Você está na página 1de 4

CRONOGRAMA DE AVANCE DE OBRA VALORIZADO

"AMPLIACION DE LA CAPACIDAD DE ALBERGUE EN EL E.P EL MILAGRO - ETAPA II"


LA LIBERTAD - TRUJILLO - EL MILAGRO

Item

Descripcin

Parcial (S/.)

MES 1

MES 2

MES 3

MES 4

MES 5

MES 6

M-1

M-2

M-3

M-4

M-5

M-6

ESTRUCTURAS
1

OBRAS PROVISIONALES,TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD

1.1

OBRAS PROVISIONALES, TRABAJOS PRELIMINARES

1.2

SEGURIDAD Y SALUD

1.2

MITIGACION DE IMPACTO AMBIENTAL

2
2.1
2.1.2
2.1.2.2
2.1.2.2.1

ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACIONES SIMPLES
EXCAVACION MANUAL EN TERRENO NATURAL NORMAL hprom=1.50 m

2.1.3
2.1.3.1

CORTES
CORTE DE PLATAFORMA MASIVO CON EQUIPO

2.1.4
2.1.4.1

RELLENOS
RELLENO DE ZANJA COMPACT. MATERIAL PROPIO SELECCIONADO

131,169.19

S/.
%
S/.
%
S/.
%

21,861.53
17%
14,024.32
100%
1,725.42
25%

31,612.64

S/.
%

31,612.64
100%

17,106.36

S/.
%

17,106.36
100%

9,589.71

S/.
%
S/.
%
S/.
%

958.97
10%
1,210.10
10%
1,359.28
100%

14,024.32
6,901.67

21,861.53
17%

21,861.53
17%

21,861.53
17%

1,725.42
25%

1,725.42
25%

1,725.42
25%

8,630.74
90%
10,890.94
90%

2.1.4.2

RELLENO AFIRMADO e= 10.0 cm PARA FALSOS PISOS

12,101.04

2.1.4.3

RELLENO AFIRMADO e= 30.0 cm CIMIENTO CORRIDO

1,359.28

2.1.5
2.1.5.1

NIVELACION
NIVELACION INTERIOR Y COMPACTADO P/FALSO PISO

3,521.76

S/.
%

3,521.76
100%

2.1.6
2.1.6.1

ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE


ACARREO MATERIAL EXCEDENTE PROCEDENTE DE EXCAVACION

13,983.55

S/.
%
S/.
%

13,983.55
100%
57,656.01
100%

S/.

21,039.91

74,596.06

22%

78%

2.1.6.2
2.2
2.2.1
2.2.1.1

2.2.2
2.2.2.1
2.3
2.3.1
2.3.1.1
2.3.6
2.3.6.1
2.3.6.2

ELIMINACION DE MAT. EXCEDENTE


PAVIMENTOS Y OBRAS DE ARTE
PAVIMENTOS
PAVIMENTO DE CONCRETO fc = 175 Kg/cm2, e = 0.15 m,CONFORMACION DE
SUBRASANTE, BASE DE e=0.20 m y SUB BASE DE e=0.20 cm Y JUNTAS

MUROS Y CERCOS
CERCO DE MALLAS (CIMENTACION)
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS
CIMIENTO CORRIDO ,CONCRETO PREMEZC fc=100 Kg/cm2 + 30% P.G.
SOBRECIMIENTO
SOBRECIMIENTO, CONCRETO fc=175 kg/cm2
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO

2.3.7
2.3.7.1

FALSO PISO
CONCRETO PREMEZC fc=100 Kg/cm2 P/FALSO PISO e=10 cm

2.3.8
2.3.8.1

SOLADOS
CONCRETO PREMEZC fc=80 Kg/cm2 P/SOLADO e=0.10 M

2.4
2.4.1
2.4.1.1

2.4.1.2
2.4.5
2.4.5.1
2.4.5.2
2.4.5.3
2.4.6
2.4.6.2
2.4.6.2.1
2.4.6.2.2
2.4.6.2.3
2.4.7
2.4.7.1

