Escolar Documentos
Profissional Documentos
Cultura Documentos
Date : 09.07.2014
ORDER
Sub : Volumetric rate for preparation of preliminary cost estimate for construction of buildings.
The volumetric rate for preparation of preliminary cost estimate for construction of buildings
in different areas of West Bengal are hereby revised as follows (with its date of effect from
10.07.2014)
1.
STRUCTURAL COST
A) In General
Type of Structure
Masonry Structure
R.C.Framed
Structure
Rs. 3250.00/m3
Rs. 3450.00m3
B) In case of works within jail compound, where works are permitted within restricted hours
Type of Structure
Masonary Structure
R.C.Framed
Structure
2.
-----