RENCANA ANGGARAN BIAYA

PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
NO.

URAIAN PEKERJAAN

VOLUME

SAT

LVMDP
Floor standing, tebal pelat 2,0 mm, cat bakar

1.00

unit

- 2 x MCCB 400 A, 4 P, 50 kA (adjustable trip unit)


ex ASCO seri 7000
- 2 x Contactor 400 A + electric - mech. Interlock
ex ASCO seri 7000
- ATS digital controller ex ASCO seri 7000
- 1 x MCCB 320 A, 3 P, 36 kA
- 3 x MCCB 50 A, 3 P, 36 kA
- 1 x MCCB 200 A, 3 P, 36 kA
- 14 x MCCB 40 A, 3 P, 36 kA
- 6 x CT 400/5A
- 6 x A-meter 0 - 400 A
- 2 x V-meter 0 - 500 V + VSS 7 posisi
- 2 x kW-meter 0 - 200 kW
- 1 x kWH-meter 3 Phasa
- 2 x F-meter 45 - 55 Hz
- 1 x Cosphi-meter
- 1 x Digital Multi Function meter PM820
- 8 x Aux relay 220 VAC
- 6 x fuse 2 A + fuse holder
- 6 x pilot lamp
- 6 x push button ON (metal)
- 6 x push button OFF (metal)
- 1 lot busbar 600 A full neutral, 5 bus
- 1 lot control wiring + aksesori
- 1 lot panel 160 (L) x 60 (D) x 220 (T) cm
- 1 lot pentanahan

2.00

IV. PEKERJAAN ELEKTRIKAL


IV.I. PANEL DAYA TEGANGAN RENDAH
Pengadaan dan pemasangan panel termasuk
pentanahan panel sesuai dgn gambar rencana
dan spesifikasi teknis.
Komponen panel sesuai dgn. gambar rencana
dan spesifikasi teknis.
Floor standing, tebal pelat 2,0 mm, cat bakar
a

2.00
2.00
1.00
3.00
1.00
14.00
6.00
6.00
2.00
2.00
1.00
2.00
1.00
1.00
8.00
6.00
6.00
6.00
6.00
1.00
1.00
1.00
1.00

PP-PUMP (Pompa Air Bersih & Hydrant)


Wall mounted, tebal pelat 2 mm, cat bakar

1.00

- 1 x MCCB 160 A, 3 P, 36 kA
- 1 x MCCB 125 A, 3 P, 36 kA
- 3 x MCCB 15 A, 3 P, 10 kA
- 1 x Y-D starter 5 kW
- 1 x Y-D starter 37 kW
- 2 x Direct on Line Starter 1,5 kW
- 3 x CT 200/5A
- 3 x CT 20/5A
- 3 x CT 150/5A
- 3 x A-meter 0 - 200 A
- 3 x A-meter 0 - 150 A
- 3 x A-meter 0 - 20 A
- 1 x V-meter 0 - 500 V + VSS 7 posisi
- 9 x fuse 2 A + fuse holder
- 9 x pilot lamp
- 4 x A/O/M selector switch
- 4 x push button ON (metal)
- 4 x push button OFF (metal)
- 1 x Phase Failure Relay
- 1 lot busbar 250 A full neutral, 5 bus
- 1 lot control wiring + aksesori
- 1 lot panel 70 (L) x 30 (d) x 100 (T) cm
- 1 lot pentanahan

1.00
1.00
3.00
1.00
1.00
2.00
3.00
3.00
3.00
3.00
3.00
3.00
1.00
9.00
9.00
4.00
4.00
4.00
1.00
1.00
1.00
1.00
1.00

unit

HARGA
SATUAN (Rp)

JUMLAH HARGA
(Rp)

NO.

URAIAN PEKERJAAN

VOLUME

SAT

PP-BOOSTER PUMP (Panel Daya Pompa Booster)


Wall mounted, tebal pelat 2 mm, cat bakar

1.00

unit

- 1 x MCCB 25 A, 3 P, 18 kA
- 3 x MCB 10 A, 3 P, 10 kA
- 3 x CT 40/5A
- 2 x Direct on Line Starter 1,5 kW
- 3 x fuse 2 A + fuse holder
- 3 x pilot lamp
- 2 x A/O/M selector switch
- 2 x push button ON
- 2 x push button OFF
- 4 x indikator lamp
- 1 x Phase Failure Relay
- 1 lot busbar 40 A full neutral, 5 bus
- 1 lot control wiring + aksesori
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm
- 1 lot pentanahan

1.00
3.00
3.00
2.00
3.00
3.00
2.00
4.00
4.00
4.00
1.00
1.00
1.00
1.00
1.00

LP-GF (Panel Penerangan Ground floor)


Wall mounted, tebal pelat 1,8 mm, cat bakar

1.00

- 1 x MCCB 25 A, 3 P, 10 kA
- 7 x MCB 6 A, 1 P, 6 kA
- 3 x fuse 2 A + fuse holder
- 3 x pilot lamp
- 1 lot busbar 40 A full neutral, 5 bus
- 1 lot internal wiring + aksesori
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm
- 1 lot instalasi kabel grounding

1.00
7.00
3.00
3.00
1.00
1.00
1.00
1.00

LP-1 (Panel Penerangan Lantai 1)


Wall mounted, tebal pelat 1,8 mm, cat bakar

1.00

- 1 x MCCB 25 A, 3 P, 10 kA
-10 x MCB 6 A, 1 P, 6 kA
- 3 x fuse 2 A + fuse holder
- 3 x pilot lamp
- 1 lot busbar 40 A full neutral, 5 bus
- 1 lot internal wiring + aksesori
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm
- 1 lot pentanahan
- 1 x MCCB 25 A, 3 P, 10 kA
-7 x MCB 10 A, 1 P, 6 kA
-7 x MCB 6 A, 1 P, 6 kA
- 3 x fuse 2 A + fuse holder
- 3 x pilot lamp
- 1 lot busbar 40 A full neutral, 5 bus
- 1 lot internal wiring + aksesori
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm
- 1 lot instalasi kabel grounding

1.00
10.00
3.00
3.00
1.00
1.00
1.00
1.00
1.00
7.00
7.00
3.00
3.00
1.00
1.00
1.00
1.00

LP-2 (Panel Penerangan Lantai 2)


Wall mounted, tebal pelat 1,8 mm, cat bakar

1.00

- 1 x MCCB 25 A, 3 P, 10 kA
- 20 x MCB 6 A, 1 P, 6 kA
- 3 x fuse 2 A + fuse holder
- 3 x pilot lamp
- 1 lot busbar 40 A full neutral, 5 bus
- 1 lot internal wiring + aksesori
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm
- 1 lot instalasi kabel grounding

1.00
20.00
3.00
3.00
1.00
1.00
1.00
1.00

unit

unit

unit

HARGA
SATUAN (Rp)

JUMLAH HARGA
(Rp)

NO.
j

URAIAN PEKERJAAN

VOLUME

SAT

LP-3 (Panel Penerangan Lantai 3)


Wall mounted, tebal pelat 1,8 mm, cat bakar

1.00

unit

- 1 x MCCB 25 A, 3 P, 10 kA
- 26 x MCB 6 A, 1 P, 6 kA
- 3 x fuse 2 A + fuse holder
- 3 x pilot lamp
- 1 lot busbar 40 A full neutral, 5 bus
- 1 lot internal wiring + aksesori
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm
- 1 lot instalasi kabel grounding

1.00
26.00
3.00
3.00
1.00
1.00
1.00
1.00

LP-4 (Panel Penerangan Lantai 4)


Wall mounted, tebal pelat 1,8 mm, cat bakar

1.00

- 1 x MCCB 25 A, 3 P, 10 kA
- 16 x MCB 6 A, 1 P, 6 kA
- 3 x fuse 2 A + fuse holder
- 3 x pilot lamp
- 1 lot busbar 40 A full neutral, 5 bus
- 1 lot internal wiring + aksesori
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm
- 1 lot instalasi kabel grounding

1.00
16.00
3.00
3.00
1.00
1.00
1.00
1.00

LP-PJ (Panel Penerangan Pos Jaga & Luar)


Wall mounted, tebal pelat 1,8 mm, cat bakar
water proof

1.00

- 1 x MCCB 16 A, 3 P, 10 kA
- 5 x MCB 6 A, 1 P, 6 kA
- 3 x fuse 2 A + fuse holder
- 3 x pilot lamp
- 1 lot busbar 40 A full neutral, 5 bus
- 1 lot control wiring + aksesori
- 1 lot panel 25 (L) x 20 (D) x 25 (T) cm
- 1 lot instalasi kabel grounding

1.00
5.00
3.00
3.00
1.00
1.00
1.00
1.00

PP-KOMP-1 (Panel Stop Kontak UPS)


Wall mounted, tebal pelat 1,8 mm, cat bakar

1.00

unit

- UPS 5 kVA (di luar panel)


- 1 x MCCB 25 A, 3 P, 10 kA
- 7 x MCB 6 A, 1 P, 6 kA
- 3 x fuse 2 A + fuse holder
- 3 x pilot lamp
- 1 lot busbar 40 A full neutral, 5 bus
- 1 lot internal wiring + aksesori
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm
- 1 lot instalasi kabel grounding

1.00
1.00
7.00
3.00
3.00
1.00
1.00
1.00
1.00

unit

PP-KOMP-M (Panel Stop Kontak UPS)


Wall mounted, tebal pelat 1,8 mm, cat bakar

1.00

unit

- UPS 5 kVA (di luar panel)


- 1 x MCCB 25 A, 3 P, 10 kA
- 10 x MCB 6 A, 1 P, 6 kA
- 3 x fuse 2 A + fuse holder
- 3 x pilot lamp
- 1 lot busbar 40 A full neutral, 5 bus
- 1 lot internal wiring + aksesori
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm
- 1 lot instalasi kabel grounding

1.00
1.00
10.00
3.00
3.00
1.00
1.00
1.00
1.00

unit

unit

unit

HARGA
SATUAN (Rp)

JUMLAH HARGA
(Rp)

NO.
m

URAIAN PEKERJAAN

VOLUME

SAT

PP-KOMP-2 (Panel Stop Kontak UPS)


Wall mounted, tebal pelat 1,8 mm, cat bakar

1.00

unit

- UPS 10 kVA (di luar panel)


- 1 x MCCB 25 A, 3 P, 10 kA

1.00
1.00

unit

- 20 x MCB 16 A, 1 P, 6 kA
- 3 x fuse 2 A + fuse holder
- 3 x pilot lamp
- 1 lot busbar 60 A full neutral, 5 bus
- 1 lot internal wiring + aksesori
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm
- 1 lot instalasi kabel grounding

20.00
3.00
3.00
1.00
1.00
1.00
1.00

PP-KOMP-3 (Panel Stop Kontak UPS)


Wall mounted, tebal pelat 1,8 mm, cat bakar

1.00

unit

- UPS 15 kVA (di luar panel)


- 1 x MCCB 25 A, 3 P, 10 kA
- 27 x MCB 16 A, 1 P, 6 kA
- 3 x fuse 2 A + fuse holder
- 3 x pilot lamp
- 1 lot busbar 60 A full neutral, 5 bus
- 1 lot internal wiring + aksesori
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm
- 1 lot instalasi kabel grounding

1.00
3.00
27.00
3.00
3.00
1.00
1.00
1.00
1.00

unit

PP-Biotech (Pompa Pengolahan limbah air kotor)


Wall mounted, tebal pelat 2 mm, cat bakar

1.00

unit

- 1 x MCCB 25 A, 3 P, 10 kA
- 5 x MCB 6 A, 3 P, 10 kA
- 2 x MCB 6 A, 1 P, 6 kA
- 2 x Y-D starter 37 kW
- 9 x Direct on Line Starter 1,5 kW
- 9 x CT 40/5A
- 9 x A-meter 0 - 20 A
- 9 x fuse 2 A + fuse holder
- 3 x pilot lamp

1.00
5.00
2.00
2.00
3.00
9.00
9.00
9.00
3.00

- 2 x A/O/M selector switch


- 2 x push button ON
- 2 x push button OFF
- 4 x indikator lamp
- 1 x Phase Failure Relay
- 1 lot busbar 60 A full neutral, 5 bus
- 1 lot control wiring + aksesori
- 1 lot panel 70 (L) x 30 (D) x 100 (T) cm
- 1 lot instalasi kabel grounding

2.00
2.00
2.00
4.00
1.00
1.00
1.00
1.00
1.00

PP-SUMP PIT ( Panel Daya Pompa Sumpit)


Wall mounted, tebal pelat 2 mm, cat bakar

1.00

- 1 x MCCB 25 A, 3 P, 10 kA
- 3 x MCB 6 A, 3 P, 10 kA
- 9 x Direct on Line Starter 1,5 kW
- 1 x Phase Failure Relay
- 3 x fuse 2 A + fuse holder
- 3 x pilot lamp
- 2 x A/O/M selector switch
- 2 x push button ON
- 2 x push button OFF
- 2 x indikator lamp
- 1 lot busbar 40 A full neutral, 5 bus
- 1 lot control wiring + aksesori
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm
- 1 lot instalasi kabel grounding

1.00
3.00
3.00
1.00
3.00
3.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00

HARGA
SATUAN (Rp)

unit

SUB TOTAL I

JUMLAH HARGA
(Rp)

NO.

URAIAN PEKERJAAN

VOLUME

SAT

20.00

30.00

38.00

52.00

60.00

72.00

50.00

43.00

50.00

55.00

60.00

5.00

18.00

16.00

15.00

4.00

6.00

20.00

30.00

HARGA
SATUAN (Rp)

IV.II KABEL DAYA


Pekerjaan kabel daya termasuk pengadaan dan
pemasangan sepatu kabel, cable conduit, cable
jointing, penggalian tanah serta penimbunan
kembali (perapihan).
Termasuk di dalam pekerjaan ini adalah pengujian tahanan isolasi kabel (megger test).
2.1 Dari kWh-meter PLN ke LVMDP
NYFGbY 4 x 120 sqmm
2.2 Dari LVMDP ke LP - GF
NYY 4 x 4 sqmm
2.3 Dari LVMDP ke LP - 1
NYY 4 x 4 sqmm
2.4 Dari LVMDP ke LP - 2
NYY 4 x 4 sqmm
2.5 Dari LVMDP ke LP - 3
NYY 4 x 4 sqmm
2.6 Dari LVMDP ke LP - 4
NYY 4 x 4 sqmm
2.7 Dari LVMDP ke LP - PJ
NYFGbY 4 x 6 sqmm
2.8 Dari LVMDP ke PP - Komp-1
NYY 4 x 4 sqmm
2.9 Dari LVMDP ke PP - Komp-M
NYY 4 x 4 sqmm
2.10 Dari LVMDP ke PP - Komp-2
NYY 4 x 4 sqmm
2.11 Dari LVMDP ke PP - Komp-3
NYY 4 x 4 sqmm
2.12 Dari PP - OCU - 2 ke PP - BOOSTER PUMP
NYY 4 x 4 sqmm
2.13 Dari PP- BOOSTER PUMP ke Booster Pump
NYY 4 x 2,5 sqmm
2.14 Dari LVMDP ke PP - PUMP
NYY 4 x 35 sqmm
2.15 Dari PP-PUMP ke seluruh pompa air bersih (PAB)
NYY 4 x 2,5 sqmm
2.16 Dari PP-PUMP ke pompa jockey hydrant JP
NYY 2 x (3 x 4 sqmm)
2.17 Dari PP-PUMP ke pompa utama hydrant MHP
NYY 2 x (3 x 35 sqmm)
2.18 Dari LVMDP ke PP - SUMP PIT
NYY 4 x 4 sqmm
2.19 Dari LVMDP ke PP - BIOTECH
NYY 4 x 4 sqmm

SUB TOTAL II
III INSTALASI PENERANGAN / DAYA
3.1 Ground floor
a
b
c
d
e
f
g
h

Lampu TL 2 x 36 W (V-SHAPE)
setara Philips.
Lampu TL 2 x 36 W (V-SHAPE) + Emergency Kit
setara Philips.
Lampu TL 2 x 18 W (V-SHAPE)
setara Philips.
Lampu Lampu baret PLE - T 18 W (SCB 20 ACR)
setara Philips.
Exit Lamp TL 2 x 10 W
setara Philips.
Instalasi titik cahaya dalam gedung lengkap
Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop
Saklar tunggal
Sakla ganda
Saklar hotel tunggal
Lampu down light plc 13

38.00

bh

4.00

bh

6.00

bh

2.00

bh

1.00

bh

51.00
3.00
2.00
3.00
2.00
6.00

ttk
ttk
bh
bh
bh
bh

JUMLAH HARGA
(Rp)

NO.

URAIAN PEKERJAAN

VOLUME

SAT

27.00

bh

2.00

bh

1.00

bh

20.00

bh

1.00

bh

51.00
11.00
2.00

ttk
ttk
ttk

6.00
8.00
2.00

bh
bh
bh

Lampu TL 2 x 36 W (RM-300)
setara Philips.
Lampu TL 2 x 36 W (RMO) + Emergency Kit
setara Philips.
Lampu TL 2 x 18 W Daylight (RM-300)
setara Philips.
D. light PLE - T 18 W (RD150 REFF E27),
setara Philips.

19.00

bh

3.00

bh

1.00

bh

14.00

bh

D. light PLE - T 18 W (RD150 REFF E27) + Emergency K


setara Philips.
Lampu Lampu baret PLE - T 18 W (SCB 20 ACR)
setara Philips.
Exit Lamp TL 2 x 10 W
setara Philips.
Instalasi titik cahaya dalam gedung lengkap
Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop
Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop
di bawahlantaimenggunakan konduit high impact
Saklar tunggal
Sakla ganda
Saklar hotel tunggal

1.00

bh

4.00

bh

3.00

bh

45.00
14.00
11.00

ttk
ttk
ttk

13.00
7.00
2.00

bh
bh
bh

Lampu TL 2 x 36 W (RM-300)
setara Philips.
Lampu TL 2 x 36 W (RMO) + Emergency Kit
setara Philips.
Lampu TL 2 x 18 W Daylight (RM-300)
setara Philips.
D. light PLE - T 18 W (RD150 REFF E27),
setara Philips.
D. light PLE - T 18 W (RD150 REFF E27) + Emergency K
setara Philips.
Lampu Lampu baret PLE - T 18 W (SCB 20 ACR)
setara Philips.
Exit Lamp TL 2 x 10 W
setara Philips.
Instalasi titik cahaya dalam gedung lengkap
Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop

19.00

bh

3.00

bh

3.00

bh

10.00

bh

1.00

bh

4.00

bh

2.00

bh

42.00
15.00

ttk
ttk

Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop
di bawahlantaimenggunakan konduit high impact
Saklar tunggal
Sakla ganda
Saklar hotel tunggal

16.00

ttk

17.00
6.00
2.00

bh
bh
bh

3.2 Lantai - Satu


a
b
c
d
e
j
k
j
n

Lampu TL 2 x 36 W (RMO)
setara Philips.
Lampu TL 2 x 36 W (RMO) + Emergency Kit
setara Philips.
Lampu TL 2 x 18 W (RMO)
setara Philips.
D. light PLE - T 18 W (RD150 REFF E27),
setara Philips.
D. light PLE - T 18 W (RD150 REFF E27) + Emergency K
setara Philips.
Instalasi titik cahaya dalam gedung lengkap
Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop
Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop
di bawahlantaimenggunakan konduit high impact
Saklar tunggal
Sakla ganda
Saklar hotel tunggal

3.2 Lantai - 2
a
b
c
d

e
d
e
j
k
j
n

3.2 Lantai - 3
a
b
c
d
e
d
e
j
k
j
n

HARGA
SATUAN (Rp)

JUMLAH HARGA
(Rp)

NO.

URAIAN PEKERJAAN

VOLUME

SAT

Lampu TL 2 x 36 W (RM-300)
setara Philips.
Lampu TL 2 x 36 W (RMO) + Emergency Kit
setara Philips.
D. light PLE - T 18 W (RD150 REFF E27),
setara Philips.
D. light PLE - T 18 W (RD150 REFF E27) + Emergency K
setara Philips.

18.00

bh

2.00

bh

15.00

bh

2.00

bh

Lampu Lampu baret PLE - T 18 W (SCB 20 ACR)


setara Philips.
Exit Lamp TL 2 x 10 W
setara Philips.
Instalasi titik cahaya dalam gedung lengkap
Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop
Saklar tunggal
Sakla ganda
Saklar hotel tunggal
Saklar hotel ganda

5.00

bh

2.00

bh

44.00
23.00
14.00
16.00
2.00
6.00

ttk
ttk
bh
bh
bh
bh

4.00
1.00

bh
bh

5.00
2.00
1.00
4.00

ttk
ttk
bh
ttk

HARGA
SATUAN (Rp)

3.3 Lantai - 4
a
b
d
e

d
e
h
i
k

3.4 Instalasi Penerangan Pos Jaga & Luar


a
d
h
i
k
e

Lampu taman PLE - T 18 W


D. light PLE - T 18 W (RD150 REFF E27),
setara Philips.
Instalasi titik cahaya dalam gedung lengkap
Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop
Saklar tunggal
Kabel instalasi lampu taman, NYFGBY 4 x 4 sqmm,
lengkap dgn pasir urug, bata pelindung dan galian tanah.

SUB TOTAL III


IV INSTALASI CABLE TRAY
Perforated type- hot rolled steel sheet, SPHC
2.0 mm thickness, 100 mm height, hot dipped
galvanized.
4.1 Ground floor
a
c
e
g
i

4.1
a
b
c
d
g
h
i
a
b
e
f
g
h
i

Straight tray 40 cm
Elbow 40 cm
Equal Tee 40 cm
Outside Riser 40 cm
Alat bantu (mur-baut, hanger rod, hinge fish
plate dll.)

30.00
1.00
1.00
1.00
1.00

m
bh
bh
bh
ls

16.00
16.00
3.00
2.00
2.00
1.00
1.00

m
m
bh
bh
bh
bh
ls

33.00
33.00
1.00
1.00
2.00
2.00
1.00

m
m
bh
bh
bh
bh
ls

Lantai Satu
Straight tray 40 cm
Straight tray 30 cm
Elbow 40 cm
Elbow 30 cm
Outside Riser 40 cm
Outside Riser 30 cm
Alat bantu (mur-baut, hanger rod, hinge fish
plate dll.)
Straight tray 40 cm
Straight tray 30 cm
Cross Tee 40 cm
Cross Tee 30 cm
Outside Riser 40 cm
Outside Riser 30 cm
Alat bantu (mur-baut, hanger rod, hinge fish
plate dll.)

JUMLAH HARGA
(Rp)

NO.
4.1

URAIAN PEKERJAAN

VOLUME

SAT

Lantai 2

a
b
e
f
g

Straight tray 40 cm
Straight tray 30 cm
Cross Tee 40 cm
Cross Tee 30 cm
Outside Riser 40 cm

33.00
33.00
1.00
1.00
1.00

m
m
bh
bh
bh

h
i

Outside Riser 30 cm
Alat bantu (mur-baut, hanger rod, hinge fish
plate dll.)

