Você está na página 1de 143

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO

TERRENO NORMAL

TRAMO
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

2.01 a

2.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

2.50 m

3.00 m

879.70
504.63
490.30
630.80
1,020.19
461.90
585.50
545.50
391.09
433.91
226.00
229.20
303.60
624.80
684.60
237.50
375.10
648.28
62.80
156.41
193.70
646.77
417.11
290.50
430.90
51.30
280.00
36.80
0.00
57.80

189.42
243.64
634.82
645.64
510.73
661.10
302.22
411.12
451.42
330.80
474.50
572.20
299.08
303.00
609.30
549.50
414.40
344.80
395.10
274.50
399.90
209.19
335.93
612.09
565.00
173.90
338.30
764.70
77.60
451.40

174.19
202.55
143.20
262.69
0.00
203.00
531.70
572.00
165.40
189.40
149.40
369.10
717.60
232.20
288.50
281.50
333.30
458.44
403.30
482.40
559.80
321.39
115.60
264.99
163.40
0.00
291.50
302.80
125.60
283.50

0.00
0.00
71.30
0.00
0.00
219.70
260.20
0.00
352.30
171.40
184.90
163.90
278.50
162.90
124.60
389.10
229.50
157.90
378.60
502.90
238.20
101.10
142.68
282.00
320.50
390.80
217.70
347.90
598.10
331.80

0.00
0.00
0.00
0.00
0.00
0.00
231.20
0.00
222.20
47.80
270.50
53.30
53.80
359.80
0.00
57.60
65.80
63.80
316.00
169.40
112.60
61.30
172.40
56.80
123.10
51.30
267.50
175.40
405.10
431.60

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56.30
143.90
0.00
94.60
0.00
0.00
0.00
59.80
0.00
237.20
0.00
177.40
0.00
38.30
68.80
71.80
268.50
91.10
0.00
138.40
54.30

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
47.30
0.00
0.00
0.00
0.00
0.00
0.00
116.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120.10
124.10
0.00
165.40
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
57.30
0.00
275.00
51.30
0.00
143.10
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
125.60
0.00
56.80
0.00
0.00
0.00
0.00

11,896.69

12,545.30

8,588.45

6,618.48

3,768.30

1,500.40

573.00

526.70

182.40

TIPO

LONG.

AREA

M2

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

COLECTORES SECUNDARIOS

SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 20

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

MH-554
Bz-546
MH-553
Bz-547
MH-582
Bz-571
MH-575
Bz-576
Bz-17
Bz-565
Bz-548
Bz-18
MH-579
BZ-03
Bz-574
Bz-575
Bz-570
Bz-566
Bz-560
Bz-561
Bz-562
Bz-564
Bz-577
Bz-578
Bz-563

Bz-546
Bz-560
Bz-547
Bz-561
Bz-571
Bz-576
Bz-576
Bz-17
Bz-565
Bz-561
Bz-562
Bz-577
Bz-578
Bz-574
Bz-575
Bz-570
Bz-566
Bz-560
Bz-561
Bz-562
Bz-564
Bz-577
Bz-578
Bz-563
Bz-27

1.20
1.31
1.20
1.46
1.20
1.20
1.20
1.21
1.21
1.21
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.97
1.21
2.62
2.02
3.79

1.31
1.31
1.46
1.46
1.20
1.21
1.20
1.21
1.21
1.20
1.75
2.20
1.71
1.20
1.20
1.20
1.20
1.20
1.20
1.97
1.21
2.62
2.02
3.79
1.96

1.26
1.31
1.33
1.46
1.20
1.20
1.20
1.21
1.21
1.21
1.48
1.70
1.46
1.20
1.20
1.20
1.20
1.20
1.20
1.58
1.59
1.92
2.32
2.90
2.87

55.50
55.50
54.00
54.50
54.50
58.52
63.00
9.78
53.02
59.50
53.00
46.22
44.00
42.00
41.27
35.73
56.00
56.00
55.48
52.00
48.00
48.00
54.00
85.00
38.79
1,273.31

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

55.50
55.50
54.00
54.50
54.50
58.52
63.00
9.78
53.02
59.50
53.00
46.22
44.00
42.00
41.27
35.73
56.00
56.00
55.48
52.00
48.00
48.00
54.00
85.00
38.79

ext.. Buzon)

54.30
54.30
52.80
53.30
53.30
57.32
61.80
8.58
51.82
58.30
51.80
45.02
42.80
40.80
40.07
34.53
54.80
54.80
54.28
50.80
46.80
46.80
52.80
83.80
37.59
1,243.31

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

54.30
54.30
52.80
53.30
53.30
57.32
61.80
8.58
51.82
58.30
51.80
45.02
42.80
40.80
40.07
34.53
54.80
54.80
54.28
50.80
46.80
46.80
52.80
83.80
37.59

0.00

879.70

189.42

174.19

0.00

0.00

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS

SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 20

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

Bz-692
MH-95
Bz-06
Bz-97
Bz-770
Bz-694
Bz-07
MH-353
Bz-91
Bz-544
MH-354
Bz-353
Bz-557
Bz-93
MH-536
Bz-543
Bz-542
MH-548
MH-563

Bz-770
Bz-06
Bz-07
Bz-770
Bz-694
Bz-07
Bz-27
Bz-91
Bz-92
Bz-545
Bz-353
Bz-557
Bz-93
Bz-556
Bz-543
Bz-555
Bz-554
Bz-551
Bz-549

1.20
2.01
2.48
1.20
0.70
0.70
2.43
1.20
1.94
1.20
1.58
3.41
0.50
0.46
1.20
1.40
1.20
1.20
1.20

0.70
2.48
2.43
0.70
0.70
2.43
2.09
1.94
2.59
1.93
1.20
1.22
1.21
1.69
1.40
2.82
2.14
1.20
1.20

0.95
2.24
2.46
0.95
0.70
1.57
2.26
1.57
2.26
1.57
1.22
1.21
1.69
1.70
1.30
2.11
1.67
1.20
1.20

46.60
36.49
11.54
46.21
74.42
18.84
59.02
48.50
48.50
52.50
75.00
72.00
45.50
45.50
53.00
53.00
40.00
53.00
94.00
973.62

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

46.60
36.49
11.54
46.21
74.42
18.84
59.02
48.50
48.50
52.50
75.00
72.00
45.50
45.50
53.00
53.00
40.00
53.00
94.00

ext.. Buzon)

45.40
35.29
10.34
45.01
73.22
17.64
57.82
47.30
47.30
51.30
73.80
70.80
44.30
44.30
51.80
51.80
38.80
51.80
92.80
950.82

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

45.40
35.29
10.34
45.01
73.22
17.64
57.82
47.30
47.30
51.30
73.80
70.80
44.30
44.30
51.80
51.80
38.80
51.80
92.80

0.00

504.63

243.64

202.55

0.00

0.00

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 20

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

Bz-354
Bz-355
Bz-357
Bz-356
Bz-92
Bz-545
Bz-556
Bz-555
Bz-554
Bz-553
Bz-552
Bz-551
Bz-550
Bz-549
MH-95
MH-705
MH-775
Bz-697
MH-677
Bz-684
MH-692
Bz-691
Bz-767
Bz-696
Bz-96
Bz-772
MH-356
Bz-358

Bz-355
Bz-357
Bz-356
Bz-92
Bz-545
Bz-556
Bz-555
Bz-554
Bz-553
Bz-552
Bz-551
Bz-550
Bz-549
Bz-26
Bz-772
Bz-691
Bz-697
Bz-696
Bz-684
Bz-696
Bz-691
Bz-767
Bz-696
Bz-96
Bz-772
Bz-26
Bz-358
Bz-360

1.20
1.93
1.44
1.94
2.59
1.93
1.70
2.82
2.37
1.36
1.32
1.32
1.31
1.31
0.90
1.20
1.20
1.41
1.20
1.20
1.20
2.38
1.68
1.59
1.36
1.79
1.20
1.67

1.93
1.44
1.94
2.59
1.93
1.70
2.82
2.37
1.36
1.32
1.32
1.31
1.31
2.09
1.79
2.38
1.41
1.31
1.20
1.59
2.45
1.68
1.59
1.36
1.79
2.04
1.67
1.83

1.57
1.69
1.69
2.26
2.26
1.82
2.26
2.59
1.87
1.34
1.32
1.31
1.31
1.70
1.35
1.79
1.31
1.36
1.20
1.40
1.83
2.03
1.64
1.47
1.58
1.92
1.44
1.75

51.50
52.00
55.50
15.50
36.50
37.00
44.50
72.50
53.50
19.50
32.50
18.00
66.00
55.32
53.00
60.00
53.50
53.00
56.00
55.50
93.00
51.50
51.00
45.50
45.50
43.40
51.00
51.50
1,373.22

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

51.50
52.00
55.50
15.50
36.50
37.00
44.50
72.50
53.50
19.50
32.50
18.00
66.00
55.32
53.00
60.00
53.50
53.00
56.00
55.50
93.00
51.50
51.00
45.50
45.50
43.40
51.00
51.50

ext.. Buzon)

50.30
50.80
54.30
14.30
35.30
35.80
43.30
71.30
52.30
18.30
31.30
16.80
64.80
54.12
51.80
58.80
52.30
51.80
54.80
54.30
91.80
50.30
49.80
44.30
44.30
42.20
49.80
50.30
1,339.62

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

50.30
50.80
54.30
14.30
35.30
35.80
43.30
71.30
52.30
18.30
31.30
16.80
64.80
54.12
51.80
58.80
52.30
51.80
54.80
54.30
91.80
50.30
49.80
44.30
44.30
42.20
49.80
50.30

0.00

490.30

634.82

143.20

71.30

0.00

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 20

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

MH-544
Bz-534
Bz-533
MH-542
MH-525
Bz-532
Bz-541
MH-550
Bz-540
MH-527
Bz-531
BZ-357
Bz-359
Bz-361
Bz-360
Bz-535
Bz-88
Bz-536
Bz-537
Bz-538
Bz-539
MH-857
Bz-685
Bz-678
Bz-677
Bz-753
Bz-752

Bz-535
Bz-535
Bz-536
Bz-537
Bz-532
Bz-537
Bz-538
Bz-540
Bz-539
Bz-531
Bz-539
Bz-359
Bz-361
Bz-360
Bz-535
Bz-88
Bz-536
Bz-537
Bz-538
Bz-539
Bz-25
Bz-685
Bz-752
Bz-677
Bz-753
Bz-752
Bz-25

1.20
1.20
1.20
1.20
1.20
2.66
1.20
1.20
1.22
1.20
1.20
1.20
1.65
2.12
2.30
2.44
1.98
1.41
2.08
1.20
1.22
1.20
1.20
1.20
2.26
1.41
2.29

1.44
2.34
1.41
1.21
2.66
2.08
1.20
1.22
1.21
1.20
1.21
1.65
2.12
2.30
2.44
1.98
1.41
2.08
1.20
1.22
1.92
1.20
2.29
2.26
1.41
2.29
1.96

1.32
1.77
1.31
1.20
1.93
2.37
1.20
1.21
1.22
1.20
1.21
1.43
1.88
2.21
2.37
2.21
1.69
1.75
1.64
1.21
1.57
1.20
1.74
1.73
1.84
1.85
2.13

52.00
63.50
63.00
68.00
63.00
63.00
54.50
53.50
54.00
66.50
61.00
50.00
50.50
55.50
52.00
41.25
40.25
74.00
55.50
66.00
97.09
55.50
55.50
54.00
52.50
53.00
56.94
1,571.53

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

52.00
63.50
63.00
68.00
63.00
63.00
54.50
53.50
54.00
66.50
61.00
50.00
50.50
55.50
52.00
41.25
40.25
74.00
55.50
66.00
97.09
55.50
55.50
54.00
52.50
53.00
56.94

ext.. Buzon)

50.80
62.30
61.80
66.80
61.80
61.80
53.30
52.30
52.80
65.30
59.80
48.80
49.30
54.30
50.80
40.05
39.05
72.80
54.30
64.80
95.89
54.30
54.30
52.80
51.30
51.80
55.74
1,539.13

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

50.80
62.30
61.80
66.80
61.80
61.80
53.30
52.30
52.80
65.30
59.80
48.80
49.30
54.30
50.80
40.05
39.05
72.80
54.30
64.80
95.89
54.30
54.30
52.80
51.30
51.80
55.74

0.00

630.80

645.64

262.69

0.00

0.00

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 20

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

MH-824
Bz-90
MH-533
MH-517
MH-515
Bz-516
Bz-522
Bz-523
Bz-524
Bz-525
Bz-526
Bz-527
Bz-89
Bz-528
MH-752
Bz-674
MH-666
Bz-94
MH-369
Bz-82
MH-360
Bz-362
MH-361
Bz-363
MH-830
Bz-365
Bz-366
Bz-370
Bz-374

Bz-90
Bz-530
Bz-523
Bz-527
Bz-516
Bz-528
Bz-523
Bz-524
Bz-525
Bz-526
Bz-527
Bz-89
Bz-528
Bz-529
Bz-674
Bz-665
Bz-94
Bz-665
Bz-82
Bz-370
Bz-362
Bz-365
Bz-363
Bz-366
Bz-365
Bz-366
Bz-370
Bz-374
Bz-373

1.20
1.40
1.20
1.20
1.20
1.25
1.20
1.50
1.45
1.39
1.38
1.94
1.51
1.56
1.20
1.58
1.20
1.20
0.90
1.00
0.90
1.00
0.90
1.00
1.00
1.00
1.32
1.98
1.20

1.40
1.70
1.40
1.94
1.25
1.25
1.50
1.45
1.39
1.38
1.94
1.51
1.56
1.41
1.58
1.41
1.20
1.41
1.00
1.98
1.00
1.00
1.00
1.32
1.00
1.32
1.98
1.20
1.82

1.30
1.55
1.30
1.57
1.23
1.25
1.35
1.48
1.42
1.39
1.66
1.73
1.54
1.49
1.39
1.49
1.20
1.30
0.95
1.49
0.95
1.00
0.95
1.16
1.00
1.16
1.65
1.59
1.51

48.00
48.00
63.00
57.00
57.50
56.68
42.50
15.00
59.50
60.50
60.00
41.00
41.03
34.31
62.00
63.77
48.50
47.93
48.00
48.00
63.50
63.50
63.50
63.50
39.50
56.00
60.00
59.00
95.00
1,565.72

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

48.00
48.00
63.00
57.00
57.50
56.68
42.50
15.00
59.50
60.50
60.00
41.00
41.03
34.31
62.00
63.77
48.50
47.93
48.00
48.00
63.50
63.50
63.50
63.50
39.50
56.00
60.00
59.00
95.00

ext.. Buzon)

46.80
46.80
61.80
55.80
56.30
55.48
41.30
13.80
58.30
59.30
58.80
39.80
39.83
33.11
60.80
62.57
47.30
46.73
46.80
46.80
62.30
62.30
62.30
62.30
38.30
54.80
58.80
57.80
93.80
1,530.92

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

46.80
46.80
61.80
55.80
56.30
55.48
41.30
13.80
58.30
59.30
58.80
39.80
39.83
33.11
60.80
62.57
47.30
46.73
46.80
46.80
62.30
62.30
62.30
62.30
38.30
54.80
58.80
57.80
93.80

0.00

1,020.19

510.73

0.00

0.00

0.00

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 20

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

Bz-504
Bz-505
Bz-517
MH-525
Bz-518
MH-524
Bz-519
MH-522
Bz-520
MH-522
MH-534
Bz-521
Bz-364
Bz-369
Bz-373
Bz-510
Bz-511
Bz-512
Bz-513
Bz-514
Bz-84
Bz-515
Bz-86
MH-860
Bz-744
MH-808
Bz-750
Bz-666
Bz-740

Bz-654
Bz-515
Bz-514
Bz-518
Bz-512
Bz-519
Bz-511
Bz-520
Bz-510
Bz-521
Bz-521
Bz-364
Bz-369
Bz-373
Bz-510
Bz-511
Bz-512
Bz-513
Bz-514
Bz-84
Bz-515
Bz-86
Bz-654
Bz-744
Bz-666
Bz-750
Bz-666
Bz-740
Bz-733

0.90
1.20
1.20
1.20
1.24
1.20
1.20
1.20
1.20
1.20
1.20
2.20
2.12
1.33
1.82
2.87
2.20
2.56
2.68
2.76
2.77
1.99
1.50
1.20
2.19
1.20
1.20
1.29
1.29

2.99
2.00
2.24
1.24
2.05
1.20
1.43
1.20
2.36
2.20
2.20
2.12
1.33
1.82
2.87
2.20
2.56
2.68
2.76
2.77
1.99
1.50
3.19
2.19
1.29
1.20
1.29
1.29
1.61

1.95
1.60
1.72
1.22
1.65
1.20
1.32
1.20
1.78
1.70
1.70
2.16
1.72
1.57
2.35
2.54
2.38
2.62
2.72
2.76
2.38
1.74
2.34
1.70
1.74
1.20
1.24
1.29
1.45

64.00
65.00
57.50
58.00
58.00
58.50
58.00
58.50
58.00
42.50
63.00
13.00
59.50
59.50
55.00
56.50
59.00
63.50
63.00
41.50
41.50
40.50
40.50
54.00
54.00
61.50
61.50
57.50
58.00
1,580.50

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

64.00
65.00
57.50
58.00
58.00
58.50
58.00
58.50
58.00
42.50
63.00
13.00
59.50
59.50
55.00
56.50
59.00
63.50
63.00
41.50
41.50
40.50
40.50
54.00
54.00
61.50
61.50
57.50
58.00

ext.. Buzon)

62.80
63.80
56.30
56.80
56.80
57.30
56.80
57.30
56.80
41.30
61.80
11.80
58.30
58.30
53.80
55.30
57.80
62.30
61.80
40.30
40.30
39.30
39.30
52.80
52.80
60.30
60.30
56.30
56.80
1,545.70

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

62.80
63.80
56.30
56.80
56.80
57.30
56.80
57.30
56.80
41.30
61.80
11.80
58.30
58.30
53.80
55.30
57.80
62.30
61.80
40.30
40.30
39.30
39.30
52.80
52.80
60.30
60.30
56.30
56.80

0.00

461.90

661.10

203.00

219.70

0.00

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 20

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

Bz-763
MH-678
Bz-689
Bz-765
Bz-687
Bz-775
Bz-683
Bz-756
Bz-749
Bz-668
Bz-662
Bz-735
Bz-734
MH-512
Bz-507
MH-511
Bz-508
MH-514
Bz-506
MH-505
MH-504
MH-510
Bz-509
Bz-497
Bz-498
Bz-499
Bz-500
Bz-501
Bz-83
Bz-502
Bz-503

Bz-687
Bz-756
Bz-765
Bz-687
Bz-775
Bz-683
Bz-756
Bz-749
Bz-668
Bz-662
Bz-735
Bz-734
Bz-733
Bz-507
Bz-499
Bz-508
Bz-498
Bz-506
Bz-501
Bz-502
Bz-503
Bz-509
Bz-497
Bz-498
Bz-499
Bz-500
Bz-501
Bz-83
Bz-502
Bz-503
Bz-723

1.20
1.20
1.20
1.54
2.45
2.88
3.41
3.33
3.40
3.09
1.84
1.34
1.34
1.20
1.54
1.20
1.72
1.20
1.78
1.20
1.20
1.20
1.50
1.57
2.79
2.95
2.25
2.31
2.16
2.61
1.83

2.45
1.20
1.54
2.45
2.88
3.41
3.33
3.40
3.09
1.84
1.34
1.34
1.61
1.54
2.64
1.72
2.79
1.78
2.25
1.77
1.21
1.50
1.57
2.79
2.95
2.25
2.31
2.16
2.61
1.83
1.80

1.82
1.20
1.37
2.00
2.67
3.14
3.37
3.37
3.25
2.47
1.59
1.34
1.47
1.37
2.09
1.46
2.25
1.49
2.01
1.48
1.20
1.35
1.53
2.18
2.87
2.60
2.28
2.23
2.38
2.22
1.82

39.50
53.50
44.50
49.50
74.50
56.50
56.50
61.50
61.50
58.00
58.00
54.50
54.50
65.00
65.00
65.50
65.00
65.50
65.50
65.50
63.50
65.50
65.00
57.50
60.00
65.00
65.50
44.50
44.00
77.50
96.22
1,883.72

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

39.50
53.50
44.50
49.50
74.50
56.50
56.50
61.50
61.50
58.00
58.00
54.50
54.50
65.00
65.00
65.50
65.00
65.50
65.50
65.50
63.50
65.50
65.00
57.50
60.00
65.00
65.50
44.50
44.00
77.50
96.22

ext.. Buzon)

38.30
52.30
43.30
48.30
73.30
55.30
55.30
60.30
60.30
56.80
56.80
53.30
53.30
63.80
63.80
64.30
63.80
64.30
64.30
64.30
62.30
64.30
63.80
56.30
58.80
63.80
64.30
43.30
42.80
76.30
95.02
1,846.52

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

38.30
52.30
43.30
48.30
73.30
55.30
55.30
60.30
60.30
56.80
56.80
53.30
53.30
63.80
63.80
64.30
63.80
64.30
64.30
64.30
62.30
64.30
63.80
56.30
58.80
63.80
64.30

64.30

43.30
42.80
76.30
95.02

0.00

585.50

302.22

531.70

260.20

231.20

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 20

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

MH-648
Bz-647
MH-497
Bz-496
MH-499
Bz-495
MH-500
Bz-494
MH-501
Bz-493
MH-502
Bz-85
MH-477
Bz-402
Bz-401
Bz-400
Bz-399
Bz-398
Bz-397
Bz-485
Bz-486
Bz-487
Bz-488
Bz-489
Bz-490
Bz-491
Bz-492

Bz-647
Bz-723
Bz-496
Bz-485
Bz-495
Bz-487
Bz-494
Bz-488
Bz-493
Bz-489
Bz-85
Bz-491
Bz-492
Bz-401
Bz-400
Bz-399
Bz-398
Bz-397
Bz-485
Bz-486
Bz-487
Bz-488
Bz-489
Bz-490
Bz-491
Bz-492
Bz-715

1.20
1.86
1.20
1.77
1.20
1.24
1.20
1.70
1.20
1.72
1.20
1.22
1.20
1.20
1.20
1.33
1.66
2.37
2.27
2.28
2.51
2.50
2.18
2.37
2.42
2.45
1.94

1.86
1.40
1.77
1.89
1.24
1.49
1.70
1.84
1.72
2.06
1.22
1.92
1.24
1.20
1.33
1.66
2.37
2.27
2.28
2.51
2.50
2.18
2.37
2.42
2.45
1.94
1.54

1.53
1.63
1.49
1.83
1.22
1.37
1.45
1.77
1.46
1.89
1.21
1.57
1.22
1.20
1.26
1.50
2.02
2.32
2.27
2.39
2.50
2.34
2.28
2.40
2.44
2.19
1.74

55.00
55.50
54.00
53.50
54.00
54.00
53.50
52.91
53.00
53.50
54.00
54.00
55.00
68.50
71.00
40.50
59.00
54.00
55.00
59.00
58.50
69.00
61.50
56.50
46.00
65.50
95.11
1,561.02

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

55.00
55.50
54.00
53.50
54.00
54.00
53.50
52.91
53.00
53.50
54.00
54.00
55.00
68.50
71.00
40.50
59.00
54.00
55.00
59.00
58.50
69.00
61.50
56.50
46.00
65.50
95.11

ext.. Buzon)

53.80
54.30
52.80
52.30
52.80
52.80
52.30
51.71
51.80
52.30
52.80
52.80
53.80
67.30
69.80
39.30
57.80
52.80
53.80
57.80
57.30
67.80
60.30
55.30
44.80
64.30
93.91
1,528.62

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

53.80
54.30
52.80
52.30
52.80
52.80
52.30
51.71
51.80
52.30
52.80
52.80
53.80
67.30
69.80
39.30
57.80
52.80
53.80
57.80
57.30
67.80
60.30
55.30
44.80
64.30
93.91

0.00

545.50

411.12

572.00

0.00

0.00

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 20

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

MH-649
MH-73
Bz-729
Bz-648
Bz-644
MH-642
Bz-718
MH-715
Bz-713
MH-407
MH-849
MH-847
MH-845
MH-843
Bz-407
Bz-406
Bz-30
Bz-405
Bz-404
Bz-403
Bz-484
Bz-483
Bz-482
Bz-481
Bz-480
Bz-479
Bz-478
Bz-477

Bz-648
Bz-729
Bz-648
Bz-644
Bz-640
Bz-718
Bz-640
Bz-713
Bz-635
Bz-405
Bz-403
Bz-482
Bz-480
Bz-479
Bz-406
Bz-30
Bz-405
Bz-404
Bz-403
Bz-484
Bz-483
Bz-482
Bz-481
Bz-480
Bz-479
Bz-478
Bz-477
Bz-475

1.20
1.20
1.72
1.31
1.30
1.20
2.28
1.20
1.14
1.20
1.20
1.20
1.20
1.20
1.20
1.22
1.21
2.31
2.24
2.35
2.73
2.54
3.16
2.81
3.02
3.25
3.14
3.05

1.23
1.72
1.31
1.30
2.06
2.28
2.06
1.14
4.91
2.31
1.73
2.28
2.13
2.20
1.22
1.21
2.31
2.24
2.35
2.73
2.54
3.16
2.81
3.02
3.25
3.14
3.05
2.91

1.21
1.46
1.52
1.31
1.68
1.74
2.17
1.17
3.02
1.75
1.46
1.74
1.66
1.70
1.21
1.22
1.76
2.27
2.29
2.54
2.64
2.85
2.99
2.92
3.14
3.20
3.10
2.98

55.50
62.00
62.00
57.49
58.02
54.00
54.00
56.00
55.50
58.50
58.50
58.00
58.00
56.50
54.00
56.00
56.00
57.50
57.50
56.50
56.00
60.00
65.50
65.50
60.00
56.00
55.50
56.00
1,616.01

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

55.50
62.00
62.00
57.49
58.02
54.00
54.00
56.00
55.50
58.50
58.50
58.00
58.00
56.50
54.00
56.00
56.00
57.50
57.50
56.50
56.00
60.00
65.50
65.50
60.00
56.00
55.50
56.00

ext.. Buzon)

54.30
60.80
60.80
56.29
56.82
52.80
52.80
54.80
54.30
57.30
57.30
56.80
56.80
55.30
52.80
54.80
54.80
56.30
56.30
55.30
54.80
58.80
64.30
64.30
58.80
54.80
54.30
54.80
1,582.41

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

54.30
60.80
60.80
56.29
56.82
52.80
52.80
54.80
54.30
57.30
57.30
56.80
56.80
55.30
52.80
54.80
54.80
56.30
56.30
55.30
54.80
58.80
64.30
64.30
58.80
54.80
54.30
54.80

