1ER NIVEL
PINTURA INTERIOR.
3.60 X 3.05=10.98
1.58 X 3.05=4.8
0.58 X 3.05=1.7
2.51 X 3.05=7.6
2.51 X 3.05=7.6
3.43 X 3.05=10.46
5.37 X 3.05=16.37
3.8 X 3.05=11.59
3.6 X 3.05=10.98
1.0 X 3.05=3.05
3.28 X 3.05=10
3.28 X 3.05=10
3.28 X 3.05=10
2.5 X 3.05=7.6
2.17 X 3.05=6.6
0.7 X 3.05=2.1
0.9 X 3.05=2.7
2.1 X 3.05=6.4
1.4 X 3.05=4.27
3.8 X 3.05=11.51
2 .0 X 3.05=6.1
1.45 X 3.05=4.4
1.4 X 3.05=4.2

0.6 X 3.05=1.8
1.95 X 3.05=5.9
1.4 X 3.05=4.2
3.8 X 3.05=11.59
3.2 X 3.05=9.7
1.1 X 3.05=3.3
3.05 X 3.05=9.30
3.05 X 3.05=9.30
1.12 X 3.05=3.4
1.22 X 3.05=3.7
1.12 X 3.05=3.4
1.12 X 3.05= 3.4
2.0 X 3.05=6.1
3.05X 3.05=9.30
4.4 X 3.05=13.4
4 .0 X 3.05= 12.2

T=283.18

PRIMER NIVEL
PINTURA EXTERIOR
3.17 X 16.16 = 51.22
3.17 X 5.5=17.43
3.17 X 4.2 =13.31
3.17 X 3.2= 10.14

3.17 X 6.5 =20.80


3.17 X 2.4 =7.80
3.17 X 2.6 =8.24
3.17 X 2.6 =8.24
3.17 X 1=3.17
3.17 X 4 =12.68
3.17 X 2.7 =8.55
3.17 X 2.7=8.55
3.17 X 3.76 =11.91

TOTAL =181.65
SEGUNDO NIVEL

PINTURA EXTERIOR
2.95*5.70=16.81M2
2.95*7.25=21.38M2
2.95*16.16=47.67M2
2.95*4.35=12.83M2
2.95*1.5=4.4M2
2.95*6.50=19.17M2
2.95*3.28=9.67M2
2.95*2.6=7.67M2
2.95*1.85=5.45M2
2.95*6.28=18.52M2
2.95*4= 11.8M2
T=175.37-31.26=144.11

PINTURA INTERIOR
3.45*0.8*2=5.52M2
3.45*2.15=7.41M2
3.45*0.65=2.24M2
3.45*0.68=2.34M2
3.45*0.60=2.07M2
3.45*2=6.9M2
3.45*4.5=15.52M2
3.45*0.75*3=7.76M2
3.45*0.75=2.41M2
3.45*2.2=7.59
3.45*3.10=10.69M2
3.45*2.55=8.79M2
3.45*1.25=4.31M2
3.45*7.15=24.66M2
3.45*0.3=1.03M2
3.45*0.86*2=5.93M2
T - PINTURA=115.14*2=230.28M2.
`
VENTANAS
V-1 2.63M2*3=7.89M2=84.92PIE2
V-2 3.78M2*1=3.78M2=40.68PIE2
V-3 1.5M2*5=7.5M2=80.72PIE2
V-4 1.75M2*4=7M2=75.34PIE2
V-5 1.63M2*2=3.26M2=35.09PIE2

V-6 4.13M2*1=4.13M2=44.45PIE2
V-7 0.28M2*2=0.56M2=6.02PIE2
V-8 0.42M2*1=0.42M2=4.52PIE2
V-9 0.63M2*1=0.63M2=6.78PIE2
V-10 0.88M2*2=1.76M2=18.94PIE2
V-11 0.91M2*2=1.82M2=19.59PIE2
V-12 3.00M2*1=3.00M2=32.29PIE2
V-13 1.25M2*1=1.25M2= 13.45PIE2
V-14 0.63M2*2=1.26M2= 13.56PIE2

