Project
AKPO
A large Nigerian deep offshore development
10%
50% NNPC ie
-45% CNOOC
- 5% SAPETRO
50%
SAPETRO
TOTAL
BRASOIL
OML 130
OPL 246
1998
NNPC
OPL 246
OML 130
2005
Contractual Strategy
DRILLING
DRILLING&&
COMPLETION
COMPLETION
SPS
SPS
Management
& &
Management
conceptual
studies
conceptual
studies
Procurement
Procurement
Onshore fabrication
Onshore
fabrication
FPSO
FPSO
Hull
Hull
Topsides
TUPNI
TUPNI
DORIS
Engineering
DORIS Engineering
Basic Engineering
FEED
Engineering
Detail Engineering
Detail
Engineering
UFR
UFR&&
Offloading
Offloading
terminal
terminal
LLI
EPSCC
EPSCC
EPS
DRILLING
SAIPEM
DRILLING
EPSCC
EPSCC Technip/HHI
EPS
TUPNI CAMERON
Onshore test
& com.
Onshore
test
& com.
Transportation
Transportation
Drilling: Transocean
Offshore
installation
Offshore
installation
Completion: Global
Santa Fe
Offshore
H.U.
Offshore
H.U.
Offshore commissioning
Offshore commissioning
Start up
Start
up& operation
& operation
TUPNI
Flotel
TUPNI
11
VENTURE
SURFACES
FACILITIES
SERVICES
FLOATING,
PRODUCTION,
STORAGE &
OFFLOADING
NIGERIA
INTERFACES
SUBSEA
PRODUCTION
SYSTEM
COMMISSIONING
UMBILICALS,
FLOWLINES &
RISERS
INTERFACES
FIELD GSR
DRILLING &
COMPLETION
FIELD
OPERATIONS
HSEQ
Akpo
Project
Significant
amount of
precipitated
asphaltene
sticking to
the wall of
the
transparent
cell
PHASE DIAGRAM
TR
Critical Points
Critical Point
Volatile Oil
Volatile oil
Pressure
PRESSURE
Condensate
Condensate
Temperature
TEMPERATURE
TEMPERATURE
press - Akpo-10
A-3
press - Akpo-06
A-2
1.75
1.50
A-2
1.25
1.00
Akpo-10
Akpo-10
A-3
Akpo-15
Akpo-15
Start Injection on
Akpo-15
A-1
0.75
0.50
0.25
End Injection on
Akpo-15
A-1
0.00
26/12/08
25/12/08
24/12/08
23/12/08
22/12/08
21/12/08
20/12/08
18/12/08
17/12/08
16/12/08
15/12/08
14/12/08
Akpo-6
13/12/08
-0.50
12/12/08
11/12/08
-0.25
19/12/08
2.00
A-1
Akpo-16
Date
Akpo-5G
Akpo-5st
Jack Ryan
Stena Tay
Pathfinder
2006
DWD
2007
2008
2009
709 days
J Ryan
S- Tay
751 days
305
days
305
days
DWP
Well testing
equipment on Jack
Ryan
Management decision to dedicate one rig for drilling, one rig for completion
Savings in rig upgrades and service costs, efficient specialized rig crew
AFTP/SPE - Akpo Project - 23-06-10
Mud Mat/TGB in
moon pool
10 km
12k
m
An Optimized Sub-Sea Layout with multi Drilling Centers, taking onboard
SCR constraints and Flow Assurance requirements, frozen at FEED
AFTP/SPE - Akpo Project - 23-06-10
21
Shut-down
WELL READY
SUBSEA
SYSTEM
PROTECTED
TO RESTART
NO TOUCH
TIME 4-hour
INJECTION
OF METHANOL
STABILISED CRUDE
CIRCULATION
DEPRESSURISATION
OF WELL, JUMPER,
MANIFOLD
AND RISER
Time
XMAS
TREE
WELLHEAD
HYDRAULIC
FLYING
LEADS
HORIZONTAL
CONNECTORS &
DOGHOUSES
MANIFOLD
PILE
OTC 23
- 20993
Main Factors
Water depth
Flow Assurance
WD : 1300m
No Gas lift
Generic concept
Local content
Bidding process
15
900 m
27
28
FPSO
SCR
transferred
to FPSO
SCR load
transfer from
FDS to FPSO
pulling rig
Pulling
rig
Transfer wire
passed to FDS
from FPSO
pulling rig
Step 2 : FL
head on FDS
SCR laying
SCR including
Flex-joint ready
to transfer
FLET
29
AKPO FPSO
Hull: 310m x 61m x 31m
Living Quarter: 240 POB
2 million barrels storage
Oil processing: 185,000 bbl/d
Water injection: 420,000 bbl/d
Produced water treatment:
150,000 bbl/d
Gas treatment: 530 mmscfd
Gas export: 290 mmscfd
Gas injection: 210 mmscfd
Re-Injection
Gas
Gas Export
Condensate
Akpo Central
Condensate
Akpo East
Akpo Central
B, EF, G
WI
An all-electric FPSO
32
33
Topsides
Subsea
Downhole
34
35
36
Cumulative
Production
PLAN
ACTUAL
Operations success
is the AKPO Project teams overall success
AFTP/SPE - Akpo Project - 23-06-10