57,656.01

OBRAS DE CONCRETO ARMADO


ZAPATAS
ZAPATAS, CONCRETO PREMEZCLADO f'c=175 Kg/cm2

95,635.97

14,756.43

S/.
%

60,562.32

S/.
%

1,843.83

S/.
%
S/.
%

1,843.83
100%
1,626.15
100%

34,603.96

S/.
%

34,603.96
100%

8,777.38

S/.
%

60,028.10

S/.
%
S/.
%
S/.
%

1,626.15

ZAPATAS, ENCOFRADO Y DESENCOFRADO

11,388.77

ZAPATAS, ACERO DE REFUERZO fy=4,200 kg/cm2

19,970.20

SOBRECIMIENTOS REFORZADOS
SOBRECIMIENTOS REFORZADOS, CONCRETO PREMEZCLADO f'c=175 kg/cm2
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTO, ACERO DE REFUERZO fy=4,200 kg/cm2
MUROS
MUROS DE CONCRETO
MUROS, CONCRETO PREMEZCLADO f'c=210 kg/cm2

13,455.70
13,289.54
8,832.83

134,654.69

MURO, ENCOFRADO Y DESENCOFRADO

273,943.66

MUROS ACERO DE REFUERZO Fy=4200 Kg/cm2

200,785.53

COLUMNAS
COLUMNAS, CONCRETO f'c= 210 kg/cm2

36,656.70

S/.
%
S/.
%
S/.
%

S/.
%
S/.
%
S/.
%
S/.

14,756.43
100%

15,140.58
25%

45,421.74
75%

8,777.38
100%

60,028.10
100%
11,388.77
100%
19,970.20
100%

6,644.77
50%

180,802.82
66%
200,785.53
100%

13,455.70
100%
6,644.77
50%
8,832.83
100%

134,654.69
100%
93,140.84
34%

36,656.70

21,861.53
17%

21,861.53
17%

CRONOGRAMA DE AVANCE DE OBRA VALORIZADO


"AMPLIACION DE LA CAPACIDAD DE ALBERGUE EN EL E.P EL MILAGRO - ETAPA II"
LA LIBERTAD - TRUJILLO - EL MILAGRO

Item
2.4.7.2
2.4.7.3
2.4.8
2.4.8.1

Descripcin

Parcial (S/.)