PUERTAS
P-1 4.08M2= 43.91 PIE2
P-2 7.2M2= 77.50PIE2
P-3 1.47M2= 18.72PIE2
P-4 11.34M2= 122.06PIE2
P-5 5.04M2= 54.25PIE2
P-6 3.04M2= 32.72PIE2
P-7 2.73M2= 29.38PIE2

PISO PRIMER NIVEL : CERAMICA

1) 3.18 X 3.60 = 11.45 MTS2


2) (1.86 + 5.47) X 3.60 / 2 = 13.2 MTS2
3) 1.30 X 0.20 = 0.26 MTS2
4) (1.11 + 2.52 ) X 2.18 /2 = 3.96 MTS2
5) (1.86 + 2.52) 2.36 / 2 = 5.20 MTS2
6) 2.5 X 1.28 = 3.2 MTS2
7) 0.20 X X 1.0 = 0.20 MTS2
8) 0.90 X 0.70 = 0.63 MTS2
9) 3.6 X 2.1 = 7.56 MTS2
10) 0.20 X 2.20 = 0.44 MTS2
11) 3.80 X 2.90 = 11.02 MTS2
12) 0.70 X 0.45 = 0.32 MTS2
13) 0.60 X 2.10 = 1.26 MTS2
14) 4.77 X 3.80 = 18.13 MTS2
15) 1.0 X 1.10 = 1.10 MTS2
16) 0.20 X 0.90 = 0.18 MTS2
17) 1.90 X Q.60 = 1.14 MTS2
18) 1.20 X 0.10 = 0.12 MTS2
19) 1.90 X 3.30 = 6.27 MTS2
20) 0.15 X 0.90 = 0.135 MTS2
21) 2.0 X 3.05 = 6.1 MTS2
22) 3.27 X 4.20 = 13.734 MTS2 - 0.09 = 13.644 MTS2
23)2.60 X 2.21 = 5.75 MTS2 - 0.09 = 5.66 MTS2
24)(1.32 + 2.08 ) X 0.80 / 2 = 1.36 MTS2

25)1.28 X 0.80 = 1.024 MTS2

TOTAL: 113.6 MTS2

BAOS
1) 0.70 X 0.15 = 0.105 MTS2
0.90 X 1.99 = 1.791 MTS2
2) 0.70 X 0.10 = 0.07 MTS2
0.90 X 1.95 = 1.755 MTS2
3) 0.80 X 0.10 = 0.08
0.90 X 2.15 = 1.94

TOTAL: 5.741 MTS2

TOTAL CERAMICA DE PISO (0.25 X 0.25) + CERAMICA DE BAOS (0.25X 0.25)


TOTAL= 119.341

0.25 X 0.25 = 0.06

1MT / 0.06 = 16.7 UND/ M2


119.341 MTS2 X 16 UNDS/MTS2 = 1.914 UNDS

PISO SEGUNDO NIVEL: CERAMICA 0.25X0.25

1) (5.83+2.01)/2X3.3.70=14.5MT2 - 0.045MT2-0.26-0.10-0.06=14.04MT2
2) 4.35X3.65=15.88MT2
3) 3.10X3.70=11.5MT2
4) (1.94+1.26)/2X1.33=2.13MT2
5) (5.04X4.51)/2X1.28=6.112MT2
6) 0.90X0.15=0.14MT2
7) 2.10X0.15=0.32MT2
8) 1.28X3.85=4.93MT2
9) 0.90X0.15=0.14MT2
10)0.60X0.60=0.36MT2
11) 1.0X0.15=0.15MT2
12)0.90X0.75=0.75MT2
13)0.60X2.05=1.23MT2
14)0.60X0.50=0.30MT2
15)0.75X1.50=1.125MT2
16)0.75X1.50=1.125MT2
17)3.10X3.10=9.61MT2
18)0.75X1.50=1.125MT2
19)0.75X1.50=1.125MT2
20)3.10X3.45=10.70MT2
21)1.50X1.30=1.95MT2
22)0.75X0.90=0.675MT2
23)1.67X1.50=2.51MT2
24)0.80X0.15=0.12MT2
25)1.35X0.15=0.203MT2
26)4.20X1.50=6.3MT2-0.04=6.26MT2
27)(3.41+2.60)/2 X 1.69=5.08MT2
28)1.60X0.15=0.24MT2
29)(1.85+2.43)/2X1.78 = 3.81MT2
TOTAL = 103.6MT2