0.00

391.09

451.42

165.40

352.30

222.20

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 20

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

MH-406
MH-405
MH-850
MH-848
MH-846
MH-844
MH-804
Bz-412
Bz-411
Bz-410
Bz-409
Bz-408
Bz-468
Bz-469
Bz-470
Bz-471
Bz-472
Bz-473
Bz-474
Bz-475
Bz-476
Bz-635
Bz-634

Bz-412
Bz-410
Bz-408
Bz-470
Bz-472
Bz-473
Bz-412
Bz-411
Bz-410
Bz-409
Bz-408
Bz-468
Bz-469
Bz-470
Bz-471
Bz-472
Bz-473
Bz-474
Bz-475
Bz-476
Bz-635
Bz-634
Bz-633

1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.80
1.23
1.46
1.37
1.59
1.77
2.15
2.62
2.27
2.58
2.83
2.46
2.91
3.11
4.91
2.16

1.81
1.46
1.59
1.79
1.87
1.83
1.80
1.23
1.46
1.37
1.59
1.77
2.15
2.62
2.27
2.58
2.83
2.46
2.91
3.11
4.91
2.16
1.81

1.50
1.33
1.39
1.49
1.53
1.51
1.50
1.51
1.34
1.42
1.48
1.68
1.96
2.38
2.44
2.42
2.70
2.65
2.69
3.01
4.01
3.53
1.99

55.00
57.00
57.00
57.00
56.00
57.50
45.01
56.00
56.50
58.00
58.00
56.00
55.50
61.50
65.75
65.75
64.50
55.50
55.00
49.00
48.50
57.50
57.00

1,304.51

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

55.00
57.00
57.00
57.00
56.00
57.50
45.01
56.00
56.50
58.00
58.00
56.00
55.50
61.50
65.75
65.75
64.50
55.50
55.00
49.00
48.50
57.50
57.00

ext.. Buzon)

53.80
55.80
55.80
55.80
54.80
56.30
43.81
54.80
55.30
56.80
56.80
54.80
54.30
60.30
64.55
64.55
63.30
54.30
53.80
47.80
47.30
56.30
55.80

1,276.91

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

53.80
55.80
55.80
55.80
54.80
56.30
43.81
54.80
55.30
56.80
56.80
54.80
54.30
60.30
64.55
64.55
63.30
54.30
53.80
47.80
47.30
56.30
55.80

0.00

433.91

330.80

189.40

171.40

47.80

56.30

47.30

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

MH-873
Bz-68
MH-874
Bz-58
MH-877
Bz-49
MH-876
Bz-42
MH-875
Bz-41
Bz-451
Bz-452
Bz-453
Bz-454
Bz-455
Bz-456
Bz-457
Bz-458
Bz-459
Bz-703
Bz-71
MH-635
Bz-72
MH-475
Bz-70
MH-473
Bz-59
MH-472
Bz-50

Bz-68
Bz-458
Bz-58
Bz-456
Bz-49
Bz-455
Bz-42
Bz-454
Bz-41
Bz-453
Bz-452
Bz-453
Bz-454
Bz-455
Bz-456
Bz-457
Bz-458
Bz-459
Bz-703
Bz-71
Bz-632
Bz-72
Bz-632
Bz-70
Bz-460
Bz-59
Bz-462
Bz-50
Bz-463

1.20
2.14
1.20
2.06
1.20
1.62
1.20
2.06
1.20
1.57
1.20
2.28
2.93
2.96
2.68
3.41
3.38
3.56
3.82
3.87
3.51
1.20
2.63
1.20
1.75
1.20
1.65
1.20
1.55

2.14
2.71
2.06
2.10
1.62
1.96
2.06
2.53
1.57
2.28
2.28
2.93
2.96
2.68
3.41
3.38
3.56
3.82
3.87
3.51
2.52
2.63
3.43
1.75
2.14
1.65
2.17
1.55
1.78

1.67
2.42
1.63
2.08
1.41
1.79
1.63
2.30
1.39
1.92
1.74
2.61
2.95
2.82
3.05
3.40
3.47
3.69
3.84
3.69
3.01
1.92
3.03
1.48
1.95
1.43
1.91
1.38
1.67

51.50
51.00
51.50
51.00
51.50
51.00
51.00
51.00
51.00
50.50
59.00
59.00
74.00
55.50
70.50
69.00
42.50
30.50
66.00
51.00
51.50
43.50
43.00
44.50
44.00
43.00
42.50
42.00
42.00
1,484.00

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

51.50
51.00
51.50
51.00
51.50
51.00
51.00
51.00
51.00
50.50
59.00
59.00
74.00
55.50
70.50
69.00
42.50
30.50
66.00
51.00
51.50
43.50
43.00
44.50
44.00
43.00
42.50
42.00
42.00

ext.. Buzon)

50.30
49.80
50.30
49.80
50.30
49.80
49.80
49.80
49.80
49.30
57.80
57.80
72.80
54.30
69.30
67.80
41.30
29.30
64.80
49.80
50.30
42.30
41.80
43.30
42.80
41.80
41.30
40.80
40.80
1,449.20

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

50.30
49.80
50.30
49.80
50.30
49.80
49.80
49.80
49.80
49.30
57.80
57.80
72.80
54.30
69.30
67.80
41.30
29.30
64.80
49.80
50.30
42.30
41.80
43.30
42.80
41.80
41.30

40.80
40.80

0.00

226.00

474.50

149.40

184.90

270.50

143.90

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

MH-470
Bz-43
Bz-465
Bz-464
Bz-463
Bz-462
Bz-461
Bz-460
Bz-69
Bz-632
Bz-708
MH-878
Bz-625
Bz-624
Bz-76
MH-97
Bz-792
MH-854
Bz-776
MH-856
Bz-757
MH-862
Bz-746
MH-863
Bz-736
Bz-649

Bz-43
Bz-465
Bz-464
Bz-463
Bz-462
Bz-461
Bz-460
Bz-69
Bz-632
Bz-708
Bz-630
Bz-625
Bz-624
Bz-76
Bz-630
Bz-789
Bz-793
Bz-776
Bz-700
Bz-757
Bz-681
Bz-746
Bz-747
Bz-736
Bz-660
Bz-727

1.20
1.93
1.73
1.69
2.13
2.69
3.22
2.24
1.23
3.43
3.15
1.20
1.99
3.00
1.32
1.20
1.20
1.20
1.89
1.20
1.21
1.20
1.66
1.20
2.05
1.20

1.93
1.73
1.69
2.13
2.69
3.22
2.24
1.23
3.43
3.15
2.33
1.99
3.00
1.32
2.40
2.02
3.13
1.89
2.15
1.21
1.71
1.66
1.79
2.05
2.89
1.70

1.56
1.83
1.71
1.91
2.41
2.96
2.73
1.73
2.33
3.29
2.74
1.60
2.50
2.16
1.86
1.61
2.16
1.54
2.02
1.21
1.46
1.43
1.72
1.62
2.47
1.45

41.40
41.00
74.00
54.50
66.00
56.50
56.00
48.00
48.00
54.50
55.00
54.00
54.00
52.50
52.50
46.00
35.50
58.50
64.50
60.00
60.00
58.50
58.50
57.00
57.00
55.50
1,418.90

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

41.40
41.00
74.00
54.50
66.00
56.50
56.00
48.00
48.00
54.50
55.00
54.00
54.00
52.50
52.50
46.00
35.50
58.50
64.50
60.00
60.00
58.50
58.50
57.00
57.00
55.50

ext.. Buzon)

40.20
39.80
72.80
53.30
64.80
55.30
54.80
46.80
46.80
53.30
53.80
52.80
52.80
51.30
51.30
44.80
34.30
57.30
63.30
58.80
58.80
57.30
57.30
55.80
55.80
54.30
1,387.70

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

40.20
39.80
72.80
53.30
64.80
55.30
54.80
46.80
46.80
53.30
53.80
52.80
52.80
51.30
51.30
44.80
34.30
57.30
63.30
58.80
58.80
57.30
57.30
55.80
55.80
54.30

0.00

229.20

572.20

369.10

163.90

53.30

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

Bz-98
Bz-789
Bz-790
Bz-791
Bz-793
Bz-794
Bz-778
Bz-700
Bz-759
Bz-681
Bz-671
Bz-747
Bz-661
Bz-660
Bz-651
Bz-727
Bz-643
Bz-642
Bz-637
Bz-05
Bz-04
Bz-618
MH-624
Bz-623
MH-624
Bz-75
Bz-621
Bz-620
Bz-619
Bz-100
Bz-622
Bz-704

Bz-789
Bz-790
Bz-791
Bz-793
Bz-794
Bz-778
Bz-700
Bz-759
Bz-681
Bz-671
Bz-747
Bz-661
Bz-660
Bz-651
Bz-727
Bz-643
Bz-642
Bz-637
Bz-05
Bz-04
Bz-705
Bz-619
Bz-623
Bz-622
Bz-75
Bz-621
Bz-620
Bz-619
Bz-100
Bz-622
Bz-704
Bz-24

1.20
2.49
2.43
2.65
3.24
1.77
2.32
2.35
2.55
2.05
2.08
2.17
1.93
2.89
2.35
2.40
1.46
1.58
1.31
1.34
1.32
1.20
1.20
1.75
1.20
1.75
1.78
2.71
3.41
4.06
3.29
1.87

2.49
2.43
2.65
3.24
1.77
2.32
2.35
2.55
2.05
2.08
2.17
1.93
2.89
2.35
2.40
1.46
1.58
1.31
1.34
1.32
2.64
3.41
1.75
1.22
1.75
1.78
2.71
3.41
4.06
3.29
1.87
1.62

1.84
2.46
2.54
2.95
2.51
2.05
2.33
2.45
2.30
2.06
2.12
2.05
2.41
2.62
2.37
1.93
1.52
1.45
1.33
1.33
1.98
2.30
1.47
1.48
1.48
1.76
2.25
3.06
3.73
3.67
2.58
1.75

58.00
55.00
55.00
53.00
64.00
72.00
78.50
57.50
57.50
60.50
60
59.50
59.00
60.50
60.00
60.50
60.50
53.50
48.15
48.15
48.15
57.50
55.00
55.00
51.00
50.50
55.00
55.00
48.50
48.50
52.00
28.63

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

58.00
55.00
55.00
53.00
64.00
72.00
78.50
57.50
57.50
60.50
60.00
59.50
59.00
60.50
60.00
60.50
60.50
53.50
48.15
48.15
48.15
57.50
55.00
55.00
51.00
50.50
55.00
55.00
48.50
48.50
52.00
28.63

56.80
53.80
53.80
51.80
62.80
70.80
77.30
56.30
56.30
59.30
58.80
58.30
57.80
59.30
58.80
59.30
59.30
52.30
46.95
46.95
46.95
56.30
53.80
53.80
49.80
49.30
53.80
53.80
47.30
47.30
50.80
27.43

ext.. Buzon)

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

56.80
53.80
53.80
51.80
62.80
70.80
77.30
56.30
56.30
59.30
58.80
58.30
57.80
59.30
58.80
59.30
59.30
52.30
46.95
46.95
46.95
56.30
53.80
53.80
49.80
49.30
53.80
53.80
47.30
47.30

50.80
27.43

1,785.58

1,747.18

0.00

303.60

299.08

717.60

278.50

53.80

94.60

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

MH-240
Bz-237
Bz-240
MH-218
Bz-217
Bz-348
Bz-339
Bz-334
Bz-318
Bz-317
Bz-294
Bz-295
Bz-293
Bz-279
Bz-278
Bz-261
Bz-260
Bz-239
Bz-238
Bz-216
Bz-101
MH-186
Bz-187
MH-317
Bz-316
MH-295
Bz-296
MH-279
Bz-280

Bz-237
Bz-217
Bz-239
Bz-217
Bz-216
Bz-339
Bz-334
Bz-318
Bz-317
Bz-294
Bz-295
Bz-293
Bz-279
Bz-278
Bz-261
Bz-260
Bz-239
Bz-238
Bz-216
Bz-101
Bz-215
Bz-187
Bz-215
Bz-316
Bz-315
Bz-296
Bz-298
Bz-280
Bz-281

1.20
1.20
1.20
1.20
1.65
1.20
2.70
3.38
3.33
3.18
3.05
3.48
3.16
2.74
1.96
1.79
1.34
1.33
1.28
3.15
2.19
1.20
1.20
1.20
1.20
1.20
1.20
1.20
2.25

1.20
1.32
1.33
1.65
3.15
2.70
3.38
3.33
3.18
3.05
3.48
3.16
2.74
1.96
1.79
1.34
1.33
1.28
3.15
2.19
2.91
1.20
2.61
1.20
1.25
1.20
1.44
2.25
2.35

1.20
1.26
1.26
1.42
2.40
1.95
3.04
3.35
3.25
3.12
3.27
3.32
2.95
2.35
1.88
1.56
1.33
1.31
2.22
2.67
2.55
1.20
1.91
1.20
1.22
1.20
1.32
1.73
2.30

54.50
54.50
59.50
56.50
61.00
71.00
71.00
58.00
58.00
60.00
60.00
60.00
60.00
60.00
59.50
60.00
60.00
55.00
55.00
53.50
53.00
58.00
57.50
60.00
60.00
60.00
60.00
61.00
61.00
1,717.50

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

54.50
54.50
59.50
56.50
61.00
71.00
71.00
58.00
58.00
60.00
60.00
60.00
60.00
60.00
59.50
60.00
60.00
55.00
55.00
53.50
53.00
58.00
57.50
60.00
60.00
60.00
60.00
61.00
61.00

ext.. Buzon)

53.30
53.30
58.30
55.30
59.80
69.80
69.80
56.80
56.80
58.80
58.80
58.80
58.80
58.80
58.30
58.80
58.80
53.80
53.80
52.30
51.80
56.80
56.30
58.80
58.80
58.80
58.80
59.80
59.80
1,682.70

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

53.30
53.30
58.30
55.30
59.80
69.80
69.80
56.80
56.80
58.80
58.80
58.80
58.80
58.80
58.30
58.80
58.80
53.80
53.80
52.30
51.80
56.80
56.30
58.80
58.80
58.80
58.80
59.80
59.80

0.00

624.80

303.00

232.20

162.90

359.80

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

MH-261
Bz-262
MH-220
Bz-219
Bz-235
Bz-240
MH-334
Bz-333
Bz-332
Bz-319
Bz-315
Bz-297
Bz-298
Bz-292
Bz-281
Bz-277
Bz-263
Bz-259
Bz-241
Bz-236
Bz-218
Bz-211
MH-209
Bz-212
MH-190
Bz-189
Bz-188
Bz-164
Bz-186
Bz-185

Bz-262
Bz-263
Bz-219
Bz-218
Bz-236
Bz-241
Bz-333
Bz-332
Bz-319
Bz-315
Bz-297
Bz-298
Bz-292
Bz-281
Bz-277
Bz-263
Bz-259
Bz-241
Bz-236
Bz-218
Bz-211
Bz-213
Bz-212
Bz-213
Bz-189
Bz-102
Bz-102
Bz-186
Bz-185
Bz-184

1.20
2.53
1.20
1.80
1.20
1.20
1.20
1.42
1.30
1.50
1.43
1.68
2.07
2.65
2.35
2.12
2.88
2.15
2.27
1.60
1.41
1.42
1.20
1.28
1.20
1.20
1.20
1.20
1.70
1.30

2.53
2.88
1.80
1.41
1.60
1.21
1.42
1.30
1.50
1.43
1.68
2.07
2.65
2.35
2.12
2.88
2.15
2.27
1.60
1.41
1.42
1.85
1.28
1.85
1.20
2.81
2.61
1.70
1.30
2.18

1.87
2.71
1.50
1.60
1.40
1.21
1.31
1.36
1.40
1.46
1.55
1.87
2.36
2.50
2.24
2.50
2.52
2.21
1.94
1.51
1.41
1.64
1.24
1.57
1.20
2.00
1.90
1.45
1.50
1.74

61.00
61.00
57.50
57.00
58.50
59.50
59.00
59.50
59.00
59.00
58.50
58.50
60.00
60.50
59.50
59.00
66.00
55.50
60.50
48.00
53.50
53.50
56.50
57.00
57.50
57.00
56.00
63.50
56.00
55.50
1,743.00

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

61.00
61.00
57.50
57.00
58.50
59.50
59.00
59.50
59.00
59.00
58.50
58.50
60.00
60.50
59.50
59.00
66.00
55.50
60.50
48.00
53.50
53.50
56.50
57.00
57.50
57.00
56.00
63.50
56.00
55.50

ext.. Buzon)

59.80
59.80
56.30
55.80
57.30
58.30
57.80
58.30
57.80
57.80
57.30
57.30
58.80
59.30
58.30
57.80
64.80
54.30
59.30
46.80
52.30
52.30
55.30
55.80
56.30
55.80
54.80
62.30
54.80
54.30
1,707.00

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

59.80
59.80
56.30
55.80
57.30
58.30
57.80
58.30
57.80
57.80
57.30
57.30
58.80
59.30
58.30
57.80
64.80
54.30
59.30
46.80
52.30
52.30
55.30
55.80
56.30
55.80
54.80
62.30
54.80
54.30

0.00

684.60

609.30

288.50

124.60

0.00

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

MH-166
MH-265
Bz-266
MH-256
MH-243
Bz-123
MH-220
Bz-221
MH-283
Bz-128
Bz-284
Bz-133
Bz-267
Bz-255
Bz-254
Bz-244
Bz-233
Bz-222
Bz-208
Bz-205
Bz-104
MH-315
Bz-314
MH-298
Bz-299
MH-281
Bz-282
MH-263
Bz-264

Bz-184
Bz-266
Bz-267
Bz-254
Bz-123
Bz-244
Bz-221
Bz-222
Bz-128
Bz-284
Bz-133
Bz-267
Bz-255
Bz-254
Bz-244
Bz-233
Bz-222
Bz-208
Bz-205
Bz-104
Bz-209
Bz-314
Bz-313
Bz-299
Bz-301
Bz-282
Bz-283
Bz-264
Bz-265

1.20
1.20
1.24
1.20
1.20
1.88
1.20
1.20
1.20
1.23
1.20
1.84
2.59
2.79
3.39
2.72
2.33
2.91
2.33
2.85
1.74
1.20
1.65
1.20
1.96
1.20
2.41
1.20
2.15

2.18
1.24
1.95
3.38
1.88
2.63
1.20
3.14
1.23
1.20
1.84
2.59
2.79
3.39
2.72
2.33
2.91
2.33
2.85
1.74
1.30
1.65
2.20
1.96
1.90
2.41
2.90
2.15
3.19

1.69
1.22
1.59
2.29
1.54
2.26
1.20
2.17
1.21
1.21
1.52
2.22
2.69
3.09
3.06
2.52
2.62
2.62
2.59
2.30
1.52
1.43
1.93
1.58
1.93
1.81
2.66
1.68
2.67

62.00
46.00
45.50
90.00
44.50
44.50
46.00
45.50
46.00
45.50
60.00
60.00
62.00
13.50
46.50
67.00
41.00
53.50
53.50
47.50
47.50
60.00
59.50
61.00
61.50
60.00
60.50
60.00
60.00
1,550.00

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

62.00
46.00
45.50
90.00
44.50
44.50
46.00
45.50
46.00
45.50
60.00
60.00
62.00
13.50
46.50
67.00
41.00
53.50
53.50
47.50
47.50
60.00
59.50
61.00
61.50
60.00
60.50
60.00
60.00

ext.. Buzon)

60.80
44.80
44.30
88.80
43.30
43.30
44.80
44.30
44.80
44.30
58.80
58.80
60.80
12.30
45.30
65.80
39.80
52.30
52.30
46.30
46.30
58.80
58.30
59.80
60.30
58.80
59.30
58.80
58.80
1,515.20

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

60.80
44.80
44.30
88.80
43.30
43.30
44.80
44.30
44.80
44.30
58.80
58.80
60.80
12.30
45.30
65.80
39.80
52.30
52.30
46.30
46.30
58.80
58.30
59.80
60.30
58.80
59.30
58.80
58.80

0.00

237.50

549.50

281.50

389.10

57.60

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

MH-259
Bz-258
MH-241
Bz-242
MH-192
Bz-191
Bz-235
MH-332
Bz-331
Bz-330
Bz-320
Bz-313
Bz-300
Bz-301
Bz-291
Bz-283
Bz-276
Bz-265
Bz-257
Bz-256
Bz-243
Bz-234
Bz-220
Bz-210
Bz-209
Bz-190
MH-181
Bz-103
MH-912
Bz-169

Bz-258
Bz-257
Bz-242
Bz-243
Bz-191
Bz-190
Bz-234
Bz-331
Bz-330
Bz-320
Bz-313
Bz-300
Bz-301
Bz-291
Bz-283
Bz-276
Bz-265
Bz-257
Bz-256
Bz-243
Bz-234
Bz-220
Bz-210
Bz-209
Bz-190
Bz-182
Bz-103
Bz-182
Bz-169
Bz-168

1.20
2.38
1.20
2.47
1.20
1.89
1.20
1.20
1.77
1.62
2.44
2.33
2.44
2.63
3.35
4.07
4.26
3.93
2.99
2.48
2.29
1.86
1.94
1.61
1.30
1.22
1.20
1.33
0.90
1.92

2.38
2.91
2.47
2.04
1.89
1.22
1.41
1.77
1.62
2.44
2.33
2.44
2.63
3.35
4.07
4.26
3.93
2.99
2.48
2.29
1.86
1.94
1.61
1.30
1.22
1.70
1.33
1.70
1.92
3.18

1.79
2.64
1.84
2.25
1.54
1.55
1.31
1.49
1.69
2.03
2.39
2.39
2.54
2.99
3.71
4.16
4.09
3.46
2.73
2.38
2.08
1.90
1.77
1.45
1.26
1.46
1.27
1.52
1.41
2.55

60.00
60.00
60.00
60.00
47.50
47.50
58.50
61.00
61.00
59.00
59.00
57.00
57.00
61.00
61.00
59.50
59.00
67.00
10.00
45.50
60.00
47.00
53.50
53.50
58.00
57.50
47.50
47.50
47.50
47.50
1,630.00

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

60.00
60.00
60.00
60.00
47.50
47.50
58.50
61.00
61.00
59.00
59.00
57.00
57.00
61.00
61.00
59.50
59.00
67.00
10.00
45.50
60.00
47.00
53.50
53.50
58.00
57.50
47.50
47.50
47.50
47.50

ext.. Buzon)

58.80
58.80
58.80
58.80
46.30
46.30
57.30
59.80
59.80
57.80
57.80
55.80
55.80
59.80
59.80
58.30
57.80
65.80
8.80
44.30
58.80
45.80
52.30
52.30
56.80
56.30
46.30
46.30
46.30
46.30
1,594.00

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

58.80
58.80
58.80
58.80
46.30
46.30
57.30
59.80
59.80
57.80
57.80
55.80
55.80
59.80
59.80
58.30
57.80
65.80
8.80
44.30
58.80
45.80
52.30
52.30
56.80
56.30
46.30
46.30
46.30
46.30

0.00

375.10

414.40

333.30

229.50

65.80

59.80

116.10

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

MH-161
Bz-165
Bz-166
Bz-167
MH-163
Bz-135
Bz-136
Bz-137
Bz-138
MH-164
Bz-163
Bz-162
Bz-161
Bz-160
Bz-171
MH-205
Bz-192
Bz-181
Bz-170
MH-313
Bz-312
MH-301
Bz-302
MH-284
MH-267
Bz-268
MH-255
Bz-253
MH-244
Bz-245

Bz-166
Bz-166
Bz-167
Bz-168
Bz-135
Bz-136
Bz-137
Bz-138
Bz-162
Bz-163
Bz-162
Bz-161
Bz-160
Bz-159
Bz-170
Bz-192
Bz-181
Bz-170
Bz-157
Bz-312
Bz-311
Bz-302
Bz-303
Bz-285
Bz-268
Bz-269
Bz-253
Bz-252
Bz-245
Bz-246

1.20
1.20
1.20
1.41
1.20
1.77
1.94
2.27
2.68
1.20
1.85
3.71
1.51
1.50
1.20
1.20
1.20
1.20
1.20
1.20
2.07
1.20
2.38
1.20
1.20
1.50
1.20
1.43
1.20
2.57

1.20
1.20
1.41
2.74
1.77
1.94
2.27
2.68
3.71
1.85
3.71
1.51
1.50
2.69
1.20
1.20
1.20
1.20
2.25
2.07
2.69
2.38
2.54
2.91
1.50
3.05
1.43
3.22
2.57
3.09

1.20
1.20
1.30
2.08
1.49
1.86
2.10
2.47
3.20
1.53
2.78
2.61
1.50
2.10
1.20
1.20
1.20
1.20
1.73
1.63
2.38
1.79
2.46
2.06
1.35
2.28
1.32
2.32
1.89
2.83

68.00
59.98
57.00
57.00
65.00
65.00
56.00
65.50
65.00
64.00
57.00
53.00
57.00
57.00
77.00
57.50
57.50
62.50
66.50
46.00
46.00
59.00
59.00
26.50
50.00
50.50
50.00
51.74
51.50
51.50
1,709.22

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

68.00
59.98
57.00
57.00
65.00
65.00
56.00
65.50
65.00
64.00
57.00
53.00
57.00
57.00
77.00
57.50
57.50
62.50
66.50
46.00
46.00
59.00
59.00
26.50
50.00
50.50
50.00
51.74
51.50
51.50

ext.. Buzon)

66.80
58.78
55.80
55.80
63.80
63.80
54.80
64.30
63.80
62.80
55.80
51.80
55.80
55.80
75.80
56.30
56.30
61.30
65.30
44.80
44.80
57.80
57.80
25.30
48.80
49.30
48.80
50.54
50.30
50.30
1,673.22

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

66.80
58.78
55.80
55.80
63.80
63.80
54.80
64.30
63.80
62.80
55.80
51.80
55.80
55.80
75.80
56.30
56.30
61.30
65.30
44.80
44.80
57.80
57.80
25.30
48.80
49.30
48.80
50.54
50.30
50.30

0.00

648.28

344.80

458.44

157.90

63.80

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

MH-233
Bz-232
MH-222
Bz-223
MH-223
Bz-207
MH-205
Bz-204
Bz-105
MH-192
Bz-193
MH-181
Bz-180
MH-171
MH-174
Bz-173
Bz-107
MH-330
Bz-321
Bz-311
Bz-304
Bz-303
Bz-290
Bz-285
Bz-286
Bz-275
Bz-269
Bz-252
Bz-246
Bz-231