1.00
1.00

bh
ls

33.00
33.00
1.00
1.00
1.00
1.00
1.00

m
m
bh
bh
bh
bh
ls

4.2
a
b
d
e
f
g
i

4.1

HARGA
SATUAN (Rp)

Lantai 3
Straight tray 40 cm
Straight tray 30 cm
Cross Tee 40 cm
Cross Tee 30 cm
Outside Riser 40 cm
Outside Riser 30 cm
Alat bantu (mur-baut, hanger rod, hinge fish
plate dll.)
Lantai 4

a
b

Straight tray 40 cm
Straight tray 30 cm

16.00
16.00

m
m

c
d
g
h
i

Elbow 40 cm
Elbow 30 cm
Outside Riser 40 cm
Outside Riser 30 cm
Alat bantu (mur-baut, hanger rod, hinge fish
plate dll.)

3.00
2.00
2.00
1.00
1.00

bh
bh
bh
bh
ls

SUB TOTAL IV
V

INSTALASI UNDERFLOOR DUCT


Hot dip pre-galvanized steel sheet, 2 ch. 120 : 70
mm, 38 mm height - underfloor duct.

5.1 Lantai 1
a
b
c
d
e

Straight duct 120 : 70 : T=38


Elbow
Tee
Riser 90 o
Intersection box type SS c/w box base, frame,
metal cover & base plate
Base plate memuat :
- 2 buah stop kontak 1 ph, 220 V, 10 A
- 2 buah female RJ-45 untuk saluran data
- 2 buah female RJ-11 untuk saluran telepon
Alat bantu (mur-baut, fisher, sekrup dll)

22.00
3.00
1.00
1.00
2.00

m
bh
bh
bh
bh

1.00

ls

50.00
3.00
4.00
1.00
11.00

m
bh
bh
bh
bh

1.00

ls

5.2 Lantai 2
a
b
c
d
e

Straight duct 120 : 70 : T=38


Elbow
Tee
Riser 90 o
Intersection box type SS c/w box base, frame,
metal cover & base plate
Base plate memuat :
- 2 buah stop kontak 1 ph, 220 V, 10 A
- 2 buah female RJ-45 untuk saluran data
- 2 buah female RJ-11 untuk saluran telepon
Alat bantu (mur-baut, fisher, sekrup dll)

JUMLAH HARGA
(Rp)

NO.

URAIAN PEKERJAAN

VOLUME

SAT

34.00
3.00
3.00
1.00
16.00

m
bh
bh
bh
bh

1.00

ls

HARGA
SATUAN (Rp)

5.2 Lantai 3
a
b
c
d
e

Straight duct 120 : 70 : T=38


Elbow
Tee
Riser 90 o
Intersection box type SS c/w box base, frame,
metal cover & base plate
Base plate memuat :
- 2 buah stop kontak 1 ph, 220 V, 10 A
- 2 buah female RJ-45 untuk saluran data
- 2 buah female RJ-11 untuk saluran telepon
Alat bantu (mur-baut, fisher, sekrup dll)

SUB TOTAL V
VI INSTALASI PENANGKAL PETIR
6.1
6.2
6.3
6.4
6.5
6.6
6.7

Dynasphere system 3000 air terminal


Termination kit
Fiberglass mast
Triaxial Down Conductor
Lighting even control
Material bantu (klem, fisher, sekrup dll.)
Pentanahan + bak kontrol

1.00
1.00
1.00
85.00
1.00
1.00
1.00

bh
sat
sat
m
ls
ls
ttk
SUB TOTAL VI

VII PENYAMBUNGAN DAYA PLN


Pekerjaan ini meliputi pembayaran BP, UJL,
pengurusan administrasi, pengadaan dan pemasangan
kabel TR dan pengujian instalasi oleh pihak PLN

0.00

ls

SUB TOTAL VII


VIII TESTING & COMMISSIONING

1.00

ls
SUB TOTAL VIII

JUMLAH HARGA
(Rp)

RENCANA ANGGARAN BIAYA


PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta

NO

URAIAN PEKERJAAN

VOLUME

SAT

HARGA SATUAN ( Rp)

IV.IX PEKERJAAN TELEPON


INSTALASI OUTLET TELEPON
a
Instalasi lengkap dgn. tel. receptacle outlet,
pengkabelan dgn. ITC 2 x 2 x 0,6 sqmm di
dalam konduit PVC high-impact heavy duty
a.1
1
2
a.2
1
2
3

1
2
3
a.3
1
2
3
a.4
1
2
3
a.5.
1
2

Lantai - Ground floor


Instalasi titik outlet telepon lkp dgn telephone
receptacle outlet(dinding)
Analog DTMF hand set
Lantai - 1
Instalasi titik outlet telepon lkp dgn telephone
receptacle outlet(dinding)
Analog DTMF hand set
Terminal Box kap. 40 prs

Instalasi titik outlet telepon lkp dgn telephone


receptacle outlet(dinding)
Analog DTMF hand set
Terminal Box kap. 10 prs
Lantai - 2
Instalasi titik outlet telepon lkp dgn telephone
receptacle outlet(dinding)
Analog DTMF hand set
Terminal Box kap. 40 prs
Lantai - 3
Instalasi titik outlet telepon lkp dgn telephone
receptacle outlet(dinding)
Analog DTMF hand set
Terminal Box kap. 10 prs
Lantai - 4
Instalasi titik outlet telepon lkp dgn telephone
receptacle outlet(dinding)
Analog DTMF hand set

1.00

ttk

1.00

unit

5.00

ttk

5.00
1.00

unit
unit

4.00

ttk

4.00
1.00

unit
unit

8.00

ttk

8.00
1.00

unit
unit

12.00

ttk

12.00
1.00

unit
unit

1.00

ttk

1.00

unit
Sub Total

JUMLAH HARGA (Rp)

NO

b
1
2
3
4
5
4
5

URAIAN PEKERJAAN

INSTALASI KABEL PENGHUBUNG


Dari CTB-TELKOM ke MDF
JATC 20 x 2 x 0,6 sqmm
Dari CTB-TELKOM ke PABX
JATC20 x 2 x 0,6 sqmm
Dari PABX ke MDF
1TC 60 x 2 x 0,6 sqmm
Dari MDF ke TB-TL-1
1TC 20 x 2 x 0,6 sqmm
Dari MDF ke TB-TL-M
1TC 40 x 2 x 0,6 sqmm
Dari MDF ke TB-TL-2
1TC 20 x 2 x 0,6 sqmm
Dari MDF ke TB-TL-3
1TC 40 x 2 x 0,6 sqmm

VOLUME

SAT

50.00

50.00

5.00

10.00

12.00

18.00

24.00

HARGA SATUAN ( Rp)

Sub Total
c

SAMBUNGAN PT. TELKOM

4.00

sst
Sub Total
Jumlah Total

JUMLAH HARGA (Rp)

RENCANA ANGGARAN BIAYA


PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta

NO

URAIAN PEKERJAAN

VOLUME

SAT

IV.X PEKERJAAN FIRE ALARM


INSTALASI
a
a.1 Peralatan Utama
1

2
3

Fire alarm control panel (FACP) kap.10 zone


lengkap dengan battery charger dan battery
untuk 20 jam operasi.
Annouciator Panel
MDF

1.00

unit

1.00
1.00

unit
unit

a.2

Instalasi Detektor, Horn dan Lamp

Ground floor
- ROR & fixed temperature detector
- Smoke temperature detector
- Manual call point / MCP
- Alarm bell dia. 4"
- Alarm lamp
- Terminal box
- Instalasi detektor dan MCP
- Instalasi alarm dan bell

8.00
1.00
1.00
1.00
1.00
1.00
10.00
1.00

bh
bh
bh
bh
bh
unit
ttk
ttk

Lantai 1
- ROR & fixed temperature detector
- Fixed temperature detector
- Smoke temperature detector
- Manual call point / MCP
- Alarm bell dia. 4"
- Alarm lamp
- Terminal box
- Instalasi detektor dan MCP
- Instalasi alarm dan bell
- ROR & fixed temperature detector
- Manual call point / MCP
- Alarm bell dia. 4"

6.00
1.00
1.00
1.00
1.00
1.00
1.00
9.00
2.00
4.00
1.00
1.00

bh
bh
bh
bh
bh
bh
unit
ttk
ttk
bh
bh
bh

- Alarm lamp
- Instalasi detektor dan MCP
- Instalasi alarm dan bell

1.00
5.00
2.00

bh
ttk
ttk

9.00
1.00
1.00
1.00
1.00
1.00
1.00
12.00
2.00

bh
bh
bh
bh
bh
bh
unit
ttk
ttk

Lantai 2
- ROR & fixed temperature detector
- Fixed temperature detector
- Smoke temperature detector
- Manual call point / MCP
- Alarm bell dia. 4"
- Alarm lamp
- Terminal box
- Instalasi detektor dan MCP
- Instalasi alarm dan bell

HARGA SATUAN
(Rp)

JUMLAH HARGA (Rp)

NO

a.3
1

URAIAN PEKERJAAN

VOLUME

SAT

Lantai 3
- ROR & fixed temperature detector
- Fixed temperature detector
- Smoke temperature detector
- Manual call point / MCP
- Alarm bell dia. 4"
- Alarm lamp
- Terminal box
- Instalasi detektor dan MCP
- Instalasi alarm dan bell

10.00
1.00
3.00
2.00
1.00
1.00
1.00
16.00
2.00

bh
bh
bh
bh
bh
bh
unit
ttk
ttk

Lantai 4
- ROR & fixed temperature detector
- Fixed temperature detector
- Manual call point / MCP
- Alarm bell dia. 4"
- Alarm lamp
- Terminal box
- Instalasi detektor dan MCP
- Instalasi alarm dan bell

9.00
1.00
1.00
1.00
1.00
1.00
11.00
2.00

bh
bh
bh
bh
bh
unit
ttk
ttk

5.00
5.00

m
m

18.00
18.00

m
m

11.00

11.00

10.00
10.00

m
m

11.00
11.00

m
m

12.00
12.00

m
m

22.00
22.00

m
m

HARGA SATUAN
(Rp)

Instalasi Kabel Penghubung


Dari FACP ke MDF
- NYA 20 x 1 x 2,5 sqmm
- NYA 20x 1 x 1,5 sqmm
Dari MDF ke TB-FA-B
- NYY 4 x 2,5 sqmm
- NYY 4 x 1,5 sqmm
Dari MDF ke TB-FA-GF
- NYY 4 x 2,5 sqmm
- NYY 4 x 1,5 sqmm
Dari MDF ke TB-FA-1
- NYY 4 x 2,5 sqmm
- NYY 4 x 1,5 sqmm
Dari MDF ke TB-FA-2
- NYY 4 x 2,5 sqmm
- NYY 4 x 1,5 sqmm
Dari MDF ke TB-FA-3
- NYY 4 x 2,5 sqmm
- NYY 4 x 1,5 sqmm
Dari MDF ke TB-FA-4
- NYY 4 x 2,5 sqmm
- NYY 4 x 1,5 sqmm

Sub Total
b

TESTING & COMMISSIONING

1.00

ls
Sub Total
Jumlah Total

JUMLAH HARGA (Rp)

RENCANA ANGGARAN BIAYA


PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
NO

URAIAN PEKERJAAN

VOLUME

SAT

HARGA SATUAN
(Rp)

IV.XI PEKERJAAN INSTALASI OUTLET DATA


Instalasi lengkap dgn. data outlet (RJ-45)
pengkabelan dengan. UTP CAT- 6 di dlm
konduit PVC high-impact heavy duty atau
di dalam underfloor ducting system
a

Lantai 1

Instalasi outlet data, lenkap dgn outlet data

4.00

ttk

Outlet Data RJ 45

4.00

ttk

Swicth Panel kap. 24 input lengkapdengan rak

1.00

bh

Instalasi outlet data, lenkap dgn outlet data

7.00

ttk

Outlet Data RJ 45

7.00

ttk

Swicth Panel kap. 24 input lengkapdengan rak

1.00

bh

Lantai 2

Instalasi outlet data, lenkap dgn outlet data

17.00

ttk

Outlet Data RJ 45

17.00

ttk

Swicth Panel kap. 24 input lengkapdengan rak

1.00

bh

Lantai 3

Instalasi outlet data, lenkap dgn outlet data

24.00

ttk

Outlet Data RJ 45

24.00

ttk

Swicth Panel kap. 24 input lengkapdengan rak

1.00

bh

Kabel Penghubung
60.00

Dari Server di Ruang Data ke seluruh


Swicth Panel. UTP CAT- 5 di dlm
konduit PVC high-impact heavy duty.

Sub Total
f

TESTING & COMMISSIONING

1.00

ls
Sub Total
Jumlah Total

JUMLAH HARGA
(Rp)

RENCANA ANGGARAN BIAYA


PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
NO

URAIAN PEKERJAAN

VOLUME

SAT

5.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
lot
lot
bh
bh
bh
lot
bh
lot
bh
set

7.00

bh

4.00
7.00
4.00
1.00

bh
ttk
ttk
bh

4.00

bh

3.00

bh

4.00
3.00

ttk
ttk

11.00

bh

7.00
11.00
7.00
1.00

bh
ttk
ttk
bh

HARGA SATUAN
(Rp)

IV. XII PEKERJAAN SOUND SYSTEM


BACKGROUND MUSIC
a
a.1
1
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Peralatan Utama Loud Speaker


Power Amplifier 480 W ( ex BOSCH)
Monitor Panel (MP-032A)
5-Zone Selector Module (V-1062)
Line Amplifier Module (V-1071A)
Paging Microphone (VR-1001)
Chime Module (V-1015)
Mic Preamp Mod w/ Compr. (V-1052A)
Allert Signal Module (V-1014)
AM/FM Tuner Module (V-1032)
Multi DVD player INCL SACD ( Sony)
Microphone Input Module (V-1005)
Aux Input Module (V-1154)
Program Selector Module (V-1061)
Power Supply Module (V-1082)
Blank Panel (BK-013A/023A/033A)
Mixer Frame (V-1000)
Power Switch Panel (PS-011G)
Junction Box (JB-600A)
Blower Unit (BP-031G)
Perforated Panel (PF-013A/023A)
Audio Rack System (CR-271N)
Alat Bantu (pengkabelan, mur-baut dll)
Main Distribution Frame (MDF) utk. BGM
Magnetic Contactor 220V/16 A + wiring

a.2

Instalasi Loud Speaker

a.2.1
1
2
3
4
5

Lantai 1
20 cm Ceiling Speaker 6W / 100 V
Ex : TOA Seri PC 34 RW
30 W Attenuator Ex TOA Seri - 311
Instalasi Ceiling Speaker
Instalasi Attenuator
Terminal Box ( TB-SS-1 )

Mezanin
20 cm Ceiling Speaker 6W / 100 V
Ex : TOA Seri PC 34 RW
30 W Attenuator Ex TOA Seri - 311

3
4

Instalasi Ceiling Speaker


Instalasi Attenuator

a.2.1
1
2
3
4
5

Lantai 2
20 cm Ceiling Speaker 6W / 100 V
Ex : TOA Seri PC 34 RW
30 W Attenuator Ex TOA Seri - 311
Instalasi Ceiling Speaker
Instalasi Attenuator
Terminal Box ( TB-SS-2 )

JUMLAH HARGA (Rp)

NO

a.2.2
1
2
3
4
5
a.2.3
1
2
3
4
5

URAIAN PEKERJAAN

Lantai 3
20 cm Ceiling Speaker 6W / 100 V
Ex : TOA Seri PC 34 RW
30 W Attenuator Ex TOA Seri - 311
Instalasi Ceiling Speaker
Instalasi Attenuator
Terminal Box ( TB-SS-3 )
Lantai 4
20 cm Ceiling Speaker 6W / 100 V
Ex : TOA Seri PC 34 RW
30 W Attenuator Ex TOA Seri - 311
Instalasi Ceiling Speaker
Instalasi Attenuator
Terminal Box ( TB-SS-3 )

VOLUME

SAT

13.00

bh

7.00
13.00
7.00
1.00

bh
ttk
ttk
bh

10.00

bh

5.00
10.00
5.00
1.00

bh
ttk
ttk
bh

HARGA SATUAN
(Rp)

Sub Total

TESTING & COMMISSIONING

1.00

ls
Sub Total
Jumlah Total

JUMLAH HARGA (Rp)

RENCANA ANGGARAN BIAYA


PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
NO

URAIAN PEKERJAAN

IV.XIII PEKERJAAN INSTALASI GENSET


a
PEKERJAAN UNIT KNALPOT GENSET
DAN DUCTING RADIATOR
1 Pengadaan Residential muffer dia. 1 x 12" +
jacketing (ex. Lokal)
2 Pemipaan exhaust lengkap dengan jacketing
BSP 1 x 10" untuk Genset 200 KVA
3 Pengadaan dan pemasangan ducting radiator
untuk Genset 200 KVA
4 Pengadaan dan pemasangan Flexible pipe dia. 10"

VOLUME

SAT

bh

ls

bh

HARGA SATUAN
(Rp)

Sub Total
b

PEKERJAAN PEMIPAAN
1 Pemipaan Bahan Bakar
Pemipaan bahan bakar antara fuel daily tank
dengan mesin dan antara weekly tank dgn
daily tank, pemipaan BSP sch. 30, penyam bungan dengan flange, termasuk klem pipa
dan pengecatan
2 Pemipaan Exhaust Gas
Pemipaan exhaust gas di dalam ruang DGS
pemipaan dgn. BSP sch 30 dilapis tali asbes
dan alumunium jacketing.

ls

ls

Sub Total
Jumlah Total

JUMLAH
HARGA (Rp)

RENCANA ANGGARAN BIAYA


PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
NO

URAIAN PEKERJAAN

IV.XIV. PEKERJAAN INSTALASI MATV


INSTALASI OUTLET TV
1 Lantai 1
Kabel coaxial 5C-2V, 75 ohm ex YURI Japan,
di dlm konduit PVC high impact-heavy gauge
ex EGA/CLIPSAL termasuk F-connector dan
outlet TV.
2 Mezaninne
Kabel coaxial 5C-2V, 75 ohm ex YURI Japan,
di dlm konduit PVC high impact-heavy gauge
ex EGA/CLIPSAL termasuk F-connector dan
outlet TV.
1 Lantai 2
Kabel coaxial 5C-2V, 75 ohm ex YURI Japan,
di dlm konduit PVC high impact-heavy gauge
ex EGA/CLIPSAL termasuk F-connector dan
outlet TV.
2 Lantai 3
Kabel coaxial 5C-2V, 75 ohm ex YURI Japan,
di dlm konduit PVC high impact-heavy gauge
ex EGA/CLIPSAL termasuk F-connector dan
outlet TV.

VOLUME

SAT

ttk

ttk

ttk

10

ttk

Total

HARGA
SATUAN (Rp)

JUMLAH
HARGA (Rp)

RENCANA ANGGARAN BIAYA


PEKERJAAN AIR BERSIH
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
NO

URAIAN PEKERJAAN

VOLUME

SAT

V.I PEKERJAAN AIR BERSIH


a PERALATAN UTAMA PEMOMPAAN AIR
BERSIH DI RUANG POMPA LANTAI DASAR
a.1 POMPA AIR BERSIH (PAB)
1 Pompa
Jenis

unit

2.00

set

1.00

unit

3.00
20.00
6.00
12.00
12.00
6.00
4.00
2.00
4.00
1.00
5.00
2.00
2.00
2.00
2.00
2.00
1.00
2.00

m
m
m
m
m
m
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

1.00
3.00
3.00
1.00
2.00
2.00
2.00
8.00
1.00

bh
bh
bh
bh
bh
bh
bh
bh
ls

: Multi stage horizontal centrifugal pump - NSP


: 50 USGPM (378,5 l/menit)
: 30 m
: 70 % minimum
: 1450 rpm

Debit
Head
Efisiensi
Kecepatan putar
2 Motor Penggerak
Jenis
: 3 phase TEFC induction
Tegangan
: 380/660 V
Starter
: DOL
Daya poros
: 1.770 VA (min)
Kopling
direct, base skid mounted
Kecepatan putar
: 1450 rpm
a.2 Water Level Controller
WLC untuk ground tank dan evelated tank,
lengkap dengan elektroda dan pengkabelan
elektroda antara ground reservoir, elevated
tank dan PP-PUMP
a.3 Priming tank kap.100 lt lengkap dgn. Asessories
b

2.00

INSTALASI PEMIPAAN

b.1 Pemipaan di Ruang Pompa


Pemipaan menggunakan GIP med. Class di cat
Header dia. 6"
Pipa dia. 4"
Pipa dia. 3"
Pipa dia. 2"
Pipa dia. 1"
Pipa dia. 1/2"
3 Gate valve dia. 4" (125 psi-flanged)
Gate valve dia. 3" (125 psi-flanged)
Gate valve dia. 2" (125 psi-screwed)
Gate valve dia. 1" (125 psi-screwed)
Gate valve dia. 1/2" (125 psi-screwed)
4 Check valve dia. 3" (125 psi - flanged)
5 Double sphere flexible joint dia. 3" (flanged)
6 Double sphere flexible joint dia. 4" (flanged)
7 Strainer dia. 4" (flanged)
8 Foot valve dia. 4" (flanged)
9 Pressure gauge
10 Pressure switch
11 Fitting
Tee dia. 6" x 1 1/2" x 6"
Tee dia. 6" x 2 1/2" x 6"
Tee dia. 6" x 3" x 6"
Tee dia. 1/2" x 1/2" x 1/2"
Elbow dia. 4"
Elbow dia. 3"
Elbow dia. 1 1/2"
Elbow dia. 1/2"
12 Material bantu (mur-baut,flens,support,klem ,
fitting dll)
1
2

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

NO

URAIAN PEKERJAAN

VOLUME

SAT

b.3 Ground floor


1 Pipa tegak dia. 3"

8.00

b.4 Lantai 1
1 Pipa tegak dia. 3"
Pipa dia. 1 1/2"
Pipa dia. 1"
Pipa dia. 3/4"
Pipa dia. 1/2"
2 Tee dia. 3" x 1 1/2" x 3"
Tee dia. 1 1/2" x 1" x 1 1/2"
Tee dia. 1" x 1" x 1"
Tee dia. 1" x 3/4" x 1"
Tee dia. 1" x 1/2" x 1"
Tee dia. 3/4" x 3/4" x 3/4"
Tee dia. 3/4" x 1/2" x 3/4"
Tee dia. 1/2" x 1/2" x 1/2"
3 Elbow dia. 1 1/2"
Elbow dia. 1"
Elbow dia. 3/4"
Elbow dia. 1/2"
4 Reducer dia. 1 1/2" x 3/4"
Reducer dia. 1" x 1/2"
Reducer dia. 3/4" x 1/2"
5 Gate valve dia. 1 1/2" (125 psi-screwed)
6 Material bantu (support,klem , socket dll)

