14.57
9.44
21.45
1,586.10
1,586.10
1.58
1.58
1.58
1.58
CONDICIONES
MATERIAL PUESTO EN OBRA DE ACUERDO A CRONOGRAMA
CONTADO CONTRA CARTA FIANZA A FAVOR DE
CORDELICA
CONDICIONES DE LA FIANZA: SOLIDARIA, INCODICIONAL,
IRREVOCABLE Y DE REALIZACION AUTOMATICA PARA
GARANTIZAR EL SUMINISTRO DE FIERRO CORRUGADO PARA LA
OBRA " C.E. 5033 200 MILLAS - AMPLIACION Y
REHABILITACION QUE CONSTRUCTORA VALORIZA SAC
VIENE EJECUTANDO PARA CORDELICA
SE HACE RENUNCIA EXPRESA AL BENEFICIO DE EXCUSION DE
ACUERDO AL ART. 1883 INC. 1 DEL CODIGO CIVIL
EL MONTO AFIANZADO DEBERA SER REAJUSTADO
DE ACUERDO AL INDICES DE PRECIOS AL CONSUMIDOR PARA
LIMA METROPOLITANA QUE DA EL INEI (IU=39)
TIPO DE CAMBIO CONSIDERADO S/. 3.11
SON DIECISIETE MILCIENTO SESENTITRES Y 48/100 NUEVOS SOLES
Detalles de pago
Cheque
En efectivo
Cuenta
Nm.
Tarjeta de crdito
TOTAL
Otras Condiciones
Caduca
Fecha de envo
Aprobado por
11/18/1998
Fecha
Pedido nm.
Representante SR. IVAN JAVE
Enviar por
Notas o comentarios
S/
14,545.33
2,618.16
17,163.49
ORDEN DE COMPRA
Proveedor
Nombre
Direccin
Ciudad
Telfono
Cantidad
67.000
31.000
1.000
1.000
19.000
31.000
5.000
181.000
16.000
Enviar a
Nombre
Direccin
Ciudad
Telfono
Tipo de unidad
Pieza
Pieza
Pieza
Pieza
Pieza
Pieza
Pieza
Pieza
Pieza
Descripcin
Precio unitario
TOTAL
S/
S/
S/
S/
S/
S/
S/
S/
S/
767.82
344.72
9.88
6.62
334.59
274.66
277.65
2,966.59
172.00
Subtotal (1) S/
Descuento Especial 0%
Subtotal (2) S/
Impuesto general a las Ventas 18% S/
5,154.53
S/
S/
S/
S/
S/
S/
S/
S/
S/
11.46
11.12
9.88
6.62
17.61
8.86
55.53
16.39
10.75
CONDICIONES
MATERIAL PUESTO EN OBRA DE ACUERDO A CRONOGRAMA
CONTADO CONTRA CARTA FIANZA A FAVOR DE
CORDELICA
CONDICIONES DE LA FIANZA: SOLIDARIA, INCODICIONAL,
IRREVOCABLE Y DE REALIZACION AUTOMATICA PARA
GARANTIZAR EL SUMINISTRO DE PERFILES METALICOS PARA LA
OBRA " C.E. 5033 200 MILLAS - AMPLIACION Y
REHABILITACION QUE CONSTRUCTORA VALORIZA SAC
VIENE EJECUTANDO PARA CORDELICA
SE HACE RENUNCIA EXPRESA AL BENEFICIO DE EXCUSION DE
ACUERDO AL ART. 1883 INC. 1 DEL CODIGO CIVIL
EL MONTO AFIANZADO DEBERA SER REAJUSTADO
DE ACUERDO AL INDICES DE PRECIOS AL CONSUMIDOR PARA
LIMA METROPOLITANA QUE DA EL INEI (IU=39)
Detalles de pago
Cheque
En efectivo
Cuenta
Nm.
Tarjeta de crdito
TOTAL
Otras Condiciones
Caduca
Fecha de envo
Aprobado por
11/18/1998
Fecha
Pedido nm.
Representante SR. IVAN JAVE
Enviar por
Notas o comentarios
S/
5,154.53
927.82
6,082.35
ORDEN DE COMPRA
Proveedor
Nombre
Direccin
Ciudad
Telfono
Cantidad
350.000
450.000
Enviar a
Nombre
Direccin
Ciudad
Telfono
Tipo de unidad
BOLSA
BOLSA
Descripcin
Precio unitario
TOTAL
S/
S/
4,672.50
5,106.38
Subtotal (1) S/
Descuento Especial 0%
Subtotal (2) S/
Impuesto general a las Ventas 18% S/
9,778.88
S/
S/
13.35
11.35
CONDICIONES
MATERIAL PUESTO EN OBRA DE ACUERDO A CRONOGRAMA
CONTADO CONTRA CARTA FIANZA A FAVOR DE
CORDELICA
CONDICIONES DE LA FIANZA: SOLIDARIA, INCODICIONAL,
IRREVOCABLE Y DE REALIZACION AUTOMATICA PARA
GARANTIZAR EL SUMINISTRO DE CEMENTO PORTLAND PARA LA
OBRA " C.E. 5033 200 MILLAS - AMPLIACION Y
REHABILITACION QUE CONSTRUCTORA VALORIZA SAC
VIENE EJECUTANDO PARA CORDELICA
SE HACE RENUNCIA EXPRESA AL BENEFICIO DE EXCUSION DE
ACUERDO AL ART. 1883 INC. 1 DEL CODIGO CIVIL
EL MONTO AFIANZADO DEBERA SER REAJUSTADO
DE ACUERDO AL INDICES DE PRECIOS AL CONSUMIDOR PARA
LIMA METROPOLITANA QUE DA EL INEI (IU=39)
Detalles de pago
Cheque
En efectivo
Cuenta
Nm.
Tarjeta de crdito
TOTAL
Otras Condiciones
Caduca
Fecha de envo
Aprobado por
11/18/1998
Fecha
Pedido nm.
Representante SR. IVAN JAVE
Enviar por
Notas o comentarios
S/
9,778.88
1,760.20
11,539.08
01
Adelanto Directo
Ladrillo
Monto
160,276.86
21,047.05
Acumulado
160,276.86
181,323.91
20.00%
2.63%
%
Acumulado
20.00%
22.63%
Expediente N 02
Material
Concreto Premezclado
Proveedor Unin de Concreteras S.A.
Expediente
01
02
Efectivo
Ladrillo
Concreto Premezclado
Monto
160,276.86
21,047.05
104,360.56
Acumulado
160,276.86
181,323.91
285,684.46
20.00%
2.63%
13.02%
%
Acumulado
20.00%
22.63%
35.65%
Expediente N 03
Material
Fierro Corrugado
Proveedor COMERCIAL DEL ACERO S.A. - COMASA
Expediente
01
02
03
Efectivo
Ladrillo
Concreto Premezclado
Fierro Corrugado
Monto
160,276.86
21,047.05
104,360.56
17,163.49
Acumulado
160,276.86
181,323.91
285,684.46
302,847.95
20.00%
2.63%
13.02%
2.14%
%
Acumulado
20.00%
22.63%
35.65%
37.79%
Expediente N 04
Material
Perfiles Metalicos
Proveedor COMERCIAL DEL ACERO S.A. - COMASA
Expediente
01
02
03
04
Efectivo
Ladrillo
Concreto Premezclado
Fierro Corrugado
Perfiles Metalicos
Monto
160,276.86
21,047.05
104,360.56
17,163.49
6,082.35
Acumulado
160,276.86
181,323.91
285,684.46
302,847.95
308,930.30
20.00%
2.63%
13.02%
2.14%
0.76%
%
Acumulado
20.00%
22.63%
35.65%
37.79%
38.55%
Expediente N 05
Material
Cemento Portland Tipo I
Proveedor COMERCIAL DEL ACERO S.A. - COMASA
Expediente
01
02
03
04
05
Efectivo
Ladrillo
Concreto Premezclado
Fierro Corrugado
Perfiles Metalicos
Cemento
Monto
160,276.86
21,047.05
104,360.56
17,163.49
6,082.35
11,539.08
Acumulado
160,276.86
181,323.91
285,684.46
302,847.95
308,930.30
320,469.38
20.00%
2.63%
13.02%
2.14%
0.76%
1.44%
%
Acumulado
20.00%
22.63%
35.65%
37.79%
38.55%
39.99%
Descripcion de la Partida
01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
01.05.00
02.00.00
02.01.00
02.01.01
02.01.02
02.01.03
02.02.00
02.02.01
02.02.02
02.02.03
02.03.00
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.04.00
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
02.04.06
02.04.07
02.04.08
02.04.09
02.04.10
02.04.11
02.04.12
02.04.13
02.04.14
02.04.15
02.05.00
02.05.01
02.05.02
02.06.00
02.06.01
02.06.02
02.06.03
02.06.04
02.06.05
02.06.06
02.06.07
02.07.00
02.07.01
02.07.02
02.07.03
02.07.04
02.08.00
02.08.01
02.08.02
02.08.03
02.08.04
02.09.00
02.09.01
02.10.00
02.10.01
02.10.02
02.10.03
02.10.04
02.10.05
02.11.00
02.11.01
02.12.00
02.12.01
02.12.02
02.12.03
02.13.00
02.13.01
02.14.00
02.14.01
02.14.02
02.14.03
02.14.04
02.14.05
02.14.06
02.14.07
02.15.00
02.15.01
02.15.02
02.15.03
02.15.04
03.00.00
03.01.00
03.01.01
03.01.02
03.02.00
03.02.01
03.02.02
03.02.03
03.03.00
03.03.01
03.03.02
03.03.03
03.04.00
03.04.01
03.04.02
03.04.03
03.04.04
03.04.05
03.04.06
03.04.07
03.04.08
OBRAS PROVISIONALES
OFICINAS PROVISIONALES
CARTEL DE OBRA "CORDELICA"
CISTERNA APOYADA 4M3 DE ALBAILERIA
CERCO DE ESTERA C/PALOS DE EUCALIPTO
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
CONSTRUCCION LABORAT.-BIBLIOTECA-COMPUTO
OBRAS PRELIMINARES
DEMOLICION DE MURO DE ALBAILERIA DE SOGA
TRAZADO Y REPLANTEO C/EQUIPO
LIMPIEZA DE TERRENO MANUAL
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
REFINE, NIVELACION Y COMPACTACION/TERRENO NORMAL C/COMPACTAD
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
CONCRETO SIMPLE
CIMIENTO CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
SOBRECIMIENTOS,CONCRETO C:H/1:8+25% P.M.
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO
FALSOPISO DE 4" CON MEZC.1:8 C:H
FALSA ZAPATA FC=100KG/CM2 /C:H 1:12+20%P.M.
CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 ZAPATA
ACERO F'Y 4200KG/CM2
CONCRETO SOBRECIMIENTO ARMADO F'C=210KG/CM2
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTOS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 COLUMNA
ENCOFRADO Y DESENCOFRADO PARA COLUMNAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 VIGA
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 LOSA ALIGERADA
ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA
ACERO F'Y 4200KG/CM2
LADRILLO HUECO ARCILLA DE 15X30X30
MUROS Y TABIQUES
MURO LAD.KK.ARCILLA CABEZA MEZ.1:5 TIPO IV
MURO LADR.K.K.ARC.SOGA MEZ.1:4 TIPO IV
REVOQUES Y ENLUCIDOS
TARRAJEO MUROS EXT.FROTACHADO MEZ.1:4;E=1.5CM.
TARRAJEO MUROS INT.FROTACHADO MEZ C:A 1:4,E=1.5CM.
TARRAJ.VIGAS/COLUMNAS MEZ.1:5 E=1.5CM.
CIELORASO C/MEZ.1:4; E=1.5CM.
VESTIDURA DE DERRAMES MEZ.1:5; E=1.5CM.
BRUAS 1.0 CM.
TARRAJEO PRIMARIO O RAYADO MUROS INTERIOR
PISOS Y PAVIMENTOS
PISO CEMENTO PULIDO/COLOREADO Y BRUADO E=2"
AFIRMADO DE E=.10M.
VEREDA 140 KG/CM2 E=.10M. INC.SARDINEL/ENCOFRADO
PISO CEMENTO FROTACHADO Y BRUADO E=2"
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO COLOREADO H=.10M.
CONTRAZOCALO DE CEMENTO FROTACHADO C:A/1:4 H=.30CM.
ZOCALO DE MAYOLICA DE 15X15 CM.BLANCA 1RA.
CONTRAZOCALO DE CEMENTO FROTACHADO C:A/1:4 H=.15M.
COBERTURA
CUB.LADR.PAST.24X24 ASENT.C/MEZ.1:5 2.5CM;JUNTA 1:5 1.5CM
CARPINTERIA METALICA
PUERTA DE FIERRO C/VARILLA DE SEGURIDAD
VENTANA DE FIERRO C/VARILLA DE SEGURIDAD DE 5/8"
MALLA METALICA
REJA DE SEGURIDAD PARA PUERTA
REJA METALICA CON MALLA EN DEPOSITO DE EQUIPO DE GAS
CARPINTERIA DE MADERA
TAPAS DE TABLERO DE MADERA CEDRO C/TORN 0.50X0.70M
CERRAJERIA
BISAGRA DE F.E. 4" S/CAP. INC. COLOCACION
CERRADURA P/PUERTA EXTER.TRES GOLPES T/YALE /MANIJA DE BRONC
BISAGRA DE FIERRO DE 2 1/2" INC. COLOCACION
VIDRIOS Y CRISTALES
VIDRIOS Y CRISTALES SEMIDOBLES NACIONALES
PINTURA
PINTURA CIELORASOS AL TEMPLE
PINTURA EN MUROS EXTERIORES C/LATEX
PINTURA EN MUROS INTERIORES C/LATEX
PINTURA EN VIGAS Y COLUMNAS
PINTURA EN CARPINTERIA METALICA I/ANTICO RROSIVO
PINTURA EN CONTRAZOCALOS CON ESMALTE-2 MANOS
PINTURA EN MURO DE PIZARRA (03 MANOS)
VARIOS
PIZARRA
MARCO PERIMETRAL P/PIZARRA DE MADERA
TICERO DE MADERA
EQUIPO DE GAS 100 LBS
CONSTRUCCION ESCALERA Y DEPOSITO
OBRAS PRELIMINARES
TRAZADO Y REPLANTEO C/EQUIPO
LIMPIEZA DE TERRENO MANUAL
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
REFINE, NIVELACION Y COMPACTACION/TERRENO NORMAL C/COMPACTAD
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
CONCRETO SIMPLE
FALSOPISO DE 4" CON MEZC.1:8 C:H
FALSA ZAPATA FC=100KG/CM2 /C:H 1:12+20%P.M.
CIMIENTO CORRIDO MEZCLA 1:10+30% P.G.
CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 ZAPATA
ACERO F'Y 4200KG/CM2
CONCRETO SOBRECIMIENTO ARMADO F'C=210KG/CM2
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTOS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 COLUMNA
ENCOFRADO Y DESENCOFRADO PARA COLUMNAS
ACERO F'Y 4200KG/CM2
Unidad
M2
GLB
UND
ML
GLB
Metrado
Precio
Unitario
50.00
50.58
2.00 2,000.00
1.00
539.83
85.00
12.00
1.00 1,874.24
Parcial
Valorizacin N 01
Metrado
Parcial
Valorizacin N 02
Metrado
Parcial
2,529.00
4,000.00
539.83
1,020.00
1,874.24
50.00
0.00
0.00
85.00
0.50
2,529.00
0.00
0.00
1,020.00
937.12
0.00
2.00
1.00
0.00
0.30
0.00
4,000.00
539.83
0.00
562.27
Valorizacin N 03
Metrado
Parcial
0.20
Valorizacin N 04
Metrado
Parcial
Valorizacin N 05
Metrado
Parcial
Valorizacin N 06
Metrado
Parcial
Valorizacin N 07
Metrado
Parcial
Valorizacin Acumulada
Metrado
Parcial
0.00
0.00
0.00
0.00
374.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.00
2.00
1.00
85.00
1.00
2,529.00
4,000.00
539.83
1,020.00
1,874.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.00
0.00
0.00
85.00
0.50
50.00
2.00
1.00
85.00
0.80
50.00
2.00
1.00
85.00
1.00
50.00
2.00
1.00
85.00
1.00
50.00
2.00
1.00
85.00
1.00
50.00
2.00
1.00
85.00
1.00
50.00
2.00
1.00
85.00
1.00
M2
M2
M2
4.90
314.00
314.00
10.01
1.38
1.61
49.05
433.32
505.54
4.90
314.00
314.00
49.05
433.32
505.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.90
314.00
314.00
49.05
433.32
505.54
0.00
0.00
0.00
0.00
0.00
0.00
4.90
314.00
314.00
4.90
314.00
314.00
4.90
314.00
314.00
4.90
314.00
314.00
4.90
314.00
314.00
4.90
314.00
314.00
4.90
314.00
314.00
M3
M2
M3
140.14
314.00
168.17
18.75
2.04
52.32
2,627.63
640.56
8,798.65
140.14
75.00
2,627.63
0.00
3,924.00
0.00
314.00
93.17
0.00
640.56
4,874.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
140.14
314.00
168.17
2,627.63
640.56
8,798.65
0.00
0.00
0.00
0.00
0.00
0.00
140.14
0.00
75.00
140.14
314.00
168.17
140.14
314.00
168.17
140.14
314.00
168.17
140.14
314.00
168.17
140.14
314.00
168.17
140.14
314.00
168.17
M3
M3
M2
M2
M3
11.18
5.06
58.80
155.00
43.27
107.85
153.70
18.51
17.94
152.25
1,205.76
777.72
1,088.39
2,780.70
6,587.86
11.18
0.00
0.00
0.00
43.27
1,205.76
0.00
0.00
0.00
6,587.86
0.00
5.06
58.80
93.00
0.00
0.00
777.72
1,088.39
1,668.42
0.00
0.00
0.00
0.00
1,112.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.18
5.06
58.80
155.00
43.27
1,205.76
777.72
1,088.39
2,780.70
6,587.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.18
0.00
0.00
0.00
43.27
11.18
5.06
58.80
93.00
43.27
11.18
5.06
58.80
155.00
43.27
11.18
5.06
58.80
155.00
43.27
11.18
5.06
58.80
155.00
43.27
11.18
5.06
58.80
155.00
43.27
11.18
5.06
58.80
155.00
43.27
37.87
830.97
3.25
35.28
500.30
12.67
151.67
2,359.50
29.78
249.53
3,670.60
65.41
383.40
1,964.60
3,110.40
208.99
2.20
253.51
18.80
2.20
294.63
26.83
2.20
230.96
30.70
2.20
220.81
19.34
2.20
1.41
7,914.45
1,828.13
823.91
663.26
1,100.66
3,732.96
4,069.31
5,190.90
6,877.99
7,660.57
8,075.32
14,443.18
7,414.96
4,322.12
4,385.66
37.87
830.97
0.00
0.00
125.00
7.60
91.00
2,359.50
17.87
149.72
2,202.36
39.25
230.04
1,178.76
1,866.24
7,914.45
1,828.13
0.00
0.00
275.00
2,239.78
2,441.58
5,190.90
4,126.79
4,596.34
4,845.19
8,665.91
4,448.97
2,593.27
2,631.40
0.00
0.00
3.25
35.28
375.30
5.07
60.67
0.00
11.91
99.81
1,468.24
26.16
153.36
785.84
1,244.16
0.00
0.00
823.91
663.26
825.66
1,493.18
1,627.72
0.00
2,751.20
3,064.23
3,230.13
5,777.27
2,965.98
1,728.85
1,754.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.87
830.97
3.25
35.28
500.30
12.67
151.67
2,359.50
29.78
249.53
3,670.60
65.41
383.40
1,964.60
3,110.40
7,914.45
1,828.13
823.91
663.26
1,100.66
3,732.96
4,069.31
5,190.90
6,877.99
7,660.57
8,075.32
14,443.18
7,414.96
4,322.12
4,385.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.87
830.97
0.00
0.00
125.00
7.60
91.00
2,359.50
17.87
149.72
2,202.36
39.25
230.04
1,178.76
1,866.24
37.87
830.97
3.25
35.28
500.30
12.67
151.67
2,359.50
29.78
249.53
3,670.60
65.41
383.40
1,964.60
3,110.40
37.87
830.97
3.25
35.28
500.30
12.67
151.67
2,359.50
29.78
249.53
3,670.60
65.41
383.40
1,964.60
3,110.40
37.87
830.97
3.25
35.28
500.30
12.67
151.67
2,359.50
29.78
249.53
3,670.60
65.41
383.40
1,964.60
3,110.40
37.87
830.97
3.25
35.28
500.30
12.67
151.67
2,359.50
29.78
249.53
3,670.60
65.41
383.40
1,964.60
3,110.40
37.87
830.97
3.25
35.28
500.30
12.67
151.67
2,359.50
29.78
249.53
3,670.60
65.41
383.40
1,964.60
3,110.40
37.87
830.97
3.25
35.28
500.30
12.67
151.67
2,359.50
29.78
249.53
3,670.60
65.41
383.40
1,964.60
3,110.40
M2
M2
117.60
165.25
53.14
32.76
6,249.26
5,413.59
0.00
0.00
117.60
165.25
6,249.26
5,413.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
117.60
165.25
6,249.26
5,413.59
0.00
0.00
0.00
0.00
0.00
0.00
117.60
165.25
117.60
165.25
117.60
165.25
117.60
165.25
117.60
165.25
117.60
165.25
M2
M2
M2
M2
ML
ML
M2
331.00
303.10
219.95
323.30
214.30
113.40
6.85
10.98
10.06
17.62
15.49
6.28
3.20
9.88
3,634.38
3,049.19
3,875.52
5,007.92
1,345.80
362.88
67.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
198.60
181.86
219.95
323.30
128.58
113.40
3.43
2,180.63
1,829.51
3,875.52
5,007.92
807.48
362.88
33.84
132.40
121.24
0.00
0.00
85.72
3.43
1,453.75
1,219.67
0.00
0.00
538.32
0.00
33.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
331.00
303.10
219.95
323.30
214.30
113.40
6.85
3,634.38
3,049.19
3,875.52
5,007.92
1,345.80
362.88
67.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
198.60
181.86
219.95
323.30
128.58
113.40
3.43
331.00
303.10
219.95
323.30
214.30
113.40
6.85
331.00
303.10
219.95
323.30
214.30
113.40
6.85
331.00
303.10
219.95
323.30
214.30
113.40
6.85
331.00
303.10
219.95
323.30
214.30
113.40
6.85
331.00
303.10
219.95
323.30
214.30
113.40
6.85
M2
M2
M2
M2
310.00
109.35
109.35
52.65
23.19
5.08
29.07
19.54
7,188.90
555.50
3,178.80
1,028.78
0.00
0.00
0.00
0.00
0.00
49.21
49.21
0.00
0.00
249.97
1,430.46
0.00
245.00
60.14
60.14
52.65
5,681.55
305.52
1,748.34
1,028.78
65.00
1,507.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
310.00
109.35
109.35
52.65
7,188.90
555.50
3,178.80
1,028.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
49.21
49.21
0.00
245.00
109.35
109.35
52.65
310.00
109.35
109.35
52.65
310.00
109.35
109.35
52.65
310.00
109.35
109.35
52.65
310.00
109.35
109.35
52.65
ML
ML
M2
ML
148.75
21.25
6.85
85.20
5.56
7.07
45.39
5.21
827.05
150.24
310.92
443.89
0.00
0.00
0.00
0.00
0.00
10.63
0.00
0.00
75.12
0.00
0.00
126.44
10.63
3.43
85.20
702.99
75.12
155.46
443.89
22.31
124.04
0.00
155.46
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
148.75
21.25
6.85
85.20
827.05
150.24
310.92
443.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.63
0.00
0.00
126.44
21.25
3.43
85.20
148.75
21.25
6.85
85.20
148.75
21.25
6.85
85.20
148.75
21.25
6.85
85.20
148.75
21.25
6.85
85.20
M2
167.90
21.51
3,611.53
0.00
167.90
3,611.53
M2
M2
M2
M2
M2
10.10
76.90
36.05
6.75
6.30
198.81
262.66
92.58
118.13
169.24
2,007.98
20,198.55
3,337.51
797.38
1,066.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.56
42.30
19.83
3.71
3.47
1,104.39
11,109.20
1,835.63
438.56
586.42
M3
KGR
M3
M2
KGR
M3
M2
KGR
M3
M2
KGR
M3
M2
KGR
UND
M2
62.00
3.43
0.00
0.00
0.00
0.00
0.00
0.00
167.90
3,611.53
0.00
0.00
0.00
167.90
167.90
167.90
167.90
167.90
167.90
4.55
34.61
16.22
3.04
1.84
903.59
9,089.35
1,501.65
358.52
310.56
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.23
0.30
169.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.10
76.90
36.05
6.75
6.30
2,007.98
20,198.55
3,337.51
797.38
1,066.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.56
42.30
19.83
3.71
3.47
10.10
76.90
36.05
6.75
5.30
10.10
76.90
36.05
6.75
6.30
10.10
76.90
36.05
6.75
6.30
10.10
76.90
36.05
6.75
6.30
4.90
171.78
841.72
0.00
0.00
0.00
0.00
0.00
4.90
841.72
0.00
0.00
4.90
841.72
0.00
0.00
0.00
0.00
0.00
0.00
4.90
4.90
4.90
PZA
UND
PZA
28.00
7.00
360.00
3.47
76.25
3.07
97.16
533.75
1,105.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
5.00
300.00
69.40
381.25
921.00
8.00
2.00
60.00
27.76
152.50
184.20
0.00
0.00
0.00
0.00
0.00
0.00
28.00
7.00
360.00
97.16
533.75
1,105.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
5.00
300.00
28.00
7.00
360.00
28.00
7.00
360.00
28.00
7.00
360.00
0.00
421.43
1,727.84
515.08
2,111.81
0.00
0.00
936.50
3,839.65
0.00
0.00
0.00
0.00
0.00
421.43
936.50
936.50
936.50
1,388.54
1,866.01
1,585.36
1,236.34
809.92
22.39
0.00
98.49
99.30
90.93
65.99
54.72
5.60
5.40
757.39
1,017.83
864.74
674.37
662.66
11.87
56.05
49.25
49.65
45.47
32.99
0.00
3.04
12.60
378.69
508.91
432.37
337.18
0.00
6.44
130.79
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
328.30
331.00
303.10
219.95
121.60
19.20
18.00
2,524.63
3,392.75
2,882.48
2,247.89
1,472.58
40.70
186.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
180.57
182.05
166.71
120.97
66.88
10.56
0.00
279.06
281.35
257.64
186.96
121.60
16.16
5.40
328.30
331.00
303.10
219.95
121.60
19.20
18.00
328.30
331.00
303.10
219.95
121.60
19.20
18.00
328.30
331.00
303.10
219.95
121.60
19.20
18.00
329.73
789.38
177.30
717.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
37.20
15.00
2.00
3.00
37.20
15.00
2.00
3.00
37.20
15.00
2.00
P2
936.50
4.10
3,839.65
0.00
0.00
0.00
M2
M2
M2
M2
M2
ML.
M2
328.30
331.00
303.10
219.95
121.60
19.20
18.00
7.69
10.25
9.51
10.22
12.11
2.12
10.38
2,524.63
3,392.75
2,882.48
2,247.89
1,472.58
40.70
186.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
UND
ML
ML
UND
3.00
37.20
15.00
2.00
109.91
21.22
11.82
358.64
329.73
789.38
177.30
717.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
37.20
15.00
2.00
329.73
789.38
177.30
717.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
37.20
15.00
2.00
M2
M2
24.00
24.00
1.38
1.61
33.12
38.64
16.56
38.64
12.00
0.00
16.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.00
24.00
33.12
38.64
0.00
0.00
0.00
0.00
12.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
M3
M2
M3
25.96
24.00
31.15
18.75
2.04
52.32
486.75
48.96
1,629.77
0.00
0.00
0.00
25.96
24.00
31.15
486.75
48.96
1,629.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.96
24.00
31.15
486.75
48.96
1,629.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.96
24.00
31.15
25.96
24.00
31.15
25.96
24.00
31.15
25.96
24.00
31.15
25.96
24.00
31.15
25.96
24.00
31.15
M2
M3
M3
24.00
7.13
5.55
17.94
152.25
107.85
430.56
1,085.54
598.57
0.00
0.00
0.00
24.00
7.13
5.55
430.56
1,085.54
598.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.00
7.13
5.55
430.56
1,085.54
598.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.00
7.13
5.55
24.00
7.13
5.55
24.00
7.13
5.55
24.00
7.13
5.55
24.00
7.13
5.55
24.00
7.13
5.55
M3
KGR
M3
M2
KGR
M3
M2
KGR
5.56
73.12
2.40
12.00
62.10
3.68
48.64
439.94
208.99
2.20
253.51
18.80
2.20
294.63
26.83
2.20
1,161.98
160.86
608.42
225.60
136.62
1,084.24
1,305.01
967.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.56
73.12
2.40
12.00
62.10
3.68
48.64
439.94
1,161.98
160.86
608.42
225.60
136.62
1,084.24
1,305.01
967.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.56
73.12
2.40
12.00
62.10
3.68
48.64
439.94
1,161.98
160.86
608.42
225.60
136.62
1,084.24
1,305.01
967.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.56
73.12
2.40
12.00
62.10
3.68
48.64
439.94
5.56
73.12
2.40
12.00
62.10
3.68
48.64
439.94
5.56
73.12
2.40
12.00
62.10
3.68
48.64
439.94
5.56
73.12
2.40
12.00
62.10
3.68
48.64
439.94
5.56
73.12
2.40
12.00
62.10
3.68
48.64
439.94
5.56
73.12
2.40
12.00
62.10
3.68
48.64
439.94
12.00
24.00
180.57
182.05
166.71
120.97
66.88
10.56
Descripcion de la Partida
REMODELACION DE PATIOS Y VEREDAS
OBRAS PRELIMINARES
DEMOLICION DE LOSA DE CONCRETO DE .20
TRAZADO Y REPLANTEO C/EQUIPO
MOVIMIENTO DE TIERRAS
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
PISOS Y PAVIMENTOS
PREPARACION DE SUBRASANTE
AFIRMADO DE E=.10M.
LOSA DE CONCRETO F'C=175KG/CM2 E=0.10M
VEREDA 140 KG/CM2 E=.10M. INC.SARDINEL/ENCOFRADO
AFIRMADO DE E=.10M.
REHABILITACION EDIFICACIONES EXISTENTES
DEMOLICION DE LOSAS DE CONCRETO
EXTRACCION DE MAYOLICA EXIST. EN SS.HH.
DEMOLICION DE MURO DE ALBAILERIA DE SOGA
DESMONTAJES DE VIDRIOS
VARIOS
MURO LADR.K.K.ARC.SOGA MEZ.1:4 TIPO IV
CONTRAPISO E=48MM. BASE 3.8CM.MEZ.1:5,ACAB.1CM.PASTA 1:2
PISO DE CERAMICA T/CELIMA DE 20X20
TARRAJEO PRIMARIO O RAYADO MUROS INTERIOR
TARRAJEO MUROS EXT.FROTACHADO MEZ.1:4;E=1.5CM.
TARRAJEO MUROS INT.FROTACHADO MEZ.1:4;E=1.5CM.
ZOCALO DE MAYOLICA DE 15X15 CM.BLANCA 1RA.
