Você está na página 1de 21

Conductor Supported

Platforms
WorleyParsons Experience
5 March 2015

Cliff Head

Cliff Head
Designed by WorleyParsons
(Perth)
Installed 2006

Cliff Head
Topsides Description
3 level , total deck area =
900m2
(excl Sub cellar & Helideck)

Lift Weight = 475 t

Installed via Jackup rig

Cliff Head

Jacket Description
Water depth = 18m
4 x vertical legs
In leg 30 OD conductors also act as piles
(drilled & grouted in place)
Lift Weight = 275 tonnes
Has been installed via Jackup rig
Natural period = less than 2 secs

Cliff Head Jacket Installation

Cliff Head Topsides Installation

Victoria

Victoria
Designed

by WorleyParsons

(Perth)
Installed 2004
5

metres water depth


Tripod jacket 80 tonnes
Conductors connected with
leopard connectors
Conductors drilled and grouted
Topsides weight 85 tonnes
Field Life 8 years

Victoria

Kupe

Kupe

FEED Design
WorleyParsons
(Melbourne)
Installed 2007

28 metres
water depth

Kupe Development Drilling

Kupe Topsides

Kupe
Features include:. Topsides = 480t
. Substructure = 500t
Conductors act with piles to
resist base shear

H manifold arrgt to limit footprint /


reduce deck size

Plot Plan Review

Pohokura

Pohokura

Designed WorleyParsons (Perth)


Installed 2008

Situated 14km off the Taranaki coast of NZ, with a 8


well WHP (producing 200 MMSCFD) in 100ft water
depth in a seismically active zone

Pohokura
Features include:. Jacket design for seismic & ship impact
Jacket lift weight 500t
Jacket transported vertically in H.L.Ship
. Deck lift weight 270 tonne
. 2 yearly planned maintenance visits.

. Extensive RAM underpinned all design aspects

Pohokura

Pohokura

Pohokura