BANOS 2DO NIVEL


1)0.80X0.20=0.16MT2
2)0.80X0.15=0.12MT2
3)0.80X0.15=0.12MT2
TOTAL= 9.8MT2

SOCALO 2DO NIVEL


TOTAL= 120.53MT2
TOTAL =113.4MT2
0.25X0.25=0.06MT
1/0.06=16.7 UDS/MT2
113.4X16.7 UDS/MT2
1,893.8=1,895UDS

2.0 X2.10 = 4.2-0.66(DUCHA)3.54MT2


1.64X1.90=3.12MT2
1.64X1.67=2.74MT2

AZULEJOS COCINA : 0.15 X 0.15


0.85 X 0.60 = 0.51 MTS2
0.85 X 0.60 = 0.492 MTS2
0.70 X 0.60 = 0.43 MTS2
0.70 X 0.60 = 0.42 MTS2
1.30 X 0.60 = 0.78 MTS2
1.30 X 0.60 = 0.78 MTS2
0.70 X 0.60 = 0.42 MTS2
1.28 X 0.08 = 0.1024 MTS2
1.20 X 0.08 = 0.096 MTS2
0.30 X 1.60 = 0.48 MTS2
1.45 X 0.60 = 0.87 MTS2
0.70 X 0.60 = 0.42 MTS2
0.70 X 0.70 = 0.49 MTS2
0.70 X 0.60 = 0.42 MTS2
2.10 X 0.60 = 1.26 MTS2
0.85 X 0.60 = 0.51 MTS2
TOTAL: 8.470 MTS2

AZULEJOS BANOS 1ER NIVEL 0.20X0.20


1)
L
H
0.90 X 2.10= 1.89MT2-0.188(AREA DE VENTANA)=1.702MT2

1.95X2.10=4.095MT2
1.95X2.10=4.095MT2
0.19X2.10=0.399MT2
TOTAL1=10.291MT2
2)
0.90X2.10=1.89MT2-0.188=1.702MT2
1.99X2.10=4.179MT2
1.99X2.10=4.179MT2
0.20X2.10=0.42MT2
TOTAL2=10.48MT2
3)
0.90X2.10=1.89MT2-0.188=1.702MT2
2.15X2.10=4.515MT2
0.10X1.90=0.19MT2
0.80X2.03=1.624MT2
0.23X2.10=0.483MT2
0.10X1.90=0.19MT2
0.80X2.03=1.6MT2
1.13X2.10=2.37MT2
TOTAL3=12.70MT2

AZULEJOS BAOS 2do NIVEL (0.20X0.20)


1.30 X 1.63 = 2.12 MTS2
0.90 X 2.10 = 1.89 MTS2
0.30 X 1.93 = 0.579 MTS2
1.70 X 1.75 = 2.975 MTS2
2.10 X 1.75 = 3.675 MTS2
2.70 X 1.20 = 2.975 MTS2
TOTAL: 14.214 MTS2
2 BANOS DE ESTE TIPO
1.64X2.10=3.444MT2
0.76X1.65=1.254MT2
0.76X1.65=1.254MT2
1.64X2.10=3.444MT2
1.67X1.65=2.756MT2
0.87X2.10=1.827MT2
13.98MTX2 = 27.96MT2 = TOTAL 27.96MT2

TOTAL DE UNDIDADES DE AZULEJOS COCINA (0.15 X 0.15)


8.470MTS2
0.15X 0.15 = 0.0225 MTS2
1 / 0.0225 = 44.4 UNDS/ MTS2
8.470 MTS2 X 44.4 UNDS/MTS2 = 377 UNIDADES

AZULEJOS BANOS 0.20X0.20


27.97+10.48+10.291+12.701+14.214=75.65MT2
0.20X0.20=0.04MT2
1/0.04=25.0 UDS/MT2
75.65X25.0=1,892 UDS