Escolar Documentos
Profissional Documentos
Cultura Documentos
50
40
17.5
480
70
40
3
2
8
A rq u iv o M ID
TJDFT
3
O 2009
CLIQUE ABAIXO PARA COMEAR
O DE PROJETOS EM TUBULES
Autor: Eng. Civil Guilherme Magalhes Almeida
Tel: (61)3103-7759
FEDERAL E TERRITRIOS
Matr. 315255
TJDFT - SERCIV
ESTE MDULO DO
SOFTWARE AINDA EST EM
FASE DE DESENVOLVIMENTO.
AGUARDE O LANAMENTO
DA NOVA VERSO!!!
DATA
CONTADOR
ENTRADA
CP 200 200.00
3.00
500.00
12.00
400.00
1.00
6.03
194.24
60.35
16.98
0.71
24.91
22.61
31.11
CARGA ATUANTE
CARGA MAXIMA
500.00
194.24
TAXA CALCULADA
TAXA ORIGINAL
6.03
3.00
D (cm)
d (cm)
h (cm)
200
460.67
91.59
320.42
RESULTADOS
465.00
95.00
325.00
ADOTAR
ADOTAR
ADOTAR
Alternar fuste
CP 100
CP 135
CP 150
CP 200
CP 250
CP 300
CP 400
CP 500
1
2
3
4
5
6
7
8
fuste alter
vinc test
UNIDADE
PREO
Armador
3.31
Carpinteiro
3.31
Pedreiro
3.31
Servente
2.13
Poceiro
3.31
MATERIAIS
UNIDADE
PREO
M3
275.32
M3
275.32
KG
4.16
KG
11.75
Cimento comum
KG
0.39
Brita 1
M3
66.27
Areia lavada
Nivel
de
Perdas
Perdas =
M3
83.73
METRO
7.21
METRO
2.58
METRO
9.19
KG
6.85
LITRO
6.99
ml
mn
med
Servente
5.4285
6.0317
Pocerio
5.4285
6.0317
ml
mn
med
Servente
3.0535
3.3928
Pocerio
3.0535
3.3928
m3
mn
med
Servente
10.0000
12.0000
Pocerio
12.0000
14.0000
Prego 18x30
Desmoldante para formas
COMPOSIES
Nvel de perdas
Alargamento da base
m3
mn
med
m3
1.0300
1.0500
Pedreiro
3.0000
4.0500
Servente
3.0000
4.0500
kg
mn
med
kg
1.0800
1.1500
kg
0.0200
0.0200
Armador
0.0700
0.0900
Servente
0.0700
0.0900
Escavao manual
Servente
m3
mn
med
1.6000
2.1700
m3
mn
med
Cimento comum
kg
209.0000
220.0000
m3
0.6631
0.6980
pedra 1
m3
0.8342
0.8780
Pedreiro
m3
3.0000
4.0500
Servente
4.0000
5.4000
Unidade
mn
med
Pedreiro
0.2400
0.2500
Servente
2.4000
2.5000
m2
mn
med
1.0000
1.0500
3.5000
3.9000
0.9000
0.9800
Prego 18x30
kg
0.1500
0.1600
0.1500
0.1700
Carpinteiro
1.3500
1.5000
Servente
1.3500
1.5000
kg
mn
med
kg
1.0800
1.1500
kg
0.0200
0.0200
Armador
0.0700
0.0900
Servente
0.0700
0.0900
m3
mn
med
Servente
3.0000
4.0500
Pedreiro
3.0000
4.0500
m3
1.0000
1.0500
Reaterro
m3
mn
med
Servente
1.5000
2.0300
Bota fora
m3
mn
med
Servente
1.6000
2.1700
min
med
mx
2
1.00
2.00
3.00
124.00
el de perdas
mx
adotada
preo
7.2380
6.0317
4.77
28.78
7.2380
6.0317
7.41
44.72
Total:
73.50
mx
adotada
preo
4.0714
3.3928
4.77
16.19
4.0714
3.3928
7.41
25.16
mx
adotada
preo
14.0000
12.0000
4.77
57.25
16.0000
14.0000
7.41
103.80
Total:
41.34
Total:
161.06
mx
adotada
preo
1.0700
1.0500
275.32
289.09
4.8600
4.0500
7.41
30.03
4.8600
4.0500
4.77
19.32
mx
adotada
preo
Total:
338.44
1.2500
1.1500
4.16
4.78
0.0200
0.0200
11.75
0.24
0.1100
0.0900
7.41
0.67
0.1100
0.0900
4.77
0.43
Total:
mx
adotada
preo
2.6000
2.1700
4.77
6.12
10.35
Total:
10.35
mx
adotada
preo
242.0000
220.0000
0.39
85.80
0.7678
0.6980
83.73
58.44
0.9658
0.8780
66.27
58.19
4.8600
4.0500
7.41
30.03
6.4800
4.0500
4.77
19.32
Total:
mx
adotada
preo
0.2600
0.2500
7.41
2.6000
2.5000
7.41
251.78
1.85
18.54
Total:
20.39
mx
adotada
1.1000
1.0500
7.21
7.57
4.1000
3.9000
2.58
10.06
1.0800
0.9800
9.19
9.01
0.1700
0.1600
6.85
1.10
0.2000
0.1700
6.99
1.19
1.5500
1.5000
7.41
11.12
1.5500
1.5000
4.77
7.16
Total:
