A.
C.
1.
Charger Unit
Visual inspection
Input voltage U1-2, U2-3, U3-1
Charger Voltage measurement
Calibration check-up
2.
Inverter Unit
Visual inspection
Inverter voltage measurement
Inverter current control
Output voltage measurement
Output current measurement
Calibration check-up
Battery Check-up
Battery room temperature check
Battery isolation
Battery condition
D. STS Check-up
Visual Inspection
Electrical Tests
E. Cabinets Clean up inside and outside
F. Corrective maintenance service on any faulty components
Any spares needed to replace faulty parts or components, or which are needed as part
of the regular service and maintenance of the UPS, are included in the total amount for
this service contract. This provision excludes the possible replacement batteries, which
are supplied by SST, if needed.