BENEFICIOS SOCIALES
DIAS TRABAJADOS
DOMINGOS
FERIADOS
VACACIONES
GRATIFICACIONES
ENFERMEDAD
CTS
TOTAL
DIAS
TRABAJADOR
265
52
13
30
60
5
35
460
(A)
(B)
(C)
(D)
(E)
(F)
(G)
(H)
FACTOR (M)/(A)
2.06462264
(N)
1.06462264
BENEFICIOS SOCIALES
Notas:
265
52
13
30
60
5
35
IMP. EXT.
5%
13.25
2.6
0.65
1.5
3
0.25
106.46 %
APORTACIONES EMPLEADOR
ESSALUD
9.00%
23.85
4.68
1.17
2.7
5.4
0.45
SUELDOS Y SALARIOS
JORNALES
CAPATAZ
PERFORISTA
AYUD. PERF.
MAESTRO
OFICIAL
OPERARIO
Notas:
BASICO
28.72
22.98
20.68
22.98
20.68
18.38
LLSS y BBSS
106.46%
30.58
24.47
22.02
24.47
22.02
19.57
IMPLEM.SEG.
HERRAMIENTAS
2.95
4.46
4.46
2.95
2.95
2.95
0
2.37
2.13
2.37
2.13
1.90
28
CANTIDAD
1.00
1.00
1.00
1.00
25.00
25.00
4.00
168.00 PIES
PRECIO (S/.)
24,990.00
194.06
33.60
3.21
8.31
3.38
13.50
VIDA
UNIDADES
100,000.00
2,300.00
700.00
1.00
300.00
300.00
300.00
PIES
PIES
PIES
PERFORADAS
PERFORADAS
PERFORADAS
PERFORADAS
BASICO (US$)
1
1
4
1
1
1
1,200.00
1,000.00
800.00
500.00
400.00
350.00
2,477.55
2,064.62
6,606.79
1,032.31
825.85
722.62
8,423.66
7,019.72
22,463.09
3,509.86
2,807.89
2,456.90
3,000.00
10,200.00
3.- CAMIONETA
900.00
3,060.00
200.00
680.00
5.- MOVILIZACION
100.00
340.00
200.00
680.00
7.- IMPREVISTOS
900.00
3,060.00
19,029.74
64,701.12
TOTAL
393,210.97
21.66%
62.25
54.28
49.29
52.77
47.78
52.77
52.77
42.80
52.77
42.80
42.80
42.80
52.77
47.78
42.80
PERFORADORA
BARRA CONICA DE 4 PIES
BARRA CONICA DE 6 PIES
BARRA CONICA DE 8 PIES
BROCA DE 1 1/2"
BROCA DE 1 3/8"
ACEITE ALMO OIL 527
DINAMITA FAMESA PULVERULENTA
DINAMITA FAMESA SEMIG. 65 %
DINAMITA FAMESA SEMIG. 45 %
IREMITA DYNO 82 %
MANGUERA DE JEBE Y LONA DE 1"
MANGUERA DE JEBE Y LONA DE 1/2"
PIEDRA ESMERIL
MECHA LENTA
MECHA RAPIDA
FULMINANTE N 6
CONECTOR PARA MECHA RAPIDA
US $
NUEVOS SOLES
4,200.00
14,280.00 POR UNIDAD ( UNICO INSUMO QUE VARA)
48.09
163.49 POR PIEZA
57.08
194.06 POR PIEZA
58.98
200.54 POR PIEZA
9.88
33.60 POR PIEZA
9.63
32.74 POR PIEZA
3.57
12.152 POR GALON
1.57
5.332 POR KILO
1.78
6.045 POR KILO
1.64
5.561 POR KILO
1.71
5.828 POR KILO
2.44
8.308 POR METRO
0.99
3.379 POR METRO
5.41
18.38 POR PIEZA
0.08
0.264 POR METRO
0.30
1.033 POR METRO
0.09
0.295 POR PIEZA
0.13
0.450 POR PIEZA
CLCULO DE NUEVOS PRECIOS UNITARIOS PARA CONTRATISTAS DE MINA SEGUNDO SEMESTRE 1,999
BENEFICIOS SOCIALES
DIAS TRABAJADOS
DOMINGOS
FERIADOS
VACACIONES
GRATIFICACIONES
ENFERMEDAD
CTS
TOTAL
DIAS
TRABAJADOR
265
52
13
30
60
5
35
460
(A)
(B)
(C)
(D)
(E)
(F)
(G)
(H)
FACTOR (M)/(A)
2.06462264
(N)
1.06462264
BENEFICIOS SOCIALES
Notas:
265
52
13
30
60
5
35
IMP. EXT.
5%
13.25
2.6
0.65
1.5
3
0.25
106.46 %
APORTACIONES EMPLEADOR
ESSALUD
ACC TRABAJ.
9.00%
6.50%
23.85
17.225
4.68
3.38
1.17
0.845
2.7
1.95
5.4
3.9
0.45
0.325
TOTAL
54.325
10.66
2.665
6.15
12.3
1.025
0
87.125
TOTAL
319.325
62.66
15.665
36.15
72.3
6.025
35
547.125
(M)
SUELDOS Y SALARIOS
JORNALES
CAPATAZ
PERFORISTA
AYUD. PERF.
MAESTRO
OFICIAL
OPERARIO
Notas:
BASICO
28.72
22.98
20.68
22.98
20.68
18.38
LLSS y BBSS
106.46%
30.58
24.47
22.02
24.47
22.02
19.57
IMPLEM.SEG.
HERRAMIENTAS
2.95
4.46
4.46
2.95
2.95
2.95
0
2.37
2.13
2.37
2.13
1.90
TOTAL
62.25
54.28
49.29
52.77
47.78
42.80
28
CANTIDAD
1.00
1.00
1.00
1.00
25.00
25.00
4.00
168.00 PIES
PRECIO (S/.)
24,990.00
194.06
33.60
3.21
8.31
3.38
13.50
VIDA
UNIDADES
100,000.00
2,300.00
700.00
1.00
300.00
300.00
300.00
PIES
PIES
PIES
PERFORADAS
PERFORADAS
PERFORADAS
PERFORADAS
COSTO
0.2499 0.074820359 7.482035928
0.0844
0.0480
0.0191
0.0041
0.0017
0.0011
0.4083 SOLES / PIE PERF.
0.1200835239
BASICO (US$)
1
1
4
1
1
1
1,200.00
1,000.00
800.00
500.00
400.00
350.00
2,477.55
2,064.62
6,606.79
1,032.31
825.85
722.62
8,423.66
7,019.72
22,463.09
3,509.86
2,807.89
2,456.90
3,000.00
10,200.00
3.- CAMIONETA
900.00
3,060.00
200.00
680.00
5.- MOVILIZACION
100.00
340.00
200.00
680.00
7.- IMPREVISTOS
900.00
3,060.00
19,029.74
64,701.12
TOTAL
393,210.97
21.66%
62.25
54.28
49.29
52.77
47.78
52.77
52.77
42.80
PARTIDA
LABOR
UNIDADES
MEDICION
(NUEVOS SOLES)
P.UNITARIO
OBSERVACIONES
Precios Anteriores
Nuevos Precios
T. de Cambio
3.1
T. de Cambio
3.4
En Dolares
En Soles
En Dolares
En Soles
337.28
108.80
346.48
101.90
Variacion
ML
346.48
ML
249.72
241.92
78.04
249.72
73.45
3.22%
ML
229.88
224.49
72.42
229.88
67.61
2.40%
ML
290.06
284.00
91.61
290.06
85.31
2.13%
DESQUINCHE
TONELADA
13.32
12.96
4.18
13.32
3.92
2.78%
5
6
CAMBIO DE CARROS
- CON DESQUINCHE
- SIN DESQUINCHE (SOLO INSTALACION)
UNIDAD
UNIDAD
840.91
247.73
822.23
245.00
265.24
79.03
840.91
247.73
247.33
72.86
2.27%
1.12%
ML
257.16
251.62
81.17
257.16
75.63
2.20%
ML
342.80
336.01
108.39
342.80
100.82
2.02%
10
TONELADA
41.25
40.17
12.96
41.25
12.13
2.69%
11
TONELADA
29.06
28.40
9.16
29.06
8.55
2.32%
12
TONELADA
23.84
23.36
7.54
23.84
7.01
2.04%
13
TONELADA
19.77
19.33
6.24
19.77
5.82
2.30%
14
TONELADA
17.95
17.51
5.65
17.95
5.28
2.53%
15
UNIDAD
28.77
28.45
9.18
28.77
8.46
1.12%
16
UNIDAD
47.85
47.32
15.26
47.85
14.07
1.11%
17
UNIDAD
191.39
189.28
61.06
191.39
56.29
1.11%
18
UNIDAD
108.81
107.61
34.71
108.81
32.00
1.12%
22
UNIDAD
8.51
8.20
2.65
8.51
2.50
3.76%
23
METRO 2
12.78
12.43
4.01
12.78
3.76
2.85%
21
ANILLO
17.56
17.37
5.60
17.56
5.16
1.10%
19
UNIDAD
574.17
567.83
183.17
574.17
168.87
1.12%
20
UNIDAD
382.78
378.56
122.12
382.78
112.58
1.11%
24
TONELADA
1.05
1.04
0.33
1.05
0.31
1.25%
27
TON x KM
1.68
1.66
0.54
1.68
0.49
1.10%
25
TONELADA
0.59
0.58
0.19
0.59
0.17
1.73%
26
TON x KM
0.60
0.59
0.19
0.60
0.18
1.59%
RELLENO CONVENCIONAL
Con Ch. Arranque y Puntales
RELLENO CONVENCIONAL
Con Ch. Arranque y Puntales
RELLENO HIDRALICO
Con Ch. Arranque y Puntales
CON PUNTALES, SIN LPZA.
Con Ch. Arranque y Relleno Hid.
CON PERNOS, SIN LPZA.
con winche ni Rell. Hidraulico
2.73%
ADENDA
261057484.xls
20 de 173 Pginas
02/20/2015
03:09:17
28
TONELADA
32.38
29
TONELADA
23.58
30
TONELADA
18.36
TONELADA
8.84
RELLENO CONVENCIONAL
Sin Ch. Arranque ni Puntales
RELLENO CONVENCIONAL
Sin Ch. Arranque ni Puntales
RELLENO HIDRALICO
Con Ch. Arranque y Puntales
31.44
10.14
32.38
9.52
3.00%
23.01
7.42
23.58
6.94
2.48%
17.96
5.79
18.36
5.40
2.23%
RELLENO CONVENCIONAL
8.61
2.78
8.84
2.60
2.70%
7.27
2.35
7.47
2.20
2.71%
6.52
2.10
6.59
1.94
1.06%
6.04
1.95
6.10
1.80
1.07%
14.31
4.62
14.61
4.30
2.08%
12.80
4.13
13.06
3.84
2.06%
7.02
2.26
6.82
2.00
-2.89%
36.24
11.69
37.23
10.95
2.73%
28.01
9.04
28.64
8.42
2.25%
22.19
7.16
22.63
6.66
1.98%
35.43
11.43
36.40
10.70
2.73%
24.50
7.90
25.08
7.38
2.37%
17.70
5.71
17.85
5.25
0.85%
24.56
7.92
21.18
6.23
-13.77%
13.44
3.95
2DA ADENDA
31
32
TONELADA
7.47
RELLENO CONVENCIONAL
Sin Ch. Arranque ni Puntales. Solo Relleno sin limpieza ni rotura
33
TONELADA
6.59
34
TONELADA
6.10
35
TONELADA
14.61
36
TONELADA
13.06
RELLENO CONVENCIONAL
Sin Ch. Arranque ni Puntales. Solo limpieza y relleno sin corte
37
TONELADA
6.82
RELLENO HIDRAULICO
Sin Ch. Arranque ni Puntales. Solo limpieza y relleno sin corte
38
TONELADA
37.23
RELLENO CONVENCIONAL
Sin Ch. Arranque ni Puntales. Limpieza con carretilla. Incl corte y relleno
39
TONELADA
28.64
RELLENO CONVENCIONAL
Sin Ch. Arranque ni Puntales. Limpieza con carretilla. Incl corte y relleno
40
TONELADA
22.63
RELLENO HIDRAULICO
Sin Ch. Arranque ni Puntales. Limpieza con carretilla. Incl corte y relleno
41
TONELADA
36.40
RELLENO CONVENCIONAL
Sin Ch. Arranque ni Puntales. Corte en Breasting incl Limp y relleno
42
TONELADA
25.08
RELLENO CONVENCIONAL
Sin Ch. Arranque ni Puntales. Corte en Breasting incl Limp y relleno
43
TONELADA
17.85
RELLENO HIDRAULICO
Sin Ch. Arranque ni Puntales. Corte en Breasting incl Limp y relleno
44
TONELADA
21.18
45
TONELADA
13.44
Sin Ch. Arranque ni Puntales. Solo corte sin limpieza ni rellen NO EXISTIA
46
CHIMENEA DE ARRANQUE
ML
154.24
150.16
48.44
154.24
45.37
2.72%
47
LIMPIEZA DE LABOR
TONELADA
2.89
2.85
0.92
2.89
0.85
1.23%
52
LIMPIEZA DE LABOR
TONELADA
11.27
LIMPIEZA A PULSO
11.27
3.31
48
PISO
217.11
214.72
69.26
217.11
63.86
1.11%
49
PUNTALES EN LNEA
PUNTAL
81.61
80.71
26.04
81.61
24.00
1.11%
50
PISO
40.80
40.35
13.02
40.80
12.00
1.12%
51
COLOCACION DE ENTABLADO
PISO
47.85
47.32
15.26
47.85
14.07
1.11%
NO EXISTIA
Notas:
- El primer grupo lo constituyen los precios de las labores que se han
pagado hasta el mes de Junio.