47.20
mx
adotada
1.2500
1.1500
4.16
4.78
0.0200
0.0200
11.75
0.24
0.1100
0.0900
7.41
0.67
0.1100
0.0900
4.77
0.43
preo
Total:
6.12
mx
adotada
preo
4.8600
4.0500
4.77
19.32
4.8600
4.0500
7.41
30.03
1.1000
1.0500
275.32
289.09
Total:
mx
adotada
preo
2.4300
2.0300
4.77
mx
adotada
preo
2.6000
2.1700
4.77
338.44
9.69
Total:
9.69
10.35
Total:
10.35
NMERO DE REPETIES
1.00
DADOS DO FUSTE
DIMETRO DO FUSTE d (cm)
PERFURAO DO FUSTE Pf (m)
80.00
21.00
DADOS DA BASE
ALTURA DA BASE h (cm)
ALTURA DO RODAP dh (cm)
DIAMETRO DA BASE D
205.00
20.00
10.00
DADOS DO BLOCO
COMPRIMENTO DO BLOCO X (cm)
LARGURA DO BLOCO Y (cm)
ALTURA DO BLOCO HB (cm)
BITOLA UTILIZADA NO BLOCO (mm)
CONSUMO MDIO DE ARMADURA NO BLOCO (kg / m3)
Distncia a1 (cm)
Distncia a2 (cm)
Distncia a3 (cm)
Distncia a4 (cm)
Distncia b1(cm)
Distncia b2 (cm)
Distncia b3 (cm)
Distncia b4 (cm)
100.00
100.00
95.00
12.50
12.5
80.00
60.00
50.00
50.00
60.00
60.00
50.00
50.00
60.00
ARMADURA LONGITUDINAL
BITOLA UTILIZADA (mm)
QUANTIDADE DE FERROS
COMPRIMENTO DO FERRO (cm)
8 FERROS DIMETRO DE 12.5 mm - 200
12.50
12.50
8
200.00
5.00
5.00
20.00
3.00
260.00
10.00
DADOS COMPLEMENTARES
NGULO DA INCLINAO DO TALUDE BETA (GRAUS)
ALTURA DO CONCRETO MACRO C (cm)
ENTRADA NO BLOCO D (cm)
Distncia A (ARREDONDADA)
ngulo Beta adotado (graus)
60.00
60.00
60.00
5.00
5.00
57.73
DIST. A ORIG.
Material + mo de obra
PREO (R$)
BLOCO
TUBULO
Descrio
Perfurao do fuste
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Lanamento e adenamento de
Concreto magro e= 5cm
Corte e preparo da cabea do
tubulo
Confeco, colocao e remoo
de forma
Dobramento e colocao de
armadura no bloco
Lanamento e adenamento de
concreto estrutural p/ blocos
Reaterro
Bota fora
Unidade
Quantidade
Unitrio
ml
m3
m3
kg
kg
m3
21.00
-0.68
9.88
15.98
4.16
6.88
73.50
161.06
338.44
6.12
6.12
10.35
m3
0.17
251.78
Unid.
1.00
20.39
m2
3.80
47.20
kg
76.00
6.12
m3
m3
m3
0.95
338.44
5.76
9.69
11.01
10.35
Total material + mo de obra:
MATERIAL
PREO (R$)
Bloco
Tub.
Descrio
Concreto
Armadura longitudinal
Armadura tranversal
Concreto magro
Concreto estrutural
Forma
Armadura
Unidade
Quantidade
m3
kg
kg
m3
m3
m2
kg
9.88
15.98
4.16
0.17
0.95
3.80
76.00
Unitrio
289.09
5.02
5.02
202.43
289.09
28.92
5.02
Total material
Total mo de obra:
PREO (R$)
Total
1,543.49
-108.76
3,343.81
97.74
25.41
71.23
ARMADURA
Vol. Base = 0.36 m3
CA-50 DIAM. 12.5
CA-60 DIAM. 5
44.03
20.39
179.37
464.79
321.52
55.74
113.94
R$ 6,172.71
PREO (R$)
Total
2,856.21
80.22
20.86
35.40
274.63
109.91
381.44
R$ 3,758.67
R$ 2,414.05
R$ 6,172.71
8 BARRAS C = 200
10 BARRAS C = 260
BLOCO
DADOS
TUBULO
ES
UL
B
TU
X (cm)
AR
HB (cm)
L
U
ARMADURA
C
R
Fuste d (cm)
CI Pf (m)
Y (cm)
h (cm)
dh (cm)
D (cm)
TUBULO
BLOCO
Concreto magro
Corte e preparo da cabea do
tutulo
Confeco, colocao e remoo
de forma
Dobramento e colocao de
armadura
Lanamento e adensamento de
concreto estrutural
Reaterro
Bota fora
MATERIAL
ES
TIPO 2
100.00
100.00
95.00
CA-50 DIAM. 12,5
80.00
21.00
205.00
20.00
8 BARRAS C = 200
10 BARRAS C = 260
UNIDADE
m
unid.
m3
kg
kg
m3
m2
0.17
0.17
m3
1.00
1.00
m2
3.80
3.80
kg
76.00
76.00
m3
m3
m3
UNIDADE
0.95
5.76
10.96
0.95
5.76
10.96
ARM. LONG.
