RNC Introduction and Configuration

Contents
ZXWR RNC Introduction
ZXWR RNC Dimensioning Principle
ZXWR RNC Dimensioning Example

RNC Overview
RNC in UTRAN
Iub

RNC

ATM/IP

Iu

Iur

To CN

To RNC

ZXWR RNC Hardware Architecture


RNC Hardware Logical Units
ZXWR RNC

Iub

Process Unit
RPU

ROMB, CLKG, SBCX

RSU

Switch Unit

RAU

Iur

Access Unit

Node B

GPS

O&M Unit
ROMU

Peripheral Monitor Unit


RPMU

Iu

RSU (RNC Switch Unit)


PSN, GLI, UIMC, GUIM and CHUB

CN

RAU (RNC Access Unit)


APBE, EIPI, GIPI,SDTB, DTB,IMAB

RNC

ROMU (RNC O&M unit)

RPU (RNC Processing Unit)

RCB, RUB

Power & Fan

RPMU( Peripheral Monitor Unit)

STM-1

FE/GE

PWRD: Power Distributor

E1

485

ALB: Alarm Board

ZXWR RNC Features

ZTE Large Capacity All-IP RNC

ZXWR RNC 2 Racks Capacity

Subscribers

1 Million

Traffic Vol.

52,500Erl

BHCA

7,000K

Switch Capacity

80Gbps

Data Throughput

Modularity design, four types of shelves

Control shelf
Resource shelf
Switch shelf
Interface shelf

Rich interface: E1T1/FE/GE/STM-1/CSTM-1

6,600 Mbps

Max. Node B

1,900

Max. Cell

5,700

Interface shelf can


expand
independently to
provide access
interface, easy for
future evolution to
IP UTRAN.

Contents
ZXWR RNC Introduction
ZXWR RNC Dimensioning Principle
ZXWR RNC Dimensioning Example

ZXWR RNC System Structure


Control shelf
DTB
SDTB
APBE

CLKG
ROMB

IMAB
EIPI

Control Signal

Data Signal

U
I
M
C

GLI
GLI

CHUB

P
S
N

Main
Control Shelf

Switch Shelf

RUB

G
U
I
M

Main
Resource Shelf

CHUB,
ROMB,
CLKG only for
main
control
shelf
SBCX
main
shelf

only in
resource

BGSN as Backboard
Process RNC user plane (RUB)
GIPI, APBE
Switch shelf

APBE

UIMC

SBCX

GIPI

BCTC as Backboard
Process RNC control plane (RCB)
ROMB,CLKG,CHUB,SBCX

Resource shelf

Interface Shelf

RCB

G
U
I
M

BPSN as Backboard
Supply switch unit for user plane
PSN, GLI
Interface shelf

BGSN as Backboard
DTB, SDTB, IMAB, EIPI, APBE

Control Shelf Configuration


1

2
S
B
C
X

10

11

12

13

14

15

16

R
C
B

R
C
B

R
C
B

R
C
B

R
C
B

R
C
B

U
I
M
C

U
I
M
C

R
O
M
B

R
O
M
B

C
L
K
G

C
L
K
G

C
H
U
B

C
H
U
B

R
U
I
M
2

R
U
I
M
3

R
M
P
B

R
M
P
B

R
C
K
G
1

R
C
K
G
2

R
C
H
B
1

R
C
H
B
2

R
S
V
B

Name

Full Name

17

CHUB, ROMB and CLKG


1 pair (1+1backup) for
one RNC in the main
control shelf.

Other

control

shelves

only have UIMC, RCB or


SBCX boards.

Configuration Principle

Backup
Principle

ROMB

RNC Operating & Maintenance Board

Each RNC 1 pair

1+1

RCB

RNC Control plane processing Board

BHCA & Cell & Sig Bandwidth

1+1

CHUB

Control plane HUB

Each RNC 1 pair

1+1

CLKG

Clock Generator

Each RNC 1 pair

1+1

SBCX

X86 Single Board Computer

Each RNC 3 pcs


OMM: 2; Log Server: 1

1+1 for
OMM

UIMC

Universal Interface Module of Control plane

Each control shelf 1 pair

1+1

Board Dimensioning: RCB in Control Shelf

RCB

Items

Processing
capacity

Formula

Number of Cells

410

RCB_1=Number of Cells / 410

No. of BHCA

500K

RCB_2 =No of BHCA / 500k

Throughput of Signaling

14Mbps

RCB_IpSig=Throughput of Signaling
/ 14Mbps

RCB and SBCX dimensioning principle

Detailed dimensioning principle with detailed traffic model:

RCB=2*MAX(RCB_1, RCB_2) + 2* RCB_IpSig

Simple dimensioning principle without detailed traffic model:

RCB = RUB + RCB_IpSig


RCB_IpSig =
2, if (RUB)<=4;
4, else (RUB)<=10;
6, else (RUB)>10;

Notes: RUB is user plane processing boards, of which dimensioning will be


introduced in following slide.

SBCX:

1 SBCX configured as log server, which will be put in main control shelf
2 SBCX configured as OMM server(1+1 backup), which can be put in
control or switch shelf.