- El segundo grupo es una variacfion debido al Tipo de cambio de 3.1
(con el que se firmo el contrato vigente) a 3.4, mas una variacion en los
gastos generales de 20.21% a 21.66 %, este cambio a que las dos
contratas (VSV y EMSA 86) cuentan con mayor supervision debido al
retiro de la Contrata Santa Fe
- No existe ninguna adenda al Contrato de las partidas 31 a 52, por lo que
sta deber crearse en los proximos dias, una vez aprobados estos
precios
261057484.xls
21 de 173 Pginas
02/20/2015
03:09:17
Partida Nro
1
FRENTE DE 2.2 x 2.4
PARAMETROS PRINCIPALES
TIPO DE ROCA
ANCHO DE LABOR
ALTURA DE LABOR
EQUIPO DE LIMPIEZA
NMERO DE TALADROS
LONGITUD DE TALADROS
RENDIM. DE AVANCE (85%)
VOLUMEN MOVIDO (TON)
FACTOR DE POTENCIA
DENSIDAD IN SITU
TC =
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
PALERO
AYUDANTE DE PALERO
CARRERO
TUBERO CARRILANO
BODEGUERO
MEDIA
2.2
2.4
PALA NEUMATICA
32
8
6.8
27.53
0.9
2.84
3.40
TALADS.
FT
FT
TONELADAS
KG / TON
TON / MT 3
SOLES/US$
UNIDAD
PRECIO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
MTS
MTS
62.246
54.277
49.291
52.767
47.781
42.795
52.767
42.795
2.4 MTS
2.04 MTS
CANTIDAD
0.067
1.000
1.000
0.600
0.600
1.000
0.667
0.067
TOTAL
COSTO TOTAL
4.15
54.28
49.29
31.66
28.67
42.80
35.18
2.85
248.87
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
256.00
24.78
86.40
30.00
6.00
30.00
TOTAL
104.52
132.12
22.77
8.86
6.20
13.49
287.95
OTROS
CAMBIOS (1 cambio cada 50 metros )
UNIDADES
638.672
TOTAL
0.00
0.00
536.83
GASTOS GENERALES
21.66%
116.30
UTILIDADES
10.00%
53.68
706.81
346.48 SOLES/MT
101.90 US $ / MT
Partida Nro
2
FRENTE DE 2.2 x 2.4 , LIMPIEZA CON SCOOP
PARAMETROS PRINCIPALES
TIPO DE ROCA
ANCHO DE LABOR
ALTURA DE LABOR
EQUIPO DE LIMPIEZA
NMERO DE TALADROS
LONGITUD DE TALADROS
RENDIM. DE AVANCE (85%)
VOLUMEN MOVIDO (TON)
FACTOR DE POTENCIA
DENSIDAD IN SITU
TC=
MEDIA
MANO DE OBRA
UNIDAD
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
PALERO
AYUDANTE DE PALERO
CARRERO
TUBERO CARRILANO
BODEGUERO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
2.2
2.4
SCOOP
30
8
6.8
27.53
0.9
2.84
3.4
MTS
MTS
TALADS.
FT
FT
TONELADAS
KG / TON
TON / MT 3
SOLES/US$
PRECIO
2.4 MTS
2.04 MTS
CANTIDAD
62.246
54.277
49.291
52.767
47.781
42.795
52.767
42.795
0.067
1.000
1.000
0.000
0.000
0.000
0.000
0.067
TOTAL
COSTO TOTAL
4.15
54.28
49.29
0.00
0.00
0.00
0.00
2.85
110.57
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
TOTAL
240.00
24.78
82.80
30.00
2.00
30.00
97.99
132.12
21.82
8.86
2.07
13.49
276.34
OTROS
0.00
TOTAL
386.91
GASTOS GENERALES
21.66%
83.82
UTILIDADES
10.00%
38.69
509.42
249.72 SOLES/MT
73.45 US $ / MT
Partida Nro
3
FRENTE DE 1.2 x 1.8 (SUBNIVEL)
PARAMETROS PRINCIPALES
TIPO DE ROCA
ANCHO DE LABOR
ALTURA DE LABOR
EQUIPO DE LIMPIEZA
NMERO DE TALADROS
LONGITUD DE TALADROS
RENDIM. DE AVANCE (90%)
VOLUMEN MOVIDO (TON)
FACTOR DE POTENCIA
DENSIDAD IN SITU
TC=
MANO DE OBRA
MEDIA
1.2 MTS.
1.8 MTS.
WINCHE DE ARRASTRE
18 TALADS.
6 FT
5.4 FT
9.45 TONELADAS
0.85 KG / TON
3 TON / MT 3
3.4 SOLES/US$
UNIDAD
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
CARRERO
TUBERO CARRILANO
BODEGUERO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
52.767
42.795
1.8 MTS
1.62 MTS
CANTIDAD
0.067
1.000
1.000
0.600
0.600
0.000
0.000
0.067
TOTAL
COSTO TOTAL
4.15
54.28
49.29
31.66
25.68
0.00
0.00
2.85
167.91
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
108.00
8.03
37.80
18.00
4.50
18.00
44.09
42.82
9.96
5.32
4.65
8.09
TOTAL
114.93
TOTAL
282.84
GASTOS GENERALES
21.66%
61.28
UTILIDADES
10.00%
28.28
372.40
229.88 SOLES/MT
67.61 US $ / MT
Partida Nro
DESQUINCHE
PARAMETROS PRINCIPALES
TIPO DE ROCA
BURDEN
ESPACIAMENTO
EQUIPO DE LIMPIEZA
NMERO DE TALADROS /GDIA
LONGITUD DE TALADROS
RENDIM. DE AVANCE (85%)
VOLUMEN MOVIDO (TON ,MT3 R.)
FACTOR DE POTENCIA
DENSIDAD IN SITU
TC=
MEDIA
0.5
0.55
PALA NEUMATICA
30
8
6.93
48.70
0.35
2.84
3.40
TALADS./GDIA
FT
FT
TONELADAS
KG / TON
TON / MT 3
SOLES/US$
MANO DE OBRA
UNIDAD
PRECIO
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
PALERO
AYUDANTE DE PALERO
CARRERO
TUBERO CARRILANO
BODEGUERO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
MTS.
MTS.
62.246
54.277
49.291
52.767
47.781
42.795
52.767
42.795
2.4 MTS
2.08 MTS
25.72 MTS 3 SUELTOS
CANTIDAD
0.067
1.000
1.000
1.000
1.000
1.000
0.000
0.067
TOTAL
COSTO TOTAL
4.15
54.28
49.29
52.77
47.78
42.80
0.00
2.85
253.91
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
240.00
17.04
81.00
30.00
6.00
30.00
97.99
90.88
21.34
8.86
6.20
13.49
TOTAL
238.76
TOTAL
492.68
GASTOS GENERALES
21.66%
106.74
UTILIDADES
10.00%
49.27
648.68
13.32 SOLES/TON.
3.92 US $ / MT
Partida Nro
5y6
INSTALACIN DE CAMBIO DE RIEL (CON DESQUINCHE) Y SOLO INSTALACIN
PARAMETROS PRINCIPALES
NMERO DE CARROS
LONGITUD DE CAMBIO
VOLUMEN DE DESQUINCHE
TIPO DE ROCA
DENSIDAD IN SITU
TC=
3
8
44.53
MEDIA
2.84
3.40
MANO DE OBRA
UNIDAD
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
PALERO
AYUDANTE DE PALERO
CARRERO
TUBERO CARRILANO
BODEGUERO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
MTS.
TONELADAS
TON / MT 3
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
47.781
42.795
52.767
42.795
CANTIDAD
0.067
0.000
0.000
0.000
0.000
3.000
1.000
0.067
TOTAL
COSTO TOTAL
4.15
0.00
0.00
0.00
0.00
128.39
52.77
2.85
188.16
OTROS
DESQUINCHE
TONELADAS
10.117
44.53
450.52
TOTAL DESQUINCHE
450.52
TOTAL
638.67
GASTOS GENERALES
21.66%
138.37
UTILIDADES
10.00%
63.87
840.91 SOLES/CAMBIO
247.33 US $ / CAMBIO
247.73 SOLES/CAMBIO
72.86 US $ / CAMBIO
Partida Nro
7
FRENTE DE 1.2 x 1.8 (SUBNIVEL)
PARAMETROS PRINCIPALES
TIPO DE ROCA
ANCHO DE LABOR
ALTURA DE LABOR
EQUIPO DE LIMPIEZA
NMERO DE TALADROS
LONGITUD DE TALADROS
RENDIM. DE AVANCE (90%)
VOLUMEN MOVIDO (TON)
FACTOR DE POTENCIA
DENSIDAD IN SITU
TC=
MANO DE OBRA
MEDIA
1.2 MTS.
1.8 MTS.
CARRETILLA
18
6
5.4
9.45
0.9
3
3.4
UNIDAD
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
CARRERO
TUBERO CARRILANO
BODEGUERO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TALADS.
FT
FT
TONELADAS
KG / TON
TON / MT 3
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
52.767
42.795
1.8 MTS
1.62 MTS
CANTIDAD
0.067
1.000
1.000
0.000
0.000
3.000
0.000
0.067
TOTAL
COSTO TOTAL
4.15
54.28
49.29
0.00
0.00
128.39
0.00
2.85
238.96
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
108.00
8.50
39.60
18.00
4.50
18.00
44.09
45.34
10.43
5.32
4.65
8.09
TOTAL
117.93
TOTAL
356.88
GASTOS GENERALES
21.66%
77.32
UTILIDADES
10.00%
35.69
469.89
290.06 SOLES/MT
85.31 US$/MT
Partida Nro
8
CHIMENEA DE SECCIN 1.50 x 1.50 MTS
PARAMETROS PRINCIPALES
TIPO DE ROCA
ANCHO DE LABOR
ALTURA DE LABOR
EQUIPO DE LIMPIEZA
NMERO DE TALADROS
LONGITUD DE TALADROS
RENDIM. DE AVANCE (90%)
VOLUMEN MOVIDO (TON)
FACTOR DE POTENCIA
DENSIDAD IN SITU
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
ENMADERADOR
AYUDANTE DE ENMADERADOR
PEON
TUBERO CARRILANO
BODEGUERO
MEDIA
1.5
1.5
NO HAY
17
6
5.4
10.39
0.9
3
3.40
UNIDAD
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
MTS.
MTS.
TALADS.
FT
FT
TONELADAS
KG / TON
TON / MT 3
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
52.767
42.795
1.8 MTS
1.62 MTS
CANTIDAD
0.050
1.000
1.000
0.667
0.667
0.500
0.000
0.067
TOTAL
COSTO TOTAL
3.11
54.28
49.29
35.18
28.53
21.40
0.00
2.85
194.64
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
LIMPIEZA CHIMENEA 1ROS 5 METROS)
PIES
KG
MTS
PZAS
MTS
PZAS
SOLES
0.408
5.332
0.264
0.295
1.033
0.450
1.998
102.00
9.35
35.70
17.00
6.00
17.00
1.00
41.64
49.85
9.41
5.02
6.20
7.64
2.00
TOTAL
121.76
TOTAL
316.40
GASTOS GENERALES
21.66%
68.55
UTILIDADES
10.00%
31.64
416.59
SOLES/MT
US $ / MT
257.16 SOLES/MT
75.63 US $ / MT
Partida Nro
9
CHIMENEA DE SECCIN 3.00 x 1.50 MTS
PARAMETROS PRINCIPALES
TIPO DE ROCA
ANCHO DE LABOR
ALTURA DE LABOR
EQUIPO DE LIMPIEZA
NMERO DE TALADROS
LONGITUD DE TALADROS
RENDIM. DE AVANCE (90%)
VOLUMEN MOVIDO (TON)
FACTOR DE POTENCIA
DENSIDAD IN SITU
TC=
MANO DE OBRA
MEDIA
3.00
1.50
NO HAY
27
8
7.2
27.70
0.9
3
3.40
UNIDAD
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
ENMADERADOR
AYUDANTE DE ENMADERADOR
PEON
TUBERO CARRILANO
BODEGUERO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
MTS.
MTS.
TALADS.
FT
FT
TONELADAS
KG / TON
TON / MT 3
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
52.767
42.795
2.4 MTS
2.16 MTS
CANTIDAD
0.067
1.000
1.000
1.000
1.000
2.000
0.000
0.067
TOTAL
COSTO TOTAL
4.15
54.28
49.29
52.77
42.80
85.59
0.00
2.85
291.72
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
LIMPIEZA CHIMENEA 1ROS 5 METROS)
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
3.995
216.00
24.93
72.90
27.00
6.00
27.00
1.00
88.19
132.94
19.21
7.98
6.20
12.14
4.00
TOTAL
270.64
TOTAL
562.37
GASTOS GENERALES
21.66%
121.84
UTILIDADES
10.00%
56.24
740.44
342.80 SOLES/MT
100.82 US $ / MT
Partida Nro
10
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO <0.60 MTS.
PARAMETROS PRINCIPALES
TIPO DE RELLENO
CONVENCIONAL
TIPO DE ROCA
MEDIA
ANCHO DE VETA
0.50
ANCHO DE LABOR
0.70
EQUIPO DE LIMPIEZA
WINCHE DE ARRASTRE
LONGITUD DE TAJEO
35
MALLA DE PERFORACIN
0.35
LONGITUD DE TALADROS
8
RENDIM. DE AVANCE (60 GRAD.)
6.93
DENSIDAD IN SITU MINERAL TAJEADO
3.00
DENSIDAD IN SITU DESMONTE
2.84
TONELADA POR TALADRO
0.76
VOLUMEN POR CORTE (MTS 3 ,RELL)
50.92
VOLUMEN POR CORTE (TONS. PROD.)
152.77
NMERO DE TALADROS /CORTE
200
VOLUMEN POR TAL. DESQUINCHE (RELL.)
0.86
NMERO DE TALADROS /RELLENO
60
TOTAL DE TALDS. CORTE Y RELLENO
260
TALADROS / GDIA. (PERF.)
30
GDIAS./CORTE
8
TON/GDIA. (LIMPIEZA)
20
GDIAS EN LIMPIEZA/CORTE
8
GDIAS. EN RELLENO (EXTENDER RELLENO)
0
TOTAL GDIAS EN LIM. Y RELL.
8
FACTOR DE POTENCIA MINERAL
0.60
FACTOR DE POTENCIA DESMONTE
0.30
TC=
3.40
MANO DE OBRA
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
1.000
MTS.
MTS.
MTS.
0.350 MTS 2
FT
2.40 MTS
FT
2.08 MTS
TON / MT 3
TON / MT 3
TONELADA
MTS 3
TONELADAS
TALADS.
MTS3 / TALADRO
TALADS.
TALADS.
TALADROS/GDIA.
GUARDIAS
TONS./GDIA.
