MATERIAL
Lima
Lima (Conchan)
Lima
Chincha
RUTAS
Lima
Barreno-Explosivos-Aditivos -Otros Especiales
El asfalto podr ser traido de Lima CONCHAN, dependiendo de Dm.
DE
Lima
Arequipa
Juliaca
A
Obra
Obra
Obra
Puno
Obra
PRECIO POR
CAPACIDAD
PRECIO
EN
DISTANCIA
DE CARGA
S/. x KG
4,632.13
1,700.08
597.97
252.50
15.00
15.00
15.00
15.00
ton
ton
ton
ton
0.3088
0.1133
0.0399
0.0168
DE
DISTANCIA
VIRTUAL
Lima
Arequipa
Juliaca
Puno
C.G Obra
C.G Obra
C.G Obra
C.G Obra
1,657.13
608.17
213.92
90.33
RUTAS
DE
Lima
Arequipa
Juliaca
Puno
A
Obra
Obra
Obra
Obra
PRECIO POR
CAPACIDAD
DISTANCIA
DE CARGA
4,323.32
1,586.74
558.11
235.66
LIMA - AREQUIPA
AREQUIPA - JULIACA
JULIACA - PUNO
PUNO - C.G.OBRA
1048.96
394.25
123.59
32.26
10.00
10.00
10.00
10.00
ton
ton
ton
ton
PRECIO
EN
S/. X KG
0.4323
0.1587
0.0558
0.0236
Dv (Km)
1.00
1.00
1.00
2.80
1048.96 Km
394.25 Km
123.59 Km
90.33 Km
asf-costa
asf-sierra
asf-sierra
afirm-sierra
Para el clculo de los fletes se emplearon los precios por kilmetro de transporte publicados en el Diario Oficial El Peruano, aprobados por el DS N010-2006-MTC,
corroborando el estudio "Tabla de Valores referenciales para la aplicacin del sistema de pago de las Obligaciones Tributarias en el servicio de Transportes de
Bienes realizado por via terrestre, con fecha 26 de marzo del 2006.
Se consider una configuracin de vehculo de tipo C3 para carga en general y de tipo C2 para carga lquida.Se ha considerado esta configuracin ya que
Aplicando los factores de Carga en Vaco como es lgico, elevan los costos por encima de los fletes reales.
"ESTUDIO DEFINITIVO PARA LA REHABILITACION Y MEJORAMIENTO DE LA CARRETERA EMP. PE-3S (PUNO) - VILQUE MAAZO - EMP. PE-34A (HUATAQUITA)"
PRECIOS DE MATERIALES E INSUMOS
(SETIEMBRE 2009)
ADQUISICIONES
N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
DESCRIPCIN
ACEITE PARA MOTOR SAE-30
ACERO DE REFUERZO FY=4200 GRADO 60
ACERO ESTRUCTURAL A-36
ACETILENO
ADITIVO EXPANSIVO DE CONCRETO
ADITIVO MEJORADOR DE ADHERENCIA
ALAMBRE NEGRO # 8
ALAMBRE NEGRO RECOCIDO # 16
ALCANTARILLA METALICA 0=36" C=12
ALCANTARILLA METALICA 0=48" C=12
ANDAMIO DE MADERA
ANGULO DE ACERO 1 1/2" x 1 1/2" x 1/4"
ANGULO DE FIERRO 1" X 1" X 3/16"
ASFALTO LIQUIDO MC - 30
ASFALTO LIQUIDO MC - 800
ASFALTO LIQUIDO RC-250
BANDERINES
BARRENO 5' X 7/8"
CALAMINA
CAPTAFAROS
CEMENTO PORTLAND TIPO I (42.5KG)
CLAVOS
CLAVOS PARA MADERA C/C 3"
CLAVOS PARA MADERA C/C 4"
CONO DE SEGURIDAD
CORDEL (ROLLO DE 100 m)
DINAMITA
DISCO DE DESBASTE 1/4" X 7"
EMULSION ASFALTICA STD ROTURA LENTA