Resource Shelf Configuration


1

10

11

12

13

14

15

16

17

G
I
P
I

G
I
P
I

A
P
B
E

A
P
B
E

R
U
B

R
U
B

R
U
B

R
U
B

G
U
I
M

G
U
I
M

G
I
P
I

G
I
P
I

R
U
B

R
U
B

R
U
B

R
U
B

G
I
P
I

R
G
E
R

R
G
E
R

R
G
I
M
1

R
G
I
M
1

R
G
U
M
1

R
G
U
M
2

R
M
N
I
C

R
M
N
I
C

Name

Full Name

RUB

RNC User plane


processing Board

GIPI

Gigabit IP
Interface

APBE

ATM Process
Board Enhanced

R
G
E
R

Each RNC has 2 GIPI


(1+1) for OMCB in slot
11/12 of main resource
shelf.

2 GUIM (1+1 backup)


for internal switching.

Providing interface
boards for IU interface.

Configuration Principle

Backup
Principle

Depends on user plan traffic model (CE)

N+1

1GE or 4FE, Throughput of each Interface

Load sharing
or 1+1

4 ATM STM-1, Throughput of each Interface & ATM


STM-1

Load sharing
or 1+1

Each Resource shelf 1 Pair

1+1

Universal Interface

GUIM

Module of User plane

Board Dimensioning: RUB in Resource Shelf


RUB number

Voice
----------2100

Data
+
---------165 Mbps (R99 64k)
265 Mbps (R99 384K)

Voice processing capacity is 2100.

For different data server, the data throughput capacity is different.

GIPI & APBE Dimensioning


Interfaces
Iub

Throughput Calculation
BIub = BIubData + BlubSig

Iu-CS

BIuCS = BIuCSData + BIuCSSig

Iu-PS

BIuPS = BIuPSData + BIuPSSig

Iu

Iur

BIur= BIurData + BIurSig


BIurData = (BIuCSData + BIuPSData) * RIur

GIPI=IP interface throughput / 1Gbps


APBE=MAX (ATM interface throughput / 140Mbps, STM-1 Interface / 4)

Interface Shelf Configuration


1

(S) (S)
D
D
T
T
B
B

R
D
T
B

R
D
T
B

Name

I
M
A
B

E
I
P
I

(S) (S)
D
D
T
T
B
B

R
D
T
B

10

11

12

13

I
M
A
B

E
I
P
I

G
U
I
M

G
U
I
M

(S) (S)
D D
T
T
B
B

I
M
A
B

R
G
U
M
1

R
G
U
M
2

R
D
T
B

Full Name

R
D
T
B

R
D
T
B

14

15
I
M
A
B

16

17
(S)
D
T
B

R
D
T
B

2 GUIM (1+1 backup)


for internal switching.

Providing interface
boards for IUB

Interface boards
depend on networking
requirements.

Configuration Principle

Backup Principle

Digital Trunk Board

32E1, DTB = N_E1/32

Load sharing

SDTB

SONET Digital Trunk Board

63E1, SDTB=N_E1/63

Load sharing/1+1

APBE

ATM Process Board Enhanced

IMAB/
EIPI

IMA & EIPI Board

DTB

4 ATM STM-1, Throughput of each


Interface & ATM STM-1

1IMAB/EIPI + 2DTB,
1IMAB/EIPI + 1SDTB

Load sharing/1+1
Load sharing/1+1

Interface boards dimensioning principle

ATM over E1 : DTB + IMAB


ATM over CSMT-1 : SDTB + IMAB
IP over E1 : DTB + EIPI
IP over CSTM-1: SDTB + EIPI
ATM over STM-1: APBE
FE/GE: GIPI

IMAB dimensioning principle:

2 DTB need 1 IMAB;


1 SDTB need 1 IMAB;

EIPI dimensioning principle:

2 DTB need 1 EIPI;


1 SDTB need 1 EIPI;

Switch Shelf Configuration


1

G
L
I

G
L
I

G
L
I

G
L
I

G
L
I

G
L
I

P
S
N

P
S
N

10

11

12

13

14

15

16

U
I
M
C

U
I
M
C

R
U
I
M
2

R
U
I
M
3

17

Each GUIM has 2 GE,


each GLI has 4 GE.

1 GLI can connect two


resource shelf or
interface shelf.

Name

Full Name

Configuration Principle

Backup Principle

PSN

Packet Switching Network

1 pair for switch shelf

1+1

GLI

GE Line Interface

UIMC

Universal Interface Module of


Control plane

2 pairs GUIM need 1 pair GLI

1 pair for switch shelf

1+1

1+1

Contents
ZXWR RNC Introduction
ZXWR RNC Dimensioning Principle
ZXWR RNC Dimensioning Example

RNC Dimensioning Example

RUB number

Voice
----------2100

Data
+
---------165 Mbps (R99 64k)
265 Mbps (R99 384K)

RUB= CEILING (5805/2100+388/200+92/200,1) = 6; After N+1 backup, RUB=8;


RCB = RUB + RCB_IpSig
RCB_IpSig =
2, if (RUB)<=4;
4, else (RUB)<=10;
6, else (RUB)>10;
RCB = RUB+RCB_Ip Sig = 8+4 = 12;

RCB Dimensioning Checking:


Cell Processing Capacity=4*420=1680
NodeB Processing Capacity=4*140=560

RNC Dimensioning Result


IUB planning :

After 1+1 backup,


SDTB dimensioning result is 9+9;
APBE dimensioning result is 2+2;
GIPI dimensioning result is 2+2;

GLI Dimensioning result:


Resource shelf + Interface shelf=5
GLI=6;