GUARDIAS
GUARDIAS
GUARDIAS
KG / TON
KG / TON
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.867
8.000
8.000
8.000
8.000
1.000
0.867
0.748245949
COSTO TOTAL
53.95
434.22
394.33
422.14
342.36
42.80
37.09
1,726.88
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
2,080.00
135.05
741.00
260.00
70.00
260.00
TOTAL MATERIALES
849.23
720.06
195.25
76.81
72.33
116.87
2,030.56
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
7.000
0.000
16.000
2.08
152.94
581.44
294.41
TOTAL OTROS
1,028.80
TOTAL
4,786.24
GASTOS GENERALES
21.66%
1,036.93
UTILIDADES
10.00%
478.62
6,301.80
41.25 SOLES/TON.
0.0525
12.13 US $ / TON.
TRABAJOS EN TOLVA CAMINO, SOSTENIMIENTO, CHS. DE ARRANQUE Y OTROS SE VALORIZAR COMO TRABAJOS ADICIONALES
Partida Nro
11
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO >0.60 MTS.
PARAMETROS PRINCIPALES
TIPO DE RELLENO
CONVENCIONAL
TIPO DE ROCA
MEDIA
ANCHO DE VETA
0.80
ANCHO DE LABOR
1.00
EQUIPO DE LIMPIEZA
WINCHE DE ARRASTRE
LONGITUD DE TAJEO
35
MALLA DE PERFORACIN
0.50
LONGITUD DE TALADROS
8
RENDIM. DE AVANCE (60 GRAD.)
6.93
DENSIDAD IN SITU MINERAL TAJEADO
3.40
DENSIDAD IN SITU DESMONTE
2.84
TONELADA POR TALADRO
1.77
VOLUMEN POR CORTE (MTS 3 ,RELL)
72.75
VOLUMEN POR CORTE (TONS. PROD.)
247.34
NMERO DE TALADROS /CORTE
140
VOLUMEN POR TAL. DESQUINCHE (RELL.)
0.86
NMERO DE TALADROS /RELLENO
85
TOTAL DE TALDS. CORTE Y RELLENO
225
TALADROS / GDIA. (PERF.)
30
GDIAS./CORTE
8
TON/GDIA. (LIMPIEZA)
20
GDIAS EN LIMPIEZA/CORTE
12
GDIAS. EN RELLENO (EXTENDER RELLENO)
0
TOTAL GDIAS EN LIM. Y RELL.
12
FACTOR DE POTENCIA MINERAL
0.6
FACTOR DE POTENCIA DESMONTE
0.35
TC=
3.40
MANO DE OBRA
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
1.000
MTS.
MTS.
MTS.
0.500 MTS 2
FT
2.40 MTS
FT
2.08 MTS
TON / MT 3
TON / MT 3
TONELADA
MTS 3
TONELADAS
TALADS.
MTS3 / TALADRO
TALADS.
TALADS.
TALADROS/GDIA.
GUARDIAS
TONS./GDIA.
GUARDIAS
GUARDIAS
GUARDIAS
KG / TON
KG / TON
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.867
8.000
8.000
12.000
12.000
1.000
0.867
41.867
COSTO TOTAL
53.95
434.22
394.33
633.21
513.54
42.80
37.09
2,109.13
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
1,800.00
220.71
641.25
225.00
70.00
225.00
TOTAL MATERIALES
734.91
1,176.84
168.97
66.47
72.33
101.14
2,320.66
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
7.000
0
16
2.08
152.94
581.44
294.41
TOTAL OTROS
1,028.80
TOTAL
5,458.58
GASTOS GENERALES
21.66%
1,182.59
UTILIDADES
10.00%
545.86
7,187.04
29.06 SOLES/TON.
8.55 US $ / TON.
TRABAJOS EN TOLVA CAMINO SE VALORIZAR COMO TRABAJOS ADICIONALES
Partida Nro
12
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO >0.60 MTS.
PARAMETROS PRINCIPALES
TIPO DE RELLENO
HIDRAULICO
TIPO DE ROCA
MEDIA
ANCHO DE VETA
0.80
ANCHO DE LABOR
1.00
EQUIPO DE LIMPIEZA
WINCHE DE ARRASTRE
LONGITUD DE TAJEO
35
MALLA DE PERFORACIN
0.50
LONGITUD DE TALADROS
8
RENDIM. DE AVANCE (60 GRAD.)
6.93
DENSIDAD IN SITU MINERAL TAJEADO
3.40
DENSIDAD IN SITU DESMONTE
2.84
TONELADA POR TALADRO
1.77
VOLUMEN POR CORTE (MTS 3 ,RELL)
72.75
VOLUMEN POR CORTE (TONS. PROD.)
247.34
NMERO DE TALADROS /CORTE
140
VOLUMEN POR TAL. DESQUINCHE (RELL.)
0.86
NMERO DE TALADROS /RELLENO
0
TOTAL DE TALDS. CORTE Y RELLENO
140
TALADROS / GDIA. (PERF.)
30
GDIAS./CORTE
5
TON/GDIA. (LIMPIEZA)
20
GDIAS EN LIMPIEZA/CORTE
12
GDIAS. EN RELLENO (EXTENDER RELLENO)
0
TOTAL GDIAS EN LIM. Y RELL.
12
FACTOR DE POTENCIA MINERAL
0.6
FACTOR DE POTENCIA DESMONTE
0
TC=
3.40
MANO DE OBRA
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
ENMADERADOR
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
MTS.
MTS.
MTS.
0.500 MTS 2
FT
2.40 MTS
FT
2.08 MTS
TON / MT 3
TON / MT 3
TONELADA
MTS 3
TONELADAS
TALADS.
MTS3 / TALADRO
TALADS.
TALADS.
TALADROS/GDIA.
GUARDIAS
TONS./GDIA.
GUARDIAS
GUARDIAS
GUARDIAS
KG / TON
KG / TON
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
52.767
42.795
42.795
CANTIDAD
0.867
5.000
5.000
12.000
12.000
2.000
2.000
0.867
COSTO TOTAL
53.95
271.39
246.46
633.21
513.54
105.53
85.59
37.09
1,946.75
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
1,120.00
148.40
399.00
140.00
43.00
140.00
TOTAL MATERIALES
457.28
791.28
105.14
41.36
44.43
62.93
1,502.42
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
7.000
0
16
2.08
152.94
581.44
294.41
TOTAL OTROS
1,028.80
TOTAL
4,477.97
GASTOS GENERALES
21.66%
970.15
UTILIDADES
10.00%
447.80
5,895.91
23.84 SOLES/TON.
7.01 US $ / TON.
* - TRABAJOS EN TOLVA CAMINO SE VALORIZAR COMO TRABAJOS ADICIONALES
Partida Nro
13
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO >0.60 MTS. (SIN LIMPIEZA)
PARAMETROS PRINCIPALES
TIPO DE RELLENO
TIPO DE ROCA
ANCHO DE VETA
ANCHO DE LABOR
EQUIPO DE LIMPIEZA
LONGITUD DE TAJEO
MALLA DE PERFORACIN
LONGITUD DE TALADROS
RENDIM. DE AVANCE (60 GRAD.)
DENSIDAD IN SITU MINERAL TAJEADO
DENSIDAD IN SITU DESMONTE
TONELADA POR TALADRO
VOLUMEN POR CORTE (MTS 3 ,RELL)
VOLUMEN POR CORTE (TONS. PROD.)
NMERO DE TALADROS /CORTE
VOLUMEN POR TAL. DESQUINCHE (RELL.)
NMERO DE TALADROS /RELLENO
TOTAL DE TALDS. CORTE Y RELLENO
TALADROS / GDIA. (PERF.)
GDIAS./CORTE
TON/GDIA. (LIMPIEZA)
GDIAS EN LIMPIEZA/CORTE
GDIAS. EN RELLENO (EXTENDER RELLENO)
TOTAL GDIAS EN LIM. Y RELL.
FACTOR DE POTENCIA MINERAL
FACTOR DE POTENCIA DESMONTE
SOSTENIMIENTO
TC=
MANO DE OBRA
HIDRAULICO
MEDIA
0.80 MTS.
1.00 MTS.
NO HAY
35 MTS.
0.50
0.500 MTS 2
8 FT
2.40 MTS
6.93 FT
2.08 MTS
3.00 TON / MT 3
2.84 TON / MT 3
1.56 TONELADA
72.75 MTS 3
218.24 TONELADAS
140 TALADS.
0.86 MTS3 / TALADRO
0 TALADS.
140 TALADS.
15 TALADROS/GDIA.
10 GUARDIAS
20 TONS./GDIA.
11 GUARDIAS
0 GUARDIAS
0 GUARDIAS
0.6 KG / TON
0 KG / TON
PUNTALES DE SEGURIDAD
3.40 SOLES/US$
UNIDAD
CAPATAZ
(20/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
ENMADERADOR
PEON
BODEGUERO (20/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
PRECIO
62.246
54.277
49.291
52.767
42.795
52.767
42.795
42.795
CANTIDAD
1.333
5.000
5.000
0.000
0.000
0.000
0.000
1.333
COSTO TOTAL
82.99
271.39
246.46
57.06
657.90
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
1,120.00
130.94
399.00
140.00
43.00
140.00
TOTAL MATERIALES
457.28
698.19
105.14
41.36
44.43
62.93
1,409.33
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
7.000
0
21
2.08
152.94
763.14
294.41
TOTAL OTROS
1,210.50
TOTAL
3,277.72
GASTOS GENERALES
21.66%
710.11
UTILIDADES
10.00%
327.77
4,315.61
19.77 SOLES/TON.
5.82 US $ / TON.
Partida Nro
14
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO >0.60 MTS. (SIN LIMPIEZA)
PARAMETROS PRINCIPALES
TIPO DE RELLENO
HIDRAULICO
TIPO DE ROCA
MEDIA
ANCHO DE VETA
0.80
ANCHO DE LABOR
1.00
EQUIPO DE LIMPIEZA
WINCHE DE ARRASTRE
LONGITUD DE TAJEO
35
MALLA DE PERFORACIN
0.50
LONGITUD DE TALADROS
8
RENDIM. DE AVANCE (60 GRAD.)
6.93
DENSIDAD IN SITU MINERAL TAJEADO
3.00
DENSIDAD IN SITU DESMONTE
2.84
TONELADA POR TALADRO
1.56
VOLUMEN POR CORTE (MTS 3 ,RELL)
72.75
VOLUMEN POR CORTE (TONS. PROD.)
218.24
NMERO DE TALADROS /CORTE
140
VOLUMEN POR TAL. DESQUINCHE (RELL.)
0.86
NMERO DE TALADROS /RELLENO
0
TOTAL DE TALDS. CORTE Y RELLENO
140
TALADROS / GDIA. (PERF.)
15
GDIAS./CORTE
10
TON/GDIA. (LIMPIEZA)
20
GDIAS EN LIMPIEZA/CORTE
11
GDIAS. EN RELLENO (EXTENDER RELLENO)
0
TOTAL GDIAS EN LIM. Y RELL.
0
FACTOR DE POTENCIA MINERAL
0.45
FACTOR DE POTENCIA DESMONTE
0
SOSTENIMIENTO
PERNOS DE ROCA
TC=
3.40
MANO DE OBRA
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
ENMADERADOR
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
MTS.
MTS.
MTS.
0.500 MTS 2
FT
2.40 MTS
FT
2.08 MTS
TON / MT 3
TON / MT 3
TONELADA
MTS 3
TONELADAS
TALADS.
MTS3 / TALADRO
TALADS.
TALADS.
TALADROS/GDIA.
GUARDIAS
TONS./GDIA.
GUARDIAS
GUARDIAS
GUARDIAS
KG / TON
KG / TON
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
52.767
42.795
42.795
CANTIDAD
0.867
5.000
5.000
0.000
0.000
0.000
0.000
0.867
COSTO TOTAL
53.95
271.39
246.46
37.09
608.88
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
1,120.00
98.21
399.00
140.00
43.00
140.00
TOTAL MATERIALES
457.28
523.64
105.14
41.36
44.43
62.93
1,234.78
OTROS
PERNOS DE SOSTENIMIENTO
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
6.464
13.337
36.340
141.544
11.548
0
21
2.08
74.65
763.14
294.41
TOTAL OTROS
1,132.20
TOTAL
2,975.86
GASTOS GENERALES
21.66%
644.72
UTILIDADES
10.00%
297.59
3,918.16
17.95 SOLES/TON.
5.28 US $ / TON.
Partida Nro
15
COLOCACIN DE PUNTALES DE SEGURIDAD
PARAMETROS PRINCIPALES
NMERO DE PUNTALES COLOCADOS /GDIA.
TIPO DE ROCA
DENSIDAD IN SITU
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
ENMADERADOR
AYUDANTE DE ENMADERADOR
PEON
TUBERO CARRILANO
BODEGUERO
6
MEDIA
2.84 TON / MT 3
3.40 SOLES/US$
UNIDAD
PRECIO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TOTAL
62.246
54.277
49.291
52.767
42.795
42.795
52.767
42.795
CANTIDAD
0.067
0.000
0.000
1.000
1.000
0.667
0.000
0.067
COSTO TOTAL
4.15
0.00
0.00
52.77
42.80
28.53
0.00
2.85
131.10
GASTOS GENERALES
21.66%
28.40
UTILIDADES
10.00%
13.11
TOTAL
172.61
28.77 SOLES/PUNTAL
8.46 US $ / PUNTAL
Partida Nro
16
COLOCACIN DE PUNTALES CORONA O ALZA Y FORRADO DE CORONA
PARAMETROS PRINCIPALES
NMERO DE PUNTALES COLOCADOS /GDIA.
TIPO DE ROCA
DENSIDAD IN SITU
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
ENMADERADOR
AYUDANTE DE ENMADERADOR
PEON
TUBERO CARRILANO
BODEGUERO
4
MEDIA
2.84 TON / MT 3
3.40 SOLES/US$
UNIDAD
PRECIO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TOTAL
62.246
54.277
49.291
52.767
42.795
42.795
52.767
42.795
CANTIDAD
0.067
0.000
0.000
1.000
1.000
1.000
0.000
0.067
COSTO TOTAL
4.15
0.00
0.00
52.77
42.80
42.80
0.00
2.85
145.36
GASTOS GENERALES
21.66%
31.49
UTILIDADES
10.00%
14.54
TOTAL
191.39
47.85 SOLES/PUNTAL
14.07 US $ / PUNTAL
Partida Nro
17
ARMADO DE CUADRO COMPLETO ( 3 ELEMENTOS )
PARAMETROS PRINCIPALES
NMERO DE CUADROS /GDIA.