EMULSION ASFALTICA STD ROTURA RAPIDA
ESTACA DE MADERA
FIBRA DE VIDRIO PREPARADA 4MM
FILLER
FIERRO CORRUGADO DE 3/4"
FIERRO LISO DE 3/4" X 6m
FULMINANTE
GASOLINA
GEOTEXTIL NO TEJIDO DE 200 GR/M2
GIGANTOGRAFIA 2.40M X 3.60M
GUARDAVIAS L=3.81M e=2.50mm
JUEGO DE PERNOS PARA GUARDAVIAS
LACA DESMOLDEADORA
LAMINA REFLECTORIZANTE
LAMPARA DESTELLANTE
LIJA
MADERA NACIONAL PARA ENCOFRADO
MADERA TORNILLO
MADERA TORNILLO INC.CORTE P/ENCOFRADO
MECHA O GUIA
MICROESFERAS DE VIDRIO
MOVILIZACION Y DESMOVILIZACION
NEOPRENO 30cm X 30 cm X 10 cm
OXIGENO
PERNOS 1" X 0.90m
PERNOS 3/8" X 8 "+2A+T
PERNOS 5/8" X 14"+2A+T
PERNOS 1/4" X 3"
PERNOS DE ANCLAJE
PETROLEO
PINTURA ANTICORROSIVA
PINTURA ANTICORROSIVA EPOXICA
PINTURA ESMALTE
PINTURA ESMALTE EPOXICA NEGRO
PINTURA ESMALTE EPOXICA BLANCO
PINTURA ESMALTE METALICO
PINTURA ESMALTE SUPERSINTETICA
PINTURA ESMALTE PARA TRAFICO
PINTURA REFLECTORIZANTE
PINTURA WASH PRIMER
PLACA DE APOYO
PLANCHA DE ACERO 3/8"
PLANCHA Fe LAC 5/8"
PLANCHA DE TECNOPOR DE 1.20 X 2.40 X 1"
PLATINA 1/8" X 1"
PLATINA 1/8" X 2"
POSTE PARA GUARDAVIAS 1.20M e=6mm
SELLADOR DE MADERA
SEALES INFORMATIVAS
SEALES PREVENTIVAS
SEALES RESTRICTIVAS
SOLDADURA
SOLVENTE XILOL
TEE DE FIERRO 1 1/2" X 3/16"
TERMINALES DE GUARDAVIAS
UND
GLN
KG
KG
KG
KG
KG
KG
KG
ML
ML
P2
ML
ML
GLN
GLN
GLN
PZA
UND
PLN
UND
BOL
KG
KG
KG
UND
UND
KG
PZA
GLN
GLN
P2
M2
KG
VAR
VAR
UND
GLN
M2
UND
UND
JGO
GLN
P2
UND
UND
P2
P2
P2
ML
KG
GLB
UND
M3
UND
UND
UND
UND
KG
GLN
GLN
GLN
GLN
GLN
GLN
GLN
GLN
GLN
GLN
GLN
KG
M2
KG
UND
ML
ML
UND
GLN
UND
UND
UND
KG
GLN
ML
UND
PESO
UND
PROCEDENCIA
3.33
1.00
1.00
1.00
1.00
1.00
1.00
1.00
58.25
93.68
1.18
2.90
1.80
2.73
2.73
2.73
10.00
20.00
0.45
0.35
42.50
1.00
1.00
1.00
5.00
0.10
1.00
0.50
2.73
2.73
0.10
5.00
1.00
20.12
13.51
0.02
4.00
0.50
3.50
42.50
1.30
2.73
0.25
0.25
0.10
1.18
1.18
1.18
0.10
1.00
kg/GLN
kg/KG
kg/KG
kg/KG
kg/KG
kg/KG
kg/KG
kg/KG
kg/ML
kg/ML
kg/P2
kg/ML
kg/ML
kg/GLN
kg/GLN
kg/GLN
kg/PZA
kg/UND
kg/PLN
kg/UND
kg/BOL
kg/KG
kg/KG
kg/KG
kg/UND
kg/UND
kg/KG
kg/PZA
kg/GLN
kg/GLN
kg/P2
kg/M2
kg/KG
kg/VAR
kg/VAR
kg/UND
kg/GLN
kg/M2
kg/UND
kg/UND
kg/JGO
kg/GLN
kg/P2
kg/UND
kg/UND
kg/P2
kg/P2
kg/P2
kg/ML
kg/KG
JULIACA
LIMA
LIMA
LIMA
LIMA
LIMA
JULIACA
JULIACA
LIMA
LIMA
JULIACA
LIMA
LIMA
LIMA
LIMA
LIMA
LIMA
LIMA
JULIACA
LIMA
LIMA
JULIACA
JULIACA
JULIACA
LIMA
PUNO
LIMA
LIMA
LIMA
LIMA
JULIACA
LIMA
LIMA
JULIACA
JULIACA
LIMA
LIMA
LIMA
LIMA
LIMA
LIMA
LIMA
LIMA
LIMA
JULIACA
JULIACA
JULIACA
JULIACA
LIMA
LIMA
7.00
8.75
1.16
0.25
0.54
0.20
0.55
3.75