Bz-232
Bz-231
Bz-223
Bz-224
Bz-207
Bz-204
Bz-204
Bz-105
Bz-203
Bz-193
Bz-194
Bz-180
Bz-179
Bz-172
Bz-173
Bz-107
Bz-172
Bz-321
Bz-311
Bz-304
Bz-303
Bz-290
Bz-285
Bz-286
Bz-275
Bz-269
Bz-252
Bz-246
Bz-231
Bz-224

1.20
2.39
1.20
1.48
1.20
2.22
1.20
2.54
2.72
1.20
2.70
1.20
2.61
1.20
1.20
2.44
3.17
1.20
3.01
3.22
3.19
2.64
3.00
3.15
3.36
3.97
3.82
3.69
3.49
2.90

2.39
2.74
1.48
2.08
2.22
2.54
2.54
2.72
2.60
2.70
2.20
2.61
2.04
2.86
2.44
3.17
2.83
3.01
3.22
3.19
2.64
3.00
3.15
3.36
3.97
3.82
3.69
3.49
2.90
2.36

1.80
2.57
1.34
1.78
1.71
2.38
1.87
2.63
2.66
1.95
2.45
1.90
2.32
2.03
1.82
2.81
3.00
2.10
3.11
3.21
2.92
2.82
3.07
3.26
3.66
3.89
3.76
3.59
3.20
2.63

52.00
51.50
64.00
42.50
53.50
53.50
62.50
45.00
45.50
76.00
76.50
77.00
76.50
77.00
40.00
57.50
57.50
75.50
75.00
43.00
80.00
60.50
60.50
76.00
60.50
60.50
61.00
60.00
67.50
41.00
1,829.00

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

52.00
51.50
64.00
42.50
53.50
53.50
62.50
45.00
45.50
76.00
76.50
77.00
76.50
77.00
40.00
57.50
57.50
75.50
75.00
43.00
80.00
60.50
60.50
76.00
60.50
60.50
61.00
60.00
67.50
41.00

ext.. Buzon)

50.80
50.30
62.80
41.30
52.30
52.30
61.30
43.80
44.30
74.80
75.30
75.80
75.30
75.80
38.80
56.30
56.30
74.30
73.80
41.80
78.80
59.30
59.30
74.80
59.30
59.30
59.80
58.80
66.30
39.80
1,793.00

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

50.80
50.30
62.80
41.30
52.30
52.30
61.30
43.80
44.30
74.80
75.30
75.80
75.30
75.80
38.80
56.30
56.30
74.30
73.80
41.80
78.80
59.30
59.30
74.80
59.30
59.30
59.80
58.80
66.30
39.80

0.00

62.80

395.10

403.30

378.60

316.00

237.20

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

Bz-224
Bz-206
Bz-203
Bz-194
Bz-179
Bz-172
MH-225
Bz-226
MH-228
MH-201
Bz-229
Bz-227
Bz-119
Bz-200
MH-270
Bz-271
MH-229
MH-217
Bz-248
MH-287
Bz-273
Bz-272
Bz-250
Bz-249
Bz-122
Bz-228
Bz-121

Bz-206
Bz-203
Bz-194
Bz-179
Bz-172
Bz-155
Bz-226
Bz-227
Bz-227
Bz-200
Bz-227
Bz-119
Bz-200
Bz-198
Bz-271
Bz-272
Bz-248
Bz-248
Bz-249
Bz-273
Bz-272
Bz-250
Bz-249
Bz-122
Bz-228
Bz-121
Bz-199

2.36
1.71
2.60
2.58
2.04
2.86
1.20
1.65
1.20
1.20
1.20
2.05
2.12
1.79
1.20
2.72
1.20
1.20
3.27
1.20
2.37
2.67
2.75
3.05
3.49
2.84
2.69

1.71
2.60
2.58
2.04
2.86
2.54
1.65
2.05
1.77
1.79
2.05
2.12
1.79
2.51
2.72
2.90
3.27
3.27
3.05
2.37
2.67
2.75
3.05
3.49
2.84
2.69
3.20

2.03
2.15
2.59
2.31
2.45
2.70
1.42
1.85
1.48
1.50
1.63
2.09
1.96
2.15
1.96
2.81
2.24
2.24
3.16
1.78
2.52
2.71
2.90
3.27
3.17
2.77
2.94

57.50
58.00
57.50
57.50
67.00
67.50
46.50
46.50
52.50
61.01
55.00
53.00
52.50
65.00
49.00
49.50
55.00
79.00
65.00
77.50
77.50
65.50
65.00
54.00
54.00
65.00
65.00
1,618.01

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

57.50
58.00
57.50
57.50
67.00
67.50
46.50
46.50
52.50
61.01
55.00
53.00
52.50
65.00
49.00
49.50
55.00
79.00
65.00
77.50
77.50
65.50
65.00
54.00
54.00
65.00
65.00

ext.. Buzon)

56.30
56.80
56.30
56.30
65.80
66.30
45.30
45.30
51.30
59.81
53.80
51.80
51.30
63.80
47.80
48.30
53.80
77.80
63.80
76.30
76.30
64.30
63.80
52.80
52.80
63.80
63.80
1,585.61

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

56.30
56.80
56.30
56.30
65.80
66.30
45.30
45.30
51.30
59.81
53.80
51.80
51.30
63.80
47.80
48.30
53.80
77.80
63.80
76.30
76.30
64.30
63.80
52.80
52.80
63.80
63.80

0.00

156.41

274.50

482.40

502.90

169.40

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

MH-303
MH-286
Bz-129
MH-275
Bz-127
MH-269
Bz-126
MH-252
Bz-125
MH-246
Bz-124
MH-224
Bz-108
MH-203
MH-194
Bz-195
MH-179
Bz-178
MH-304
Bz-130
Bz-305
Bz-289
Bz-287
Bz-274
Bz-270
Bz-251
Bz-247
Bz-230
Bz-225
Bz-202
Bz-201
Bz-196

Bz-305
Bz-129
Bz-287
Bz-127
Bz-274
Bz-126
Bz-270
Bz-125
Bz-251
Bz-124
Bz-247
Bz-108
Bz-225
Bz-201
Bz-195
Bz-196
Bz-178
Bz-134
Bz-130
Bz-305
Bz-289
Bz-287
Bz-274
Bz-270
Bz-251
Bz-247
Bz-230
Bz-225
Bz-202
Bz-201
Bz-196
Bz-197

1.20
1.20
1.73
1.20
2.05
1.20
2.45
1.20
2.95
1.20
1.93
1.20
1.80
1.20
1.20
1.81
1.20
1.56
1.20
1.78
2.91
2.85
3.08
3.38
3.73
4.07
3.65
2.57
1.99
1.96
2.18
2.04

2.92
1.73
2.47
2.05
2.13
2.45
2.59
2.95
3.01
1.93
2.72
1.80
1.99
2.19
1.81
2.05
1.56
2.84
1.78
2.91
2.85
3.08
3.38
3.73
4.07
3.65
2.57
1.99
1.96
2.18
2.04
2.72

2.06
1.47
2.10
1.63
2.09
1.83
2.52
2.08
2.98
1.57
2.33
1.50
1.90
1.69
1.51
1.93
1.38
2.20
1.49
2.35
2.88
2.96
3.23
3.55
3.90
3.86
3.11
2.28
1.98
2.07
2.11
2.38

65.00
42.50
43.00
43.50
43.50
44.00
44.00
44.00
44.00
44.00
44.00
41.50
41.50
78.00
51.00
51.00
62.50
62.50
52.00
52.00
77.50
77.50
60.00
60.00
61.50
59.50
55.00
55.00
56.50
56.00
61.00
47.00

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

65.00
42.50
43.00
43.50
43.50
44.00
44.00
44.00
44.00
44.00
44.00
41.50
41.50
78.00
51.00
51.00
62.50
62.50
52.00
52.00
77.50
77.50
60.00
60.00
61.50
59.50
55.00
55.00
56.50
56.00
61.00
47.00

63.80
41.30
41.80
42.30
42.30
42.80
42.80
42.80
42.80
42.80
42.80
40.30
40.30
76.80
49.80
49.80
61.30
61.30
50.80
50.80
76.30
76.30
58.80
58.80
60.30
58.30
53.80
53.80
55.30
54.80
59.80
45.80

ext.. Buzon)

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

63.80
41.30
41.80
42.30
42.30
42.80
42.80
42.80
42.80
42.80
42.80
40.30
40.30
76.80
49.80
49.80
61.30
61.30
50.80
50.80
76.30
76.30
58.80
58.80
60.30
58.30
53.80
53.80
55.30
54.80
59.80
45.80

1,720.00

1,681.60

0.00

193.70

399.90

559.80

238.20

112.60

177.40

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

Bz-579
MH-77
B-73
B-69
B-100
B-134
B-179
B-201
B-227
B-189
B-197
B-181
B-20
B-19
B-92
B-30
B-149
B-56
B-121
B-157
B-186
B-318
B-132
B-158
B-180
B-256

Bz-580
Bz-29
B-69
B-100
B-134
B-179
B-201
B-227
B-189
B-197
B-181
B-267
B-69
B-92
B-201
B-149
B-189
B-121
B-157
B-186
B-318
B-366
B-158
B-157
B-256
B-318

1.20
1.50
0.73
2.22
1.91
1.71
1.26
1.21
1.36
2.54
2.34
3.06
1.20
1.20
1.24
1.20
1.34
1.92
1.57
2.91
2.60
1.71
1.20
1.67
1.20
1.26

3.28
5.00
2.22
1.91
1.71
1.26
1.21
1.36
2.54
2.34
3.06
1.58
1.34
1.24
1.24
1.34
1.56
1.57
2.91
2.60
1.52
1.98
1.67
2.78
1.26
1.52

2.24
3.25
1.48
2.07
1.81
1.49
1.24
1.29
1.95
2.44
2.70
2.32
1.27
1.22
1.24
1.27
1.45
1.75
2.24
2.76
2.06
1.84
1.44
2.23
1.23
1.39

44.50
62.50
40.00
50.30
49.00
54.98
48.50
57.01
56.99
16.49
38.00
25.00
25.00
56.00
58.68
63.00
62.50
58.00
58.50
65.50
65.50
50.00
69.50
69.50
63.00
63.00
1,370.95

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

44.50
62.50
40.00
50.30
49.00
54.98
48.50
57.01
56.99
16.49
38.00
25.00
25.00
56.00
58.68
63.00
62.50
58.00
58.50
65.50
65.50
50.00
69.50
69.50
63.00
63.00

ext.. Buzon)

43.30
61.30
38.80
49.10
47.80
53.78
47.30
55.81
55.79
15.29
36.80
23.80
23.80
54.80
57.48
61.80
61.30
56.80
57.30
64.30
64.30
48.80
68.30
68.30
61.80
61.80
1,339.75

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

43.30
61.30
38.80
49.10
47.80
53.78
47.30
55.81
55.79
15.29
36.80
23.80
23.80
54.80
57.48
61.80
61.30
56.80
57.30
64.30
64.30
48.80
68.30
68.30
61.80
61.80

0.00

646.77

209.19

321.39

101.10

61.30

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

B-53
B-90
B-81
B-97
B-157
B-204
B-318
B-180
B-262
B-286
B-287
B-347
B-207
B-337
B-354
B-207
B-246
B-295
B-337
B-287
B-282

B-90
B-181
B-97
B-268
B-204
B-303
B-360
B-262
B-286
B-287
B-347
B-371
B-286
B-354
B-347
B-246
B-295
B-337
B-367
B-282
B-295

1.20
1.30
1.20
2.15
1.20
1.62
1.20
1.20
1.28
1.66
3.31
3.63
1.20
1.20
2.14
1.20
1.95
3.56
3.44
1.20
2.85

1.30
1.41
2.15
1.28
1.62
1.26
2.06
1.28
1.66
3.31
3.63
1.73
1.26
2.14
3.30
1.95
3.56
3.44
3.67
2.85
3.36

1.25
1.35
1.68
1.71
1.41
1.44
1.63
1.24
1.47
2.49
3.47
2.68
1.23
1.67
2.72
1.58
2.76
3.50
3.56
2.03
3.11

76.50
76.51
82.93
83.50
49.00
46.00
58.00
59.00
59.50
59.50
58.50
27.78
59.00
58.50
59.00
59.00
59.50
58.50
39.50
58.50
59.00
1,247.22

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

76.50
76.51
82.93
83.50
49.00
46.00
58.00
59.00
59.50
59.50
58.50
27.78
59.00
58.50
59.00
59.00
59.50
58.50
39.50
58.50
59.00

ext.. Buzon)

75.30
75.31
81.73
82.30
47.80
44.80
56.80
57.80
58.30
58.30
57.30
26.58
57.80
57.30
57.80
57.80
58.30
57.30
38.30
57.30
57.80
1,222.02

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

75.30
75.31
81.73
82.30
47.80
44.80
56.80
57.80
58.30
58.30
57.30
26.58
57.80
57.30
57.80
57.80
58.30
57.30
38.30
57.30
57.80

0.00

417.11

335.93

115.60

142.68

172.40

38.30

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
LOS OLIVOS 4TA ETAPA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

B-002
B-004
B-008
B-014
B-001
B-009
B-044
B-070
B-063
B-023
B-025
B-035
B-008
B-014
B-025
B-028
MH-412
B-002
B-010
B-015
B-031
B-039
B-010
B-011
B-015
B-017
B-031
B-032
B-039
MH-328

B-004
B-070
B-063
B-023
B-009
B-044
B-070
B-063
B-023
B-025
B-035
B-042
B-010
B-015
B-028
B-031
B-002
B-010
B-015
B-031
B-039
B-055
B-011
B-012
B-017
B-022
B-032
B-036
MH-328
B-052

1.20
2.04
1.20
1.20
1.21
1.36
0.86
0.84
1.93
5.50
5.94
5.53
1.20
1.20
1.20
2.49
1.20
2.49
2.66
2.25
3.07
2.97
1.20
2.54
1.20
2.49
1.20
2.61
1.20
2.21

2.04
0.84
1.93
1.82
1.36
0.86
0.84
1.71
5.50
5.94
5.53
5.09
2.66
2.25
2.49
3.07
2.49
2.45
2.15
2.07
2.97
2.72
2.54
3.10
2.49
2.98
2.61
3.06
2.21
2.65

1.62
1.44
1.56
1.51
1.28
1.11
0.85
1.28
3.71
5.72
5.74
5.31
1.93
1.73
1.84
2.78
1.85
2.47
2.41
2.16
3.02
2.85
1.87
2.82
1.85
2.74
1.91
2.84
1.71
2.43

55.50
55.50
55.50
60.00
55.50
55.50
60.00
70.00
70.00
70.00
58.00
58.50
55.50
51.00
55.50
55.50
58.50
71.50
70.00
70.00
58.00
58.50
58.50
58.00
58.50
58.00
58.50
58.00
58.29
58.29
1,794.08

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

55.50
55.50
55.50
60.00
55.50
55.50
60.00
70.00
70.00
70.00
58.00
58.50
55.50
51.00
55.50
55.50
58.50
71.50
70.00
70.00
58.00
58.50
58.50
58.00
58.50
58.00
58.50
58.00
58.29
58.29

ext.. Buzon)

54.30
54.30
54.30
58.80
54.30
54.30
58.80
68.80
68.80
68.80
56.80
57.30
54.30
49.80
54.30
54.30
57.30
70.30
68.80
68.80
56.80
57.30
57.30
56.80
57.30
56.80
57.30
56.80
57.09
57.09
1,758.08

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

54.30
54.30
54.30
58.80
54.30
54.30
58.80
68.80
68.80
68.80
56.80
57.30
54.30
49.80
54.30
54.30
57.30
70.30
68.80
68.80
56.80
57.30
57.30
56.80
57.30
56.80
57.30
56.80
57.09
57.09

0.00

290.50

612.09

264.99

282.00

56.80

68.80

0.00

57.30

125.60

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
LOS OLIVOS 4TA ETAPA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

B-002
B-003
B-005
B-012
B-022
B-036
B-052
B-012
B-016
B-022
B-034
B-036
B-040
B-005
B-006
B-007
B-018
B-045
B-060
B-101
B-103
B-141
B-018
B-029
B-045
B-086
B-060
B-124
B-049
B-109

B-003
B-005
B-012
B-022
B-036
B-052
B-080
B-016
B-018
B-034
B-045
B-040
B-060
B-006
B-007
B-018
B-045
B-060
B-101
B-133
B-141
B-130
B-029
B-049
B-086
B-109
B-124
B-130
B-109
B-130

1.20
2.40
3.05
3.10
2.98
3.06
2.65
1.20
1.91
1.20
1.64
1.20
1.94
1.20
2.73
3.93
3.83
2.80
2.91
1.73
1.20
1.23
1.20
1.62
1.20
1.20
1.20
1.22
1.95
1.33

2.40
3.05
2.89
2.40
2.33
2.22
1.86
1.91
2.82
1.64
1.80
1.94
1.91
2.73
3.93
3.83
2.80
2.91
1.73
1.33
1.23
2.57
1.62
1.22
1.20
1.33
1.22
2.02
1.26
1.57

1.80
2.72
2.97
2.75
2.65
2.64
2.25
1.55
2.36
1.42
1.72
1.57
1.93
1.97
3.33
3.88
3.31
2.85
2.32
1.53
1.21
1.90
1.41
1.42
1.20
1.27
1.21
1.62
1.60
1.45

58.50
58.00
72.50
70.00
70.00
58.50
58.50
61.50
50.00
55.50
56.00
55.50
56.00
56.00
55.50
73.00
70.00
70.00
58.50
58.50
52.50
52.50
52.50
52.50
52.50
52.50
52.50
52.50
70.00
70.00
1,782.00

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

58.50
58.00
72.50
70.00
70.00
58.50
58.50
61.50
50.00
55.50
56.00
55.50
56.00
56.00
55.50
73.00
70.00
70.00
58.50
58.50
52.50
52.50
52.50
52.50
52.50
52.50
52.50
52.50
70.00
70.00

ext.. Buzon)

57.30
56.80
71.30
68.80
68.80
57.30
57.30
60.30
48.80
54.30
54.80
54.30
54.80
54.80
54.30
71.80
68.80
68.80
57.30
57.30
51.30
51.30
51.30
51.30
51.30
51.30
51.30
51.30
68.80
68.80
1,746.00

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

57.30
56.80
71.30
68.80
68.80
57.30
57.30
60.30
48.80
54.30
54.80
54.30
54.80
54.80
54.30
71.80
68.80
68.80
57.30
57.30
51.30
51.30
51.30
51.30
51.30
51.30
51.30
51.30
68.80
68.80

0.00

430.90

565.00

163.40

391.80

123.10

71.80

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
LOS OLIVOS 4TA ETAPA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

B-130
B-147
B-049
B-068
B-109
B-110
B-077
B-085
B-103
B-136
B-103
B-107
B-125
B-123
B-144
B-145
B-048
B-042
B-051
B-055
B-066
B-080
B-096
B-133
B-152

B-147
B-164
B-068
B-077
B-110
B-085
B-085
B-103
B-136
B-144
B-107
B-125
B-123
B-144
B-145
B-164
B-042
B-051
B-055
B-066
B-080
B-096
B-133
B-152
B-164

2.57
2.64
1.20
1.35
1.20
2.54
2.38
4.28
4.34
3.58
1.20
2.79
2.48
2.98
3.79
4.19
1.20
5.09
5.34
5.51
5.51
5.36
5.13
4.27
3.86

2.64
2.96
1.35
1.84
2.54
4.28
3.28
4.34
3.58
3.79
2.79
2.48
2.98
2.94
4.19
3.81
4.09
5.34
5.51
5.51
5.36
5.13
4.27
3.86
3.96

2.60
2.80
1.27
1.59
1.87
3.41
2.83
4.31
3.96
3.68
2.00
2.63
2.73
2.96
3.99
4.00
2.65
5.22
5.42
5.51
5.43
5.25
4.70
4.07
3.91

58.50
58.50
52.50
52.50
52.50
52.50
70.00
70.00
58.50
58.50
72.50
58.50
58.50
72.50
52.50
52.50
80.00
55.50
55.50
58.00
58.50
61.50
50.00
52.50
52.50
1,475.00

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

58.50
58.50
52.50
52.50
52.50
52.50
70.00
70.00
58.50
58.50
72.50
58.50
58.50
72.50
52.50
52.50
80.00
55.50
55.50
58.00
58.50
61.50
50.00
52.50
52.50

ext.. Buzon)

57.30
57.30
51.30
51.30
51.30
51.30
68.80
68.80
57.30
57.30
71.30
57.30
57.30
71.30
51.30
51.30
78.80
54.30
54.30
56.80
57.30
60.30
48.80
51.30
51.30
1,445.00

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

57.30
57.30
51.30
51.30
51.30
51.30
68.80
68.80
57.30
57.30
71.30
57.30
57.30
71.30
51.30
51.30
78.80
54.30
54.30
56.80
57.30
60.30
48.80
51.30
51.30

0.00

51.30

173.90

0.00

448.10

51.30

268.50

120.10

275.00

56.80

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
LOTIZACION SANTA MARIA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

B-129
B-146
B-135
B-138
B-143
B-160
B-156
B-138
B-146
B-173
B-169
B-162
B-171
B-160
B-188
B-188
B-196
B-162
B-184
B-191
B-221
B-234
B-113
B-117
B-150
B-025
B-193
B-195
B-113
B-154

B-146
B-135
B-138
B-143
B-160
B-156
B-165
B-162
B-173
B-169
B-162
B-171
B-188
B-188
B-221
B-196
B-205
B-184
B-191
B-221
B-234
B-233
B-117
B-150
B-165
B-193
B-195
B-205
B-154
B-224

1.20
2.12
3.25
3.81
4.16
4.19
4.78
1.20
0.80
0.96
2.03
2.97
3.15
1.20
3.31
1.20
2.41
1.20
1.92
2.71
3.02
3.17
1.20
2.44
2.26
1.20
1.50
2.38
1.20
1.21

2.12
3.25
3.81
4.16
4.19
4.78
4.84
1.76
0.96
2.03
2.97
3.15
3.31
2.31
3.02
2.41
3.10
1.92
2.71
2.85
3.17
3.53
2.44
2.26
2.43
1.50
2.38
2.90
1.21
3.01

1.66
2.69
3.53
3.99
4.18
4.49
4.81
1.48
0.88
1.49
2.50
3.06
3.23
1.75
3.16
1.81
2.76
1.56
2.32
2.78
3.09
3.35
1.82
2.35
2.34
1.35
1.94
2.64
1.20
2.11

57.50
52.50
52.50
41.00
74.00
52.50
52.50
56.00
56.00
52.50
52.50
57.50
57.50
56.00
53.50
52.50
52.50
53.50
57.50
57.50
52.50
52.50
66.00
66.00
66.00
64.00
60.00
60.00
57.50
55.50
1,697.50

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

57.50
52.50
52.50
41.00
74.00
52.50
52.50
56.00
56.00
52.50
52.50
57.50
57.50
56.00
53.50
52.50
52.50
53.50
57.50
57.50
52.50
52.50
66.00
66.00
66.00
64.00
60.00
60.00
57.50
55.50

ext.. Buzon)

56.30
51.30
51.30
39.80
72.80
51.30
51.30
54.80
54.80
51.30
51.30
56.30
56.30
54.80
52.30
51.30
51.30
52.30
56.30
56.30
51.30
51.30
64.80
64.80
64.80
62.80
58.80
58.80
56.30
54.30
1,661.50

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

56.30
51.30
51.30
39.80
72.80
51.30
51.30
54.80
54.80
51.30
51.30
56.30
56.30
54.80
52.30
51.30
51.30
52.30
56.30
56.30
51.30
51.30
64.80
64.80
64.80
62.80
58.80
58.80
56.30
54.30

0.00

280.00

338.30

291.50

217.70

267.50

91.10

124.10

51.30

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
LOS OLIVOS

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

B-037
B-054
B-061
B-074
B-037
B-041
B-065
B-061
B-075
B-078
B-094
B-098
B-102
B-112
B-062
B-099
B-114
B-139
B-075
B-105
B-111
B-061
B-072
B-075
B-095
B-105
B-111
B-061
B-062
B-071
B-087
B-099

B-043
B-065
B-074
B-065
B-041
B-065
B-059
B-076
B-078
B-088
B-098
B-105
B-112
B-111
B-108
B-128
B-161
B-118
B-087
B-114
B-118
B-072
B-075
B-095
B-105
B-111
B-120
B-062
B-071
B-087
B-099
B-116

1.20
1.20
1.20
1.91
1.20
2.04
3.01
1.20
1.20
2.45
1.20
2.31
1.20
2.13
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.98
2.69
2.50
3.03
3.39
1.20
2.44
2.96
2.80
2.54

1.78
3.01
1.91
3.01
2.04
2.01
3.86
2.21
2.45
2.70
2.31
3.03
2.13
3.08
1.81
2.11
2.00
3.24
2.06
2.42
2.43
1.98
2.69
2.50
2.93
3.39
3.24
2.44
2.96
2.80
2.54
2.43

1.49
2.11
1.56
2.46
1.62
2.02
3.44
1.71
1.82
2.57
1.75
2.67
1.66
2.60
1.51
1.66
1.60
2.22
1.63
1.81
1.82
1.59
2.34
2.60
2.71
3.21
3.32
1.82
2.70
2.88
2.67
2.48

38.00
76.50
42.50
42.00
55.00
54.50
63.00
80.00
43.00
43.50
43.00
43.00
42.50
42.00
50.00
60.50
79.50
46.50
62.50
66.00
69.00
43.50
43.50
57.00
57.00
52.50
63.50
44.50
47.00
47.50
20.50
47.00

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

38.00
76.50
42.50
42.00
55.00
54.50
63.00
80.00
43.00
43.50
43.00
43.00
42.50
42.00
50.00
60.50
79.50
46.50
62.50
66.00
69.00
43.50
43.50
57.00
57.00
52.50
63.50
44.50
47.00
47.50
20.50
47.00

36.80
75.30
41.30
40.80
53.80
53.30
61.80
78.80
41.80
42.30
41.80
41.80
41.30
40.80
48.80
59.30
78.30
45.30
61.30
64.80
67.80
42.30
42.30
55.80
55.80
51.30
62.30
43.30
45.80
46.30
19.30
45.80

ext.. Buzon)

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

36.80
75.30
41.30
40.80
53.80
53.30
61.80
78.80
41.80
42.30
41.80
41.80
41.30
40.80
48.80
59.30
78.30
45.30
61.30
64.80
67.80
42.30
42.30
55.80
55.80
51.30
62.30
43.30
45.80
46.30
19.30
45.80

1,666.00

1,627.60

0.00

36.80

764.70

302.80

347.90

175.40

0.00

0.00

0.00

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
LOS OLIVOS

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

B-116
B-114
B-118
B-037
B-038
B-050
B-054
B-067
B-076
B-089
B-088
B-091
B-094
B-102
B-084
B-120
B-137
B-153
B-021
B-027
B-033
B-043
B-046
B-059
B-058
B-108
B-126
B-128
B-140
B-161
B-182