TIPO DE ROCA
DENSIDAD IN SITU
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
ENMADERADOR
AYUDANTE DE ENMADERADOR
PEON
TUBERO CARRILANO
BODEGUERO
1 CUADRO/GUARDIA
MEDIA
2.84 TON / MT 3
3.40 SOLES/US$
UNIDAD
PRECIO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TOTAL
62.246
54.277
49.291
52.767
42.795
42.795
52.767
42.795
CANTIDAD
0.067
0.000
0.000
1.000
1.000
1.000
0.000
0.067
COSTO TOTAL
4.15
0.00
0.00
52.77
42.80
42.80
0.00
2.85
145.36
GASTOS GENERALES
21.66%
31.49
UTILIDADES
10.00%
14.54
TOTAL
191.39
191.39 SOLES/CUADRO
56.29 US $ / CUADRO
Partida Nro
18
ARMADO DE CUADROS DE MADERA COJO ( 2 ELEMENTOS )
PARAMETROS PRINCIPALES
NMERO DE CUADROS /GDIA.
TIPO DE ROCA
DENSIDAD IN SITU
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
ENMADERADOR
AYUDANTE DE ENMADERADOR
PEON
TUBERO CARRILANO
BODEGUERO
1.5 CUADRO/GUARDIA
MEDIA
2.84 TON / MT 3
3.40 SOLES/US$
UNIDAD
PRECIO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TOTAL
62.246
54.277
49.291
52.767
42.795
42.795
52.767
42.795
CANTIDAD
0.067
0.000
0.000
1.000
1.000
0.500
0.000
0.067
COSTO TOTAL
4.15
0.00
0.00
52.77
42.80
21.40
0.00
2.85
123.96
GASTOS GENERALES
21.66%
26.86
UTILIDADES
10.00%
12.40
TOTAL
163.22
Partida Nro
19
ARMADO DE BUZONES
PARAMETROS PRINCIPALES
NMERO DE BUZONES /GDIA.
TIPO DE ROCA
DENSIDAD IN SITU
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
ENMADERADOR
AYUDANTE DE ENMADERADOR
PEON
TUBERO CARRILANO
BODEGUERO
1 BUZON/GUARDIA
MEDIA
2.84 TON / MT 3
3.40 SOLES/US$
UNIDAD
PRECIO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TOTAL
62.246
54.277
49.291
52.767
42.795
42.795
52.767
42.795
CANTIDAD
0.200
0.000
0.000
3.000
3.000
3.000
0.000
0.200
COSTO TOTAL
12.45
0.00
0.00
158.30
128.39
128.39
0.00
8.56
436.08
GASTOS GENERALES
21.66%
94.48
UTILIDADES
10.00%
43.61
TOTAL
574.17
Partida Nro
20
ARMADO DE BUZONES COLGANTES
PARAMETROS PRINCIPALES
NMERO DE BUZONES /GDIA.
TIPO DE ROCA
DENSIDAD IN SITU
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
ENMADERADOR
AYUDANTE DE ENMADERADOR
PEON
TUBERO CARRILANO
BODEGUERO
1 CUADRO/GUARDIA
MEDIA
2.84 TON / MT 3
3.40 SOLES/US$
UNIDAD
PRECIO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TOTAL
62.246
54.277
49.291
52.767
42.795
42.795
52.767
42.795
CANTIDAD
0.133
0.000
0.000
2.000
2.000
2.000
0.000
0.133
COSTO TOTAL
8.30
0.00
0.00
105.53
85.59
85.59
0.00
5.71
290.72
GASTOS GENERALES
21.66%
62.98
UTILIDADES
10.00%
29.07
TOTAL
382.78
Partida Nro
21
ARMADO DE CRIBING EN TAJOS
PARAMETROS PRINCIPALES
NMERO DE CRIBING /GDIA.
TIPO DE ROCA
DENSIDAD IN SITU
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
ENMADERADOR
AYUDANTE DE ENMADERADOR
PEON
TUBERO CARRILANO
BODEGUERO
20 ANILLOS/GUARDIA
MEDIA
2.84 TON / MT 3
3.40 SOLES/US$
UNIDAD
PRECIO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TOTAL
62.246
54.277
49.291
52.767
42.795
42.795
52.767
42.795
CANTIDAD
0.000
0.000
0.000
1.000
1.000
4.000
0.000
0.000
COSTO TOTAL
0.00
0.00
0.00
52.77
42.80
171.18
0.00
0.00
266.74
GASTOS GENERALES
21.66%
57.79
UTILIDADES
10.00%
26.67
TOTAL
351.21
Partida Nro
22
COLOCACIN DE PERNOS DE SOSTENIMIENTO
PARAMETROS PRINCIPALES
LONGITUD DE PERNOS
RENDIMIENTO
TIPO DE ROCA
DENSIDAD IN SITU
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
ENMADERADOR
AYUDANTE DE ENMADERADOR
PEON
TUBERO CARRILANO
BODEGUERO
5
25
MEDIA
2.84
3.40
UNIDAD
PIES
PERNOS / GUARDIA
TON / MT 3
SOLES/US$
PRECIO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
25
62.246
54.277
49.291
52.767
42.795
42.795
52.767
42.795
CANTIDAD
0.067
1.000
1.000
0.000
0.000
0.000
0.000
0.067
TOTAL
COSTO TOTAL
4.15
54.28
49.29
0.00
0.00
0.00
0.00
2.85
110.57
OTROS
PERFORACIN
PIES
0.408
TOTAL
125
51.04
161.61
GASTOS GENERALES
21.66%
35.01
UTILIDADES
10.00%
16.16
TOTAL
212.78
Partida Nro
23
COLOCACIN DE PERNOS Y MALLA ELECTROSOLDADA DE SOSTENIMIENTO
RENDIMIENTO
1
20
MEDIA
2.84
3.40
TIPO DE ROCA
DENSIDAD IN SITU
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
ENMADERADOR
AYUDANTE DE ENMADERADOR
PEON
TUBERO CARRILANO
BODEGUERO
UNIDAD
PRECIO
CANTIDAD
COSTO TOTAL
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
62.246
54.277
49.291
52.767
42.795
42.795
52.767
42.795
0.067
1.000
1.000
0.000
0.000
1.000
0.000
0.067
4.15
54.28
49.29
0.00
0.00
42.80
0.00
2.85
PIES
0.408
100
40.83
OTROS
PERFORACIN
TOTAL
194.19
GASTOS GENERALES
21.66%
42.07
UTILIDADES
10.00%
19.42
TOTAL
COSTO POR PERNO INSTALADO
255.69
12.78 SOLES/ PERNO
3.76 US $ / PERNO
Partida Nro
24
CARGA Y DESCARGA DE CARROS V40
PARAMETROS PRINCIPALES
RENDIMIENTO (8 CARROS/HORA(35 MIN.)) (60%)
TON. / CARRO
DENSIDAD IN SITU MINERAL
DENSIDAD IN SITU DESMONTE
TC =
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
MOTORISTA
AYUDANTE DE MOTORISTA
PEON
TUBERO CARRILANO
BODEGUERO
135
1.5
3.00
2.84
3.40
UNIDAD
TONS. / GUARDIA
TON / CARRO
TON / MT 3
TON / MT 3
SOLES/US$
PRECIO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
CANTIDAD
62.246
54.277
49.291
52.767
47.781
42.795
52.767
42.795
TOTAL
0.067
0.000
0.000
1.000
1.000
0.000
0.000
0.067
COSTO TOTAL
4.15
0.00
0.00
52.77
47.78
0.00
0.00
2.85
107.55
GASTOS GENERALES
21.66%
23.30
UTILIDADES
10.00%
10.76
TOTAL
141.61
SOLES/ TONELADA
US $ / TONELADA
Partida Nro
25
CARGA Y DESCARGA DE CARROS GRAMBY DE 120 Y 84 PIES CUB.
PARAMETROS PRINCIPALES
RENDIMIENTO (20 CARROS/HORA(45 MIN.)) (75%
TON. / CARRO
DENSIDAD IN SITU MINERAL
DENSIDAD IN SITU DESMONTE
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
MOTORISTA
AYUDANTE DE MOTORISTA
PEON
TUBERO CARRILANO
BODEGUERO
240
4.2
3.00
2.84
3.40
UNIDAD
TONS. / GUARDIA
TON / CARRO
TON / MT 3
TON / MT 3
SOLES/US$
PRECIO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TOTAL
62.246
54.277
49.291
52.767
47.781
42.795
52.767
42.795
CANTIDAD
0.067
0.000
0.000
1.000
1.000
0.000
0.000
0.067
COSTO TOTAL
4.15
0.00
0.00
52.77
47.78
0.00
0.00
2.85
107.55
GASTOS GENERALES
21.66%
23.30
UTILIDADES
10.00%
10.76
TOTAL
141.61
Partida Nro
26
ACARREO CON LOCOMOTORA , POR KILOMETRO Nv. 220
PARAMETROS PRINCIPALES
DISTANCIA ACARREO
VELOC. PROMEDIO
TIEMPO DE IDA Y VUELTA
UTILIZACIN DE LA GUARDIA ( 75 % )
VIAJES / GUARDIA
TON. / CARRO
CARROS POR VIAJE
TONELADAS / VIAJE
TONELADAS / GUARDIA
DENSIDAD IN SITU MINERAL
DENSIDAD IN SITU DESMONTE
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
MOTORISTA
AYUDANTE DE MOTORISTA
PEON
TUBERO CARRILANO
BODEGUERO
1.00
4.5
0.444
5
11.25
4.2
5
21
236.25
3.00
2.84
3.40
UNIDAD
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TOTAL
KM.
1,000 METROS
KM / HORA
HORAS
HORAS / GUARDIA
VIAJES / GUARDIA
TON / CARRO
CARROS
TONELADAS
TONELADAS GUARDIA
TON / MT 3
TON / MT 3
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
47.781
42.795
52.767
42.795
CANTIDAD
0.067
0.000
0.000
1.000
1.000
0.000
0.000
0.067
COSTO TOTAL
4.15
0.00
0.00
52.77
47.78
0.00
0.00
2.85
107.55
GASTOS GENERALES
21.66%
23.30
UTILIDADES
10.00%
10.76
TOTAL
141.61
Partida Nro
27
ACARREO CON LOCOMOTORA , POR KILOMETRO
PARAMETROS PRINCIPALES
DISTANCIA ACARREO
VELOC. PROMEDIO
TIEMPO DE IDA Y VUELTA
UTILIZACIN DE LA GUARDIA ( 75 % )
VIAJES / GUARDIA
TON. / CARRO
CARROS POR VIAJE
TONELADAS / VIAJE
TONELADAS / GUARDIA
DENSIDAD IN SITU MINERAL
DENSIDAD IN SITU DESMONTE
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
MOTORISTA
AYUDANTE DE MOTORISTA
PEON
TUBERO CARRILANO
BODEGUERO
1.00
4.5
0.444
5
11.25
1.5
5
7.5
84.375
3.00
2.84
3.40
UNIDAD
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TOTAL
KM.
1,000 METROS
KM / HORA
HORAS
HORAS / GUARDIA
VIAJES / GUARDIA
TON / CARRO
CARROS
TONELADAS
TONELADAS GUARDIA
TON / MT 3
TON / MT 3
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
47.781
42.795
52.767
42.795
CANTIDAD
0.067
0.000
0.000
1.000
1.000
0.000
0.000
0.067
COSTO TOTAL
4.15
0.00
0.00
52.77
47.78
0.00
0.00
2.85
107.55
GASTOS GENERALES
21.66%
23.30
UTILIDADES
10.00%
10.76
TOTAL
141.61
Partida Nro
28
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO <0.60 MTS.
PARAMETROS PRINCIPALES
TIPO DE RELLENO
CONVENCIONAL
TIPO DE ROCA
MEDIA
ANCHO DE VETA
0.50
ANCHO DE LABOR
0.70
EQUIPO DE LIMPIEZA
WINCHE DE ARRASTRE
LONGITUD DE TAJEO
35
MALLA DE PERFORACIN
0.35
LONGITUD DE TALADROS
8
RENDIM. DE AVANCE (60 GRAD.)
6.93
DENSIDAD IN SITU MINERAL TAJEADO
3.00
DENSIDAD IN SITU DESMONTE
2.84
TONELADA POR TALADRO
0.76
VOLUMEN POR CORTE (MTS 3 ,RELL)
50.92
VOLUMEN POR CORTE (TONS. PROD.)
152.77
NMERO DE TALADROS /CORTE
200
VOLUMEN POR TAL. DESQUINCHE (RELL.)
0.86
NMERO DE TALADROS /RELLENO
60
TOTAL DE TALDS. CORTE Y RELLENO
260
TALADROS / GDIA. (PERF.)
30
GDIAS./CORTE
8
TON/GDIA. (LIMPIEZA)
20
GDIAS EN LIMPIEZA/CORTE
8
GDIAS. EN RELLENO (EXTENDER RELLENO)
0
TOTAL GDIAS EN LIM. Y RELL.
8
FACTOR DE POTENCIA MINERAL
0.60
FACTOR DE POTENCIA DESMONTE
0.30
TC=
3.40
MANO DE OBRA
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
1.000
MTS.
MTS.
MTS.
0.350 MTS 2
FT
2.40 MTS
FT
2.08 MTS
TON / MT 3
TON / MT 3
TONELADA
MTS 3
TONELADAS
TALADS.
MTS3 / TALADRO
TALADS.
TALADS.
TALADROS/GDIA.
GUARDIAS
TONS./GDIA.
GUARDIAS
GUARDIAS
GUARDIAS
KG / TON
KG / TON
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.867
8.000
8.000
8.000
8.000
1.000
0.867
0.748245949
COSTO TOTAL
53.95
434.22
394.33
422.14
342.36
42.80
37.09
1,726.88
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
2,080.00
135.05
741.00
260.00
70.00
260.00
TOTAL MATERIALES
849.23
720.06
195.25
76.81
72.33
116.87
2,030.56
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.000
0.000
0.000
0.00
0.00
-
TOTAL
3,757.44
GASTOS GENERALES
21.66%
814.04
UTILIDADES
10.00%
375.74
4,947.23
32.38 SOLES/TON.
0.0525
9.52 US $ / TON.
TRABAJOS EN TOLVA CAMINO, SOSTENIMIENTO, CHS. DE ARRANQUE Y OTROS SE VALORIZAR COMO TRABAJOS ADICIONALES
Partida Nro
29
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO >0.60 MTS.