VIDRIOS Y CRISTALES SEMIDOBLES NACIONALES
CERRADURA P/PUERTA INTERIOR T/YALE O SIMILAR
PINTURA CIELORASOS AL TEMPLE
PINTURA EN MUROS EXTERIORES C/LATEX
PINTURA EN MUROS INTERIORES C/LATEX
PINTURA ESMALTE CON BASEANTICORROSIVA EN CARP. METALICA
PINTURA ESMALTE EN CARPINTERIA DE MADERA
INSTALACIONES ELECTRICAS
DESMONTAJE DE ACCESORIOS ELECTRICOS
DESMONTAJE DE TOMACORRIENTES MONOFASICOS DOBLES
DESMONTAJE DE INTERRUPTORES UNIPOLAR SIMPLE
DESMONTAJE DE INTERRUPTORES UNIPOLAR DOBLE
DESMONTAJE DE INTERRUPTORES DE CONMUTACION
DESMONTAJE DE TIMBRE C/PULSADOR
DESMONTAJE DE WALL SOCKET
DESMONTAJE DE FLUORESCENTE BE 1/40W
DESMONTAJE DE FLUORESCENTE BE 2/40W
DESMONTAJE DE FLUORESCENTE BE 3/40W
DESMONTAJE DE FLUORESCENTE JCM 1/40W
Unidad
M2
M2
M3
M2
M2
M2
M2
M2
M2
M2
M2
P2
M2
M2
M2
M2
M2
M2
M2
P2
UND
M2
M2
M2
M2
M2
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
04.01.11
04.01.12
05.00.00
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.01.08
05.01.09
05.01.10
05.01.11
05.01.12
05.02.00
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.02.06
05.02.07
06.00.00
06.01.00
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.01.08
06.01.09
06.01.10
06.01.11
06.01.12
06.01.13
06.01.14
UND
UND
UND
UND
UND
UND
UND
ML
ML
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
ML
ML
ML
ML
ML
UND
UND
UND
ML
M2
ML
ML
ML
UND
GLB
15.00%
10.00%
Metrado
Precio
Unitario
Parcial
Valorizacin N 01
Metrado Parcial
Valorizacin N 02
Metrado
Parcial
Valorizacin N 03
Metrado
662.00
662.00
6.64
1.38
4,395.68
913.56
0.00
0.00
662.00
662.00
4,395.68
913.56
175.50
52.32
9,182.16
0.00
175.50
9,182.16
675.00
675.00
675.00
77.80
77.80
2.63
5.08
39.83
29.07
5.08
1,775.25
3,429.00
26,885.25
2,261.65
395.22
0.00
0.00
0.00
0.00
0.00
675.00
675.00
202.50
23.34
77.80
1,775.25
3,429.00
8,065.58
678.49
395.22
51.80
37.20
10.50
85.00
21.01
5.72
10.01
18.44
1,088.32
212.78
105.11
1,567.40
0.00
0.00
0.00
0.00
0.00
37.20
0.00
0.00
0.00
212.78
0.00
0.00
51.80
10.50
51.80
51.80
54.20
10.50
10.50
54.20
85.00
15.00
1,419.00
1,644.00
1,930.00
166.00
251.50
32.76
18.67
52.98
9.88
10.98
10.06
45.39
4.10
66.25
7.69
10.25
9.51
12.11
10.97
343.98
967.11
2,744.36
535.50
115.29
105.63
2,460.14
348.50
993.75
10,912.11
16,851.00
18,354.30
2,010.26
2,758.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.50
25.90
9.00
5.00
3.00
2.00
1.00
1.00
9.00
60.00
3.00
3.00
12.21
12.21
12.21
12.21
24.41
9.78
19.53
19.53
19.53
19.53
109.89
61.05
36.63
24.42
24.41
9.78
175.77
1,171.80
58.59
58.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
472.50
54.46
10.50
51.00
54.20
10.50
10.50
879.78
822.00
1,119.40
41.50
9.00
5.00
3.00
2.00
1.00
1.00
9.00
60.00
3.00
3.00
3.00
2.00
19.53
19.53
58.59
39.06
0.00
0.00
0.00
0.00
0.00
0.00
3.00
2.00
54.00
26.00
5.00
23.00
3.00
32.00
21.00
9.00
5.00
3.00
2.00
1.00
23.76
25.67
12.67
12.67
16.47
14.43
15.03
28.32
22.45
26.11
31.24
135.20
1,283.04
667.42
63.35
291.41
49.41
461.76
315.63
254.88
112.25
78.33
62.48
135.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.00
26.00
5.00
1.00
9.00
60.00
3.00
3.00
3.00
2.00
17.25
111.87
151.87
171.87
111.87
46.87
116.87
17.25
1,006.83
9,112.20
515.61
335.61
140.61
233.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.00
17.00
17.00
17.00
17.00
1.00
1.00
1.00
65.00
60.00
60.00
60.00
60.00
1.00
2.00
63.93
1.08
6.56
4.69
16.02
1,311.30
465.15
749.74
69.66
1.38
6.56
4.69
16.02
1,733.80
1,200.00
1,598.25
18.36
111.52
79.73
272.34
1,311.30
465.15
749.74
4,527.90
82.80
393.60
281.40
961.20
1,733.80
2,400.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
65.00
60.00
60.00
60.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
465.15
749.74
4,527.90
82.80
393.60
281.40
0.00
0.00
0.00
143,664.95
21,549.74
14,366.50
179,581.19
pre02 163,761.52VAL02_01
0.00
0.00
0.00
0.00
0.00
VAL02_02
35,548.31
5,332.25
3,554.83
44,435.39
40,520.99
32.00
21.00
3.15
21.00
1.05
1.05
1.05
25.00
17.00
17.00
17.00
15.30
0.30
60.00
VAL02_03
Valorizacin N 03
Parcial
Valorizacin N 04
Metrado
Parcial
Valorizacin N 05
Metrado
Parcial
Valorizacin N 06
Metrado
Parcial
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18,819.68
1,583.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,088.32
0.00
105.11
940.44
0.00
0.00
0.00
626.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
483.55
2,744.36
0.00
0.00
0.00
2,460.14
102.50
132.50
3,614.30
6,457.50
6,229.05
968.80
872.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.00
13.00
69.22
192.00
155.60
44.50
172.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
246.00
861.25
532.30
1,968.00
1,479.76
538.90
1,886.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
343.98
483.55
0.00
535.50
115.29
105.63
0.00
0.00
0.00
6,765.51
8,425.50
10,645.49
502.57
0.00
109.89
61.05
36.63
24.42
24.41
9.78
175.77
1,171.80
58.59
58.59
34.00
25.90
51.80
54.20
25.00
2.00
470.00
630.00
655.00
80.00
79.50
Valorizacin N 07
Metrado
58.59
39.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,283.04
667.42
63.35
0.00
0.00
461.76
315.63
0.00
0.00
0.00
0.00
0.00
9.00
5.00
3.00
2.00
0.60
0.00
0.00
0.00
190.05
16.47
0.00
0.00
254.88
112.25
78.33
62.48
81.12
0.00
0.00
0.00
8.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.40
0.00
0.00
0.00
101.36
32.94
0.00
0.00
0.00
0.00
0.00
0.00
54.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
22.00
1.00
1.00
1.00
1.00
0.00
335.61
3,341.14
171.87
111.87
46.87
116.87
1.00
2.85
17.00
0.95
0.95
0.95
1.00
17.25
318.83
2,581.79
163.28
106.28
44.53
116.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
27.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,733.80
1,200.00
0.00
0.00
0.00
0.00
0.00
0.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
917.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,200.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VAL02_04
32,572.62
4,885.89
3,257.26
40,715.78
37,129.04
VAL02_05
13,168.17
1,975.23
1,316.82
16,460.21
15,010.20
0.00
0.00
0.00
0.00
0.00
0.00
352.39
3,189.27
180.46
117.46
49.21
0.00
1,598.25
18.36
111.52
79.73
245.11
393.39
0.00
0.00
0.00
0.00
0.00
0.00
961.20
0.00
0.00
62,375.85
9,356.38
6,237.59
77,969.81
71,101.30
15.00
1.00
1.70
VAL02_06
VAL02_07
Metrado 01
Acumulado
Metrado 02
Acumulado
0.00
0.00
662.00
662.00
4,395.68
913.56
0.00
0.00
0.00
0.00
0.00
0.00
662.00
662.00
0.00
175.50
9,182.16
0.00
0.00
0.00
175.50
0.00
0.00
0.00
0.00
0.00
675.00
675.00
675.00
77.80
77.80
1,775.25
3,429.00
26,885.25
2,261.65
395.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
675.00
675.00
202.50
23.34
77.80
0.00
0.00
0.00
0.00
51.80
37.20
10.50
85.00
1,088.32
212.78
105.11
1,567.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.50
51.80
51.80
54.20
10.50
10.50
54.20
85.00
15.00
1,419.00
1,644.00
1,930.00
166.00
251.50
343.98
967.11
2,744.36
535.50
115.29
105.63
2,460.14
348.50
993.75
10,912.11
16,851.00
18,354.30
2,010.26
2,758.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.00
5.00
3.00
2.00
1.00
1.00
9.00
60.00
3.00
3.00
109.89
61.05
36.63
24.42
24.41
9.78
175.77
1,171.80
58.59
58.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
2.00
58.59
39.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.00
26.00
5.00
23.00
3.00
32.00
21.00
9.00
5.00
3.00
2.00
1.00
1,283.04
667.42
63.35
291.41
49.41
461.76
315.63
254.88
112.25
78.33
62.48
135.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
9.00
60.00
3.00
3.00
3.00
2.00
17.25
1,006.83
9,112.20
515.61
335.61
140.61
233.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.00
17.00
17.00
17.00
17.00
1.00
1.00
1.00
65.00
60.00
60.00
60.00
60.00
1.00
2.00
1,598.25
18.36
111.52
79.73
272.34
1,311.30
465.15
749.74
4,527.90
82.80
393.60
281.40
961.20
1,733.80
2,400.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
65.00
60.00
60.00
60.00
0.00
0.00
0.00
Saldo02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
143,664.95
21,549.74
14,366.50
179,581.19
Acumul02 163,761.52
Metrado 03
Acumulado
Metrado 04
Acumulado
Metrado 05
Acumulado
Metrado 06
Acumulado
Metrado 07
Acumulado
662.00
662.00
662.00
662.00
662.00
662.00
662.00
662.00
662.00
662.00
175.50
175.50
175.50
175.50
175.50
675.00
675.00
675.00
77.80
77.80
675.00
675.00
675.00
77.80
77.80
675.00
675.00
675.00
77.80
77.80
675.00
675.00
675.00
77.80
77.80
675.00
675.00
675.00
77.80
77.80
51.80
37.20
10.50
51.00
51.80
37.20
10.50
85.00
51.80
37.20
10.50
85.00
51.80
37.20
10.50
85.00
51.80
37.20
10.50
85.00
10.50
25.90
0.00
54.20
10.50
10.50
0.00
0.00
0.00
879.78
822.00
1,119.40
41.50
0.00
10.50
51.80
51.80
54.20
10.50
10.50
54.20
25.00
2.00
1,349.78
1,452.00
1,774.40
121.50
79.50
10.50
51.80
51.80
54.20
10.50
10.50
54.20
85.00
15.00
1,419.00
1,644.00
1,930.00
166.00
251.50
10.50
51.80
51.80
54.20
10.50
10.50
54.20
85.00
15.00
1,419.00
1,644.00
1,930.00
166.00
251.50
10.50
51.80
51.80
54.20
10.50
10.50
54.20
85.00
15.00
1,419.00
1,644.00
1,930.00
166.00
251.50
9.00
5.00
3.00
2.00
1.00
1.00
9.00
60.00
3.00
3.00
9.00
5.00
3.00
2.00
1.00
1.00
9.00
60.00
3.00
3.00
9.00
5.00
3.00
2.00
1.00
1.00
9.00
60.00
3.00
3.00
9.00
5.00
3.00
2.00
1.00
1.00
9.00
60.00
3.00
3.00
9.00
5.00
3.00
2.00
1.00
1.00
9.00
60.00
3.00
3.00
3.00
2.00
3.00
2.00
3.00
2.00
3.00
2.00
3.00
2.00
54.00
26.00
5.00
0.00
0.00
32.00
21.00
0.00
0.00
0.00
0.00
0.00
54.00
26.00
5.00
15.00
1.00
32.00
21.00
9.00
5.00
3.00
2.00
0.60
54.00
26.00
5.00
23.00
3.00
32.00
21.00
9.00
5.00
3.00
2.00
1.00
54.00
26.00
5.00
23.00
3.00
32.00
21.00
9.00
5.00
3.00
2.00
1.00
54.00
26.00
5.00
23.00
3.00
32.00
21.00
9.00
5.00
3.00
2.00
1.00
0.00
3.15
21.00
1.05
1.05
1.05
0.00
0.00
6.15
43.00
2.05
2.05
2.05
1.00
1.00
9.00
60.00
3.00
3.00
3.00
2.00
1.00
9.00
60.00
3.00
3.00
3.00
2.00
1.00
9.00
60.00
3.00
3.00
3.00
2.00
25.00
17.00
17.00
17.00
15.30
0.30
1.00
1.00
65.00
60.00
60.00
60.00
60.00
0.00
0.00
25.00
17.00
17.00
17.00
17.00
0.30
1.00
1.00
65.00
60.00
60.00
60.00
60.00
1.00
1.00
25.00
17.00
17.00
17.00
17.00
1.00
1.00
1.00
65.00
60.00
60.00
60.00
60.00
1.00
2.00
25.00
17.00
17.00
17.00
17.00
1.00
1.00
1.00
65.00
60.00
60.00
60.00
60.00
1.00
2.00
25.00
17.00
17.00
17.00
17.00
1.00
1.00
1.00
65.00
60.00
60.00
60.00
60.00
1.00
2.00
Descripcion de la Partida
01.00.00
01.01.00
01.01.01
01.02.00
01.02.01
01.02.02
01.03.00
01.03.01
01.03.02
01.03.03
01.04.00
01.04.01
01.04.02
01.04.03
01.04.04
01.04.05
01.05.00
01.05.01
01.05.02
01.05.03
01.05.04
01.06.00
01.06.01
02.00.00
02.01.00
02.01.01
02.01.02
02.02.00
02.02.01
02.02.03
02.02.04
02.03.00
02.03.01
02.04.00
02.04.01
02.04.02
02.04.03
02.05.00
02.05.01
03.00.00
LOSA DEPORTIVA
OBRAS PROVISIONALES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO P/LOSA DEPORTIVA
OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO EN LOSAS
MOVIMIENTO DE TIERRAS
CORTE HASTA NIVEL DE SUBRASANTE EN LOSAS
EXCAVACION DE SARDINELES
ELIMINACION DE EXCEDENTES D=5KM
PISOS Y PAVIMENTOS
PREPARACION DE SUBRASANTE
BASE E=0.15
LOSA DE CONCRETO DE F'C=210KG/CM2
SARDINEL DE CONCRETO DE F'C=140KG/CM2 10X30
ACERO GRADO 60- 3/8" EN MALLA DE CIMIENTO DE ARCOS
VARIOS
ARCOS DE FULBITO CON TABLERO DE BASQUET
PARANTES DE NET DE VOLEY INC. INST. NET Y REGISTROS
JUNTAS DE DILATACION
JUNTAS DE CONTRACCION
PINTURA
PINTURA LINEAL AL ESMALTE EN LOSAS DEPORTIVAS
GRADERIAS
OBRAS PRELIMINARES
TRAZO DE NIVELES Y REPLANTEO PRELIMINARES C/EQUIPO
LIMPIEZA DE TERRENO MANUAL
MOVIMIENTO DE TIERRAS
EXCAV. ZANJAS P/CIMIENTOS MAT.SUEL.
RELLENO APISONADO C/MAT.PREST.
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
CONCRETO SIMPLE
CIMIENTO CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 EN GRADERIAS
ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERIAS
ACERO F'Y 4200KG/CM2
ACABADOS
ACABADOS PASOS Y CONTRAPASOS C/ CEMENTO FROTACHADO
ALUMBRADO LOSA DEPORTIVA
03
04
Unidad
Metrado
GLB
1.00
M2
M2
608.00
608.00
M3
M3
M3
182.40
3.60
218.60
M2
M2
M2
ML
KG
608.00
608.00
608.00
102.00
15.00
PAR
PAR
ML
ML
1.00
1.00
70.00
120.00
ML
316.38
M2
M2
62.50
62.50
M3
M3
M3
8.00
49.80
9.60
M3
8.00
M3
M2
KGR
7.75
29.90
306.55
M2
101.30
03.01.00
03.01.01
03.01.02
03.01.03
03.01.04
03.02.00
03.02.01
03.02.02
03.02.03
03.02.05
03.02.06
03.02.07
03.02.08
04.00.00
04.01.00
04.02.00
04.03.00
04.04.00
04.05.00
04.06.00
05.00.00
05.01.00
05.01.01
05.02.00
05.02.01
05.02.02
05.02.03
05.03.00
05.03.01
05.03.02
05.03.03
05.04.00
05.04.01
05.04.02
05.04.03
05.04.04
05.04.05
05.04.06
05.05.00
05.05.01
05.06.00
05.06.01
OBRAS PRELIMINARES
TRAZO Y REPLANTEO P/ALUMBRADO
EXCAVACION DE ZANJA 0.50X0.65M
RELLENO Y COMPACTACION DE ZANJA 0.50X0.65M
RETIRO DE POSTES DE ALUMBRADO PUBLICO C/LUMINARIA
ALUMBRADO
CONDUCTOR 2-1 X6MM2 NYY + 2.5MM2 NYY/T
POSTE DE 13M/400/180/380 C.A.C.
CRUZETA C.A.V. ASIMETRICO 1.50M-78KG
REFLECTOR C/LAMPARA 400W
EMPALME 3M-0 ( P/SUBTERRANEA)
HOYO PARA POSTE DE 13M/400/180/380
SOLADO DE CONCRETO P/POSTE
ALUMBRADO PUBLICO
CONDUCTOR 2-1X6MM2 NYY
POSTE DE 8M/200/120/240/C.A.C.
PASTORAL PS 0.50/0.25/125 C.A.V.