B-114
B-118
B-137
B-038
B-050
B-054
B-067
B-076
B-089
B-088
B-091
B-094
B-102
B-084
B-120
B-137
B-153
B-211
B-027
B-033
B-043
B-046
B-059
B-058
B-108
B-126
B-128
B-140
B-161
B-182
B-211

2.43
3.13
3.44
1.20
2.48
2.71
2.92
2.78
2.86
2.49
2.91
3.20
3.69
3.95
5.26
4.45
4.47
4.11
1.20
2.05
2.49
2.34
2.89
3.86
4.37
2.80
2.63
3.10
3.26
2.99
3.01

3.13
3.44
3.47
2.48
2.71
2.92
2.78
2.86
2.49
2.91
3.20
3.69
3.95
5.26
4.45
4.47
4.11
3.08
2.05
2.49
2.34
2.89
2.86
4.37
2.80
2.63
3.10
3.26
2.99
3.01
3.08

2.78
3.28
3.45
1.84
2.59
2.81
2.85
2.82
2.67
2.70
3.05
3.45
3.82
4.61
4.85
4.46
4.29
3.60
1.63
2.27
2.42
2.62
2.88
4.11
3.59
2.72
2.87
3.18
3.13
3.00
3.05

47.50
58.50
63.00
46.00
48.00
47.50
41.00
41.00
42.50
42.50
57.00
57.50
45.00
65.50
80.00
72.00
51.50
51.50
34.00
56.00
72.00
59.00
65.50
45.50
45.50
53.50
53.50
58.00
57.50
71.00
62.00
1,690.50

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

47.50
58.50
63.00
46.00
48.00
47.50
41.00
41.00
42.50
42.50
57.00
57.50
45.00
65.50
80.00
72.00
51.50
51.50
34.00
56.00
72.00
59.00
65.50
45.50
45.50
53.50
53.50
58.00
57.50
71.00
62.00

ext.. Buzon)

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

46.30
57.30
61.80
44.80
46.80
46.30
39.80
39.80
41.30
41.30
55.80
56.30
43.80
64.30
78.80
70.80
50.30
50.30
32.80
54.80
70.80
57.80
64.30
44.30
44.30
52.30
52.30
56.80
56.30
69.80
60.80
1,653.30

46.30
57.30
61.80
44.80
46.80
46.30
39.80
39.80
41.30
41.30
55.80
56.30
43.80
64.30
78.80
70.80
50.30
50.30
32.80
54.80
70.80
57.80
64.30
44.30
44.30
52.30
52.30
56.80
56.30
69.80
60.80

0.00

0.00

77.60

125.60

598.10

405.10

138.40

165.40

143.10

0.00

COLECTORES SECUNDARIOS
SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SECUNDARIOS
MONTERREY

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

May-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

B-159
B-163
B-220
B-185
B-192
B-168
B-170
B-206
B-245
B-203
B-216
B-206
B-131
B-151
B-168
B-183
B-202
B-231
B-106
B-115
B-131
B-122
B-106
B-155
B-159
B-172
B-185
B-223

B-163
B-168
B-185
B-192
B-203
B-170
B-261
B-245
B-283
B-216
B-206
B-264
B-151
B-168
B-183
B-202
B-231
B-257
B-115
B-131
B-122
B-217
B-155
B-159
B-172
B-185
B-223
B-241

1.20
2.42
1.20
1.20
2.40
1.20
2.59
1.20
1.90
1.20
2.35
3.25
1.20
1.87
3.27
3.43
3.48
3.43
1.20
2.19
2.54
3.52
1.21
1.22
2.01
2.20
2.73
2.72

2.42
3.27
4.94
2.40
2.97
2.59
2.73
1.90
3.99
2.35
3.25
3.52
1.87
2.27
3.43
3.48
3.43
3.95
2.19
2.54
3.52
1.48
1.22
2.01
2.20
2.73
2.72
3.54

1.81
2.84
3.07
1.80
2.69
1.89
2.66
1.55
2.94
1.77
2.80
3.39
1.53
2.07
3.35
3.45
3.45
3.69
1.70
2.37
3.03
2.50
1.21
1.62
2.11
2.47
2.73
3.13

55.50
55.50
85.00
53.00
53.00
72.50
72.50
55.00
55.00
50.50
46.50
72.50
57.50
57.50
56.50
56.50
55.00
55.50
58.50
58.00
59.50
60.00
59.00
58.50
57.00
57.00
56.50
55.00
1,644.00

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

55.50
55.50
85.00
53.00
53.00
72.50
72.50
55.00
55.00
50.50
46.50
72.50
57.50
57.50
56.50
56.50
55.00
55.50
58.50
58.00
59.50
60.00
59.00
58.50
57.00
57.00
56.50
55.00

ext.. Buzon)

54.30
54.30
83.80
51.80
51.80
71.30
71.30
53.80
53.80
49.30
45.30
71.30
56.30
56.30
55.30
55.30
53.80
54.30
57.30
56.80
58.30
58.80
57.80
57.30
55.80
55.80
55.30
53.80
1,610.40

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.51 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

2.00 m

54.30
54.30
83.80
51.80
51.80
71.30
71.30
53.80
53.80
49.30
45.30
71.30
56.30
56.30
55.30
55.30
53.80
54.30
57.30
56.80
58.30
58.80
57.80
57.30
55.80
55.80
55.30
53.80

0.00

57.80

451.40

283.50

331.80

431.60

54.30

0.00

0.00

0.00

TORES SECUNDARIOS

FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

1/23

: DN 200 PVC-UF SERIE 20

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO

2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

0
0
0

TORES SECUNDARIOS

FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

HOJA N

2/23

: DN 200 PVC-UF SERIE 20

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


TIPO DE PAVIMENTO

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

3/23

: DN 200 PVC-UF SERIE 20

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

4/23

: DN 200 PVC-UF SERIE 20

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

5/23

: DN 200 PVC-UF SERIE 20

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

6/23

: DN 200 PVC-UF SERIE 20

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

7/23

: DN 200 PVC-UF SERIE 20

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

8/23

: DN 200 PVC-UF SERIE 20

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

9/23

: DN 200 PVC-UF SERIE 20

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

10/23

: DN 200 PVC-UF SERIE 20

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

11/23
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

12/23
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

13/23
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

14/23
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

15/23
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

16/23
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

17/23
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

18/23
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

19/23
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

20/23
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

21/23
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

22/23
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

23/23
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

1/3
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

2/3

DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

3/3
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

1/1
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

1/2
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

2/2
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

TORES SECUNDARIOS
FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

1/1
DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
2.01 a

2.51 a

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0

PRESUPUESTO GENERAL
ITEM

DESCRIPCION

UND METRADO

OBRAS PRELIMINARES

1.100

CAMPAMENTO PROVISIONAL PARA LA OBRA-S

GLB

1.00

1.200

MOVILIZACION DE MAQUINARIAS-HERRAMIENTAS PARA LA OBRA

GLB

1.00

1.300

DESMOVILIZACION DE MAQUINARIAS-HERRAMIENTAS PARA LA OBRA

GLB

1.00

1.400

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.50X1.80M

UND

2.00

SISTEMA DE AGUA POTABLE

1.00

CAPTACION

1.01.01

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA M

1.01.02

TRAZO Y REPLANTEO INICIAL P./CONSTRUCCION DE CAPTACION

UND

1.01.03

REPLANTEO FINAL DE ESTRUCTURA DE CAPTACION

UND

1.01.04

EXCAVACION EN T-NORMAL SATURADO C/CARGADOR RETROEXCAVADOR


M3

495.00

1.01.05

ELIMINACION DE DESMONTE TERRENO NORMAL "S" R=10 KM CON MAQM3

593.40

1.01.06

CONCRETO 1:10 +30% P.G. PARA CIMIENTO CORRIDO (CEMENTO PV)

M3

91.60

1.01.07

ENCOFRADO (INC. HABILITACION DE MADERA) PARA SOLADOS Y/O SUB M2

79.60

1.01.08

CONCRETO CICLOPEO FC=245 KG/CM2 + 70 % PG.(C-V)

M3

55.20

1.01.10

CONCRETO F'C=245 KG/CM2 PARA BARRAJE (CEMENTO PV)

M3

280.30

1.01.11

ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE) M2

323.70

1.01.12

CONCRETO F'C=245 KG/CM2 PARA CANAL DE LIMPIA (CEMENTO PV)

M3

56.21

1.01.13

ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE) M2

80.00

1.01.14

CONCRETO F'C=245 KG/CM2 PARA MUROS REFORZADOS (CEMENTO PVM3

1.01.15

ENCOFRADO Y DESENCOF MUROS REFORZADOS

M2

290.83

1.01.16

ACERO ESTRUCTURAL TRABAJADO PARA MUROS (CAPTACION)

KG

4,550.00

1.01.17

COMPUERTA METALICA DE LIMPIA 1.60 x 1.75M.

UND

2.00

1.01.18

COMPUERTA METALICA DE LIMPIA 0.50 x 0.30M.

UND

2.00

1.01.19

REJA MANUAL DE SEGUN ESPECIFICACIONES

UND

1.00

2.00

DESARENADOR

2.01.01

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA M

2.01.02

TRAZO Y REPLANTEO INICIAL P./CONSTRUCCION DE DESARENADOR

UND

2.01.03

REPLANTEO FINAL DE ESTRUCTURA DEL DESARENADOR

UND

2.01.04

EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL /RETRO .5Y3

M3

198.00

2.01.05

ELIMINACION DE DESMONTE TERRENO NORMAL "S" R=10 KM CON MAQM3

240.00

2.01.06

CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES

M3

15.20

2.01.07

ENCOFRADO (INC. HABILITACION DE MADERA) PARA SOLADOS Y/O SUB M2

25.00

2.01.08

CONCRETO F'C=245 KG/CM2 PARA ESTRUCTURAS -DESARENADOR (C M3

65.00

2.01.09

ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE) M2

332.10

2.01.091

ACERO ESTRUCTURAL TRABAJADO PARA MUROS (CAPTACION)

KG

9,950.00

2.01.10

TARRAJEO CON IMPERMEABILIZANTE DE ESTRUCTURAS HIDRAULICAS M2

253.70

2.01.11

TUBERIA DE HIERRO DUCTIL DN 300MM (12") K-9 INCL. ANILLO + 1%DES M

15.00

2.01.12

VALVULA COMPUERTA BB Ho DUCTIL DN 300

4.00

LINEA DE CONDUCCION

4.01.01

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADAKM


1

4.01.02

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA M

4.01.03

CONO DE FIBRA DE VIDRIO FOS. P/DESVIO TRANSITO S/D

UND

24.00

4.01.04

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA UND

20.00

4.01.05

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS UND

24.00

UND

120.00
1.00
1.00

62.70

120.00
1.00
1.00

1.00
6.40
12,800.00

P.U.

COSTO PARCIAL

4.01.06

PROTECCION DE REDES EXISTENTE DE DN 200 A 250

UND

10.00

4.01.09

PROTECCION DE POSTES DE ALUMBRADO - TELEFONO

UND

18.00

4.01.10

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES KM

6.40

4.01.11

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOKM

6.40

4.01.12

EXCAV. ZANJA (A PULSO) P/TUB.TERRENO NORMAL DN 300 A 350 MM H=1


M

1,165.93

4.01.121

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 300 A 350MM H=1.5M

5,194.45

4.01.13

REFINE Y NIVELACION ZANJA TERRENO NORMAL P/TUB. DN 300 PARA M

6,360.50

4.01.14

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 300 A 350MM H=1.51 A 2 M

6,360.50

4.01.141

ELIMIN.DESMONTE (PULSO+VOLQ) T-NORMAL D=5 KM DN 300-350MM PAM

1,165.93

4.01.150

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=5KM DN 300-350MM PARM

5,194.45

4.01.151

TUBERIA PVC- U UF NTP ISO 4422 PN 7.5 DN 300 INC. ANILLO +2% DES M

1,126.40

4.01.152

TUBERIA PVC-U UF NTP ISO 4422 PN 10 DN 300 INC. ANILLO +2 %DESP M

5,026.36

4.01.153

TUBERIA PVC-U UF NTP ISP 4422 PN 10 DN 350 INC. ANILLO + 2%DESP M

4.01.154

INSTALAC.TUBERIA P.V.C. DE 300MM+PRUEBA HIDRA

6,152.96

4.01.155

INSTALAC.TUBERIA P.V.C. DE 350MM+PRUEBA HIDRA

207.42

4.01.181

CODO 45 PVC PARA RED AGUA POTABLE DE 12"

UND

10.00

4.01.182

CODO 22 30' PVC PARA RED AGUA POTABLE DE 12"

UND

28.00

4.01.183

CODO 1115' PVC PARA RED AGUA POTABLE DE 12"

UND

56.00

4.01.184

CODO 45 PVC PARA RED AGUA POTABLE DE 14"

UND

1.00

4.01.185

CODO 22 30' PVC PARA RED AGUA POTABLE DE 14"

UND

4.00

4.01.186

CODO 1115' PVC PARA RED AGUA POTABLE DE 14"

UND

8.00

4.01.19

CONCRETO FC=140 KG/CM2 PARA ANCLAJES DE ACCESORIOS DN 300- UND

105.00

4.01.20

VALVULA DE AIRE DE FIERRO FUNDIDO DE 1"DE DOBLE ACCION

UND

11.00

4.01.21

MONTAJE DE VALVULA DE AIRE DN 40 A 50 E INST. HIDRAULICA

UND

11.00

4.01.22

CAMARA P/VALV.AIRE TERR.NORMAL E.D.CARG.+VOL.P/MATRIZ DN 100 UND

11.00

4.01.23

VALVULA DE PURGA DN 100 mm

UND

9.00

4.01.24

MONTAJE DE VALVULA DE PURGA DN 100 E INST. HIDRAULICA

UND

9.00

4.01.25

CAMARA P/VALV.PURGA T-NORMAL E.D.CARG+VOLQ. P/MATRIZ DN 100-4UND

9.00

4.01.26

PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD UND

60.00

4.01.27

PRUEBA HIDRAULICA DE ESCORRENTIA P/TUB DN 300MM

4.01.28

INSTALAC.TUBERIA DE ACERO PARA CRUCE DE RIO

GLB

1.00

5.00

PLANTA DE TRATAMIENTO DE AGUA POTABLE (112 lps)


EST

1.00

207.42

6,400.00

5.01.01

PLANTA DE TRATAMIENTO DE AGUA POTABLE (Q = 112 LPS)

6.00

RESERVORIOS

6.01.01

RESERVORIO ELEVADO ( 1500 m3)

EST

1.00

6.01.02

REHABILITACION DE RESERVORIO EXISTENTE

UND

1.00

8.00

REDES

8.01.01

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADAKM


1

8.01.02

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA M

8.01.03

CONO DE FIBRA DE VIDRIO FOS. P/DESVIO TRANSITO S/D

UND

80.00

8.01.04

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA UND

80.00

8.01.05

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS UND

50.00

8.01.051

PUENTE DE MADERA PARA PASE VEHICULAR SOBRE ZANJA S/D (PROV UND

40.00

8.01.07

PROTECCION DE REDES EXISTENTE DE DN 200 A 250

60.00

8.01.10

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES KM

8.01.11

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOKM

8.01.12

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 50 MM H=1.00 A 1.5 M

26,796.00

8.01.13

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 80 MM H=1.00 A 1.5 M

3,967.00

8.01.14

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 100 MM H=1.00 A 1. M

6,421.00

8.01.15

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 150 MM H=1.00 A 1. M

4,589.00

8.01.16

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200- 250 MM H=1.00 M

4,793.00

8.01.17

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 250 MM H=1.00 A 1. M

8.01.18

REFINE Y NIVELACION ZANJA TERRENO NORMAL P/TUB. DN 50 - 80 P

30,763.00

8.01.19

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 100 -150 PA M

11,010.00

UND

47.60
82,000.00

47.60
47.60

1,010.00

8.01.20

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARM

5,803.00

8.01.21

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 50- 80MM H=1.00 A 1.50 M

30,763.00

8.01.22

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 100 - 150MM H=1.00 A 1 M

11,010.00

8.01.23

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=1.00 A 1 M

5,803.00

8.01.24

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 50- 80MM PARM

30,763.00

8.01.25

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 100- 150MM P M

11,010.00

8.01.26

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250M

5,803.00

8.01.27

TUBERIA PVC- U UF NTP ISO 4422 PN 7.5 DN 50 INC. ANILLO +2% DESP M

26,796.00

8.01.28

TUBERIA PVC- U UF NTP ISO 4422 PN 7.5 DN 80 INC. ANILLO +2% DESP M

3,967.00

8.01.29

TUBERIA PVC- U UF NTP ISO 4422 PN 7.5 DN 100 INC. ANILLO +2% DES M

6,421.00

8.01.30

TUBERIA PVC- U UF NTP ISO 4422 PN 7.5 DN 150 INC. ANILLO +2% DES M

4,589.00

8.01.31

TUBERIA PVC- U UF NTP ISO 4422 PN 7.5 DN 200 INC. ANILLO +2% DES M

4,678.00

8.01.32

TUBERIA PVC- U UF NTP ISO 4422 PN 7.5 DN 250 INC. ANILLO +2% DES M

1,010.00

8.01.321

TUBERIA DE HIERRO DUCTIL DN 200MM (10") K-9 INCL. ANILLO + 1%DES M

8.01.33

INSTALAC.TUBERIA P.V.C. CLASE A - 7.5 DE DN 50 -65 +PRUEBA HIDRA

26,796.00

8.01.34

INSTALAC.TUBERIA P.V.C. CLASE A - 7.5 DE DN 80 +PRUEBA HIDRA

3,967.00

8.01.35

INSTALAC.TUBERIA P.V.C. CLASE A - 7.5 DE DN 100+PRUEBA HIDRA

6,421.00

8.01.36

INSTALAC.TUBERIA P.V.C. CLASE A - 7.5 DE DN 150+PRUEBA HIDRA

4,589.00

8.01.37

INSTALAC.TUBERIA P.V.C. CLASE A - 7.5 DE DN 200+PRUEBA HIDRA

4,678.00

8.01.38

INSTALAC.TUBERIA P.V.C. CLASE A - 7.5 DE DN 250+PRUEBA HIDRA

1,010.00

8.01.39

INSTALAC.TUBERIA HIERRO FUNDIDO DUCTIL K-7 DE 200 MM+PRUEBA M

115.00

8.01.40

PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD UND

8.01.41

PRUEBA HIDRAULICA+DESINFECCION TUB.2"(50MM) A ZANJA TAPADA

26,796.00

8.01.42

PRUEBA HIDRAULICA+DESINFECCION TUB.3"(75MM) A ZANJA TAPADA

3,967.00

8.01.43

PRUEBA HIDRAULICA+DESINFECCION TUB.4"(100MM) A ZANJA TAPADA M

6,421.00

8.01.44

PRUEBA HIDRAULICA+DESINFECCION TUB.6"(150MM) A ZANJA TAPADA M

4,589.00

8.01.45

PRUEBA HIDRAULICA+DESINFECCION TUB.8"(200MM) A ZANJA TAPADA M

4,793.00

8.01.46

PRUEBA HIDRAULICA+DESINFECCION TUB.10"(250MM) A ZANJA TAPADA M

1,010.00

8.02

ACCESORIOS

8.02.001

VALVULA COMPUERTA BB Ho DUCTIL DN 200

UND

1.00

8.02.01

VALVULA COMPUERTA BB Ho DUCTIL DN 150

UND

3.00

8.02.02

VALVULA COMPUERTA BB Ho DUCTIL DN 100

UND

2.00

8.02.03

VALVULA COMPUERTA BB Ho DUCTIL DN 80

UND

1.00

8.02.04

VALVULA COMPUERTA BB Ho DUCTIL DN 50

UND

2.00

8.02.05

GRIFO CONTRA INCENDIO DN 200

UND

2.00

8.02.06

GRIFO CONTRA INCENDIO DN 150

UND

2.00

8.02.07

GRIFO CONTRA INCENDIO DN 100

UND

15.00

8.02.08

CODO 90 PVC PARA RED AGUA POTABLE DE 10"

UND

6.00

8.02.09

CODO 45 PVC PARA RED AGUA POTABLE DE 10"

UND

2.00

8.02.10

CODO 1115' PVC PARA RED AGUA POTABLE DE 10"

UND

1.00

8.02.11

CODO 90 PVC PARA RED AGUA POTABLE DE 8"

UND

11.00

8.02.13

CODO 45 PVC PARA RED AGUA POTABLE DE 8"

UND

3.00

8.02.14

CODO 22 30' PVC PARA RED AGUA POTABLE DE 8"

UND

2.00

8.02.15

CODO 11 15' PVC PARA RED AGUA POTABLE DE 8"

UND

2.00

8.02.16

CODO 2230 PVC PARA RED AGUA POTABLE DE 6"

UND

4.00

8.02.17

CODO 90 PVC PARA RED AGUA POTABLE DE 4"

UND

6.00

8.02.18

CODO 90 PVC PARA RED AGUA POTABLE DE 3"

UND

2.00

8.02.19

CODO 2230 PVC PARA RED AGUA POTABLE DE 3"

UND

2.00

8.02.20

CODO 90 PVC PARA RED AGUA POTABLE DE 2"

UND

10.00

8.02.21

CODO 45 PVC PARA RED AGUA POTABLE DE 2"

UND

1.00

8.02.22

CODO 2230 PVC PARA RED AGUA POTABLE DE 2"

UND

8.00

8.02.23

CODO 11 15' PVC PARA RED AGUA POTABLE DE 2"

UND

5.00

8.02.24

TEE DE PVC PARA RED AGUA POTABLE DE 10"X 8"

UND

2.00

8.02.25

TEE DE PVC PARA RED AGUA POTABLE DE 8"X 8"

UND

6.00

115.00

300.00

8.02.26

TEE DE PVC PARA RED AGUA POTABLE DE 8"X 6"

UND

6.00

8.02.27

TEE DE PVC PARA RED AGUA POTABLE DE 8"X 4"

UND

23.00

8.02.28

TEE DE PVC PARA RED AGUA POTABLE DE 6"X 6"

UND

8.00

8.02.29

TEE DE PVC PARA RED AGUA POTABLE DE 6"X 4"

UND

9.00

8.02.30

TEE DE PVC PARA RED AGUA POTABLE DE 4"X 4"

UND

12.00

8.02.31

TEE DE PVC PARA RED AGUA POTABLE DE 4"X 3"

UND

1.00

8.02.32

TEE DE PVC PARA RED AGUA POTABLE DE 4"X 2"

UND

17.00

8.02.33

TEE DE PVC PARA RED AGUA POTABLE DE 4"X 1"

UND

1.00

8.02.34

TEE DE PVC PARA RED AGUA POTABLE DE 3"X 3"

UND

10.00

8.02.35

TEE DE PVC PARA RED AGUA POTABLE DE 3"X 2"

UND

9.00

8.02.36

TEE DE PVC PARA RED AGUA POTABLE DE 2"X 2"

UND

104.00

8.02.361

TEE DE PVC PARA RED AGUA POTABLE DE 2"X 1"

UND

1.00

8.02.362

TEE DE PVC PARA RED AGUA POTABLE DE 1"X 1"

UND

1.00

8.02.38

CRUZ DE PVC PARA RED AGUA POTABLE DE 8"X 8"

UND

6.00

8.02.39

CRUZ DE PVC PARA RED AGUA POTABLE DE 8"X 6"

UND

1.00

8.02.40

CRUZ DE PVC PARA RED AGUA POTABLE DE 8"X 4"

UND

9.00

8.02.41

CRUZ DE PVC PARA RED AGUA POTABLE DE 6"X 6"

UND

7.00

8.02.42

CRUZ DE PVC PARA RED AGUA POTABLE DE 6"X 4"

UND

18.00

8.02.43

CRUZ DE PVC PARA RED AGUA POTABLE DE 4"X 4"

UND

12.00

8.02.44

CRUZ DE PVC PARA RED AGUA POTABLE DE 4"X 3"

UND

1.00

8.02.45

CRUZ DE PVC PARA RED AGUA POTABLE DE 4"X 2"

UND

10.00

8.02.46

CRUZ DE PVC PARA RED AGUA POTABLE DE 3"X 2"

UND

12.00

8.02.47

CRUZ DE PVC PARA RED AGUA POTABLE DE 2"X 2"

UND

72.00

8.02.48

CRUZ DE PVC PARA RED AGUA POTABLE DE 2"X 1"

UND

2.00

8.02.50

REDUCCION PVC PARA RED AGUA POTABLE DE 10" A 8"

UND

1.00

8.02.51

REDUCCION PVC PARA RED AGUA POTABLE DE 8" A 6"

UND

1.00

8.02.52

REDUCCION PVC PARA RED AGUA POTABLE DE 8" A 4"

UND

6.00

8.02.53

REDUCCION PVC PARA RED AGUA POTABLE DE 6" A 4"

UND

16.00

8.02.54

REDUCCION PVC PARA RED AGUA POTABLE DE 6" A 3"

UND

2.00

8.02.55

REDUCCION PVC PARA RED AGUA POTABLE DE 4" A 3"

UND

23.00

8.02.56

REDUCCION PVC PARA RED AGUA POTABLE DE 4" A 2"

UND

91.00

8.02.57

REDUCCION PVC PARA RED AGUA POTABLE DE 3" A 2"

UND

14.00

8.02.58

REDUCCION PVC PARA RED AGUA POTABLE DE 2" A 1"

UND

12.00

8.02.59

TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 8"

UND

7.00

8.02.60

TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 6"

UND

7.00

8.02.61

TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 4"

UND

6.00

8.02.62

TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 3"

UND

5.00

8.02.63

TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 2"