PARAMETROS PRINCIPALES
TIPO DE RELLENO
CONVENCIONAL
TIPO DE ROCA
MEDIA
ANCHO DE VETA
0.80
ANCHO DE LABOR
1.00
EQUIPO DE LIMPIEZA
WINCHE DE ARRASTRE
LONGITUD DE TAJEO
35
MALLA DE PERFORACIN
0.50
LONGITUD DE TALADROS
8
RENDIM. DE AVANCE (60 GRAD.)
6.93
DENSIDAD IN SITU MINERAL TAJEADO
3.40
DENSIDAD IN SITU DESMONTE
2.84
TONELADA POR TALADRO
1.77
VOLUMEN POR CORTE (MTS 3 ,RELL)
72.75
VOLUMEN POR CORTE (TONS. PROD.)
247.34
NMERO DE TALADROS /CORTE
140
VOLUMEN POR TAL. DESQUINCHE (RELL.)
0.86
NMERO DE TALADROS /RELLENO
85
TOTAL DE TALDS. CORTE Y RELLENO
225
TALADROS / GDIA. (PERF.)
30
GDIAS./CORTE
8
TON/GDIA. (LIMPIEZA)
20
GDIAS EN LIMPIEZA/CORTE
12
GDIAS. EN RELLENO (EXTENDER RELLENO)
0
TOTAL GDIAS EN LIM. Y RELL.
12
FACTOR DE POTENCIA MINERAL
0.6
FACTOR DE POTENCIA DESMONTE
0.35
TC=
3.40
MANO DE OBRA
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
1.000
MTS.
MTS.
MTS.
0.500 MTS 2
FT
2.40 MTS
FT
2.08 MTS
TON / MT 3
TON / MT 3
TONELADA
MTS 3
TONELADAS
TALADS.
MTS3 / TALADRO
TALADS.
TALADS.
TALADROS/GDIA.
GUARDIAS
TONS./GDIA.
GUARDIAS
GUARDIAS
GUARDIAS
KG / TON
KG / TON
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.867
8.000
8.000
12.000
12.000
1.000
0.867
41.867
COSTO TOTAL
53.95
434.22
394.33
633.21
513.54
42.80
37.09
2,109.13
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
1,800.00
220.71
641.25
225.00
70.00
225.00
TOTAL MATERIALES
734.91
1,176.84
168.97
66.47
72.33
101.14
2,320.66
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.000
0
0
0.00
0.00
-
TOTAL
4,429.79
GASTOS GENERALES
21.66%
959.71
UTILIDADES
10.00%
442.98
5,832.47
SOLES/TON.
23.58
US $ / TON.
TRABAJOS EN TOLVA CAMINO SE VALORIZAR COMO TRABAJOS ADICIONALES
6.94
Partida Nro
30
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO >0.60 MTS.
PARAMETROS PRINCIPALES
TIPO DE RELLENO
HIDRAULICO
TIPO DE ROCA
MEDIA
ANCHO DE VETA
0.80
ANCHO DE LABOR
1.00
EQUIPO DE LIMPIEZA
WINCHE DE ARRASTRE
LONGITUD DE TAJEO
35
MALLA DE PERFORACIN
0.50
LONGITUD DE TALADROS
8
RENDIM. DE AVANCE (60 GRAD.)
6.93
DENSIDAD IN SITU MINERAL TAJEADO
3.40
DENSIDAD IN SITU DESMONTE
2.84
TONELADA POR TALADRO
1.77
VOLUMEN POR CORTE (MTS 3 ,RELL)
72.75
VOLUMEN POR CORTE (TONS. PROD.)
247.34
NMERO DE TALADROS /CORTE
140
VOLUMEN POR TAL. DESQUINCHE (RELL.)
0.86
NMERO DE TALADROS /RELLENO
0
TOTAL DE TALDS. CORTE Y RELLENO
140
TALADROS / GDIA. (PERF.)
30
GDIAS./CORTE
5
TON/GDIA. (LIMPIEZA)
20
GDIAS EN LIMPIEZA/CORTE
12
GDIAS. EN RELLENO (EXTENDER RELLENO)
0
TOTAL GDIAS EN LIM. Y RELL.
12
FACTOR DE POTENCIA MINERAL
0.6
FACTOR DE POTENCIA DESMONTE
0
TC=
3.40
MANO DE OBRA
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
ENMADERADOR
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
MTS.
MTS.
MTS.
0.500 MTS 2
FT
2.40 MTS
FT
2.08 MTS
TON / MT 3
TON / MT 3
TONELADA
MTS 3
TONELADAS
TALADS.
MTS3 / TALADRO
TALADS.
TALADS.
TALADROS/GDIA.
GUARDIAS
TONS./GDIA.
GUARDIAS
GUARDIAS
GUARDIAS
KG / TON
KG / TON
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
52.767
42.795
42.795
CANTIDAD
0.867
5.000
5.000
12.000
12.000
2.000
2.000
0.867
COSTO TOTAL
53.95
271.39
246.46
633.21
513.54
105.53
85.59
37.09
1,946.75
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
1,120.00
148.40
399.00
140.00
43.00
140.00
TOTAL MATERIALES
457.28
791.28
105.14
41.36
44.43
62.93
1,502.42
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.000
0
0
0.00
0.00
-
TOTAL
3,449.17
GASTOS GENERALES
21.66%
747.26
UTILIDADES
10.00%
344.92
4,541.35
18.36 SOLES/TON.
5.40 US $ / TON.
* - TRABAJOS EN TOLVA CAMINO SE VALORIZAR COMO TRABAJOS ADICIONALES
Partida Nro
31
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO <0.60 MTS.
SLO RELLENO (CONVENCIONAL) DE TAJOS, SIN LIMPIEZA ,NO INCLUYE ROTURA DE MINERAL
PARAMETROS PRINCIPALES
TIPO DE RELLENO
CONVENCIONAL
TIPO DE ROCA
MEDIA
ANCHO DE VETA
0.50
ANCHO DE LABOR
0.70
EQUIPO DE LIMPIEZA
WINCHE DE ARRASTRE
LONGITUD DE TAJEO
35
MALLA DE PERFORACIN
0.35
LONGITUD DE TALADROS
8
RENDIM. DE AVANCE (60 GRAD.)
6.93
DENSIDAD IN SITU MINERAL TAJEADO
3.00
DENSIDAD IN SITU DESMONTE
2.84
TONELADA POR TALADRO
0.76
VOLUMEN POR CORTE (MTS 3 ,RELL)
50.92
VOLUMEN POR CORTE (TONS. PROD.)
152.77
NMERO DE TALADROS /CORTE
0
VOLUMEN POR TAL. DESQUINCHE (RELL.)
0.86
NMERO DE TALADROS /RELLENO
60
TOTAL DE TALDS. CORTE Y RELLENO
60
TALADROS / GDIA. (PERF.)
30
GDIAS./CORTE
2
TON/GDIA. (LIMPIEZA)
20
GDIAS EN LIMPIEZA/CORTE
8
GDIAS. EN RELLENO (EXTENDER RELLENO)
0
TOTAL GDIAS EN LIM. Y RELL.
8
FACTOR DE POTENCIA MINERAL
0.60
FACTOR DE POTENCIA DESMONTE
0.30
TC=
3.40
MANO DE OBRA
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
1.000
MTS.
MTS.
MTS.
0.35 MTS 2
FT
2.40 MTS
FT
2.08 MTS
TON / MT 3
TON / MT 3
TONELADA
MTS 3
TONELADAS
TALADS.
MTS3 / TALADRO
TALADS.
TALADS.
TALADROS/GDIA.
GUARDIAS
TONS./GDIA.
GUARDIAS
GUARDIAS
GUARDIAS
KG / TON
KG / TON
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.867
2.000
2.000
1.000
1.000
1.000
0.867
0.748245949
COSTO TOTAL
53.95
108.55
98.58
52.77
42.80
42.80
37.09
436.53
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
480.00
43.39
171.00
60.00
70.00
60.00
TOTAL MATERIALES
195.98
231.33
45.06
17.73
72.33
26.97
589.40
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.000
0.000
0.000
0.000
TOTAL
1,025.93
GASTOS GENERALES
21.66%
222.27
UTILIDADES
10.00%
102.59
1,350.79
8.84 SOLES/TON.
2.60 US $ / TON.
TRABAJOS EN TOLVA CAMINO SE VALORIZAR COMO TRABAJOS ADICIONALES
TRABAJOS EN MADERA Y SOSTENIMIENTO SE VALORIZAR COMO TRABAJOS ADICIONALES
TRABAJOS DE CHIM. DE ARRANQUE SE VALORIZAR COMO TRABAJOS ADICIONALES
Partida Nro
32
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO >0.60 MTS.
SLO RELLENO (CONVENCIONAL) DE TAJOS, SIN LIMPIEZA ,NO INCLUYE ROTURA DE MINERAL
PARAMETROS PRINCIPALES
TIPO DE RELLENO
CONVENCIONAL
TIPO DE ROCA
MEDIA
ANCHO DE VETA
0.80
ANCHO DE LABOR
1.00
EQUIPO DE LIMPIEZA
WINCHE DE ARRASTRE
LONGITUD DE TAJEO
35
MALLA DE PERFORACIN
0.50
LONGITUD DE TALADROS
8
RENDIM. DE AVANCE (60 GRAD.)
6.93
DENSIDAD IN SITU MINERAL TAJEADO
3.40
DENSIDAD IN SITU DESMONTE
2.84
TONELADA POR TALADRO
1.77
VOLUMEN POR CORTE (MTS 3 ,RELL)
72.75
VOLUMEN POR CORTE (TONS. PROD.)
247.34
NMERO DE TALADROS /CORTE
0
VOLUMEN POR TAL. DESQUINCHE (RELL.)
0.86
NMERO DE TALADROS /RELLENO
85
TOTAL DE TALDS. CORTE Y RELLENO
85
TALADROS / GDIA. (PERF.)
30
GDIAS./CORTE
3
TON/GDIA. (LIMPIEZA)
20
GDIAS EN LIMPIEZA/CORTE
12
GDIAS. EN RELLENO (EXTENDER RELLENO)
0
TOTAL GDIAS EN LIM. Y RELL.
12
FACTOR DE POTENCIA MINERAL
0.6
FACTOR DE POTENCIA DESMONTE
0.35
TC=
3.40
MANO DE OBRA
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
1.000
MTS.
MTS.
MTS.
0.50 MTS 2
FT
2.40 MTS
FT
2.08 MTS
TON / MT 3
TON / MT 3
TONELADA
MTS 3
TONELADAS
TALADS.
MTS3 / TALADRO
TALADS.
TALADS.
TALADROS/GDIA.
GUARDIAS
TONS./GDIA.
GUARDIAS
GUARDIAS
GUARDIAS
KG / TON
KG / TON
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.867
3.000
3.000
1.000
1.000
1.000
0.867
COSTO TOTAL
53.95
162.83
147.87
52.77
42.80
42.80
37.09
540.10
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
680.00
72.31
242.25
85.00
70.00
85.00
TOTAL MATERIALES
277.63
385.56
63.83
25.11
72.33
38.21
862.67
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.000
0.000
0.000
0.000
TOTAL
1,402.77
GASTOS GENERALES
21.66%
303.91
UTILIDADES
10.00%
140.28
1,846.96
7.47 SOLES/TON.
2.20 US $ / TON.
TRABAJOS EN TOLVA CAMINO SE VALORIZAR COMO TRABAJOS ADICIONALES
TRABAJOS EN MADERA Y SOSTENIMIENTO SE VALORIZAR COMO TRABAJOS ADICIONALES
TRABAJOS DE CHIM. DE ARRANQUE SE VALORIZAR COMO TRABAJOS ADICIONALES
Partida Nro
33
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO <0.60 MTS.
SOLO LIMPIEZA DE MINERAL NO INCLUYE CORTE NI RELLENO
PARAMETROS PRINCIPALES
TIPO DE RELLENO
TIPO DE ROCA
ANCHO DE VETA
ANCHO DE LABOR
EQUIPO DE LIMPIEZA
LONGITUD DE TAJEO
MALLA DE PERFORACIN
LONGITUD DE TALADROS
RENDIM. DE AVANCE (60 GRAD.)
DENSIDAD IN SITU MINERAL TAJEADO
DENSIDAD IN SITU DESMONTE
TONELADA POR TALADRO
VOLUMEN POR CORTE (MTS 3 ,RELL)
VOLUMEN POR CORTE (TONS. PROD.)
NMERO DE TALADROS /CORTE
VOLUMEN POR TAL. DESQUINCHE (RELL.)
NMERO DE TALADROS /RELLENO
TOTAL DE TALDS. CORTE Y RELLENO
TALADROS / GDIA. (PERF.)
GDIAS./CORTE
TON/GDIA. (LIMPIEZA)
GDIAS EN LIMPIEZA/CORTE
GDIAS. EN RELLENO (EXTENDER RELLENO)
TOTAL GDIAS EN LIM. Y RELL.
FACTOR DE POTENCIA MINERAL
FACTOR DE POTENCIA DESMONTE
TC=
MANO DE OBRA
CONVENCIONAL
1.000
MEDIA
0.50 MTS.
0.70 MTS.
WINCHE DE ARRASTRE
35 MTS.
0.35
0.35 MTS 2
8 FT
2.40 MTS
6.93 FT
2.08 MTS
3.00 TON / MT 3
2.84 TON / MT 3
0.76 TONELADA
50.92 MTS 3
152.77 TONELADAS
200 TALADS.
0.86 MTS3 / TALADRO
60 TALADS.
260 TALADS.
30 TALADROS/GDIA.
8 GUARDIAS
20 TONS./GDIA.
8 GUARDIAS
0 GUARDIAS
8 GUARDIAS
0.60 KG / TON
0.30 KG / TON
3.40 SOLES/US$
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.000
0.000
0.000
8.000
8.000
0.000
0.000
0.748245949
COSTO TOTAL
422.14
342.36
764.50
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL MATERIALES
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.000
0.000
0.000
0.000
TOTAL
764.50
GASTOS GENERALES
21.66%
165.63
UTILIDADES
10.00%
76.45
1,006.58
6.59 SOLES/TON.
1.94 US $ / TON.
TRABAJOS EN TOLVA CAMINO SE VALORIZAR COMO TRABAJOS ADICIONALES
TRABAJOS EN MADERA Y SOSTENIMIENTO SE VALORIZAR COMO TRABAJOS ADICIONALES
Partida Nro
34
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO >0.60 MTS.