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
1.00
35.00
1.00
0.50
0.65
1.23
14.50
6.00
25.00
25.00
25.00
1.00
3.74
2.84
7.50
kg/UND
kg/M3
kg/UND
kg/UND
kg/UND
kg/UND
kg/KG
kg/GLN
kg/GLN
kg/GLN
kg/GLN
kg/GLN
kg/GLN
kg/GLN
kg/GLN
kg/GLN
kg/GLN
kg/GLN
kg/KG
kg/M2
kg/KG
kg/UND
kg/ML
kg/ML
kg/UND
kg/GLN
kg/UND
kg/UND
kg/UND
kg/KG
kg/GLN
kg/ML
kg/UND
LIMA
LIMA
LIMA
LIMA
LIMA
LIMA
LIMA
JULIACA
JULIACA
LIMA
JULIACA
LIMA
LIMA
JULIACA
JULIACA
JULIACA
LIMA
LIMA
LIMA
LIMA
LIMA
JULIACA
LIMA
LIMA
LIMA
PUNO
LIMA
LIMA
LIMA
PUNO
JULIACA
JULIACA
LIMA
ADICIONALES O RECARGAS
ALMAC.
MERMAS
MANIP
5%
2%
PRECIO S/.
FLETE
75.21
2.39
2.20
26.00
28.00
15.75
2.70
2.70
321.00
519.00
2.18
10.55
5.05
6.26
6.21
5.46
25.00
351.91
12.18
21.00
13.55
3.78
4.03
4.03
35.00
4.00
7.80
11.50
5.75
5.57
1.51
173.63
0.32
49.50
35.00
0.40
6.80
2.55
100.00
204.00
27.00
68.00
13.00
85.00
1.18
3.19
2.18
2.44
0.35
3.60
507,448.40
880.00
11.00
85.00
2.50
14.20
0.55
25.00
7.37
34.87
138.66
28.99
63.00
63.00
29.83
31.93
44.54
57.14
120.00
2.20
160.92
2.42
10.00
1.88
3.83
78.00
37.00
330.00
330.00
330.00
12.18
30.00
10.46
97.50
0.13
0.31
0.31
0.31
0.31
0.31
0.04
0.04
17.99
28.93
0.05
0.90
0.56
1.18
1.18
1.18
3.09
6.18
0.02
0.11
13.12
0.04
0.04
0.04
1.54
0.00
0.31
0.15
1.18
1.18
0.00
1.54
0.31
0.80
0.54
0.01
1.24
0.15
1.08
13.12
0.40
1.18
0.08
0.08
0.00
0.05
0.05
0.05
0.03
0.31
1.50
0.05
0.04
0.52
0.56
0.32
0.05
0.05
6.42
10.38
0.04
0.21
0.10
0.13
0.12
0.11
0.50
7.04
0.24
0.42
0.27
0.08
0.08
0.08
0.70
0.08
0.16
0.23
0.12
0.11
0.03
3.47
0.01
0.99
0.70
0.01
0.14
0.05
2.00
4.08
0.54
1.36
0.26
1.70
0.02
0.06
0.04
0.05
0.01
0.07
0.03
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.61
0.98
0.01
0.03
0.02
0.03
0.03
0.03
0.11
0.21
0.00
0.00
0.45
0.01
0.01
0.01
0.05
0.00
0.01
0.01
0.03
0.03
0.00
0.05
0.01
0.21
0.14
0.00
0.04
0.01
0.04
0.45
0.01
0.03
0.00
0.00
0.00
0.01
0.01
0.01
0.00
0.01
2.16
2.70
0.36
0.08
0.17
0.06
0.17
0.15
0.24
1.85
0.24
1.85
1.85
0.24
0.24
0.24
1.85
1.85
0.31
10.81
0.31
0.02
0.20
0.38
4.48
0.10
7.72
7.72
7.72
0.02
0.15
0.11
2.32
17.60
0.22
1.70
0.05
0.28
0.01
0.50
0.15
0.70
2.77
0.58
1.26
1.26
0.60
0.64
0.89
1.14
2.40
0.04
3.22
0.05
0.20
0.04
0.08
1.56
0.74
6.60
6.60
6.60
0.24
0.60
0.21
1.95
0.07
0.09
0.01
0.00
0.01
0.00
0.01
0.04
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.01
0.37
0.01
0.01
0.01
0.01
0.15
0.06
0.26
0.26
0.26
0.01
0.04
0.03
0.08
VITICOS
3.76
1.30
2.60
0.31
0.31
0.27
0.61
0.68
0.78
0.29
0.28
0.02
0.04
0.34
3.40
0.04
0.18
1.10
0.37
1.50
TOTAL S/.