UND

44.00

9.00

CONEXIONES DOMICILIARIAS

9.01.01

CONEX. AGUA 1/2" T-SEMIROC.DE 4.01-8 M INCL.LOSA 1 X 1 X .1

UND

941.00

9.01.02

MICROMEDICION

UND

3,100.00

SISTEMA DE ALCANTARILLADO

1.00

REDES

1.101

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES KM

46.20

1.102

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOKM

46.20

1.103

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADAKM


1

46.20

1.104

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA M

1.105

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA UND

80.00

1.106

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

UND

60.00

1.107

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS UND

50.00

1.108

PUENTE DE MADERA PARA PASE VEHICULAR SOBRE ZANJA S/D (PROV UND

50.00

1.109

PROTECCION DE REDES EXISTENTE DE DN 200 A 250

60.00

UND

82,000.00

1.112

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200- 250 MM H=1.00 M

11,896.69

1.113

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=1.51 AM

12,545.30

1.114

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200 MM H=2.01 A 2. M

8,588.45

1.116

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=2.51 AM

6,618.50

1.117

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.01 AM

3,768.30

1.118

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.51 AM

1,500.40

1.119

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200 MM H=4.01 A 4. M

573.00

1.120

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=4.51 AM

526.70

1.121

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200 MM H=5.51 A 6. M

182.40

1.122

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARM

46,200.00

1.123

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=1.00 A 1 M

11,896.70

1.124

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=1.51 A 2 M

12,545.30

1.125

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.01 A 2 M

8,588.50

1.126

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.51 A 3 M

6,618.50

1.127

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.01 A 3 M

3,768.30

1.128

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.51 A 4 M

1,500.40

1.129

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=4.01 A 4 M

573.00

1.130

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=4.51 A 5 M

526.70

1.131

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=5.51 A 6 M

182.40

1.132

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250M

46,200.00

1.133

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 200 INC. ANILLO + 2%

46,200.00

1.134

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 200 INC. PRUEBA HI M

46,200.00

1.135

PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD UND

1.136

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 200MM

1.200

BUZONES TIPO I (COLECTOR SECUNDARIO)

1.201

BUZON TIPO I T-NORMAL. 1.01 A 1.50M PROF. (ENCOFR. INTERIOR Y EX UND

337.00

1.202

BUZON TIPO I T-NORMAL. 1.51 A 2.00M PROF. (ENCOFR. INTERIOR Y EX UND

123.00

1.203

BUZON TIPO I T-NORMAL. 2.01 A 2.50M PROF. (ENCOFR. INTERIOR Y EX UND

129.00

1.204

BUZON TIPO I T-NORMAL . 2.51 A 3.00M PROF. (ENCOFR. INTERIOR Y EXTUND

111.00

1.205

BUZON TIPO I T-NORMAL 3.01 A 3.50M PROF. (ENCOFR. INTERIOR Y EXT UND

75.00

1.206

BUZON TIPO I T-NORMAL 3.51 A 4.00M PROF. (ENCOFR. INTERIOR Y EXT) UND

32.00

1.207

BUZON TIPO I T-NORMAL. 4.51 A 5.50M PROF. (ENCOFR. INTERIOR Y EXT UND

14.00

1.208

BUZON TIPO I T-NORMAL. 5.51 A 6.50M PROF. (ENCOFR. INTERIOR Y EXT UND

15.00

2.00

COLECTORES

2.100

COLECTOR DE REBOSE

2.101

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES KM

0.42

2.102

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOKM

0.42

2.103

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADAKM


1

2.104

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA M

2.105

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA UND

8.00

2.106

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

UND

6.00

2.107

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS UND

4.00

2.108

PUENTE DE MADERA PARA PASE VEHICULAR SOBRE ZANJA S/D (PROV UND

4.00

2.1081

EXCAVAC. ZANJAI(MAQ.) P/TUB. TERR-NORMAL DN .200 - 250 DE 1.26m a M

142.00

2.109

EXCAVAC. ZANJAI(MAQ.) P/TUB. TERR-NORMAL DN .200 - 250 DE 1.5m a M

129.50

2.1091

EXCAVAC. ZANJAI(MAQ.) P/TUB. TERR-NORMAL DN 200 - 250 DE 2.01m a M

139.00

2.110

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARM

410.00

2.1101

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=1.00 A 1 M

142.00

2.1102

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=1.51 A 2 M

129.50

2.111

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.01 A 2 M

139.00

2.112

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250M

410.00

2.1121

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 200 INC. ANILLO + 2%

14.48

2.113

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 250 INC. ANILLO + 2%

405.00

2.1131

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 200 INC. PRUEBA HI M

14.48

300.00
46,200.00

0.42
840.00

2.114

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 250 INC. PRUEBA HI M

2.115

BUZON TIPO I T-NORMAL. 1.01 A 1.50M PROF. (ENCOFR. INTERIOR Y EX UND

3.00

2.116

BUZON TIPO I T-NORMAL. 1.51 A 2.00M PROF. (ENCOFR. INTERIOR Y EX UND

3.00

2.117

BUZON TIPO I T-NORMAL. 2.01 A 2.50M PROF. (ENCOFR. INTERIOR Y EX UND

3.00

2.125

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

2.00

2.130

PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIF. DENSIDAD UND

2.140

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 250MM

2.200

COLECTOR IMPERIO

2.201

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES KM

0.43

2.202

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOKM

0.43

2.203

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADAKM


1

2.204

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA M

2.205

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA UND

6.00

2.206

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

UND

8.00

2.207

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS UND

4.00

2.208

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200 MM H=2.01 A 2. M

117.00

2.209

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=2.51 AM

230.60

2.210

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200 MM H=4.01 A 4. M

69.30

2.211

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARM

425.00

2.212

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.01 A 2 M

117.00

2.213

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.51 A 3 M

230.60

2.214

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=4.01 A 4 M

69.30

2.215

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250M

425.00

2.216

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 200 INC. ANILLO + 2%

425.00

2.217

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 200 INC. PRUEBA HI M

425.00

2.218

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 200MM

425.00

2.219

BUZON TIPO I T-NORMAL. 2.01 A 2.50M PROF. (ENCOFR. INTERIOR Y EX UND

2.00

2.220

BUZON TIPO I T-NORMAL . 2.51 A 3.00M PROF. (ENCOFR. INTERIOR Y EXTUND

4.00

2.221

BUZON TIPO I T-NORMAL 3.01 A 3.50M PROF. (ENCOFR. INTERIOR Y EXT UND

2.00

2.222

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

UND

2.00

2.223

PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIF. DENSIDAD UND

6.00

2.300

COLECTOR LOS OLIVOS

2.301

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES KM

0.40

2.302

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOKM

0.40

2.303

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADAKM


1

2.304

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA M

2.305

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA UND

6.00

2.306

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

5.00

2.307

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS UND

2.308

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.01 AM

145.00

2.309

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200 MM H=4.01 A 4. M

230.50

2.310

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARM

390.00

2.311

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.01 A 3 M

145.00

2.312

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=4.01 A 4 M

230.50

2.313

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250M

390.00

2.314

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 200 INC. ANILLO + 2%

390.00

2.315

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 200 INC. PRUEBA HI M

390.00

2.316

BUZON TIPO I T-NORMAL 3.01 A 3.50M PROF. (ENCOFR. INTERIOR Y EXT UND

5.00

2.317

BUZON TIPO I T-NORMAL 3.51 A 4.00M PROF. (ENCOFR. INTERIOR Y EXT) UND

2.00

2.318

BUZON TIPO I T-NORMAL. 4.01 A 4.50M PROF. (ENCOFR. INTERIOR Y EXT UND

2.00

2.319

BUZON TIPO I T-NORMAL. 4.51 A 5.50M PROF. (ENCOFR. INTERIOR Y EXT UND

1.00

2.320

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

2.00

2.321

PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIF. DENSIDAD UND

2.322

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 200MM

UND
M

UND

UND
M

405.00

6.00
420.00

0.43
850.00

0.40
780.00

4.00

5.00
390.00

2.400

COLECTOR MONTERREY

2.401

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES KM

1.50

2.402

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOKM

1.50

2.403

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADAKM


1

1.50

2.404

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA M

2.405

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA UND

12.00

2.406

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

UND

14.00

2.407

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS UND

12.00

2.408

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.01 AM

98.50

2.409

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.51 AM

507.30

2.410

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200 MM H=4.01 A 4. M

456.00

2.411

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=4.51 AM

348.50

2.412

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARM

1,440.00

2.413

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.01 A 3 M

98.50

2.414

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.51 A 4 M

507.30

2.415

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=4.01 A 4 M

456.00

2.416

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=4.51 A 5 M

348.50

2.417

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250M

1,440.00

2.418

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 250 INC. ANILLO + 2%

1,440.00

2.419

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 250 INC. PRUEBA HI M

1,440.00

2.420

BUZON TIPO I T-NORMAL 3.01 A 3.50M PROF. (ENCOFR. INTERIOR Y EXT UND

1.00

2.421

BUZON TIPO I T-NORMAL. 4.01 A 4.50M PROF. (ENCOFR. INTERIOR Y EXT UND

21.00

2.422

BUZON TIPO I T-NORMAL. 5.51 A 6.50M PROF. (ENCOFR. INTERIOR Y EXT UND

1.00

2.423

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

UND

6.00

2.424

PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIF. DENSIDAD UND

18.00

2.425

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 250MM

2.500

COLECTOR SANTA ROSA

2.501

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES KM

0.60

2.502

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOKM

0.60

2.503

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADAKM


1

2.504

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA M

2.505

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA UND

2.506

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

2.507

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS UND

2.508

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=1.51 AM

114.00

2.509

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200 MM H=2.01 A 2. M

202.50

2.510

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=2.51 AM

119.00

2.511

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.51 AM

22.00

2.512

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=4.51 AM

132.50

2.513

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARM

604.51

2.514

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=1.51 A 2 M

114.00

2.515

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.01 A 2 M

202.50

2.516

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.51 A 3 M

119.00

2.517

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.51 A 4 M

22.00

2.518

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=4.51 A 5 M

132.50

2.519

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250M

604.51

2.520

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 200 INC. ANILLO + 2%

604.50

2.521

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 200 INC. PRUEBA HI M

604.50

2.522

BUZON TIPO I T-NORMAL. 1.51 A 2.00M PROF. (ENCOFR. INTERIOR Y EX UND

4.00

2.523

BUZON TIPO I T-NORMAL. 2.01 A 2.50M PROF. (ENCOFR. INTERIOR Y EX UND

5.00

2.524

BUZON TIPO I T-NORMAL . 2.51 A 3.00M PROF. (ENCOFR. INTERIOR Y EXTUND

1.00

2.525

BUZON TIPO I T-NORMAL. 4.51 A 5.50M PROF. (ENCOFR. INTERIOR Y EXT UND

3.00

2.526

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

UND

3.00

2.527

PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIF. DENSIDAD UND

8.00

UND

3,000.00

1,440.00

0.60
1,210.00
8.00
10.00
8.00

2.528

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 200MM

2.600

COLECTOR MORITO

2.601

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES KM

1.50

2.602

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOKM

1.50

2.603

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADAKM


1

2.604

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA M

2.605

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA UND

20.00

2.606

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

UND

12.00

2.607

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS UND

12.00

2.608

PUENTE DE MADERA PARA PASE VEHICULAR SOBRE ZANJA S/D (PROV UND

8.00

2.609

EXCAV. ZANJA (PULSO) P/TUB.TERRENO NORMAL DN 200-250 MM H=2.01M

174.30

2.610

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.01 AM

765.29

2.611

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.51 AM

176.24

2.612

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=4.51 AM

320.80

2.613

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARM

1,465.00

2.614

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.01 A 2 M

174.30

2.615

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.01 A 3 M

765.29

2.616

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.51 A 4 M

176.24

2.617

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=4.51 A 5 M

320.74

2.618

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250M

1,465.00

2.619

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 250 INC. ANILLO + 2%

1,465.00

2.620

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 250 INC. PRUEBA HI M

1,465.00

2.621

BUZON TIPO I T-NORMAL. 2.01 A 2.50M PROF. (ENCOFR. INTERIOR Y EX UND

2.622

BUZON TIPO I T-NORMAL . 2.51 A 3.00M PROF. (ENCOFR. INTERIOR Y EXTUND

3.00

2.623

BUZON TIPO I T-NORMAL 3.01 A 3.50M PROF. (ENCOFR. INTERIOR Y EXT UND

11.00

2.624

BUZON TIPO I T-NORMAL. 4.01 A 4.50M PROF. (ENCOFR. INTERIOR Y EXT UND

4.00

2.625

BUZON TIPO I T-NORMAL. 4.51 A 5.50M PROF. (ENCOFR. INTERIOR Y EXT UND

3.00

2.626

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

UND

8.00

2.627

PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIF. DENSIDAD UND

20.00

2.628

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 250MM

2.700

COLECTOR GALINDONA

2.701

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES KM

2.20

2.702

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOKM

2.20

2.703

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADAKM


1

2.704

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA M

2.705

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA UND

25.00

2.706

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

UND

28.00

2.707

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS UND

18.00

2.708

PUENTE DE MADERA PARA PASE VEHICULAR SOBRE ZANJA S/D (PROV UND

2.709

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=1.51 AM

256.30

2.710

EXCAV. ZANJA (PULSO) P/TUB.TERRENO NORMAL DN 200-250 MM H=2.01M

209.60

2.711

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=2.51 AM

103.80

2.712

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.01 AM

97.50

2.713

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 300 A 350MM H=1.5M

283.50

2.714

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 300 A 350MM H=2.0M

324.05

2.715

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 300 A 350MM H=2.5M

53.30

2.716

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 300 A 350MM H=3.0M

147.39

2.717

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 400 A 450MM H=2.0M

55.30

2.718

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 400 A 450MM H=2.5M

351.85

2.719

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 400 A 450MM H=3.1M

247.30

2.720

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARM

679.63

2.721

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 300-350 PARM

827.44

2.722

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 400-450 PARM

669.00

2.723

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=1.51 A 2 M

256.30

604.51

1.50
3,000.00

2.00

1,465.00

2.20
4,400.00

15.00

2.724

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.01 A 2 M

209.60

2.725

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.51 A 3 M

103.80

2.726

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.01 A 3 M

97.50

2.727

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 300 A 350MM H=1.51 A 2 M

283.50

2.728

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 300 A 350MM H=2.01 A 2 M

324.05

2.729

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 300 A 350MM H=2.51 A 3 M

53.30

2.730

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 300 A 350MM H=3.01 A 3 M

147.39

2.731

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 400 A 450MM H=2.01 A 2 M

55.30

2.732

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 400 A 450MM H=2.51 A 3 M

351.85

2.733

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 400 A 450MM H=3.01 A 3 M

247.30

2.734

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250M

679.63

2.735

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 300-350MM PA M

827.44

2.736

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 400-450MM PAM

669.00

2.738

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 250 INC. ANILLO + 2%

679.63

2.739

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 300 INC. ANILLO + 2%

520.65

2.740

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 350 INC. ANILLO + 2%

306.79

2.741

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 400 INC. ANILLO + 2%

669.00

2.742

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 250 INC. PRUEBA HI M

679.63

2.743

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 300 INC. PRUEBA HI M

520.65

2.744

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 350 INC. PRUEBA HI M

306.79

2.745

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 400 INC. PRUEBA HI M

669.00

2.746

BUZON TIPO I T-NORMAL. 1.01 A 1.50M PROF. (ENCOFR. INTERIOR Y EX UND

1.00

2.747

BUZON TIPO I T-NORMAL. 1.51 A 2.00M PROF. (ENCOFR. INTERIOR Y EX UND

14.00

2.748

BUZON TIPO I T-NORMAL. 2.01 A 2.50M PROF. (ENCOFR. INTERIOR Y EX UND

6.00

2.749

BUZON TIPO I T-NORMAL . 2.51 A 3.00M PROF. (ENCOFR. INTERIOR Y EXTUND

9.00

2.750

BUZON TIPO I T-NORMAL 3.01 A 3.50M PROF. (ENCOFR. INTERIOR Y EXT UND

3.00

2.751

BUZON TIPO I T-NORMAL 3.51 A 4.00M PROF. (ENCOFR. INTERIOR Y EXT) UND

4.00

2.752

BUZON TIPO I T-NORMAL. 4.51 A 5.50M PROF. (ENCOFR. INTERIOR Y EXT UND

1.00

2.753

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

UND

8.00

2.754

PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIF. DENSIDAD UND

24.00

2.755

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 250MM

679.63

2.756

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 300MM

520.65

2.757

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 350MM

306.79

2.758

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 400MM

669.00

2.759

CORTE + ROTURA,E.D.Y REPOSIC. DE PAVIMENTO FLEXIBLE ASFALTO C M2

3.00

EMISORES

3.100

EMISOR

3.101

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES KM

1.20

3.102

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOKM

1.20

3.103

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADAKM


1

3.104

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA M

3.105

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA UND

16.00

3.106

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

15.00

3.107

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS UND

3.108

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 400 A 450MM H=1.0M

175.92

3.109

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 400 A 450MM H=1.5M

428.93

3.110

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 400 A 450MM H=2.5M

118.70

3.111

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 450MM H=4.01 A 4.50M


M

118.50

3.112

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 450MM H=4.51 A 5M

372.00

3.113

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 400-450 PARM

1,231.21

3.114

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 400 A 450MM H=1.00 A 1 M

175.92

3.115

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 400 A 450MM H=1.50 A 2 M

428.93

3.116

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 400 A 450MM H=2.51 A 3 M

118.70

3.117

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 400 A 450MM H=4.01 A 4 M

118.50

UND

40.00

1.20
2,400.00

14.00

3.118

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 400 A 450MM H=4.51 A 5 M

371.70

3.119

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 400-450MM PAM

1,231.21

3.120

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 450 INC. ANILLO + 2%

1,231.21

3.121

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 450 INC. PRUEBA HI M

1,231.21

3.122

BUZON TIPO I T-NORMAL. 1.01 A 1.50M PROF. (ENCOFR. INTERIOR Y EX UND

7.00

3.123

BUZON TIPO I T-NORMAL 3.01 A 3.50M PROF. (ENCOFR. INTERIOR Y EXT UND

2.00

3.124

BUZON TIPO I T-NORMAL. 4.51 A 5.50M PROF. (ENCOFR. INTERIOR Y EXT UND

5.00

3.125

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

UND

6.00

3.126

PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIF. DENSIDAD UND

18.00

3.127

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 450MM

4.00

PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES

1,231.21

4.10

LAGUNAS

4.101

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA M

1,200.00

4.102

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA UND

10.00

4.103

TRAZO Y REPLANTEO INICIAL P./CONSTRUCCION DE PLANTA DE TRATA UND

1.00

4.104

REPLANTEO FINAL DE LA OBRA P./CONSTRUCCION DE PLANTA DE TR UND

1.00

4.105

LIMPIEZA Y DESFORESTACION RENDIMIENTO 1.0 HAS/DIA

HA

7.70

4.106

EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL /RETRO .5Y3

M3

200,834.51

4.107

REFINE Y NIVELACION Y COMPACTACION EN TERRENO NORMAL A PUL M2

74,075.04

4.108

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO: AFIRMADO (INCLM3

15,854.64

4.111

IMPERMEABILIZACION CON ARCILLA COMPACTADA

73,415.50

4.200

OBRAS CIVILES

4.201

OBRAS CIVILES

6.00

CONEXIONES DOMICILIARIAS

6.101

CONEXIONES DOMICILIARIAS DE ALCANTARILLADO

COSTO DIRECTO TOTAL

M2
GLB

1.00

UND

2,665.00

S/.

COSTO PARCIAL

TOTAL

PRESUPUESTO GENERAL
ITEM DESCRIPCION

UND METRADO

OBRAS PRELIMINARES

1.100

CAMPAMENTO PROVISIONAL PARA LA OBRA-S

GLB

1.00

1.200

MOVILIZACION DE MAQUINARIAS-HERRAMIENTAS PARA LA OBRA

GLB

1.00

1.300

DESMOVILIZACION DE MAQUINARIAS-HERRAMIENTAS PARA LA OBRA

GLB

1.00

1.400

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.50X1.80M

UND

2.00

SISTEMA DE AGUA POTABLE

1.00

CAPTACION

1.01.01

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA

1.01.02

TRAZO Y REPLANTEO INICIAL P./CONSTRUCCION DE CAPTACION

UND

1.01.03

REPLANTEO FINAL DE ESTRUCTURA DE CAPTACION

UND

1.01.04

EXCAVACION EN T-NORMAL SATURADO C/CARGADOR RETROEXCAVADOR 0.50-0.75Y3

M3

495.00

1.01.05

ELIMINACION DE DESMONTE TERRENO NORMAL "S" R=10 KM CON MAQUINARIA

M3

593.40

1.01.06

CONCRETO 1:10 +30% P.G. PARA CIMIENTO CORRIDO (CEMENTO PV)

M3

91.60

1.01.07

ENCOFRADO (INC. HABILITACION DE MADERA) PARA SOLADOS Y/O SUB-BASES

M2

79.60

1.01.08

CONCRETO CICLOPEO FC=245 KG/CM2 + 70 % PG.(C-V)

M3

55.20

1.01.10

CONCRETO F'C=245 KG/CM2 PARA BARRAJE (CEMENTO PV)

M3

280.30

1.01.11

ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)

M2

323.70

1.01.12

CONCRETO F'C=245 KG/CM2 PARA CANAL DE LIMPIA (CEMENTO PV)

M3

56.21

1.01.13

ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)

M2

80.00

1.01.14

CONCRETO F'C=245 KG/CM2 PARA MUROS REFORZADOS (CEMENTO PV)

M3

62.70

1.01.15

ENCOFRADO Y DESENCOF MUROS REFORZADOS

M2

290.83

1.01.16

ACERO ESTRUCTURAL TRABAJADO PARA MUROS (CAPTACION)

KG

4,550.00

1.01.17

COMPUERTA METALICA DE LIMPIA 1.60 x 1.75M.

UND

2.00

1.01.18

COMPUERTA METALICA DE LIMPIA 0.50 x 0.30M.

UND

2.00

1.01.19

REJA MANUAL DE SEGUN ESPECIFICACIONES

UND

1.00

2.00

DESARENADOR

2.01.01

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA

2.01.02

TRAZO Y REPLANTEO INICIAL P./CONSTRUCCION DE DESARENADOR

UND

2.01.03

REPLANTEO FINAL DE ESTRUCTURA DEL DESARENADOR

UND

2.01.04

EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL /RETRO .5Y3

M3

198.00

2.01.05

ELIMINACION DE DESMONTE TERRENO NORMAL "S" R=10 KM CON MAQUINARIA

M3

240.00

2.01.06

CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES

M3

15.20

2.01.07

ENCOFRADO (INC. HABILITACION DE MADERA) PARA SOLADOS Y/O SUB-BASES

M2

25.00

2.01.08

CONCRETO F'C=245 KG/CM2 PARA ESTRUCTURAS -DESARENADOR (CEMENTO PV)

M3

65.00

2.01.09

ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)

M2

332.10

2.01.091 ACERO ESTRUCTURAL TRABAJADO PARA MUROS (CAPTACION)

KG

9,950.00

2.01.10

TARRAJEO CON IMPERMEABILIZANTE DE ESTRUCTURAS HIDRAULICAS

M2

253.70

2.01.11

TUBERIA DE HIERRO DUCTIL DN 300MM (12") K-9 INCL. ANILLO + 1%DESP.

15.00

2.01.12

VALVULA COMPUERTA BB Ho DUCTIL DN 300

UND

4.00

LINEA DE CONDUCCION

4.01.01

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADA 10M. (LINEA HASTA 10")

KM

4.01.02

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA

4.01.03

CONO DE FIBRA DE VIDRIO FOS. P/DESVIO TRANSITO S/D

UND

24.00

4.01.04

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA OBRA

UND

20.00

4.01.05

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS. DURANTE OBRA)

UND

24.00

4.01.06

PROTECCION DE REDES EXISTENTE DE DN 200 A 250

UND

10.00

4.01.09

PROTECCION DE POSTES DE ALUMBRADO - TELEFONO

UND

18.00

4.01.10

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL

KM

6.40

4.01.11

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL

KM

4.01.12

EXCAV. ZANJA (A PULSO) P/TUB.TERRENO NORMAL DN 300 A 350 MM H=1.51 A 2.00M

1,165.93

4.01.121 EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 300 A 350MM H=1.51 A 2.00M

5,194.45

4.01.13

REFINE Y NIVELACION ZANJA TERRENO NORMAL P/TUB. DN 300 PARA TODA PROFUNDIDAD

6,360.50

4.01.14

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 300 A 350MM H=1.51 A 2.00M

6,360.50

4.01.141 ELIMIN.DESMONTE (PULSO+VOLQ) T-NORMAL D=5 KM DN 300-350MM PARA TODA PROF.

1,165.93

4.01.150 ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=5KM DN 300-350MM PARA TODA PROF.

5,194.45

4.01.151 TUBERIA PVC- U UF NTP ISO 4422 PN 7.5 DN 300 INC. ANILLO +2% DESPERDICIOS

1,126.40

4.01.152 TUBERIA PVC-U UF NTP ISO 4422 PN 10 DN 300 INC. ANILLO +2 %DESP

5,026.36

4.01.153 TUBERIA PVC-U UF NTP ISP 4422 PN 10 DN 350 INC. ANILLO + 2%DESP

207.42

4.01.154 INSTALAC.TUBERIA P.V.C. DE 300MM+PRUEBA HIDRA

6,152.96

4.01.155 INSTALAC.TUBERIA P.V.C. DE 350MM+PRUEBA HIDRA

207.42

120.00
1.00
1.00

120.00
1.00
1.00

1.00
6.40
12,800.00

6.40

PRESUPUESTO GENERAL
ITEM DESCRIPCION

UND METRADO

4.01.181 CODO 45 PVC PARA RED AGUA POTABLE DE 12"

UND

10.00

4.01.182 CODO 22 30' PVC PARA RED AGUA POTABLE DE 12"

UND

28.00

4.01.183 CODO 1115' PVC PARA RED AGUA POTABLE DE 12"

UND

56.00

4.01.184 CODO 45 PVC PARA RED AGUA POTABLE DE 14"

UND

1.00

4.01.185 CODO 22 30' PVC PARA RED AGUA POTABLE DE 14"

UND

4.00

4.01.186 CODO 1115' PVC PARA RED AGUA POTABLE DE 14"

UND

8.00

4.01.19

CONCRETO FC=140 KG/CM2 PARA ANCLAJES DE ACCESORIOS DN 300-350

UND

105.00

4.01.20

VALVULA DE AIRE DE FIERRO FUNDIDO DE 1"DE DOBLE ACCION

UND

11.00

4.01.21

MONTAJE DE VALVULA DE AIRE DN 40 A 50 E INST. HIDRAULICA

UND

11.00

4.01.22

CAMARA P/VALV.AIRE TERR.NORMAL E.D.CARG.+VOL.P/MATRIZ DN 100 A 400MM

UND

11.00

4.01.23

VALVULA DE PURGA DN 100 mm

UND

9.00

4.01.24

MONTAJE DE VALVULA DE PURGA DN 100 E INST. HIDRAULICA

UND

9.00

4.01.25

CAMARA P/VALV.PURGA T-NORMAL E.D.CARG+VOLQ. P/MATRIZ DN 100-400MM (C-V)

UND

9.00

4.01.26

PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD CAMPO)

UND

60.00

4.01.27

PRUEBA HIDRAULICA DE ESCORRENTIA P/TUB DN 300MM

4.01.28

INSTALAC.TUBERIA DE ACERO PARA CRUCE DE RIO

GLB

1.00

5.00

PLANTA DE TRATAMIENTO DE AGUA POTABLE (112 lps)


EST

1.00

6,400.00

5.01.01

PLANTA DE TRATAMIENTO DE AGUA POTABLE (Q = 112 LPS)

6.00

RESERVORIOS

6.01.01

RESERVORIO ELEVADO ( 1500 m3)

EST

1.00

6.01.02

REHABILITACION DE RESERVORIO EXISTENTE

UND

1.00

8.00

REDES

8.01.01

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADA 10M. (LINEA HASTA 10")

KM

8.01.02

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA

8.01.03

CONO DE FIBRA DE VIDRIO FOS. P/DESVIO TRANSITO S/D

UND

80.00

8.01.04

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA OBRA

UND

80.00

8.01.05

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS. DURANTE OBRA)

UND

50.00

8.01.051 PUENTE DE MADERA PARA PASE VEHICULAR SOBRE ZANJA S/D (PROVIS. DURANTE OBRA)

UND

40.00

8.01.07

PROTECCION DE REDES EXISTENTE DE DN 200 A 250

UND

60.00

8.01.10

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL

KM

47.60

8.01.11

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL

KM

8.01.12

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 50 MM H=1.00 A 1.50M

26,796.00

8.01.13

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 80 MM H=1.00 A 1.50M

3,967.00

8.01.14

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 100 MM H=1.00 A 1.50M

6,421.00

8.01.15

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 150 MM H=1.00 A 1.50M

4,589.00

8.01.16

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200- 250 MM H=1.00 A 1.50M

4,793.00

8.01.17

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 250 MM H=1.00 A 1.50M

1,010.00

8.01.18

REFINE Y NIVELACION ZANJA TERRENO NORMAL P/TUB. DN 50 - 80 PARA TODA PROFUNDIDAD

30,763.00

8.01.19

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 100 -150 PARA TODA PROF.