LUMINARIA C/LAMPARA DE 70W
HOYO PARA POSTE DE 8M/120/240
SOLADO DE CONCRETO P/POSTE
REHABILITACION CERCO PERIMETRICO
OBRAS PRELIMINARES
DEMOLICION DE MURO DE ALBAILERIA DE SOGA
MOVIMIENTO DE TIERRAS
EXCAV. ZANJAS P/CIMIENTOS MAT.SUEL.H=0.70M.
REFINE, NIVELACION Y COMPACTACION/TERRENO NORMAL MANUAL
ELIMIN. MATER.EXCED.CARGUIO A MANO/VOLQUETE 6M3
CONCRETO SIMPLE
CIMIENTO CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
SOBRECIMIENTOS,CONCRETO C:H/1:8+25% P.M.
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO
CONCRETO ARMADO
CONCRETO F'C 210 KG/CM2 VIGA
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO F'Y 4200KG/CM2
CONCRETO F'C 210 KG/CM2 COLUMNA
ENCOFRADO Y DESENCOFRADO PARA COLUMNAS
ACERO F'Y 4200KG/CM2
MUROS Y TABIQUES
MURO LADR.K.K.ARC.SOGA MEZ.1:4 TIPO IV 1 CARAVISTA
REVOQUES Y ENLUCIDOS
TARRAJ.COLUMNAS/VIGAS/SOBREC. MEZ.C:A 1:5, E=1.5CM
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
COSTO TOTAL
COSTO TOTAL X FACTOR DE RELACION
ML
ML
ML
UND
123.00
123.00
123.00
1.00
ML
UND
UND
UND
UND
UND
UND
110.00
4.00
4.00
4.00
12.00
4.00
4.00
ML
UND
UND
UND
UND
UND
80.00
3.00
3.00
3.00
3.00
3.00
M2
45.60
M3
M2
M3
3.60
3.00
4.32
M3
M3
M2
2.10
0.89
10.80
M3
M2
KGR
M3
M2
KGR
0.11
1.44
10.20
0.30
4.50
32.40
M2
15.50
M2
8.10
15.00%
10.00%
05
06
Precio
Unitario
Parcial
07
08
09
Valorizacin N 01
Metrado
Parcial
10
11
Valorizacin N 02
Metrado
Parcial
12
Valorizacin N 03
Metrado
Parcial
2,337.20
2,337.20
0.50
1,168.60
0.00
0.00
1.61
0.58
978.88
352.64
608.00
608.00
978.88
352.64
0.00
0.00
0.00
0.00
0.00
0.00
15.21
9.56
22.00
2,774.30
34.42
4,809.20
182.40
2,774.30
0.00
2,013.00
0.00
0.00
78.00
0.00
0.00
1,716.00
0.00
0.00
865.66
2.63
6.35
40.57
19.20
2.53
1,599.04
3,860.80
24,666.56
1,958.40
37.95
0.00
0.00
0.00
0.00
0.00
456.00
456.00
0.00
0.00
0.00
1,199.28
2,895.60
0.00
0.00
0.00
3,100.00
670.00
1.88
0.95
3,100.00
670.00
131.60
114.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.87
275.25
0.00
0.00
0.00
0.00
1.38
1.61
86.25
100.63
0.00
0.00
0.00
0.00
0.00
0.00
31.25
50.00
43.13
80.50
18.75
45.28
52.32
150.00
2,254.94
502.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.40
7.68
120.00
0.00
401.82
107.85
862.80
0.00
0.00
0.00
4.00
431.40
236.80
30.26
2.20
1,835.20
904.77
674.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.97
0.00
271.43
0.00
33.17
3,360.12
0.00
0.00
0.00
91.50
0.50
39.35
152.00
152.00
1,168.60
399.76
965.20
0.00
0.00
0.00
0.00
1.08
6.56
4.69
188.75
132.84
806.88
576.87
188.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
188.75
73.80
61.50
79.70
403.44
0.00
0.00
23.92
1,013.72
82.97
589.28
43.91
16.10
12.39
2,631.20
4,054.88
331.88
2,357.12
526.92
64.40
49.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
66.00
1,578.72
0.00
0.00
0.00
0.00
0.00
0.00
19.42
537.32
171.50
330.59
12.88
12.39
1,553.60
1,611.96
514.50
991.77
38.64
37.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48.00
932.16
0.00
0.00
0.00
0.00
0.00
10.01
456.46
0.00
0.00
0.00
45.60
456.46
18.75
11.52
52.32
67.50
34.56
226.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.60
3.00
4.32
67.50
34.56
226.02
107.85
153.70
18.51
226.49
136.79
199.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.10
0.89
10.80
226.49
136.79
199.91
230.96
30.70
2.20
294.63
26.83
2.20
25.41
44.21
22.44
88.39
120.74
71.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.11
1.44
10.20
0.30
4.50
32.40
25.41
44.21
22.44
88.39
120.74
71.28
42.82
663.71
0.00
0.00
0.00
15.50
663.71
19.14
155.03
0.00
0.00
0.00
8.10
155.03
pre03
77,439.51
11,615.93
7,743.95
96,799.39
88,272.14
7,287.42
1,093.11
728.74
9,109.28
8,306.82
VAL03_02
5,999.63
899.94
599.96
7,499.54
6,838.89
VAL03_03
10,280.46
1,542.07
1,028.05
12,850.58
11,718.54
VAL03_01
13
14
15
Valorizacin N 04
Metrado
Parcial
16
Valorizacin N 05
Metrado
Parcial
17
18
Valorizacin N 06
Metrado
Parcial
19
20
Valorizacin N 07
Metrado
Parcial
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.60
9.75
0.00
34.42
214.50
0.00
0.00
0.00
0.00
0.00
0.04
0.00
0.00
0.00
0.00
0.00
0.00
608.00
102.00
15.00
0.00
0.00
24,666.56
1,958.40
37.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
67.00
0.00
114.00
1.00
0.90
70.00
0.00
3,100.00
603.00
131.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
316.38
275.25
0.00
0.00
31.25
12.50
43.13
20.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.60
49.80
1.92
30.00
2,254.94
100.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
431.40
0.00
0.00
0.00
0.00
3.13
11.96
190.00
741.18
361.91
418.00
4.62
8.97
116.55
1,094.02
271.43
256.41
0.00
0.00
0.00
0.00
0.00
0.00
40.52
1,344.05
60.78
2,016.07
0.00
0.00
0.10
120.00
49.20
61.50
123.00
53.14
403.44
576.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44.00
4.00
4.00
1,052.48
4,054.88
331.88
0.00
526.92
64.40
49.56
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
2,357.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
621.44
1,611.96
514.50
0.00
38.64
37.17
0.00
0.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
991.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11,096.71
1,664.51
1,109.67
13,870.89
VAL03_05 12,648.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
4.00
4.00
32.00
3.00
3.00
3.00
3.00
VAL03_04
42,775.30
6,416.30
4,277.53
53,469.13
48,758.92
VAL03_06
VAL03_07
21
22
Valorizacin Acumulada
Metrado
Parcial
23
24
25
26
27
Metrado 01
Acumulado
Metrado 02
Acumulado
Metrado 03
Acumulado
1.00
2,337.20
0.00
0.00
0.50
0.50
1.00
608.00
608.00
978.88
352.64
0.00
0.00
0.00
0.00
608.00
608.00
608.00
608.00
608.00
608.00
182.40
3.60
218.60
2,774.30
34.42
4,809.20
0.00
0.00
0.00
0.00
0.00
0.00
182.40
0.00
91.50
182.40
0.00
169.50
182.40
0.00
208.85
608.00
608.00
608.00
102.00
15.00
1,599.04
3,860.80
24,666.56
1,958.40
37.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
456.00
456.00
0.00
0.00
0.00
608.00
608.00
0.00
0.00
0.00
1.00
1.00
70.00
120.00
3,100.00
670.00
131.60
114.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
316.38
275.25
0.00
0.00
0.00
0.00
0.00
62.50
62.50
86.25
100.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31.25
50.00
8.00
49.80
9.60
150.00
2,254.94
502.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.40
0.00
7.68
8.00
862.80
0.00
0.00
0.00
0.00
4.00
7.75
29.90
306.55
1,835.20
904.77
674.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.97
0.00
101.30
3,360.12
0.00
0.00
0.00
0.00
0.00
123.00
123.00
123.00
1.00
132.84
806.88
576.87
188.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
73.80
61.50
0.00
1.00
110.00
4.00
4.00
4.00
12.00
4.00
4.00
2,631.20
4,054.88
331.88
2,357.12
526.92
64.40
49.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
66.00
0.00
0.00
0.00
0.00
0.00
0.00
80.00
3.00
3.00
3.00
3.00
3.00
1,553.60
1,611.96
514.50
991.77
38.64
37.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48.00
0.00
0.00
0.00
0.00
0.00
45.60
456.46
0.00
0.00
0.00
0.00
45.60
3.60
3.00
4.32
67.50
34.56
226.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.60
3.00
4.32
2.10
0.89
10.80
226.49
136.79
199.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.10
0.89
10.80
0.11
1.44
10.20
0.30
4.50
32.40
25.41
44.21
22.44
88.39
120.74
71.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.11
1.44
10.20
0.30
4.50
32.40
15.50
663.71
0.00
0.00
0.00
0.00
15.50
8.10
155.03
0.00
0.00
0.00
0.00
8.10
Acumul03
77,439.51
11,615.93
7,743.95
96,799.39
88,272.14
Saldo03
0.00
0.00
0.00
0.00
0.00
28
29
30
31
Metrado 04
Acumulado
Metrado 05
Acumulado
Metrado 06
Acumulado
Metrado 07
Acumulado
1.00
1.00
1.00
1.00
608.00
608.00
608.00
608.00
608.00
608.00
608.00
608.00
182.40
3.60
218.60
182.40
3.60
218.60
182.40
3.60
218.60
182.40
3.60
218.60
608.00
608.00
608.00
102.00
15.00
608.00
608.00
608.00
102.00
15.00
608.00
608.00
608.00
102.00
15.00
608.00
608.00
608.00
102.00
15.00
0.00
0.10
0.00
120.00
1.00
1.00
70.00
120.00
1.00
1.00
70.00
120.00
1.00
1.00
70.00
120.00
0.00
316.38
316.38
316.38
62.50
62.50
62.50
62.50
62.50
62.50
62.50
62.50
8.00
49.80
9.60
8.00
49.80
9.60
8.00
49.80
9.60
8.00
49.80
9.60
8.00
8.00
8.00
8.00
3.13
20.93
190.00
7.75
29.90
306.55
7.75
29.90
306.55
7.75
29.90
306.55
40.52
101.30
101.30
101.30
123.00
123.00
123.00
1.00
123.00
123.00
123.00
1.00
123.00
123.00
123.00
1.00
123.00
123.00
123.00
1.00
110.00
4.00
4.00
0.00
12.00
4.00
4.00
110.00
4.00
4.00
4.00
12.00
4.00
4.00
110.00
4.00
4.00
4.00
12.00
4.00
4.00
110.00
4.00
4.00
4.00
12.00
4.00
4.00
80.00
3.00
3.00
0.00
3.00
3.00
80.00
3.00
3.00
3.00
3.00
3.00
80.00
3.00
3.00
3.00
3.00
3.00
80.00
3.00
3.00
3.00
3.00
3.00
45.60
45.60
45.60
45.60
3.60
3.00
4.32
3.60
3.00
4.32
3.60
3.00
4.32
3.60
3.00
4.32
2.10
0.89
10.80
2.10
0.89
10.80
2.10
0.89
10.80
2.10
0.89
10.80
0.11
1.44
10.20
0.30
4.50
32.40
0.11
1.44
10.20
0.30
4.50
32.40
0.11
1.44
10.20
0.30
4.50
32.40
0.11
1.44
10.20
0.30
4.50
32.40
15.50
15.50
15.50
15.50
8.10
8.10
8.10
8.10
Factura
Emisin
Pago
Concepto
Directo
Adelanto
Material
Monto
VALORIZACION
Reajuste
135,827.85
AMORTIZACION
Directo
Material
Bruta
Valorizacin
Neta
Fondo de
Garantia
IGV
18%
Total
Facturable
24,449.01 160,276.86
Neto a
Cobrar
001-00253
0.00
0.00
0.00
001-00254
17,836.48
0.00
0.00
0.00
001-00255
88,441.15
0.00
0.00
0.00
001-00256
14,545.33
0.00
0.00
0.00
2,618.16
17,163.49
001-00257
5,154.53
0.00
0.00
0.00
927.82
6,082.35
6,082.35
001-00258
9,778.88
0.00
0.00
0.00
1,760.20
11,539.08
11,539.08
9,352.94
3,210.57
160,276.86
21,047.05
21,047.05
15,919.41 104,360.56
104,360.56
17,163.49
001-00259
11/3/1998
VALORIZACION N 01 AL 31/10/98
99,131.13
1,231.11
100,362.24
19,826.23
28,575.21
51,960.80
5,018.11
61,313.74
56,295.63
001-00260
12/3/1998
VALORIZACION N 02 AL 30/11/98
207,877.11
3,056.03
210,933.14
41,575.42
52,658.13
116,699.59
10,546.66
21,005.93 137,705.52
127,158.86
001-00261
1/4/1999
VALORIZACION N 03 AL 31/12/98
173,991.97
4,077.31
178,069.28
34,798.39
32,080.41
111,190.48
8,903.46
20,014.29 131,204.77
122,301.31
001-00262
2/2/1999
VALORIZACION N 04 AL 31/01/99
143,278.64
3,878.95
147,157.59
28,655.73
21,599.50
96,902.36
7,357.88
17,442.42 114,344.78
106,986.90
001-00263
2/12/1999
VALORIZACION N 05 AL 11/02/99
54,880.93
1,499.51
56,380.44
10,976.19
843.09
44,561.16
2,819.02
679,159.78
13,742.91
692,902.69
135,831.96
135,756.34
421,314.39
135,827.85
135,756.37
8,021.01
52,582.17
49,763.15
782,975.24
CALCULO DE REAJUSTE
Obra
Supervisin
Contratista
P.Base
P.Oferta
F.Relacin
Fecha
Plazo
VALORIZACION N 01 AL 31/10/98
Formula
Val
01
01
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
Monto Valorizado
Real
Programada
90,821.26
26,716.47
90,821.26
Formula
Val
01
02
Val
01
Mes
K
Sep-98 1.012
26,716.47
Real
1,089.86
Reajuste
Programada
320.60
Reconocido
1,089.86
1,089.86
320.60
1,089.86
Real
0.00
Reajuste
Programada
154.72
Reconocido
0.00
0.00
154.72
0.00
Real
141.22
Reajuste
Programada
5.13
Reconocido
141.22
141.22
5.13
141.22
Deduccin
Reajuste
Directo
Materiales
Total
0.00
0.00
1,089.86
0.00
0.00
1,089.86
REHABILITACION
Monto Valorizado
Real
Programada
0.00
11,901.24
0.00
Formula
Monto Acumulado
Real
Programada
90,821.26
26,716.47
03
Mes
K
Sep-98 1.013
11,901.24
Deduccin
Reajuste
Directo
Materiales
Total
0.00
0.00
0.00
0.00
0.00
0.00
Monto Valorizado
Real
Programada
8,306.82
301.94
8,306.82
Monto Acumulado
Real
Programada
0.00
11,901.24
301.94
Monto Acumulado
Real
Programada
8,306.82
301.94
Mes
K
Sep-98 1.017
Deduccin
Reajuste
Directo
Materiales
Total
0.00
0.00
141.22
0.00
0.00
141.22
REAJUSTE01_01
REAJUSTE02_01
REAJUSTE03_01
1,089.86
0.00
141.22
REAJUSTE VALORIZACION N 01
1,231.08
CALCULO DE REAJUSTE
Obra
Supervisin
Contratista
P.Base
P.Oferta
F.Relacin
Fecha
Plazo
VALORIZACION N 02 AL 30/11/98
Formula
Val
01
02
01
251,332.11
Formula
Val
01
02
02
Val
01
02
03
Mes
K
Oct-98 1.013
Oct-98 1.013
Real
1,180.68
2,086.64
Reajuste
Programada
347.31
956.32
Reconocido
1,180.68
2,086.64
3,267.32
1,303.63
3,267.32
Real
0.00
648.34
Reajuste
Programada
190.42
613.20
Reconocido
0.00
648.34
648.34
803.62
648.34
Real
199.36
164.13
Reajuste
Programada
7.25
280.83
Reconocido
199.36
164.13
363.49
288.08
Deduccin
Reajuste
Directo
Materiales
Total
17.95
-62.55
1,225.28
31.72
-112.97
2,167.89
49.67
-175.52
3,393.17
REHABILITACION
Monto Acumulado
Real
Programada
0.00
11,901.24
40520.99
50225.93
Mes
K
Oct-98 1.016
Oct-98 1.016
50,225.93
Deduccin
Reajuste
Directo
Materiales
Total
0.00
0.00
0.00
24.00
0.00
624.34
24.00
0.00
624.34
Monto Valorizado
Real
Programada
8,306.82
301.94
6,838.89
11,701.19
15,145.71
Monto Acumulado
Real
Programada
90,821.26
