Você está na página 1de 11

DAFTAR HARGA SATUAN UPAH DAN BAHAN

NO
1
2
3
4
5
6
7
8
9
10

NO

JENIS TENAGA KERJA


Pekerja
Tukang
Mandor
Operator
Pembantu Operator
Supir/Driver
Pembatu Supir/Driver
Mekanik
Pembantu Mekanik
Kepala Tukang

JENIS BAHAN BANGUNAN

SATUAN
Orang/Hari/jam
Orang/Hari/jam
Orang/Hari/jam
Orang/Hari/jam
Orang/Hari/jam
Orang/Hari/jam
Orang/Hari/jam
Orang/Hari/jam
Orang/Hari/jam
Orang/Hari/jam

SATUAN

HARGA SATUAN
(Rp/Hari)
86,925.00
100,650.00
105,225.00
114,375.00
86,925.00
107,970.00
68,625.00
114,375.00
86,925.00
109,800.00

HARGA SATUAN
(Rp)

UPAH PEMBONGKARAN BANGUANAN


Upah Bongkar Atap Genteng/Sirap/Asbest/Seng Gib
Upah Bongkar Lantai Lama
Upah Bongkar Rangka Atap Kayu
Upah Bongkar plafond + Rangka

A.

BAHAN BANGUNAN GEDUNG


Bahan - bahan Galian, Semen

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

Aspal Emulsi
Aspal Cair
Batu Gunung
Batu Kali
Batu Koral
Batu Pecah 15/20 cm
Batu Pecah 5-10 cm
Batu Pecah 3-5 cm
Batu Pecah 2-3 cm
Batu Kelapa
Batu Belah/Padas
Batu Templek
Batu Bata Cetak Mesin
Batu Beton Ringan uk 10 x 20 x 60
Batu Terawang uk. 10 x 20
Paving Block
Kerikil Beton Guli (maz 30 mm)
Pasir Pasang/Beton
Pasir Urug
Semen Putih 40 Kg
Semen Portland ( andalas ) 40 kg
Semen Portland ( andalas )
Semen Mortar
Sirtu (Pasir Batu)
Tanah Timbun/merah
Tanah Humus
Semen Instan Mu-480 / Lemkra FK 101 atau setara
Air
Pasir Pasang/Beton

m2
m2
m2
m2

6,412.50
15,010.00
23,750.00
9,025.00

ltr
ltr
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
bh
bh
bh
bh
Kg
M3
m3
zak
zak
kg
kg
m3
m3
m3
kg
Ltr
Kg

5,510.00
6,460.00
166,250.00
146,015.00
160,075.00
142,500.00
216,600.00
220,400.00
228,000.00
160,075.00
220,000.00
171,000.00
836.00
17,100.00
11,400.00
3,800.00
47.50
114,000.00
108,300.00
136,800.00
55,195.00
1,235.00
4,750.00
132,050.00
96,615.00
142,500.00
11,362.00
20.00
100.00

KET

1
2
3
1
2
3
4
5
6
10
11
12
13
14
15

Bahan - bahan Perkayuan


Ijuk
Kayu Dolken/Bulat 3''-4''
Kayu Profil
Kayu Papan / Broti (Setara Kayu Kuat Kls 2)
Kayu Papan / Broti (Setara Kayu Kuat Kls 3)
Kayu Papan / Broti (Setara Kayu Kuat Kls 4)
Lem Kayu
Lem Kuning
Listplank Motif Bunga 14 x 40
Tepas Kelapa Sawit
Tepas Bambu
Triplek 4 mm
Triplek 6 mm
Triplek 9 mm
Triplek Sungkai 3 mm

kg
btg
btg
m3
m3
m3
kg
kg
bh
lembar
lembar
lembar
lembar
lembar
lembar

33,250.00
19,000.00
19,950.00
10,355,000.00
6,907,450.00
3,040,000.00
14,962.50
19,950.00
28,500.00
30,400.00
30,400.00
95,000.00
133,000.00
161,500.00
142,500.00

1
2
3
4
5
6
3
8
9
10
11
12
13
4
5
6
17
18
19
7
8
9
23
24
25
10
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