11,010.00

8.01.20

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARA TODA PROF.

5,803.00

8.01.21

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 50- 80MM H=1.00 A 1.50M

30,763.00

8.01.22

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 100 - 150MM H=1.00 A 1.50M

11,010.00

8.01.23

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=1.00 A 1.50M

5,803.00

8.01.24

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 50- 80MM PARA TODA PROF.

30,763.00

8.01.25

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 100- 150MM PARA TODA PROF.

11,010.00

8.01.26

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250 P/TODA PROF.

5,803.00

8.01.27

TUBERIA PVC- U UF NTP ISO 4422 PN 7.5 DN 50 INC. ANILLO +2% DESPERDICIOS

26,796.00

8.01.28

TUBERIA PVC- U UF NTP ISO 4422 PN 7.5 DN 80 INC. ANILLO +2% DESPERDICIOS

3,967.00

8.01.29

TUBERIA PVC- U UF NTP ISO 4422 PN 7.5 DN 100 INC. ANILLO +2% DESPERDICIOS

6,421.00

8.01.30

TUBERIA PVC- U UF NTP ISO 4422 PN 7.5 DN 150 INC. ANILLO +2% DESPERDICIOS

4,589.00

8.01.31

TUBERIA PVC- U UF NTP ISO 4422 PN 7.5 DN 200 INC. ANILLO +2% DESPERDICIOS

4,678.00

8.01.32

TUBERIA PVC- U UF NTP ISO 4422 PN 7.5 DN 250 INC. ANILLO +2% DESPERDICIOS

1,010.00

47.60
82,000.00

47.60

8.01.321 TUBERIA DE HIERRO DUCTIL DN 200MM (10") K-9 INCL. ANILLO + 1%DESP.

115.00

8.01.33

INSTALAC.TUBERIA P.V.C. CLASE A - 7.5 DE DN 50 -65 +PRUEBA HIDRA

26,796.00

8.01.34

INSTALAC.TUBERIA P.V.C. CLASE A - 7.5 DE DN 80 +PRUEBA HIDRA

3,967.00

8.01.35

INSTALAC.TUBERIA P.V.C. CLASE A - 7.5 DE DN 100+PRUEBA HIDRA

6,421.00

8.01.36

INSTALAC.TUBERIA P.V.C. CLASE A - 7.5 DE DN 150+PRUEBA HIDRA

4,589.00

8.01.37

INSTALAC.TUBERIA P.V.C. CLASE A - 7.5 DE DN 200+PRUEBA HIDRA

4,678.00

8.01.38

INSTALAC.TUBERIA P.V.C. CLASE A - 7.5 DE DN 250+PRUEBA HIDRA

1,010.00

8.01.39

INSTALAC.TUBERIA HIERRO FUNDIDO DUCTIL K-7 DE 200 MM+PRUEBA HIDRA

115.00

8.01.40

PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD CAMPO)

UND

300.00

8.01.41

PRUEBA HIDRAULICA+DESINFECCION TUB.2"(50MM) A ZANJA TAPADA

26,796.00

8.01.42

PRUEBA HIDRAULICA+DESINFECCION TUB.3"(75MM) A ZANJA TAPADA

3,967.00

PRESUPUESTO GENERAL
ITEM DESCRIPCION

UND METRADO

8.01.43

PRUEBA HIDRAULICA+DESINFECCION TUB.4"(100MM) A ZANJA TAPADA

6,421.00

8.01.44

PRUEBA HIDRAULICA+DESINFECCION TUB.6"(150MM) A ZANJA TAPADA

4,589.00

8.01.45

PRUEBA HIDRAULICA+DESINFECCION TUB.8"(200MM) A ZANJA TAPADA

4,793.00

8.01.46

PRUEBA HIDRAULICA+DESINFECCION TUB.10"(250MM) A ZANJA TAPADA

1,010.00

8.02

ACCESORIOS

8.02.001 VALVULA COMPUERTA BB Ho DUCTIL DN 200

UND

1.00

8.02.01

VALVULA COMPUERTA BB Ho DUCTIL DN 150

UND

3.00

8.02.02

VALVULA COMPUERTA BB Ho DUCTIL DN 100

UND

2.00

8.02.03

VALVULA COMPUERTA BB Ho DUCTIL DN 80

UND

1.00

8.02.04

VALVULA COMPUERTA BB Ho DUCTIL DN 50

UND

2.00

8.02.05

GRIFO CONTRA INCENDIO DN 200

UND

2.00

8.02.06

GRIFO CONTRA INCENDIO DN 150

UND

2.00

8.02.07

GRIFO CONTRA INCENDIO DN 100

UND

15.00

8.02.08

CODO 90 PVC PARA RED AGUA POTABLE DE 10"

UND

6.00

8.02.09

CODO 45 PVC PARA RED AGUA POTABLE DE 10"

UND

2.00

8.02.10

CODO 1115' PVC PARA RED AGUA POTABLE DE 10"

UND

1.00

8.02.11

CODO 90 PVC PARA RED AGUA POTABLE DE 8"

UND

11.00

8.02.13

CODO 45 PVC PARA RED AGUA POTABLE DE 8"

UND

3.00

8.02.14

CODO 22 30' PVC PARA RED AGUA POTABLE DE 8"

UND

2.00

8.02.15

CODO 11 15' PVC PARA RED AGUA POTABLE DE 8"

UND

2.00

8.02.16

CODO 2230 PVC PARA RED AGUA POTABLE DE 6"

UND

4.00

8.02.17

CODO 90 PVC PARA RED AGUA POTABLE DE 4"

UND

6.00

8.02.18

CODO 90 PVC PARA RED AGUA POTABLE DE 3"

UND

2.00

8.02.19

CODO 2230 PVC PARA RED AGUA POTABLE DE 3"

UND

2.00

8.02.20

CODO 90 PVC PARA RED AGUA POTABLE DE 2"

UND

10.00

8.02.21

CODO 45 PVC PARA RED AGUA POTABLE DE 2"

UND

1.00

8.02.22

CODO 2230 PVC PARA RED AGUA POTABLE DE 2"

UND

8.00

8.02.23

CODO 11 15' PVC PARA RED AGUA POTABLE DE 2"

UND

5.00

8.02.24

TEE DE PVC PARA RED AGUA POTABLE DE 10"X 8"

UND

2.00

8.02.25

TEE DE PVC PARA RED AGUA POTABLE DE 8"X 8"

UND

6.00

8.02.26

TEE DE PVC PARA RED AGUA POTABLE DE 8"X 6"

UND

6.00

8.02.27

TEE DE PVC PARA RED AGUA POTABLE DE 8"X 4"

UND

23.00

8.02.28

TEE DE PVC PARA RED AGUA POTABLE DE 6"X 6"

UND

8.00

8.02.29

TEE DE PVC PARA RED AGUA POTABLE DE 6"X 4"

UND

9.00

8.02.30

TEE DE PVC PARA RED AGUA POTABLE DE 4"X 4"

UND

12.00

8.02.31

TEE DE PVC PARA RED AGUA POTABLE DE 4"X 3"

UND

1.00

8.02.32

TEE DE PVC PARA RED AGUA POTABLE DE 4"X 2"

UND

17.00

8.02.33

TEE DE PVC PARA RED AGUA POTABLE DE 4"X 1"

UND

1.00

8.02.34

TEE DE PVC PARA RED AGUA POTABLE DE 3"X 3"

UND

10.00

8.02.35

TEE DE PVC PARA RED AGUA POTABLE DE 3"X 2"

UND

9.00

8.02.36

TEE DE PVC PARA RED AGUA POTABLE DE 2"X 2"

UND

104.00

8.02.361 TEE DE PVC PARA RED AGUA POTABLE DE 2"X 1"

UND

1.00

8.02.362 TEE DE PVC PARA RED AGUA POTABLE DE 1"X 1"

UND

1.00

8.02.38

CRUZ DE PVC PARA RED AGUA POTABLE DE 8"X 8"

UND

6.00

8.02.39

CRUZ DE PVC PARA RED AGUA POTABLE DE 8"X 6"

UND

1.00

8.02.40

CRUZ DE PVC PARA RED AGUA POTABLE DE 8"X 4"

UND

9.00

8.02.41

CRUZ DE PVC PARA RED AGUA POTABLE DE 6"X 6"

UND

7.00

8.02.42

CRUZ DE PVC PARA RED AGUA POTABLE DE 6"X 4"

UND

18.00

8.02.43

CRUZ DE PVC PARA RED AGUA POTABLE DE 4"X 4"

UND

12.00

8.02.44

CRUZ DE PVC PARA RED AGUA POTABLE DE 4"X 3"

UND

1.00

8.02.45

CRUZ DE PVC PARA RED AGUA POTABLE DE 4"X 2"

UND

10.00

8.02.46

CRUZ DE PVC PARA RED AGUA POTABLE DE 3"X 2"

UND

12.00

8.02.47

CRUZ DE PVC PARA RED AGUA POTABLE DE 2"X 2"

UND

72.00

8.02.48

CRUZ DE PVC PARA RED AGUA POTABLE DE 2"X 1"

UND

2.00

8.02.50

REDUCCION PVC PARA RED AGUA POTABLE DE 10" A 8"

UND

1.00

8.02.51

REDUCCION PVC PARA RED AGUA POTABLE DE 8" A 6"

UND

1.00

8.02.52

REDUCCION PVC PARA RED AGUA POTABLE DE 8" A 4"

UND

6.00

8.02.53

REDUCCION PVC PARA RED AGUA POTABLE DE 6" A 4"

UND

16.00

8.02.54

REDUCCION PVC PARA RED AGUA POTABLE DE 6" A 3"

UND

2.00

8.02.55

REDUCCION PVC PARA RED AGUA POTABLE DE 4" A 3"

UND

23.00

8.02.56

REDUCCION PVC PARA RED AGUA POTABLE DE 4" A 2"

UND

91.00

8.02.57

REDUCCION PVC PARA RED AGUA POTABLE DE 3" A 2"

UND

14.00

8.02.58

REDUCCION PVC PARA RED AGUA POTABLE DE 2" A 1"

UND

12.00

PRESUPUESTO GENERAL
ITEM DESCRIPCION

UND METRADO

8.02.59

TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 8"

UND

7.00

8.02.60

TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 6"

UND

7.00

8.02.61

TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 4"

UND

6.00

8.02.62

TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 3"

UND

5.00

8.02.63

TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 2"

UND

44.00

9.00

CONEXIONES DOMICILIARIAS

9.01.01

CONEX. AGUA 1/2" T-SEMIROC.DE 4.01-8 M INCL.LOSA 1 X 1 X .1

UND

941.00

9.01.02

MICROMEDICION

UND

3,100.00

SISTEMA DE ALCANTARILLADO

1.00

REDES

1.101

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL

KM

46.20

1.102

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL

KM

46.20

1.103

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADA 10M. (LINEA HASTA 10")

KM

1.104

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA

1.105

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA OBRA

UND

80.00

1.106

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

UND

60.00

1.107

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS. DURANTE OBRA)

UND

50.00

1.108

PUENTE DE MADERA PARA PASE VEHICULAR SOBRE ZANJA S/D (PROVIS. DURANTE OBRA)

UND

50.00

1.109

PROTECCION DE REDES EXISTENTE DE DN 200 A 250

UND

1.112

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200- 250 MM H=1.00 A 1.50M

11,896.69

1.113

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=1.51 A 2.00M

12,545.30

1.114

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200 MM H=2.01 A 2.50M

8,588.45

1.116

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=2.51 A 3.00M

6,618.50

1.117

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.01 A 3.50M

3,768.30

1.118

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.51 A 4.00M

1,500.40

1.119

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200 MM H=4.01 A 4.50M

573.00

1.120

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=4.51 A 5.50M

526.70

1.121

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200 MM H=5.51 A 6.50M

182.40

1.122

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARA TODA PROF.

46,200.00

1.123

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=1.00 A 1.50M

11,896.70

1.124

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=1.51 A 2.00M

12,545.30

1.125

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.01 A 2.50M

8,588.50

1.126

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.51 A 3.00M

6,618.50

1.127

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.01 A 3.50M

3,768.30

1.128

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.51 A 4.00M

1,500.40

1.129

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=4.01 A 4.50M

573.00

1.130

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=4.51 A 5.50M

526.70

1.131

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=5.51 A 6.50M

182.40

1.132

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250 P/TODA PROF.

46,200.00

1.133

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 200 INC. ANILLO + 2% DESPERDICIOS

46,200.00

1.134

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 200 INC. PRUEBA HIDRAULICA

46,200.00

1.135

PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD CAMPO)

UND

1.136

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 200MM

1.200

BUZONES TIPO I (COLECTOR SECUNDARIO)

1.201

BUZON TIPO I T-NORMAL. 1.01 A 1.50M PROF. (ENCOFR. INTERIOR Y EXTERIOR)

UND

337.00

1.202

BUZON TIPO I T-NORMAL. 1.51 A 2.00M PROF. (ENCOFR. INTERIOR Y EXTERIOR)

UND

123.00

1.203

BUZON TIPO I T-NORMAL. 2.01 A 2.50M PROF. (ENCOFR. INTERIOR Y EXTERIOR)

UND

129.00

1.204

BUZON TIPO I T-NORMAL . 2.51 A 3.00M PROF. (ENCOFR. INTERIOR Y EXT)

UND

111.00

1.205

BUZON TIPO I T-NORMAL 3.01 A 3.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

75.00

1.206

BUZON TIPO I T-NORMAL 3.51 A 4.00M PROF. (ENCOFR. INTERIOR Y EXT)

UND

32.00

1.207

BUZON TIPO I T-NORMAL. 4.51 A 5.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

14.00

1.208

BUZON TIPO I T-NORMAL. 5.51 A 6.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

15.00

2.00

COLECTORES

2.100

COLECTOR DE REBOSE

2.101

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL

KM

0.42

2.102

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL

KM

0.42

2.103

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADA 10M. (LINEA HASTA 10")

KM

2.104

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA

2.105

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA OBRA

UND

8.00

2.106

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

UND

6.00

2.107

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS. DURANTE OBRA)

UND

4.00

46.20
82,000.00

60.00

300.00
46,200.00

0.42
840.00

PRESUPUESTO GENERAL
ITEM DESCRIPCION

UND METRADO

2.108

PUENTE DE MADERA PARA PASE VEHICULAR SOBRE ZANJA S/D (PROVIS. DURANTE OBRA)

UND

2.1081

EXCAVAC. ZANJAI(MAQ.) P/TUB. TERR-NORMAL DN .200 - 250 DE 1.26m a 1.50m PROF

142.00

2.109

EXCAVAC. ZANJAI(MAQ.) P/TUB. TERR-NORMAL DN .200 - 250 DE 1.5m a 2.0m PROF

129.50

2.1091

EXCAVAC. ZANJAI(MAQ.) P/TUB. TERR-NORMAL DN 200 - 250 DE 2.01m a 2.50m PROF

139.00

2.110

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARA TODA PROF.

410.00

2.1101

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=1.00 A 1.50M

142.00

2.1102

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=1.51 A 2.00M

129.50

2.111

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.01 A 2.50M

139.00

2.112

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250 P/TODA PROF.

410.00

2.1121

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 200 INC. ANILLO + 2% DESPERDICIOS

14.48

2.113

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 250 INC. ANILLO + 2% DESPERDICIOS

405.00

2.1131

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 200 INC. PRUEBA HIDRAULICA

14.48

2.114

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 250 INC. PRUEBA HIDRAULICA

405.00

2.115

BUZON TIPO I T-NORMAL. 1.01 A 1.50M PROF. (ENCOFR. INTERIOR Y EXTERIOR)

UND

3.00

2.116

BUZON TIPO I T-NORMAL. 1.51 A 2.00M PROF. (ENCOFR. INTERIOR Y EXTERIOR)

UND

3.00

2.117

BUZON TIPO I T-NORMAL. 2.01 A 2.50M PROF. (ENCOFR. INTERIOR Y EXTERIOR)

UND

3.00

2.125

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

UND

2.00

2.130

PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIF. DENSIDAD DE CAMPO)

UND

2.140

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 250MM

2.200

COLECTOR IMPERIO

2.201

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL

KM

0.43

2.202

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL

KM

0.43

2.203

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADA 10M. (LINEA HASTA 10")

KM

2.204

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA

2.205

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA OBRA

UND

6.00

2.206

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

UND

8.00

2.207

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS. DURANTE OBRA)

UND

2.208

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200 MM H=2.01 A 2.50M

117.00

2.209

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=2.51 A 3.00M

230.60

2.210

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200 MM H=4.01 A 4.50M

69.30

2.211

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARA TODA PROF.

425.00

2.212

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.01 A 2.50M

117.00

2.213

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.51 A 3.00M

230.60

2.214

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=4.01 A 4.50M

69.30

2.215

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250 P/TODA PROF.

425.00

2.216

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 200 INC. ANILLO + 2% DESPERDICIOS

425.00

2.217

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 200 INC. PRUEBA HIDRAULICA

425.00

2.218

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 200MM

425.00

2.219

BUZON TIPO I T-NORMAL. 2.01 A 2.50M PROF. (ENCOFR. INTERIOR Y EXTERIOR)

UND

2.00

2.220

BUZON TIPO I T-NORMAL . 2.51 A 3.00M PROF. (ENCOFR. INTERIOR Y EXT)

UND

4.00

2.221

BUZON TIPO I T-NORMAL 3.01 A 3.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

2.00

2.222

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

UND

2.00

2.223

PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIF. DENSIDAD DE CAMPO)

UND

6.00

2.300

COLECTOR LOS OLIVOS

2.301

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL

KM

0.40

2.302

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL

KM

0.40

2.303

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADA 10M. (LINEA HASTA 10")

KM

2.304

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA

2.305

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA OBRA

UND

6.00

2.306

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

UND

5.00

2.307

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS. DURANTE OBRA)

UND

2.308

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.01 A 3.50M

145.00

2.309

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200 MM H=4.01 A 4.50M

230.50

2.310

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARA TODA PROF.

390.00

2.311

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.01 A 3.50M

145.00

2.312

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=4.01 A 4.50M

230.50

2.313

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250 P/TODA PROF.

390.00

2.314

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 200 INC. ANILLO + 2% DESPERDICIOS

390.00

2.315

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 200 INC. PRUEBA HIDRAULICA

390.00

2.316

BUZON TIPO I T-NORMAL 3.01 A 3.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

5.00

2.317

BUZON TIPO I T-NORMAL 3.51 A 4.00M PROF. (ENCOFR. INTERIOR Y EXT)

UND

2.00

2.318

BUZON TIPO I T-NORMAL. 4.01 A 4.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

2.00

2.319

BUZON TIPO I T-NORMAL. 4.51 A 5.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

1.00

4.00

6.00
420.00

0.43
850.00

4.00

0.40
780.00

4.00

PRESUPUESTO GENERAL
ITEM DESCRIPCION

UND METRADO

2.320

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

UND

2.321

PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIF. DENSIDAD DE CAMPO)

UND

2.322

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 200MM

2.400

COLECTOR MONTERREY

2.401

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL

KM

1.50

2.402

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL

KM

1.50

2.403

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADA 10M. (LINEA HASTA 10")

KM

2.404

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA

2.405

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA OBRA

UND

12.00

2.406

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

UND

14.00

2.407

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS. DURANTE OBRA)

UND

12.00

2.408

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.01 A 3.50M

98.50

2.409

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.51 A 4.00M

507.30

2.410

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200 MM H=4.01 A 4.50M

456.00

2.411

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=4.51 A 5.50M

348.50

2.412

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARA TODA PROF.

1,440.00

2.413

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.01 A 3.50M

98.50

2.414

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.51 A 4.00M

507.30

2.415

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=4.01 A 4.50M

456.00

2.416

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=4.51 A 5.50M

348.50

2.417

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250 P/TODA PROF.

1,440.00

2.418

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 250 INC. ANILLO + 2% DESPERDICIOS

1,440.00

2.419

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 250 INC. PRUEBA HIDRAULICA

1,440.00

2.420

BUZON TIPO I T-NORMAL 3.01 A 3.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

1.00

2.421

BUZON TIPO I T-NORMAL. 4.01 A 4.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

21.00

2.422

BUZON TIPO I T-NORMAL. 5.51 A 6.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

1.00

2.423

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

UND

6.00

2.424

PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIF. DENSIDAD DE CAMPO)

UND

18.00

2.425

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 250MM

2.500

COLECTOR SANTA ROSA

2.501

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL

KM

0.60

2.502

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL

KM

0.60

2.503

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADA 10M. (LINEA HASTA 10")

KM

2.504

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA

2.505

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA OBRA

UND

8.00

2.506

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

UND

10.00

2.507

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS. DURANTE OBRA)

UND

2.508

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=1.51 A 2.00M

114.00

2.509

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200 MM H=2.01 A 2.50M

202.50

2.510

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=2.51 A 3.00M

119.00

2.511

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.51 A 4.00M

22.00

2.512

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=4.51 A 5.50M

132.50

2.513

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARA TODA PROF.

604.51

2.514

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=1.51 A 2.00M

114.00

2.515

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.01 A 2.50M

202.50

2.516

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.51 A 3.00M

119.00

2.517

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.51 A 4.00M

22.00

2.518

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=4.51 A 5.50M

132.50

2.519

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250 P/TODA PROF.

604.51

2.520

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 200 INC. ANILLO + 2% DESPERDICIOS

604.50

2.521

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 200 INC. PRUEBA HIDRAULICA

604.50

2.522

BUZON TIPO I T-NORMAL. 1.51 A 2.00M PROF. (ENCOFR. INTERIOR Y EXTERIOR)

UND

4.00

2.523

BUZON TIPO I T-NORMAL. 2.01 A 2.50M PROF. (ENCOFR. INTERIOR Y EXTERIOR)

UND

5.00

2.524

BUZON TIPO I T-NORMAL . 2.51 A 3.00M PROF. (ENCOFR. INTERIOR Y EXT)

UND

1.00

2.525

BUZON TIPO I T-NORMAL. 4.51 A 5.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

3.00

2.526

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

UND

3.00

2.527

PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIF. DENSIDAD DE CAMPO)

UND

2.528

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 200MM

2.600

COLECTOR MORITO

2.601

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL

KM

1.50

2.602

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL

KM

1.50

2.603

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADA 10M. (LINEA HASTA 10")

KM

2.604

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA

2.00
5.00
390.00

1.50
3,000.00

1,440.00

0.60
1,210.00

8.00

8.00
604.51

1.50
3,000.00

PRESUPUESTO GENERAL
ITEM DESCRIPCION

UND METRADO

2.605

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA OBRA

UND

20.00

2.606

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

UND

12.00

2.607

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS. DURANTE OBRA)

UND

12.00

2.608

PUENTE DE MADERA PARA PASE VEHICULAR SOBRE ZANJA S/D (PROVIS. DURANTE OBRA)

UND

2.609

EXCAV. ZANJA (PULSO) P/TUB.TERRENO NORMAL DN 200-250 MM H=2.01 A 2.50M

174.30

2.610

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.01 A 3.50M

765.29

2.611

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.51 A 4.00M

176.24

2.612

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=4.51 A 5.50M

320.80

2.613

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARA TODA PROF.

1,465.00

2.614

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.01 A 2.50M

174.30

2.615

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.01 A 3.50M

765.29

2.616

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.51 A 4.00M

176.24

2.617

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=4.51 A 5.50M

320.74

2.618

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250 P/TODA PROF.

1,465.00

2.619

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 250 INC. ANILLO + 2% DESPERDICIOS

1,465.00

2.620

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 250 INC. PRUEBA HIDRAULICA

1,465.00

2.621

BUZON TIPO I T-NORMAL. 2.01 A 2.50M PROF. (ENCOFR. INTERIOR Y EXTERIOR)

UND

2.622

BUZON TIPO I T-NORMAL . 2.51 A 3.00M PROF. (ENCOFR. INTERIOR Y EXT)

UND

3.00

2.623

BUZON TIPO I T-NORMAL 3.01 A 3.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

11.00

2.624

BUZON TIPO I T-NORMAL. 4.01 A 4.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

4.00

2.625

BUZON TIPO I T-NORMAL. 4.51 A 5.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

3.00

2.626

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

UND

8.00

2.627

PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIF. DENSIDAD DE CAMPO)

UND

20.00

2.628

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 250MM

2.700

COLECTOR GALINDONA

2.701

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL

KM

2.20

2.702

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL

KM

2.20

2.703

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADA 10M. (LINEA HASTA 10")

KM

2.704

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA

2.705

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA OBRA

UND

25.00

2.706

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

UND

28.00

2.707

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS. DURANTE OBRA)

UND

18.00

2.708

PUENTE DE MADERA PARA PASE VEHICULAR SOBRE ZANJA S/D (PROVIS. DURANTE OBRA)

UND

2.709

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=1.51 A 2.00M

256.30

2.710

EXCAV. ZANJA (PULSO) P/TUB.TERRENO NORMAL DN 200-250 MM H=2.01 A 2.50M

209.60

2.711

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=2.51 A 3.00M

103.80

2.712

EXCAV. ZANJA (MAQ) P/TUB.TERRENO NORMAL DN 200-250 MM H=3.01 A 3.50M

97.50

2.713

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 300 A 350MM H=1.51 A 2.00M

283.50

2.714

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 300 A 350MM H=2.01 A 2.50M

324.05

2.715

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 300 A 350MM H=2.51 A 3.00M

53.30

2.716

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 300 A 350MM H=3.01 A 3.50M

147.39

2.717

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 400 A 450MM H=2.01 A 2.50M

55.30

2.718

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 400 A 450MM H=2.51 A 3.00M

351.85

2.719

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 400 A 450MM H=3.1 A 3.50M

247.30

2.720

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 200-250 PARA TODA PROF.