ARM.TRANV.
REPETIES
MATERIAL + MO DE OBRA
Perfurao do fuste
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
TIPO 1
UNITRIO
21.00
-0.72
9.83
15.98
4.16
6.88
TOTAL
TUB.
BLOCO
Concreto
Armadura longitudinal
Armadura tranversal
Concreto magro
Concreto estrutural
Forma
Armadura
m3
kg
kg
m3
m3
m2
kg
9.83
15.98
4.16
0.17
0.95
3.80
76.00
9.83
15.98
4.16
0.17
0.95
3.80
76.00
73.50
1,543.49
UNITRIO
3,745.61
3,745.61
2,404.08
2,404.08
6,149.69
6,149.69
TIPO 1
BLOCO
TUBULO
Perfurao do fuste
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Concreto magro
Corte e preparo da cabea do
tutulo
Confeco, colocao e remoo
de forma
Dobramento e colocao de
armadura
PREO (R$)
UNIDADE QUANT.
m
21.00
m3
-0.72
m3
9.83
kg
15.98
kg
4.16
m3
6.88
m2
0.17
TIPO 2
UNITRIO
VAR
161.06
338.44
6.12
6.12
10.35
251.78
TOTAL
#VALUE!
-116.03
3,328.53
97.74
25.41
71.23
44.03
unid.
1.00
20.39
20.39
m2
3.80
47.20
179.37
kg
76.00
6.12
464.79
BLOCO
Lanamento e adensamento de
concreto estrutural p/ blocos
Reaterro
Bota fora
m3
m3
m3
0.95
338.44
5.76
9.69
10.96
10.35
Total material + mo de obra
Total material
Total mo de obra
TUBULES CIRCULARES
BLOCO
TUBULO
Perfurao do fuste
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Concreto magro
Corte e preparo da cabea do
tutulo
Confeco, colocao e remoo
de forma
Dobramento e colocao de
armadura
Lanamento e adensamento de
concreto estrutural
Reaterro
Bota fora
UNIDADE QUANT.
m
21.00
m3
-0.72
m3
9.83
kg
15.98
kg
4.16
m3
6.88
m2
0.17
PREO (R$)
UNITRIO
VAR
161.06
338.44
6.12
6.12
10.35
251.78
321.52
55.74
113.47
#VALUE!
3,745.61
2,404.08
unid.
1.00
20.39
20.39
m2
3.80
47.20
179.37
kg
76.00
6.12
464.79
m3
m3
m3
0.95
338.44
5.76
9.69
10.96
10.35
Total material + mo de obra
Total material
Total mo de obra
321.52
55.74
113.47
6,149.69
3,745.61
2,404.08
TUBULES CIRCULARES
BLOCO
TUBULO
Perfurao do fuste
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Concreto magro
Corte e preparo da cabea do
tutulo
Confeco, colocao e remoo
de forma
Dobramento e colocao de
armadura
Lanamento e adensamento de
concreto estrutural
Reaterro
Bota fora
UNIDADE QUANT.
m
21.00
m3
-0.72
m3
9.83
kg
15.98
kg
4.16
m3
6.88
m2
0.17
TUBULO
BLOCO
Perfurao do fuste
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Concreto magro
unid.
1.00
20.39
20.39
m2
3.80
47.20
179.37
kg
76.00
6.12
464.79
m3
m3
m3
0.95
338.44
5.76
9.69
10.96
10.35
Total material + mo de obra
Total material
Total mo de obra
TUBULES CIRCULARES
GERAL - BLOCOS RETANGULARES
PREO (R$)
UNITRIO
VAR
161.06
338.44
6.12
6.12
10.35
251.78
UNIDADE QUANT.
m
21.00
m3
-0.72
m3
9.83
kg
15.98
kg
4.16
m3
6.88
m2
0.17
PREO (R$)
UNITRIO
VAR
161.06
338.44
6.12
6.12
10.35
251.78
321.52
55.74
113.47
6,149.69
3,745.61
2,404.08
BLOCO
unid.
1.00
20.39
20.39
m2
3.80
47.20
179.37
kg
76.00
6.12
464.79
m3
m3
m3
0.95
338.44
5.76
9.69
10.96
10.35
Total material + mo de obra
Total material
Total mo de obra
TUBULES CIRCULARES
BLOCO
TUBULO
Perfurao do fuste
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Concreto magro
Corte e preparo da cabea do
tutulo
Confeco, colocao e remoo
de forma
Dobramento e colocao de
armadura
Lanamento e adensamento de
concreto estrutural
Reaterro
Bota fora
UNIDADE QUANT.
m
21.00
m3
-0.72
m3
9.83
kg
15.98
kg
4.16
m3
6.88
m2
0.17
PREO (R$)
UNITRIO
VAR
161.06
338.44
6.12
6.12
10.35
251.78
321.52
55.74
113.47
6,149.69
3,745.61
2,404.08
unid.