80.63
2.76
2.56
30.74
28.88
16.39
2.80
2.80
346.02
559.29
2.28
11.69
5.73
7.91
7.85
7.05
28.70
365.34
13.05
21.53
28.07
3.91
4.16
4.16
37.29
4.08
9.06
11.89
7.37
7.17
1.54
178.69
0.67
51.50
36.38
0.46
8.56
2.76
103.12
221.65
27.95
73.97
13.34
86.78
1.20
3.31
2.28
2.55
0.43
4.17
###
899.83
15.11
87.07
2.63
14.66
0.62
25.68
8.08
35.87
143.34
29.87
66.17
66.17
30.73
32.87
45.73
60.19
124.31
2.56
175.32
2.79
10.23
2.13
4.30
84.19
37.90
344.58
344.58
344.58
12.45
32.29
10.81
101.85
"ESTUDIO DEFINITIVO PARA LA REHABILITACION Y MEJORAMIENTO DE LA CARRETERA EMP. PE-3S (PUNO) - VILQUE MAAZO - EMP. PE-34A (HUATAQUITA)"
PRECIOS DE MATERIALES E INSUMOS
(SETIEMBRE 2009)
ADQUISICIONES
N
85
86
87
88
89
90
91
92
93
94
95
96
97
98
DESCRIPCIN
UND
THINER
TINTA SERIGRAFICA
TRANQUERA
GLN
GLN
UND
TRIPLAY DE 4 MM.
TRIPLAY DE 6 MM.
TRIPLAY DE 19MM.
TUBERIA FG 3"
TUBERIA PVC SAP PRESION,C-10 EC=4" 5M
TUBERIA PVC SAP PRESION,C-10 EC=3" 5M
TUBERIA FG 2"
TUBERIA FG 4"
TUBERIA DE FIERRO GALVANIZADO 7/8"
WINCHA 30 m
YESO 28 KG
PLN
PLN
PLN
M
UND
UND
M
M
M
UND
BOL
PESO
UND
3.74
5.07
35.00
2.50
4.00
25.00
8.16
3.50
2.00
7.48
12.91
2.20
0.50
28.00
kg/GLN
kg/GLN
kg/UND
kg/PLN
kg/PLN
kg/PLN
kg/M
kg/UND
kg/UND
kg/M
kg/M
kg/M
kg/UND
kg/BOL
PROCEDENCIA
PRECIO S/.
FLETE
JULIACA
LIMA
JULIACA
LIMA
LIMA
LIMA
LIMA
JULIACA
JULIACA
LIMA
LIMA
LIMA
JULIACA
JULIACA
10.08
1,086.25
150.00
23.00
32.00
90.00
39.23
70.00
42.50
17.90
44.15
5.55
43.95
4.37
0.15
1.57
1.40
0.77
1.24
7.72
2.52
0.14
0.08
2.31
3.99
0.68
0.02
1.12
ADICIONALES O RECARGAS
ALMAC.
MERMAS
MANIP
5%
2%
0.20
21.73
3.00
0.46
0.64
1.80
0.78
1.40
0.85
0.36
0.88
0.11
0.88
0.09
0.04
0.05
0.37
0.03
0.04
0.26
0.09
0.04
0.02
0.08
0.14
0.02
0.01
0.29
VITICOS
TOTAL S/.
10.47
1,109.60
154.77
24.26
33.92
99.78
42.62
71.58
43.45
20.65
49.16
6.36
44.86
5.87
Peso Tn
Und
#N/A
#N/A
21000.00
1.00
#REF!