8.00
12.00
26.00
8.00
76.00
1.00
2.00
1.00
1.00
8.00
1.00
2.00
6.00
3.00
3.00
1.00
20.00
1.00
2.00
2.00
1.00
1.00

m
m
m
m
m
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ls

b.5 Lantai 2
1 Pipa tegak dia. 3"
Pipa dia. 1 1/2"
Pipa dia. 1"
Pipa dia. 3/4"
Pipa dia. 1/2"
2 Tee dia. 3" x 1 1/2" x 3"
Tee dia. 1 1/2" x 1" x 1 1/2"
Tee dia. 1 1/2" x 3/4" x 1 1/2"
Tee dia. 1" x 1/2" x 1"
Tee dia. 3/4" x 1/2" x 3/4"
Tee dia. 1/2" x 1/2" x 1/2"
3 Elbow dia. 1 1/2"
Elbow dia. 1"
Elbow dia. 3/4"
Elbow dia. 1/2"
4 Reducer dia. 1 1/2" x 3/4"
Reducer dia. 1" x 1/2"
Reducer dia. 3/4" x 1/2"
5 Gate valve dia. 1 1/2" (125 psi-screwed)
6 Material bantu (support,klem , socket dll)

8.00
16.00
12.00
26.00
48.00
1.00
1.00
2.00
4.00
6.00
5.00
4.00
2.00
2.00
19.00
1.00
1.00
2.00
1.00
1.00

m
m
m
m
m
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ls

b.6 Lantai 3
1 Pipa tegak dia. 3"
Pipa tegak dia. 2"
Pipa dia. 1 1/2"
Pipa dia. 1"
Pipa dia. 3/4"
Pipa dia. 1/2"
2 Tee dia. 2" x 1 1/2" x 2"
Tee dia. 1 1/2" x 1" x 1 1/2"
Tee dia. 1 1/2" x 3/4" x 1 1/2"
Tee dia. 1" x 1/2" x 1"
Tee dia. 3/4" x 1/2" x 3/4"
Tee dia. 1/2" x 1/2" x 1/2"
3 Elbow dia. 1 1/2"
Elbow dia. 1"
Elbow dia. 3/4"

8.00
2.00
16.00
12.00
28.00
36.00
1.00
1.00
3.00
2.00
5.00
7.00
4.00
2.00
3.00

m
m
m
m
m
m
bh
bh
bh
bh
bh
bh
bh
bh
bh

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

NO

URAIAN PEKERJAAN
Elbow dia. 1/2"
Reducer dia. 1 1/2" x 3/4"

VOLUME
16.00
1.00

SAT
bh
bh

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

NO

URAIAN PEKERJAAN

VOLUME

SAT

Reducer dia. 1" x 1/2"


Reducer dia. 3/4" x 1/2"
Gate valve dia. 1 1/2" (125 psi-screwed)
Material bantu (support,klem , socket dll)

1.00
1.00
1.00
1.00

bh
bh
bh
ls

b.7 Lantai 4
1 Pipa tegak dia. 3"
Pipa tegak dia. 2"
Pipa dia. 1 1/2"
Pipa dia. 1"
Pipa dia. 3/4"
Pipa dia. 1/2"
2 Tee dia. 2" x 1 1/2" x 2"
Tee dia. 1 1/2" x 1" x 1 1/2"
Tee dia. 1 1/2" x 3/4" x 1 1/2"
Tee dia. 1" x 3/4" x 1"
Tee dia. 1" x 1/2" x 1"
Tee dia. 3/4" x 1/2" x 3/4"
Tee dia. 1/2" x 1/2" x 1/2"
3 Elbow dia. 1 1/2"
Elbow dia. 1"
Elbow dia. 3/4"
Elbow dia. 1/2"
4 Reducer dia. 1 1/2" x 1"
Reducer dia. 1" x 1/2"
5 Gate valve dia. 1 1/2" (125 psi-screwed)
6 Material bantu (support,klem , socket dll)

8.00
2.00
6.00
22.00
18.00
24.00
1.00
2.00
1.00
1.00
6.00
6.00
4.00
4.00
2.00
5.00
12.00
1.00
2.00
1.00
1.00

m
m
m
m
m
m
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ls

2.00
2.00

bh
set

1.00

bh

3.00
28.00
16.00
1.00
1.00
1.00
4.00
20.00
9.00
3.00
2.00

m
m
m
bh
bh
bh
bh
bh
bh
bh
bh

5
6

b.8 Lantai Atap


b.8.1 Peralatan Utama
1 Tangki Atas, Fiber glass kap. 2 m3
2 Booster Pump
Pompa (2 unit)
Jenis

Debit
Head
Efisiensi
Kecepatan putar

: horizontal -centrifugal
pump - NSP
: 30 USGPM (113,4 l/menit)
: 20 m
: 70 % minimum
: 1450 rpm

Motor Penggerak (2 unit)


Jenis

: 3 phase TEFC induction

Tegangan
Starter
Daya poros
Kopling
Kecepatan putar
Pengadaan pompa lengkap dgn panel kontrol
dan kabel power
Pressure Tank kap. 500 liter, 10 kg/cm2
(1 unit)

b.8.2 Instalasi Pemipaan


1 Header dia. 3"
Pipa dia. 2"
Pipa dia. 1 1/2"
Tee dia. 3" x 2" x 3"
Tee dia. 2" x 2" x 2"
Tee dia. 2" x 1 1/2" x 2"
4 Elbow dia. 3"
Elbow dia. 2"
Elbow dia. 1 1/2"
5 Gate Valve dia. 3" (125 psi-flenged)
Gate Valve dia. 2 1/2" (125 psi-flenged)

: 380/660 V
: DOL
: 750 VA (min)
direct, base skid mounted
: 1450 rpm

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

NO

URAIAN PEKERJAAN
Gate Valve dia. 2" (125 psi-flenged)
Gate Valve dia. 1 1/2" (125 psi-flenged)

VOLUME
10.00
4.00

SAT
bh
bh

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

NO

URAIAN PEKERJAAN

Check Valve dia. 2" (125 psi-flenged)


Strainer dia. 2 1/2" (flanged)
Double sphere flexible joint dia. 2 1/2" (flanged)
Double sphere flexible joint dia. 2" (flanged)
9 Pressure gauge
10 Pressure switch
11 Material bantu (support,klem , socket dll)
6
7
8

b.8.3 INSTALASI PENYAMBUNGAN METER AIR PDAM / PALIJA 3"

VOLUME

SAT

2.00
2.00
2.00
2.00
1.00
2.00
1.00

bh
bh
bh
bh
bh
bh
ls

1.00

unit

HARGA SATUAN
(Rp)

Sub Total
d

TESTING & COMMISSIONING

1.00

ls
Sub Total
Jumlah Total

JUMLAH HARGA
(Rp)

RENCANA ANGGARAN BIAYA


PEKERJAAN AIR KOTOR
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
NO

URAIAN PEKERJAAN

VOLUME

SAT

36.00
40.00
10.00

m
m
m

4.00
4.00

m
m

1.00
1.00
1.00
1.00
1.00

bh
bh
bh
bh
bh

4.00
2.00
3.00
1.00

bh
bh
bh
unit

1.00

ls

34.00
8.00
36.00
64.00

m
m
m
m

4.00
4.00
4.00
4.00

m
m
m
m

1.00
6.00
1.00
1.00
5.00
1.00
5.00
3.00
3.00

bh
bh
bh
bh
bh
bh
bh
bh
bh

V.II PEKERJAAN PEMIPAAN AIR KOTOR / AIR BEKAS


Pemipaan dan fitting menggunakan pipa PVC
kelas AW dengan metode penyambungan
RRJ (rubber ring joint)
a
1

Ground floor
Pipa
- dia. 6"
- dia. 4"
- dia. 2"
Pipa Tegak
- dia. 6"
- dia. 4"
Tee-Wye
- dia. 6" x 6" x 6"
- dia. 6" x 2" x 6"
- dia. 4" x 4" x 4"
- dia. 4" x 2" x 4"
- dia. 2" x 2" x 2"
Elbow
- dia. 6"
- dia. 4"
- dia. 2"
Septictank Biotech model RCX 10 (10m3)
Pekerjaan sudah termasuk penggalian dan
pengurugan, pondasi struktur.

Material bantu (socker, klem, lem dll.)

b
1

Lantai - 1
Pipa
- dia. 4"
- dia. 3"
- dia. 2"
- dia.11/2"
Pipa Tegak
- dia. 6"
- dia. 4"
- dia. 3"
- dia. 2"
Tee-Wye
- dia. 6" x 4" x 6"
- dia. 4" x 4" x 4"
- dia. 4" x 3" x 4"
- dia. 4" x 2" x 4"
- dia. 3" x 2" x 3"
- dia. 3" x 1 1/2" x 3"
- dia. 2" x 2" x 2"
- dia. 2" x 1 1/2" x 2"
- dia. 1 1/2" x 1 1/2" x 1 1/2"

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

NO

URAIAN PEKERJAAN

5
6

Elbow
- dia. 4"
- dia. 2"
- dia. 1 1/2"
Floor drain dia 2"
Material bantu (socker, klem, lem dll.)

Lantai 2

5
6

Pipa
- dia. 4"
- dia. 3"
- dia. 2"
- dia.1 1/2"
Pipa Tegak
- dia. 6"
- dia. 4"
- dia. 3"
- dia. 2"
Tee-Wye
- dia. 6" x 4" x 6"
- dia. 4" x 4" x 4"
- dia. 4" x 3" x 4"
- dia. 4" x 2" x 4"
- dia. 4" x 1 1/2" x 4"
- dia. 3" x 2" x 3"
- dia. 3" x 1 1/2" x 3"
- dia. 2" x 2" x 2"
- dia. 2" x 1 1/2" x 2"
- dia. 1 1/2" x 1 1/2" x 1 1/2"
Elbow
- dia. 4"
- dia. 2"
- dia. 1 1/2"
Floor drain dia 2"
Material bantu (socker, klem, lem dll.)

Lantai 3

Pipa
- dia. 4"
- dia. 3"
- dia. 2"
- dia.1 1/2"
Pipa Tegak
- dia. 6"
- dia. 4"
- dia. 3"

VOLUME

SAT

6.00
12.00
14.00
6.00
1.00

bh
bh
bh
bh
ls

18.00
12.00
50.00
46.00

m
m
m
m

4.00
4.00
4.00
4.00

m
m
m
m

1.00
5.00
1.00
1.00
1.00
7.00
2.00
4.00
5.00
4.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

5.00
16.00
20.00
5.00
1.00

bh
bh
bh
bh
ls

18.00
12.00
42.00
20.00

m
m
m
m

4.00
4.00
4.00

m
m
m

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

NO

URAIAN PEKERJAAN

5
6

Tee-Wye
- dia. 6" x 4" x 6"
- dia. 4" x 4" x 4"
- dia. 4" x 3" x 4"
- dia. 4" x 2" x 4"
- dia. 4" x 1 1/2" x 4"
- dia. 3" x 2" x 3"
- dia. 3" x 1 1/2" x 3"
- dia. 2" x 2" x 2"
- dia. 2" x 1 1/2" x 2"
- dia. 1 1/2" x 1 1/2" x 1 1/2"
Elbow
- dia. 4"
- dia. 2"
- dia. 1 1/2"
Floor drain dia 2"
Material bantu (socker, klem, lem dll.)

Lantai 4

Pipa
- dia. 4"
- dia. 3"
- dia. 2"
- dia.1 1/2"
Pipa Tegak
- dia. 6"
- dia. 4"
- dia. 3"
Tee-Wye
- dia. 6" x 4" x 6"
- dia. 4" x 4" x 4"
- dia. 4" x 3" x 4"
- dia. 4" x 2" x 4"
- dia. 4" x 1 1/2" x 4"
- dia. 3" x 2" x 3"
- dia. 3" x 1 1/2" x 3"
- dia. 2" x 2" x 2"
- dia. 2" x 1 1/2" x 2"
- dia. 1 1/2" x 1 1/2" x 1 1/2"
Elbow
- dia. 4"
- dia. 2"
- dia. 1 1/2"
Floor drain dia 2"
Material bantu (socker, klem, lem dll.)

5
6

VOLUME

SAT

1.00
5.00
1.00
1.00
1.00
7.00
2.00
2.00
3.00
6.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

5.00
16.00
17.00
5.00
1.00

bh
bh
bh
bh
ls

18.00
12.00
48.00
46.00

m
m
m
m

4.00
4.00
4.00

m
m
m

1.00
5.00
1.00
1.00
1.00
5.00
2.00
3.00
6.00
6.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

5.00
17.00
18.00
5.00
1.00

bh
bh
bh
bh
ls

HARGA SATUAN
(Rp)

Sub Total
f

TESTING & COMMISSIONING

1.00

ls
Sub Total
Jumlah Total

JUMLAH HARGA
(Rp)

RENCANA ANGGARAN BIAYA


PEKERJAAN INSTALASI AC
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
NO

URAIAN PEKERJAAN

VOLUME

SAT

6.00

set

6.00

ttk

2.00
3.00
18.00
3.00
5.00
2.00

unit
unit
m
bh
bh
bh

6.00

set

6.00

ttk

2.00
2.00
1.00
14.00
3.00
5.00
2.00

unit
unit
unit
m
bh
bh
bh

V.III PEKERJAAN INSTALASI AIR CONDITIONER


a

Lantai 1

Instalasi Pemipaan Refrigerant & Drain


Instalasi pemipaan refrigerant dengan pipa tembaga
type L, lengkap dengan isolasi dan tray.
- Instalasi pipa untuk IO/OU 1 PK s/d 4 PK
Pemipaan dengan pipa PVC kelas AW, lengkap
dengan isolasi pipa.
Instalasi Kabel Power & Kontrol
- AC 1 s/d 4 PK
Kabel NYM 3 x 2,5 sqmm + NYMHY 3 x 2,5 sqmm
didalam conduit PVC high-impact heavy duty
Instalasi Exhaust Fan, setara KDK
Pengadaan exhaust lengkap dgn Instalasi power listrik
- Kapasitas 270 cmh (ceiling Type)
- Kapasitas 210 cmh (ceiling Type)
- Pipa PVC AW dia. 6"
- Tee dia. 6" x 6" x 6"
- Ell bow dia. 6"
- Exhaust Air Louvre 300 x 200 mm

Lantai 2

Instalasi Pemipaan Refrigerant & Drain


Instalasi pemipaan refrigerant dengan pipa tembaga
type L, lengkap dengan isolasi dan tray.
- Instalasi pipa untuk IO/OU 3/4 PK s/d 3 PK
Pemipaan dengan pipa PVC kelas AW, lengkap
dengan isolasi pipa.
Instalasi Kabel Power & Kontrol
- AC 3/4 s/d 3 PK
Kabel NYM 3 x 2,5 sqmm + NYMHY 3 x 2,5 sqmm
didalam conduit PVC high-impact heavy duty
Instalasi Exhaust Fan, setara KDK
Pengadaan exhaust lengkap dgn Instalasi power listrik
- Kapasitas 320 cmh (ceiling Type)
- Kapasitas 250 cmh (ceiling Type)
- Kapasitas 135 cmh (ceiling Type)
- Pipa PVC AW dia. 6"
- Tee dia. 6" x 6" x 6"
- Ell bow dia. 6"
- Exhaust Air Louvre 300 x 200 mm

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

NO

URAIAN PEKERJAAN

Lantai 3

Instalasi Pemipaan Refrigerant & Pipa Drain


Instalasi pemipaan refrigerant dengan pipa tembaga
type L, lengkap dengan isolasi dan tray.
- Instalasi pipa untuk IO/OU 1 PK s/d 5 PK
Pemipaan dengan pipa PVC kelas AW, lengkap
dengan isolasi pipa.
Instalasi Kabel Power & Kontrol
- AC 1 s/d 5 PK
Kabel NYM 3 x 2,5 sqmm + NYMHY 3 x 2,5 sqmm
didalam conduit PVC high-impact heavy duty
Instalasi Exhaust Fan, setara KDK
Pengadaan exhaust lengkap dgn Instalasi power listrik
- Kapasitas 320 cmh (ceiling Type)
- Pipa PVC AW dia. 6"
- Tee dia. 6" x 6" x 6"
- Ell bow dia. 6"
- Exhaust Air Louvre 300 x 200 mm

Lantai 4

Instalasi Pemipaan Refrigerant & Pipa Drain


Instalasi pemipaan refrigerant dengan pipa tembaga
type L, lengkap dengan isolasi dan tray.
- Instalasi pipa untuk IO/OU 4 PK
Pemipaan dengan pipa PVC kelas AW, lengkap
dengan isolasi pipa.
Instalasi Kabel Power & Kontrol
- AC 4 PK
Kabel NYM 3 x 2,5 sqmm + NYMHY 3 x 2,5 sqmm
didalam conduit PVC high-impact heavy duty
Instalasi Exhaust Fan, setara KDK
Pengadaan exhaust lengkap dgn Instalasi power listrik
- Kapasitas 320 cmh (ceiling Type)
- Pipa PVC AW dia. 6"
- Tee dia. 6" x 6" x 6"
- Ell bow dia. 6"
- Exhaust Air Louvre 300 x 200 mm

VOLUME

SAT

6.00

set

6.00

ttk

2.00
10.00
2.00
4.00
2.00

unit
m
bh
bh
bh

4.00

set

4.00

ttk

2.00
10.00
2.00
4.00
2.00

unit
m
bh
bh
bh

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Total

RENCANA ANGGARAN BIAYA


PEKERJAAN FRE HYDRANT
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
NO.
V.IV.

1.1
a

1.2
a

1.3

URAIAN PEKERJAAN

VOLUME

SAT

1.00

unit

1.00

unit

1.00

unit

HARGA SATUAN
(Rp)

PEKERJAAN FIRE HYDRANT


PERALATAN UTAMA DI RUANG POMPA
Electric Main Pump
Pompa
Jenis
: horizontal single/multi stage
centrifugal pump, self priming.
Debit
: 500 USGPM
Head
: 60 m
Efisiensi
: 70 % minimum
Kecepatan putar
: 2900 rpm
Motor Penggerak
Jenis
: 3 phase TEFC induction
Tegangan
: 380/660 V
Starter
: wye-delta
Daya poros
: 35.000 VA (min)
Kopling
: direct, base skid mounted
Kecepatan putar
: 2900 rpm
Electric Jockey Pump
Pompa
Jenis
: multi stage
centrifugal pump, self priming
Debit
: 50 USGPM
Head
: 60 m
Efisiensi
: 70 % minimum
Kecepatan putar
: 1450 rpm
Motor Penggerak
Jenis
: 3 phase TEFC induction
Tegangan
: 380/660 V
Starter
: wye-delta
Daya poros
: 3.500 (min)
Kopling
direct, base skid mounted
Kecepatan putar
: 1450 rpm
Diesel Main Pump

SUB TOTAL I

JUMLAH HARGA
(Rp)

NO.

URAIAN PEKERJAAN

II

INSTALASI PEMIPAAN

2.1

Pemipaan di Ruang Pompa

VOLUME

SAT

6.00

16.00
6.00
6.00
6.00
6.00
6.00

m
m
m
m
m
m

3.00
1.00
2.00
2.00
1.00
3.00

bh
bh
bh
bh
bh
bh

4.00
2.00
2.00
4.00

bh
bh
bh
bh

3.00
2.00
2.00
2.00
1.00
2.00

bh
bh
bh
bh
bh
bh

2.00
1.00

bh
bh

2.00
2.00
1.00
1.00

bh
bh
bh
bh

2.00
1.00
2.00
4.00
3.00
1.00
1.00

bh
bh
bh
bh
bh
bh
unit

1.00
1.00

bh
ls

Pemipaan menggunakan BSP sch. 40, ASTM A-120


di cat warna merah.
a
b

i
j
k
l
m
n
o

Header dia. 8"


Pipa
- dia. 6"
- dia. 5"
- dia. 4"
- dia. 3"
- dia. 2 1/2"
- dia. 2"
Tee
- dia 8" x 6" x 8"
- dia 8" x 5" x 8"
- dia 8" x 4" x 8"
- dia 8" x 3" x 8"
- dia 8" x 2 1/2" x 8"
- dia 8" x 2" x 8"
Elbow
- dia. 6"
- dia. 4"
- dia. 3"
- dia. 2"
Gate Valve
- dia. 6" (150 psi-flanged)
- dia. 5" (150 psi-flanged)
- dia. 4" (150 psi-flanged)
- dia. 3" (125 psi-flanged)
- dia. 2 1/2" (150 psi-flanged)
- dia. 2" (125 psi-screwed)
Check Valve
- dia. 4" (150 psi - flanged)
- dia. 2 1/2" (150 psi-flanged)
Double Sphere Flexible Joint
- dia. 5" (flanged)
- dia. 4" (flanged)
- dia. 2 1/2" (flanged)
- dia. 2" (flanged)
Strainer
- dia. 5" (flanged)
- dia. 2 1/2" (flanged)
Foot valve dia. 6" (flanged)
Pressure gauge 0 - 15 kg/cm2
Pressure switch
Savety valve 12 kg/cm2 dia. 2" (flanged)
Pressure tank 1000 lt, 15 kg/cm2 lengkap dgn.
accessories
Air Relase Valve (ARV) dia. 2"
Material bantu (mur-baut,flens,support,klem ,
fitting dll)

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

NO.

2.2

b
c
c
f

g
2.3

b
c
e
f

g
2.4

b
c
e
f

URAIAN PEKERJAAN

VOLUME

SAT

4.00
24.00

m
m

3.00

bh

1.00
1.00
4.00

bh
bh
bh

1.00

ls

4.00
18.00

m
m

3.00

bh

1.00
1.00
4.00

bh
bh
bh

1.00

ls

4.00
24.00

m
m

3.00

bh

1.00
1.00
4.00

bh
bh
bh

1.00

ls

Ground floor
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)
Pipa
- dia. 6" (Pipa Tegak)
- dia. 2 1/2"
Elbow
- dia 2 1/2"
Tee
- dia 6" x 2 1/2" x 6"
Indoor hydrant box lengkap
Multipurpose dry chemical fire extinguisher
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
Material bantu (mur-baut, flange, socket dll.)
Lantai 1
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)
Pipa
- dia. 6" (Pipa Tegak)
- dia. 2 1/2"
Elbow
- dia 2 1/2"
Tee
- dia 6" x 2 1/2" x 6"
Indoor hydrant box lengkap
Multipurpose dry chemical fire extinguisher
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
Material bantu (mur-baut, flange, socket dll.)
Lantai 2
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)
Pipa
- dia. 6" (Pipa Tegak)
- dia. 2 1/2"
Elbow
- dia 2 1/2"
Tee
- dia 6" x 2 1/2" x 6"
Indoor hydrant box lengkap
Multipurpose dry chemical fire extinguisher
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
Material bantu (mur-baut, flange, socket dll.)

