FINI

Sch. Aggr.-100-FINI

SPRIN
G

MRP Run

MI

BLAN
K
MB

10 Planned OrderFINI

LOT SIZE-1-10

BLANK-Planned
Order-1

Partial Conversion40kg Each

40kg1Batch
Number

Consumption of Rubber from Store


1. Suppose I have 50kg of rubber blank required for one Production Order. In
Rubber mixing they are producing 1batch quantity is 40kg Approx (see
BOM file). So how to issue the remaining 10kg quantity from store? They
are not agree to divide the batch quantity.
SuggestionIssue one
Put Min and Max Lot size and get several Planned Order-But You cannot
see the whole requirement proposed by Sales department. For each 40kg
we will get one Planned Order and subsequently Batch number.
quantity for one week. Partially convert the Planned Order to Production
Order and for each Production Order one batch no will be generated. One
batch quantity should be 40kg.
1? No we dont have any problem , if there is no linkage of
producing master batches
I see a problem with the requirement of Rubber Mixing department to see
the MONTH Requirements. This would mean they need the depended
requirements from the FINI plannend orders, but they could change after
every MRP run. We really should discuss this with Kadir Avci and Ashwin.
FINI
04.05.2015 100pcs
15.05.2015 100pcs

Production order
Planned order

ACC

20.05.2015 200pcs
25.05.2015 100pcs

Planned order
Planned order

SEMI Level Rubber blanks


02.05.2015
02.05.2015
02.05.2015
02.05.2015
13.05.2015
13.05.2015
18.05.2015
18.05.2015
18.05.2015
18.05.2015
23.05.2015

40
40
40
40
40
40
40
40
40
40
40

KG Planned
KG Planned
KG Planned
KG Planned
KG Planned
KG Planned
KG Planned
KG Planned
KG Planned
KG Planned
KG Planned

order
order
order
order
order
order
order
order
order
order
order

So if the FINI planned order for the date 25.05.2015 is deleted by the MRP,
it will be deleted automatically on SEMI Level too. But when they make the
planning on MONTH level it is in my opinion only a rough forecast.