1.00
20.39
20.39
m2
3.80
47.20
179.37
kg
76.00
6.12
464.79
m3
m3
m3
0.95
5.76
10.96
338.44
9.69
10.35
321.52
55.74
113.47
TUBULES CIRCULARES
BLOCO
TUBULO
Perfurao do fuste
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Concreto magro
Corte e preparo da cabea do
tutulo
Confeco, colocao e remoo
de forma
Dobramento e colocao de
armadura
Lanamento e adensamento de
concreto estrutural
Reaterro
Bota fora
UNIDADE QUANT.
m
m3
m3
kg
kg
m3
m2
6,149.69
3,745.61
2,404.08
PREO (R$)
UNITRIO
TOTAL
unid.
m2
kg
m3
m3
m3
Total material + mo de obra
Total material
Total mo de obra
TUBULES OVAIS
GERAL - BLOCOS RETANGULARES
UNIDADE QUANT.
PREO (R$)
UNITRIO
TOTAL
TUBULO
BLOCO
Perfurao do fuste
84.00
VAR
6,173.97
Restaurar
Alargamento da base
m3
-2.88
161.06
-464.13
Restaurar
Lanamento de concreto
m3
39.34
338.44
13,314.12
Restaurar
Armadura longitudinal
kg
63.93
6.12
390.97
Restaurar
Armadura tranversal
kg
16.62
6.12
101.65
Restaurar
Escavao manual
m3
27.52
10.35
284.93
Restaurar
Concreto magro
Corte e preparo da cabea do
tutulo
Confeco, colocao e remoo
de forma
Dobramento e colocao de
armadura
Lanamento e adensamento de
concreto estrutural
m2
0.70
251.78
176.11
Restaurar
unid.
4.00
20.39
81.56
Restaurar
m2
15.20
47.20
717.46
Restaurar
kg
304.00
6.12
1,859.17
Restaurar
m3
3.80
338.44
1,286.06
Restaurar
Reaterro
m3
23.02
9.69
222.97
Restaurar
Bota fora
m3
43.84
10.35
Total material + mo de obra
Total material
Total mo de obra
453.89
24,598.75
14,982.44
9,616.30
Restaurar
TUBULES OVAIS
QUANTITATIVOS GERAL
TUBULO
Perfurao do fuste
UNIDADE QUANT.
m
160.00
PREO (R$)
UNITRIO
TOTAL
VAR
10,471.00
TUBULO
BLOCO
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Concreto magro
Corte e preparo da cabea do
tutulo
Confeco, colocao e remoo
de forma
Dobramento e colocao de
armadura
Lanamento e adensamento de
concreto estrutural
Reaterro
Bota fora
m3
m3
kg
kg
m3
m2
79.37
205.03
599.34
245.87
249.68
5.46
91.39
159.37
2.15
2.15
6.32
132.92
7,253.96
32,676.60
1,290.95
529.60
1,577.74
726.36
unid.
20.00
8.75
174.99
m2
110.40
24.54
2,709.11
kg
2,649.60
2.15
5,707.13
m3
m3
m3
33.12
177.22
211.10
5.91
243.62
6.32
Total material + mo de obra
Total material
Total mo de obra
LUCRO (%)
ADMNISTRAO (%)
CUSTOS FINANCEIROS (%)
Total material + mo de obra
total material
Total mo de obra
BDI MDIO
DIFERENA BRUTA
5,869.63
1,247.86
1,539.42
R$ 71,774.35
R$ 39,324.06
R$ 32,450.29
10.00
12.00
6.00
CUSTO FINAL
R$ 93,731.56
R$ 51,354.08
R$ 42,377.48
30.59%
R$ 21,957.21
TIPO 3
TIPO 4
TIPO 5
UNITRIO
TOTAL
UNITRIO
TOTAL
UNITRIO
TOTAL
UNITRIO
UNITRIO
TIPO 2
ANTIDADES
UNITRIO
TIPO 3
UNITRIO
TIPO 4
UNITRIO
TIPO 5
s e preos originais do BD
TIPO 6
TOTAL
TIPO 7
TIPO 8
TIPO 9
UNITRIO
TOTAL
UNITRIO
TOTAL
UNITRIO
TOTAL
UNITRIO
TIPO 6
UNITRIO
TIPO 7
UNITRIO
TIPO 8
TIPO 9
TIPO 10
UNITRIO
TOTAL
UNITRIO
UNITRIO
TIPO 9
UNITRIO
TIPO 10
AO
BLOCO
CA-50
8.0
10.0
12.5
16.0
20.0
25.0
CA-60
5.0
6.0
ARM. LONGIT.
CA-50
8.0
10.0
12.5
16.0
20.0
25.0
CA-60
5.0
6.0
TIPO 1
76.00
15.98
ARM. TRANSV.
CA-50
6.3
8.0
10.0
12.5
16.0
CA-60
3.4
5.0
6.0
4.16
TIPO 2
TIPO 3
TIPO 4
TIPO 5
TIPO 6
TIPO 7
TIPO 8
TIPO 9
TIPO 10
SOMA 1
0.00
0.00
76.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.16
0.00
AO
BLOCO
CA-50
8.0
10.0
12.5
16.0
20.0
25.0
CA-60
5.0
6.0
ARM. LONGIT.
CA-50
8.0
10.0
12.5
16.0
20.0
25.0
CA-60
5.0
6.0
ARM. TRANSV.