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

NO.
2.5

b
c
d
e
f

g
2.6

a
b

c
e
f
g

URAIAN PEKERJAAN

VOLUME

SAT

4.00
22.00

m
m

3.00

bh

1.00
1.00
1.00
4.00

bh
bh
bh
bh

1.00

ls

22.00

1.00
10.00

bh
bh

1.00
1.00
1.00
4.00

bh
bh
bh
bh

1.00

ls

HARGA SATUAN
(Rp)

Lantai 3
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)
Pipa
- dia. 4" (Pipa Tegak)
- dia. 2 1/2"
Elbow
- dia 2 1/2"
Tee
- dia 4" x 2 1/2" x 4"
Reducer dia 6" x 4"
Indoor hydrant box lengkap
Multipurpose dry chemical fire extinguisher
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
Material bantu (mur-baut, flange, socket dll.)
Lantai 4
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)
Pipa
- dia. 2 1/2"
Elbow
- dia. 4"
- dia 2 1/2"
Tee
- dia 4" x 2 1/2" x 4"
Air release valve dia. 4"
Indoor hydrant box lengkap
Multipurpose dry chemical fire extinguisher
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
Material bantu (mur-baut, flange, socket dll.)

SUB TOTAL II
III

TESTING & COMMISSIONING

1.00

ls
SUB TOTAL III
TOTAL

JUMLAH HARGA
(Rp)

RENCANA ANGGARAN BIAYA


PEKERJAAN SPRINKLER
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
NO.

URAIAN PEKERJAAN

V.V.
1

INSTALASI SPRINKLER
INSTALASI PEMIPAAN

1.1

Ground floor
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah

f
g

Pipa Distribusi
- dia. 2 1/2"
- dia. 2"
- dia. 1 1/2"
- dia. 1 1/4"
- dia. 1"
Pipa Tegak
- dia. 6" (flanged setiap 3 batang)
- dia. 2" (flanged setiap 3 batang)
Tee
- dia. 6" x 2 1/2" x 6" (flanged)
- dia. 2 1/2" x 2 1/2" x 2 1/2"
- dia. 2 1/2" x 1 1/2" x 2 1/2"
- dia. 2 1/2" x 1 1/4" x 2 1/2"
- dia. 2" x 1 1/2" x 2"
- dia. 1 1/2" x 1 1/2" x 1 1/2"
- dia. 1 1/2" x 1" x 1 1/2"
- dia. 1 1/4" x 1" x 1 1/4"
- dia. 1" x 1" x 1"
Elbow
- dia. 1 1/2"
- dia. 1"
Reducer
- dia. 2 1/2" x 2"
- dia. 2" x 1 1/2"
- dia. 1 1/2" x 1"
- dia. 1 1/4" x 1"
Red bulb pendant sprinkler head dia. 1/2"
Ex Viking atau setara
Gate Valve
- dia. 2 1/2" (150 psi-screwed)
- dia. 1 1/2" (150 psi-screwed)
Flow switch dia. 2 1/2", termasuk penarikan
kabel ke zona fire alarm terdekat
Ex Viking atau setara
Material bantu ( hanger, flens, mur-baut dll.)

SAT

VOLUME

m
m
m
m
m

8.00
4.00
40.00
6.00
38.00

m
m

4.00
4.00

bh
bh
bh
bh
bh
bh
bh
bh
bh

1.00
2.00
1.00
1.00
1.00
1.00
6.00
1.00
4.00

bh
bh

2.00
6.00

bh
bh
bh
bh
bh

1.00
1.00
3.00
1.00
15.00

bh
bh
bh

2.00
1.00
1.00

ls

1.00

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

NO.

1.2

e
f
g
h

URAIAN PEKERJAAN

SAT

VOLUME

Lantai 1
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah
Pipa Distribusi
- dia. 1 1/2"
- dia. 1"
Pipa Tegak
- dia. 6" (flanged setiap 3 batang)
- dia. 2" (flanged setiap 3 batang)
Tee
- dia. 6" x 2 1/2" x 6" (flanged)
- dia. 2 1/2" x 2 1/2" x 2 1/2"
- dia. 2 1/2" x 1 1/2" x 2 1/2"
- dia. 2 1/2" x 1 1/4" x 2 1/2"
- dia. 2" x 1 1/2" x 2"
- dia. 1 1/2" x 1 1/2" x 1 1/2"
- dia. 1 1/2" x 1" x 1 1/2"
- dia. 1 1/4" x 1" x 1 1/4"
- dia. 1" x 1" x 1"
Elbow
- dia. 1 1/2"
- dia. 1"
Reducer
- dia. 1 1/2" x 1"
Red bulb pendant sprinkler head dia. 1/2"
Ex Viking atau setara
Gate Valve
- dia. 1 1/2" (150 psi-screwed)
Flow switch dia. 1 1/2", termasuk penarikan
kabel ke zona fire alarm terdekat
Ex Viking atau setara
Material bantu ( hanger, flens, mur-baut dll.)

m
m

24.00
16.00

m
m

4.00
4.00

bh
bh
bh
bh
bh
bh
bh
bh
bh

1.00
2.00
1.00
1.00
1.00
1.00
6.00
1.00
4.00

bh
bh

2.00
3.00

bh
bh

1.00
5.00

bh
bh

3.00
1.00

ls

1.00

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

NO.

1.3

f
g

URAIAN PEKERJAAN

SAT

VOLUME

Lantai 2
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah
Pipa Distribusi
- dia. 2 1/2"
- dia. 2"
- dia. 1 1/2"
- dia. 1 1/4"
- dia. 1"
Pipa Tegak
- dia. 6" (flanged setiap 3 batang)
- dia. 2" (flanged setiap 3 batang)
Tee
- dia. 6" x 2 1/2" x 6" (flanged)
- dia. 2 1/2" x 2 1/2" x 2 1/2"
- dia. 2 1/2" x 1 1/2" x 2 1/2"
- dia. 2" x 1 1/2" x 2"
- dia. 1 1/2" x 2 1/2" x 1 1/2"
- dia. 1 1/2" x 1 1/2" x 1 1/2"
- dia. 1 1/2" x 1" x 1 1/2"
- dia. 1 1/4" x 1" x 1 1/4"
- dia. 1" x 1" x 1"
Elbow
- dia. 2 1/2"
- dia. 1 1/2"
- dia. 1"
Reducer
- dia. 2 1/2" x 2"
- dia. 2" x 1 1/2"
- dia. 1 1/2" x 1 1/4"
- dia. 1 1/2" x 1"
- dia. 1 1/4" x 1"
Red bulb pendant sprinkler head dia. 1/2"
Ex Viking atau setara
Gate Valve
- dia. 2 1/2" (150 psi-screwed)
- dia. 1 1/2" (150 psi-screwed)
Flow switch dia. 2 1/2", termasuk penarikan
kabel ke zona fire alarm terdekat
Ex Viking atau setara
Material bantu ( hanger, flens, mur-baut dll.)

m
m
m
m
m

14.00
4.00
44.00
6.00
42.00

m
m

4.00
4.00

bh
bh
bh
bh
bh
bh
bh
bh
bh

1.00
2.00
3.00
1.00
1.00
1.00
8.00
1.00
4.00

bh
bh
bh

2.00
4.00
9.00

bh
bh
bh
bh
bh
bh

1.00
1.00
1.00
3.00
1.00
17.00

bh
bh
bh

2.00
1.00
1.00

ls

1.00

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

NO.

1.4

b
c

f
g

URAIAN PEKERJAAN

SAT

VOLUME

Lantai 3
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah
Pipa Distribusi
- dia. 2 1/2"
- dia. 2"
- dia. 1 1/2"
- dia. 1 1/4"
- dia. 1"
Pipa Tegak
- dia. 4" (flanged setiap 3 batang)
Tee
- dia. 4" x 2 1/2" x 4" (flanged)
- dia. 4" x 1 1/2" x 4" (flanged)
- dia. 2 1/2" x 2 1/2" x 2 1/2"
- dia. 2 1/2" x 1 1/2" x 2 1/2"
- dia. 2" x 1 1/2" x 2"
- dia. 2 1/2" x 1 1/4" x 2 1/2"
- dia. 1 1/2" x 2 1/2" x 1 1/2"
- dia. 1 1/2" x 1 1/2" x 1 1/2"
- dia. 1 1/2" x 1" x 1 1/2"
- dia. 1 1/4" x 1" x 1 1/4"
- dia. 1" x 1" x 1"
Elbow
- dia. 2 1/2"
- dia. 1 1/2"
- dia. 1"
Reducer
- dia. 2 1/2" x 2"
- dia. 2" x 1 1/2"
- dia. 1 1/2" x 1 1/4"
- dia. 1 1/4" x 1"
Red bulb pendant sprinkler head dia. 1/2"
Ex Viking atau setara
Gate Valve
- dia. 2 1/2" (150 psi-flanged)
- dia. 1 1/2" (150 psi-flanged)
Flow switch dia. 2 1/2", termasuk penarikan
kabel ke zona fire alarm terdekat
Ex Viking atau setara
Material bantu ( hanger, flens, mur-baut dll.)

m
m
m
m
m

14.00
4.00
46.00
18.00
32.00

8.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
4.00
5.00
5.00

bh
bh
bh

2.00
7.00
6.00

bh
bh
bh
bh
bh

1.00
1.00
4.00
5.00
23.00

bh
bh
bh

2.00
1.00
1.00

ls

1.00

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

NO.

1.5

b
c

f
g

URAIAN PEKERJAAN

SAT

VOLUME

HARGA SATUAN (Rp)

Lantai 4
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah
Pipa Distribusi
- dia. 2 1/2"
- dia. 2"
- dia. 1 1/2"
- dia. 1 1/4"
- dia. 1"
Pipa Tegak
- dia. 4" (flanged setiap 3 batang)
Tee
- dia. 4" x 2 1/2" x 4" (flanged)
- dia. 4" x 1 1/2" x 4" (flanged)
- dia. 2 1/2" x 2 1/2" x 2 1/2"
- dia. 2 1/2" x 1 1/2" x 2 1/2"
- dia. 2" x 1 1/2" x 2"
- dia. 2 1/2" x 1 1/4" x 2 1/2"
- dia. 1 1/2" x 2 1/2" x 1 1/2"
- dia. 1 1/2" x 1 1/2" x 1 1/2"
- dia. 1 1/2" x 1" x 1 1/2"
- dia. 1 1/4" x 1" x 1 1/4"
- dia. 1" x 1" x 1"
Elbow
- dia. 2 1/2"
- dia. 1 1/2"
- dia. 1"
Reducer
- dia. 2 1/2" x 2"
- dia. 2" x 1 1/2"
- dia. 1 1/2" x 1 1/4"
- dia. 1 1/4" x 1"
Red bulb pendant sprinkler head dia. 1/2"
Ex Viking atau setara
Gate Valve
- dia. 2 1/2" (150 psi-flanged)
- dia. 1 1/2" (150 psi-flanged)
Flow switch dia. 2 1/2", termasuk penarikan
kabel ke zona fire alarm terdekat
Ex Viking atau setara
Material bantu ( hanger, flens, mur-baut dll.)

m
m
m
m
m

10.00
4.00
36.00
16.00
30.00

8.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
4.00
5.00
5.00

bh
bh
bh

2.00
8.00
6.00

bh
bh
bh
bh
bh

1.00
1.00
4.00
5.00
23.00

bh
bh
bh

2.00
1.00
1.00

ls

1.00
SUB TOTAL I

II

TESTING & COMMISSIONING

ls

1.00
SUB TOTAL II
TOTAL

JUMLAH HARGA (Rp)

RENCANA ANGGARAN BIAYA


PEKERJAAN PERSIAPAN, STRUKTUR DAN ARSITEKTURAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KANTOR KEMENTERIAN PPN/BAPPENAS JAKARTA
LOKASI : JL. PROKLAMASI NO.70 JAKARTA PUSAT

NO.
I.
1
2
3
4
5
6
7
8
9
10
11

II
A
1
2
3
4
5
6
7
8

URAIAN PEKERJAAN

VOL. SAT.

HARGA SATUAN
Rp

PEKERJAAN PERSIAPAN
Biaya Administrasi & Dokumentasi
Pek. Mobilisasi dan Demobilisasi
Pembuatan Gambar As-Built Drawing
Pek. Kantor Direksi 2 Lantai
Pek. Pagar Pengaman (seng gelombang tinggi 2 m)
Pek. Papan Proyek
Pek. Keamanan Proyek
Pek. Pembersihan Site (buang puing, semak2 & Tebang Pohon)
Pek. Penyediaan Lift barang
Pekerjaan Pengukuran & Bouwplank
Tower Crane (sewa)

1
1
1
36
20
1
4
745
1
110
4

ls
ls
ls
m2
m'
ls
bln
m2
ls
m'
bln
PEKERJAAN PERSIAPAN

PEKERJAAN STRUKTUR
PEKERJAAN PONDASI TIANG PANCANG
Mobilisasi de mobilisasi tiang pancang
Pondasi Tiang Pancang 40 Type P-1
Pondasi Tiang Pancang 40 Type P-3
Pondasi Tiang Pancang 40 Type P-4
Pondasi Tiang Pancang 40 Type P-9
Sambungan Tiang Pancang
Bobokan Tiang Pancang
Loading Test

1
144
720
192
216
53
53
2

ls
m1
m1
m1
m1
ttk
ttk
ttk
PEKERJAAN PONDASI

3
1
0
2
606
12

m3
m3
m3
m3
kg
m2

28
3
1
19
2989
1580
19

m3
m3
m3
m3
kg
kg
m2

12
1
1
8
8
1281
677
19

m3
m3
m3
m3
m3
kg
kg
m2

6
1
0
5
847
18

m3
m3
m3
m3
kg
m2

PEKERJAAN PILE CAP PONDASI DAN DINDING PIT LIFT


1 Poer Beton Type P-1
- Galian tanah
- Pasir Urug dipadatkan t=10 cm
- Lantai kerja 1:3:5 t=5 cm
- Cor Beton Ready Mix K-300
- Besi D-16
- Bekisting Pasangan Bata
2 Poer Beton Type P-3
- Galian tanah
- Pasir Urug dipadatkan t=10 cm
- Lantai kerja 1:3:5 t=5 cm
- Cor Beton Ready Mix K-300
- Besi D-22
- Besi D-16
- Bekisting Pasangan Bata
3 Poer Beton Type P-3A
- Galian tanah
- Pasir Urug dipadatkan t=10 cm
- Lantai kerja 1:3:5 t=5 cm
- Cor Beton Ready Mix K-300
- Water proofing interaged
- Besi D-22
- Besi D-16
- Bekisting Pasangan Bata
4 Poer Beton Type P-4
- Galian tanah
- Pasir Urug dipadatkan t=10 cm
- Lantai kerja 1:3:5 t=5 cm
- Cor Beton Ready Mix K-300
- Besi D-22
- Bekisting Pasangan Bata

JUMLAH HARGA
Rp

5 Poer Beton Type P-4A


- Galian tanah
- Pasir Urug dipadatkan t=10 cm
- Lantai kerja 1:3:5 t=5 cm
- Cor Beton Ready Mix K-300
- Water proofing interaged
- Besi D-22
- Bekisting Pasangan Bata
6 Poer Beton Type P-9
- Galian tanah
- Pasir Urug dipadatkan t=10 cm
- Lantai kerja 1:3:5 t=5 cm
- Cor Beton Ready Mix K-300
- Water proofing interaged
- Besi D-19
- Bekisting Pasangan Bata
7 Dinding Pit Lift t=20 cm
- Galian tanah
- Cor Beton Ready Mix K-300
- Water proofing interaged
- Besi D-13
- Besi 10 ( Sengkang )
- Bekisting Pasangan Bata
- Bekisting Multi t=9 mm
- Stoot werk
- Bongkar bekesting
8 Pekerjaan Anti Rayap
- Anti rayap

6
1
0
5
5
847
9

m3
m3
m3
m3
m3
kg
m2

14
1
1
10
10
2474
21

m3
m3
m3
m3
m3
kg
m2

11
3
3
229
136
15
14
14
14

m3
m3
m3
kg
kg
m2
m2
m2
m2

909

m2

PEKERJAAN PILE
CAP PONDASI DAN
DINDING PIT LIFT
C
I.
1

PEKERJAAN STRUKTUR LANTAI GROUND


PEKERJAAN SLOOF, DINDING & LANTAI GROUND
Balok Beton Type SB-1 400/700
- Galian tanah
- Pasir Urug dipadatkan t=10 cm
- Lantai kerja 1:3:5 t=5 cm
- Cor Beton Ready Mix K-300
- Besi D-19
- Besi 412
- Besi 10 ( Sengkang )
- Bekisting Pasangan Bata
Balok Beton Type SB-1A 400/700
- Galian tanah
- Pasir Urug dipadatkan t=10 cm
- Lantai kerja 1:3:5 t=5 cm
- Cor Beton Ready Mix K-300
- Water proofing interaged
- Besi D-19
- Besi D-12
- Besi 10 ( Sengkang )
- Bekisting Pasangan Bata
Balok Beton Type SB-1 300/600
- Galian tanah
- Pasir Urug dipadatkan t=10 cm
- Lantai kerja 1:3:5 t=5 cm
- Cor Beton Ready Mix K-300
- Besi D-19
- Besi D-12
- Besi 10 ( Sengkang )
- Bekisting Pasangan Bata
Balok Beton Type SB-1 300/600
- Galian tanah
- Pasir Urug dipadatkan t=10 cm
- Lantai kerja 1:3:5 t=5 cm
- Cor Beton Ready Mix K-300
- Water proofing interaged
- Besi D-19

41
4
2
20
3179
281
615
101

m3
m3
m3
m3
kg
kg
kg
m2

14
1
1
7
7
1060
94
205
34

m3
m3
m3
m3
m3
kg
kg
kg
m2

26
4
2
13
2404
137
553
84

m3
m3
m3
m3
kg
kg
kg
m2

3
0
0
1
1
258

m3
m3
m3
m3
m3
kg

- Besi D-12
- Besi 10 ( Sengkang )
- Bekisting Pasangan Bata
5 Lantai Beton t=12 cm
- Cor Beton Ready Mix K-300
- Besi 10-150 (dua lapis)
- Pasir urug t=10 cm
- Lantai kerja 1:3:5 t=5 cm
- Pemeliharaan Plat lantai beton (rendam)

15
59
9

kg
kg
m2

31
5008
26
13
261

m3
kg
m3
m3
m2
Sub Jumlah

II.
1

PEKERJAAN KOLOM
Kolom Beton Type K-1 650
- Cor Beton Ready Mix K-300
- Besi D22
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
Kolom Beton Type K-2 650
- Cor Beton Ready Mix K-300
- Besi D22
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
Kolom Beton Type K-3 200/700/700
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
Kolom Beton Type K-6 400/400
- Cor Beton Ready Mix K-300
- Besi D-19
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
Kolom Beton Type K-7 650
- Cor Beton Ready Mix K-300
- Besi D22
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting

1
468
36
4
4
4

m3
kg
kg
m2
m2
m2

7
3277
251
30
30
30

m3
kg
kg
m2
m2
m2

3
1099
229
32
32
32

m3
kg
kg
m2
m2
m2

1
300
57
7
7
7

m3
kg
kg
m2
m2
m2

8
2974
296
45
45
45

m3
kg
kg
m2
m2
m2
Sub Jumlah

III.
1

PEKERJAAN TANGGA BETON


Pondasi Tangga
- Galian tanah
- Buangan tanah
- Cor Beton Ready Mix K-300
- Besi 12-150
- Besi 10-150
- Bekisting pasangan bata
Dinding Tangga
- Cor Beton Ready Mix K-300
- Besi D13-150
- Besi 10-150
- Bekisting Multiplex 9 mm
- Stoot samping
- Bongkar bekesting
Plat bordes dan Plat Tangga
- Cor Beton Ready Mix K-300
- Besi D13-150
- Besi 10-150
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
Anak Tangga
- Cor Beton Ready Mix K-300

1
1
0
14
10
0

m3
m3
m3
kg
kg
m2

0
19
11
2
2
2

m3
kg
kg
m2
m2
m2

2
177
104
11
11
11

m3
kg
kg
m2
m2
m2

m3

- Besi 8-200
- Besi 8
- Bekisting Multiplex 9 mm
- Bongkar bekesting

34
10
3
3

kg
kg
m2
m2
Sub Jumlah

IV.

PEKERJAAN TANGGA BETON (ENTRANCE)


1 Pondasi Tangga
- Galian tanah
- Buangan tanah
- Cor Beton Ready Mix K-300
- Besi 12-150
- Besi 10-150
- Bekisting pasangan bata
2 Dinding Tangga
- Cor Beton Ready Mix K-300
- Besi D13-150
- Besi 10-150
- Bekisting Multiplex 9 mm
- Stoot samping
- Bongkar bekesting
3 Plat bordes dan Plat Tangga
- Cor Beton Ready Mix K-300
- Besi D16-150
- Besi D13-150
- Besi 10-150
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting

2
2
0
25
17
1

m3
m3
m3
kg
kg
m2

0
34
20
3
3
3

m3
kg
kg
m2
m2
m2

4
941
676
429
45
45
45

m3
kg
kg
kg
m2
m2
m2
Sub Jumlah

V.