Bahan - bahan Besi, Alumunium


Besi Beton Polos
Besi Beton Ulir
Besi Profil
Besi Baja IWF
Besi Plat Strip
Kawat Licin / Bronjong
Kawat Beton
Kawat Las
Kawat Jaring Galvanis (Harmonika)
Kusen Pintu Almunium (80 x 210 ) coklat
Kusen Pintu Almunium (80 x 210 ) putih
Kusen Jendela Aluminium (120 x 60 ) Coklat
Kusen Jendela Aluminium (120 x 60 ) Putih
Jerjak Besi Biasa
Jerjak Besi Bermotif
Jendela Besi
Jendela Aluminium + Kaca (120 x 60) coklat
Jendela Aluminium + Kaca (120 x 60) putih
Pintu Gulung Besi
Pintu Besi
Pintu Besi Lipat Harmonika
Pintu KM/WC PVC
Pintu Almunium Putih
Pintu Kaca #5 Bingkai Almunium + Engsel Tanam
Plat Baja Profil
Paku Biasa
Screw Truss 10-16 x 16
Paku Seng
Pagar Besi Strip
Venetion Blinds Aluminium
Venetion Blinds Kayu
Vertical Blinds
Frame Aluminium Hollow
Almunium Composit Panel (ACP)
Dinabolt dia 10 mm
Seallent
Pagar BRC 120 Polos
Rangka Atap Kanopi Besi Hollow
Kusen Pintu UPVC uk. 80x210 cm atau 90 x 210 cm
Kusen Jendela UPVC
Daun Pintu UPVC uk. 80x210 cm atau 90 x 210 cm
Daun Jendela Kaca RangkaPVC

kg
kg
kg
kg
kg
kg
kg
dos
lembar
bh
bh
bh
bh
m2
m2
m2
bh
bh
m2
m2
m2
unit
set
unit
kg
kg
Bh
kg
m2
m2
m2
m2
m'
m2
bh
m'
m2
m2
unit
m2
unit
m2

16,150.00
17,575.00
22,800.00
22,800.00
22,800.00
16,093.00
4,750.00
152,000.00
304,000.00
665,000.00
617,500.00
665,000.00
617,500.00
335,578.00
361,000.00
361,000.00
712,500.00
665,000.00
855,000.00
588,050.00
1,035,500.00
372,067.50
1,045,000.00
2,565,000.00
22,800.00
20,900.00
1,900.00
40,280.00
389,500.00
332,500.00
380,000.00
199,500.00
71,250.00
285,000.00
9,500.00
10,450.00
522,500.00
475,000.00
988,000.00
894,140.00
1,580,800.00
1,574,625.00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Kusen Pintu / Jendela Metal


Kozen Metal Type PJ 1
Kozen Metal Type P 1
Kozen Metal Type P 2
Kozen Metal Type P 3
Kozen Metal Type P 4
Kozen Metal Type J 1
Kozen Metal Type J 2
Kozen Metal Type J 3
Kozen Metal Type J 4
Kozen Metal Type V 1
Kozen Metal Type V 2
Kozen Metal Type V 3
Kozen Metal Type V 4
Kozen Metal Type PJ 1 K
Kozen Metal Type P 1 K
Kozen Metal Type P 2 K
Kozen Metal Type P 3 K
Kozen Metal Type J 1 K
Kozen Metal Type J 2 K
Kozen Metal Type J 3 K
Kozen Metal Type J 4 K
Kozen Metal Type V 1 K
Kozen Metal Type V 2 K
Kozen Metal Type V 3 K
Kozen Metal Type V 4 K

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit

1
2
3
1
2
3
4
5
6
7
8
9
13
14
15
16
17
18
10
11
12
22
23

Bahan - bahan Penutup Lantai


Conblok #6cm mutu K-125
Conblok #8cm mutu K-175
Floor Hardener
Keramik Polos 20 x 20 cm
Keramik Polos 20 x 25 cm
Keramik Polos 30 x 30 cm
Keramik Polos 40 x 40 cm
Keramik 60 x 60 cm
Keramik 40 x 40 setara Granito
Keramik 40 x 40 setara Essenza
Keramik Warna Polos 20 x 20 cm
Keramik Siku (Bon Bon)
Karpet Wool
Karpet Wool + Nylon
Kanstin 15 x 30 x 45 cm
Kanstin 15 x 30 x 60 cm
Parquent kayu Solid
Lantai Kayu Sintesis ( Gym Floor)
Plint Keramik 10 x 30 cm
Plint Keramik 10 x 40 cm
Plint Keramik 10 x 60 cm
Wallpaper biasa
Wallpaper lux

bh
bh
kg
bh
bh
bh
bh
bh
bh
bh
bh
m'
m2
m2
bh
bh
m2
m2
bh
bh
bh
m'
m'

1
2
3
4
5
6
7

Bahan - bahan Kaca


Kaca 5 mm
Kaca 3 mm
Kaca 8 mm
Kaca Buram / Reyben 5 mm
Kaca Cermin 5 mm
Kaca Jendela Nako + rangka
Kaca Blok

m2
m2
m2
m2
m2
m2
bh

2,223,380.00
1,220,940.00
837,900.00
813,960.00
560,500.00
2,669,310.00
2,034,900.00
1,382,535.00
736,155.00
1,556,100.00
1,173,060.00
796,005.00
412,965.00
1,950,293.00
975,146.50
654,740.00
634,410.00
1,933,155.00
1,472,310.00
1,011,465.00
550,620.00
819,945.00
622,440.00
424,935.00
278,559.00
1,928.50
2,185.00
3,885.50
2,280.00
3,562.50
6,754.50
13,176.50
57,000.00
51,794.00
64,410.00
2,204.00
11,295.50
66,500.00
52,250.00
47,500.00
63,080.00
342,000.00
199,500.00
2,251.50
3,287.00
8,550.00
57,000.00
95,000.00
116,042.50
97,764.50
256,500.00
118,750.00
171,000.00
128,250.00
23,750.00
-