CA-50
6.3
8.0
10.0
12.5
16.0
CA-60
3.4
5.0
6.0
3.40
0.00
5.00
4.16
20.00
0.00
3.40
0.00
5.00
4.16
20.00
0.00
3.40
0.00
5.00
4.16
20.00
0.00
3.40
0.00
5.00
4.16
20.00
0.00
3.40
5.00
20.00
RESULTADO FINAL AO
3.40
5.00
6.00
6.30
8.00
10.00
12.50
16.00
20.00
25.00
CA-50+10 %
CA-60+10 %
0.00
16.62
0.00
0.00
0.00
0.00
367.93
0.00
0.00
0.00
405.00
19.00
kg
CA - 60
kg
CA - 50
3.40
0.00
DADES
25.00
0.00
25.00
0.00
25.00
0.00
25.00
0.00
25.00
0.00
25.00
ENTRADA
200.00
CP 200
3.00
50.00
1.40
1.60
40.00
500.00
2.00
21.00
10.00
200.00
1.00
29.87
16,666.67
96.62
53.19
17,730.50
98.77
121.24
200.00
2.07
1.06
30.00
3.19
1.60
8.40
1.77
0.28
1.85
1.50
7.44
adotar
adotar
adotar
h <= 200 - ok!
adotar
a/b < 2,5 - ok!
60.75
1
1
1
2
3
4
5
6
7
8
CP 100
CP 135
CP 150
CP 200
CP 250
CP 300
CP 400
CP 500
dh adotar (cm)
10
ATENO !
Volume calculado com dh = 20 cm!
valor da norma NB51/78 ok!
valor da norma NB51/78 ok!
Alternar fuste
1.60
8.40
1.77
0.28
1.85
1.50
7.44
2
1
1.00
50.00
94.07
0.53
88.14%
1.59
3.00
1.00
338.44
1.00
1.00
1.00
DADOS DO FUSTE
DIMETRO DO FUSTE d (cm)
PERFURAO DO FUSTE Pf (m)
60.00
21.00
DADOS DA BASE
ALTURA DA BASE h (cm)
ALTURA DO RODAP dh (cm)
COMPRIMENTO DA BASE OVAL a (x + b) - (cm)
BASE RETA x - (cm)
DIMETRO b (cm)
100.00
20.00
175.00
90.00
85.00
DADOS DO BLOCO
COMPRIMENTO DO BLOCO X (cm)
LARGURA DO BLOCO Y (cm)
ALTURA DO BLOCO HB (cm)
BITOLA UTILIZADA NO BLOCO (mm)
CONSUMO MDIO DE ARMADURA NO BLOCO (kg / m3)
Distncia a1 (cm)
Distncia a2 (cm)
Distncia a3 (cm)
Distncia a4 (cm)
Distncia b1(cm)
Distncia b2 (cm)
Distncia b3 (cm)
Distncia b4 (cm)
80.00
80.00
75.00
10.00
10
80.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
ARMADURA LONGITUDINAL
BITOLA UTILIZADA (mm)
QUANTIDADE DE FERROS
COMPRIMENTO DO FERRO (cm)
6 FERROS DIMETRO DE 12.5 mm - 200
12.50
12.50
6.00
200.00
6.30
6.30
20.00
3.00
197.00
10.00
DADOS COMPLEMENTARES
NGULO DA INCLINAO DO TALUDE BETA (GRAUS)
ALTURA DO CONCRETO MACRO C (cm)
ENTRADA NO BLOCO D (cm) DESCONTA VOLUME DA ENTRADA
Distncia A (ARREDONDADA)
ngulo Beta adotado (graus)
50.00
60.00
60.00
5.00
5.00
46.19
DIST. A ORIG.
Material + mo de obra
BLOCO
TUBULO
PREO (R$)
Descrio
Unidade
Quantidade
Unitrio
Perfurao do fuste
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Lanamento e adenamento de
Concreto magro e= 5cm
Corte e preparo da cabea do
tubulo
Confeco, colocao e remoo de
forma
Dobramento e colocao de
armadura no bloco
Lanamento e adenamento de
concreto estrutural p/ blocos
Reaterro
Bota fora
ml
m3
m3
kg
kg
m3
21.00
0.92
6.85
12.00
5.00
4.30
41.34
161.06
338.44
6.12
6.12
10.35
m3
0.15
251.78
Unid.
1.00
20.39
m2
2.40
47.20
kg
38.40
6.12
m3
m3
m3
0.47
338.44
3.67
9.69
7.48
10.35
Total material + mo de obra:
MATERIAL
PREO (R$)
Bloco
Tub.
Descrio
Unidade
Quantidade
Unitrio
Concreto
Armadura longitudinal
Armadura tranversal
Concreto magro
m3
kg
kg
m3
6.85
12.00
5.00
0.15
289.09
5.02
5.02
202.43
Concreto estrutural
Forma
Armadura
m3
m2
kg
0.47
2.40
38.40
289.09
28.92
5.02
Total material
Total mo de obra:
PREO (R$)
Total
868.21
147.73
2,319.89
73.39
30.58
44.51
ARMADURA
Vol. Base = 1.2 m3
CA-50 DIAM. 12.5
CA-60 DIAM. 6.3
37.23
20.39
113.28
234.84
CA-50 DIAM. 10
157.67
35.55
77.47
R$ 4,160.74
PREO (R$)
Total
1,981.60
60.23
25.10
29.93
134.67
69.42
192.73
R$ 2,493.67
R$ 1,667.07
R$ 4,160.74
6 BARRAS C = 200
10 BARRAS C = 197
TIPO 1
X (cm)
100.00
100.00
Y (cm)
100.00
100.00
8 BARRAS C = 200
10 BARRAS C = 260
UNIDADE
m
unid.