PEKERJAAN GROUND RESERVOAR


1 Galian Tanah
- Galian
- Buangan tanah
2 Plat lantai
- Cor Beton Ready Mix K-300
- Water proofing interaged
- Besi D16-150
- Pasir urug dipadatkan t=10 cm
- Lantai Kerja t=5 cm (1:3:5)
3 Dinding pinggir t=25 cm
- Cor Beton Ready Mix K-300
- Water proofing interaged
- Besi D13-150
- Besi D10-150
- Bekisting Pasangan Bata
- Bekisting Multiplex 9 mm
- Bongkar bekesting
4 Dinding tengah t=20 cm
- Cor Beton Ready Mix K-300
- Water proofing interaged
- Besi D13-150
- Besi D10-150
- Bekisting Multiplex 9 mm
- Bongkar bekesting
5 Penutup lantai t=15 cm
- Cor Beton Ready Mix K-300
- Besi 10-150
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
- Penutup plat baja man hole

171
171

m3
m3

15
15
2436
5
2

m3
m3
kg
m3
m3

17
17
1127
669
69
69
69

m3
m3
kg
kg
m2
m2
m2

3
3
203
121
25
25

m3
m3
kg
kg
m2
m2

7
869
45
45
45
1

m3
kg
m2
m2
m2
bh
Sub Jumlah
PEKERJAAN
STRUKTUR
LANTAI GROUND

D
I
1

PEKERJAAN STRUKTUR LANTAI SATU


PEKERJAAN BALOK DAN PLAT
Balok Beton Type B1-1 (400/650)
- Cor Beton Ready Mix K-300
- Besi D22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multi 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B1-2 (400/650)
- Cor Beton Ready Mix K-300
- Besi D-22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B1-3 (400/600)
- Cor Beton Ready Mix K-300
- Besi D-22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B1-4 (400/600)
- Cor Beton Ready Mix K-300
- Besi D-22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm

8
1751
60
429
45
25
45

m3
kg
kg
kg
m2
m2
m2

6
1062
45
256
33
18
33

m3
kg
kg
kg
m2
m2
m2

13
2297
107
583
71
44
71

m3
kg
kg
kg
m2
m2
m2

1
170
10
104
7

m3
kg
kg
kg
m2

10

11

12

- Stoot werk (scafolding)


- Bongkar bekesting
Balok Beton Type B1-5 (250/500)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B1-6 (250/500)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B1-7 (200/730)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B1-7A (200/650)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B1-8 (250/400)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 212 ( Pinggang )
- Besi 12 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B1-9 200/400
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 12 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B1-10 400/500
- Cor Beton Ready Mix K-300
- Besi D-22
- Besi 210 ( Pinggang )
- Besi 12 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B1-11 250/400
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 12 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting

4
7

m2
m2

7
1070
81
331
57
36
57

m3
kg
kg
kg
m2
m2
m2

5
731
48
204
40
25
40

m3
kg
kg
kg
m2
m2
m2

0
33
9
19
2
1
2

m3
kg
kg
kg
m2
m2
m2

0
86
24
29
5
2
5

m3
kg
kg
kg
m2
m2
m2

1
138
39
55
7
6
7

m3
kg
kg
kg
m2
m2
m2

3
495
68
150
24
21
24

m3
kg
kg
kg
m2
m2
m2

1
169
8
51
5
3
5

m3
kg
kg
kg
m2
m2
m2

1
112
13
36
7
5
7

m3
kg
kg
kg
m2
m2
m2

13 Balok Beton Type B1-12 200/400/10


- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 310 ( Pinggang )
- Besi 12 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
14 Lantai Beton t=12 cm
- Cor Beton Ready Mix K-300
- Besi WM8-150
- Bekisting Multi 9 mm
- Stoot werk (scafolding)
- Pemeliharaan Plat lantai beton (rendam)
- Bongkar bekesting

1
144
28
60
12
7
12

m3
kg
kg
m2
m2
m2
m2

27
453
226
226
226
226

m3
m2
m2
m2
m2
m2
Sub Jumlah

II.

PEKERJAAN TANGGA BETON


1 Plat bordes dan Plat Tangga
- Cor Beton Ready Mix K-300
- Besi D13-150
- Besi 10-150
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
2 Anak Tangga
- Cor Beton Ready Mix K-300
- Besi 8-200
- Besi 8
- Bekisting Multiplex 9 mm
- Bongkar bekesting

2
219
130
14
14
14

m3
kg
kg
m2
m2
m2

1
60
17
6
6

m3
kg
kg
m2
m2
Sub Jumlah

III.
1

PEKERJAAN KOLOM
Kolom Beton Type K-1 650
- Cor Beton Ready Mix K-300
- Besi D22
- Besi D-10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
Kolom Beton Type K-2 650
- Cor Beton Ready Mix K-300
- Besi D22
- Besi D-10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
Kolom Beton Type K-3 200/700/700
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi D-10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
Kolom Beton Type K-6 400/400
- Cor Beton Ready Mix K-300
- Besi D-19
- Besi D-10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
Kolom Beton Type K-7 650
- Cor Beton Ready Mix K-300
- Besi D22
- Besi D-10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting

1
468
53
9
9
9

m3
kg
kg
m2
m2
m2

10
2809
371
61
61
61

m3
kg
kg
m2
m2
m2

4
1056
340
48
48
48

m3
kg
kg
m2
m2
m2

1
300
85
14
14
14

m3
kg
kg
m2
m2
m2

9
2300
191
49
49
49

m3
kg
kg
m2
m2
m2
Subjumlah

PEKERJAAN
STRUKTUR LANTAI
SATU

E
I
1

PEKERJAAN STRUKTUR LANTAI DUA


PEKERJAAN BALOK DAN PLAT
Balok Beton Type B2-1 (400/650)
- Cor Beton Ready Mix K-300
- Besi D22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multi 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B2-2 (400/650)
- Cor Beton Ready Mix K-300
- Besi D-22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B2-3 (400/600)
- Cor Beton Ready Mix K-300
- Besi D-22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B2-4 (400/600)
- Cor Beton Ready Mix K-300
- Besi D-22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B2-5 (250/500)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B2-6 (250/500)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B2-7 (200/730)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B2-7A (200/650)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B2-8 (250/400)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 212 ( Pinggang )

8
1728
59
423
44
24
44

m3
kg
kg
kg
m2
m2
m2

6
1062
45
256
33
18
33

m3
kg
kg
kg
m2
m2
m2

10
1661
78
422
52
32
52

m3
kg
kg
kg
m2
m2
m2

1
170
10
104
7
4
7

m3
kg
kg
kg
m2
m2
m2

7
1070
81
331
57
36
57

m3
kg
kg
kg
m2
m2
m2

5
731
48
204
40
25
40

m3
kg
kg
kg
m2
m2
m2

0
33
9
19
2
1
2

m3
kg
kg
kg
m2
m2
m2

0
86
24
29
5
2
5

m3
kg
kg
kg
m2
m2
m2

1
138
39

m3
kg
kg

10

11

12

14

15

- Besi 12 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B2-9 200/400
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 12 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B2-14 (400/600)
- Cor Beton Ready Mix K-300
- Besi D22
- Besi 1512 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multi 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type BK-1 (400/600)
- Cor Beton Ready Mix K-300
- Besi D22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multi 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type BK-2 (250/400)
- Cor Beton Ready Mix K-300
- Besi D16
- Besi 4D16 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multi 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Lantai Beton t=12 cm
- Cor Beton Ready Mix K-300
- Besi WM8-150
- Bekisting Multi 9 mm
- Stoot werk
- Pemeliharaan Plat lantai beton (rendam)
- Bongkar bekesting
Plat Kanopi Beton t=12
- Cor Beton Ready Mix K-300
- Besi D13-150
- Besi 10-150
- Bekisting Multi 9 mm
- Stoot werk (scafolding)
- Pemeliharaan Plat beton (rendam)

55
7
6
7

kg
m2
m2
m2

3
483
68
261
24
21
24

m3
kg
kg
kg
m2
m2
m2

4
939
36
586
35
10
35

m3
kg
kg
kg
m2
m2
m2

3
755
25
507
11
10
11

m3
kg
kg
kg
m2
m2
m2

2
250
125
298
35
10
35

m3
kg
kg
kg
m2
m2
m2

26
430
226
226
226
226

m3
m2
m2
m2
m2
m2

3
413
245
16
16
16

m3
kg
kg
m2
m2
m2
Sub Jumlah

II.

PEKERJAAN TANGGA BETON


1 Plat bordes dan Plat Tangga
- Cor Beton Ready Mix K-300
- Besi D13-150
- Besi 10-150
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
2 Anak Tangga
- Cor Beton Ready Mix K-300
- Besi 8-200
- Besi 8
- Bekisting Multiplex 9 mm
- Bongkar bekesting

2
170
101
11
11
11

m3
kg
kg
m2
m2
m2

1
43
12
4
4

m3
kg
kg
m2
m2
Sub Jumlah

III.

PEKERJAAN KOLOM
1 Kolom Beton Type K-1 600
- Cor Beton Ready Mix K-300
- Besi D19
- Besi D-10 ( Sengkang )

1
216
42

m3
kg
kg

- Bekisting Plat baja


- Stoot werk
- Bongkar bekesting
2 Kolom Beton Type K-2 600
- Cor Beton Ready Mix K-300
- Besi D19
- Besi D-10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
3 Kolom Beton Type K-7 200/700/700
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi D-10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
4 Kolom Beton Type K-7 600
- Cor Beton Ready Mix K-300
- Besi D19
- Besi D-10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting

7
7
7

m2
m2
m2

7
1511
295
51
51
51

m3
kg
kg
m2
m2
m2

3
905
284
40
40
40

m3
kg
kg
m2
m2
m2

4
863
169
29
29
29

m3
kg
kg
m2
m2
m2
Sub Jumlah
PEKERJAAN
STRUKTUR LANTAI
DUA

F
I
1

PEKERJAAN STRUKTUR LANTAI TIGA


PEKERJAAN BALOK DAN PLAT
Balok Beton Type B3-1 (400/650)
- Cor Beton Ready Mix K-300
- Besi D22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multi 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B3-2 (400/650)
- Cor Beton Ready Mix K-300
- Besi D-22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B3-3 (400/600)
- Cor Beton Ready Mix K-300
- Besi D-22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B3-4 (400/600)
- Cor Beton Ready Mix K-300
- Besi D-22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B3-5 (250/500)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)

8
1522
59
286
44
24
44

m3
kg
kg
kg
m2
m2
m2

6
940
45
214
33
18
33

m3
kg
kg
kg
m2
m2
m2

13
2175
107
583
71
44
71

m3
kg
kg
kg
m2
m2
m2

1
170
10
104
7
4
7

m3
kg
kg
kg
m2
m2
m2

7
1070
81
331
57
36

m3
kg
kg
kg
m2
m2

- Bongkar bekesting
6 Balok Beton Type B3-6 (250/500)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
7 Balok Beton Type B3-7 (200/730)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
8 Balok Beton Type B3-7A (200/650)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
8 Balok Beton Type B3-8 (250/400)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 212 ( Pinggang )
- Besi 12 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
9 Balok Beton Type B3-9 200/400
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 12 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
14 Lantai Beton t=12 cm
- Cor Beton Ready Mix K-300
- Besi WM8-150
- Bekisting Multi 9 mm
- Stoot werk (scafolding)
- Pemeliharaan Plat lantai beton (rendam)
- Bongkar bekesting
15 Plat Kanopi Beton t=12
- Cor Beton Ready Mix K-300
- Besi D13-150
- Besi 10-150
- Bekisting Multi 9 mm
- Stoot werk (scafolding)
- Pemeliharaan Plat beton (rendam)
- Bongkar bekesting

57

m2

5
731
48
204
40
25
40

m3
kg
kg
kg
m2
m2
m2

0
33
9
19
2
1
2

m3
kg
kg
kg
m2
m2
m2

0
86
24
29
5
2
5

m3
kg
kg
kg
m2
m2
m2

1
138
39
55
7
6
7

m3
kg
kg
kg
m2
m2
m2

3
483
68
261
24
21
24

m3
kg
kg
kg
m2
m2
m2

26
430
226
226
226
226

m3
m2
m2
m2
m2
m2

3
452
268
16
16
16
16

m3
kg
kg
m2
m2
m2
m2
Sub Jumlah

II.

PEKERJAAN TANGGA BETON


1 Plat bordes dan Plat Tangga
- Cor Beton Ready Mix K-300
- Besi D13-150
- Besi 10-150
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
2 Anak Tangga
- Cor Beton Ready Mix K-300
- Besi 8-200
- Besi 8
- Bekisting Multiplex 9 mm
- Bongkar bekesting

2
170
101
11
11
11

m3
kg
kg
m2
m2
m2

1
43
12
4
4

m3
kg
kg
m2
m2

Sub Jumlah
III.
1

PEKERJAAN KOLOM
Kolom Beton Type K-1 600
- Cor Beton Ready Mix K-300
- Besi D19
- Besi D-10 ( Sengkang )
- Bekisting Plat baja
- Stoot werk
- Bongkar bekesting
Kolom Beton Type K-2 600
- Cor Beton Ready Mix K-300
- Besi D19
- Besi D-10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
Kolom Beton Type K-3 200/700/700
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi D-10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
Kolom Beton Type K-7 600
- Cor Beton Ready Mix K-300
- Besi D19
- Besi D-10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting

1
173
42
7
7
7

m3
kg
kg
m2
m2
m2

7
1209
295
51
51
51

m3
kg
kg
m2
m2
m2

3
905
284
40
40
40

m3
kg
kg
m2
m2
m2

4
691
169
29
29
29

m3
kg
kg
m2
m2
m2
Sub Jumlah
PEKERJAAN
STRUKTUR
LANTAI TIGA

G
I
1

PEKERJAAN STRUKTUR LANTAI EMPAT


PEKERJAAN BALOK DAN PLAT
Balok Beton Type B4-1 (400/650)
- Cor Beton Ready Mix K-300
- Besi D22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multi 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B4-2 (400/650)
- Cor Beton Ready Mix K-300
- Besi D-22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B4-3 (400/600)
- Cor Beton Ready Mix K-300
- Besi D-22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B4-4 (400/600)
- Cor Beton Ready Mix K-300
- Besi D-22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B4-5 (250/500)

8
1522
59
286
44
24
44

m3
kg
kg
kg
m2
m2
m2

6
940
45
214
33
18
33

m3
kg
kg
kg
m2
m2
m2

13
2175
107
583
71
44
71

m3
kg
kg
kg
m2
m2
m2

1
170
10
104
7
4
7

m3
kg
kg
kg
m2
m2
m2

- Cor Beton Ready Mix K-300


- Besi D-16
- Besi 210 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm

7
1070
81
331
57

m3
kg
kg
kg
m2

14

15

- Stoot werk (scafolding)


- Bongkar bekesting
Balok Beton Type B4-6 (250/500)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B4-7 (200/730)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B4-7A (200/650)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B4-8 (250/400)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 212 ( Pinggang )
- Besi 12 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type B4-9 200/400
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 12 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Lantai Beton t=12 cm
- Cor Beton Ready Mix K-300
- Besi WM8-150
- Bekisting Multi 9 mm
- Stoot werk
- Pemeliharaan Plat lantai beton (rendam)
- Bongkar bekesting
Plat Kanopi Beton t=12
- Cor Beton Ready Mix K-300
- Besi D13-150
- Besi 10-150
- Bekisting Multi 9 mm
- Stoot werk (scafolding)
- Pemeliharaan Plat beton (rendam)
- Bongkar bekesting

36
57

m2
m2

5
731
48
204
40
25
40

m3
kg
kg
kg
m2
m2
m2

0
33
9
19
2
1
2

m3
kg
kg
kg
m2
m2
m2

0
86
24
29
5
2
5

m3
kg
kg
kg
m2
m2
m2

1
138
39
55
7
6
7

m3
kg
kg
kg
m2
m2
m2

3
483
68
261
24
21
24

m3
kg
kg
kg
m2
m2
m2

26
430
226
226
226
226

m3
m2
m2
m2
m2
m2

3
452
268
16
16
16
16

m3
kg
kg
m2
m2
m2
m2
Sub Jumlah

II.

PEKERJAAN TANGGA BETON


1 Plat bordes dan Plat Tangga
- Cor Beton Ready Mix K-300
- Besi D13-150
- Besi 10-150
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
2 Anak Tangga
- Cor Beton Ready Mix K-300
- Besi 8-200
- Besi 8
- Bekisting Multiplex 9 mm

2
170
101
11
11
11

m3
kg
kg
m2
m2
m2

1
43
12
4

m3
kg
kg
m2

- Bongkar bekesting

m2
Sub Jumlah

III.

PEKERJAAN KOLOM
1 Kolom Beton Type K-2 600
- Cor Beton Ready Mix K-300
- Besi D19
- Besi D-10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
2 Kolom Beton Type K-6 200/700/700
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi D-10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
3 Kolom Beton Type K-7 600
- Cor Beton Ready Mix K-300
- Besi D19
- Besi D-10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting

11
1209
464
36
36
36

m3
kg
kg
m2
m2
m2

3
905
284
40
40
40

m3
kg
kg
m2
m2
m2

4
691
169
29
29
29

m3
kg
kg
m2
m2
m2
Sub Jumlah
PEKERJAAN
STRUKTUR
LANTAI EMPAT

H
I
1

PEKERJAAN STRUKTUR RING BALOK


PEKERJAAN BALOK DAN PLAT
Balok Beton Type BA-1 (400/600)
- Cor Beton Ready Mix K-300
- Besi D22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multi 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type BA-2 (400/600)
- Cor Beton Ready Mix K-300
- Besi D19
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type BA-3 (400/500)
- Cor Beton Ready Mix K-300
- Besi D19
- Besi 4D16 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type BA-4 (400/600)
- Cor Beton Ready Mix K-300
- Besi D-22
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type BA-5 (250/500)
- Cor Beton Ready Mix K-300
- Besi D16
- Besi 210 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type BA-6 (250/500)

6
1093
51
232
47
26
47

m3
kg
kg
kg
m2
m2
m2

4
455
34
154
23
13
23

m3
kg
kg
kg
m2
m2
m2

14
2106
501
681
78
48
78

m3
kg
kg
kg
m2
m2
m2

1
97
6
59
4
2
4

m3
kg
kg
kg
m2
m2
m2

2
251
19
78
13
8
13

m3
kg
kg
kg
m2
m2
m2

10

11

12

13

14

- Cor Beton Ready Mix K-300


- Besi D-16
- Besi 210 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type BA-7 (200/730)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type BA-7A (200/650)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 212 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type BA-8 (250/400)
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 212 ( Pinggang )
- Besi 12 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk
- Bongkar bekesting
Balok Beton Type BA-9 200/400
- Cor Beton Ready Mix K-300
- Besi D-16
- Besi 210 ( Pinggang )
- Besi 12 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type BA-10 400/500
- Cor Beton Ready Mix K-300
- Besi D19
- Besi 210 ( Pinggang )
- Besi 12 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type BA-11 250/400
- Cor Beton Ready Mix K-300
- Besi D16
- Besi 210 ( Pinggang )
- Besi 12 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type BA-12 200/400/10
- Cor Beton Ready Mix K-300
- Besi D16
- Besi 310 ( Pinggang )
- Besi 12 ( Sengkang )
- Bekisting Multiplex 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting
Balok Beton Type BA-13 (200/500)
- Cor Beton Ready Mix K-300
- Besi D16
- Besi 6D13 ( Pinggang )
- Besi 10 ( Sengkang )
- Bekisting Multi 9 mm
- Stoot werk (scafolding)
- Bongkar bekesting

1
159
10
44
8
5
8

m3
kg
kg
kg
m2
m2
m2

0
33
9
19
2
1
2

m3
kg
kg
kg
m2
m2
m2

0
86
24
29
5
2
5

m3
kg
kg
kg
m2
m2
m2

0
51
14
20
3
2
3

m3
kg
kg
kg
m2
m2
m2

0
52
7
28
3
2
3

m3
kg
kg
kg
m2
m2
m2

4
530
35
212
21
14
21

m3
kg
kg
kg
m2
m2
m2

2
287
32
91
17
13
17

m3
kg
kg
kg
m2
m2
m2

2
211
41
88
18
11
18

m3
kg
kg
kg
m2
m2
m2

2
278
110
87
19
10
19

m3
kg
kg
kg
m2
m2
m2

15 Lantai Beton t=15 cm


- Cor Beton Ready Mix K-300
- Besi WM10-150
- Bekisting Multi 9 mm
- Stoot werk (scafolding)
- Pemeliharaan Plat lantai beton (rendam)
- Bongkar bekesting
16 Lantai Beton t=10 cm
- Cor Beton Ready Mix K-300
- Besi WM8-150
- Bekisting Multi 9 mm
- Stoot werk
- Pemeliharaan Plat lantai beton (rendam)
- Bongkar bekesting
17 Plat Kanopi Beton t=12
- Cor Beton Ready Mix K-300
- Besi D13-150
- Besi 10-150
- Bekisting Multi 9 mm
- Stoot werk (scafolding)
- Pemeliharaan Plat beton (rendam)
- Bongkar bekesting

18
246
62
62
62
62

m3
m2
m2
m2
m2
m2

3
246
29
29
29
29

m3
m2
m2
m2
m2
m2

2
257
152
16
16
16
16

m3
kg
kg
m2
m2
m2
m2
Sub Jumlah

II.

PEKERJAAN KOLOM
1 Kolom Beton Type K-4 300
- Cor Beton Ready Mix K-300
- Besi D13
- Besi D-10 ( Sengkang )
- Bekisting Multi 9 mm
- Stoot werk
- Bongkar bekesting
1 Kolom Beton Type K-5 120/300
- Cor Beton Ready Mix K-300
- Besi D13
- Besi D-10 ( Sengkang )
- Bekisting Multi 9 mm
- Stoot werk
- Bongkar bekesting

1
117
84
11
11
11

m3
kg
kg
m2
m2
m2

0
44
26
5
5
5

m3
kg
kg
m2
m2
m2
Sub Jumlah
PEKERJAAN
STRUKTUR RING
BALOK

PEKERJAAN STRUKTUR RANGKA ATAP


1 BAJA RINGAN
- Rangka atap dari baja ringan
- Penutup atap dari zincalum

281
281

m2
m2
PEKERJAAN
STRUKTUR
RANGKA ATAP

J.

PEKERJAAN OVERSTEK GRC


- Kolom Grc
- Knopi GRC
- Rangka Pendukung

81
120
1

m2
m2
ls
PEKERJAAN
OVERSTEK GRC

III.