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Bahan - bahan Atap


Atap Asbes Gelombang
Atap Zincalum Gelombang # 0,30 mm
Atap Super Dex
Atap Plastik Gelbang Fiber
Atap Genteng Metal # 0,30
Genteng Keramik
Genteng Beton Warna
Rabung Genteng Beton
Nok Genteng Metal

lembar
kaki
kaki
lembar
lembar
keping
keping
keping
lembar
m'
lembar
keping
m'
m2
m2
m2
lembar
lembar
lembar
kaki
lembar
m'
m2
m2
m'
m'

1
2
3
4
5
6
7
8
9

Rabung Zincalum #0,30


Rabung Seng Lebar 30 cm
Rabung Genteng Keramik
Rangka Atap Baja Ringan Atap C 75 t = 0.75
Rangka Atap Baja Ringan Atap Seng
Rangka Atap Baja Ringan Atap Genteng Metal
Rangka Atap Baja Ringan Genteng Keramik / Beton
Rabung Asbes Panjang 0,5 m'
Seng Gelombang 7 kaki BJLS 20
Seng Gelombang 7 kaki BJLS 30
Seng Plat BJLS 30
Seng Plat BJLS 35
Talang Kantong Seng BJLS
Isolasi Atap/ Aluminuium Foil
Atap Polikarbonat
Listplank GRC
Topspan Truss II. t=0,5 mm
Bahan - bahan Plafond
Asbes
Gypsum board 9 mm
Gypsum board 6 mm
Gysum board 12 mm
Profil Gypsum 6''
Profil Gypsum 4''
Profil Gypsum 3''
Profil Gypsum 2''
Rangka Furing Plafond Gypsum

1
2
3
4
5
6
7
8

Bahan Sistem Plafond Akustik Rangka Tampak


Rangka utama (Main Tee)
Rang Silang (Cross Tee)
Rangka ke Dinding (Wall Angle)
Penggantung (Adjustable Hanger Clip)
Pengikat (Suspension Rod) 3 mm x 2400 mm
Braket Sudut (Angle Bracket)
Paku Ramset
Paku Beton

btg
btg
btg
bh
bh
bh
bh
bh

Panel Plafond AKustik setara Jaya Tekstur Byhua

lembar

1
2
3
4
5
6
7
8
9
10

Bahan - bahan Cat


Cat Kilat setara Bee Brand
Cat Perak setara Bee Brand
Cat Tembok Setara Paragon
Cat Tembok Setara Vinilex
Cat Tembok Setara Jotahshield
Cat Tembok Setara Jotahplush
Cat Penutup
Cat Motif
Cat Menie Kayu
Cat Dasar

keping
lembar
lembar
lembar
m'
m'
m'
m'
m2

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

38,997.50
12,967.50
19,950.00
59,850.00
66,500.00
15,675.00
7,666.50
11,400.00
46,046.50
29,450.00
23,018.50
24,700.00
14,250.00
190,000.00
228,000.00
285,000.00
28,500.00
53,684.50
72,817.50
14,962.50
102,600.00
144,637.50
35,150.00
247,000.00
52,250.00
13,000.00
17,100.00
76,000.00
66,500.00
99,750.00
12,350.00
10,450.00
7,125.00
5,225.00
76,000.00
66,500.00
20,900.00
38,000.00
7,125.00
8,075.00
2,850.00
3,325.00
190.00
33,250.00
65,521.50
65,521.50
19,665.00
23,018.50
123,500.00
23,018.50
53,675.00
33,440.00
38,646.00
36,907.50
-

11
12
13
14
15
16

Dempul
Filler
Plamur
Flinkote
Soda Api
Residu / Kolter

kg
kg
kg
kg
kg
ltr

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

Bahan - bahan Sanitair


Bak Air Fiberglass
Bak Cuci Piring 2 Lobang Komplet
Filter Plastik
Floor Drain
Instalasi Air Bersih
Kloset Duduk (dengan bak air)
Kloset Duduk (dengan bak air) setara TOTO Standar
Kloset Jongkok Porselin Standar
Kloset Jongkok setara TOTO dengan flusher
Kran Air Lokal
Kran Air Bebek Lokal
Kran Air setara San Ei
Kran Air Bebek setara San Ei
Kran Shower
Kran Bidet / Cebok
Stop Kran 3/4
Septitank Kapasitas 3 m3
Tempat Sabun Keramik 10 x 20 cm
Urinoir
Wastafel Biasa
Wastafel setara TOTO