26,716.47
251332.11
100279.65
100,279.65
Monto Valorizado
Real
Programada
0.00
11,901.24
40,520.99
38,324.69
40,520.99
Formula
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
Monto Valorizado
Real
Programada
90,821.26
26,716.47
160,510.85
73,563.18
12,003.13
Monto Acumulado
Real
Programada
8,306.82
301.94
15145.71
12003.13
Mes
K
Oct-98 1.024
Oct-98 1.024
363.49
Deduccin
Reajuste
Directo
Materiales
Total
11.44
40.12
147.80
9.41
33.03
121.69
20.85
73.15
269.49
Formula 01
Reajuste Total
Reajuste Anterior
Reajuste Reconocido
3,393.17
1,089.86
2,303.31
Formula 02
Reajuste Total
Reajuste Anterior
Reajuste Reconocido
624.34
0.00
624.34
Formula 03
Reajuste Total
Reajuste Anterior
Reajuste Reconocido
269.49
141.22
128.27
REAJUSTE VALORIZACION N 02
3,055.92
CALCULO DE REAJUSTE
Obra
Supervisin
Contratista
P.Base
P.Oferta
F.Relacin
Fecha
Plazo
VALORIZACION N 03 AL 31/12/98
Formula
Val
01
02
03
01
342,498.90
Formula
Val
01
02
03
02
Val
01
02
03
03
Mes
K
Nov-98 1.020
Nov-98 1.020
Nov-98 1.020
224,138.45
Real
1,816.43
3,210.22
1,823.34
Reajuste
Programada
534.33
1,471.26
2,477.18
Reconocido
1,816.43
3,210.22
1,823.34
6,849.99
4,482.77
6,849.99
Real
0.00
1,053.55
1,848.63
Reajuste
Programada
309.43
996.44
1,499.83
Reconocido
0.00
1,053.55
1,752.15
2,902.18
2,805.70
2,805.70
Real
249.20
205.17
351.56
Reajuste
Programada
9.06
351.04
982.35
Reconocido
249.20
205.17
351.56
805.93
1,342.45
805.93
Deduccin
Reajuste
Directo
Materiales
Total
143.59
202.75
1,470.09
253.77
343.05
2,613.40
144.14
184.86
1,494.34
541.50
730.66
5,577.83
Monto Acumulado
Real
Programada
0.00
11,901.24
40520.99
50225.93
111622.29
107911.82
Mes
K
Nov-98 1.026
Nov-98 1.026
Nov-98 1.026
107,911.82
Deduccin
Reajuste
Directo
Materiales
Total
0.00
0.00
0.00
104.00
95.43
854.12
182.49
167.45
1,402.21
286.49
262.88
2,256.33
Monto Valorizado
Real
Programada
8,306.82
301.94
6,838.89
11,701.19
11,718.54
32,744.88
26,864.25
Monto Acumulado
Real
Programada
90,821.26
26,716.47
251332.11
100279.65
342498.90
224138.45
REHABILITACION
Monto Valorizado
Real
Programada
0.00
11,901.24
40,520.99
38,324.69
71,101.30
57,685.89
111,622.29
Formula
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
Monto Valorizado
Real
Programada
90,821.26
26,716.47
160,510.85
73,563.18
91,166.79
123,858.80
44,748.01
Monto Acumulado
Real
Programada
8,306.82
301.94
15145.71
12003.13
26864.25
44748.01
Mes
K
Nov-98 1.030
Nov-98 1.030
Nov-98 1.030
Deduccin
Reajuste
Directo
Materiales
Total
21.24
64.07
163.89
17.48
52.75
134.94
29.96
90.37
231.23
68.68
207.19
530.06
Formula 01
Reajuste Total
Reajuste Anterior
Reajuste Reconocido
5,577.83
3,393.17
2,184.66
Formula 02
Reajuste Total
Reajuste Anterior
Reajuste Reconocido
2,256.33
624.34
1,631.99
Formula 03
Reajuste Total
Reajuste Anterior
Reajuste Reconocido
530.06
269.49
260.57
REAJUSTE VALORIZACION N 03
4,077.22
CALCULO DE REAJUSTE
Obra
Supervisin
Contratista
P.Base
P.Oferta
F.Relacin
Fecha
Plazo
VALORIZACION N 04 AL 31/01/99
Formula
Val
01
02
03
04
01
399,885.18
Formula
Val
01
02
03
04
02
Val
01
02
03
04
03
Mes
Nov-98
Dec-98
Dec-98
Dec-98
K
1.020
1.023
1.023
1.023
373,028.71
Monto Acumulado
Real
Programada
0.00
11,901.24
40520.99
50225.93
111622.29
107911.82
148751.33
151921.55
Mes
Nov-98
Dec-98
Dec-98
Dec-98
K
1.026
1.031
1.031
1.031
151,921.55
Real
1,816.43
3,691.75
2,096.84
1,319.88
Reajuste
Programada
534.33
1,691.95
2,848.75
3,424.48
Reconocido
1,816.43
3,691.75
2,096.84
1,319.88
8,924.90
8,499.51
8,924.90
Real
0.00
1,256.15
2,204.14
1,151.00
Reajuste
Programada
309.43
1,188.07
1,788.26
1,364.30
Reconocido
0.00
1,256.15
2,029.61
1,151.00
4,611.29
4,650.06
4,436.76
Real
249.20
259.88
445.30
1,852.84
Reajuste
Programada
9.06
444.65
1,244.31
1,270.17
Reconocido
249.20
259.88
445.30
1,852.84
2,807.22
2,968.19
Deduccin
Reajuste
Directo
Materiales
Total
143.59
202.75
1,470.09
348.94
573.38
2,769.43
198.19
302.97
1,595.68
124.75
195.01
1,000.12
815.47
1,274.11
6,835.32
Deduccin
Reajuste
Directo
Materiales
Total
0.00
0.00
0.00
144.00
141.17
970.98
252.68
247.72
1,529.21
131.95
129.36
889.69
528.63
518.25
3,389.88
Monto Valorizado
Real
Programada
8,306.82
301.94
6,838.89
11,701.19
11,718.54
32,744.88
48,758.92
33,425.48
75,623.17
Monto Acumulado
Real
Programada
90,821.26
26,716.47
251332.11
100279.65
342498.90
224138.45
399885.18
373028.71
REHABILITACION
Monto Valorizado
Real
Programada
0.00
11,901.24
40,520.99
38,324.69
71,101.30
57,685.89
37,129.04
44,009.73
148,751.33
Formula
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
Monto Valorizado
Real
Programada
90,821.26
26,716.47
160,510.85
73,563.18
91,166.79
123,858.80
57,386.28
148,890.26
78,173.49
Monto Acumulado
Real
Programada
8,306.82
301.94
15145.71
12003.13
26864.25
44748.01
75623.17
78173.49
Mes
Nov-98
Dec-98
Dec-98
Dec-98
K
1.030
1.038
1.038
1.038
2,807.22
Deduccin
Reajuste
Directo
Materiales
Total
21.24
64.07
163.89
28.24
62.20
169.44
48.40
106.57
290.33
201.36
257.42
1,394.06
299.24
490.26
2,017.72
Formula 01
Reajuste Total
Reajuste Anterior
Reajuste Reconocido
6,835.32
5,577.83
1,257.49
Formula 02
Reajuste Total
Reajuste Anterior
Reajuste Reconocido
3,389.88
2,256.33
1,133.55
Formula 03
Reajuste Total
Reajuste Anterior
Reajuste Reconocido
2,017.72
530.06
1,487.66
REAJUSTE VALORIZACION N 04
3,878.70
CALCULO DE REAJUSTE
Obra
Supervisin
Contratista
P.Base
P.Oferta
F.Relacin
Fecha
Plazo
VALORIZACION N 05 AL 11/02/99
Formula
Val
01
02
03
04
05
01
427,105.26
Formula
Val
01
02
03
04
05
02
Val
01
02
03
04
05
03
Mes
Nov-98
Dec-98
Dec-98
Dec-98
Dec-98
K
1.020
1.023
1.023
1.023
1.023
Real
1,816.43
3,691.75
2,096.84
1,319.88
626.06
Reajuste
Programada
534.33
1,691.95
2,848.75
3,424.48
1,243.76
Reconocido
1,816.43
3,691.75
2,096.84
1,319.88
626.06
9,550.96
9,743.27
9,550.96
Real
0.00
1,256.15
2,204.14
1,151.00
465.32
Reajuste
Programada
309.43
1,188.07
1,788.26
1,364.30
367.04
Reconocido
0.00
1,256.15
2,029.61
1,151.00
580.34
5,076.61
5,017.10
5,017.10
Real
249.20
259.88
445.30
1,852.84
480.66
Reajuste
Programada
9.06
444.65
1,244.31
1,270.17
383.75
Reconocido
249.20
259.88
445.30
1,852.84
480.66
3,287.88
3,351.94
Deduccin
Reajuste
Directo
Materiales
Total
143.59
202.75
1,470.09
348.94
573.38
2,769.43
198.19
302.97
1,595.68
124.75
195.01
1,000.12
59.17
0.00
566.89
874.64
1,274.11
7,402.21
REHABILITACION
Monto Acumulado
Real
Programada
0.00
11,901.24
40520.99
50225.93
111622.29
107911.82
148751.33
151921.55
163761.53
163761.52
Mes
Nov-98
Dec-98
Dec-98
Dec-98
Dec-98
K
1.026
1.031
1.031
1.031
1.031
163,761.52
Deduccin
Reajuste
Directo
Materiales
Total
0.00
0.00
0.00
144.00
141.17
970.98
252.68
247.72
1,529.21
131.95
129.36
889.69
53.34
2.04
524.96
581.97
520.29
3,914.84
Monto Valorizado
Real
Programada
8,306.82
301.94
6,838.89
11,701.19
11,718.54
32,744.88
48,758.92
33,425.48
12,648.97
10,098.67
88,272.14
Monto Acumulado
Real
Programada
90,821.26
26,716.47
251332.11
100279.65
342498.90
224138.45
399885.18
373028.71
427105.26
427105.36
427,105.36
Monto Valorizado
Real
Programada
0.00
11,901.24
40,520.99
38,324.69
71,101.30
57,685.89
37,129.04
44,009.73
15,010.20
11,839.97
163,761.53
Formula
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
Monto Valorizado
Real
Programada
90,821.26
26,716.47
160,510.85
73,563.18
91,166.79
123,858.80
57,386.28
148,890.26
27,220.08
54,076.65
88,272.16
Monto Acumulado
Real
Programada
8,306.82
301.94
15145.71
12003.13
26864.25
44748.01
75623.17
78173.49
88272.14
88272.16
Mes
Nov-98
Dec-98
Dec-98
Dec-98
Dec-98
K
1.030
1.038
1.038
1.038
1.038
3,287.88
Deduccin
Reajuste
Directo
Materiales
Total
21.24
64.07
163.89
28.24
62.20
169.44
48.40
106.57
290.33
201.36
257.42
1,394.06
52.24
20.78
407.64
351.48
511.04
2,425.36
Formula 01
Reajuste Total
Reajuste Anterior
Reajuste Reconocido
7,402.21
6,835.32
566.89
Formula 02
Reajuste Total
Reajuste Anterior
Reajuste Reconocido
3,914.84
3,389.88
524.96
Formula 03
Reajuste Total
Reajuste Anterior
Reajuste Reconocido
2,425.36
2,017.72
407.64
REAJUSTE VALORIZACION N 05
1,499.49
VALORIZACION N 01 AL 31/10/98
Formula
Val
01
01
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
Monto
Valorizado
90,821.26
Ka
Sep-98
1.012
Mes
Sep-98
Kr
1.012
90,821.26
Formula
Val
01
02
0.00
Val
01
18,164.25
REHABILITACION
Monto Valorizado
Ka
Real
Sep-98
0.00
1.013
Mes
Sep-98
K
1.013
0.00
Formula
Deduccin Amortizacin
Directo
Total
0.00
18,164.25
03
0.00
0.00
Monto Valorizado
Ka
Real
Sep-98
8,306.82
1.017
8,306.82
Deduccin Reajuste
Directo
Total
0.00
0.00
Mes
Sep-98
K
1.017
Deduccin Reajuste
Directo
Total
0.00
1,661.36
0.00
1,661.36
VALORIZACION N 02 AL 30/11/98
Formula
Val
01
02
01
Monto
Valorizado
90,821.26
160,510.85
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
Ka
Sep-98
1.012
1.012
Mes
Oct-98
Oct-98
Kr
1.013
1.013
251,332.11
Formula
Val
01
02
02
49.67
Monto Valorizado
Ka
Real
Sep-98
0.00
1.013
40,520.99
1.013
Val
01
02
03
Mes
Oct-98
Oct-98
K
1.016
1.016
Deduccin Reajuste
Directo
Total
0.00
0.00
24.00
8,104.20
24.00
8,104.20
Monto Valorizado
Ka
Real
Sep-98
8,306.82
1.017
6,838.89
1.017
15,145.71
50,266.42
REHABILITACION
40,520.99
Formula
Deduccin Amortizacin
Directo
Total
17.95
18,164.25
31.72
32,102.17
Mes
Oct-98
Oct-98
K
1.024
1.024
Deduccin Reajuste
Directo
Total
11.44
1,661.36
9.41
1,367.78
20.85
3,029.14
VALORIZACION N 03 AL 31/12/98
Formula
Val
01
02
03
01
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
Monto
Valorizado
90,821.26
160,510.85
91,166.79
Ka
Sep-98
1.012
1.012
1.012
Mes
Nov-98
Nov-98
Nov-98
Kr
1.020
1.020
1.020
342,498.90
Formula
Val
01
02
03
02
541.50
Monto Valorizado
Real
0.00
40,520.99
71,101.30
Val
01
02
03
03
Ka
Sep-98
1.013
1.013
1.013
Mes
Nov-98
Nov-98
Nov-98
K
1.026
1.026
1.026
Deduccin Reajuste
Directo
Total
0.00
0.00
104.00
8,104.20
182.49
14,220.26
286.49
22,324.46
Monto Valorizado
Real
8,306.82
6,838.89
11,718.54
26,864.25
68,499.78
REHABILITACION
111,622.29
Formula
Deduccin Amortizacin
Directo
Total
143.59
18,164.25
253.77
32,102.17
144.14
18,233.36
Ka
Sep-98
1.017
1.017
1.017
Mes
Nov-98
Nov-98
Nov-98
K
1.030
1.030
1.030
Deduccin Reajuste
Directo
Total
21.24
1,661.36
17.48
1,367.78
29.96
2,343.71
68.68
5,372.85
VALORIZACION N 04 AL 31/01/99
Formula
Val
01
02
03
04
01
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
Monto
Valorizado
90,821.26
160,510.85
91,166.79
57,386.28
Ka
Sep-98
1.012
1.012
1.012
1.012
Mes
Nov-98
Dec-98
Dec-98
Dec-98
Kr
1.020
1.023
1.023
1.023
399,885.18
Formula
Val
01
02
03
04
02
815.47
Monto Valorizado
Real
0.00
40,520.99
71,101.30
37,129.04
Val
01
02
03
04
03
Ka
Sep-98
1.013
1.013
1.013
1.013
Mes
Nov-98
Dec-98
Dec-98
Dec-98
K
1.026
1.031
1.031
1.031
Deduccin Reajuste
Directo
Total
0.00
0.00
144.00
8,104.20
252.68
14,220.26
131.95
7,425.81
528.63
29,750.27
Monto Valorizado
Real
8,306.82
6,838.89
11,718.54
48,758.92
75,623.17
79,977.04
REHABILITACION
148,751.33
Formula
Deduccin Amortizacin
Directo
Total
143.59
18,164.25
348.94
32,102.17
198.19
18,233.36
124.75
11,477.26
Ka
Sep-98
1.017
1.017
1.017
1.017
Mes
Nov-98
Dec-98
Dec-98
Dec-98
K
1.030
1.038
1.038
1.038
Deduccin Reajuste
Directo
Total
21.24
1,661.36
28.24
1,367.78
48.40
2,343.71
201.36
9,751.78
299.24
15,124.63
VALORIZACION N 05 AL 11/02/99
Formula
Val
01
02
03
04
05
01
AMPLACION LABORAT.BIBLIO.-COMPUTO,SSHH,G
Monto
Valorizado
90,821.26
160,510.85
91,166.79
57,386.28
27,220.08
Ka
Sep-98
1.012
1.012
1.012
1.012
1.012
Mes
Nov-98
Dec-98
Dec-98
Dec-98
Dec-98
Kr
1.020
1.023
1.023
1.023
1.023
427,105.26
Formula
Val
01
02
03
04
05
02
874.64
Monto Valorizado
Real
0.00
40,520.99
71,101.30
37,129.04
15,010.20
Val
01
02
03
04
05
03
Ka
Sep-98
1.013
1.013
1.013
1.013
1.013
Mes
Nov-98
Dec-98
Dec-98
Dec-98
Dec-98
K
1.026
1.031
1.031
1.031
1.031
Deduccin Reajuste
Directo
Total
0.00
0.00
144.00
8,104.20
252.68
14,220.26
131.95
7,425.81
53.34
3,002.04
581.97
32,752.31
Monto Valorizado
Real
8,306.82
6,838.89
11,718.54
48,758.92
12,648.97
88,272.14
85,421.06
REHABILITACION
163,761.53
Formula
Deduccin Amortizacin
Directo
Total
143.59
18,164.25
348.94
32,102.17
198.19
18,233.36
124.75
11,477.26
59.17
5,444.02
Ka
Sep-98
1.017
1.017
1.017
1.017
1.017
Mes
Nov-98
Dec-98
Dec-98
Dec-98
Dec-98
K
1.030
1.038
1.038
1.038
1.038
Deduccin Reajuste
Directo
Total
21.24
1,661.36
28.24
1,367.78
48.40
2,343.71
201.36
9,751.78
52.24
2,529.79
351.48
17,654.42
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
01
BLOQUE Y LADRILLO
01
17
17,836.48
10/22/1998
VALORIZACION N 01 AL 31/10/98
Val
IU
FOR
01
17
01
Incidencia
%
Io
Ia
Saldo Deflatado
Incidencia
Coef .