PEKERJAAN ARSITEKTUR

I
A

LANTAI GROUND
Pekerjaan lantai
Floor hardener
Pekerjaan granito tile 60 x 60
Pekerjaan plin granito tile 10 x 60
Pekerjaan keramik tile 40 x 40
Pekerjaan step nosing tangga keramik tile 10 x 40
Pekerjaan keramik tile anti slip 20 x 20
Urugan pasir peninggian lantai bangunan
Beton tumbuk 1 : 3 : 5

1
2
3
4
5
6
7
8

326
26
17
19
19
4
2
2

m
m
m
m
m
m
m
m

9 Waterproofing bitutine sheet area taman


10 Screeding

57
57

m
m
Sub Total

B
1
2
3
4
5
6
7
8
9
10

Pekerjaan dinding
Pekerjaan Pasangan bata 1:5, 1/2 batu
Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar)
Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam)
Pekerjaan Plesteran Prime Mortar & acian (dinding)
Pekerjaan Plesteran Prime Mortar & acian (beton)
Pekerjaan dinding keramik 20 x 25 Toilet
Kolom praktis
Ring balok praktis
Pengecatan dinding interior
Pengecatan dinding eksterior

7
326
79
654
81
14
111
27
459
305

m
m
m
m
m
m2
m
m
m
m
Sub Total

C
1
2
3
4
5
6
7
8

Pekerjaan Kusen Pintu dan Jendela


Pekerjaan pintu Ps 1
Pekerjaan pintu P1
Pekerjaan pintu P3
Pekerjaan pintu P4
Pekerjaan BV 1
Pekerjaan BV 2
Pekerjaan BV 3
Pekerjaan pintu PB1

2
1
2
1
1
2
3
1

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Sub Total

Pekerjaan Plafond
1 Plafond ekspose beton
2 Pengecatan plafond

252
377

m
m
Sub Total

Pekerjaan Sanitary
1 Kran air
2 Floor drain
3 Closed Jongkok

2
1
1

Bh.
Bh.
Bh.
Sub Total

Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco
2 Hand rail hollow 5/5 finnish cat duco

14
21

m
m
Sub Total
TOTAL LANTAI GROUND

II
A
1
2
3
4
5
6
7
8
9

LANTAI 1
Pekerjaan lantai
Pekerjaan granito tile 60 x 60
Pekerjaan plin granito tile 10 x 60
Pekerjaan keramik tile anti slip 20 x 20
Pekerjaan keramik tile 40 x 40
Pekerjaan step nosing tangga keramik tile 10 x 40
Waterproofing coating area toilet
Waterproofing bitutine sheet dak beton
Screeding dak beton
Pekerjaan dinding keramik 20 x 25 Tilet & Janitor

235
116
25
19
18
35
127
127
60

m
m
m
m
m
m
m
m
m2
Sub Total

B
1
2
3
4
5
6
7
8
9
10
11

Pekerjaan dinding
Pekerjaan Pasangan bata 1:5, 1/2 batu
Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar)
Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam)
Pekerjaan Plesteran Prime Mortar & acian (dinding)
Pekerjaan Plesteran Prime Mortar & acian (beton)
Pekerjaan dinding keramik 20 x 25
Kolom praktis
Ring balok praktis
Pengecatan dinding interior
Pengecatan dinding eksterior +Beton kolom
Pekerjaan Glass block

73
398
47
942
79
60
143
30
647
307
28

m
m
m
m
m
m
m
m
m
m
m2

12 Pekerjaan batu andesit abu-abu

26

m2
Sub Total

C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Pekerjaan Kusen Pintu dan Jendela


Pekerjaan pintu P2
Pekerjaan pintu P5
Pekerjaan pintu P6
Pekerjaan pintu P7
Pekerjaan pintu Ps 2
Pekerjaan pintu Ps 3
Pekerjaan partisi PT1
Pekerjaan partisi PT2
Pekerjaan partisi PT3
Pekerjaan pintu PJ1
Pekerjaan jendela J3
Pekerjaan jendela J4
Pekerjaan jendela J6
Pekerjaan jendela BV4
Pekerjaan jendela BV5

1
1
2
1
1
1
3
2
3
1
1
1
1
2
1

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Sub Total

D
1
2
3
4
5

Pekerjaan Plafond
Plafond Gypsum t = 9 mm + rangka Metal Furing
Plafond GRC t = 4 mm + rangka Metal Furing (Toilet)
List Plafond 5 cm
Plafond ekspose beton
Pengecatan Plafond

279
23
142
127
303

m
m
m
m
m
Sub Total

E
1
2
3
4
5
6
7
8
9
10

Pekerjaan Sanitary
Kloset duduk
Jetwasher
Wastafel
Urinoir
Sekat urinoir
Kitchen zink
Kran dinding
Floor drain
Meja beton + keramik
Cermin 5 mm

5
5
3
3
2
1
1
4
5
4

Bh.
Bh.
Bh.
Bh.
Bh.
Bh.
Bh.
Bh.
m
m
Sub Total

Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco
2 Hand rail hollow 5/5 finnish cat duco

20
28

m
m
Sub Total
LANTAI 1

III
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14

LANTAI 2
Pekerjaan lantai
Pekerjaan granito tile 60 x 60
Pekerjaan plin granito tile 10 x 60
Pekerjaan keramik tile 30 x 30
Pekerjaan plin keramik tile 10 x 30
Pekerjaan keramik tile anti slip 20 x 20
Pekerjaan keramik tile 40 x 40
Pekerjaan step nosing tangga keramik tile 10 x 40
Waterproofing coating area toilet
Screeding lantai
Acian lantai
Lantai vynil Tarket Sports T. 3.5 mm
Waterproofing bitutine sheet dak beton
Screeding dak beton
Keramik Dinding KM / WC 20/25

10
13
5
9
28
21
26
40
283
283
233
92
92
72

m
m
m
m
m
m
m
m
m
m
m
m
m
m2
Sub Total

Pekerjaan dinding
1 Pekerjaan Pasangan bata 1:5, 1/2 batu
2 Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar)
3 Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam)

73
284
68

m
m
m

4
5
6
7
7
8
9
10
11

Pekerjaan Plesteran Prime Mortar & acian (dinding)


Pekerjaan Plesteran Prime Mortar & acian (beton)
Pekerjaan dinding keramik 20 x 25
Kolom praktis
Ring balok praktis
Pengecatan dinding interior
Pengecatan dinding eksterior
Pengecatan dinding partisi
Pekerjaan Glass block

713
84
81
143
7
440
250
225
21

m
m
m
m
m
m
m
m
m2
Sub Total

C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Pekerjaan Kusen Pintu dan Jendela


Pekerjaan partisi PT1
Pekerjaan partisi PT2
Pekerjaan partisi PT3
Pekerjaan pintu P2
Pekerjaan pintu P5
Pekerjaan pintu P6
Pekerjaan pintu P9
Pekerjaan pintu Ps3
Pekerjaan jendela BV4
Pekerjaan jendela BV5
Pekerjaan jendela BV6
Pekerjaan jendela J2
Pekerjaan jendela J4
Pekerjaan jendela J5
Pekerjaan jendela J7

3
2
3
1
1
2
1
1
1
1
1
1
1
1
1

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Sub Total

D
1
2
3
4
5
6

Pekerjaan Plafond
Plafond Gypsum t = 9 mm + rangka Metal Furing
Plafond GRC t = 4 mm + rangka Metal Furing (Toilet)
List Plafond 5 cm
Plafond ekspose beton
Pengecatan Plafond
Skylight kaca 6 + 6 mm

247
23
150
19
282
4

m
m
m
m
m
m
Sub Total

E
1
2
3
4
5
6
7
8
9
10

Pekerjaan Sanitary
Kloset duduk
Jetwasher
Wastafel
Urinoir
Sekat urinoir
Kitchen zink
Kran dinding
Floor drain
Meja beton + keramik
Cermin 5 mm

6
6
4
2
1
1
2
4
5
4

Bh.
Bh.
Bh.
Bh.
Bh.
Bh.
Bh.
Bh.
m
m
Sub Total

Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco
2 Hand rail hollow 5/5 finnish cat duco
3 Rambatan bunga besi beton 10 mm, 19 mm & plat besi 12 mm

12
24
20

m
m
m
Sub Total
LANTAI 2

IV
A
1
2
3
4
5
6
7
8
9
10

LANTAI 3
Pekerjaan lantai
Pekerjaan granito tile 60 x 60
Pekerjaan plin granito tile 10 x 60
Pekerjaan keramik tile 30 x 30
Pekerjaan plin keramik tile 10 x 30
Pekerjaan keramik tile anti slip 20 x 20
Pekerjaan keramik tile 40 x 40
Pekerjaan step nosing tangga keramik tile 10 x 40
Waterproofing coating area toilet
Screeding lantai
Acian lantai

9
12
7
9
25
20
24
30
251
251

m
m
m
m
m
m
m
m
m
m

11 Lantai vynil Tarket Sports T. 3.5 mm


12 Waterproofing bitutine sheet dak beton
13 Screeding dak beton

251
19
19

m
m
m
Sub Total

B
1
2
3
4
5
6
7
7
8
9
10
11

Pekerjaan dinding
Pekerjaan Pasangan bata 1:5, 1/2 batu
Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar)
Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam)
Pekerjaan Plesteran Prime Mortar & acian (dinding)
Pekerjaan Plesteran Prime Mortar & acian (beton)
Pekerjaan dinding keramik 20 x 25
Kolom praktis
Ring balok praktis
Pengecatan dinding interior
Pengecatan dinding eksterior
Pengecatan dinding partisi
Pekerjaan Glass block

73
293
77
731
84
64
143
32
440
250
280
21

m
m
m
m
m
m
m
m
m
m
m
m2
Sub Total

C
1
2
3
4
5
6
7
8
9
10
11
12
13

Pekerjaan Kusen Pintu dan Jendela


Pekerjaan partisi PT1
Pekerjaan partisi PT3
Pekerjaan pintu P2
Pekerjaan pintu P5
Pekerjaan pintu P6
Pekerjaan pintu P7
Pekerjaan pintu Ps 3
Pekerjaan pintu Ps 1
Pekerjaan jendela J1
Pekerjaan jendela J2
Pekerjaan jendela J5
Pekerjaan jendela J8
Pekerjaan jendela BV5

4
6
1
2
2
1
1
1
1
1
1
1
1

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Sub Total

D
1
2
3
4
5

Pekerjaan Plafond
Plafond Gypsum t = 9 mm + rangka Metal Furing
Plafond GRC t = 4 mm + rangka Metal Furing (Toilet)
List Plafond 5 cm
Plafond ekspose beton
Pengecatan Plafond

244
32
150
18
294

m
m
m
m
m
Sub Total

E
1
2
3
4
5
6
7
8
9
10

Pekerjaan Sanitary
Kloset duduk
Jetwasher
Wastafel
Urinoir
Sekat urinoir
Kitchen zink
Kran dinding
Floor drain
Meja beton + keramik
Cermin 5 mm

6
6
3
2
1
1
2
3
1
4

Bh.
Bh.
Bh.
Bh.
Bh.
Bh.
Bh.
Bh.
m
m
Sub Total

Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco
2 Hand rail hollow 5/5 finnish cat duco
3 Rambatan bunga besi beton 10 mm, 19 mm & plat besi 12 mm

12
25
20

m
m
m
Sub Total
LANTAI 3

V
A
1
2
3
4

LANTAI 4
Pekerjaan lantai
Pekerjaan granito tile 60 x 60
Pekerjaan plin granito tile 10 x 60
Pekerjaan keramik tile anti slip 20 x 20
Pekerjaan keramik tile 40 x 40

12
14
31
20

m
m
m
m

5
6
7
8
9
10
11

Pekerjaan step nosing tangga keramik tile 10 x 40


Waterproofing coating area toilet
Screeding lantai
Acian lantai
Lantai vynil Tarket Sports T. 3.5 mm
Waterproofing bitutine sheet dak beton
Screeding dak beton

24
37
262
262
262
36
36

m
m
m
m
m
m
m
Sub Total

B
1
2
3
4
5
6
7
7
8
9
10
11

Pekerjaan dinding
Pekerjaan Pasangan bata 1:5, 1/2 batu
Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar)
Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam)
Pekerjaan Plesteran Prime Mortar & acian (dinding)
Pekerjaan Plesteran Prime Mortar & acian (beton)
Pekerjaan dinding keramik 20 x 25
Kolom praktis
Ring balok praktis
Pengecatan dinding interior
Pengecatan dinding eksterior
Pengecatan dinding partisi
Pekerjaan Glass block

73
270
32
686
84
73
114
25
630
271
68
21

m
m
m
m
m
m
m
m
m
m
m
m2
Sub Total

C
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Pekerjaan Kusen Pintu dan Jendela


Pekerjaan partisi PT1
Pekerjaan partisi PT3
Pekerjaan pintu P2
Pekerjaan pintu P6
Pekerjaan pintu P7
Pekerjaan pintu Ps 1
Pekerjaan pintu Ps 3
Pekerjaan jendela J2
Pekerjaan jendela J3
Pekerjaan jendela J5
Pekerjaan jendela J8
Pekerjaan jendela J7
Pekerjaan jendela BV3
Pekerjaan jendela BV5

4
6
1
2
1
1
1
1
1
1
1
1
1
1

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Sub Total

D
1
2
3
4
5

Pekerjaan Plafond
Plafond Gypsum t = 9 mm + rangka Metal Furing
Plafond GRC t = 4 mm + rangka Metal Furing (Toilet)
List Plafond 5 cm
Plafond ekspose beton
Pengecatan Plafond

256
30
150
15
302

m
m
m
m
m
Sub Total

E
1
2
3
4
5
6
7
8
9
10

Pekerjaan Sanitary
Kloset duduk
Jetwasher
Wastafel
Urinoir
Sekat urinoir
Kitchen zink
Kran dinding
Floor drain
Meja beton + keramik
Cermin 5 mm

6
6
3
3
2
1
5
4
5
4

Bh.
Bh.
Bh.
Bh.
Bh.
Bh.
Bh.
Bh.
m
m
Sub Total

Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco
2 Hand rail hollow 5/5 finnish cat duco
3 Rambatan bunga besi beton 10 mm, 19 mm & plat besi 12 mm

13
25
20

m
m
m
Sub Total
LANTAI 4

VII

LANTAI ATAP

A
1
2
3
4

Pekerjaan lantai
Pekerjaan granito tile 60 x 60
Pekerjaan plin granito tile 10 x 60
Waterproofing bitutine sheet dak beton
Screeding dak beton

5
7
140
140

m
m
m
m

1
2
3
4
5
6

Pekerjaan dinding
Pekerjaan Pasangan bata Ringan, T. 10 cm (Dinding Luar)
Pekerjaan Plesteran Prime Mortar & acian (dinding)
Kolom praktis
Ring balok praktis
Pengecatan dinding interior
Pengecatan dinding eksterior

76
152
15
82
100
100

m
m
m
m
m
m

Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan pintu P1

Unit

Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco

LANTAI ATAP
VII

PEKERJAAN LANSEKAP

VII.1
1
2
3

LANTAI LUAR BANGUNAN


Lapisan tanah subur + rumput gajah mini
Taman (tanaman rendah, ground cover dan tanaman rambat)
Saluran air hujan 30 x 30
a. Galian tanah
b. Urugan pasir
c. Pasangan batu kali
d. Peluran + acian dasar saluran
e. Plesteran + acian dinding daluran
f. Grill penutup saluran
g. Buang tanah bekas galian
4 Saluran air hujan 5 x 15 (diluar bangunan)
5 Kansteen pasangan bata tinggi 15 cm
6 Lapisan aspal hotmix
a. Galian Tanah
b. Pemadatan/Persiapan Subgrade
c. Subbase Klas C tebal 35 cm
d. Base Coarse Klas A tebal 25 cm
e. Prime Coat RC 60, 1kg/m2
f. Aspal hotmix 5 cm
g. Buangan tanah keluar site

99
53

m
m

34
27
6
8
16
20
34
12
47

m
m
m
m
m
m
m
m
m

55
73
26
18
73
73
55

m
m
m
m
m
m
m
LANTAI LUAR
BANGUNAN

VII.2 POS JAGA


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Galian tanah
Urugan kembali
Pasir urug
Lantai kerja
Pondasi batu kosong
Pondasi batu belah
Beton tumbuk 1 : 3 : 5
Sloof beton
Pasangan dinding
Plesteran dan acian
Kolom beton 15 x 30
Balok beton
Plat dak beton
Lantai keramik
Kusen kaca depan ( kaca tempered)
Kusen pintu (kaca tempered)
Kusen jendela samping ( kaca tempered)
meja kayu
Cat dinding interior
Cat dinding exterior

15
7
2
0
2
4
1
0
7
18
0
0
1
9
1
1
1
2
13
6

m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m3
m3
m3
m2
bh
bh
bh
bh
m2
m2

POS JAGA
VII.3
1
2
3
4
5

PAGAR BANGUNAN DAN KELENGKAPANNYA


Pagar besi dan dinding masive
Pintu gerbang
Standing letter
Tiang bendera dan alasnya
Bak sampah

15
1
1
1
1

m2
1
1
1
1
PAGAR BANGUNAN

VII.4 SUMUR RESAPAN


1 Sumur resapan

titik
PEKERJAAN LANSEKAP

REKAPITULASI RENCANA ANGGARAN BIAYA


PEKERJAAN PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
JL. PROKLAMASI NO. 70
JAKARTA PUSAT

NILAI TOTAL
NO.

URAIAN PEKERJAAN

I.

PEKERJAAN PERSIAPAN

II

PEKERJAAN STRUKTUR
A
B
C
D
E
F
G
H
I
J.

III.

(Rp)

PEKERJAAN PONDASI TIANG PANCANG


PEKERJAAN PILE CAP PONDASI DAN DINDING PIT LIFT
PEKERJAAN STRUKTUR LANTAI GROUND
PEKERJAAN STRUKTUR LANTAI SATU
PEKERJAAN STRUKTUR LANTAI DUA
PEKERJAAN STRUKTUR LANTAI TIGA
PEKERJAAN STRUKTUR LANTAI EMPAT
PEKERJAAN STRUKTUR RING BALOK
PEKERJAAN STRUKTUR RANGKA ATAP
PEKERJAAN OVERSTEK GRC

LANTAI GROUND
LANTAI 1
LANTAI 2
LANTAI 3
LANTAI 4
LANTAI ATAP
PEKERJAAN LANSEKAP

PEKERJAAN ELEKTRIKAL
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV

V.

JUMLAH

PEKERJAAN ARSITEKTUR
I
II
III
IV
V
VI
VII

IV.

SUBJUMLAH
(Rp)

PEKERJAAN PANEL DAYA


KABEL DAYA
INSTALASI PENERANGAN DAYA
INSTALASI CABLE TRAY
INSTALASI UNDERFLOOR DUCT
INSTALASI PENANGKAL PETIR
PENYAMBUNGAN DAYA PLN
TESTING & COMMISSIONING
PEKERJAAN INSTALASI TELEPON
PEKERJAAN FIRE ALARM
PEKERJAAN INSTALASI OUTLET DATA
PEKERJAAN INSTALASI SOUND SYSTEM
PEKERJAAN INSTALASI GENSET
PEKERJAAN MATV

PEKERJAAN MEKANIKAL DAN PLUMBING


I
II
III
IV
V

PEKERJAAN INSTALASI AIR BERSIH


PEKERJAAN INSTALASI AIR KOTOR
PEKERJAAN INSTALASI AC
FIRE HYDRANT SYSTEM
INSTALASI SPRINKLER

JUMLAH BIAYA KONSTRUKSI


PAJAK PERTAMBAHAN NILAI ( PPN 10 % )
JUMLAH TOTAL
DIBULATKAN
Terbilang : Sebelas miliar lima ratus sembilan belas juta rupiah

11,519,000,000.00

ANALISA HARGA SATUAN PEKERJAAN


PEKERJAAN ARSITEKTUR

JENIS PEKERJAAN

HARGA-SAT
( Rp )

VOLUME

1 Pasangan Bata Ringan batu dengan perekat MU ( Tebal.10 cm )


Bata ringan T.10 cm
8.5 bh
7,900.00
Bahan MU.380 Untuk pasangan
6 kg
3,600.00
Pekerja
0.15 oh
85,000.00
Tukang batu
0.12 oh
95,000.00
Kepala tukang batu
0.015 oh
115,000.00
Mandor
0.015 oh
130,000.00

2 Pasangan Bata Ringan batu dengan perekat MU ( Tebal.7.5 cm )


Bata ringan T.7.5 cm
8.5 bh
5,500.00
Bahan MU.380 Untuk pasangan
6 kg
3,600.00
Pekerja
0.15 oh
85,000.00
Tukang batu
0.12 oh
95,000.00
Kepala tukang batu
0.015 oh
115,000.00
Mandor
0.015 oh
130,000.00

MATERIAL
( Rp )

67,150.00
21,600.00

46,750.00
21,600.00

3 Plester Aci dinding bahan MU /m


Bahan MU.301 Untuk Plester
Bahan MU.250 Untuk Aci
Pekerja
Tukang batu
Kepala tukang batu
Mandor

22
3
0.15
0.15
0.023
0.023

kg
kg
oh
oh
oh
oh

1,090.00
2,425.00
85,000.00
95,000.00
115,000.00
130,000.00

23,980.00
7,275.00

4 Pek. Acian bahan semen PC /m


Semen Pc
Pekerja
Tukang batu
Kepala tukang batu
Mandor

3.25
0.15
0.1
0.01
0.008

kg
oh
oh
oh
oh

1,160.00
85,000.00
95,000.00
115,000.00
130,000.00

3,770.00

5 Pekerjaan Sceed T.4 cm /m


Pasir beton
Semen Pc
Pekerja
Tukang batu
Kepala tukang batu
Mandor

0.045
15
0.21
0.21
0.022
0.022

m3
kg
oh
oh
oh
oh

210,453.00
1,160.00
85,000.00
95,000.00
115,000.00
130,000.00

9,470.39
17,400.00

6 Pasangan Batu bata batu ad. 1 : 5


Bata merah
Pasir Pasang
Semen
Pekerja
Tukang batu
Kepala tukang batu
Mandor

70
0.04
11
0.3
0.1
0.01
0.015

bh
m3
kg
oh
oh
oh
oh

563.00
214,733.00
1,160.00
85,000.00
95,000.00
115,000.00
130,000.00

39,410.00
8,589.32
12,760.00

7 Lantai keramik roman. 30 x 30 cm /m


Keramik roman. 30 x 30 cm
Portland cement
Pasir Pasang
Grouting naad MU.408
Pekerja
Tukang batu
Kepala tukang batu
Mandor

1
13
0.045
0.35
0.27
0.17
0.025
0.025

m2
kg
m
kg
oh
oh
oh
oh

86,000.00
1,160.00
214,733.00
11,500.00
85,000.00
95,000.00
115,000.00
130,000.00

86,000.00
15,080.00
9,662.99
4,025.00

8 Lantai keramik roman. 40 x 40 cm /m


Keramik roman. 40 x 40 cm
Portland cement
Pasir Pasang
Grouting naad MU.408
Pekerja
Tukang batu
Kepala tukang batu
Mandor

1
13
0.045
0.35
0.27
0.17
0.025
0.025

m2
kg
m
kg
oh
oh
oh
oh

96,000.00
1,160.00
214,733.00
11,500.00
85,000.00
95,000.00
115,000.00
130,000.00

96,000.00
15,080.00
9,662.99
4,025.00

9 Lantai Homogeunious Tile Polish Ex Granito. 60 x 60 cm /m ( Salsa )


Homogeunious Tile 60 x 60 cm
1 m2
221,100.00
Portland cement
13 kg
1,160.00
Pasir Pasang
0.045 m
214,733.00
Grouting naad MU.408
0.35 kg
11,500.00
Pekerja
0.27 oh
85,000.00
Tukang batu
0.17 oh
95,000.00
Kepala tukang batu
0.025 oh
115,000.00
Mandor
0.025 oh
130,000.00

10 Lantai keramik Anti Slip roman. 20 x 20 cm /m


Keramik Anti Slip roman. 20 x 20 c
1 m2
Portland cement
13 kg

74,500.00
1,160.00

221,100.00
15,080.00
9,662.99
4,025.00

74,500.00
15,080.00

Pasir Pasang
Grouting naad MU.408
Pekerja
Tukang batu
Kepala tukang batu
Mandor

0.045
0.35
0.27
0.17
0.025
0.025

m
kg
oh
oh
oh
oh

214,733.00
11,500.00
85,000.00
95,000.00
115,000.00
130,000.00

9,662.99
4,025.00

1
13
0.045
0.35
0.33
0.27
0.025
0.025

m2
kg
m
kg
oh
oh
oh
oh

80,000.00
1,160.00
214,733.00
11,500.00
85,000.00
95,000.00
115,000.00
130,000.00