m3
kg
kg
m3
95.00
CA-50 DIAM. 10
80.00
21.00
205.00
20.00
335.00
150.00
185.00
CA-50 DIAM. 12,5
CA-60 DIAM. 6,3
1.00
1.00
1.00
TOTAL
21.00
7.37
17.93
16.00
7.00
6.88
UNITRIO
21.00
7.37
17.93
16.00
7.00
6.88
95.00
CA-50 DIAM. 10
80.00
21.00
205.00
20.00
350.00
135.00
215.00
CA-50 DIAM. 12,5
CA-60 DIAM. 6,3
1.00
1.00
1.00
TOTAL
21.00
8.77
19.33
16.00
7.00
6.88
m2
0.17
0.17
0.17
m3
1.00
1.00
1.00
m2
3.80
3.80
3.80
Dobramento e colocao de
armadura
kg
76.00
76.00
76.00
Lanamento e adensamento de
concreto estrutural
m3
0.92
0.92
0.92
BLOCO
DADOS
HB (cm)
ARMADURA
Fuste d (cm)
Pf (m)
h (cm)
dh (cm)
a (cm)
x (cm)
b (cm)
TUBULO
S
E
L
U
B
U
T ARM. LONG.
IS
A
OV
ARM.TRANV.
BLOCO
TUBULO
NUM. CONJUNTOS
NUM. TUB. 1 CONJ.
TOTAL TUBULES
MATERIAL + MO DE OBRA
Perfurao do fuste
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Concreto magro
Corte e preparo da cabea do
tutulo
Confeco, colocao e remoo
de forma
TIPO 2
BLOC
BLOCO
TUB.
Reaterro
Bota fora
MATERIAL
Concreto
Armadura longitudinal
Armadura tranversal
Concreto magro
Concreto estrutural
Forma
Armadura
m3
m3
UNIDADE
m3
kg
kg
m3
m3
m2
kg
5.76
19.05
5.76
19.05
5.76
20.45
17.93
16.00
7.00
0.17
0.92
3.80
76.00
17.93
16.00
7.00
0.17
0.92
3.80
76.00
19.33
16.00
7.00
0.17
0.92
3.80
76.00
73.50
1,543.49
1 CONJUNTO
6,091.43
6,091.43
73.50
1,543.49
6,496.15
4,191.94
4,191.94
4,501.01
10,283.37
10,283.37
10,997.15
TIPO 1
6,091.43
4,191.94
10,283.37
PREO (R$)
BLOCO
TUBULO
Perfurao do fuste
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Concreto magro
m
m3
m3
kg
kg
m3
m2
105.00
24.75
72.58
76.00
33.00
31.63
0.85
UNITRIO
VAR
161.06
338.44
6.12
6.12
10.35
251.78
TIPO 2
6,496.15
4,501.01
10,997.15
BLOCO
unid.
5.00
20.39
101.95
m2
17.52
47.20
826.97
kg
338.16
6.12
2,068.09
m3
m3
m3
4.11
338.44
26.55
9.69
77.66
10.35
Total material + mo de obra
Total material
Total mo de obra
BLOCO
TUBULO
TUBULES OVAIS
GERAL - BLOCOS RETANGULARES UNIDADE QUANT.
Perfurao do fuste
m
105.00
Alargamento da base
m3
24.75
Lanamento de concreto
m3
72.58
Armadura longitudinal
kg
76.00
Armadura tranversal
kg
33.00
Escavao manual
m3
31.63
Concreto magro
m2
0.85
Corte e preparo da cabea do
tutulo
unid.
5.00
Confeco, colocao e remoo
de forma
m2
17.52
Dobramento e colocao de
armadura
kg
338.16
Lanamento e adensamento de
concreto estrutural
m3
4.11
Reaterro
m3
26.55
Bota fora
m3
77.66
1,392.04
257.17
804.03
#VALUE!
25,094.54
17,108.98
PREO (R$)
UNITRIO
TOTAL
VAR
6,993.95
161.06
3,986.87
338.44
24,565.12
6.12
464.79
6.12
201.82
10.35
327.44
251.78
213.29
20.39
101.95
47.20
826.97
6.12
2,068.09
338.44
9.69
10.35
1,392.04
257.17
804.03
TUBULES OVAIS
BLOCO
TUBULO
Perfurao do fuste
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Concreto magro
Corte e preparo da cabea do
tutulo
Confeco, colocao e remoo
de forma
Dobramento e colocao de
armadura
Lanamento e adensamento de
concreto estrutural
Reaterro
Bota fora
42,203.52
25,094.54
17,108.98
PREO (R$)
UNITRIO
TOTAL
m
m3
m3
kg
kg
m3
m2
unid.
m2
kg
m3
m3
m3
Total material + mo de obra
Total material
Total mo de obra
TUBULES OVAIS
TUBULO
Perfurao do fuste
Alargamento da base
m
m3
PREO (R$)
UNITRIO
TOTAL
TUBULO
BLOCO
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Concreto magro
Corte e preparo da cabea do
tutulo
Confeco, colocao e remoo
de forma
Dobramento e colocao de
armadura
Lanamento e adensamento de
concreto estrutural
Reaterro
Bota fora
m3
kg
kg
m3
m2
unid.