COLUMNAS, ENCOFRADO Y DESENCOFRADO

48,083.32

COLUMNAS, ACERO DE REFUERZO fy=4,200 kg/cm2

79,772.11

VIGAS
VIGAS, CONCRETO f'c= 210 kg/cm2

35,730.52

6,792.00
100%
4,345.59
100%

S/.
%
S/.
%

1,558.57
25%
1,224.72
100%

360.00

S/.
%

360.00
100%

91,164.43

S/.
%
S/.
%

54,698.66
60%
15,424.77
100%

LOSAS
LOSA MACISA
LOSA MACIZA, CONCRETO PREMEZCLADO f'c=210 kg/cm2

6,252.56

2.4.9.1.2

LOSA MACISA, ENCOFRADO Y DESENCOFRADO

7,180.70

2.4.9.1.3

LOSA MACISA, ACERO DE REFUERZO fy=4,200 kg/cm2

4,395.19

61,878.10

2.4.9.2.2

LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO

65,676.90

2.4.9.2.3

LOSA AIGERADA, ACERO DE REFUERZO fy=4,200 kg/cm2

45,695.97

2.4.9.2.4

LOSA ALIGERADA, LADRILLO DE TECHJO 15X30X30

51,244.50

2.4.10
2.4.10.1

ESCALERAS
ESCALERA, CONCRETO PREMEZCLADO f'c=210 kg/cm2

3,921.24

2.4.10.2

ENCOFRADO Y DESENCOFRADO ESCALERA NORMAL

6,792.00

2.4.10.3

ESCALERAS, ACERO DE REFUERZO fy=4,200 kg/cm2

4,345.59

3
3.1
3.1.2
3.1.3
3.2
3.2.1

VARIOS
JUNTAS SISMICAS
JUNTAS SISMICAS e= 3 cm

2,404.17
5%
79,772.11
100%

S/.
%
S/.
%
S/.
%

2.4.9
2.4.9.1
2.4.9.1.1

2.6
2.6.1
2.6.1.1

M-6

100%
45,679.15
95%

61,878.10
100%
65,676.90
100%
45,695.97
100%
51,244.50
100%

85,996.80

ANCLAJE METALICO DE APOYO T-1

MES 6

M-5

S/.
%
S/.
%
S/.
%
S/.
%

VIGAS, ACERO DE REFUERZO fy=4,200 kg/cm2

2.5.1.2

MES 5

M-4

6,252.56
100%
7,180.70
100%
4,395.19
100%

2.4.8.3

ESTRUCTURAS METALICAS
ESTRUCTURAS METALICAS
ESTRUCTURA METALICA

MES 4

M-3

S/.
%
S/.
%
S/.
%

58,042.23

2.5
2.5.1
2.5.1.1

MES 3

M-2

35,730.52
100%
58,042.23
100%
85,996.80
100%

VIGAS, ENCOFRADO Y DESENCOFRADO

LOSAS ALIGERADAS
LOSA ALIGERADA, CONCRETO f'c= 210 kg/cm2

MES 2

M-1

S/.
%
S/.
%
S/.
%

2.4.8.2

2.4.9.2
2.4.9.2.1

%
S/.
%
S/.
%

MES 1

6,234.28
1,224.72

3,921.24
100%

4,675.71
75%

ARQUITECTURA
ALBAILERIA
MURO LAD.KK.MAQ.T IV SOGA, MEZC. C:A 1:5 JUNTA 1.5 CM
MURO LAD.KK.MAQ.T IV CABEZA, MEZC. C:A 1:5 JUNTA 1.5 CM
REVOQUES, ENLUCIDOS Y MOLDURAS
TARRAJEO PRIMARIO O RAYADO.

15,424.77

10,354.12

3.2.2

TARRAJEO EN INTERIORES

28,428.10

3.2.3

TARRAJEO EN EXTERIORES

60,229.96

3.2.4

TARRAJEO EN COLUMNAS

7,959.78

3.2.5

TARRAJEO EN VIGAS

6,084.88

3.2.8

TARRAJEO CON IMPERMEABILIZANTE

3.2.11

VESTIDURA DE DERRAMES

7,129.58

3.2.19

BRUAS

2,337.96

3.2.20

TARRAJEO EN FONDO DE ESCALERAS

3.2.21

PREPARACION DE GRADAS DE CONCRETO

3.2.22

PREPARACION DE DESCANSOS

3.3
3.3.3
3.3.3.1

CIELO RASOS
CIELO RASO CON MEZCLA
TARRAJEO FROTACHADO CIELO RASO C/MORT. C:A, e=1.5 CM

3.4

PISOS Y PAVIMENTOS

690.13

779.08
3,954.39
742.69

49,006.61

S/.
%
S/.
%
S/.
%
S/.
%
S/.
%
S/.
%
S/.
%
S/.
%
S/.
%
S/.
%
S/.
%

3,979.89
50%
1,216.98
20%
690.13
100%
7,129.58
100%
1,168.98
50%
389.54
50%
1,977.20
50%
371.35
50%

S/.
%

2,450.33
5%

36,465.77
40%

10,354.12
100%
28,428.10
100%
60,229.96
100%
3,979.89
50%
4,867.90
80%

1,168.98
50%
389.54
50%
1,977.20
50%
371.35
50%

46,556.28
95%

CRONOGRAMA DE AVANCE DE OBRA VALORIZADO


"AMPLIACION DE LA CAPACIDAD DE ALBERGUE EN EL E.P EL MILAGRO - ETAPA II"
LA LIBERTAD - TRUJILLO - EL MILAGRO

Item

Descripcin

3.4.1
3.4.1.1

CONTRAPISOS
CONTRAPISO DE 50 MM MEZCLA 1:5 C:A

3.4.2
3.4.2.21
3.4.2.21.1

Parcial (S/.)

MES 1

MES 2

MES 3

MES 4

MES 5

MES 6

M-1

M-2

M-3

M-4

M-5

M-6

4,344.71

S/.
%

4,344.71
100%

PISOS
PISOS DE LOSETA CERAMICA
PISO DE LOSETA CERAMICA ANTIDESLIZANTE 0.30x0.30 m COLOR

11,571.83

S/.
%

578.59
5%

10,993.24
95%

3.4.3
3.4.3.1

PISOS DE CONCRETO
ACABADO PISO DE CEMENTO PULIDO C/OCRE ROJO e=2" MEZCLA 1:4

46,933.40

3.4.6

VEREDAS

30,281.08

S/.
%
S/.
%
S/.
%
S/.
%
S/.
%
S/.
%
S/.
%
S/.
%

2,346.67
5%
1,514.05
5%
125.00
5%
277.47
5%
2,073.99
5%

44,586.73
95%
28,767.03
95%
2,375.03
95%
5,271.92
95%
39,405.87
95%
83,461.38
100%