80,000.00
15,080.00
9,662.99
4,025.00

3.333333
0.147
0.01
0.02
0.111111

lbr
Zak
m3
kg
m2

6,500.00
58,000.00
214,733.00
11,500.00
45,225.00

21,666.67
8,526.00
2,147.33
230.00

13 Plint Homogenus / granito tile 10x60 / m1


Plint homogenus tile
1.666667
Semen
0.024
Pasir Pasang
0.001
AM Grout
0.2
Upah Pas. Keramik
0.125

lbr
Zak
m3
kg
m2

17,000.00
58,000.00
214,733.00
11,500.00
45,225.00

28,333.33
1,392.00
214.73
2,300.00

14 Step nozing tangga.10 x 40 / m1


Stair Nosing 10x40 cm
Semen
Pasir Pasang
AM Grout
Upah Pas. Keramik

lbr
Zak
m3
kg
m2

18,500.00
58,000.00
214,733.00
11,500.00
45,225.00

46,250.00
6,960.00
751.57
230.00

37,500.00
64,000.00
100.00
75.00
32,500.00

37,500.00
25,536.00
1,200.00
900.00
1,625.00

11 Dinding keramik roman. 20 x 25 cm /m


Keramik dinding roman. 20 x 25 cm
Portland cement
Pasir Pasang
Grouting naad MU.408
Pekerja
Tukang batu
Kepala tukang batu
Mandor

12 Plint keramik 10x30 / m1


Plint Keramik
Semen
Pasir Pasang
AM Grout
Upah Pas. Keramik

2.5
0.12
0.0035
0.02
0.125

15 Plafond Gypsum t = 9 mm + rangka Metal Furing / M2


Rangka Plafond
1 m2
Gypsum 9 mm
0.399 lbr
Skrup Gpsum 5 cm
12 bh
Skrup Gpsum 3 cm
12 bh
Joint Tape
0.05 roll

Cornise Gypsum
Alat Bantu
Pekerja
Tukang plafond
Kep. Tukang Plafond
Mandor

0.01
1
0.15
0.12
0.012
0.0075

zak
ls
oh
oh
oh
oh

42,000.00
1,500.00
85,000.00
95,000.00
115,000.00
130,000.00

420.00
1,500.00

16 Plafond GRC t = 4 mm + rangka Metal Furing (Toilet) / M2


Rangka Plafond
1 m2
GRC.4 MM
0.399 lbr
Skrup Gpsum 5 cm
12 bh
Skrup Gpsum 3 cm
12 bh
Joint Tape
0.05 roll
Cornise Gypsum
0.01 zak
Alat Bantu
1 ls
Pekerja
0.15 oh
Tukang plafond
0.12 oh
Kep. Tukang Plafond
0.012 oh
Mandor
0.0075 oh

37,500.00
82,000.00
100.00
75.00
32,500.00
42,000.00
1,500.00
85,000.00
95,000.00
115,000.00
130,000.00

37,500.00
32,718.00
1,200.00
900.00
1,625.00
420.00
1,500.00

17 Cat dinding Luar Dulux Weathershiaed / m ( Ex ICI )


Cat Alkali
0.1 kg
Cat Dulux weathershield
0.24 kg
Ampelas
0.35 lbr
Rol cat
0.01 bh
Steger werk
1 ls
Pekerja
0.01 oh
Tukang cat
0.04 oh
Kepala tukang cat
0.003 oh
Mandor
0.003 oh

34,000.00
62,000.00
4,000.00
30,000.00
1,350.00
85,000.00
100,000.00
120,000.00
130,000.00

3,400.00
14,880.00
1,400.00
300.00
1,350.00

18 Cat dinding dalam Dulux Pantalite / m2 ( Ex ICI )


Plamir
0.1 kg
Cat dasar Dulux pantalite
0.1 kg
Cat penutup Dulux pantalite
0.24 kg
Ampelas
0.35 lbr
Rol cat
0.01 bh
Steger werk
1 ls
Pekerja
0.01 oh
Tukang cat
0.04 oh
Kepala tukang cat
0.003 oh
Mandor
0.003 oh

12,000.00
28,500.00
28,500.00
4,000.00
30,000.00
1,350.00
85,000.00
100,000.00
120,000.00
130,000.00

1,200.00
2,850.00
6,840.00
1,400.00
300.00
1,350.00

19 Pek.Pancang 20x20 cm.L.9 m.190 ttk ( Pengaman Galian Basement )


Mob demob Alat Pancang
1 Unit
14,400,000.00

14,400,000.00

Pengadaan Beton Pancang 20x20


Pemancangan

1710 m'
1710 m'

120,000.00 205,200,000.00
60,000.00

UPAH
( Rp )

JUMLAH
( Rp )

12,750.00
11,400.00
1,725.00
1,950.00
Jumlah
Jasa 10 %
Juml.Harga

27,825.00
116,575.00
11,657.50
128,232.50

12,750.00
11,400.00
1,725.00
1,950.00
Jumlah
Jasa 10 %
Juml.Harga

28,210.00
2,821.00
31,031.00

17,850.00
19,950.00
2,530.00
2,860.00
Jumlah

1.22 %

0.00

0.00 %

0.00

0.00 %

32,635.00
63,890.00
6,389.00
70,279.00

12,750.00
9,500.00
1,150.00
1,040.00
Jumlah
Jasa 10 %
Juml.Harga

156,425.50

27,825.00
96,175.00
9,617.50
105,792.50

12,750.00
14,250.00
2,645.00
2,990.00
Jumlah
Jasa 10 %
Juml.Harga

IMB

70,060.39

1,637
1,561

Jasa 10 %
Juml.Harga

7,006.04
77,066.42

25,500.00
9,500.00
1,150.00
1,950.00
Jumlah
Jasa 10 %
Juml.Harga

38,100.00
98,859.32
9,885.93
108,745.25

22,950.00
16,150.00
2,875.00
3,250.00
Jumlah
Jasa 10 %
Juml.Harga

45,225.00
159,992.99
15,999.30
175,992.28

22,950.00
16,150.00
2,875.00
3,250.00
Jumlah
Jasa 10 %
Juml.Harga

#REF! %

0.00

0.00 %

0.00

0.00 %

45,225.00
169,992.99
16,999.30
186,992.28

22,950.00
16,150.00
2,875.00
3,250.00
Jumlah
Jasa 10 %
Juml.Harga

#REF!

45,225.00
295,092.99
29,509.30
324,602.28

22,950.00
16,150.00
2,875.00
3,250.00
Jumlah
Jasa 10 %
Juml.Harga

45,225.00
148,492.99
14,849.30
163,342.28

28,050.00
25,650.00
2,875.00
3,250.00
Jumlah
Jasa 10 %
Juml.Harga

0.00

0.00 %

157,058.13

0.85 %

59,825.00
168,592.99
16,859.30
185,452.28

5,025.00
Jumlah
Jasa 10 %
Juml.Harga

37,595.00
3,759.50
41,354.50

5,653.13
Jumlah
Jasa 10 %
Juml.Harga

37,893.19
3,789.32
41,682.51

5,653.13
Jumlah
Jasa 10 %
Juml.Harga

59,844.69
5,984.47
65,829.16

12,750.00
11,400.00
1,380.00
975.00
Jumlah
Jasa 10 %
Juml.Harga

95,186.00
9,518.60
104,704.60

12,750.00
11,400.00
1,380.00
975.00
Jumlah
Jasa 10 %
Juml.Harga

850.00
4,000.00
360.00
390.00
Jumlah
Jasa 10 %
Juml.Harga

850.00
4,000.00
360.00
390.00
Jumlah
Jasa 10 %
Juml.Harga

102,368.00
10,236.80
112,604.80

5,600.00
26,930.00 19,000.00
2,693.00
29,623.00

5,600.00
19,540.00 14,000.00
1,954.00
21,494.00

12,000,000.00

102,600,000.00
Jumlah
322,200,000.00
Jasa 10 %
32,220,000.00
Juml.Harga
354,420,000.00

100,000.00
50,000.00

11,500,000,000 7,025,046 1,835,000

0.01
5973.5952

2425

ANALISA HARGA SATUAN PEKERJAAN


PEKERJAAN STRUKTUR

JENIS PEKERJAAN

VOL.

SAT

1 GaLian Tanah Dalam Mak.1 m / M3


Tukang Gali
0.35 Oh
Mandor
0.042 Oh
Alat Bantu
1 Ls

2 GaLian Tanah Dalam .1 - 2 M / M3


Tukang Gali
0.48 Oh
Mandor
0.052 Oh
Alat Bantu
1 Ls

3 GaLian Tanah Dalam .3 M / M3


Tukang Gali
Mandor
Alat Bantu

4 Urugan Tanah kembali / M3


Tukang Gali
Mandor
Alat Bantu

0.58 Oh
0.062 Oh
1 Ls

0.192 Oh
0.0192 Oh
1 Ls

5 Urugan Pasir dengan Pasir Urug/ M3


Pasir Urug
1.2
Pekerja
0.15
Mandor
0.12
Alat Bantu
1

6 Beton lantai kerja ad.1 : 3 : 5 / M3


Pasir beton
Batu Split 2/3
Semen Pc
Pekerja
Tukang Batu
Kepala Tukang Batu

0.55
0.82
3.96
1.3
0.25
0.25

m3
Oh
Oh
Ls

m3
m3
Zak
Oh
Oh
Oh

HARGA-SATMATERIAL
( Rp )
( Rp )

95,000
130,000
13,750

95,000
130,000
14,500

95,000
130,000
16,500

95,000
130,000
750

214,283
85,000
130,000
1,000

222,733
212,333
58,000
85,000
95,000
115,000

UPAH
( Rp )

JUMLAH
( Rp )

33,250
5,460
13,750
Jumlah
Jasa 10 %
Juml.Harga/

52,460
5,246
57,706

45,600
6,760
14,500
Jumlah
Jasa 10 %
Juml.Harga/

66,860
6,686
73,546

55,100
8,060
16,500
Jumlah
Jasa 10 %
Juml.Harga/

79,660
7,966
87,626

18,240
2,496
750
Jumlah
Jasa 10 %
Juml.Harga/

21,486
2,149
23,635

12,750
15,600
1,000
Jumlah
Jasa 10 %
Juml.Harga/

286,490
28,649
315,139

257,140

122,503
174,113
229,680
110,500
23,750
28,750

Mandor
Alat Bantu

0.025 Oh
1 Ls

130,000
17,500

3,250
17,500
Jumlah
Jasa 10 %
Juml.Harga/

7 Pengecoran Beton Readymix. K.300 / M3


Beton Readymix. K300
1.05 m3
Pekerja
1.35 Oh
Tukang Batu
0.25 Oh
Kepala Tukang Batu
0.1 Oh
Mandor
0.01 Oh
Pompa beton
1 m3
Alat Bantu
1 Ls

686,000
85,000
95,000
115,000
130,000
25,000
17,500

720,300

8 Pengecoran Beton Readymix. K.350 / M3


Beton Readymix. K350
1.05 m3
Pekerja
1.35 Oh
Tukang Batu
0.25 Oh
Kepala Tukang Batu
0.1 Oh
Mandor
0.01 Oh
Pompa beton
1 m3
Alat Bantu
1 Ls

710,000
85,000
95,000
115,000
130,000
25,000
17,500

745,500

9 Pek.Besi beton U.24 Terpasang./Kg


Besi beton U. 24
1.05
Kawat beton
0.015
Pekerja
0.012
Tukang besi
0.011
Kepala tukang besi
0.0011
Mandor
0.0035
Alat Bantu
1

11,776
19,694
85,000
95,000
115,000
130,000
435

12,365

10 Pek.Besi beton U.39 Terpasang./Kg


Besi beton U. 39
1.05
Kawat beton
0.015
Pekerja
0.013
Tukang besi
0.012
Kepala tukang besi
0.0012
Mandor
0.005
Alat Bantu
1

Kg
Kg
Oh
Oh
Oh
Oh
Ls

Kg
Kg
Oh
Oh
Oh
Oh
Ls

11,776
19,694
85,000
95,000
115,000
130,000
435

710,046
71,005
781,051

114,750
23,750
11,500
1,300 151,300
25,000
17,500
Jumlah
914,100
Jasa 10 %
91,410
Juml.Harga/ 1,005,510

114,750
23,750
11,500
1,300 151,300
25,000
17,500
Jumlah
939,300
Jasa 10 %
93,930
Juml.Harga/ 1,033,230

295
1,020
1,045
127
455
435
Jumlah
Jasa 10 %
Juml.Harga/

2,647

15,742
1,574
17,316

12,365
295
1,105
1,140
138
650
435
Jumlah
Jasa 10 %
Juml.Harga/

3,033

16,128
1,613
17,741

1 Pek Beton Pancang Dia.40 cm / M'


Pengadaan Tiang Dia.40 c
Handeling Tiang
Pemancangan

1 m'
1 m'
1 m'

450000
12500
110000

450000
12500
110000
Jumlah
572500
Jasa 10 %
57250
Juml.Harga/M 629750

2 Pek.Pancang 20x20 cm.L.9 m.190 ttk ( Pengaman Galian Basement )


Mob demob Alat Pancang
1 Unit
15000000 15000000
Pengadaan Beton Pancang
1710 m'
120000 2.1E+008
Pemancangan
1710 m'
60000
102600000
Jumlah
3.2E+008
Jasa 10 % 32280000
Juml.Harga 3.6E+008

#REF!

#REF!

355000
10000
90000

#REF!

12000000
100000
50000

3.5E+008

ANALISA KUSEN
sat
1 PJ1
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma B
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 PJ5
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma B
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 PJ4
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma B
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 PJ3
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma B
Upah kerja
Jumlah 1

volume

harga satuan

jumlah

m1
m2
bh
bh
bh
bh
bh
m2

25.032
21.756
2
2
1
2
2
21.756

20,000
600,000
150,000
150,000
850,000
1,000,000
2,500,000
50,000

500,640
13,053,600
300,000
300,000
850,000
2,000,000
5,000,000
1,087,800
23,092,040
2,309,204
25,401,244
25,401,240

m1
m2
bh
bh
bh
bh
bh
m2

16.905
13.24008
2
2
1
2
2
13.24008

20,000
600,000
150,000
150,000
850,000
1,000,000
2,500,000
50,000

338,100
7,944,048
300,000
300,000
850,000
2,000,000
5,000,000
662,004
17,394,152
1,739,415
19,133,567
19,133,560

m1
m2
bh
bh
bh
bh
bh
m2

16.905
13.24008
1
1
1
1
1
13.24008

20,000
600,000
150,000
150,000
850,000
1,000,000
2,500,000
50,000

338,100
7,944,048
150,000
150,000
850,000
1,000,000
2,500,000
662,004
13,594,152
1,359,415
14,953,567
14,953,560

m1
m2
bh
bh
bh
bh
bh
m2

17.01
8.61
2
2
2
2
2
8.61

20,000
600,000
150,000
150,000
850,000
1,000,000
2,500,000
50,000

340,200
5,166,000
300,000
300,000
1,700,000
2,000,000
5,000,000
430,500
15,236,700

Jasa 10%
Jumlah 2
Pembulatan
1 PJ2
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma B
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 P6
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma B
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 J2
Alumunium U
Kaca tempered 12 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 J1
Alumunium U
Kaca tempered 12 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 PT7
Partisi PVC
Engsel pintu
Upah kerja

1,523,670
16,760,370
16,760,370

m1
m2
bh
bh
bh
bh
bh
m2

24.738
34.0326
2
2
2
2
2
34.0326

20,000
600,000
150,000
150,000
850,000
1,000,000
2,500,000
50,000

494,760
20,419,560
300,000
300,000
1,700,000
2,000,000
5,000,000
1,701,630
31,915,950
3,191,595
35,107,545
35,107,540

m1
m2
bh
bh
bh
bh
bh
m2

10.92
6.780375
2
2
2
2
2
6.780375

20,000
600,000
150,000
150,000
850,000
1,000,000
2,500,000
50,000

218,400
4,068,225
300,000
300,000
1,700,000
2,000,000
5,000,000
339,019
13,925,644
1,392,564
15,318,208
15,318,200

m1
m2
m2

15.645
11.6235
11.6235

20,000
600,000
50,000

312,900
6,974,100
581,175
7,868,175
786,818
8,654,993
8,654,990

m1
m2
m2

17.4825
17.73188
17.73188

20,000
600,000
50,000

349,650
10,639,125
886,594
11,875,369
1,187,537
13,062,906
13,062,900

m2
bh
m2

1.4175
4
1.4175

1,250,000
35,000
50,000

1,771,875
140,000
70,875

Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 PT6
Partisi PVC
Engsel pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 J5
Alumunium U
Kaca tempered 12 mm
Engsel jendela
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 J4
Alumunium U
Kaca tempered 12 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 J3
Alumunium U
Kaca tempered 12 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

1,982,750
198,275
2,181,025
2,181,020

m2
bh
m2

4.9665
4
4.9665

1,250,000
35,000
50,000

6,208,125
140,000
248,325
6,596,450
659,645
7,256,095
7,256,090

m1
m2
bh
m2

96.306
48.27113
12
48.27113

20,000
600,000
20,000
50,000

1,926,120
28,962,675
240,000
2,413,556
33,542,351
3,354,235
36,896,586
36,896,580

m1
m2
m2

6.678
2.432325
2.432325

20,000
600,000
50,000

133,560
1,459,395
121,616
1,714,571
171,457
1,886,028
1,886,020

m1
m2
m2

10.605
6.4575
6.4575

20,000
600,000
50,000

212,100
3,874,500
322,875
4,409,475
440,948
4,850,423
4,850,420

19.95
8.526
8.526
1
1
1
1
1
8.526

105,000
600,000
150,000
150,000
150,000
850,000
1,000,000
2,500,000
50,000

2,094,750
5,115,600
1,278,900
150,000
150,000
850,000
1,000,000
2,500,000
426,300
13,565,550
1,356,555

1 PJP2
Alumunium 4" powder coam1
Kaca tempered 12 mm m2
Sticker sandblast
m2
Engsel atas PT 20
bh
Engsel bawah PT 10
bh
Kunci US 10
bh
Handle stainless 100 cm bh
Floor hinge ex. Dorma B bh
Upah kerja
m2
Jumlah 1
Jasa 10%

Jumlah 2
Pembulatan
1 PJP4
Alumunium 4" powder coam1
Kaca tempered 12 mm m2
Sticker sandblast
m2
Engsel atas PT 20
bh
Engsel bawah PT 10
bh
Kunci US 10
bh
Handle stainless 100 cm bh
Floor hinge ex. Dorma B bh
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 PP1
Alumunium 4" powder coam1
Kaca tempered 12 mm m2
Sticker sandblast
m2
Engsel atas PT 20
bh
Engsel bawah PT 10
bh
Kunci US 10
bh
Handle stainless 100 cm bh
Floor hinge ex. Dorma B bh
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 PJP3
Alumunium 4" powder coam1
Kaca tempered 12 mm m2
Sticker sandblast
m2
Engsel atas PT 20
bh
Engsel bawah PT 10
bh
Kunci US 10
bh
Handle stainless 100 cm bh
Floor hinge ex. Dorma B bh
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 JP1
Alumunium 4" powder coam1
Kaca tempered 12 mm m2
Sticker sandblast
m2
Upah kerja
m2
Jumlah 1

14,922,105
14,922,100

29.1375
14.3325
14.3325
2
2
2
2
2
14.3325

105,000
600,000
150,000
150,000
150,000
850,000
1,000,000
2,500,000
50,000

3,059,438
8,599,500
2,149,875
300,000
300,000
1,700,000
2,000,000
5,000,000
716,625
23,825,438
2,382,544
26,207,981
26,207,980

10.794
5.5272
5.5272
2
2
2
2
2
5.5272

105,000
600,000
150,000
150,000
150,000
850,000
1,000,000
2,500,000
50,000

1,133,370
3,316,320
829,080
300,000
300,000
1,700,000
2,000,000
5,000,000
276,360
14,855,130
1,485,513
16,340,643
16,340,640

17.1675
9.9225
9.9225
2
2
2
2
2
9.9225

105,000
600,000
150,000
150,000
150,000
850,000
1,000,000
2,500,000
50,000

1,802,588
5,953,500
1,488,375
300,000
300,000
1,700,000
2,000,000
5,000,000
496,125
19,040,588
1,904,059
20,944,646
20,944,640

25.7775
11.3925
11.3925
11.3925

105,000
600,000
150,000
50,000

2,706,638
6,835,500
1,708,875
569,625
11,820,638

Jasa 10%
Jumlah 2
Pembulatan
1 PT5
Partisi PVC
Engsel pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 J7
Alumunium U
Kaca tempered 12 mm
Engsel jendela
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

1,182,064
13,002,701
13,002,700

m2
bh
m2

6.388725
6
6.388725

1,250,000
35,000
50,000

7,985,906
210,000
319,436
8,515,343
851,534
9,366,877
9,366,870

m1
m2
bh
m2

96.306
48.27113
12
48.27113

20,000
600,000
20,000
50,000

1,926,120
28,962,675
240,000
2,413,556
33,542,351
3,354,235
36,896,586
36,896,580

37.9575
17.2725
17.2725
1
1
1
1
1
17.2725

105,000
600,000
150,000
150,000
150,000
850,000
1,000,000
2,500,000
50,000

3,985,538
10,363,500
2,590,875
150,000
150,000
850,000
1,000,000
2,500,000
863,625
22,453,538
2,245,354
24,698,891
24,698,890

m1
m2
bh
m2

87.5385
48.27113
12
48.27113

20,000
600,000
20,000
50,000

1,750,770
28,962,675
240,000
2,413,556
33,367,001
3,336,700
36,703,701
36,703,700

m2
m2
m2
m2

3.273375
0.39375
3.667125
3.667125

1,000,000
500,000
35,000
100,000

3,273,375
196,875
128,349
366,713
3,965,312

1 PJP1
Alumunium 4" powder coam1
Kaca tempered 12 mm m2
Sticker sandblast
m2
Engsel atas PT 20
bh
Engsel bawah PT 10
bh
Kunci US 10
bh
Handle stainless 100 cm bh
Floor hinge ex. Dorma B bh
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 J6
Alumunium U
Kaca tempered 12 mm
Engsel jendela
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 PB2
Pintu besi + accessories
Jalusi plat besi
Cat besi
Upah kerja
Jumlah 1

Jasa 10%
Jumlah 2
Pembulatan
1 P6
Pintu besi + accessories m2
Cat besi
m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 P1 & P1'
Pintu besi + accessories m2
Cat besi
m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 P2
Alumunium 4" powder coam1
Daun pintu kayu
m2
Kaca polos 5 mm
m2
Handle + kunci
bh
Kunci tanam
bh
Engsel pintu
bh
Finnishing melamik daun m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 PP2
Alumunium 4" powder coam1
Daun pintu kayu
m2
Kaca polos 5 mm
m2
Handle + kunci
bh
Kunci tanam
bh
Engsel pintu
bh
Finnishing melamik daun m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 PP3
Alumunium 4" powder coam1
Daun pintu kayu
m2
Handle + kunci
bh