679.63

2.721

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 300-350 PARA TODA PROF.

827.44

2.722

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 400-450 PARA TODA PROF.

669.00

2.723

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=1.51 A 2.00M

256.30

2.724

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.01 A 2.50M

209.60

2.725

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=2.51 A 3.00M

103.80

2.726

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 200 A 250MM H=3.01 A 3.50M

97.50

2.727

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 300 A 350MM H=1.51 A 2.00M

283.50

2.728

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 300 A 350MM H=2.01 A 2.50M

324.05

2.729

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 300 A 350MM H=2.51 A 3.00M

53.30

2.730

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 300 A 350MM H=3.01 A 3.50M

147.39

2.731

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 400 A 450MM H=2.01 A 2.50M

55.30

2.732

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 400 A 450MM H=2.51 A 3.00M

351.85

2.733

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 400 A 450MM H=3.01 A 3.50M

247.30

2.734

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM P/TUB. DN 200-250 P/TODA PROF.

679.63

2.735

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 300-350MM PARA TODA PROF.

827.44

2.736

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 400-450MM PARA TODA PROF.

669.00

2.738

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 250 INC. ANILLO + 2% DESPERDICIOS

679.63

2.739

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 300 INC. ANILLO + 2% DESPERDICIOS

520.65

8.00

2.00

1,465.00

2.20
4,400.00

15.00

PRESUPUESTO GENERAL
ITEM DESCRIPCION

UND METRADO

2.740

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 350 INC. ANILLO + 2% DESPERDICIOS

306.79

2.741

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 400 INC. ANILLO + 2% DESPERDICIOS

669.00

2.742

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 250 INC. PRUEBA HIDRAULICA

679.63

2.743

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 300 INC. PRUEBA HIDRAULICA

520.65

2.744

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 350 INC. PRUEBA HIDRAULICA

306.79

2.745

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 400 INC. PRUEBA HIDRAULICA

669.00

2.746

BUZON TIPO I T-NORMAL. 1.01 A 1.50M PROF. (ENCOFR. INTERIOR Y EXTERIOR)

UND

1.00

2.747

BUZON TIPO I T-NORMAL. 1.51 A 2.00M PROF. (ENCOFR. INTERIOR Y EXTERIOR)

UND

14.00

2.748

BUZON TIPO I T-NORMAL. 2.01 A 2.50M PROF. (ENCOFR. INTERIOR Y EXTERIOR)

UND

6.00

2.749

BUZON TIPO I T-NORMAL . 2.51 A 3.00M PROF. (ENCOFR. INTERIOR Y EXT)

UND

9.00

2.750

BUZON TIPO I T-NORMAL 3.01 A 3.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

3.00

2.751

BUZON TIPO I T-NORMAL 3.51 A 4.00M PROF. (ENCOFR. INTERIOR Y EXT)

UND

4.00

2.752

BUZON TIPO I T-NORMAL. 4.51 A 5.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

1.00

2.753

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

UND

8.00

2.754

PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIF. DENSIDAD DE CAMPO)

UND

24.00

2.755

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 250MM

679.63

2.756

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 300MM

520.65

2.757

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 350MM

306.79

2.758

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 400MM

669.00

2.759

CORTE + ROTURA,E.D.Y REPOSIC. DE PAVIMENTO FLEXIBLE ASFALTO CALIENTE DE E=4"

M2

40.00

3.00

EMISORES

3.100

EMISOR

3.101

TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL

KM

1.20

3.102

REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL

KM

1.20

3.103

SEALES-ILUMINACION NOCTURNA CON LAMPARA INTERMITENTE CADA 10M. (LINEA HASTA 10")

KM

3.104

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA

3.105

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA OBRA

UND

16.00

3.106

LETRERO METALICO 0.60 x 0.60 S/POSTE P/DESVIO TRANSITO

UND

15.00

3.107

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROVIS. DURANTE OBRA)

UND

3.108

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 400 A 450MM H=1.01 A 1.50M

175.92

3.109

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 400 A 450MM H=1.51 A 2.00M

428.93

3.110

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 400 A 450MM H=2.51 A 3.00M

118.70

3.111

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 450MM H=4.01 A 4.50M (inc. Instalacin de tuberia)

118.50

3.112

EXCAV. ZANJA (MAQ) P/TUB EN TERRENO NORMAL DN 450MM H=4.51 A 5.50M

372.00

3.113

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. DN 400-450 PARA TODA PROF.

1,231.21

3.114

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 400 A 450MM H=1.00 A 1.50M

175.92

3.115

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 400 A 450MM H=1.50 A 2.00M

428.93

3.116

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 400 A 450MM H=2.51 A 3.00M

118.70

3.117

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 400 A 450MM H=4.01 A 4.50M

118.50

3.118

RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 400 A 450MM H=4.51 A 5.50M

371.70

3.119

ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 400-450MM PARA TODA PROF.

1,231.21

3.120

TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 450 INC. ANILLO + 2% DESPERDICIOS

1,231.21

3.121

INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 450 INC. PRUEBA HIDRAULICA

1,231.21

3.122

BUZON TIPO I T-NORMAL. 1.01 A 1.50M PROF. (ENCOFR. INTERIOR Y EXTERIOR)

UND

7.00

3.123

BUZON TIPO I T-NORMAL 3.01 A 3.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

2.00

3.124

BUZON TIPO I T-NORMAL. 4.51 A 5.50M PROF. (ENCOFR. INTERIOR Y EXT)

UND

5.00

3.125

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

UND

6.00

3.126

PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIF. DENSIDAD DE CAMPO)

UND

18.00

3.127

PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 450MM

1,231.21

4.00

PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES

4.10

LAGUNAS

4.101

CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA

1,200.00

4.102

TRANQUERA T/TIJERA 2.4X1.2M. P/SEAL PELIGRO PROV. DURANTE LA OBRA

UND

10.00

4.103

TRAZO Y REPLANTEO INICIAL P./CONSTRUCCION DE PLANTA DE TRATAMIENTO C/ESTACION TOTAL

UND

1.00

4.104

REPLANTEO FINAL DE LA OBRA P./CONSTRUCCION DE PLANTA DE TRATAMIENTO C/ESTACION TOTAL

UND

1.00

4.105

LIMPIEZA Y DESFORESTACION RENDIMIENTO 1.0 HAS/DIA

HA

7.70

4.106

EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL /RETRO .5Y3

M3

200,834.51

4.107

REFINE Y NIVELACION Y COMPACTACION EN TERRENO NORMAL A PULSO

M2

74,075.04

4.108

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO: AFIRMADO (INCL. PROVISION)

M3

15,854.64

4.111

IMPERMEABILIZACION CON ARCILLA COMPACTADA

M2

73,415.50

4.200

OBRAS CIVILES

4.201

OBRAS CIVILES

6.00

CONEXIONES DOMICILIARIAS

GLB

1.20
2,400.00

14.00

1.00

PRESUPUESTO GENERAL
ITEM DESCRIPCION

UND METRADO

6.101

UND

CONEXIONES DOMICILIARIAS DE ALCANTARILLADO

COSTO DIRECTO TOTAL

2,665.00

PRESUPUESTO GENERAL
P.U.

COSTO PARCIAL

TOTAL
24,782.66

24,782.66
10,038.54

10,038.54

6,559.18

6,559.18

6,544.92

6,544.92

820.01

1,640.02

8,318,796.13
267,523.27
1.04

124.80

693.23

693.23

880.37

880.37

8.13

4,024.35

22.28

13,220.95

185.70

17,010.12

19.36

1,541.06

252.02

13,911.50

353.51

99,088.85

29.12

9,426.14

369.28

20,757.23

29.12

2,329.60

390.28

24,470.56

29.53

8,588.21

3.29

14,969.50

9,637.36

19,274.72

7,337.36

14,674.72

2,537.36

2,537.36

1.04

124.80

905.33

905.33

880.37

880.37

88,930.39

3.47

687.06

22.28

5,347.20

159.88

2,430.18

19.36

484.00

353.51

22,978.15

29.12

9,670.75

3.29

32,735.50

21.96

5,571.25

276.96

4,154.40

2,961.40

2,961.40

416.70

2,666.88

1.04

13,312.00

5.80

139.20

19.50

390.00

18.00

432.00

1,738,256.10

53.38

533.80

96.20

1,731.60

701.14

4,487.30

322.27

2,062.53

41.44

48,316.14

9.92

51,528.94

1.09

6,932.95

24.90

158,376.45

47.05

54,857.01

5.72

29,712.25

123.49

139,099.14

158.53

796,828.85

201.11

41,714.24

6.02

37,040.82

8.66

1,796.26

PRESUPUESTO GENERAL
P.U.

COSTO PARCIAL

1,363.62

13,636.20

1,068.56

29,919.68

793.36

44,428.16

1,548.66

1,548.66

1,245.36

4,981.44

944.46

7,555.68

120.81

12,685.05

604.50

6,649.50

429.33

4,722.63

4,254.64

46,801.04

600.00

5,400.00

637.24

5,735.16

4,286.44

38,577.96

105.21

6,312.60

3.96

25,344.00

92,000.00

92,000.00

1,485,500.00

1,485,500.00

1,650,400.00

1,650,400.00

78,600.00

78,600.00

416.70

19,834.92

1.04

85,280.00

1,485,500.00
1,729,000.00

2,256,593.53

5.80

464.00

19.50

1,560.00

18.00

900.00

195.00

7,800.00

53.38

3,202.80

701.14

33,374.26

322.27

15,340.05

3.85

103,164.60

3.85

15,272.95

4.79

30,756.59

4.79

21,981.31

5.76

27,607.68

5.76

5,817.60

0.63

19,380.69

0.83

9,138.30

0.94

5,454.82

11.57

355,927.91

13.88

152,818.80

14.51

84,201.53

1.19

36,607.97

1.99

21,909.90

3.39

19,672.17

7.14

191,323.44

9.43

37,408.81

15.80

101,451.80

32.82

150,610.98

55.22

258,319.16

79.86

80,658.60

257.66

29,630.90

1.26

33,762.96

1.45

5,752.15

1.57

10,080.97

3.62

16,612.18

3.73

17,448.94

4.79

4,837.90

4.27

491.05

105.21

31,563.00

1.00

26,796.00

1.23

4,879.41

TOTAL

PRESUPUESTO GENERAL
P.U.

COSTO PARCIAL
1.63

10,466.23

1.70

7,801.30

2.22

10,640.46

3.11

3,141.10

919.00

919.00

570.00

1,710.00

407.50

815.00

370.00

370.00

320.00

640.00

7.00

14.00

0.00

7.00

14.00

7.00

105.00

621.56

3,729.36

581.26

1,162.52

581.26

581.26

386.96

4,256.56

387.26

1,161.78

385.46

770.92

385.46

770.92

181.36

725.44

101.36

608.16

68.36

136.72

68.36

136.72

52.36

523.60

53.26

53.26

52.36

418.88

51.46

257.30

475.04

950.08

458.24

2,749.44

458.24

2,749.44

458.24

10,539.52

325.24

2,601.92

323.24

2,909.16

188.24

2,258.88

185.84

185.84

175.84

2,989.28

150.84

150.84

146.84

1,468.40

148.84

1,339.56

117.84

12,255.36

112.84

112.84

112.84

112.84

1,063.36

6,380.16

1,008.36

1,008.36

1,056.56

9,509.04

726.56

5,085.92

686.56

12,358.08

371.36

4,456.32

370.36

370.36

349.46

3,494.60

290.46

3,485.52

227.36

16,369.92

222.36

444.72

210.04

210.04

155.04

155.04

152.04

912.24

116.04

1,856.64

114.04

228.08

95.04

2,185.92

91.04

8,284.64

87.04

1,218.56

85.04

1,020.48

TOTAL

PRESUPUESTO GENERAL
P.U.

COSTO PARCIAL

63.36

443.52

61.36

429.52

44.95

269.70

34.95

174.75

41.85

1,841.40

487.24

458,492.84

95.00

294,500.00

TOTAL

752,992.84

11,535,982.60
5,820,088.05
690.05

31,880.31

318.35

14,707.77

470.60

21,741.72

1.04

85,280.00

19.50

1,560.00

20.00

1,200.00

18.00

900.00

335.00

16,750.00

53.17

3,190.20

5.76

68,524.93

7.45

93,462.49

9.65

82,878.54

11.72

77,568.82

13.92

52,454.74

16.40

24,606.56

17.48

10,016.04

18.67

9,833.49

22.00

4,012.80

0.95

43,890.00

14.53

172,859.05

18.82

236,102.55

23.10

198,394.35

29.21

193,326.39

33.30

125,484.39

39.10

58,665.64

62.61

35,875.53

63.86

33,635.06

82.35

15,020.64

3.40

157,080.00

45.82

2,116,884.00

3.11

143,682.00

105.23

31,569.00

2.88

133,056.00

1,425.70

480,460.90

1,585.09

194,966.07

1,616.18

208,487.22

2,282.07

253,309.77

2,594.56

194,592.00

2,755.76

88,184.32

3,415.13

47,811.82

3,745.53

56,182.95

1,131,529.77
54,229.40
690.05

289.82

318.35

133.71

470.60

197.65

1.04

873.60

19.50

156.00

20.00

120.00

18.00

72.00

PRESUPUESTO GENERAL
P.U.

COSTO PARCIAL

335.00

1,340.00

5.72

812.24

7.75

1,003.63

9.67

1,344.13

0.95

389.50

14.53

2,063.26

18.82

2,437.19

23.10

3,210.90

3.40

1,394.00

45.82

663.47

49.52

20,055.60

3.11

45.03

4.34

1,757.70

1,425.70

4,277.10

1,585.09

4,755.27

1,616.18

4,848.54

32.04

64.08

105.23

631.38

3.08

1,293.60
62,802.64

690.05

296.72

318.35

136.89

470.60

202.36

1.04

884.00

19.50

117.00

20.00

160.00

18.00

72.00

9.65

1,129.05

11.72

2,702.63

17.48

1,211.36

0.95

403.75

23.10

2,702.70

29.21

6,735.83

62.61

4,338.87

3.40

1,445.00

45.82

19,473.50

3.11

1,321.75

2.88

1,224.00

1,616.18

3,232.36

2,282.07

9,128.28

2,594.56

5,189.12

32.04

64.08

105.23

631.38
77,890.95

690.05

276.02

318.35

127.34

470.60

188.24

1.04

811.20

19.50

117.00

20.00

100.00

18.00

72.00

13.92

2,018.40

17.48

4,029.14

0.95

370.50

33.30

4,828.50

62.61

14,431.61

3.40

1,326.00

45.82

17,869.80

3.11

1,212.90

2,594.56

12,972.80

2,755.76

5,511.52

3,249.71

6,499.42

3,415.13

3,415.13

TOTAL

PRESUPUESTO GENERAL
P.U.

COSTO PARCIAL

32.04

64.08

105.23

526.15

2.88

1,123.20
269,085.55

690.05

1,035.08

318.35

477.53

470.60

705.90

1.04

3,120.00

19.50

234.00

20.00

280.00

18.00

216.00

13.92

1,371.12

16.40

8,319.72

17.48

7,970.88

18.67

6,506.50

0.95

1,368.00

33.30

3,280.05

39.10

19,835.43

62.61

28,550.16

63.86

22,255.21

3.40

4,896.00

49.52

71,308.80

4.34

6,249.60

2,594.56

2,594.56

3,249.71

68,243.91

3,745.53

3,745.53

32.04

192.24

105.23

1,894.14

3.08

4,435.20
91,134.82

690.05

414.03

318.35

191.01

470.60

282.36

1.04

1,258.40

19.50

156.00

20.00

200.00

18.00

144.00

7.45

849.30

9.65

1,954.13

11.72

1,394.68

16.40

360.80

18.67

2,473.78

0.95

574.28

18.82

2,145.48

23.10

4,677.75

29.21

3,475.99

39.10

860.20

63.86

8,461.45

3.40

2,055.33

45.82

27,698.19

3.11

1,880.00

1,585.09

6,340.36

1,616.18

8,080.90

2,282.07

2,282.07

3,415.13

10,245.39

32.04

96.12

105.23

841.84

2.88

1,740.99
243,592.90

690.05

1,035.08

318.35

477.53

470.60

705.90

1.04

3,120.00

TOTAL

PRESUPUESTO GENERAL
P.U.

COSTO PARCIAL

19.50

390.00

20.00

240.00

18.00

216.00

335.00

2,680.00

24.66

4,298.24

13.92

10,652.84

16.40

2,890.34

18.67

5,989.34

0.95

1,391.75

23.10

4,026.33

33.30

25,484.16

39.10

6,890.98

63.86

20,482.46

3.40

4,981.00

49.52

72,546.80

4.34

6,358.10

1,616.18

3,232.36

2,282.07

6,846.21

2,594.56

28,540.16

3,249.71

12,998.84

3,415.13

10,245.39

32.04

256.32

105.23

2,104.60

3.08

4,512.20
332,793.52

690.05

1,518.11

318.35

700.37

470.60

1,035.32

1.04

4,576.00

19.50

487.50

20.00

560.00

18.00

324.00

335.00

5,025.00

7.45

1,909.44

24.66

5,168.74

11.72

1,216.54

13.92

1,357.20

9.93

2,815.16

11.72

3,797.87

14.92

795.24

17.46

2,573.43

14.14

781.94

17.10

6,016.64

19.54

4,832.24

0.95

645.65

1.14

943.28

1.34

896.46

18.82

4,823.57

23.10

4,841.76

29.21

3,032.00

33.30

3,246.75

24.94

7,070.49

28.57

9,258.11

33.97

1,810.60

36.75

5,416.58

34.82

1,925.55

36.75

12,930.49

41.08

10,159.08

3.40

2,310.74

5.72

4,732.96

8.09

5,412.21

49.52

33,655.28

45.82

23,856.18

TOTAL

PRESUPUESTO GENERAL
P.U.

COSTO PARCIAL

47.15

14,465.15

47.48

31,764.12

4.34

2,949.59

5.43

2,827.13

7.00

2,147.53

9.21

6,161.49

1,425.70

1,425.70

1,585.09

22,191.26

1,616.18

9,697.08

2,282.07

20,538.63

2,594.56

7,783.68

2,755.76

11,023.04

3,415.13

3,415.13

32.04

256.32

105.23

2,525.52

3.08

2,093.26

3.49

1,817.07

4.36

1,337.60

5.33

3,565.77

58.75

2,350.00

419,479.12
419,479.12
690.05

828.06

318.35

382.02

470.60

564.72

1.04

2,496.00

19.50

312.00

20.00

300.00

18.00

252.00

10.26

1,804.94

11.72

5,027.06

17.10

2,029.77

34.10

4,040.85

38.96

14,493.12

1.34

1,649.82

25.15

4,424.39

26.17

11,225.10

36.75

4,362.23

41.08

4,867.98

47.24

17,559.11

8.09

9,960.49

227.26

279,804.78

9.59

11,807.30

1,425.70

9,979.90

2,594.56

5,189.12

3,415.13

17,075.65

32.04

192.24

105.23

1,894.14

5.65

6,956.34

2,152,810.66
1,854,010.66
1.04

1,248.00

19.50

195.00

1,354.56

1,354.56

669.81

669.81

1,414.70

10,893.19

3.48

698,904.09

0.89

65,926.79

42.00

665,894.88

5.57

408,924.34
298,800.00

298,800.00

298,800.00

2,012,075.00

TOTAL

PRESUPUESTO GENERAL
P.U.

COSTO PARCIAL

755.00

TOTAL

2,012,075.00

S/.

19,879,561.40

COLECTORES PRINCIPALES

SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR REBOSES RP-01 Y RE-01


NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

Apr-05

TUBERIA : DN 250 PVC-UF SERIE 25 (

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

BZ-00
CR-01
BZ-796
BZ-23
BZ-21
BZ-22
BZ-20
BZ-19

BZ-02
BZ-796
BZ-23
BZ-21
BZ-22
BZ-20
BZ-19
BZ--01

0.55
1.20
1.73
1.62
1.34
2.02
1.95
2.36

1.73
1.73
1.62
1.34
2.02
1.95
2.36
2.42

1.14
1.47
1.68
1.48
1.68
1.99
2.16
2.39

14.48
36.00
8.00
95.00
95.00
30.00
90.00
51.00
419.48

*)

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

ARRIBA

14.48
36.00
8.00
95.00
95.00
30.00
90.00
51.00

ext.. Buzon)

13.28
34.80
6.80
93.80
93.80
28.80
88.80
49.80
409.88

*)

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

13.28
34.80
6.80
93.80
93.80
28.80
88.80
49.80

0.00

141.88

129.40

138.60

0.00

0.00

EL PRIMER TRAMO DESDE BZ-00 A BZ-02 UTILIZA TUBERIA DN 200 PVC-UF CLASE 20 L = 14.48 Mt.
409.88

0.00

0.00

0.00

0.00

COLECTORES PRINCIPALES

SETARIP
S.R.L.

OBRA
UBICACIN
PLANO

FORMATO DE METRADOS
COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

:
:
:

COLECTOR IMPERIO
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

Apr-05

TUBERIA : DN 250 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

BZ-1
BZ-2
BZ-3
BZ-795
BZ-582
BZ-581
BZ-580

BZ-2
BZ-3
BZ-795
BZ-582
BZ-581
BZ-580
BZ-29

2.42
2.52
2.23
2.83
2.82
2.61
3.28

2.52
2.23
2.83
2.82
2.61
3.28
5.00

2.47
2.38
2.53
2.83
2.72
2.95
4.14

59.50
59.50
67.50
48.55
60.45
59.00
70.72
425.22

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

59.50
59.50
67.50
48.55
60.45
59.00
70.72

ext.. Buzon)

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

58.30
58.30
66.30
47.35
59.25
57.65
69.22
416.37

58.30
58.30
66.30
47.35
59.25
57.65
69.22

0.00

0.00

0.00

116.60

230.55

0.00

0.00

69.22

0.00

0.00

COLECTORES PRINCIPALES

SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR GALINDONA
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

Apr-05

TUBERIA : DN 250 PVC-UF SERIE 25

BUZON
TRAMO

AGUAS

AGUAS

COTA
AGUAS

AGUAS

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS
ALTURA

TUBERIA (no

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

TERRENO NORMAL

COLECTORES PRINCIPALES

TRAMO
ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

ENTRE EJES

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10

BZ-29
BZ-28
BZ-27
BZ-26
BZ-25
BZ-530
BZ-529
BZ-665
BZ-741
BZ-654

BZ-28
BZ-27
BZ-26
BZ-25
BZ-530
BZ-529
BZ-665
BZ-741
BZ-654
BZ-655

5.00
1.74
2.24
2.36
2.07
1.77
1.80
1.70
1.75
3.59

1.74
2.24
2.36
2.07
1.77
1.80
1.70
1.75
3.59
1.69

3.37
1.99
2.30
2.22
1.92
1.79
1.75
1.73
2.67
2.64

98.84
29.20
99.65
112.35
47.82
81.21
47.76
56.30
58.00
48.50
679.63

98.84
29.20
99.65
112.35
47.82
81.21
47.76
56.30
58.00
48.50

ext.. Buzon)

1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

97.49
28.00
98.45
111.15
46.62
80.01
46.56
55.10
56.65
47.15
667.18

97.49
28.00
98.45
111.15
46.62
80.01
46.56
55.10
56.65
47.15

0.00

0.00

256.29

209.60

103.80

97.49

0.00

0.00

0.00

0.00

SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

COLECTORES PRINCIPALES
OBRA
UBICACIN
PLANO

:
:
:

COLECTOR GALINDONA
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

Apr-05

TUBERIA : DN 300 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

BZ-655
BZ-733
BZ-730
BZ-723
BZ-645
BZ-715
BZ-716
BZ-640

BZ-733
BZ-730
BZ-723
BZ-645
BZ-715
BZ-716
BZ-640
BZ-633

1.69
1.97
1.43
1.85
1.99
1.92
2.10
2.92

1.97
1.43
1.85
1.99
1.92
2.10
2.92
1.91

1.83
1.70
1.64
1.92
1.96
2.01
2.51
2.42

48.50
63.50
63.50
57.00
57.00
59.40
59.40
112.35
520.65

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

11
12
13
14
15
16
17
18

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

48.50
63.50
63.50
57.00
57.00
59.40
59.40
112.35

ext.. Buzon)

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

47.30
62.30
62.30
55.80
55.80
58.05
58.05
110.85
510.45

47.30
62.30
62.30
55.80
55.80
58.05
58.05
110.85

0.00

0.00

283.50

226.95

0.00

0.00

0.00

0.00

0.00

0.00

SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

COLECTORES PRINCIPALES
OBRA
UBICACIN
PLANO

:
:
:

COLECTOR GALINDONA
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

Apr-05

TUBERIA : DN 350 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

BZ-633
BZ-77
BZ-630
BZ-629
BZ-705
BZ-24
BZ-215

BZ-77
BZ-630
BZ-629
BZ-705
BZ-24
BZ-215
BZ-214

1.91
2.91
3.92
2.51
2.80
3.47
2.97

2.91
3.92
2.51
2.80
3.47
2.97
1.77

2.41
3.42
3.22
2.66
3.14
3.22
2.37

42.50
42.00
54.50
54.50
18.37
37.92
57.00
306.79

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

19
20
21
22
23
24
25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

42.50
42.00
54.50
54.50
18.37
37.92
57.00

ext.. Buzon)

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

41.30
40.65
53.15
53.30
17.02
36.57
55.80
297.79

41.30
40.65
53.15
53.30
17.02
36.57
55.80

0.00

0.00

0.00

97.10

53.30
297.79

147.39

0.00

0.00

0.00

0.00

COLECTORES PRINCIPALES

SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR GALINDONA
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

Apr-05

TUBERIA : DN 400 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

26
27
28
29
30
31
32
33
34
35
36

BZ-214
BZ-213
BZ-102
BZ-184
BZ-183
BZ-182
BZ-168
BZ-159
BZ-158
BZ-157
BZ-156

BZ-213
BZ-102
BZ-184
BZ-183
BZ-182
BZ-168
BZ-159
BZ-158
BZ-157
BZ-156
BZ-155

1.77
2.26
3.11
2.98
2.70
2.41
3.43
3.53
2.65
2.77
3.15

2.26
3.11
2.98
2.70
2.41
3.43
3.53
2.65
2.77
3.15
3.36

2.02
2.69
3.05
2.84
2.56
2.92
3.48
3.09
2.71
2.96
3.26

56.50
57.50
58.00
57.00
57.00
62.50
70.00
48.00
48.50
77.00
77.00
669.00

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

56.50
57.50
58.00
57.00
57.00
62.50
70.00
48.00
48.50
77.00
77.00

ext.. Buzon)

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

55.30
56.15
56.65
55.80
55.80
61.15
68.50
46.65
47.30
75.65
75.50
654.45

55.30
56.15
56.65
55.80
55.80
61.15
68.50
46.65
47.30
75.65
75.50

0.00

0.00

0.00

654.45

55.30

351.85

247.30

0.00

0.00

0.00

0.00

COLECTORES PRINCIPALES

SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR MONTERREY
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

Apr-05

TUBERIA : DN 250 PVC-UF SERIE 25 (

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

BZ-164
BZ-165
BZ-205
BZ-233
BZ-237
BZ-232
BZ-224
BZ-225
BZ-291
BZ-230
BZ-208
BZ-243
BZ-240
BZ-242
BZ-241
BZ-253
BZ-257
BZ-278
BZ-283
BZ-322
BZ-359
BZ-353

BZ-165
BZ-205
BZ-233
BZ-237
BZ-232
BZ-224
BZ-225
BZ-291
BZ-230
BZ-208
BZ-243
BZ-240
BZ-242
BZ-241
BZ-253
BZ-257
BZ-278
BZ-283
BZ-322
BZ-359
BZ-353
BZ-344

3.96
4.84
3.91
3.53
3.58
3.73
4.01
3.53
2.85
4.36
4.77
4.25
4.36
4.43
4.54
4.68
4.95
4.89
4.99
4.38
3.64
4.18

4.84
3.91
3.53
3.58
3.73
4.01
3.53
2.85
4.36
4.77
4.25
4.36
4.43
4.54
4.68
4.95
4.89
4.99
4.38
3.64
4.18
4.34

4.40
4.38
3.72
3.56
3.66
3.87
3.77
3.19
3.61
4.57
4.51
4.31
4.40
4.49
4.61
4.82
4.92
4.94
4.69
4.01
3.91
4.26

31.00
56.00
53.50
60.00
60.00
50.50
100.00
100.00
100.00
32.50
59.50
58.00
55.00
55.00
50.50
50.00
46.50
46.50
72.00
100.00
92.00
109.44
1,437.94

*)

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

ARRIBA

31.00
56.00
53.50
60.00
60.00
50.50
100.00
100.00
100.00
32.50
59.50
58.00
55.00
55.00
50.50
50.00
46.50
46.50
72.00
100.00
92.00
109.44

ext.. Buzon)

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

29.80
54.80
52.30
58.80
58.80
49.15
98.65
98.50
98.80
31.15
58.15
56.80
53.80
53.80
49.30
48.65
45.15
45.15
70.80
98.80
90.80
108.24
1,410.19

*)

29.80
54.80
52.30
58.80
58.80
49.15
98.65
98.50
98.80
31.15
58.15
56.80
53.80
53.80
49.30
48.65
45.15
45.15
70.80
98.80
90.80
108.24

0.00

EL PRIMER TRAMO DESDE BZ-164 A BZ-165 UTILIZA TUBERIA DN 200 PVC-UF SERIE 25 L = 31.00 Mt.