SOLO LIMPIEZA DE MINERAL NO INCLUYE CORTE NI RELLENO
PARAMETROS PRINCIPALES
TIPO DE RELLENO
TIPO DE ROCA
ANCHO DE VETA
ANCHO DE LABOR
EQUIPO DE LIMPIEZA
LONGITUD DE TAJEO
MALLA DE PERFORACIN
LONGITUD DE TALADROS
RENDIM. DE AVANCE (60 GRAD.)
DENSIDAD IN SITU MINERAL TAJEADO
DENSIDAD IN SITU DESMONTE
TONELADA POR TALADRO
VOLUMEN POR CORTE (MTS 3 ,RELL)
VOLUMEN POR CORTE (TONS. PROD.)
NMERO DE TALADROS /CORTE
VOLUMEN POR TAL. DESQUINCHE (RELL.)
NMERO DE TALADROS /RELLENO
TOTAL DE TALDS. CORTE Y RELLENO
TALADROS / GDIA. (PERF.)
GDIAS./CORTE
TON/GDIA. (LIMPIEZA)
GDIAS EN LIMPIEZA/CORTE
GDIAS. EN RELLENO (EXTENDER RELLENO)
TOTAL GDIAS EN LIM. Y RELL.
FACTOR DE POTENCIA MINERAL
FACTOR DE POTENCIA DESMONTE
TC=
MANO DE OBRA
CONVENCIONAL
1.000
MEDIA
0.80 MTS.
1.00 MTS.
WINCHE DE ARRASTRE
35 MTS.
0.50
0.50 MTS 2
8 FT
2.40 MTS
6.93 FT
2.08 MTS
3.40 TON / MT 3
2.84 TON / MT 3
1.77 TONELADA
72.75 MTS 3
247.34 TONELADAS
140 TALADS.
0.86 MTS3 / TALADRO
85 TALADS.
225 TALADS.
30 TALADROS/GDIA.
8 GUARDIAS
20 TONS./GDIA.
12 GUARDIAS
0 GUARDIAS
12 GUARDIAS
0.60 KG / TON
0.35 KG / TON
3.40 SOLES/US$
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.000
0.000
0.000
12.000
12.000
0.000
0.000
COSTO TOTAL
633.21
513.54
1,146.75
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL MATERIALES
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.000
0.000
0.000
0.000
TOTAL
1,146.75
GASTOS GENERALES
21.66%
248.44
UTILIDADES
10.00%
114.67
1,509.87
6.10 SOLES/TON.
1.80 US $ / TON.
TRABAJOS EN TOLVA CAMINO SE VALORIZAR COMO TRABAJOS ADICIONALES
TRABAJOS EN MADERA Y SOSTENIMIENTO SE VALORIZAR COMO TRABAJOS ADICIONALES
Partida Nro
35
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO <0.60 MTS.
SOLO LIMPIEZA DE MINERAL NO INCLUYE CORTE PERO SI RELLENO (CONVENCIONAL)
PARAMETROS PRINCIPALES
TIPO DE RELLENO
TIPO DE ROCA
ANCHO DE VETA
ANCHO DE LABOR
EQUIPO DE LIMPIEZA
LONGITUD DE TAJEO
MALLA DE PERFORACIN
LONGITUD DE TALADROS
RENDIM. DE AVANCE (60 GRAD.)
DENSIDAD IN SITU MINERAL TAJEADO
DENSIDAD IN SITU DESMONTE
TONELADA POR TALADRO
VOLUMEN POR CORTE (MTS 3 ,RELL)
VOLUMEN POR CORTE (TONS. PROD.)
NMERO DE TALADROS /CORTE
VOLUMEN POR TAL. DESQUINCHE (RELL.)
NMERO DE TALADROS /RELLENO
TOTAL DE TALDS. CORTE Y RELLENO
TALADROS / GDIA. (PERF.)
GDIAS./CORTE
TON/GDIA. (LIMPIEZA)
GDIAS EN LIMPIEZA/CORTE
GDIAS. EN RELLENO (EXTENDER RELLENO)
TOTAL GDIAS EN LIM. Y RELL.
FACTOR DE POTENCIA MINERAL
FACTOR DE POTENCIA DESMONTE
TC=
MANO DE OBRA
CONVENCIONAL
1.000
MEDIA
0.50 MTS.
0.70 MTS.
WINCHE DE ARRASTRE
35 MTS.
0.35
0.35 MTS 2
8 FT
2.40 MTS
6.93 FT
2.08 MTS
3.00 TON / MT 3
2.84 TON / MT 3
0.76 TONELADA
50.92 MTS 3
152.77 TONELADAS
0 TALADS.
0.86 MTS3 / TALADRO
60 TALADS.
60 TALADS.
30 TALADROS/GDIA.
2 GUARDIAS
20 TONS./GDIA.
8 GUARDIAS
0 GUARDIAS
8 GUARDIAS
0.60 KG / TON
0.30 KG / TON
3.40 SOLES/US$
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.867
2.000
2.000
8.000
8.000
1.000
0.867
0.748245949
COSTO TOTAL
53.95
108.55
98.58
422.14
342.36
42.80
37.09
1,105.47
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
480.00
43.39
171.00
60.00
70.00
60.00
TOTAL MATERIALES
195.98
231.33
45.06
17.73
72.33
26.97
589.40
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.000
0.000
0.000
0.000
TOTAL
1,694.86
GASTOS GENERALES
21.66%
367.19
UTILIDADES
10.00%
169.49
2,231.54
14.61 SOLES/TON.
4.30 US $ / TON.
TRABAJOS EN TOLVA CAMINO SE VALORIZAR COMO TRABAJOS ADICIONALES
TRABAJOS EN MADERA Y SOSTENIMIENTO SE VALORIZAR COMO TRABAJOS ADICIONALES
TRABAJOS DE CHIM. DE ARRANQUE SE VALORIZAR COMO TRABAJOS ADICIONALES
Partida Nro
36
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO >0.60 MTS.
SOLO LIMPIEZA DE MINERAL NO INCLUYE CORTE PERO SI RELLENO (CONVENCIONAL)
PARAMETROS PRINCIPALES
TIPO DE RELLENO
TIPO DE ROCA
ANCHO DE VETA
ANCHO DE LABOR
EQUIPO DE LIMPIEZA
LONGITUD DE TAJEO
MALLA DE PERFORACIN
LONGITUD DE TALADROS
RENDIM. DE AVANCE (60 GRAD.)
DENSIDAD IN SITU MINERAL TAJEADO
DENSIDAD IN SITU DESMONTE
TONELADA POR TALADRO
VOLUMEN POR CORTE (MTS 3 ,RELL)
VOLUMEN POR CORTE (TONS. PROD.)
NMERO DE TALADROS /CORTE
VOLUMEN POR TAL. DESQUINCHE (RELL.)
NMERO DE TALADROS /RELLENO
TOTAL DE TALDS. CORTE Y RELLENO
TALADROS / GDIA. (PERF.)
GDIAS./CORTE
TON/GDIA. (LIMPIEZA)
GDIAS EN LIMPIEZA/CORTE
GDIAS. EN RELLENO (EXTENDER RELLENO)
TOTAL GDIAS EN LIM. Y RELL.
FACTOR DE POTENCIA MINERAL
FACTOR DE POTENCIA DESMONTE
TC=
MANO DE OBRA
CONVENCIONAL
1.000
MEDIA
0.80 MTS.
1.00 MTS.
WINCHE DE ARRASTRE
35 MTS.
0.50
0.50 MTS 2
8 FT
2.40 MTS
6.93 FT
2.08 MTS
3.40 TON / MT 3
2.84 TON / MT 3
1.77 TONELADA
72.75 MTS 3
247.34 TONELADAS
0 TALADS.
0.86 MTS3 / TALADRO
85 TALADS.
85 TALADS.
30 TALADROS/GDIA.
3 GUARDIAS
20 TONS./GDIA.
12 GUARDIAS
0 GUARDIAS
12 GUARDIAS
0.60 KG / TON
0.35 KG / TON
3.40 SOLES/US$
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.867
3.000
3.000
12.000
12.000
1.000
0.867
COSTO TOTAL
53.95
162.83
147.87
633.21
513.54
42.80
37.09
1,591.29
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
680.00
72.31
242.25
85.00
70.00
85.00
TOTAL MATERIALES
277.63
385.56
63.83
25.11
72.33
38.21
862.67
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.000
0.000
0.000
0.000
TOTAL
2,453.96
GASTOS GENERALES
21.66%
531.65
UTILIDADES
10.00%
245.40
3,231.00
13.06
3.84
TRABAJOS EN TOLVA CAMINO SE VALORIZAR COMO TRABAJOS ADICIONALES
TRABAJOS EN MADERA Y SOSTENIMIENTO SE VALORIZAR COMO TRABAJOS ADICIONALES
TRABAJOS DE CHIM. DE ARRANQUE SE VALORIZAR COMO TRABAJOS ADICIONALES
Partida Nro
37
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO >0.60 MTS.
SOLO LIMPIEZA DE MINERAL NO INCLUYE CORTE PERO SI RELLENO (HIDRAULICO)
PARAMETROS PRINCIPALES
TIPO DE RELLENO
HIDRAULICO
TIPO DE ROCA
MEDIA
ANCHO DE VETA
0.80
ANCHO DE LABOR
1.00
EQUIPO DE LIMPIEZA
WINCHE DE ARRASTRE
LONGITUD DE TAJEO
35
MALLA DE PERFORACIN
0.50
LONGITUD DE TALADROS
8
RENDIM. DE AVANCE (60 GRAD.)
6.93
DENSIDAD IN SITU MINERAL TAJEADO
3.40
DENSIDAD IN SITU DESMONTE
2.84
TONELADA POR TALADRO
1.77
VOLUMEN POR CORTE (MTS 3 ,RELL)
72.75
VOLUMEN POR CORTE (TONS. PROD.)
247.34
NMERO DE TALADROS /CORTE
0
VOLUMEN POR TAL. DESQUINCHE (RELL.)
0.86
NMERO DE TALADROS /RELLENO
0
TOTAL DE TALDS. CORTE Y RELLENO
0
TALADROS / GDIA. (PERF.)
30
GDIAS./CORTE
0
TON/GDIA. (LIMPIEZA)
20
GDIAS EN LIMPIEZA/CORTE
12
GDIAS. EN RELLENO (EXTENDER RELLENO)
0
TOTAL GDIAS EN LIM. Y RELL.
12
FACTOR DE POTENCIA MINERAL
0.6
FACTOR DE POTENCIA DESMONTE
0
TC=
3.40
MANO DE OBRA
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
ENMADERADOR
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
MTS.
MTS.
MTS.
0.500 MTS 2
FT
2.40 MTS
FT
2.08 MTS
TON / MT 3
TON / MT 3
TONELADA
MTS 3
TONELADAS
TALADS.
MTS3 / TALADRO
TALADS.
TALADS.
TALADROS/GDIA.
GUARDIAS
TONS./GDIA.
GUARDIAS
GUARDIAS
GUARDIAS
KG / TON
KG / TON
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
52.767
42.795
42.795
CANTIDAD
0.867
0.000
0.000
12.000
12.000
0.000
1.000
0.867
COSTO TOTAL
53.95
633.21
513.54
42.80
37.09
1,280.58
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL MATERIALES
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.00
0.00
0.00
0.00
0.00
-
TOTAL
1,280.58
GASTOS GENERALES
21.66%
277.44
UTILIDADES
10.00%
128.06
1,686.07
6.82 SOLES/TON.
2.00 US $ / TON.
Partida Nro
38
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO <0.60 MTS.
LIMPIEZACON CARRETILLA, INCLUYE RELLENO
PARAMETROS PRINCIPALES
TIPO DE RELLENO
TIPO DE ROCA
ANCHO DE VETA
ANCHO DE LABOR
EQUIPO DE LIMPIEZA
LONGITUD DE TAJEO
MALLA DE PERFORACIN
LONGITUD DE TALADROS
RENDIM. DE AVANCE (60 GRAD.)
DENSIDAD IN SITU MINERAL TAJEADO
DENSIDAD IN SITU DESMONTE
TONELADA POR TALADRO
VOLUMEN POR CORTE (MTS 3 ,RELL)
VOLUMEN POR CORTE (TONS. PROD.)
NMERO DE TALADROS /CORTE
VOLUMEN POR TAL. DESQUINCHE (RELL.)
NMERO DE TALADROS /RELLENO
TOTAL DE TALDS. CORTE Y RELLENO
TALADROS / GDIA. (PERF.)
GDIAS./CORTE
TON/GDIA. (LIMPIEZA)
GDIAS EN LIMPIEZA/CORTE
GDIAS. EN RELLENO (EXTENDER RELLENO)
TOTAL GDIAS EN LIM. Y RELL.
FACTOR DE POTENCIA MINERAL
FACTOR DE POTENCIA DESMONTE
TC=
MANO DE OBRA
CONVENCIONAL
MEDIA
0.50
0.70
CARRETILLA
35
0.35
8
6.93
3.00
2.84
0.76
50.92
152.77
200
0.86
60
260
30
8
5
31
0
31
0.60
0.30
3.40
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
CARRERO
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
1.000
MTS.
MTS.
MTS.
0.35 MTS 2
FT
2.40 MTS
FT
2.08 MTS
TON / MT 3
TON / MT 3
TONELADA
MTS 3
TONELADAS
TALADS.
MTS3 / TALADRO
TALADS.
TALADS.
TALADROS/GDIA.
GUARDIAS
TONS./GDIA.