3.4.8

SOBREPISO O PISO TECNICO

2,500.03

3.4.9

JUNTA DE DILATACION

5,549.39

3.5

ZOCALOS Y CONTRAZOCALOS

41,479.86

3.6

CUBIERTAS

83,461.38

3.7

CARPINTERIA DE MADERA

3.8

CARPINTERIA METALICA Y HERRERIA

3.10
3.10.1

VIDRIOS CRISTALES Y SIMILARES


ESPEJO DE 6 mm

3.11
3.11.1
3.11.1.1

PINTURAS
PINTURA DE CIELO RASOS, MUROS
PINTURA LATEX EN MURO EXTERIOR (1 MANO IMPRIMANTE Y 2 MANOS
LATEX)

28,382.06
316,281.74

116.10

S/.
%

116.10
100%

22,793.59

S/.

6,838.08

30%

70%

S/.

22,502.83

15,001.89

%
S/.
%
S/.
%

60%
13,788.00
80%
1,281.19
100%

40%
3,447.00
20%

3.11.1.2

PINTURA LATEX EN MURO INTERIOR (1 MANO IMPRIMANTE Y 2 MANOS LATEX)

37,504.72

3.11.1.3

PINTURA LATEX EN CIELO RASO (1 MANO IMPRIMANTE Y LATEX)

17,235.00

3.11.5

PINTURA EN CONTRAZOCALOS

3.13
3.13.1

OTROS
LAVADERO CORRIDO

3.13.2

ACCESORIOS PARA BAO

488.94

3.13.3

MESAS DE CONCRETO

379.39

3.13.4

CAMAS DE CONCRETO

116,544.96

3.13.5

URINARIO DE CONCRETO

3.13.6

CERCOS DE MALLA

1,281.19

23,542.64

2,674.44
36,336.70

3.13.7

VENTANA DE CONCRETO

3.13.8

ESCALERA METALICA

256.20

3.13.9

TAPAS METALICAS

683.01

GARGOLOAS DE PVC

634.40

4
4.1

28,382.06
100%
316,281.74
100%

26,370.24

S/.
%
S/.
%
S/.
%
S/.
%
S/.
%

23,542.64
100%
488.94
100%
379.39
100%
116,544.96
100%
2,674.44
100%

S/.

36,336.70

%
S/.
%
S/.
%
S/.
%
S/.
%

100%
26,370.24
100%
256.20
100%
683.01
100%
634.40
100%

INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS

11,661.96

S/.

11,661.96
100%

%
4.2
4.2.1
4.2.2
4.2.2.1
4.2.2.3
4.2.3
4.2.3.1
4.2.3.2
4.2.3.3

SISTEMA DE AGUA FRIA


SALIDAS DE AGUA FRIA
REDES DE DISTRIBUCION
TRABAJOS PRELIMINARES RED DE AGUA FRIA
TUBERIAS
REDES DE ALIMENTACION:LINEA DE IMPULSION DE AGUA
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS - RED EXTERIOR
TUBERIAS

6,918.29

S/.
%

6,918.29
100%

1,209.99

S/.
%
S/.
%

1,209.99
100%

S/.
%
S/.
%
S/.
%
S/.
%
S/.
%

924.00
100%
27,694.24
100%

10,969.65

924.00
27,694.24
9,362.20

4.2.4

ACCESORIOS DE RED DE AGUA FRIA

3,454.50

4.2.5

VALVULAS

9,644.58

10,969.65
100%

9,362.20
100%
3,454.50
100%
4,822.29
50%

4,822.29
50%

15,955.51

CRONOGRAMA DE AVANCE DE OBRA VALORIZADO


"AMPLIACION DE LA CAPACIDAD DE ALBERGUE EN EL E.P EL MILAGRO - ETAPA II"
LA LIBERTAD - TRUJILLO - EL MILAGRO

Item
4.2.6
4.6
4.6.1

Descripcin
ALMACENAMIENTO DE AGUA
DESAGUE Y VENTILACION
SALIDAS DE DESAGUE

Parcial (S/.)
13,988.22

S/.
%

MES 1

MES 2

MES 3

MES 4

MES 5

MES 6

M-1

M-2

M-3

M-4

M-5

M-6

13,988.22
100%

15,937.26

S/.
%

15,937.26
100%

4.6.2
4.6.2.1

REDES DE DERIVACIN
TRABAJOS PRELIMINARES

1,539.06

4.6.2.2

EXCAVACION DE ZANJAS

47,418.41

4.6.2.3

TUBERIAS DE PVC DE DESAGUE (REDES INTERIORES)