0.00

0.00

0.00

0.00

98.50

507.30

456.04

348.35

0.00

COLECTORES PRINCIPALES

SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR LOS OLIVOS


NUEVA CAJAMARCA
D-05

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

Apr-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

BZ-211
BZ-386
BZ-387
BZ-217
BZ-258
BZ-261
BZ-226
BZ-264
BZ-294

BZ-386
BZ-387
BZ-217
BZ-258
BZ-261
BZ-226
BZ-264
BZ-294
BZ-322

3.08
3.26
3.19
3.44
3.31
3.72
4.72
4.35
3.76

3.26
3.19
3.44
3.31
3.72
4.72
4.35
3.76
4.38

3.17
3.23
3.32
3.38
3.52
4.22
4.54
4.06
4.07

6.00
26.72
6.31
57.00
56.50
63.00
63.50
55.01
55.00

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

6.00
26.72
6.31
57.00
56.50
63.00
63.50
55.01
55.00

4.50
25.22
4.81
55.50
55.00
61.50
62.00
53.51
53.50

ext.. Buzon)

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

4.50
25.22
4.81
55.50
55.00
61.50
62.00
53.51
53.50

COLECTORES PRINCIPALES
389.04

375.54

0.00

0.00

0.00

0.00

0.00

145.03

0.00

230.51

0.00

0.00

375.54

SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR SANTA ROSA


NUEVA CAJAMARCA
D-06

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

Apr-05

TUBERIA : DN 200 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

BZ-267
BZ-268
BZ-350
BZ-302
BZ-331
BZ-303
BZ-351
BZ-360

BZ-268
BZ-350
BZ-302
BZ-331
BZ-303
BZ-351
BZ-360
BZ-365

1.58
1.81
1.21
2.02
2.24
2.94
2.22
2.16

1.81
1.21
2.02
2.24
2.94
2.22
2.16
2.03

1.70
1.51
1.62
2.13
2.59
2.58
2.19
2.10

36.00
37.52
44.00
44.01
49.49
72.00
72.07
37.50

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

36.00
37.52
44.00
44.01
49.49
72.00
72.07
37.50

34.80
36.32
42.80
42.81
48.29
70.65
70.72
36.00

ext.. Buzon)

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

34.80
36.32
42.80
42.81
48.29
70.65
70.72
36.00

COLECTORES PRINCIPALES
9
10
11
12

BZ-365
BZ-366
BZ-266
BZ-296

BZ-366
BZ-266
BZ-296
BZ-394

2.03
1.98
5.12
4.78

1.98
5.12
4.78
4.98

2.01
3.55
4.95
4.88

53.93
22.99
75.00
60.00
604.51

53.93
22.99
75.00
60.00

52.73
21.64
73.65
58.80
589.21

52.73
21.64
73.65
58.80

0.00

0.00

113.92

202.26

118.94

0.00

21.64

0.00

132.45

0.00

SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR MORITO
NUEVA CAJAMARCA
D-07

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

Apr-05

TUBERIA : DN 250 PVC-UF SERIE 25

BUZON
TRAMO

COTA

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

ext.. Buzon)

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

COLECTORES PRINCIPALES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

BZ-344
BZ-369
BZ-371
BZ-372
BZ-367
BZ-375
BZ-374
BZ-373
BZ-368
BZ-370
BZ-379
BZ-378
BZ-376
BZ-199
BZ-198
BZ-197
BZ-134
BZ-109
BZ-174
BZ-116
BZ-154
BZ-106

BZ-369
BZ-371
BZ-372
BZ-367
BZ-375
BZ-374
BZ-373
BZ-368
BZ-370
BZ-379
BZ-378
BZ-376
BZ-199
BZ-198
BZ-197
BZ-134
BZ-109
BZ-174
BZ-116
BZ-154
BZ-106
BZ-155

4.98
4.13
3.27
2.75
3.61
2.06
2.70
4.43
4.78
4.29
1.94
2.61
3.45
3.45
3.52
3.01
3.16
3.33
3.46
4.41
5.06
3.50

4.13
3.27
2.75
3.61
2.06
2.70
4.43
4.78
4.29
1.94
2.61
3.45
3.45
3.52
3.01
3.16
3.33
3.46
4.41
5.06
3.50
3.36

4.56
3.70
3.01
3.18
2.84
2.38
3.57
4.61
4.54
3.12
2.28
3.03
3.45
3.49
3.27
3.09
3.25
3.40
3.94
4.74
4.28
3.43

47.00
53.49
60.00
60.00
81.00
77.00
76.00
76.01
103.33
117.14
100.00
99.99
102.66
57.50
56.00
14.50
41.00
40.50
50.50
50.50
50.50
50.00
1,464.62

47.00
53.49
60.00
60.00
81.00
77.00
76.00
76.01
103.33
117.14
100.00
99.99
102.66
57.50
56.00
14.50
41.00
40.50
50.50
50.50
50.50
50.00

45.50
52.29
58.80
58.80
79.80
75.65
74.65
74.51
102.13
115.79
98.65
98.79
101.46
56.30
54.80
13.15
39.65
39.15
49.30
49.30
49.30
48.80
1,436.57

45.50
52.29
58.80
58.80
79.80
75.65
74.65
74.51
102.13
115.79
98.65
98.79
101.46
56.30
54.80
13.15
39.65
39.15
49.30
49.30
49.30
48.80

0.00

0.00

0.00

174.30

0.00

765.29

176.24

0.00

320.74

0.00

EMISOR

SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

EMISOR
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

Apr-05

COLECTORES PRINCIPALES
TUBERIA : DN 450 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

BZ 155
MH-2
MH-1
MH-3
BZ-141
BZ-140
BZ-16
BZ-15
BZ-14
BZ-13
BZ-12
BZ-11
BZ-10

MH-2
MH-1
MH-3
BZ-141
BZ-140
BZ-16
BZ-15
BZ-14
BZ-13
BZ-12
BZ-11
BZ-10
BZ-9

3.36
6.08
4.77
5.27
4.99
4.60
3.41
1.99
1.51
1.54
1.54
1.38
1.88

6.08
4.77
5.27
4.99
4.60
3.41
1.99
1.51
1.54
1.54
1.38
1.88
1.06

4.72
5.43
5.02
5.13
4.80
4.01
2.70
1.75
1.53
1.54
1.46
1.63
1.47

100.00
100.00
100.00
42.66
36.50
120.00
120.00
120.00
54.70
150.19
104.87
108.84
73.45
1,231.21

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
9
10
11
12
13

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

100.00
100.00
100.00
42.66
36.50
120.00
120.00
120.00
54.70
150.19
104.87
108.84
73.45

ext.. Buzon)

TERRENO NORMAL
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

98.50
98.50
98.50
41.16
35.00
118.50
118.65
118.80
53.50
148.99
103.67
107.64
72.25
1,213.66

98.50
98.50
98.50
41.16
35.00
118.50
118.65
118.80
53.50
148.99
103.67
107.64
72.25

0.00

175.92

428.93

0.00

118.65

0.00

0.00

118.50

371.66

0.00

1,213.66

SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA
UBICACIN
PLANO

:
:
:

COLECTOR IMPERIO
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

Apr-05

COLECTORES PRINCIPALES
TUBERIA : DN 250 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

M-1
M-2
M-3
M-4
M-5
M-6
M-7
M-8
M-18
M-19
M-20
M-21
M-22
M-23
M-24
M-25
M-26
M-27
M-28
M-29
M-30
M-31
M-32
M-33
M-34
M-35
M-36
M-37
M-38
M-39

M-2
M-3
M-4
M-5
M-6
M-7
M-8
M-9
M-19
M-20
M-21
M-22
M-23
M-24
M-25
M-26
M-27
M-28
M-29
M-30
M-31
M-32
M-33
M-34
M-35
M-36
M-37
M-38
M-39
EB-1

2.20
2.45
2.27
2.34
2.43
2.64
3.80
5.72
1.61
1.84
3.04
2.81
2.42
1.50
1.83
2.06
1.76
3.72
2.35
2.37
1.67
1.50
1.75
1.68
1.80
1.93
2.72
2.74
2.81
3.55

2.45
2.27
2.34
2.43
2.64
3.80
5.72
6.37
1.84
2.09
2.81
2.42
1.50
1.83
2.06
1.76
3.72
2.35
2.37
1.67
1.50
1.75
1.68
1.80
1.93
2.10
2.74
2.81
3.55
3.27

2.33
2.36
2.31
2.39
2.54
3.22
4.76
6.05
1.73
1.97
2.93
2.62
1.96
1.67
1.95
1.91
2.74
3.04
2.36
2.02
1.59
1.63
1.72
1.74
1.87
2.02
2.73
2.78
3.18
3.41

54.00
48.00
16.00
15.00
18.00
80.00
80.00
35.00
50.00
50.00
50.00
58.00
75.00
30.00
25.00
24.00
80.00
60.00
30.00
66.00
36.00
68.00
50.00
26.00
32.00
32.00
60.35
11.50
4.40
1.60
1,265.85

*)

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

54.00
48.00
16.00
15.00
18.00
80.00
80.00
35.00
50.00
50.00
50.00
58.00
75.00
30.00
25.00
24.00
80.00
60.00
30.00
66.00
36.00
68.00
50.00
26.00
32.00
32.00
60.35
11.50
4.40
1.60

ext.. Buzon)

TERRENO SEMIROCOSO
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

52.80
46.80
14.80
13.80
16.80
78.65
78.65
33.50
48.80
48.65
48.65
56.80
73.80
28.80
23.80
22.65
78.65
58.65
28.80
64.80
34.80
66.80
48.80
24.80
30.80
30.80
59.15
10.30
3.05
1.60
1,229.55

52.80
46.80
14.80
13.80
16.80
78.65
78.65
33.50
48.80
48.65
48.65
56.80
73.80
28.80
23.80
22.65
78.65
58.65
28.80
64.80
34.80
66.80
48.80
24.80
30.80
30.80
59.15
10.30
3.05
1.60

0.00

0.00

452.50

252.60

270.35

141.95

0.00

0.00

78.65

33.50

EL PRIMER TRAMO DESDE BZ-00 A BZ-02 UTILIZA TUBERIA DN 200 PVC-UF CLASE 20 L = 14.48 Mt.

SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

OBRA

COLECTOR IMPERIO

HECHO POR

ING. MARCO ROSAS P.

COLECTORES PRINCIPALES
UBICACIN
PLANO

:
:

NUEVA CAJAMARCA

REVISADO POR
FECHA

:
:

Apr-05

TUBERIA : DN 250 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

M-1
M-2
M-3
M-4
M-5
M-6
M-7
M-8
M-18
M-19
M-20
M-21
M-22
M-23
M-24
M-25
M-26
M-27
M-28
M-29
M-30
M-31
M-32
M-33
M-34
M-35
M-36
M-37
M-38
M-39

M-2
M-3
M-4
M-5
M-6
M-7
M-8
M-9
M-19
M-20
M-21
M-22
M-23
M-24
M-25
M-26
M-27
M-28
M-29
M-30
M-31
M-32
M-33
M-34
M-35
M-36
M-37
M-38
M-39
EB-1

2.20
2.45
2.27
2.34
2.43
2.64
3.80
5.72
1.61
1.84
3.04
2.81
2.42
1.50
1.83
2.06
1.76
3.72
2.35
2.37
1.67
1.50
1.75
1.68
1.80
1.93
2.72
2.74
2.81
3.55

2.45
2.27
2.34
2.43
2.64
3.80
5.72
6.37
1.84
2.09
2.81
2.42
1.50
1.83
2.06
1.76
3.72
2.35
2.37
1.67
1.50
1.75
1.68
1.80
1.93
2.10
2.74
2.81
3.55
3.27

2.33
2.36
2.31
2.39
2.54
3.22
4.76
6.05
1.73
1.97
2.93
2.62
1.96
1.67
1.95
1.91
2.74
3.04
2.36
2.02
1.59
1.63
1.72
1.74
1.87
2.02
2.73
2.78
3.18
3.41

54.00
48.00
16.00
15.00
18.00
80.00
80.00
35.00
50.00
50.00
50.00
58.00
75.00
30.00
25.00
24.00
80.00
60.00
30.00
66.00
36.00
68.00
50.00
26.00
32.00
32.00
60.35
11.50
4.40
1.60
1,265.85

*)

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

54.00
48.00
16.00
15.00
18.00
80.00
80.00
35.00
50.00
50.00
50.00
58.00
75.00
30.00
25.00
24.00
80.00
60.00
30.00
66.00
36.00
68.00
50.00
26.00
32.00
32.00
60.35
11.50
4.40
1.60

ext.. Buzon)

TERRENO SEMIROCOSO
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

52.80
46.80
14.80
13.80
16.80
78.65
78.65
33.50
48.80
48.65
48.65
56.80
73.80
28.80
23.80
22.65
78.65
58.65
28.80
64.80
34.80
66.80
48.80
24.80
30.80
30.80
59.15
10.30
3.05
1.60
1,229.55

52.80
46.80
14.80
13.80
16.80
78.65
78.65
33.50
48.80
48.65
48.65
56.80
73.80
28.80
23.80
22.65
78.65
58.65
28.80
64.80
34.80
66.80
48.80
24.80
30.80
30.80
59.15
10.30
3.05
1.60

0.00

0.00

452.50

252.60

270.35

141.95

0.00

0.00

78.65

33.50

EL PRIMER TRAMO DESDE BZ-00 A BZ-02 UTILIZA TUBERIA DN 200 PVC-UF CLASE 20 L = 14.48 Mt.

SETARIP

FORMATO DE METRADOS

S.R.L.

COLECTORES DE ALCANTARILLADO
MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

COLECTORES PRINCIPALES
OBRA
UBICACIN
PLANO

:
:
:

COLECTOR IMPERIO
NUEVA CAJAMARCA

HECHO POR
REVISADO POR
FECHA

ING. MARCO ROSAS P.

:
:

Apr-05

TUBERIA : DN 250 PVC-UF SERIE 25

BUZON
TRAMO

COTA

AGUAS

AGUAS

AGUAS

AGUAS

ALTURA

ARRIBA

ABAJO

ARRIBA

ABAJO

PROMEDIO

TUBERIA (no

ENTRE EJES

M-1
M-2
M-3
M-4
M-5
M-6
M-7
M-8
M-18
M-19
M-20
M-21
M-22
M-23
M-24
M-25
M-26
M-27
M-28
M-29
M-30
M-31
M-32
M-33
M-34
M-35
M-36
M-37
M-38
M-39

M-2
M-3
M-4
M-5
M-6
M-7
M-8
M-9
M-19
M-20
M-21
M-22
M-23
M-24
M-25
M-26
M-27
M-28
M-29
M-30
M-31
M-32
M-33
M-34
M-35
M-36
M-37
M-38
M-39
EB-1

2.20
2.45
2.27
2.34
2.43
2.64
3.80
5.72
1.61
1.84
3.04
2.81
2.42
1.50
1.83
2.06
1.76
3.72
2.35
2.37
1.67
1.50
1.75
1.68
1.80
1.93
2.72
2.74
2.81
3.55

2.45
2.27
2.34
2.43
2.64
3.80
5.72
6.37
1.84
2.09
2.81
2.42
1.50
1.83
2.06
1.76
3.72
2.35
2.37
1.67
1.50
1.75
1.68
1.80
1.93
2.10
2.74
2.81
3.55
3.27

2.33
2.36
2.31
2.39
2.54
3.22
4.76
6.05
1.73
1.97
2.93
2.62
1.96
1.67
1.95
1.91
2.74
3.04
2.36
2.02
1.59
1.63
1.72
1.74
1.87
2.02
2.73
2.78
3.18
3.41

54.00
48.00
16.00
15.00
18.00
80.00
80.00
35.00
50.00
50.00
50.00
58.00
75.00
30.00
25.00
24.00
80.00
60.00
30.00
66.00
36.00
68.00
50.00
26.00
32.00
32.00
60.35
11.50
4.40
1.60
1,265.85

*)

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO


ZANJA (no

incluye Diam. incluye Diam.


int. Buzon)

1
2
3
4
5
6
7
8
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)

LONGITUD EN TUBERIAS

54.00
48.00
16.00
15.00
18.00
80.00
80.00
35.00
50.00
50.00
50.00
58.00
75.00
30.00
25.00
24.00
80.00
60.00
30.00
66.00
36.00
68.00
50.00
26.00
32.00
32.00
60.35
11.50
4.40
1.60

ext.. Buzon)

TERRENO SEMIROCOSO
1.00 a

1.51 a

2.01 a

2.51 a

3.01 a

3.51 m

4.01 a

4.51 a

5.51 a

1.00 a

1.51 a

2.01 a

5.51 a

1.00 a

1.50 m

2.00 m

2.50 m

3.00 m

3.50 m

4.00 m

4.50 m

5.50 m

6.50 m

1.50 m

2.00 m

2.50 m

6.50 m

1.50 m

52.80
46.80
14.80
13.80
16.80
78.65
78.65
33.50
48.80
48.65
48.65
56.80
73.80
28.80
23.80
22.65
78.65
58.65
28.80
64.80
34.80
66.80
48.80
24.80
30.80
30.80
59.15
10.30
3.05
1.60
1,229.55

52.80
46.80
14.80
13.80
16.80
78.65
78.65
33.50
48.80
48.65
48.65
56.80
73.80
28.80
23.80
22.65
78.65
58.65
28.80
64.80
34.80
66.80
48.80
24.80
30.80
30.80
59.15
10.30
3.05
1.60

0.00

EL PRIMER TRAMO DESDE BZ-00 A BZ-02 UTILIZA TUBERIA DN 200 PVC-UF CLASE 20 L = 14.48 Mt.

0.00

452.50

252.60

270.35

141.95

0.00

0.00

78.65

33.50

COLECTORES PRINCIPALES

FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
ENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

1/1

BERIA : DN 250 PVC-UF SERIE 25 (

*)

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO

1.51 a

2.01 a

2.51 a

2.00 m

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0
0
0
0

COLECTORES PRINCIPALES

FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
ENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

HOJA N

1/1

UBERIA : DN 250 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


TIPO DE PAVIMENTO

CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

1.51 a

2.01 a

2.51 a

2.00 m

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

COLECTORES PRINCIPALES

FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
ENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

1/4

UBERIA : DN 250 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO

COLECTORES PRINCIPALES
1.51 a

2.01 a

2.51 a

2.00 m

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
ENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

COLECTORES PRINCIPALES

2/4

UBERIA : DN 300 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
1.51 a

2.01 a

2.51 a

2.00 m

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
ENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

COLECTORES PRINCIPALES
HOJA N

3/4

UBERIA : DN 350 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
1.51 a

2.01 a

2.51 a

2.00 m

2.50 m

3.00 m

TIPO

ASFALTO

LONG.

AREA

M2

37

29.6

29.6

COLECTORES PRINCIPALES

FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
ENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

4/4

UBERIA : DN 400 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
1.51 a

2.01 a

2.51 a

2.00 m

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

PAVIMENTO

54
48
16
15
18
80
80
35
50

43.2
38.4
12.8
12
14.4
64
64
28
40

PAVIMENTO

50

40

PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO

356.8

COLECTORES PRINCIPALES

FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
ENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

1/1

BERIA : DN 250 PVC-UF SERIE 25 (

*)

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
1.51 a

2.01 a

2.51 a

2.00 m

2.50 m

3.00 m

TIPO

PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO

LONG.

AREA

M2

54
48
16
15
18
80
80
35
50
50
50
58

43.2
38.4
12.8
12
14.4
64
64
28
40
40
40
46.4

20
36
19

16
28.8
15.2

TIERRA
TIERRA
TIERRA
TIERRA
TIERRA
TIERRA
TIERRA
PAVIMENTO
PAVIMENTO
PAVIMENTO

503.2

COLECTORES PRINCIPALES

FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
ENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

1/1

UBERIA : DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
1.51 a

2.01 a

2.51 a

2.00 m

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

COLECTORES PRINCIPALES
0

FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
ENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

1/1

UBERIA : DN 200 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
1.51 a

2.01 a

2.51 a

2.00 m

2.50 m

3.00 m

TIPO

PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO

LONG.

AREA

M2

54
48
16
15
18
80
80
35

43.2
38.4
12.8
12
14.4
64
64
28

COLECTORES PRINCIPALES
50
50
50
58

PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO

40
40
40
46.4
443.2

FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
ENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

1/1

UBERIA : DN 250 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
1.51 a

2.01 a

2.51 a

2.00 m

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

COLECTORES PRINCIPALES

EMISOR

FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
ENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

1/1

COLECTORES PRINCIPALES

UBERIA : DN 450 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
1.51 a

2.01 a

2.51 a

2.00 m

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

0
0
0
0
0
0
0
0
0
0
0
0

FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
ENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

1/1

COLECTORES PRINCIPALES

UBERIA : DN 250 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
1.51 a

2.01 a

2.51 a

2.00 m

2.50 m

3.00 m

TIPO

LONG.

AREA

M2

54
48
16
15
18
80
80
35
50
50
50
58

43.2
38.4
12.8
12
14.4
64
64
28
40
40
40
46.4

20
36
19
50
26
32
32
13.5
11.5

16
28.8
15.2

PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
TIERRA
TIERRA
TIERRA
TIERRA
TIERRA
TIERRA
TIERRA
PAVIMENTO
PAVIMENTO
PAVIMENTO
VEREDA
VEREDA
VEREDA
VEREDA
PAVIMENTO
PAVIMENTO

10.8
9.2

523.2

FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
ENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA
HOJA N

1/1

COLECTORES PRINCIPALES

1/1

UBERIA : DN 250 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
1.51 a

2.01 a

2.51 a

2.00 m

2.50 m

3.00 m

TIPO

PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO

LONG.

AREA

M2

54
48
16
15
18
80
80
35
50
50
50
58

43.2
38.4
12.8
12
14.4
64
64
28
40
40
40
46.4

20
36
19
50
26
32
32
13.5
11.5

16
28.8
15.2

TIERRA
TIERRA
TIERRA
TIERRA
TIERRA
TIERRA
TIERRA
PAVIMENTO
PAVIMENTO
PAVIMENTO
VEREDA
VEREDA
VEREDA
VEREDA
PAVIMENTO
PAVIMENTO

10.8
9.2

523.2

FORMATO DE METRADOS

COLECTORES DE ALCANTARILLADO
ENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA

COLECTORES PRINCIPALES
HOJA N

1/1

UBERIA : DN 250 PVC-UF SERIE 25

MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO

TIPO DE PAVIMENTO
1.51 a

2.01 a

2.51 a

2.00 m

2.50 m

3.00 m

TIPO

PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO
PAVIMENTO

LONG.

AREA

M2

54
48
16
15
18
80
80
35
50
50
50
58

43.2
38.4
12.8
12
14.4
64
64
28
40
40
40
46.4

20
36
19
50
26
32
32
13.5
11.5

16
28.8
15.2

TIERRA
TIERRA
TIERRA
TIERRA
TIERRA
TIERRA
TIERRA
PAVIMENTO
PAVIMENTO
PAVIMENTO
VEREDA
VEREDA
VEREDA
VEREDA
PAVIMENTO
PAVIMENTO

10.8
9.2

523.2

Você também pode gostar