#REF!
#REF!
EQUIPO DE SOLDAR
100.00
1.00
EQUIPO DE PINTURA
100.00
1.00
ESPARCIDORA DE AGREGADOS
10000.00
1.00
1150.00
1.00
12000.00
1.00
VEHCULO
CAMIN SEMITRAYLER
CAMA BAJA
N Viajes
2
8
Programacin de Transporte
2
1
0.5
2
1
1
2
0.5
UNIDAD
1.00
5.00
1.00
3.00
2.00
4.00
3.00
3.00
4.00
1.00
5.00
1.00
3.00
2.00
4.00
2.00
3.00
4.00
PESO EN KG
1000.00
18585.00
10308.00
160.00
2300.00
1700.00
2200.00
11515.00
20520.00
OBSERVACIN
(1)
(2)
(2)
(1)
(1)
(1)
(1)
(2)
(2)
COSTO EN SOLES
N Viajes
PESO
VEHCULO
13
TIEMPO VIAJE
KG
HRS
COSTO ALQUILER
HM
219,858.00
14.26
220.73
S/.
220.62
S/.
SUB TOTAL
40,922.37
-
TOTAL S/.
MOV Y DESMV.
S/.
40,922.37
NOTA :
TRACTO Y CAMA BAJA PARA TRANSPORTE DE MAQUINARIA PESADA (PBM: 40-50 TON)
Juliaca - C.G.
Distancia
Velocidad
KM
KM/HR
213.918
30.00
TOTAL
Tiempo
7.1306
213.918
7.13
OBSERVACIONES:
UNIDAD
3.00
1.00
10.00
LOS PRECIOS DE LOS EQUIPOS DE TRANSPORTE COMO CAMA BAJA SE HAN TOMADO DE LA REVISTA COSTOS,
ASUMIENDO QUE NO SE CUENTA CON ESTOS EQUIPOS EL SEMITRAILER SE TOMO DE REFERENCIA PRECIOS MTC P/HORA.
2.0 EQUIPO AUTOTRANSPORTADO
COSTO EN SOLES
VEHCULO
TIEMPO DE VIAJE
ALQ / HOR
SUB TOTAL
IDA
VUELTA
CAMION CISTERNA (AGUA) 122 HP 2,000 GAL.
7.13
7.13
110.00
S/.
4,706.20
CAMION IMPRIMADOR 6X2 178-210 HP 1,800 GL
7.13
7.13
103.02
S/.
1,469.19
CAMION VOLQUETE 6X4 330 HP 10 M3.
7.13
7.13
109.24
S/.
15,578.93
TOTAL
S/.
21,754.32
RESUMEN
S/.
S/.
S/.
40,922.37
21,754.32
62,676.69
UNIDAD
1.00
1.00
1.00
1.00
1.00
1.00
4.00
1.00
1.00
4.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
2.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00
1.00
1.00
4.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
2.00
4.00
PESO EN KG
21000.00
100.00
100.00
100.00
100.00
10000.00
4000.00
1150.00
150.00
29.00
250.00
12000.00
23400.00
7300.00
5500.00
8800.00
4320.00
20.00
7000.00
OBSERVACIN
(2)
(1)
(1)
(1)
(1)
(2)
(2)
(1)
(1)
(1)
(1)
(2)
(2)
(2)
(2)
(2)
(1)
(1)
(2)
COSTO EN SOLES
N Viajes
PESO
VEHCULO
TIEMPO VIAJE
KG
HRS
COSTO ALQUILER
HM
SUB TOTAL
56,400.00
110.48
220.73
S/.
73,155.57
90,200.00
110.48
220.62
S/.
194,984.31
S/.
375,395.83
TOTAL S/.
NOTA :
TRACTO Y CAMA BAJA PARA TRANSPORTE DE MAQUINARIA PESADA (PBM: 40-50 TON)
Lima - C.G.
Distancia
Velocidad
KM
KM/HR
1657.128
30.00
TOTAL
Tiempo
55.2376
1657.128
55.24
OBSERVACIONES:
UNIDAD
1.00
1.00
LOS PRECIOS DE LOS EQUIPOS DE TRANSPORTE COMO CAMA BAJA SE HAN TOMADO DE LA REVISTA COSTOS,
ASUMIENDO QUE NO SE CUENTA CON ESTOS EQUIPOS EL SEMITRAILER SE TOMO DE REFERENCIA PRECIOS MTC P/HORA.
