Você está na página 1de 1

ADVANCING development

through sustainable ENGINEERING

PROJECT
HIGHLIGHTS
Project Type:
Off-Grid Solar PV System
Experience Type: Individual
Andre Susanto
Solar PV Installed:
23,970 Wp
Battery Installed:
120 x OPzV 2VDC@800Ah

COMMERCIAL HYBRID OFF GRID SOLAR


PV SYSTEM
Project Location: East Kalimantan, Indonesia

Energy Produced:
112.3 kWh/day (Maximum)
72.8 kWh/day (Average)

Mr. Susanto (VP AE Indonesia) was tasked by a major


telecommunication company to add a solar PV system to their
existing installation in order to reduce the fuel consumption. The end
result was a solar PV hybrid system with the existing diesel generator.
Operational since 2012, the system has been working together with
the diesel generator to provide over 70kWh/day of electricity to the
commercial camp. The electricity is used to provide power to the
living quarters and offices of the staff as well as numerous critical Advancing Engineering
United States of America
telecommunication equipment.
+ 1 510-992-3834
The hybrid system is a little bit more complex than an urban www.aeconsults.com
installation of a grid tied solar PV system. Under Mr. Susantos info@aeconsults.com
technical supervision, the design and installation went smoothly and
the system is running well. Mr. Susanto also supervised the design Advancing Engineering
and implementation of a remote monitoring system with an Kingdom of Cambodia
automatic cut off switch to guard against damage to the batteries.
+ 855 (0)23 986 330
Currently the system is saving this off grid facility about $15000/year Advancing Engineering
on fuel and maintenance of the generator, which has been Republic of Indonesia
supplemented by this solar PV system.
+ 62 21 9949 0770