GUARDIAS
GUARDIAS
GUARDIAS
KG / TON
KG / TON
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
42.795
42.795
CANTIDAD
0.867
8.000
8.000
0.000
0.000
31.000
1.000
0.867
0.748245949
COSTO TOTAL
53.95
434.22
394.33
1,326.65
42.80
37.09
2,289.03
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
2,080.00
135.05
741.00
260.00
70.00
260.00
TOTAL MATERIALES
849.23
720.06
195.25
76.81
72.33
116.87
2,030.56
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.000
0.000
0.000
0.000
TOTAL
4,319.59
GASTOS GENERALES
21.66%
935.83
UTILIDADES
10.00%
431.96
5,687.39
37.23 SOLES/TON.
10.95 US $ / TON.
Partida Nro
39
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO >0.60 MTS.
LIMPIEZACON CARRETILLA, INCLUYE RELLENO
PARAMETROS PRINCIPALES
TIPO DE RELLENO
TIPO DE ROCA
ANCHO DE VETA
ANCHO DE LABOR
EQUIPO DE LIMPIEZA
LONGITUD DE TAJEO
MALLA DE PERFORACIN
LONGITUD DE TALADROS
RENDIM. DE AVANCE (60 GRAD.)
DENSIDAD IN SITU MINERAL TAJEADO
DENSIDAD IN SITU DESMONTE
TONELADA POR TALADRO
VOLUMEN POR CORTE (MTS 3 ,RELL)
VOLUMEN POR CORTE (TONS. PROD.)
NMERO DE TALADROS /CORTE
VOLUMEN POR TAL. DESQUINCHE (RELL.)
NMERO DE TALADROS /RELLENO
TOTAL DE TALDS. CORTE Y RELLENO
TALADROS / GDIA. (PERF.)
GDIAS./CORTE
TON/GDIA. (LIMPIEZA)
GDIAS EN LIMPIEZA/CORTE
GDIAS. EN RELLENO (EXTENDER RELLENO)
TOTAL GDIAS EN LIM. Y RELL.
FACTOR DE POTENCIA MINERAL
FACTOR DE POTENCIA DESMONTE
TC=
MANO DE OBRA
CONVENCIONAL
MEDIA
0.80
1.00
CARRETILLA
35
0.50
8
6.93
3.40
2.84
1.77
72.75
247.34
140
0.86
85
225
30
8
5
49
0
49
0.60
0.35
3.40
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
CARRERO
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
1.000
MTS.
MTS.
MTS.
0.50 MTS 2
FT
2.40 MTS
FT
2.08 MTS
TON / MT 3
TON / MT 3
TONELADA
MTS 3
TONELADAS
TALADS.
MTS3 / TALADRO
TALADS.
TALADS.
TALADROS/GDIA.
GUARDIAS
TONS./GDIA.
GUARDIAS
GUARDIAS
GUARDIAS
KG / TON
KG / TON
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
42.795
42.795
CANTIDAD
0.867
8.000
8.000
0.000
0.000
49.000
1.000
0.867
COSTO TOTAL
53.95
434.22
394.33
2,096.96
42.80
37.09
3,059.34
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
1,800.00
220.71
641.25
225.00
70.00
225.00
TOTAL MATERIALES
734.91
1,176.84
168.97
66.47
72.33
101.14
2,320.66
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.000
0.000
0.000
0.000
TOTAL
5,380.00
GASTOS GENERALES
21.66%
1,165.57
UTILIDADES
10.00%
538.00
7,083.57
28.64
8.42
Partida Nro
40
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO >0.60 MTS.
LIMPIEZACON CARRETILLA, INCLUYE RELLENO
PARAMETROS PRINCIPALES
TIPO DE RELLENO
TIPO DE ROCA
ANCHO DE VETA
ANCHO DE LABOR
EQUIPO DE LIMPIEZA
LONGITUD DE TAJEO
MALLA DE PERFORACIN
LONGITUD DE TALADROS
RENDIM. DE AVANCE (60 GRAD.)
DENSIDAD IN SITU MINERAL TAJEADO
DENSIDAD IN SITU DESMONTE
TONELADA POR TALADRO
VOLUMEN POR CORTE (MTS 3 ,RELL)
VOLUMEN POR CORTE (TONS. PROD.)
NMERO DE TALADROS /CORTE
VOLUMEN POR TAL. DESQUINCHE (RELL.)
NMERO DE TALADROS /RELLENO
TOTAL DE TALDS. CORTE Y RELLENO
TALADROS / GDIA. (PERF.)
GDIAS./CORTE
TON/GDIA. (LIMPIEZA)
GDIAS EN LIMPIEZA/CORTE
GDIAS. EN RELLENO (EXTENDER RELLENO)
TOTAL GDIAS EN LIM. Y RELL.
FACTOR DE POTENCIA MINERAL
FACTOR DE POTENCIA DESMONTE
TC=
MANO DE OBRA
HIDRAULICO
MEDIA
0.80
1.00
CARRETILLA
35
0.50
8
6.93
3.40
2.84
1.77
72.75
247.34
140
0.86
0
140
30
5
5
49
0
49
0.6
0
3.40
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
CARRERO
ENMADERADOR
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
MTS.
MTS.
MTS.
0.500 MTS 2
FT
2.40 MTS
FT
2.08 MTS
TON / MT 3
TON / MT 3
TONELADA
MTS 3
TONELADAS
TALADS.
MTS3 / TALADRO
TALADS.
TALADS.
TALADROS/GDIA.
GUARDIAS
TONS./GDIA.
GUARDIAS
GUARDIAS
GUARDIAS
KG / TON
KG / TON
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
52.767
42.795
42.795
CANTIDAD
0.867
5.000
5.000
0.000
0.000
49.000
0.000
1.000
0.867
COSTO TOTAL
53.95
271.39
246.46
2,096.96
42.80
37.09
2,748.64
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
1,120.00
148.40
399.00
140.00
43.00
140.00
TOTAL MATERIALES
457.28
791.28
105.14
41.36
44.43
62.93
1,502.42
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.000
0
0
0.00
0.00
-
TOTAL
4,251.05
GASTOS GENERALES
21.66%
920.99
UTILIDADES
10.00%
425.11
5,597.14
22.63 SOLES/TON.
6.66 US $ / TON.
Partida Nro
41
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO <0.60 MTS.
CORTE EN BREASTING INCLUYE RELLENO CONVENCIONAL
PARAMETROS PRINCIPALES
TIPO DE RELLENO
TIPO DE ROCA
ANCHO DE VETA
ANCHO DE LABOR
ALTURA DE CORTE
EQUIPO DE LIMPIEZA
LONGITUD DE TAJEO
MALLA DE PERFORACIN
LONGITUD DE TALADROS
RENDIM. DE AVANCE (90 %)
DENSIDAD IN SITU MINERAL TAJEADO
DENSIDAD IN SITU DESMONTE
TONELADA POR TALADRO
VOLUMEN POR CORTE (MTS 3 ,RELL)
VOLUMEN POR CORTE (TONS. PROD.)
NMERO DE TALADROS /CORTE
VOLUMEN POR TAL. DESQUINCHE (RELL.)
NMERO DE TALADROS /RELLENO
TOTAL DE TALDS. CORTE Y RELLENO
TALADROS / GDIA. (PERF.)
GDIAS./CORTE
TON/GDIA. (LIMPIEZA)
GDIAS EN LIMPIEZA/CORTE
GDIAS. EN RELLENO (EXTENDER RELLENO)
TOTAL GDIAS EN LIM. Y RELL.
FACTOR DE POTENCIA MINERAL
FACTOR DE POTENCIA DESMONTE
TC=
MANO DE OBRA
CONVENCIONAL
1.000
MEDIA
0.50 MTS.
0.70 MTS.
2.00 MTS.
WINCHE DE ARRASTRE
35 MTS.
0.35
0.35 MTS 2
8 FT
2.40 MTS
7.20 FT
2.16 MTS
3.00 TON / MT 3
2.84 TON / MT 3
0.79 TONELADA
49.00 MTS 3
147.00 TONELADAS
185 TALADS.
0.86 MTS3 / TALADRO
58 TALADS.
243 TALADS.
20 TALADROS/GDIA.
12 GUARDIAS
20 TONS./GDIA.
8 GUARDIAS
0 GUARDIAS
8 GUARDIAS
0.60 KG / TON
0.30 KG / TON
3.40 SOLES/US$
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.867
12.000
12.000
8.000
8.000
1.000
0.867
0.7776
COSTO TOTAL
53.95
651.33
591.49
422.14
342.36
42.80
37.09
2,141.15
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
1,944.00
129.95
692.55
243.00
70.00
243.00
TOTAL MATERIALES
793.70
692.88
182.49
71.79
72.33
109.23
1,922.43
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.000
0.000
0.000
0.000
TOTAL
4,063.58
GASTOS GENERALES
21.66%
880.37
UTILIDADES
10.00%
406.36
5,350.30
36.40 SOLES/TON.
10.70 US $ / TON.
Partida Nro
42
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO >0.60 MTS.
CORTE EN BREASTING INCLUYE RELLENO CONVENCIONAL
PARAMETROS PRINCIPALES
TIPO DE RELLENO
TIPO DE ROCA
ANCHO DE VETA
ANCHO DE LABOR
ALTURA DE CORTE
EQUIPO DE LIMPIEZA
LONGITUD DE TAJEO
MALLA DE PERFORACIN
LONGITUD DE TALADROS
RENDIM. DE AVANCE (90 %)
DENSIDAD IN SITU MINERAL TAJEADO
DENSIDAD IN SITU DESMONTE
TONELADA POR TALADRO
VOLUMEN POR CORTE (MTS 3 ,RELL)
VOLUMEN POR CORTE (TONS. PROD.)
NMERO DE TALADROS /CORTE
VOLUMEN POR TAL. DESQUINCHE (RELL.)
NMERO DE TALADROS /RELLENO
TOTAL DE TALDS. CORTE Y RELLENO
TALADROS / GDIA. (PERF.)
GDIAS./CORTE
TON/GDIA. (LIMPIEZA)
GDIAS EN LIMPIEZA/CORTE
GDIAS. EN RELLENO (EXTENDER RELLENO)
TOTAL GDIAS EN LIM. Y RELL.
FACTOR DE POTENCIA MINERAL
FACTOR DE POTENCIA DESMONTE
TC=
MANO DE OBRA
CONVENCIONAL
1.000
MEDIA
0.80 MTS.
1.00 MTS.
2.00 MTS
WINCHE DE ARRASTRE
35 MTS.
0.50
0.50 MTS 2
8 FT
2.40 MTS
7.20 FT
2.16 MTS
3.40 TON / MT 3
2.84 TON / MT 3
1.84 TONELADA
70.00 MTS 3
238.00 TONELADAS
129 TALADS.
0.86 MTS3 / TALADRO
82 TALADS.
211 TALADS.
20 TALADROS/GDIA.
11 GUARDIAS
20 TONS./GDIA.
11 GUARDIAS
0 GUARDIAS
11 GUARDIAS
0.60 KG / TON
0.35 KG / TON
3.40 SOLES/US$
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.867
11.000
11.000
11.000
11.000
1.000
0.867
COSTO TOTAL
53.95
597.05
542.20
580.44
470.75
42.80
37.09
2,324.27
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
1,688.00
212.38
601.35
211.00
70.00
211.00
TOTAL MATERIALES
689.18
1,132.41
158.46
62.34
72.33
94.84
2,209.56
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.000
0.000
0.000
0.000
TOTAL
4,533.83
GASTOS GENERALES
21.66%
982.25
UTILIDADES
10.00%
453.38
5,969.47
25.08
7.38
Partida Nro
43
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO >0.60 MTS.
LIMPIEZACON CARRETILLA, INCLUYE RELLENO
PARAMETROS PRINCIPALES
TIPO DE RELLENO
TIPO DE ROCA
ANCHO DE VETA
ANCHO DE LABOR
ALTURA DE CORTE
EQUIPO DE LIMPIEZA
LONGITUD DE TAJEO
MALLA DE PERFORACIN
LONGITUD DE TALADROS
RENDIM. DE AVANCE (90 %)
DENSIDAD IN SITU MINERAL TAJEADO
DENSIDAD IN SITU DESMONTE
TONELADA POR TALADRO
VOLUMEN POR CORTE (MTS 3 ,RELL)
VOLUMEN POR CORTE (TONS. PROD.)
NMERO DE TALADROS /CORTE
VOLUMEN POR TAL. DESQUINCHE (RELL.)
NMERO DE TALADROS /RELLENO
TOTAL DE TALDS. CORTE Y RELLENO
TALADROS / GDIA. (PERF.)
GDIAS./CORTE
TON/GDIA. (LIMPIEZA)
GDIAS EN LIMPIEZA/CORTE
GDIAS. EN RELLENO (EXTENDER RELLENO)
TOTAL GDIAS EN LIM. Y RELL.
FACTOR DE POTENCIA MINERAL
FACTOR DE POTENCIA DESMONTE
TC=
MANO DE OBRA
HIDRAULICO
MEDIA
0.80 MTS.
1.00 MTS.
2.00 MTS
WINCHE DE ARRASTRE
35 MTS.
0.50
0.500 MTS 2
8 FT
2.40 MTS
7.20 FT
2.16 MTS
3.40 TON / MT 3
2.84 TON / MT 3
1.84 TONELADA
70.00 MTS 3
238.00 TONELADAS
129 TALADS.
0.86 MTS3 / TALADRO
0 TALADS.
129 TALADS.
20 TALADROS/GDIA.
6 GUARDIAS
20 TONS./GDIA.
11 GUARDIAS
0 GUARDIAS
11 GUARDIAS
0.6 KG / TON
0 KG / TON
3.40 SOLES/US$
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
ENMADERADOR
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
PRECIO
62.246
54.277
49.291
52.767
42.795
52.767
42.795
42.795
CANTIDAD
0.867
6.000
6.000
11.000
11.000
0.000
1.000
0.867
COSTO TOTAL
53.95
325.66
295.75
580.44
470.75
42.80
37.09
1,806.43
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
1032.00
142.80
367.65
129.00
43.00
129.00
TOTAL MATERIALES
421.35
761.41
96.88
38.11
44.43
57.99
1,420.16
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.00
0.00
0.00
0.00
0.00
-
TOTAL
3,226.59
GASTOS GENERALES
21.66%
699.04
UTILIDADES
10.00%
322.66
4,248.29
17.85 SOLES/TON.
5.25 US $ / TON.
Partida Nro
44
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO <0.60 MTS.