2.0 EQUIPO AUTOTRANSPORTADO
COSTO EN SOLES
VEHCULO
TIEMPO DE VIAJE
ALQ / HOR
SUB TOTAL
IDA
VUELTA
CAMION BARANDA 3 TON
55.24
55.24
23.06
S/.
2,547.56
MAQUINA EXTENDEDORA DE MORTERO
55.24
55.24
507.50
S/.
56,066.16
TOTAL
S/.
58,613.72
S/.
S/.
S/.
375,395.83
58,613.72
434,009.56
RESUMEN
1.0 EQUIPO TRANSPORTADO
2.0 EQUIPO AUTOTRANSPORTADO
TOTAL MOVILIZACION Y DESMOVILIZACION
DESCRIPCIN
BARREDORA MECANICA 10-20 HP 7 P. LONG
CAMION BARANDA 3 TON
CAMION CISTERNA (AGUA) 122 HP 2,000 GAL.
CAMION IMPRIMADOR 6X2 178-210 HP 1,800 GL
CAMION VOLQUETE 6X4 330 HP 10 M3.
CARGADOR S/LLANTAS 100-115 HP 2.5 YD3.
CARGADOR S/LLANTAS 160-195 HP 3.5 YD3.
CHANCADORA PRIM/SECUNDARIA 5 FAJAS 75 HP 46-70 T/H
COMPACTADOR VIBR. TIPO PLANCHA 7 HP
COMPRESORA NEUMATICA 250-330 PCM, 87 HP
EQUIPO DE CORTE Y SOLDEO (OXI-ACET)
EQUIPO DE SOLDAR
EQUIPO DE CORTE
EQUIPO DE PINTURA
ESPARCIDORA DE AGREGADOS
FAJA TRANSPORTADORA 18"x40' M.E. 3KW 150 TON/H
GRUPO ELECTROGENO 140HP 90KW
GRUPO ELECTROGENO 89HP 50KW
HERRAMIENTAS MANUALES
JALONES
MAQUINA EXTENDEDORA DE MORTERO
MAQUINA PARA PINTAR PAVIMENTO
MARTILLO NEUMATICO DE 25 Kg.
MEZCLADORA DE CONCRETO DE 11 P3-18 HP
MIRA 4 MTS
MOTOBOMBA 12 HP 4"
MOTONIVELADORA DE 125 HP
MOTOSOLDADORA DE 250 AMP.
NIVEL TOPOGRAFICO
PAVIMENTADORA SOBRE ORUGAS 69 HO 10-16'
RETROEXCAVADOR S/ORUG 115-165HP .75-1.4Y
RODILLO LISO VIBR AUTOP 70-100 HP 7-9 T.
RODILLO NEUMATICO AUTOP. 81-100 HP 5.5-20T
RODILLO TANDEM EST. AUTOP. 70-100 HP 8-14 T
TEODOLITO
TRACTOR DE ORUGAS DE 190-240 HP
TRACTOR DE TIRO 80HP
VIBRADOR DE CONCRETO 4 HP 2.40"
ZARANDA VIBRATORIA 4"x6"x14" M.E. 15 HP
CAMABAJA 6 X 4, 330HP DE 40 TON
SEMITRAILER 6 X 4, 330HP DE 35 TON
Und.
Precio S/.
HM
80.80
23.06
110.00
103.02
109.24
119.30
160.00
225.80
19.00
51.60
12.00
12.00
12.00
12.00
125.00
6.30
45.98
40.00
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
%MO
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
0.20
507.50
45.00
7.40
12.50
1.50
8.40
159.66
16.00
7.00
91.10
181.60
80.92
115.76
63.50
10.00
210.00
61.64
6.40
49.26
216.20
208.00
JULIACA
LIMA
JULIACA
JULIACA
JULIACA
JULIACA
JULIACA
LIMA
JULIACA
JULIACA
LIMA
LIMA
LIMA
LIMA
LIMA
LIMA
JULIACA
LIMA
JULIACA
LIMA
LIMA
LIMA
JULIACA
LIMA
JULIACA
JULIACA
LIMA
JULIACA
LIMA
LIMA
LIMA
LIMA
LIMA
JULIACA
JULIACA
LIMA
LIMA
LIMA
LIMA
LIMA
DESCRIPCIN
BARREDORA MECANICA 10-20 HP 7 P. LONG
CAMION BARANDA 3 TON
CAMION CISTERNA (AGUA) 122 HP 2,000 GAL.