bh
unit
m2
bh
titik
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

Bahan - bahan Listrik


Instalasi Titik Nyala
Instalasi Stop Kontak
Lampu SL 24 watt komplet
Lampu SL 18 watt komplet
Lampu SL 10 watt komplet
Lampu TL 1 x 20 watt komplet kotak
Lampu TL 1 x 40 watt komplet kotak
Lampu TL 2 x 20 watt komplet kotak
Lampu TL 2 x 40 watt komplet kotak
Lampu Pijar 5 watt + Fitting
Lampu Pijar 10 watt + Fitting
Lampu Pijar 20 watt + Fitting
Lampu Pijar 40 watt + Fitting
Lampu Pijar 100 watt + Fitting
Saklar Tunggal
Saklar Double
Saklar Triple
Stop Kontak Tanam
Downlight lengkap
MCB 2A
MCB 4A
MCB 6A
MCB 8A
Bok Sekering 1 group
Bok Sekering 2 group
Bok Sekering 3 group
Bok Sekering 4 group
Kabel NYA 1,5 mm
Kabel NYA 2,5 mm

titik
titik
set
set
set
set
set
set
set
set
set
set
set
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
unit
unit
unit
unit
m'
m'

17,100.00
20,947.50
7,695.00
38,000.00
19,000.00
8,550.00
416,451.50
805,410.00
17,100.00
29,925.00
66,500.00
1,710,000.00
2,850,000.00
159,400.50
2,698,000.00
14,250.00
38,000.00
111,720.00
139,650.00
190,000.00
118,750.00
23,750.00
3,657,500.00
37,620.00
855,000.00
555,750.00
950,000.00
104,500.00
104,500.00
38,000.00
30,400.00
27,550.00
80,750.00
123,500.00
161,500.00
247,000.00
16,625.00
20,900.00
26,125.00
36,575.00
42,750.00
12,350.00
16,150.00
19,000.00
15,675.00
80,750.00
36,575.00
42,750.00
66,500.00
90,250.00
42,750.00
52,250.00
57,000.00
61,750.00
2,850.00
6,175.00
-

30
31
32
33

Kabel NYA 4 mm
Kabel NYM 2 x 1,5 mm
Kabel NYM 2 x 2,5 mm
Kabel NYM 2 x 4 mm

m'
m'
m'
m'

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Bahan - bahan Pengunci Pengagantung


Door Closer
Door Holder
Engsel Pintu Nyilon 4''
Engsel Jendela Nyilon 3''
Grendel Besar 4"
Grendel Besar 3"
Hak Angin Biasa
Handle (Pegangan) Jendela Biasa
Kunci Tanam 4''
Kunci Lock KCL Biasa uk 6" (antik)
Kunci Lock Besar uk 4"
Kunci Silinder
Kunci Lemari
Rel Pintu Dorong

bh
bh
pasang
pasang
bh
bh
pasang
bh
bh
bh
bh
bh
bh
bh

1
2
3
4
5

Bahan Pendukung
Amplas
Kuas
Kipas Angin Stainless lengkap
Waterproof Pelapis (setara sika top seal)
Waterproof membran biasa

lembar
bh
bh
m2
m2

1
2
3
4
5
6
7
8
9

Bahan - bahan Minyak


Bensin Premium bersubsidi
Minyak Pelumas/Silender
Minyak Gemuk
Minyak Solar bersubsidi
Minyak Lampu / Tanah
Kerosone
Minyak Bekisting
Minyak Gerdang
Minyak Cat

1
2
3
4
5
6
7
8
9
10
11

Bahan - bahan Riol


Riol uk. 1/2 150 mm Panjang 1 m
Riol uk. 1/2 200 mm Panjang 1 m
Riol uk. 1/2 300 mm Panjang 1 m
Riol uk. 150 mm Panjang 1 m
Riol uk. 200 mm Panjang 1 m
Riol uk. 300 mm Panjang 1 m
Riol uk. 400 mm Panjang 1 m
Riol uk. 500 mm Panjang 1 m
Riol uk. 600 mm Panjang 1 m
Riol uk. 800 mm Panjang 1 m
Riol uk. 1000 mm Panjang 1 m

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Bahan - bahan Perpipaan


Pipa Porous
Pipa PVC 6 m 1/2"
Pipa PVC 6 m 3/4"
Pipa PVC 6 m 1"
Pipa PVC 6 m 1 1/2"
Pipa PVC 6 m 2"
Pipa PVC 6 m 2,5"
Pipa PVC 6 m 3"
Pipa PVC 6 m 4"
Pipa PVC 6 m 6"
Pipa Galvanis 6 m 1/2"
Pipa Galvanis 6 m 3/4"
Pipa Galvanis 6 m 1"
Pipa Galvanis 6 m 1 1/2"
Pipa Galvanis 6 m 2"
Pipa Galvanis 6 m 2 1/2"

