1. Reinforcement.
1.1 Resources to be used
(a). Tools
i.
Bar cutter
ii.
iii.
Engineer
ii.
Technical supervisor
iii.
Bar bender
iv.
Unskilled labour
1.2 Fabrication
Bar bending schedules will be prepared by the Engineer,Cutting and bending are done
at bending yard, under the inspection of Engineer. Following facilities available at
yard
i.
Bar cutters
ii.
Bar benders
iii.
Loading and unloading by crane (Stationary)
1.3 Transportation and Store
Transport 50% of Reinforcement from yard to site is done usingLorries and stored the
Reinforcement on 4x4 with covered by canopy, other 50% of reinforcement is kept
in the yard.
i.
ii.
Loading
Unloading
Wight (Kg/m)
T 32
6.313
T 25
3.853
T 20
2.466
T 16
1.578
T 12
0.888
T 10
0.617
T6
0.222