CAMION IMPRIMADOR 6X2 178-210 HP 1,800 GL
CAMION VOLQUETE 6X4 330 HP 10 M3.
CARGADOR S/LLANTAS 160-195 HP 3.5 YD3.
CARGADOR S/LLANTAS 100-115 HP 2.5 YD3.
CHANCADORA PRIM/SECUNDARIA 5 FAJAS 75 HP 46-70 T/H
COMPACTADOR VIBR. TIPO PLANCHA 7 HP
COMPRESORA NEUMATICA 250-330 PCM, 87 HP
EQUIPO DE SOLDAR
EQUIPO DE CORTE
EQUIPO DE CORTE Y SOLDEO (OXI-ACET)
EQUIPO DE PINTURA
ESPARCIDORA DE AGREGADOS
FAJA TRANSPORTADORA 18"x40' M.E. 3KW 150 TON/H
GRUPO ELECTROGENO 140HP 90KW
GRUPO ELECTROGENO 89HP 50KW
HERRAMIENTAS MANUALES
JALONES
MAQUINA EXTENDEDORA DE MORTERO
MAQUINA PARA PINTAR PAVIMENTO
MARTILLO NEUMATICO DE 25 Kg.
MEZCLADORA DE CONCRETO DE 11 P3-18 HP
MIRA 4 MTS
MOTOBOMBA 12 HP 4"
MOTONIVELADORA DE 125 HP
MOTOSOLDADORA DE 250 AMP.
NIVEL TOPOGRAFICO
PAVIMENTADORA SOBRE ORUGAS 69 HO 10-16'
RETROEXCAVADOR S/ORUG 115-165HP .75-1.4Y
RODILLO LISO VIBR AUTOP 70-100 HP 7-9 T.
RODILLO NEUMATICO AUTOP. 81-100 HP 5.5-20T
RODILLO TANDEM EST. AUTOP. 70-100 HP 8-14 T
TEODOLITO
TRACTOR DE ORUGAS DE 190-240 HP
TRACTOR DE TIRO 80HP
VIBRADOR DE CONCRETO 4 HP 2.40"
ZARANDA VIBRATORIA 4"x6"x14" M.E. 15 HP
Und.
Cantidad
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
1.00
1.00
3.00
1.00
10.00
5.00
1.00
1.00
3.00
2.00
1.00
1.00
1.00
1.00
1.00
4.00
4.00
1.00
1.00
1.00
1.00
4.00
2.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
4.00
1.00
2.00
4.00
"ESTUDIO DEFINITIVO PARA LA REHABILITACION Y MEJORAMIENTO DE LA CARRETERA EMP. PE3S (PUNO) - VILQUE - MAAZO - EMP. PE-34A (HUATAQUITA)"
CAPATAZ OPERARIO
53.04
40.80
OFICIAL
36.10
PEN
32.30
19.20
13.06
10.83
9.69
59.68
45.91
40.62
36.34
2.30
1.57
1.30
1.16
7.20
7.20
7.20
7.20
0.40
0.40
0.40
0.40
141.83
108.93
96.45
87.10
17.73
13.62
12.06
10.89
OVEROL
(02 vestimentas de trabajo por ao)
CAPATAZ OPERARIO
53.04
40.80
OFICIAL
36.10
PEN
32.30
19.20
13.06
10.83
9.69
59.68
45.91
40.62
36.34
2.30
1.57
1.30
1.16
10.61
8.16
7.22
6.46
7.20
7.20
7.20
7.20
0.40
0.40
0.40
0.40
152.43
117.09
103.67
93.56
19.05
14.64
12.96
11.69
OVEROL
(02 vestimentas de trabajo por ao)
De la relacin anterior, la variacin del jornal por hh entre el normal y el realizado en contacto con el agua es el sigui
Diferencia de costos de la Mano de Obra
1.32
1.02
0.90
0.80
Valor
en % deen
la %,
Variacin
encontrada
7.47%
Valor elegido
del Costo
de la Bonificacin por Contacto con
el Agua en7.49%
los Anlisis 7.49%
de
Precios Unitarios en Funcin de la Mano de Obra
8.00%
7.39%
on el agua es el siguiente: