Escolar Documentos
Profissional Documentos
Cultura Documentos
S/. 1.50
MATERIALES VARIOS
CEMENTO PORTLAND TIPO I
ACERO DE REFUERZO Fy = 4200 Kg/cm2
CLAVOS, ALAMBRE NEGRO N 8, ALAMBRE NEGRO N 16
LADRILLO KK TIPO IV DE 18 HUECOS
IMPRIMANTE
TRANSPORTE DE CARPINTERIA DE MADERA
TRANSPORTE DE EQUIPO LIVIANO (IDA Y VUELTA)
IMPREVISTOS, VARIOS
COSTO
PESO
PESO
UNIT. POR
KG
UND CANT. (KG) UNIT. (KG) TOTAL (KG)
BOL
515.00
42.50
21887.50
0.0353
KG.
1730.00
1.00
1730.00
0.0353
KG.
216.00
1.00
216.00
0.0353
UND
5600.00
4.00
22400.00
0.0353
KG.
290.00
1.00
290.00
0.0353
GLB
1.00
1.00
1.00
500.0
GLB
1.00
1.00
1.00
1000.0
GLB
1.00
1.00
1.00
500.00
COSTO TOTAL DE FLETE TERRSTRE S/.
COSTO
PARCIAL.
POR KG
772.63
61.07
7.62
790.72
10.24
500.00
1000.00
500.00
3642.28