%
0.228
21.93%
Io
Aug-98
286.47
Ia
Sep-98
289.49
Reajuste
Mes
Ir
289.49
Sep-98
Monto
Valorizado
90,821.26
Saldo
Adelanto
17,650.41
Adelanto
Utilizado
4,541.10
Deduccion
4,541.10
90,821.26
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
IU
FOR
01
21
01
Incidencia
Coef .
%
0.228
67.98%
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
Ia
Sep-98
264.25
Reajuste
Mes
Ir
264.25
Sep-98
Monto
Valorizado
90,821.26
Saldo
Adelanto
55,168.83
Adelanto
Utilizado
14,076.79
Deduccion
14,076.79
90,821.26
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
03
Fierro Corrugado
01
03
14,545.33
10/22/1998
Val
IU
FOR
01
03
01
Io
Aug-98
187.00
Ia
Sep-98
194.87
Reajuste
Mes
Ir
194.87
Sep-98
Monto
Valorizado
90,821.26
Saldo
Adelanto
13,957.90
Adelanto
Utilizado
5,359.23
04
Perfiles de Acero
01
65
5,154.53
10/23/1998
Val
IU
FOR
01
65
01
Io
Aug-98
204.15
Ia
Sep-98
205.97
Reajuste
Mes
Ir
205.97
Sep-98
Monto
Valorizado
90,821.26
Saldo
Adelanto
5,108.98
Adelanto
Utilizado
1,634.37
90,821.26
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
05
CEMENTO PORTLAND TIPO I
01
21
5,292.62
10/23/1998
Val
IU
FOR
01
21
01
Incidencia
Coef .
%
0.228
67.98%
Io
Aug-98
256.88
Ia
Sep-98
264.25
Reajuste
Mes
Ir
264.25
Sep-98
Monto
Valorizado
90,821.26
Saldo
Adelanto
5,145.01
Adelanto
Utilizado
-
IU
FOR
01
21
02
5,584.78
Incidencia
Coef .
%
0.212
58.96%
Io
Aug-98
256.88
Ia
Sep-98
264.25
Reajuste
Mes
Ir
264.25
Sep-98
Monto
Valorizado
-
Saldo
Adelanto
15,862.40
Adelanto
Utilizado
-
IU
FOR
01
21
02
Incidencia
Coef .
%
0.212
58.96%
1,648.94
1,648.94
Ia
Sep-98
264.25
Reajuste
Mes
Ir
264.25
Sep-98
Monto
Valorizado
-
0.228
67.98%
256.88
264.25
5,145.01
Amortizacin
Saldo
Adelanto
2,803.82
Adelanto
Utilizado
-
Amortizacin
-
Deduccion
-
0.212
58.96%
256.88
264.25
15,862.40
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
Amortizacin
Deduccion
-
05
CEMENTO PORTLAND TIPO I
02
21
2,884.26
10/23/1998
Val
0.155
11.61%
204.15
205.97
5,108.98
Incidencia
%
Io
Ia
Saldo Deflatado
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
5,584.78
02
CEMENTO PORTLAND TIPO I
02
21
16,317.50
10/22/1998
Val
Amortizacin
Deduccion
-
0.155
38.07%
187.00
194.87
13,957.90
Incidencia
%
Io
Ia
Saldo Deflatado
90,821.26
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
14,480.66
Deduccion
1,634.37
Amortizacin
14,480.66
Incidencia
%
Io
Ia
Saldo Deflatado
Incidencia
Coef .
%
0.155
11.61%
4,588.97
0.228
67.98%
256.88
264.25
55,168.83
Deduccion
5,359.23
90,821.26
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
4,588.97
Incidencia
%
Io
Ia
Saldo Deflatado
Incidencia
Coef .
%
0.155
38.07%
Amortizacin
02
CEMENTO PORTLAND TIPO I
01
21
56,751.65
10/22/1998
Val
0.228
21.93%
286.47
289.49
17,650.41
0.212
58.96%
256.88
264.25
2,803.82
Amortizacin
Incidencia
%
Io
Ia
Saldo Deflatado
Reajuste
Mes
Ir
166.93
Sep-98
Monto
Valorizado
8,306.82
Saldo
Adelanto
4,304.16
Adelanto
Utilizado
963.53
Deduccion
963.53
8,306.82
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
02
CEMENTO PORTLAND TIPO I
03
21
11,067.84
10/22/1998
Val
IU
FOR
01
21
03
Incidencia
Coef .
%
0.269
56.88%
Ia
Sep-98
264.25
Reajuste
Mes
Ir
264.25
Sep-98
Monto
Valorizado
8,306.82
Saldo
Adelanto
10,759.16
Adelanto
Utilizado
1,271.00
8,306.82
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
05
CEMENTO PORTLAND TIPO I
03
21
1,602.00
10/23/1998
Val
IU
FOR
01
21
03
Incidencia
Coef .
%
0.269
56.88%
963.53
963.53
Deduccion
1,271.00
Ia
Sep-98
264.25
Reajuste
Mes
Ir
264.25
Sep-98
Monto
Valorizado
8,306.82
Saldo
Adelanto
1,557.32
Adelanto
Utilizado
-
8,306.82
Amortizacin
1,307.47
1,307.47
Deduccion
-
0.269
56.88%
256.88
264.25
10,759.16
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
Amortizacin
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
0.269
43.12%
166.93
166.93
4,304.16
0.269
56.88%
256.88
264.25
1,557.32
Amortizacin
Val
01
01
Deduccion
-
FOR
Val
02
01
FOR
Val
03
01
Deduccion
26,303.35
26,303.35
Amortizacin
Deduccion
-
Amortizacion Total
Amortizacin
Amortizacin
2,271.00
2,271.00
28,574.35
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
01
BLOQUE Y LADRILLO
01
17
17,836.48
10/22/1998
VALORIZACION N 02 AL 30/11/98
Val
IU
FOR
01
02
17
17
01
01
Incidencia
%
Io
Ia
Saldo Deflatado
Incidencia
Coef .
%
0.228
21.93%
0.228 21.93%
Io
Aug-98
286.47
286.47
Ia
Sep-98
289.49
289.49
Reajuste
Mes
Ir
290.20
Oct-98
290.20
Oct-98
Monto
Valorizado
90,821.26
160,510.85
Saldo
Adelanto
17,650.41
13,109.31
Adelanto
Utilizado
4,541.10
8,025.61
Deduccion
4,541.10
8,025.61
251,332.11
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
IU
FOR
01
02
21
21
01
01
Incidencia
Coef .
%
0.228
67.98%
0.228 67.98%
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
Ia
Sep-98
264.25
264.25
Reajuste
Mes
Ir
264.25
Oct-98
264.25
Oct-98
Monto
Valorizado
90,821.26
160,510.85
Saldo
Adelanto
55,168.83
41,092.04
Adelanto
Utilizado
14,076.79
24,878.28
Deduccion
14,076.79
24,878.28
251,332.11
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
03
Fierro Corrugado
01
03
14,545.33
10/22/1998
Val
IU
FOR
01
02
03
03
01
01
Io
Aug-98
187.00
187.00
Ia
Sep-98
194.87
194.87
Reajuste
Mes
Ir
195.39
Oct-98
195.39
Oct-98
Monto
Valorizado
90,821.26
160,510.85
Saldo
Adelanto
13,957.90
8,598.67
Adelanto
Utilizado
5,359.23
9,471.50
04
Perfiles de Acero
01
65
5,154.53
10/23/1998
Val
IU
FOR
01
02
65
65
01
01
Io
Aug-98
204.15
204.15
Ia
Sep-98
205.97
205.97
Reajuste
Mes
Ir
194.89
Oct-98
194.89
Oct-98
Monto
Valorizado
90,821.26
160,510.85
Saldo
Adelanto
5,108.98
3,474.61
Adelanto
Utilizado
1,634.37
2,888.47
251,332.11
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
05
CEMENTO PORTLAND TIPO I
01
21
5,292.62
10/23/1998
Val
IU
FOR
01
02
21
21
01
01
Incidencia
Coef .
%
0.228
67.98%
0.228 67.98%
Io
Aug-98
256.88
256.88
Ia
Sep-98
264.25
264.25
Reajuste
Mes
Ir
264.25
Oct-98
264.25
Oct-98
Monto
Valorizado
90,821.26
160,510.85
Saldo
Adelanto
5,145.01
5,145.01
Adelanto
Utilizado
-
IU
FOR
01
02
21
21
02
02
14,545.33
Incidencia
Coef .
%
0.212
58.96%
0.212 58.96%
Io
Aug-98
256.88
256.88
Ia
Sep-98
264.25
264.25
Reajuste
Mes
Ir
264.25
Oct-98
264.25
Oct-98
Monto
Valorizado
40,520.99
Saldo
Adelanto
15,862.40
15,862.40
Adelanto
Utilizado
5,064.93
IU
FOR
01
02
21
21
02
02
Incidencia
Coef .
%
0.212
58.96%
0.212 58.96%
-245.47
4,563.16
Ia
Sep-98
264.25
264.25
Reajuste
Mes
Ir
264.25
Oct-98
264.25
Oct-98
Monto
Valorizado
40,520.99
40,520.99
0.228
67.98%
256.88
264.25
5,145.01
Amortizacin
Saldo
Adelanto
2,803.82
2,803.82
Adelanto
Utilizado
-
Amortizacin
5,210.25
5,210.25
Deduccion
-
0.212
58.96%
256.88
264.25
15,862.40
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
Amortizacin
1,648.94
2,914.22
Deduccion
5,064.93
05
CEMENTO PORTLAND TIPO I
02
21
2,884.26
10/23/1998
Val
0.155
11.61%
204.15
205.97
5,108.98
(88.70)
(156.77)
Incidencia
%
Io
Ia
Saldo Deflatado
40,520.99
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
38.81
02
CEMENTO PORTLAND TIPO I
02
21
16,317.50
10/22/1998
Val
Amortizacin
5,584.78
8,960.55
Deduccion
-
0.155
38.07%
187.00
194.87
13,957.90
14.90
23.91
Incidencia
%
Io
Ia
Saldo Deflatado
251,332.11
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
40,072.71
Deduccion
1,634.37
2,888.47
Amortizacin
Incidencia
%
Io
Ia
Saldo Deflatado
Incidencia
Coef .
%
0.155
11.61%
0.155 11.61%
12,699.19
0.228
67.98%
256.88
264.25
55,168.83
14,480.66
25,592.05
Deduccion
5,359.23
8,598.67
251,332.11
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
4,588.97
8,110.22
Incidencia
%
Io
Ia
Saldo Deflatado
Incidencia
Coef .
%
0.155
38.07%
0.155 38.07%
Amortizacin
11.25
19.89
31.14
02
CEMENTO PORTLAND TIPO I
01
21
56,751.65
10/22/1998
Val
0.228
21.93%
286.47
289.49
17,650.41
0.212
58.96%
256.88
264.25
2,803.82
Amortizacin
Incidencia
%
Io
Ia
Saldo Deflatado
Reajuste
Mes
Ir
173.88
Oct-98
173.88
Oct-98
Monto
Valorizado
8,306.82
6,838.89
Saldo
Adelanto
4,304.16
3,340.63
Adelanto
Utilizado
963.53
793.26
Deduccion
963.53
793.26
15,145.71
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
02
CEMENTO PORTLAND TIPO I
03
21
11,067.84
10/22/1998
Val
IU
FOR
01
02
21
21
03
03
Incidencia
Coef .
%
0.269
56.88%
0.269 56.88%
Ia
Sep-98
264.25
264.25
Reajuste
Mes
Ir
264.25
Oct-98
264.25
Oct-98
Monto
Valorizado
8,306.82
6,838.89
Saldo
Adelanto
10,759.16
9,488.16
Adelanto
Utilizado
1,271.00
1,046.40
15,145.71
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
05
CEMENTO PORTLAND TIPO I
03
21
1,602.00
10/23/1998
Val
IU
FOR
01
02
21
21
03
03
Incidencia
Coef .
%
0.269
56.88%
0.269 56.88%
963.53
793.26
73.15
1,756.79
Deduccion
1,271.00
1,046.40
Ia
Sep-98
264.25
264.25
Reajuste
Mes
Ir
264.25
Oct-98
264.25
Oct-98
Monto
Valorizado
8,306.82
6,838.89
Saldo
Adelanto
1,557.32
1,557.32
Adelanto
Utilizado
-
15,145.71
Amortizacin
1,307.47
1,076.42
2,383.89
Deduccion
-
0.269
56.88%
256.88
264.25
10,759.16
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
Amortizacin
40.12
33.03
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
0.269
43.12%
166.93
166.93
4,304.16
0.269
56.88%
256.88
264.25
1,557.32
Amortizacin
Val
01
01
01
02
FOR
Val
02
02
01
02
Deduccion
(62.55)
(112.97)
-175.52
FOR
Val
03
03
01
02
Deduccion
26,303.35
45,577.04
71,880.39
Amortizacin
5,210.25
5,210.25
Deduccion
40.12
33.03
73.15
Amortizacion Total
Amortizacion Anterior
Monto a Amortizar
Amortizacin
Amortizacin
2,271.00
1,869.68
4,140.68
81,231.32
28,574.35
52,656.97
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
01
BLOQUE Y LADRILLO
01
17
17,836.48
10/22/1998
VALORIZACION N 03 AL 31/12/98
Val
IU
FOR
01
02
03
17
17
17
01
01
01
Incidencia
%
Io
Ia
Saldo Deflatado
Incidencia
Coef .
%
0.228
21.93%
0.228 21.93%
0.228 21.93%
Io
Aug-98
286.47
286.47
286.47
Ia
Sep-98
289.49
289.49
289.49
Reajuste
Mes
Ir
287.01
Nov-98
287.01
Nov-98
287.01
Nov-98
Monto
Valorizado
90,821.26
160,510.85
91,166.79
Saldo
Adelanto
17,650.41
13,109.31
5,083.70
Adelanto
Utilizado
4,541.10
8,025.61
4,558.38
Deduccion
4,541.10
8,025.61
4,558.38
342,498.90
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
IU
FOR
01
02
03
21
21
21
01
01
01
Incidencia
Coef .