m2
kg
m3
m3
m3
Total material + mo de obra
Total material
Total mo de obra
TUBULES OVAIS
BLOCO
TUBULO
Perfurao do fuste
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Concreto magro
Corte e preparo da cabea do
tutulo
Confeco, colocao e remoo
de forma
m
m3
m3
kg
kg
m3
m2
unid.
m2
PREO (R$)
UNITRIO
TOTAL
BLOCO
Dobramento e colocao de
armadura
Lanamento e adensamento de
concreto estrutural
Reaterro
Bota fora
kg
m3
m3
m3
Total material + mo de obra
Total material
Total mo de obra
TUBULES OVAIS
BLOCO
TUBULO
Perfurao do fuste
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Concreto magro
Corte e preparo da cabea do
tutulo
Confeco, colocao e remoo
de forma
Dobramento e colocao de
armadura
Lanamento e adensamento de
concreto estrutural
Reaterro
Bota fora
PREO (R$)
UNITRIO
TOTAL
m
m3
m3
kg
kg
m3
m2
unid.
m2
kg
m3
m3
m3
Total material + mo de obra
Total material
Total mo de obra
TUBULES OVAIS
BLOCO
TUBULO
PREO (R$)
UNITRIO
TOTAL
Perfurao do fuste
105.00
^VAR
6,993.95
Alargamento da base
m3
24.75
161.06
3,986.87
Restaurar
Lanamento de concreto
m3
72.58
338.44
24,565.12
Restaurar
Armadura longitudinal
kg
76.00
6.12
464.79
Restaurar
Armadura tranversal
kg
33.00
6.12
201.82
Restaurar
Escavao manual
m3
31.63
10.35
327.44
Restaurar
Concreto magro
Corte e preparo da cabea do
tutulo
Confeco, colocao e remoo
de forma
Dobramento e colocao de
armadura
Lanamento e adensamento de
concreto estrutural
m2
0.85
251.78
213.29
Restaurar
unid.
5.00
20.39
101.95
m2
17.52
47.20
826.97
kg
338.16
6.12
2,068.09
m3
4.11
338.44
1,392.04
Restaurar
Reaterro
m3
26.55
9.69
257.17
Restaurar
Bota fora
m3
77.66
10.35
Total material + mo de obra
Total material
Total mo de obra
804.03
R$ 42,203.52
R$ 25,094.54
R$ 17,108.98
Restaurar
Restaurar
Restaurar
Restaurar
TUBULES OVAIS
BLOCO
TUBULO
QUANTITATIVOS GERAL
Perfurao do fuste
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Concreto magro
Corte e preparo da cabea do
tutulo
Confeco, colocao e remoo
de forma
Dobramento e colocao de
armadura
Lanamento e adensamento de
concreto estrutural
Reaterro
Bota fora
UNIDADE QUANT.
m
8.00
m3
21.71
m3
28.64
kg
15.00
kg
18.00
m3
11.48
m2
0.21
PREO (R$)
UNITRIO
VAR
91.39
159.37
2.15
2.15
6.32
132.92
TOTAL
577.21
1,984.37
4,564.41
32.31
38.77
72.57
27.89
unid.
1.00
11.09
11.09
m2
6.00
24.54
147.23
kg
150.00
2.15
323.09
m3
m3
m3
1.83
177.22
9.40
5.91
30.72
6.32
Total material + mo de obra
Total material
Total mo de obra
LUCRO (%)
ADMNISTRAO (%)
CUSTOS FINANCEIROS (%)
CUSTO FINAL
Total material + mo de obra
Total material
Total mo de obra
BDI MDIO
DIFERENA BRUTA
324.62
55.56
194.15
R$ 8,353.28
R$ 4,418.61
R$ 3,934.67
10.00
12.00
6.00
R$ 10,908.72
R$ 5,770.35
R$ 5,138.37
30.59%
R$ 2,555.44
TIPO 3
TIPO 4
TIPO 5
100.00
90.00
90.00
100.00
90.00
90.00
8 BARRAS C = 200
10 BARRAS C = 260
UNITRIO
21.00
0.53
8.61
14.00
6.00
5.49
85.00
CA-50 DIAM. 10
70.00
21.00
100.00
20.00
170.00
90.00
80.00
CA-50 DIAM. 12,5
CA-60 DIAM. 6,3
1.00
1.00
1.00
TOTAL
21.00
0.82
8.90
14.00
6.00
5.49
UNITRIO
21.00
7.27
17.83
16.00
7.00
6.88
85.00
CA-50 DIAM. 10
70.00
21.00
70.00
20.00
140.00
60.00
80.00
CA-50 DIAM. 12,5
CA-60 DIAM. 6,3
1.00
1.00
1.00
TOTAL
21.00
0.53
8.61
14.00
6.00
5.49
95.00
CA-50 DIAM. 10
80.00
21.00
205.00