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

liter
liter
liter
liter
liter
liter
liter
liter
liter

10,450.00
5,225.00
10,450.00
20,900.00
199,500.00
99,750.00
14,250.00
8,550.00
25,650.00
20,900.00
17,100.00
8,550.00
63,270.00
171,000.00
63,270.00
34,200.00
14,250.00
237,500.00
3,420.00
21,375.00
1,068,750.00
52,250.00
190,000.00
6,175.00
54,549.00
25,650.00
5,225.00
9,500.00
9,500.00
25,650.00
38,475.00
15,390.00
47,880.00
51,300.00
57,285.00
47,025.00
64,125.00
80,370.00
128,250.00
193,230.00
256,500.00
353,400.00
418,950.00
16,957.50
4,256.00
5,842.50
8,512.00
9,975.00
11,400.00
13,300.00
21,375.00
29,640.00
42,750.00
12,065.00
15,960.00
19,950.00
29,925.00
40,897.50
49,875.00

Pipa PVC AW
Pipa PVC AW
Pipa PVC AW
Pipa PVC AW
Pipa PVC AW
Pipa PVC AW
Pipa PVC AW
Pipa PVC AW
Pipa PVC AW

ALAT - ALAT KONSTRUKSI BANGUNAN

1
2
3
4
5
6
7
8
9
10
11

Concrete Mixer
Concrete Vibrator
Buldozer
Mesin Genset
Mesin Las
Water Pump
Tandem Roller 6-8 Ton
Excavator
Vibrator Roller
Pneumatic Tyre Roller
Dump Truck

Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam

12
13
14

Truck Bak Terbuka


Water Tank Truck
Truk Tiga Suku

Jam
Jam
Trip

PIPA DISTRIBUSI AIR BERSIH

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

MATERIAL PEMASANGAN PIPA DISTRIBUSI


PVC Pipes SNI S - 125, 250 mm
PVC Pipes SNI S - 125, 160 mm
PVC Pipes SNI S - 125, 110 mm
PVC Pipes SNI S - 125, 90 mm
PVC Pipes SNI S - 125, 63 mm
PVC Pipes SNI S - 16, 250 mm
PVC Pipes SNI S - 16, 200 mm
PVC Pipes SNI S - 16, 160 mm
PVC Pipes SNI S - 16, 110 mm
Oblique Saddle
Oblique Wyne
Solvent Cement
Bend 45 SNI 10''
Bend 45 SNI 8''
Bend 45 SNI 6''
Bend 45 SNI 4''
Bend 90 SNI 6''
Bend 90 SNI 4''
Pipa Steel 6''
Pipa Galvanis 160 mm
Bend Steel 6'' x 45
Counfling/Midifit 6''
Counfling/Midifit 4''
Counfling/Midifit 3''
All Socket Tee 200 x 160 x 200 mm
All Socket Tee 160 x 160 x 160 mm
All Socket Tee 160 x 110 x 160 mm
All Socket Tee 160 x 90 x 160 mm
All Socket Tee 250 mm
All Socket Tee 4'' x 3''
All Socket Tee 3'' x 3''
All Socket Tee 6'' x 3''
All Socket Tee 6'' x 4''
All Socket Tee 110 mm
All Socket Tee 90 mm
All Socket Tee Solvent Cement 110 x 90 mm
All Socket Tee Solvent Cement 90 x 90 mm
All Socket Tee Solvent Cement 63 mm
Bend PVC 90 160 mm
Flange Socket 250 mm
Flange Socket 160 mm
Flange Socket 110 mm
Flange Socket 90 mm
Flange Gate Valve 10''
Flange Gate Valve 6''
Flange Gate Valve 4''
Flange Gate Valve 3''
Reducing Socket 160 x 110
Reducing Socket 110 x 90
Long Bend 22,5 6''
Long Bend Socket / Spigot 250 x 90 mm
Long Bend Double Sock 90 x 90
Long Bend Double Sock 110 x 90
Collar 200 x 205 mm 200 x 205 mm

m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
kg
bh
bh
bh
bh
bh
bh
m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

85,880.00
79,040.00
356,392.50
52,155.00
96,187.50
56,572.50
228,000.00
399,000.00
256,500.00
218,500.00
273,315.00
250,040.00
240,540.00
356,250.00
345,800.00
142,500.00
63,650.00
42,750.00
20,900.00
280,250.00
180,500.00
142,500.00
65,550.00
285,000.00
142,500.00
77,900.00
570,000.00
475,000.00
380,000.00
166,250.00
285,000.00
237,500.00
511,100.00
427,500.00
546,250.00
1,092,500.00
855,000.00
760,000.00
1,710,000.00
418,000.00
365,750.00
365,750.00
2,090,000.00
99,750.00
55,575.00
365,750.00
365,750.00
104,500.00
55,575.00
38,000.00
55,100.00
36,100.00
408,500.00
845,500.00
370,500.00
190,000.00
150,100.00
5,225,000.00
1,900,000.00
907,250.00
689,700.00
129,200.00
61,750.00
171,000.00
1,805,000.00
53,200.00
79,800.00
712,500.00
-

55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79

Coupling Modifit 10''


Coupling Modifit 6''
Coupling Modifit 4''
Coupling Modifit 3''
Rubber Packing 3mm
Bolt & Nut 5/8x3''
Gip u/ Sarungan 8''
Pipa PVC u/ Sarungan 110mm
Pig Busa 6''
Pig Busa 4''
Pig Busa 3''
Valve Cover CL
Valve Sock 63mm
Screwed Gaet Valve 2''
Simple Joint 2''
Elbow 160mm
Elbow 110mm
Elbow 90mm
Elbow 63mm
Cup PVC 160mm
Cup PVC 110mm
Cup PVC 90mm
Cup PVC 63mm
Water meter Type Helix 400 250mm
Double AIr Valve 3''

bh
bh
bh
bh
m2
bh
m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

HDPE PIPES
Pipa HDPE PE. 100 PN. 10 dia 3''
Pipa HDPE PE. 100 PN. 10 dia 2''
HPDE Spigot Tee dia. 3'' x 3''
HPDE Spigot Tee dia. 3'' x 2''
HPDE Spigot Tee dia. 2'' x 2''
HDPE Spigot Reducer dia. 3'' x 2''
HDPE Spigot Bend dia. 3'' x 90
HDPE Spigot Bend dia. 2'' x 90
HDPE End Cap dia. 2''
HDPE End Cap dia. 3''
HDPE Straight Coupler dia. 2''
HDPE Straight Coupler dia. 3''
Pipa HDPE dia. 1/2''
HDPE Clamp Sadle dia. 3'' x 1/2
HDPE Clamp Sadle dia. 2'' x 1/2
HDPE Female Thread Equal 20 x 1/2''
HDPE Male Thread Elbow 20 x 1/2''
HDPE Double Male Thread Elbow 20 x 1/2''
Sreewed Gate Valve 1/2''
Pipa PVC dia. 1/2''
PVC Faucet Elbow dia. 1/2''
PVC Elbow dia. 1/2''
PVC Faucet Socket dia. 1/2''
Kran Air 1/2
Water Meter 1/2'' Komplit

m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

1
2
3
4
5
6
7

BIAYA PEMASANGAN
Lobang Potong Hotmix
Lobang Potong Hotmix
Lobang Potong Hotmix
Lobang Potong Hotmix
Lobang Potong Trotoar
Lobang Potong Trotoar
Lobang Potong Trotoar

tpt
tpt
tpt
tpt
tpt
tpt
tpt

10''
6''
4''
3''
6''
4''
3''

4,892,500.00
1,140,000.00
855,000.00
760,000.00
133,000.00
2,850.00
826,500.00
57,000.00
831,250.00
617,500.00
479,750.00
190,000.00
33,250.00
174,800.00
53,200.00
492,100.00
173,850.00
104,500.00
48,450.00
161,500.00
69,350.00
28,025.00
16,150.00
27,075,000.00
3,329,750.00
68,400.00
42,750.00
508,250.00
741,000.00
399,000.00
380,000.00
427,500.00
332,500.00
427,500.00
332,500.00
213,750.00
570,000.00
5,700.00
34,200.00
31,350.00
19,950.00
18,050.00
33,250.00
74,100.00
4,750.00
6,650.00
2,850.00
5,700.00
14,250.00
237,500.00
714,400.00
458,850.00
239,400.00
147,250.00
133,950.00
81,700.00
133,950.00

8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

Lobang Potong Trotoar 2''


Gal/Timb. Cross Hotmix 6''
Gal/Timb. Cross Hotmix 4''
Gal/Timb. Cross Hotmix 3''
Gal/Pot Berm (tanah) 6''
Gal/Pot Berm (tanah) 4''
Gal/Pot Berm (tanah) 3''
Gal/Timb. Hotmix 6''
Gal/Timb. Hotmix 4''
Gal/Timb. Hotmix 3''
Gal/Timb. Hotmix 2''
Gal/Timb. Trotoar (cor) 6''
Gal/Timb. Trotoar (cor) 4''
Gal/Timb. Trotoar (cor) 3''
Gal/Timb. Trotoar (cor) 2''
Gal/Timb. Sirtu/Berm 10''
Gal/Timb. Sirtu/Berm 6''
Gal/Timb. Sirtu/Berm 4''
Gal/Timb. Sirtu/Berm 3''
Gal/Timb. Sirtu/Berm 2''
Upah Pasang Pipa 10''
Upah Pasang Pipa 8''
Upah Pasang Pipa 6''
Upah Pasang Pipa 4''
Upah Pasang Pipa 3''
Upah Pasang Pipa 2''
Upah Pasang Pipa Steel
Upah Pemotongan Pipa Steel
Upah Jos Pipa Steel
Pengelasan Pipa, Bend, Flange
Upah Pemotangan Pipa
Upah Pasang Gate Valve 10''
Upah Pasang Gate Valve 6''
Upah Pasang Gate Valve 4''
Upah Pasang Gate Valve 3''
Upah Pasang Collar 250mm
Upah Pasang Collar 200mm
Upah Pasang Collar 160mm
Upah Pasang Collar 110mm
Upah Pasang Collar 90mm
Upah Pasang Coupling Modifit 6''
Upah Pasang Coupling Modifit 4''
Upah Pasang Coupling Modifit 3''
Upah Pasang Meteran
Pengepikan dengan Pig Busa (3x)
Bak Meter Lob (Komplet)
Bor Gate Valve

tpt
tpt
tpt
tpt
tpt
tpt
tpt
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
ttk
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m'
bh
lbg

1
2
3
4
5
6
7
8
9
10
11
12

BIAYA PERBAIKAN
Lobang Potong Hotmix 10''
Lobang Potong Hotmix 6''
Lobang Potong Hotmix 4''
Lobang Potong Hotmix 3''
Lobang Potong Trotoar 6''
Lobang Potong Trotoar 4''
Lobang Potong Trotoar 3''
Lobang Potong Trotoar 2''
Gal/Timb. Cross Hotmix 6''
Gal/Timb. Cross Hotmix 4''
Gal/Timb. Cross Hotmix 3''
Gal/Pot Berm (tanah) 6''

tpt
tpt
tpt
tpt
tpt
tpt
tpt
tpt
tpt
tpt
tpt
tpt

81,700.00
50,350.00
39,900.00
39,900.00
400,900.00
126,350.00
126,350.00
36,100.00
28,500.00
22,800.00
22,800.00
32,300.00
24,700.00
19,000.00
14,250.00
95,950.00
95,950.00
57,000.00
43,700.00
33,250.00
8,550.00
4,750.00
3,515.00
2,660.00
2,280.00
2,280.00
14,250.00
42,750.00
40,850.00
177,650.00
167,200.00
213,750.00
124,450.00
124,450.00
110,200.00
88,350.00
88,350.00
43,700.00
43,700.00
36,100.00
423,700.00
36,100.00
36,100.00
89,300.00
285.00
13,775,000.00
5,700.00
1,320,500.00
1,320,500.00
741,950.00
494,950.00
211,850.00
147,250.00
211,850.00
147,250.00
148,200.00
50,350.00
50,350.00
249,850.00

13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Gal/Pot Berm (tanah)


Gal/Pot Berm (tanah)
Gal/Timb. Hotmix 6''
Gal/Timb. Hotmix 4''
Gal/Timb. Hotmix 3''
Gal/Timb. Hotmix 2''
Gal/Timb. Trotoar 6''
Gal/Timb. Trotoar 4''
Gal/Timb. Trotoar 3''
Gal/Timb. Trotoar 2''
Gal/Timb. Sirtu/Berm
Gal/Timb. Sirtu/Berm
Gal/Timb. Sirtu/Berm
Gal/Timb. Sirtu/Berm
Gal/Timb. Sirtu/Berm

4''
3''

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

BIAYA IZIN GALIAN / TIMBUNAN


Lobang Potong Hotmix 10''
Lobang Potong Hotmix 6''
Lobang Potong Hotmix 4''
Lobang Potong Hotmix 3''
Lobang Potong Trotoar 6''
Lobang Potong Trotoar 4''
Lobang Potong Trotoar 3''
Lobang Potong Trotoar 2''
Gal/Timb. Cross Hotmix 6''
Gal/Timb. Cross Hotmix 4''
Gal/Timb. Cross Hotmix 3''
Gal/Pot Berm (tanah) 6''
Gal/Pot Berm (tanah) 4''
Gal/Pot Berm (tanah) 3''
Gal/Timb. Hotmix 6''
Gal/Timb. Hotmix 4''
Gal/Timb. Hotmix 3''
Gal/Timb. Hotmix 2''
Gal/Timb. Trotoar 6''
Gal/Timb. Trotoar 4''
Gal/Timb. Trotoar 3''
Gal/Timb. Trotoar 2''
Gal/Timb. Sirtu/Berm 10''
Gal/Timb. Sirtu/Berm 6''
Gal/Timb. Sirtu/Berm 4''
Gal/Timb. Sirtu/Berm 3''
Gal/Timb. Sirtu/Berm 2''

10''
6''
4''
3''
2''