%
0.228
67.98%
0.228 67.98%
0.228 67.98%
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
256.88
Ia
Sep-98
264.25
264.25
264.25
Reajuste
Mes
Ir
269.09
Nov-98
269.09
Nov-98
269.09
Nov-98
Monto
Valorizado
90,821.26
160,510.85
91,166.79
Saldo
Adelanto
55,168.83
41,092.04
16,213.76
Adelanto
Utilizado
14,076.79
24,878.28
14,130.34
Deduccion
14,076.79
24,878.28
14,130.34
342,498.90
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
03
Fierro Corrugado
01
03
14,545.33
10/22/1998
Val
IU
FOR
01
02
03
03
03
03
01
01
01
Io
Aug-98
187.00
187.00
187.00
Ia
Sep-98
194.87
194.87
194.87
Reajuste
Mes
Ir
198.14
Nov-98
198.14
Nov-98
198.14
Nov-98
Monto
Valorizado
90,821.26
160,510.85
91,166.79
Saldo
Adelanto
13,957.90
8,598.67
-
Adelanto
Utilizado
5,359.23
9,471.50
5,379.62
04
Perfiles de Acero
01
65
5,154.53
10/23/1998
Val
IU
FOR
01
02
03
65
65
65
01
01
01
Io
Aug-98
204.15
204.15
204.15
Ia
Sep-98
205.97
205.97
205.97
Reajuste
Mes
Ir
191.37
Nov-98
191.37
Nov-98
191.37
Nov-98
Monto
Valorizado
90,821.26
160,510.85
91,166.79
Saldo
Adelanto
5,108.98
3,474.61
586.14
Adelanto
Utilizado
1,634.37
2,888.47
1,640.59
342,498.90
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
05
CEMENTO PORTLAND TIPO I
01
21
5,292.62
10/23/1998
Val
IU
FOR
01
02
03
21
21
21
01
01
01
Incidencia
Coef .
%
0.228
67.98%
0.228 67.98%
0.228 67.98%
Io
Aug-98
256.88
256.88
256.88
Ia
Sep-98
264.25
264.25
264.25
Reajuste
Mes
Ir
269.09
Nov-98
269.09
Nov-98
269.09
Nov-98
Monto
Valorizado
90,821.26
160,510.85
91,166.79
Saldo
Adelanto
5,145.01
5,145.01
5,145.01
Adelanto
Utilizado
-
244.07
14,545.33
IU
FOR
01
02
03
21
21
21
02
02
02
Incidencia
Coef .
%
0.212
58.96%
0.212 58.96%
0.212 58.96%
Ia
Sep-98
264.25
264.25
264.25
Reajuste
Mes
Ir
269.09
Nov-98
269.09
Nov-98
269.09
Nov-98
Monto
Valorizado
40,520.99
71,101.30
111,622.29
Amortizacin
(116.88)
(206.57)
(41.92)
1,648.94
2,914.22
591.37
-365.37
5,154.53
0.228
67.98%
256.88
264.25
5,145.01
Amortizacin
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
256.88
0.155
11.61%
204.15
205.97
5,108.98
02
CEMENTO PORTLAND TIPO I
02
21
16,317.50
10/22/1998
Val
Amortizacin
5,584.78
8,960.55
-
Deduccion
-
0.155
38.07%
187.00
194.87
13,957.90
93.71
150.36
-
Incidencia
%
Io
Ia
Saldo Deflatado
342,498.90
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
54,608.46
Deduccion
1,634.37
2,888.47
586.14
Amortizacin
1,000.21
Incidencia
%
Io
Ia
Saldo Deflatado
Incidencia
Coef .
%
0.155
11.61%
0.155 11.61%
0.155 11.61%
17,305.62
0.228
67.98%
256.88
264.25
55,168.83
14,480.66
25,592.05
14,535.75
Deduccion
5,359.23
8,598.67
-
342,498.90
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
4,588.97
8,110.22
4,606.43
265.23
468.74
266.24
Incidencia
%
Io
Ia
Saldo Deflatado
Incidencia
Coef .
%
0.155
38.07%
0.155 38.07%
0.155 38.07%
Amortizacin
(39.31)
(69.48)
(39.46)
-148.25
02
CEMENTO PORTLAND TIPO I
01
21
56,751.65
10/22/1998
Val
0.228
21.93%
286.47
289.49
17,650.41
Saldo
Adelanto
15,862.40
15,862.40
10,797.47
Adelanto
Utilizado
5,064.93
8,887.32
A
5,064.93
8,887.32
Deduccion
0.212
58.96%
256.88
264.25
15,862.40
Amortizacin
95.43
167.45
5,210.25
9,142.30
262.88
14,352.55
Incidencia
%
Io
Ia
Saldo Deflatado
Reajuste
Mes
Ir
269.09
Nov-98
269.09
Nov-98
269.09
Nov-98
Monto
Valorizado
40,520.99
71,101.30
Saldo
Adelanto
2,803.82
2,803.82
2,803.82
Adelanto
Utilizado
-
Deduccion
-
111,622.29
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
02
AGREGADO GRUESO
03
05
4,304.16
10/22/1998
Val
IU
FOR
01
02
03
05
05
05
03
03
03
Io
Aug-98
166.93
166.93
166.93
Ia
Sep-98
166.93
166.93
166.93
Reajuste
Mes
Ir
173.88
Nov-98
173.88
Nov-98
173.88
Nov-98
Monto
Valorizado
8,306.82
6,838.89
11,718.54
Saldo
Adelanto
4,304.16
3,340.63
2,547.37
Adelanto
Utilizado
963.53
793.26
1,359.27
26,864.25
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
02
CEMENTO PORTLAND TIPO I
03
21
11,067.84
10/22/1998
Val
IU
FOR
01
02
03
21
21
21
03
03
03
Incidencia
Coef .
%
0.269
56.88%
0.269 56.88%
0.269 56.88%
Io
Aug-98
256.88
256.88
256.88
Ia
Sep-98
264.25
264.25
264.25
Reajuste
Mes
Ir
269.09
Nov-98
269.09
Nov-98
269.09
Nov-98
Monto
Valorizado
8,306.82
6,838.89
11,718.54
Saldo
Adelanto
10,759.16
9,488.16
8,441.76
Adelanto
Utilizado
1,271.00
1,046.40
1,793.02
IU
FOR
01
02
03
21
21
21
03
03
03
Incidencia
Coef .
%
0.269
56.88%
0.269 56.88%
0.269 56.88%
Ia
Sep-98
264.25
264.25
264.25
Reajuste
Mes
Ir
269.09
Nov-98
269.09
Nov-98
269.09
Nov-98
Monto
Valorizado
8,306.82
6,838.89
11,718.54
Saldo
Adelanto
1,557.32
1,557.32
1,557.32
Adelanto
Utilizado
-
129.74
3,116.06
26,864.25
0.269
56.88%
256.88
264.25
10,759.16
Amortizacin
23.95
19.72
33.78
1,307.47
1,076.42
1,844.46
77.45
4,228.35
Deduccion
-
Amortizacin
963.53
793.26
1,359.27
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
256.88
0.269
43.12%
166.93
166.93
4,304.16
40.12
33.03
56.59
Deduccion
1,271.00
1,046.40
1,793.02
05
CEMENTO PORTLAND TIPO I
03
21
1,602.00
10/23/1998
Val
Incidencia
%
Io
Ia
Saldo Deflatado
26,864.25
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
Deduccion
963.53
793.26
1,359.27
Amortizacin
Incidencia
%
Io
Ia
Saldo Deflatado
Incidencia
Coef .
%
0.269
43.12%
0.269 43.12%
0.269 43.12%
0.212
58.96%
256.88
264.25
2,803.82
0.269
56.88%
256.88
264.25
1,557.32
Amortizacin
Val
01
01
01
01
02
03
FOR
Val
02
02
02
01
02
03
FOR
Val
03
03
03
01
02
03
Deduccion
26,303.35
45,577.04
19,733.55
730.66
91,613.94
Deduccion
95.43
167.45
262.88
Deduccion
64.07
52.75
90.37
207.19
Amortizacion Total
Amortizacion Anterior
Monto a Amortizar
Amortizacin
202.75
343.05
184.86
Amortizacin
5,210.25
9,142.30
14,352.55
Amortizacin
2,271.00
1,869.68
3,203.73
7,344.41
113,310.90
81,231.32
32,079.58
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
01
BLOQUE Y LADRILLO
01
17
17,836.48
10/22/1998
VALORIZACION N 04 AL 31/01/99
Val
IU
FOR
01
02
03
04
17
17
17
17
01
01
01
01
Incidencia
%
Io
Ia
Saldo Deflatado
Incidencia
Coef .
%
0.228
21.93%
0.228 21.93%
0.228 21.93%
0.228 21.93%
Io
Aug-98
286.47
286.47
286.47
286.47
Ia
Sep-98
289.49
289.49
289.49
289.49
Reajuste
Mes
Ir
287.01
Nov-98
285.96
Dec-98
285.96
Dec-98
285.96
Dec-98
Monto
Valorizado
90,821.26
160,510.85
91,166.79
57,386.28
Saldo
Adelanto
17,650.41
13,109.31
5,083.70
525.32
Adelanto
Utilizado
4,541.10
8,025.61
4,558.38
2,869.34
A
4,541.10
8,025.61
4,558.38
525.32
399,885.18
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
IU
FOR
01
02
03
04
21
21
21
21
01
01
01
01
Incidencia
Coef .
%
0.228
67.98%
0.228 67.98%
0.228 67.98%
0.228 67.98%
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
256.88
256.88
Ia
Sep-98
264.25
264.25
264.25
264.25
Reajuste
Mes
Ir
269.09
Nov-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
Monto
Valorizado
90,821.26
160,510.85
91,166.79
57,386.28
Saldo
Adelanto
55,168.83
41,092.04
16,213.76
2,083.42
Adelanto
Utilizado
14,076.79
24,878.28
14,130.34
8,894.55
A
14,076.79
24,878.28
14,130.34
2,083.42
399,885.18
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
03
Fierro Corrugado
01
03
14,545.33
10/22/1998
Val
IU
FOR
01
02
03
04
03
03
03
03
01
01
01
01
Io
Aug-98
187.00
187.00
187.00
187.00
Ia
Sep-98
194.87
194.87
194.87
194.87
Reajuste
Mes
Ir
198.14
Nov-98
198.13
Dec-98
198.13
Dec-98
198.13
Dec-98
Monto
Valorizado
90,821.26
160,510.85
91,166.79
57,386.28
Saldo
Adelanto
13,957.90
8,598.67
-
Adelanto
Utilizado
5,359.23
9,471.50
5,379.62
3,386.28
A
5,359.23
8,598.67
-
399,885.18
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
04
Perfiles de Acero
01
65
5,154.53
10/23/1998
Val
IU
FOR
01
02
03
04
65
65
65
65
01
01
01
01
Incidencia
Coef .
%
0.155
11.61%
0.155 11.61%
0.155 11.61%
0.155 11.61%
Io
Aug-98
204.15
204.15
204.15
204.15
Ia
Sep-98
205.97
205.97
205.97
205.97
Reajuste
Mes
Ir
191.37
Nov-98
193.88
Dec-98
193.88
Dec-98
193.88
Dec-98
Monto
Valorizado
90,821.26
160,510.85
91,166.79
57,386.28
Saldo
Adelanto
5,108.98
3,474.61
586.14
-
Adelanto
Utilizado
1,634.37
2,888.47
1,640.59
1,032.69
A
1,634.37
2,888.47
586.14
-
05
CEMENTO PORTLAND TIPO I
01
21
5,292.62
10/23/1998
Val
IU
FOR
01
02
03
04
21
21
21
21
01
01
01
01
Incidencia
Coef .
%
0.228
67.98%
0.228 67.98%
0.228 67.98%
0.228 67.98%
Ia
Sep-98
264.25
264.25
264.25
264.25
Reajuste
Mes
Ir
269.09
Nov-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
Monto
Valorizado
90,821.26
160,510.85
91,166.79
57,386.28
Saldo
Adelanto
5,145.01
5,145.01
5,145.01
5,145.01
Adelanto
Utilizado
6,811.13
A
5,145.01
399,885.18
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
IU
FOR
01
02
03
04
21
21
21
21
02
02
02
02
Incidencia
Coef .
%
0.212
58.96%
0.212 58.96%
0.212 58.96%
0.212 58.96%
1,410.58
56,751.65
Deduccion
Ia
Sep-98
264.25
264.25
264.25
264.25
Reajuste
Mes
Ir
269.09
Nov-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
Monto
Valorizado
40,520.99
71,101.30
37,129.04
148,751.33
0.155
38.07%
187.00
194.87
13,957.90
Amortizacin
93.71
149.90
-
5,584.78
8,960.55
-
243.61
14,545.33
Deduccion
0.155
11.61%
204.15
205.97
5,108.98
Amortizacin
(116.88)
(171.06)
(34.71)
-
1,648.94
2,914.22
591.37
-
-322.65
5,154.53
Deduccion
143.41
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
256.88
256.88
Amortizacin
0.228
67.98%
256.88
264.25
5,145.01
Amortizacin
5,292.62
143.41
02
CEMENTO PORTLAND TIPO I
02
21
16,317.50
10/22/1998
Val
17,836.48
0.228
67.98%
256.88
264.25
55,168.83
14,480.66
25,592.05
14,535.75
2,143.19
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
256.88
256.88
4,588.97
8,110.22
4,606.43
530.86
265.23
693.43
393.85
58.07
Incidencia
%
Io
Ia
Saldo Deflatado
399,885.18
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
Deduccion
Incidencia
%
Io
Ia
Saldo Deflatado
Incidencia
Coef .
%
0.155
38.07%
0.155 38.07%
0.155 38.07%
0.155 38.07%
Amortizacin
(39.31)
(98.89)
(56.17)
(6.47)
-200.84
02
CEMENTO PORTLAND TIPO I
01
21
56,751.65
10/22/1998
Val
Deduccion
0.228
21.93%
286.47
289.49
17,650.41
Saldo
Adelanto
15,862.40
15,862.40
10,797.47
1,910.15
Adelanto
Utilizado
5,064.93
8,887.32
4,640.95
A
5,064.93
8,887.32
1,910.15
Deduccion
5,292.62
0.212
58.96%
256.88
264.25
15,862.40
Amortizacin
141.17
247.72
53.24
5,210.25
9,142.30
1,964.95
442.13
16,317.50
Incidencia
%
Io
Ia
Saldo Deflatado
Reajuste
Mes
Ir
269.09
Nov-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
Monto
Valorizado
40,520.99
71,101.30
37,129.04
Saldo
Adelanto
2,803.82
2,803.82
2,803.82
2,803.82
Adelanto
Utilizado
2,730.80
A
2,730.80
148,751.33
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
02
AGREGADO GRUESO
03
05
4,304.16
10/22/1998
Val
IU
FOR
01
02
03
04
05
05
05
05
03
03
03
03
Incidencia
Coef .
%
0.269
43.12%
0.269 43.12%
0.269 43.12%
0.269 43.12%
Io
Aug-98
166.93
166.93
166.93
166.93
Ia
Sep-98
166.93
166.93
166.93
166.93
Reajuste
Mes
Ir
173.88
Nov-98
173.88
Dec-98
173.88
Dec-98
173.88
Dec-98
Monto
Valorizado
8,306.82
6,838.89
11,718.54
48,758.92
Saldo
Adelanto
4,304.16
3,340.63
2,547.37
1,188.10
Adelanto
Utilizado
963.53
793.26
1,359.27
5,655.68
A
963.53
793.26
1,359.27
1,188.10
02
CEMENTO PORTLAND TIPO I
03
21
11,067.84
10/22/1998
Val
IU
FOR
01
02
03
04
21
21
21
21
03
03
03
03
Incidencia
Coef .
%
0.269
56.88%
0.269 56.88%
0.269 56.88%
0.269 56.88%
Ia
Sep-98
264.25
264.25
264.25
264.25
Reajuste
Mes
Ir
269.09
Nov-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
Monto
Valorizado
8,306.82
6,838.89
11,718.54
48,758.92
Saldo
Adelanto
10,759.16
9,488.16
8,441.76
6,648.74
Adelanto
Utilizado
1,271.00
1,046.40
1,793.02
7,460.47
A
1,271.00
1,046.40
1,793.02
6,648.74
75,623.17
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
05
CEMENTO PORTLAND TIPO I
03
21
1,602.00
10/23/1998
Val
IU
FOR
01
02
03
04
21
21
21
21
03
03
03
03
2,809.15
76.12
2,809.15
Incidencia
Coef .
%
0.269
56.88%
0.269 56.88%
0.269 56.88%
0.269 56.88%
Deduccion
Ia
Sep-98
264.25
264.25
264.25
264.25
Reajuste
Mes
Ir
269.09
Nov-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
Monto
Valorizado
8,306.82
6,838.89
11,718.54
48,758.92
Saldo
Adelanto
1,557.32
1,557.32
1,557.32
1,557.32
Adelanto
Utilizado
811.73
A
811.73
75,623.17
Amortizacin
963.53
793.26
1,359.27
1,188.10
179.21
4,304.16
Deduccion
0.269
56.88%
256.88
264.25
10,759.16
Amortizacin
23.95
29.17
49.98
185.32
1,307.47
1,076.42
1,844.46
6,839.50
288.42
11,067.85
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
256.88
256.88
0.269
43.12%
166.93
166.93
4,304.16
40.12
33.03
56.59
49.47
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
256.88
256.88
Amortizacin
76.12
Incidencia
%
Io
Ia
Saldo Deflatado
75,623.17
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
Deduccion
0.212
58.96%
256.88
264.25
2,803.82
Deduccion
0.269
56.88%
256.88
264.25
1,557.32
Amortizacin
22.63
835.02
22.63
835.02
Val
01
01
01
01
01
02
03
04
FOR
Val
02
02
02
02
01
02
03
04
FOR
Val
03
03
03
03
01
02
03
04
Deduccion
26,303.35
45,577.04
19,733.55
7,966.67
1,274.11
99,580.61
Deduccion
141.17
247.72
129.36
518.25
Deduccion
64.07
62.20
106.57
257.42
490.26
Amortizacion Total
Amortizacion Anterior
Monto a Amortizar
Amortizacin
202.75
573.38
302.97
195.01
Amortizacin
5,210.25
9,142.30
4,774.10
19,126.65
Amortizacin
2,271.00
1,869.68
3,203.73
8,862.62
16,207.03
134,914.29
113,310.90
21,603.39
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
01
BLOQUE Y LADRILLO
01
17
17,836.48
10/22/1998
VALORIZACION N 05 AL 11/02/99
Val
IU
FOR
01
02
03
04
05
17
17
17
17
17
01
01
01
01
01
Incidencia
%
Io
Ia
Saldo Deflatado
Incidencia
Coef .
%
0.228
21.93%
0.228 21.93%
0.228 21.93%
0.228 21.93%
0.228 21.93%
Io
Aug-98
286.47
286.47
286.47
286.47
286.47
Ia
Sep-98
289.49
289.49
289.49
289.49
289.49
Reajuste
Mes
Ir
287.01
Nov-98
285.96
Dec-98
285.96
Dec-98
285.96
Dec-98
285.96
Dec-98
Monto
Valorizado
90,821.26
160,510.85
91,166.79
57,386.28
27,220.08
Saldo
Adelanto
17,650.41
13,109.31
5,083.70
525.32
-
Adelanto
Utilizado
4,541.10
8,025.61
4,558.38
2,869.34
1,361.01
A
4,541.10
8,025.61
4,558.38
525.32
-
427,105.26
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
IU
FOR
01
02
03
04
05
21
21
21
21
21
01
01
01
01
01
Incidencia
Coef .
%
0.228
67.98%
0.228 67.98%
0.228 67.98%
0.228 67.98%
0.228 67.98%
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
256.88
256.88
256.88
Ia
Sep-98
264.25
264.25
264.25
264.25
264.25
Reajuste
Mes
Ir
269.09
Nov-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
Monto
Valorizado
90,821.26
160,510.85
91,166.79
57,386.28
27,220.08
Saldo
Adelanto
55,168.83
41,092.04
16,213.76
2,083.42
-
Adelanto
Utilizado
14,076.79
24,878.28
14,130.34
8,894.55
4,218.96
A
14,076.79
24,878.28
14,130.34
2,083.42
-
427,105.26
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
03
Fierro Corrugado
01
03
14,545.33
10/22/1998
Val
IU
FOR
01
02
03
04
05
03
03
03
03
03
01
01
01
01
01
Io
Aug-98
187.00
187.00
187.00
187.00
187.00
Ia
Sep-98
194.87
194.87
194.87
194.87
194.87
Reajuste
Mes
Ir
198.14
Nov-98
198.13
Dec-98
198.13
Dec-98
198.13
Dec-98
198.13
Dec-98
Monto
Valorizado
90,821.26
160,510.85
91,166.79
57,386.28
27,220.08
Saldo
Adelanto
13,957.90
8,598.67
-
Adelanto
Utilizado
5,359.23
9,471.50
5,379.62
3,386.28
1,606.22
A
5,359.23
8,598.67
-
427,105.26
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
04
Perfiles de Acero
01
65
5,154.53
10/23/1998
Val
IU
FOR
01
02
03
04
05
65
65
65
65
65
01
01
01
01
01
Incidencia
Coef .
%
0.155
11.61%
0.155 11.61%
0.155 11.61%
0.155 11.61%
0.155 11.61%
Io
Aug-98
204.15
204.15
204.15
204.15
204.15
Ia
Sep-98
205.97
205.97
205.97
205.97
205.97
Reajuste
Mes
Ir
191.37
Nov-98
193.88
Dec-98
193.88
Dec-98
193.88
Dec-98
193.88
Dec-98
Monto
Valorizado
90,821.26
160,510.85
91,166.79
57,386.28
27,220.08
Saldo
Adelanto
5,108.98
3,474.61
586.14
-
Adelanto
Utilizado
1,634.37
2,888.47
1,640.59
1,032.69
489.84
A
1,634.37
2,888.47
586.14
-
05
CEMENTO PORTLAND TIPO I
01
21
5,292.62
10/23/1998
Val
IU
FOR
01
02
03
04
05
21
21
21
21
21
01
01
01
01
01
Incidencia
Coef .
%
0.228
67.98%
0.228 67.98%
0.228 67.98%
0.228 67.98%
0.228 67.98%
Ia
Sep-98
264.25
264.25
264.25
264.25
264.25
Reajuste
Mes
Ir
269.09
Nov-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
Monto
Valorizado
90,821.26
160,510.85
91,166.79
57,386.28
27,220.08
Saldo
Adelanto
5,145.01
5,145.01
5,145.01
5,145.01
-
Adelanto
Utilizado
6,811.13
4,218.96
A
5,145.01
-
427,105.26
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
IU
FOR
01
02
03
04
05
21
21
21
21
21
02
02
02
02
02
Incidencia
Coef .
%
0.212
58.96%
0.212 58.96%
0.212 58.96%
0.212 58.96%
0.212 58.96%
1,410.58
56,751.65
Deduccion
Ia
Sep-98
264.25
264.25
264.25
264.25
264.25
Reajuste
Mes
Ir
269.09
Nov-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
Monto
Valorizado
40,520.99
71,101.30
37,129.04
15,010.20
163,761.53
0.155
38.07%
187.00
194.87
13,957.90
Amortizacin
93.71
149.90
-
5,584.78
8,960.55
-
243.61
14,545.33
Deduccion
0.155
11.61%
204.15
205.97
5,108.98
Amortizacin
(116.88)
(171.06)
(34.71)
-
1,648.94
2,914.22
591.37
-
-322.65
5,154.53
Deduccion
143.41
-
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
256.88
256.88
256.88
Amortizacin
0.228
67.98%
256.88
264.25
5,145.01
Amortizacin
5,292.62
-
143.41
02
CEMENTO PORTLAND TIPO I
02
21
16,317.50
10/22/1998
Val
17,836.48
0.228
67.98%
256.88
264.25
55,168.83
14,480.66
25,592.05
14,535.75
2,143.19
-
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
256.88
256.88
256.88
4,588.97
8,110.22
4,606.43
530.86
-
265.23
693.43
393.85
58.07
-
Incidencia
%
Io
Ia
Saldo Deflatado
427,105.26
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
Deduccion
Incidencia
%
Io
Ia
Saldo Deflatado
Incidencia
Coef .
%
0.155
38.07%
0.155 38.07%
0.155 38.07%
0.155 38.07%
0.155 38.07%
Amortizacin
(39.31)
(98.89)
(56.17)
(6.47)
-200.84
02
CEMENTO PORTLAND TIPO I
01
21
56,751.65
10/22/1998
Val
Deduccion
0.228
21.93%
286.47
289.49
17,650.41
Saldo
Adelanto
15,862.40
15,862.40
10,797.47
1,910.15
-
Adelanto
Utilizado
5,064.93
8,887.32
4,640.95
1,876.20
A
5,064.93
8,887.32
1,910.15
-
Deduccion
5,292.62
0.212
58.96%
256.88
264.25
15,862.40
Amortizacin
141.17
247.72
53.24
-
5,210.25
9,142.30
1,964.95
-
442.13
16,317.50
Incidencia
%
Io
Ia
Saldo Deflatado
Reajuste
Mes
Ir
269.09
Nov-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
Monto
Valorizado
40,520.99
71,101.30
37,129.04
15,010.20
Saldo
Adelanto
2,803.82
2,803.82
2,803.82
2,803.82
73.02
Adelanto
Utilizado
2,730.80
1,876.20
A
2,730.80
73.02
163,761.53
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
02
AGREGADO GRUESO
03
05
4,304.16
10/22/1998
Val
IU
FOR
01
02
03
04
05
05
05
05
05
05
03
03
03
03
03
Incidencia
Coef .
%
0.269
43.12%
0.269 43.12%
0.269 43.12%
0.269 43.12%
0.269 43.12%
Io
Aug-98
166.93
166.93
166.93
166.93
166.93
Ia
Sep-98
166.93
166.93
166.93
166.93
166.93
Reajuste
Mes
Ir
173.88
Nov-98
173.88
Dec-98
173.88
Dec-98
173.88
Dec-98
173.88
Dec-98
Monto
Valorizado
8,306.82
6,838.89
11,718.54
48,758.92
12,648.97
Saldo
Adelanto
4,304.16
3,340.63
2,547.37
1,188.10
-
Adelanto
Utilizado
963.53
793.26
1,359.27
5,655.68
1,467.19
A
963.53
793.26
1,359.27
1,188.10
-
02
CEMENTO PORTLAND TIPO I
03
21
11,067.84
10/22/1998
Val
IU
FOR
01
02
03
04
05
21
21
21
21
21
03
03
03
03
03
Incidencia
Coef .
%
0.269
56.88%
0.269 56.88%
0.269 56.88%
0.269 56.88%
0.269 56.88%
Ia
Sep-98
264.25
264.25
264.25
264.25
264.25
Reajuste
Mes
Ir
269.09
Nov-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
Monto
Valorizado
8,306.82
6,838.89
11,718.54
48,758.92
12,648.97
Saldo
Adelanto
10,759.16
9,488.16
8,441.76
6,648.74
-
Adelanto
Utilizado
1,271.00
1,046.40
1,793.02
7,460.47
1,935.38
A
1,271.00
1,046.40
1,793.02
6,648.74
-
88,272.14
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
05
CEMENTO PORTLAND TIPO I
03
21
1,602.00
10/23/1998
Val
IU
FOR
01
02
03
04
05
21
21
21
21
21
03
03
03
03
03
2,809.15
75.11
78.16
2,884.26
Incidencia
Coef .
%
0.269
56.88%
0.269 56.88%
0.269 56.88%
0.269 56.88%
0.269 56.88%
Deduccion
Ia
Sep-98
264.25
264.25
264.25
264.25
264.25
Reajuste
Mes
Ir
269.09
Nov-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
271.41
Dec-98
Monto
Valorizado
8,306.82
6,838.89
11,718.54
48,758.92
12,648.97
Saldo
Adelanto
1,557.32
1,557.32
1,557.32
1,557.32
745.59
Adelanto
Utilizado
811.73
1,935.38
A
811.73
745.59
88,272.14
Amortizacin
963.53
793.26
1,359.27
1,188.10
-
179.21
4,304.16
Deduccion
0.269
56.88%
256.88
264.25
10,759.16
Amortizacin
23.95
29.17
49.98
185.32
-
1,307.47
1,076.42
1,844.46
6,839.50
-
288.42
11,067.85
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
256.88
256.88
256.88
0.269
43.12%
166.93
166.93
4,304.16
40.12
33.03
56.59
49.47
-
Incidencia
%
Io
Ia
Saldo Deflatado
Io
Aug-98
256.88
256.88
256.88
256.88
256.88
Amortizacin
76.12
2.04
Incidencia
%
Io
Ia
Saldo Deflatado
88,272.14
Expediente
Material
Formula
IU
Adelanto
Fecha Pago
Deduccion
0.212
58.96%
256.88
264.25
2,803.82
Deduccion
0.269
56.88%
256.88
264.25
1,557.32
Amortizacin
22.63
20.78
835.02
766.98
43.41
1,602.00
Val
01
01
01
01
01
01
02
03
04
05
FOR
Val
02
02
02
02
02
01
02
03
04
05
FOR
Val
03
03
03
03
03
01
02
03
04
05
Deduccion
26,303.35
45,577.04
19,733.55
7,966.67
-
1,274.11
99,580.61
Deduccion
141.17
247.72
129.36
2.04
520.29
Deduccion
64.07
62.20
106.57
257.42
20.78
511.04
Amortizacion Total
Amortizacion Anterior
Monto a Amortizar
Amortizacin
202.75
573.38
302.97
195.01
-
Amortizacin
5,210.25
9,142.30
4,774.10
75.11
19,201.76
Amortizacin
2,271.00
1,869.68
3,203.73
8,862.62
766.98
16,974.01
135,756.38
134,914.29
842.09
IU
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
INSUMO
ACEITE
ACERO DE CONSTRUCCION LISO
ACERO DE CONSTRUCCION CORRUGADO
AGREGADO FINO
AGREGADO GRUESO
ALAMBRE Y CABLE DE COBRE DESNUDO
ALAMBRE Y CABLE TIPO TW Y THW
ALAMBRE Y CABLE TIPO WP
ALCANTARILLA METALICA
APARATO SANITARIO CON GRIFERIA
ARTEFACTO ALUMBRADO EXTERIOR
ARTEFACTO DE ALUMBRADO INTERIOR
ASFALTO
BALDOSA ACUSTICA
BALDOSA ASFALTICA
BALDOSA VINILICA
BLOQUE Y LADRILLO
CABLE TELEFONICO
CABLE NYY - CABLE NKY
CEMENTO ASFALTICO
CEMENTO PORTLAND TIPO I
CEMENTO PORTLAND TIPO II
CEMENTO PORTLAND TIPO V
CERAMICA ESMALTADA Y SIN ESMALTAR
CERRAJERIA NACIONAL
DETONANTE
DINAMITA
DOLAR (GENERAL PONDERADO)
DUCTO DE CONCRETO
FLETE TERRESTRE
FLETE AEREO
GASOLINA
GELATINA
GELIGNITA
HERRAMIENTA MANUAL
HORMIGON
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
LOSETA
MADERA EN TIRAS PARA PISO
MADERA IMPORT. ENCOF. Y CARP.
MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA
MADERA TERCIADA PARA ENCOFRADO Y CARPINTERIA
MADERA TERCIADA PARA ENCOF.
MALLA DE ACERO
MANO DE OBRA (INCLUIDO LEYES SOCIALES)
MAQUINARIA Y EQUIPO NACIONAL
MAQUINARIA Y EQUIPO IMPORTADO
MARCO Y TAPA DE FIERRO FUNDIDO
PERFIL DE ACERO LIVIANO
PERFIL DE ALUMINIO
PETROLEO DIESEL
PINTURA LATEX
PINTURA TEMPLE
PLANCHA DE ACERO LAC
PLANCHA DE ACERO LAF
PLANCHA DE ASBESTO-CEMENTO
PLANCHA DE POLIURETANO
PLANCHA GALVANIZADA
POSTE DE CONCRETO
POSTE DE FIERRO Y TUB. ACERO
TERRAZO
TUBO DE ACERO NEGRO Y/O GALVANIZADO
TUBERIA DE ASBESTO CEMENTO
TUBER. DE COBRE Y ACC. BRONCE
TUBERIA DE ASBESTO CEMENTO
TUBERIA DE CONCRETO REFORZADO
TUBERIA DE FIERRO FUNDIDO
TUBERIA DE PVC AGUA-DESAG-ELEC
DUCTOS TELEFONICOS DE PVC
Jun-98
304.87
185.38
186.17
293.07
162.09
317.04
217.32
286.38
188.47
226.67
203.29
223.29
407.62
211.42
0
303.06
287.14
193.29
264.45
385.09
256.88
275.62
276.52
221.93
0
241.92
296.2
278.68
0
274.01
213.26
248.06
351.27
216.41
0
0
223.99
246.33
261.57
258.87
250.6
259.78
314.25
255.04
231.76
279.6
258.94
265.79
238.08
302.94
217.24
247.72
265.58
275.93
304.32
183.4
196.61
0
158.3
155.44
215.62
201.73
0
183.05
203.59
237.85
0
213.46
183.48
206.44
315.37
228.86
221.99
0
0
0
233.53
347.71
0
Feb-99 Mar-99 Apr-99 May-99 Jun-99 Jul-99 Aug-99 Sep-99 Oct-99 Nov-99 Dec-99