Resin

Unloading

Maintenance Engineer- Production Department

At Acwapipe we have 5 bulk tanks for Resin. 2 for


Ortho Resin, 2 for Iso Resin and 1 for VE resins
In order to correctly and safely collect resin from these
we need to follow this checklist.

Maintenance Engineer- Production Department

KNOW YOUR TANK

Maintenance Engineer- Production Department

PREPARE STORAGE VESSELS:


Shift the storage tanks/drums under the filling valve.

Maintenance Engineer- Production Department

Close the Valves


Close the valves of the unrelated tanks and
their routes

Maintenance Engineer- Production Department

Open the Valves


Open the valves of the tank and its route which will give
the resin

Maintenance Engineer- Production Department

Turn on the pump:


Open the valve of the diaphragm pump and turn on the
air for the diaphragm pump to begin pumping the resin
into the vessel.

Maintenance Engineer- Production Department

Turn off the Pump:


After filling the vessel, be ready to close the airline to
stop the diaphragm pump

Maintenance Engineer- Production Department

Close the valve:


Close the valves from the diaphragm pump and
unloading route of the tank from which resin was
removed.

Maintenance Engineer- Production Department

Remove the vessel:


After making sure it is safe, transport the tank/drums to
the required location.

Maintenance Engineer- Production Department