The Nu Line process begins by mapping out the pipe system followed by drying the system with heated, compressed
air. A safe abrading agent is blown through the pipe system, removing rust and corrosion by-products that are
collected in a holding unit for disposal. Compressed air is applied once again to remove fine particles.
When the pipe system is ready for lining, conditioned air is then introduced into the pipe to uniformly distribute
the epoxy coating throughout the pipe segment. Following the coating application, continuous controlled air flows
through the piping to facilitate epoxy curing. After the epoxy coating cures, valves and couplings are refitted. A
final leak test and inspection confirms lining integrity. Final water quality, volume and flow tests confirm the system
functionality.
Nu Line is used not only as a long-term solution to prevent corrosion and leaks, but is commonly used as a
preventative tool to preserve the life of existing piping systems.