15,818.48

S/.
%
S/.
%
S/.
%

1,539.06
100%
47,418.41
100%
15,818.48
100%

S/.
%
S/.
%
S/.
%
S/.
%
S/.
%

1,039.83
100%
31,869.83
90%
18,723.95
80%

4.6.3
4.6.3.1

REDES COLECTORAS
TRABAJOS PRELIMINARES

1,039.83

4.6.3.2

EXCAVACION DE ZANJAS

35,410.92

4.6.3.3

TUBERIAS PVC DE DESAGUE- RED DE RECOLECCION (EXTERNAS)

23,404.94

4.6.4

ACCESORIOS DE REDES COLECTORAS

4.6.5

CAMARAS DE INSPECCION

5
5.2
5.2.1

SALIDAS PARA ALUMBRADO, TOMACORRIENTES, Y SEALES DEBILES


SALIDAS
CANALIZACIONES, CONDUCTOS

5.2.3

CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS

5.2.7

TABLEROS DE DISTRIBUCION

5.2.8

DISPOSITIVOS DE MANIOBRA Y PROTECCION

5.5.1.1

5.5.1.2
5.5.1.3
5.5.1.4

32,666.95

32,666.95
100%

INSTALACIONES ELECTRICAS Y MECANICAS

5.2.2

5.5
5.5.1

2,872.31

3,541.09
10%
4,680.99
20%
2,872.31
100%

LUMINARIAS
LUMINARIAS MAS LAMPARAS
LUMINARIAS C/EQUIPO LAP.FLUOR 2X36 W SIM BE-2 JOSFEL O DE MEJOR
CALIDAD
LUMINARIA C/EQUIPO LAMP.FLUOR. 2X36 W SIM BE-2 JOSFEL O DE MEJOR
CALIDAD,C/REJILLA DE SEGURIDAD
LUMINARIA WALL SOCKET C/LAMP AHORRADORA 25W C/REJILLA SEG.
LUMINARIA C/EQUIPO LAMP.FLUOR. 1X36W, SIM BE-1JOSFEL O DE MEJOR
CALIDAD ,C/REJILLA SEGURIDAD

35,277.42
662.85
7,641.14
10,590.40
1,958.17

1,816.20

S/.
%
S/.
%
S/.
%
S/.
%
S/.
%

198.86
30%

7,055.48
20%
464.00
70%
7,641.14
100%
10,590.40
100%
1,958.17
100%

28,221.94
80%

S/.

1,816.20

100%

8,563.68

S/.

8,563.68

253.30

%
S/.
%

100%
253.30
100%

7,559.52

S/.

7,559.52

100%
5,449.44

5.5.1.5

LUMINARIA C/EQUIPO LAMP.FLUORESC. 1X32W, SIM. CIR-132 JOSFEL,


C/REJILLA SEGURIDAD

5,449.44

S/.
%

100%

5.5.1.6

LUMINARIA EMERGENCIA CON CAJA PORTA EQUIPO + LAMPARAS


INCANDESCENTES 2X18 W STARDARD MODELO LEP-6H DE JOSFEL

377.40

S/.

377.40

100%

S/.
%
S/.
%

13,963.32
100%
351.28
100%

5.5.2
5.5.2.1
5.5.2.2

REFLECTORES
REFLECTOR FIJO C/E LAM. 250 w A.P.VS M/LUXIOD EX (INTEGRADO), JOSFEL
REJILLA DE SEGURIDAD PARA REFLECTORES FIJOS

13,963.32
351.28

562%

1349%

Costo Directo
Gastos Generales (7.17%)
Utilidades (10%)
Sub Total
IGV

3,370,977.41
241,699.08
337,097.74
3,949,774.23
710,959.36

113,776.58

784,602.00

Total

4,660,733.59

% de Avance mensual

1,383,251.63

2702%

667%

947%

555,473.65

439,273.47

94,600.07

8,157.78

56,255.96

99,179.14

39,827.46

31,495.91

6,782.83

11,377.66

78,460.20

138,325.16

55,547.37

43,927.35

9,460.01

133,312.02

919,318.16

1,620,755.94

650,848.48

514,696.72

110,842.91

23,996.16

165,477.27

291,736.07

117,152.73

92,645.41

19,951.72

157,308.19

1,084,795.43

1,912,492.01

768,001.21

607,342.13

130,794.63

3.38

23.28

41.03

16.48

13.03

2.81

Você também pode gostar