KOMPONEN PEMBUATAN TANGKI FILTER


DAN TANGKI AERATOR

1
2
3
4
5
6
7
8
9
10
11
12
13

Plate Steel t= 6 mm, 4' x 8'


Plate Steel t= 8 mm, 4' x 8'
Disc end Lengkung t = 8 mm
Flange Steel 600 m
Blind Flange Steel 600 mm
Flange Gate Valve 4''
Flange Steel 300 mm
Bend Steel 3'' x 90
Pipa Steel 600 mm
Pipa Steel 3'' mm t= 4,05 mm
Profil WF.125.125.5.7-12
Double Air Valve 3''
Manometer

tpt
tpt
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

tpt
tpt
tpt
tpt
tpt
tpt
tpt
tpt
tpt
tpt
tpt
tpt
tpt
tpt
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

lbr
lbr
bh
bh
bh
bh
bh
bh
m
m
btg
bh
bh

249,850.00
249,850.00
148,200.00
148,200.00
148,200.00
148,200.00
77,900.00
77,900.00
69,350.00
60,800.00
27,550.00
27,550.00
27,550.00
24,700.00
27,550.00
1,320,500.00
1,320,500.00
741,950.00
494,950.00
211,850.00
147,250.00
211,850.00
147,250.00
148,200.00
50,350.00
50,350.00
249,850.00
249,850.00
249,850.00
148,200.00
148,200.00
148,200.00
148,200.00
77,900.00
77,900.00
69,350.00
60,800.00
27,550.00
27,550.00
27,550.00
24,700.00
27,550.00
2,660,000.00
3,610,000.00
5,510,000.00
2,850,000.00
2,850,000.00
902,500.00
323,000.00
204,250.00
2,090,000.00
247,000.00
3,230,000.00
3,325,000.00
332,500.00
-

14
15
16
17
18
19
20
21
22
23
24
25

Nozel Filter
Pasir Kwarsa 0.1 - 0.2 cm
Pasir Kwarsa 0.2 - 0.4 cm
Batu Gravel 0.5 - 1.0 cm
Batu Gravel 3.0 - 5.0 cm
Ruber Packing t = 3 mm
Bolt & Nut 5/8 x 3''
Bolt & Nut 1'' x 14''
Angker Bolt & Nut 3/4 x 16'' Steel
Tiang Wencis
Stabiliser Type ETS-7000-M2 + Asesoris
AIr Compresor 5 HP + Asesoris

bh
kg
kg
kg
kg
bh
bh
bh
bh
unit
unit
unit

KOMPONEN SUMUR BOR

1
2
3
4
5
6
7
8
9
10
11
12

Pipa Galvanis 6'' PVC


m'
Pipa Galvanis 8'' PVC
m'
Well Screen 6'' (@ 10 ft) SS
m'
Reducer 8'' x 6''
bh
Check Valve 3''
bh
Pressure Gauge
bh
Flange Gate Valve 3''
bh
Flange Steel 8''
bh
Flange Steel 3''
bh
Plat Uk. 6 mm x 19 mm x 6 mtr
bh
Water Meter 3''
bh
Submersible Pump Kap. 10 l/det, motor 11 Kw, 3ph 380 voltunit
Panel, Kabel NYY dan NYYHY, Kabel Tie, Kabel arus
unit
transmisi, Box - terminal kabel , dan electroda
level control
Pipa Galvanis 3'' PVC
m'
Socket Galvanis 3''
bh
Bochten Galvanis 3''
bh
Batu Kacang / Gavel Pack
m3
Bentonite
zak
Pekerjaan Penyetelan Mesin Bor, Pembuatan Bak Spull
unit
Pengeboran dan Pemasangan Temporary Casing 12''
titik
Pemasangan Konstruksi Sumur
titik

13
14
15
16
17
18
19
20
21
22

23
24

Penyempurnaan, Pemeliharaan dan Pembersihan


Lubang Sumur, Pemompa Uji (Pumping Test)
Termasuk Step Draw Test, Time Draw Down Test,
Recovery Test
Pembersihan Lokasi , Penutupan Spull Bak Saluran Air
Laboratorium Air
Medan, 24 April 2015
Dibuat Oleh
CV. ANUGRAH BERSAMA ENGINEERING

FERRY WISUDA PUTRA


Direktur

69,350.00
2,850.00
2,375.00
1,900.00
1,900.00
133,000.00
25,650.00
85,500.00
22,800.00
16,150,000.00
33,250,000.00
17,100,000.00
437,000.00
655,500.00
2,280,000.00
427,500.00
712,500.00
332,500.00
750,500.00
275,500.00
57,000.00
114,000.00
1,995,000.00
36,100,000.00

11,400,000.00
175,750.00
99,750.00
641,250.00
641,250.00
688,750.00
4,750,000.00
104,500,000.00
9,500,000.00

titik

titik
titik

3,800,000.00
1,140,000.00
665,000.00