SOLO CORTE SIN LIMPIEZA NI RELLENO
PARAMETROS PRINCIPALES
TIPO DE RELLENO
CONVENCIONAL
TIPO DE ROCA
MEDIA
ANCHO DE VETA
0.50
ANCHO DE LABOR
0.70
EQUIPO DE LIMPIEZA
WINCHE DE ARRASTRE
LONGITUD DE TAJEO
35
MALLA DE PERFORACIN
0.35
LONGITUD DE TALADROS
8
RENDIM. DE AVANCE (60 GRAD.)
6.93
DENSIDAD IN SITU MINERAL TAJEADO
3.00
DENSIDAD IN SITU DESMONTE
2.84
TONELADA POR TALADRO
0.76
VOLUMEN POR CORTE (MTS 3 ,RELL)
50.92
VOLUMEN POR CORTE (TONS. PROD.)
152.77
NMERO DE TALADROS /CORTE
200
VOLUMEN POR TAL. DESQUINCHE (RELL.)
0.86
NMERO DE TALADROS /RELLENO
0
TOTAL DE TALDS. CORTE Y RELLENO
200
TALADROS / GDIA. (PERF.)
30
GDIAS./CORTE
6
TON/GDIA. (LIMPIEZA)
20
GDIAS EN LIMPIEZA/CORTE
8
GDIAS. EN RELLENO (EXTENDER RELLENO)
0
TOTAL GDIAS EN LIM. Y RELL.
8
FACTOR DE POTENCIA MINERAL
0.60
FACTOR DE POTENCIA DESMONTE
0.30
TC=
3.40
MANO DE OBRA
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
1.000
MTS.
MTS.
MTS.
0.350 MTS 2
FT
2.40 MTS
FT
2.08 MTS
TON / MT 3
TON / MT 3
TONELADA
MTS 3
TONELADAS
TALADS.
MTS3 / TALADRO
TALADS.
TALADS.
TALADROS/GDIA.
GUARDIAS
TONS./GDIA.
GUARDIAS
GUARDIAS
GUARDIAS
KG / TON
KG / TON
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.867
6.000
6.000
0.000
0.000
0.000
0.867
0.748245949
COSTO TOTAL
53.95
325.66
295.75
37.09
712.45
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
1,600.00
135.05
570.00
200.00
70.00
200.00
TOTAL MATERIALES
653.25
720.06
150.20
59.09
72.33
89.90
1,744.83
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.00
0.00
0.00
0.00
TOTAL
2,457.28
GASTOS GENERALES
21.66%
532.37
UTILIDADES
10.00%
245.73
3,235.37
21.18 SOLES/TON.
6.23 US $ / TON.
Partida Nro
45
TAJEOS EN EXPLOTACIN CORTE Y RELLENO ANCHO DE MINADO >0.60 MTS.
SOLO CORTE SIN LIMPIEZA NI RELLENO
PARAMETROS PRINCIPALES
TIPO DE RELLENO
CONVENCIONAL
TIPO DE ROCA
MEDIA
ANCHO DE VETA
0.80
ANCHO DE LABOR
1.00
EQUIPO DE LIMPIEZA
WINCHE DE ARRASTRE
LONGITUD DE TAJEO
35
MALLA DE PERFORACIN
0.50
LONGITUD DE TALADROS
8
RENDIM. DE AVANCE (60 GRAD.)
6.93
DENSIDAD IN SITU MINERAL TAJEADO
3.40
DENSIDAD IN SITU DESMONTE
2.84
TONELADA POR TALADRO
1.77
VOLUMEN POR CORTE (MTS 3 ,RELL)
72.75
VOLUMEN POR CORTE (TONS. PROD.)
247.34
NMERO DE TALADROS /CORTE
140
VOLUMEN POR TAL. DESQUINCHE (RELL.)
0.86
NMERO DE TALADROS /RELLENO
0
TOTAL DE TALDS. CORTE Y RELLENO
140
TALADROS / GDIA. (PERF.)
30
GDIAS./CORTE
5
TON/GDIA. (LIMPIEZA)
20
GDIAS EN LIMPIEZA/CORTE
12
GDIAS. EN RELLENO (EXTENDER RELLENO)
0
TOTAL GDIAS EN LIM. Y RELL.
12
FACTOR DE POTENCIA MINERAL
0.6
FACTOR DE POTENCIA DESMONTE
0.35
TC=
3.40
MANO DE OBRA
UNIDAD
CAPATAZ
(13/15)
PERFORISTA
AYUDANTE DE PERFORISTA
WINCHERO
AYUDANTE DE WINCHERO
PEON
BODEGUERO (13/15)
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
1.000
MTS.
MTS.
MTS.
0.500 MTS 2
FT
2.40 MTS
FT
2.08 MTS
TON / MT 3
TON / MT 3
TONELADA
MTS 3
TONELADAS
TALADS.
MTS3 / TALADRO
TALADS.
TALADS.
TALADROS/GDIA.
GUARDIAS
TONS./GDIA.
GUARDIAS
GUARDIAS
GUARDIAS
KG / TON
KG / TON
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.867
5.000
5.000
0.000
0.000
0.000
0.867
10.867
COSTO TOTAL
53.95
271.39
246.46
37.09
608.88
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
1,120.00
220.71
399.00
140.00
70.00
140.00
TOTAL MATERIALES
457.28
1,176.84
105.14
41.36
72.33
62.93
1,915.87
OTROS
PUNTALES DE SEGURIDAD
ENCRIBADO DE CHIMENEA
PUNTALES DE ALZA
CHIMENEA DE ARRANQUE
PZAS
PZAS
PZAS
MT
21.849
13.337
36.340
141.544
TOTAL OTROS
0.000
0
0
0.00
0.00
-
TOTAL
2,524.75
GASTOS GENERALES
21.66%
546.98
UTILIDADES
10.00%
252.48
3,324.21
13.44 SOLES/TON.
3.95 US $ / TON.
Partida Nro
46
CHIMENEA DE ARRANQUE
PARAMETROS PRINCIPALES
TIPO DE ROCA
ANCHO DE LABOR
ALTURA DE LABOR
EQUIPO DE LIMPIEZA
NMERO DE TALADROS
LONGITUD DE TALADROS
RENDIM. DE AVANCE (90%)
VOLUMEN MOVIDO (TON)
FACTOR DE POTENCIA
DENSIDAD IN SITU
TC=
MANO DE OBRA
MEDIA
1.5
1.5
NO HAY
15
8
7.2
13.85
0.9
3
3.40
UNIDAD
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
ENMADERADOR
AYUDANTE DE ENMADERADOR
PEON
TUBERO CARRILANO
BODEGUERO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
MTS.
MTS.
TALADS.
FT
FT
TONELADAS
KG / TON
TON / MT 3
SOLES/US$
PRECIO
62.246
54.277
49.291
52.767
42.795
42.795
52.767
42.795
2.4 MTS
2.16 MTS
CANTIDAD
0.050
1.000
1.000
0.000
0.000
0.000
0.000
0.067
TOTAL
COSTO TOTAL
3.11
54.28
49.29
0.00
0.00
0.00
0.00
2.85
109.53
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
120.00
12.47
40.50
15.00
6.00
15.00
48.99
66.47
10.67
4.43
6.20
6.74
TOTAL
143.51
TOTAL
253.04
GASTOS GENERALES
21.66%
54.82
UTILIDADES
10.00%
25.30
333.17
154.24 SOLES/MT
45.37 US $ / MT
Partida Nro
47
Limpieza de labor
Se aplicara en cualquier labor que solo se requiera limpieza
PARAMETROS PRINCIPALES para un frente 2.2 x 2.4
TIPO DE ROCA
ANCHO DE LABOR
ALTURA DE LABOR
EQUIPO DE LIMPIEZA
NMERO DE TALADROS
LONGITUD DE TALADROS
RENDIM. DE AVANCE (85%)
VOLUMEN MOVIDO (TON)
FACTOR DE POTENCIA
DENSIDAD IN SITU
TC =
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
PALERO
AYUDANTE DE PALERO
CARRERO
TUBERO CARRILANO
BODEGUERO
MEDIA
2.2
2.4
PALA NEUMATICA
32
8
6.8
27.53
0.9
2.84
3.40
TALADS.
FT
FT
TONELADAS
KG / TON
TON / MT 3
SOLES/US$
UNIDAD
PRECIO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
MTS
MTS
2.4 MTS
2.04 MTS
CANTIDAD
62.246
54.277
49.291
52.767
47.781
42.795
52.767
42.795
0.000
0.000
0.000
0.600
0.600
0.000
0.000
0.000
TOTAL
COSTO TOTAL
0.00
0.00
0.00
31.66
28.67
0.00
0.00
0.00
60.33
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
OTROS
CAMBIOS (1 cambio cada 50 metros )
UNIDADES
TOTAL
0.00
0.00
60.33
GASTOS GENERALES
21.66%
13.07
UTILIDADES
10.00%
6.03
79.43
2.89 SOLES/TON
0.85 US $ / TON
Partida Nro
48
PUNTALES EN LNEA, ENTABLADO, ENREJADO Y FORRADO
PARAMETROS PRINCIPALES
NMERO DE PISOS/GDIA.
TIPO DE ROCA
ALTURA DE PISO
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
ENMADERADOR
AYUDANTE DE ENMADERADOR
PEON
( TRASLADO DE MADERA )
BODEGUERO
1 PISO/GUARDIA
MEDIA
1.5 MT
3.40 SOLES/US$
UNIDAD
PRECIO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TOTAL
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.067
0.000
0.000
1.350
1.350
0.675
0.067
COSTO TOTAL
4.15
0.00
0.00
71.24
57.77
28.89
2.85
164.90
GASTOS GENERALES
21.66%
35.73
UTILIDADES
10.00%
16.49
TOTAL
217.11
217.11 SOLES/PISO
63.86 US $ / PISO
Partida Nro
49
PUNTALES EN LNEA
PARAMETROS PRINCIPALES
NMERO DE PUNTALES COLOCADOS /GDIA.
TIPO DE ROCA
DENSIDAD IN SITU
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
ENMADERADOR
AYUDANTE DE ENMADERADOR
PEON
TUBERO CARRILANO
BODEGUERO
2
MEDIA
2.84 TON / MT 3
3.40 SOLES/US$
UNIDAD
PRECIO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TOTAL
62.246
54.277
49.291
52.767
42.795
42.795
52.767
42.795
CANTIDAD
0.067
0.000
0.000
1.000
1.000
0.500
0.000
0.067
COSTO TOTAL
4.15
0.00
0.00
52.77
42.80
21.40
0.00
2.85
123.96
GASTOS GENERALES
21.66%
26.86
UTILIDADES
10.00%
12.40
TOTAL
163.22
81.61 SOLES/PUNTAL
24.00 US $ / PUNTAL
Partida Nro
50
PREPARACION Y COLOCACION DE ENREJADO
PARAMETROS PRINCIPALES
NMERO DE PISOS/GDIA.
TIPO DE ROCA
DENSIDAD IN SITU
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
ENMADERADOR
AYUDANTE DE ENMADERADOR
PEON
BODEGUERO
4 PISO/GUARDIA
MEDIA
2.84 TON / MT 3
3.40 SOLES/US$
UNIDAD
PRECIO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TOTAL
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.067
0.000
0.000
1.000
1.000
0.500
0.067
COSTO TOTAL
4.15
0.00
0.00
52.77
42.80
21.40
2.85
123.96
GASTOS GENERALES
21.66%
26.86
UTILIDADES
10.00%
12.40
TOTAL
163.22
40.80 SOLES/PISO
12.00 US $ / PISO
Partida Nro
51
COLOCACION DE ENTABLADO
PARAMETROS PRINCIPALES
NMERO DE PISOS/GDIA.
TIPO DE ROCA
DENSIDAD IN SITU
TC=
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
ENMADERADOR
AYUDANTE DE ENMADERADOR
PEON
BODEGUERO
4 PISO/GUARDIA
MEDIA
2.84 TON / MT 3
3.40 SOLES/US$
UNIDAD
PRECIO
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TOTAL
62.246
54.277
49.291
52.767
42.795
42.795
42.795
CANTIDAD
0.067
0.000
0.000
1.000
1.000
1.000
0.067
COSTO TOTAL
4.15
0.00
0.00
52.77
42.80
42.80
2.85
145.36
GASTOS GENERALES
21.66%
31.49
UTILIDADES
10.00%
14.54
TOTAL
191.39
47.85 SOLES/PISO
14.07 US $ / PISO
Partida Nro
52
Limpieza de labor
Se aplicara en cualquier labor que solo se requiera limpieza
PARAMETROS PRINCIPALES para un frente 2.2 x 2.4
TIPO DE ROCA
ANCHO DE LABOR
ALTURA DE LABOR
EQUIPO DE LIMPIEZA
NMERO DE TALADROS
LONGITUD DE TALADROS
RENDIM. LIMPIEZA
RENDIM. DE AVANCE (85%)
VOLUMEN MOVIDO (TON)
FACTOR DE POTENCIA
DENSIDAD IN SITU
TC =
MANO DE OBRA
CAPATAZ
PERFORISTA
AYUDANTE DE PERFORISTA
PALERO
AYUDANTE DE PALERO
CARRERO
TUBERO CARRILANO
BODEGUERO
MEDIA
2.2 MTS
2.4 MTS
A PULSO
32
8
5
6.8
27.53
0.9
2.84
3.40
UNIDAD
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TAREA
TALADS.
FT
2.4 MTS
TON/GDIA POR PERSONA
FT
2.04 MTS
TONELADAS
KG / TON
TON / MT 3
SOLES/US$
PRECIO
CANTIDAD
62.246
54.277
49.291
52.767
47.781
42.795
52.767
42.795
0.000
0.000
0.000
0.000
0.000
5.506
0.000
0.000
TOTAL
COSTO TOTAL
0.00
0.00
0.00
0.00
0.00
235.64
0.00
0.00
235.64
MATERIALES
PIES PERFORADOS
DINAMITA
MECHA LENTA
FULMINANTE N 6
MECHA RAPIDA
CONECTORES
PIES
KG
MTS
PZAS
MTS
PZAS
0.408
5.332
0.264
0.295
1.033
0.450
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
OTROS
CAMBIOS (1 cambio cada 50 metros )
UNIDADES
TOTAL
0.00
0.00
235.64
GASTOS GENERALES
21.66%
51.05
UTILIDADES
10.00%
23.56
310.26
11.27 SOLES/TON
3.31 US $ / TON
FALTA REVISAR