K .

Deepak Kumar Subudhi


GET - EPIL , Salaya Power Project
Dept .- Mechanical - BOP
Supervisor ’ s name - Mr . Alok Gupta ( DGM )
GET SKILL BUILDER PROGRAM OVERVIEW

HSE TRAINING CLASS ROOM TRAINING


OUT BOUND TRAINING

PLANT VISITS ON THE JOB TRAININGCONTACT PROGRAM


ON THE JOB TRAINING


FABRICATION PROCEDURE

BOP Department
Planning Dept Fabrication (Marking, Cutting, Preparation) Store
Receive Material
Receive Approved Drawings

Fit up, inspection & Release for welding


HED Dept

Receive Heavy Equipments


Welding

Quality Dept
Weld Visual Inspection
&
Surface Preparation,
NDT
Daily Progress Report

Surface Preparation and Painting Inspection

Release for Erection


WELDING
SURFACE PREPARATION
VISUAL INSPECTION OF THE PIPE &
RELEASE FOR SANDBLASTING AFTER NDT
CLEARANCE

VERIFICATION OF CALIBRATION
CERTIFICATES FOR PRESSURE GUAGE ON
COMPRESSOR

CHEKING SURFACE PREPARATION


REQUIREMENTS AS PER IS9954 - i . e . SA
2 1/2

RELEASE FOR COAL TAR ENAMEL BASED


PRIMER

CHECKING DFT WITH ALCOMETER

RELEASE FOR TAPE COAT APPLICATION

VISUAL INSPECTION OF THE TAPE COAT


CHECKING FOR AIR POCKETS

PEEL OFF TEST

HOLIDAY TESTING UN ACCEPTABLE

ACCEPTABLE

RELEASE FOR FURTHER ACTIVITIES


ERECTION OF UNDERGROUND PIPES
Transportation of fabricated
pipes to erection site
MATERIAL IDENTIFICATION

Sand bag packing up to reqd .


level and Lowering of pipe
RECTIFICATION AS
PER CODE
Fit - up of pipe joint

Complete Welding as per


Approved WPS U
N
Weld visual by QAQC

A
RELEASE FOR NDT C
C
E
ACCEPTABLE P
T
A
B
Field joint coating & L
Holiday Testing E

Inner Corrocoat Painting

ACCEPTABLE

Cleared for Back Filling