20.00
330.00
145.00
185.00
8 BARRAS C = 200 CA-50 DIAM. 12,5
10 BARRAS C = 260 CA-60 DIAM. 6,3
1.00
1.00
1.00
UNITRIO
TOTAL
21.00
21.00
8.77
7.27
19.33
17.83
16.00
16.00
7.00
7.00
6.88
6.88
7 BARRAS C = 200
10 BARRAS C = 228
7 BARRAS C = 200
10 BARRAS C = 228
UNITRIO
21.00
0.82
8.90
14.00
6.00
5.49
0.17
0.17
0.17
0.16
0.16
0.16
0.16
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.80
3.80
3.80
3.06
3.06
3.06
3.06
76.00
76.00
76.00
55.08
55.08
55.08
55.08
0.92
0.92
0.92
0.67
0.67
0.67
0.67
5.76
20.45
5.76
18.95
5.76
18.95
4.64
9.46
4.64
9.46
4.64
9.75
4.64
9.75
19.33
16.00
7.00
0.17
0.92
3.80
76.00
17.83
16.00
7.00
0.17
0.92
3.80
76.00
17.83
16.00
7.00
0.17
0.92
3.80
76.00
8.61
14.00
6.00
0.16
0.67
3.06
55.08
8.61
14.00
6.00
0.16
0.67
3.06
55.08
8.90
14.00
6.00
0.16
0.67
3.06
55.08
8.90
14.00
6.00
0.16
0.67
3.06
55.08
1 CONJUNTO
6,496.15
73.50
1,543.49
1 CONJUNTO
6,062.52
6,062.52
1 CONJUNTO
3,181.09
3,181.09
4,501.01
TIPO 2
5,272.77
5,272.77
TIPO 3
6,062.52
4,169.86
10,232.38
2,154.49
2,154.49
10,232.38
10,232.38
1 CONJUNTO
3,263.35
2,091.68
2,091.68
10,997.15
56.27
1,181.74
3,263.35
4,169.86
4,169.86
ANTIDADES
56.27
1,181.74
5,417.84
5,417.84
TIPO 4
3,181.09
2,091.68
5,272.77
TIPO 5
3,263.35
2,154.49
5,417.84
s e preos originais do BD
TIPO 6
TOTAL
TIPO 7
TIPO 8
TIPO 9
UNITRIO
TOTAL
UNITRIO
TOTAL
UNITRIO
TOTAL
1 CONJUNTO
TIPO 6
1 CONJUNTO
TIPO 7
1 CONJUNTO
TIPO 8
TIPO 9
TIPO 10
UNITRIO
TOTAL
UNITRIO
#VALUE!
1 CONJUNTO
TIPO 9
1 CONJUNTO
TIPO 10
AO
BLOCO
CA-50
8.0
10.0
12.5
16.0
20.0
25.0
CA-60
5.0
6.0
ARM. LONGIT.
CA-50
8.0
10.0
12.5
16.0
20.0
25.0
CA-60
5.0
6.0
TIPO 1
TIPO 2
TIPO 3
TIPO 4
76.00
76.00
76.00
55.08
16.00
16.00
16.00
14.00
7.00
7.00
7.00
6.00
ARM. TRANSV.
CA-50
6.3
8.0
10.0
12.5
16.0
CA-60
3.4
5.0
6.0
TIPO 5
55.08
14.00
6.00
TIPO 6
TIPO 7
TIPO 8
TIPO 9
TIPO 10
SOMA 1
0.00
338.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
76.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AO
BLOCO
CA-50
8.0
10.0
12.5
16.0
20.0
25.0
CA-60
5.0
6.0
ARM. LONGIT.
CA-50
8.0
10.0
12.5
16.0
20.0
25.0
CA-60
5.0
6.0
ARM. TRANSV.
CA-50
6.3
8.0
10.0
12.5
16.0
CA-60
3.4
5.0
6.0
3.40
0.00
5.00
0.00
20.00
0.00
3.40
5.00
20.00
3.40
5.00
20.00
3.40
5.00
20.00
3.40
5.00
20.00
RESULTADO FINAL AO
3.40
5.00
6.00
6.30
8.00
10.00
12.50
16.00
20.00
25.00
CA-50+10 %
CA-60+10 %
kg
kg
kg
CA - 50
0.00
0.00
0.00
33.00
0.00
338.16
76.00
0.00
0.00
0.00
492.00
0.00
CA - 60
3.40
0.00
DADES
25.00
0.00
25.00
0.00
25.00
25.00
25.00
25.00
BLOCO
TUBULO
PLANILHA DE CUSTO
Perfurao do fuste
Alargamento da base
Lanamento de concreto
Armadura longitudinal
Armadura tranversal
Escavao manual
Lanamento e adenamento de
concreto magro
Corte e preparo da cabea do
tubulo
Confeco, colocao e remoo de
forma
Dobramento e colocao de
armadura no bloco
Lanamento e adenamento de
concreto estrutural
Reaterro
Bota fora
UNIDADE
m
m3
m3
kg
kg
m3
QUANTIDADE
189.00
21.87
111.92
139.93
49.62
59.15
UNITRIO
VAR
161.06
338.44
6.12
6.12
10.35
TOTAL
13,167.92
3,522.74
37,879.25
855.77
303.47
612.37
m2
1.55
251.78
389.40
unidade
9.00
20.39
183.51
m2
32.72
47.20
1,544.43
kg
642.16
6.12
3,927.26
m3
m3
m3
7.91
338.44
2,678.10
49.57
9.69
480.14
121.50
10.35
1,257.92
TOTAL MO DE OBRA + MATERIAL R$ 66,802.27