396,531
4,361,843
4,361,840

3.83775
3.83775
3.83775

1,000,000
35,000
100,000

3,837,750
134,321
383,775
4,355,846
435,585
4,791,431
4,791,430

2.48325
2.48325
2.48325

1,750,000
35,000
100,000

4,345,688
86,914
248,325
4,680,926
468,093
5,149,019
5,149,010

7.77
1.89
0.6615
1
1
3
1.89
2.646

105,000
750,000
100,000
150,000
50,000
35,000
90,000
50,000

815,850
1,417,500
66,150
150,000
50,000
105,000
170,100
132,300
2,906,900
290,690
3,197,590
3,197,590

7.77
1.9845
0.6615
1
1
3
1.9845
2.646

105,000
750,000
100,000
150,000
50,000
35,000
90,000
50,000

815,850
1,488,375
66,150
150,000
50,000
105,000
178,605
132,300
2,986,280
298,628
3,284,908
3,284,900

5.46
2.03175
1

105,000
750,000
150,000

573,300
1,523,813
150,000

Kunci tanam
bh
Engsel pintu
bh
Finnishing melamik daun m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 PJ7
Alumunium 4" powder coam1
Daun pintu kayu
m2
Daun jendela alumunium m1
Kaca polos 5 mm
m2
Handle + kunci
bh
Kunci tanam
bh
Engsel pintu
bh
Engsel jendela
bh
Finnishing melamik daun m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 PJ8
Alumunium 4" powder coam1
Daun pintu kayu
m2
Daun jendela alumunium m1
Kaca polos 5 mm
m2
Handle + kunci
bh
Kunci tanam
bh
Engsel pintu
bh
Engsel jendela
bh
Finnishing melamik daun m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 P3
Alumunium 4" powder coam1
Daun pintu kayu
m2
Kaca polos 5 mm
m2
Handle + kunci
bh
Kunci tanam
bh
Engsel pintu
bh
Finnishing melamik daun m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

1
3
2.03175
2.03175

50,000
35,000
90,000
50,000

50,000
105,000
182,858
101,588
2,686,558
268,656
2,955,213
2,955,210

16.38
1.764
6.93
3.1815
1
1
3
4
1.764
4.9455

105,000
750,000
120,000
100,000
150,000
50,000
35,000
20,000
90,000
50,000

1,719,900
1,323,000
831,600
318,150
150,000
50,000
105,000
80,000
158,760
247,275
4,983,685
498,369
5,482,054
5,482,050

12.1275
1.764
3.465
2.0055
1
1
3
2
1.764
3.7695

105,000
750,000
120,000
100,000
150,000
50,000
35,000
20,000
90,000
50,000

1,273,388
1,323,000
415,800
200,550
150,000
50,000
105,000
40,000
158,760
188,475
3,904,973
390,497
4,295,470
4,295,460

7.77
1.89
0.6615
1
1
3
1.89
2.5515

105,000
750,000
100,000
150,000
50,000
35,000
90,000
50,000

815,850
1,417,500
66,150
150,000
50,000
105,000
170,100
127,575
2,902,175
290,218
3,192,393
3,192,390

1 P4 & P4'
Alumunium 4" powder coam1
Daun pintu kayu
m2
Kaca polos 5 mm
m2
Handle + kunci
bh
Kunci tanam
bh
Engsel pintu
bh
Finnishing melamik daun m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 PB1
Alumunium 4" powder coam1
Daun pintu kayu
m2
Kaca polos 5 mm
m2
Handle + kunci
bh
Kunci tanam
bh
Engsel pintu
bh
Finnishing melamik daun m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 P5
Alumunium 4" powder coam1
Daun pintu kayu
m2
Handle + kunci
bh
Kunci tanam
bh
Engsel pintu
bh
Finnishing melamik daun m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 Ps
Alumunium 4" powder coam1
Daun pintu kayu
m2
Handle + kunci
bh
Kunci tanam
bh
Engsel pintu
bh
Finnishing melamik daun m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

7.56
1.68
0.588
1
1
3
1.68
2.268

105,000
750,000
100,000
150,000
50,000
35,000
90,000
50,000

793,800
1,260,000
58,800
150,000
50,000
105,000
151,200
113,400
2,682,200
268,220
2,950,420
2,950,420

9.765
1.806
0.7875
1
1
3
1.806
2.5935

105,000
750,000
100,000
150,000
50,000
35,000
90,000
50,000

1,025,325
1,354,500
78,750
150,000
50,000
105,000
162,540
129,675
3,055,790
305,579
3,361,369
3,361,360

5.355
1.806
1
1
3
1.806
1.806

105,000
750,000
150,000
50,000
35,000
90,000
50,000

562,275
1,354,500
150,000
50,000
105,000
162,540
90,300
2,474,615
247,462
2,722,077
2,722,070

5.25
1.93725
1
1
3
1.93725
1.93725

105,000
750,000
150,000
50,000
35,000
90,000
50,000

551,250
1,452,938
150,000
50,000
105,000
174,353
96,863
2,580,403
258,040
2,838,443
2,838,440

1 BV3
Alumunium 4" powder coam1
Kaca polos 5 mm
m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 BV4
Alumunium 4" powder coam1
Kaca polos 5 mm
m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 BV5
Alumunium 4" powder coam1
Kaca polos 5 mm
m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 BV6
Alumunium 4" powder coam1
Kaca polos 5 mm
m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 BV1'
Alumunium 4" powder coam1
Kaca polos 5 mm
m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 BV1
Jalusi besi
Cat besi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

m2
m2
m2

10.08
2.24175
2.24175

105,000
100,000
50,000

1,058,400
224,175
112,088
1,394,663
139,466
1,534,129
1,534,120

7.77
1.6905
1.6905

105,000
100,000
50,000

815,850
169,050
84,525
1,069,425
106,943
1,176,368
1,176,360

5.46
1.13925
1.13925

105,000
100,000
50,000

573,300
113,925
56,963
744,188
74,419
818,606
818,600

3.15
0.588
0.588

105,000
100,000
50,000

330,750
58,800
29,400
418,950
41,895
460,845
460,840

6.93
1.2075
1.2075

105,000
100,000
50,000

727,650
120,750
60,375
908,775
90,878
999,653
999,650

1.2075
1.2075
1.2075

500,000
35,000
100,000

603,750
42,263
120,750
766,763
76,676
843,439
843,430

1 BV2'
Alumunium 4" powder coam1
Kaca polos 5 mm
m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 BV2
Jalusi besi
Cat besi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

15.33
0.81375
0.81375

105,000
100,000
50,000

1,609,650
81,375
40,688
1,731,713
173,171
1,904,884
1,904,880

0.81375
0.81375
0.81375

500,000
35,000
100,000

406,875
28,481
81,375
516,731
51,673
568,404
568,400

6.3
3.83775
2
1
6
3.83775
3.83775

105,000
750,000
150,000
50,000
35,000
90,000
50,000

661,500
2,878,313
300,000
50,000
210,000
345,398
191,888
4,637,098
463,710
5,100,807
5,100,800

m2
unit
bh
bh
m2
m2

26.565
1
1
27
53.13
26.565

120,000
350,000
50,000
35,000
75,000
25,000

3,187,800
350,000
50,000
945,000
3,984,750
664,125
9,181,675
918,168
10,099,843
10,099,840

m2
m2

1.05
1.05

120,000
25,000

126,000
26,250
152,250
15,225
167,475
167,470

m2

3.15

120,000

378,000

m2
m2
m2

1 P7
Alumunium 4" powder coam1
Daun pintu kayu
m2
Handle + kunci
bh
Kunci tanam
bh
Engsel pintu
bh
Finnishing melamik daun m2
Upah kerja
m2
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 PP4
Partisi gypsum
Rel gantung
Kunci tanam
Engsel pintu
Cat partisi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 PT2, PT3, PT4
Partisi gypsum
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 PT1
Partisi gypsum

Kusen alumunium 4" powm1


Kaca polos 5 mm
m2
Upah kerja
m2
Jumlah 1
Jumlah 2 (per m2)
Jasa 10%
Jumlah 2
Pembulatan
1 Grill penutup saluran
Siku 5 x 5
Plat strip 3 cm
Besi 10 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 Railing tangga
Hollow 5/5
Hollow 2/2
Plat strip 5/5
Base plat 6 mm
Angkur
Catbesi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 Hand rail
Hollow 5/5
Hollow 2/2
Base plat 6 mm
Angkur
Catbesi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
1 Grill penutup saluran
Plat 12 mm
Besi 10 mm
Besi 19 mm
Angkur
Catbesi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2

5.1
1.05
3.15

120,000
350,000
25,000

612,000
367,500
78,750
1,436,250
341,964
34,196
376,161
376,160

kg
kg
kg
m1

8.316
7.7
1.356454
1

15,000
15,000
10,233
30,000

124,740
115,500
13,881
30,000
284,121
28,412
312,533
312,530

kg
kg
kg
kg
bh
kg
m1

16.9708
3.696
1.2936
1.069444
4
23.02984
1

15,000
15,000
15,000
15,000
5,000
2,500
50,000

254,562
55,440
19,404
16,042
20,000
57,575
50,000
473,022
47,302
520,325
520,320

kg
kg
kg
bh
kg
m1

6.061
0.4928
1.069444
4
7.623244
1

15,000
15,000
15,000
5,000
2,500
25,000

90,915
7,392
16,042
20,000
19,058
25,000
178,407
17,841
196,247
196,240

kg
kg
kg
bh
kg
m1

16.3625
3.391135
12.242
8
31.99563
1

15,000
10,233
10,233
5,000
2,500
50,000

245,438
34,701
125,272
40,000
79,989
50,000
575,400
57,540
632,940

Pembulatan

632,940

23.84
20.72

11.84
20.72

16.1
12.6096
0
0
0
0
0
0

11.84
12.6096

4.26

16.1
12.6096
0
0
0
0
0
0

11.84
12.6096

4.26

16.2
8.2
0
0
0
0
0
8.2

8
8.2

8.2

20.72

23.56
32.412
0
0
0
0
0
32.412

14.8
32.412

8.76

10.4
6.4575
0
0
0
0
0
6.4575

6.3
6.4575

4.1

14.9
11.07
11.07

10.8
11.07

4.1

16.65
16.8875
16.8875

9.25
16.8875

1.35

1.35

1.35

0.4

4.73

4.73

4.73

91.72
45.9725

51.8

26.88

6.36
2.3165
2.3165

2.26

4.1

10.1
6.15
6.15

4.1

19
8.12

5.8
8.12

-0.8

13.04

45.9725

0
0
0
0
0
8.12

14

27.75
13.65

8.15
13.65

19.6

1.88
5.264

8.4

5.15
9.45

11.2

7.75
10.85

16.8

0
0
0
0
0
13.65

10.28
5.264
0
0
0
0
0
5.264

16.35
9.45
0
0
0
0
0
9.45

24.55
10.85
10.85

6.0845

6.0845

6.0845

91.72
45.9725

51.8

26.88

13.04

11.75
16.45

-0.8

25.2

51.8

20.16

11.41

45.9725

36.15
16.45
0
0
0
0
0
16.45

83.37
45.9725
45.9725

3.1175
0.375
3.4925

3.1175
0.375

3.655

3.655

2.365

2.365

7.4
1.8
0.63

1.8
1.8

5.6

1.8
1.89

5.6

0.9
1.935

4.3

2.52

7.4
1.89
0.63

2.52

5.2
1.935

2.52

15.6
1.68
6.6
3.03

4.8
1.68
3
1.68

1.6

11.55
1.68
3.3
1.91

3.3
1.68
1.5
1.35

0.85

7.4
1.8
0.63

1.8
1.8

5.6

5.6

3.6

5.6

1.8

3.6
1.35

1.8
0.56

7.2
1.6
0.56

1.6
1.6

5.6

9.3
1.72
0.75

4
1.72
0.75

4.3

5.1
1.72

0.8
1.72

4.3

0.9
1.72

4.1

2.52

5
1.845

2.52

9.6
2.135
2.135

6.1

3.5

7.4
1.61
1.61

4.6

2.8

5.2
1.085
1.085

3.1

2.1

3
0.56
0.56

1.6

1.4

6.6
1.15
1.15

4.6

1.15
0
1.15

1.15

14.6
0.775
0.775

3.1

11.5

0.775
0
0.775

0.775

6
3.655

1.7
3.655

4.3

21
3.655

4.3

3.655

25.3
3.655

3.655

1
#REF!

3.15

3.15

5.1
1.05
0

3
1.05

2.1

8.316
8.316
7.7
7.7
1.356454 1.356454
1

16.9708 10.9098
3.696
3.696
1.2936
1.2936
1.0694444444 1.069444
0

6.061

6.061
0.4928
0.4928
1.0694444444 1.069444
0

6.061

16.3625 12.83333 3.529167


3.391135 3.391135
12.24199735
12.242
0
1

1.Unit

1.Unit

1.Unit

1.Unit

Pasang Pintu Type.PJ.1


18.84 m'
Aluminium U
14.7 m2
Kaca Tempered 12mm
2 bh
Daun Pintu Kaca Tempered 12mm
5.85 m'
Gawangan Pintu
2 set
Konci Pintu dan Phat piting
2 bh
Floor Hing Dorma BTS 84
2 set
Handel Pintu
70 m'
Sealant kaca Tempered

Pasang Pintu Type.PJ.7 ( Aluminium )


15.5 m'
Kusen Aluminium 4"
7.4 m'
Frame jendela
1.68 m2
Daun Pintu Triplek
3.36 m2
Cat Daun Pintu DUCO
1 bh
Konci Pintu ( Setara Dekson )
3 bh
Engsel Pintu
4 bh
Engsel Jendela
2 bh
Grendel Jendela
3.35 m2
Kaca 5 mm
19 m'
Sealant kusen
32.8 m'
Sealant kaca

Pasang Pintu Type.PJ.8 ( Aluminium )


11.45 m'
Kusen Aluminium 4"
3.7 m'
Frame jendela
1.68 m2
Daun Pintu Triplek
3.36 m2
Cat Daun Pintu DUCO
1 bh
Konci Pintu ( Setara Dekson )
3 bh
Engsel Pintu
2 bh
Engsel Jendela
1 bh
Grendel Jendela
1.97 m2
Kaca 5 mm
16 m'
Sealant kusen
19.6 m'
Sealant kaca

Pasang Pintu Type.PB.1 ( Aluminium )


9.2 m'
Kusen Aluminium 4"
1.72 m2
Daun Pintu Triplek
3.44 m2
Cat Daun Pintu DUCO

@ Rp.
45,000
@ Rp.
850,000
@ Rp.
2,500,000
@ Rp.
685,000
@ Rp.
2,150,000
@ Rp.
1,350,000
@ Rp.
650,000
@ Rp.
16,500
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

132,500
105,000
750,000
160,000
475,000
48,750
48,500
33,500
125,000
7,500
6,500

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

132,500
105,000
750,000
160,000
475,000
48,750
48,500
33,500
125,000
7,500
6,500

@ Rp.
@ Rp.
@ Rp.

132,500
750,000
160,000

1
3
0.75
16.4
9

1.Unit

1.Unit

1.Unit

1.Unit

1.Unit

bh
bh
m2
m'
m'

Konci Pintu ( Setara Dekson )


Engsel Pintu
Kaca 5 mm
Sealant kusen
Sealant kaca

Pasang Pintu Type.PB.2 ( Besi )


3.1175 m2
Kusen Pintu Type PB2
0.375 m2
Jalusi Plat Besi
6.61 m2
Cat Besi
1 bh
Upah Pasang

Pasang Pintu Type.P.1 & P1' ( Besi ) 2.15 x 1.10 m


2.365 m2
Kusen Pintu Type P1'
4.73 m2
Cat Daun Pintu DUCO
1 bh
Upah Pasang

Pasang Pintu Type.P.2 ( Aluminium )


7.4 m'
Kusen Aluminium 4"
1.89 m2
Daun Pintu Triplek
3.78 m2
Cat Daun Pintu DUCO
1 bh
Konci Pintu ( Setara Dekson )
3 bh
Engsel Pintu
0.63 m2
Kaca 5 mm
13 m'
Sealant kusen
6.4 m'
Sealant kaca

Pasang Pintu Type.P.3 ( Aluminium )


7.4 m'
Kusen Aluminium 4"
1.89 m2
Daun Pintu Triplek
3.78 m2
Cat Daun Pintu DUCO
1 bh
Konci Pintu ( Setara Dekson )
3 bh
Engsel Pintu
0.63 m2
Kaca 5 mm
13 m'
Sealant kusen
6.4 m'
Sealant kaca

Pasang Pintu Type.P.4 & P4' ( Aluminium )


7.2 m'
Kusen Aluminium 4"
1.68 m2
Daun Pintu Triplek
3.36 m2
Cat Daun Pintu DUCO
1 bh
Konci Pintu ( Setara Dekson )
3 bh
Engsel Pintu

@ Rp.
475,000
@ Rp.
48,750
@ Rp.
125,000
@ Rp.
7,500
@ Rp.
6,500
Sub total :
Jasa.
Total Harga
@ Rp.
1,650,000
@ Rp.
1,600,000
@ Rp.
39,500
@ Rp.
250,000
Sub total :
Jasa.
Total Harga

@ Rp.
1,650,000
@ Rp.
160,000
@ Rp.
225,000
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

132,500
750,000
160,000
475,000
48,750
125,000
7,500
6,500

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

132,500
750,000
160,000
475,000
48,750
125,000
7,500
6,500

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

132,500
750,000
160,000
475,000
48,750

0.56 m2
12.8 m'
6 m'

1.Unit

1.Unit

1.Unit

1.Unit

1.Unit

1.Unit

Kaca 5 mm
Sealant kusen
Sealant kaca

Pasang Pintu Type.P.5 ( Aluminium )


5.1 m'
Kusen Aluminium 4"
1.72 m2
Daun Pintu Triplek
3.44 m2
Cat Daun Pintu DUCO
1 bh
Konci Pintu ( Setara Dekson )
3 bh
Engsel Pintu
10.2 m'
Sealant kusen

Pasang Pintu Type.PS ( Pintu Shaft)


5 m'
Kusen Aluminium 4"
1.84 m2
Daun Pintu Triplek
3.68 m2
Cat Daun Pintu DUCO
1 bh
Konci Pintu ( Setara Dekson )
3 bh
Engsel Pintu
10.4 m'
Sealant kusen

Pasang Pintu Type.P.6 ( Besi ) 2.15 x 1.70 m


3.655 m2
Kusen Pintu Type P6
7.31 m2
Cat Besi
1 bh
Upah Pasang

Pasang Pintu Type.P.7 ( Aluminium )


6 m'
Kusen Aluminium 4"
3.65 m2
Daun Pintu Triplek
7.3 m2
Cat Daun Pintu DUCO
1 bh
Konci Pintu ( Setara Dekson )
6 bh
Engsel Pintu
12 m'
Sealant kusen

Pasang Kusen BV.2 & BV.2'


4.6 m'
Kusen Aluminium 4"
0.77 m2
Kaca 5 mm
8.2 m'
Sealant kusen
10.2 m'
Sealant kaca

Pasang Kusen BV.3


9.6 m'
Kusen Aluminium 4"

@ Rp.
125,000
@ Rp.
7,500
@ Rp.
6,500
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

132,500
750,000
160,000
475,000
48,750
7,500

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

132,500
750,000
160,000
475,000
48,750
7,500

@ Rp.
1,650,000
@ Rp.
39,500
@ Rp.
325,000
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

132,500
750,000
160,000
475,000
48,750
7,500

@ Rp.
132,500
@ Rp.
125,000
@ Rp.
7,500
@ Rp.
6,500
Sub total :
Jasa.
Total Harga

@ Rp.

132,500

2.13 m2
15 m'
23.4 m'

1.Unit

1.Unit

1.Unit

1.Unit

1.Unit

1.Unit

Kaca 5 mm
Sealant kusen
Sealant kaca

@ Rp.
125,000
@ Rp.
7,500
@ Rp.
6,500
Sub total :
Jasa.
Total Harga

Pasang Kusen BV5


5.2 m'
1.08 m2
9 m'
11.8 m'

Kusen Aluminium 4"


Kaca 5 mm
Sealant kusen
Sealant kaca

@ Rp.
132,500
@ Rp.
125,000
@ Rp.
7,500
@ Rp.
6,500
Sub total :
Jasa.
Total Harga

Pasang Kusen BV6


3 m'
0.56 m2
6 m'
6 m'

Kusen Aluminium 4"


Kaca 5 mm
Sealant kusen
Sealant kaca

@ Rp.
132,500
@ Rp.
125,000
@ Rp.
7,500
@ Rp.
6,500
Sub total :
Jasa.
Total Harga

Pasang Kusen Jendela Type.J.1 ( Uk.4.625 x 3.5 m)


16.25 m'
Canal U
16.18 m2
Kaca Tempered 12mm
60.5 m'
Sealant kaca Tempered

Pasang Kusen Jendela Type.J.5 (Uk.13.3 x 3.55 m)


m'
Aluminium U
47.215 m2
Kaca Tempered 12mm
6 ps
Engsel jendela
6 bh
Grendel jendel
m'
Sealant kaca Tempered

Pasang Kusen Jendela Type.J.6 (Uk.13.3 x 3.55 m)


m'
Aluminium U
47.215 m2
Kaca Tempered 12mm
6 ps
Engsel jendela
6 bh
Grendel jendel
m'
Sealant kaca Tempered

Pasang Kusen Jendela Type.J.7 (Uk.13.3 x 3.55 m)


m'
Aluminium U
47.215 m2
Kaca Tempered 12mm
6 ps
Engsel jendela
6 bh
Grendel jendel

@ Rp.
45,000
@ Rp.
850,000
@ Rp.
16,500
Sub total :
Jasa.
Total Harga
@ Rp.
45,000
@ Rp.
850,000
@ Rp.
110,000
@ Rp.
33,500
@ Rp.
16,500
Sub total :
Jasa.
Total Harga
@ Rp.
45,000
@ Rp.
850,000
@ Rp.
110,000
@ Rp.
33,500
@ Rp.
16,500
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.

45,000
850,000
110,000
33,500

m'

Sealant kaca Tempered

@ Rp.
Sub total :
Jasa.
Total Harga

16,500

=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

847,800
12,495,000
5,000,000
4,007,250
4,300,000
2,700,000
1,300,000
1,155,000
31,805,050
3,180,505
34,985,555

34985555

=
=
=
=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,053,750
777,000
1,260,000
537,600
475,000
146,250
194,000
67,000
418,750
142,500
213,200
6,285,050
628,505
6,913,555

6913555

=
=
=
=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,517,125
388,500
1,260,000
537,600
475,000
146,250
97,000
33,500
246,250
120,000
127,400
4,948,625
494,863
5,443,488

5443488

=
=
=

Rp
Rp
Rp

1,219,000
1,290,000
550,400

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

475,000
146,250
93,750
123,000
58,500
3,955,900
395,590
4,351,490

4351490

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,143,875
600,000
261,095
250,000
6,254,970
625,497
6,880,467

6880467

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,902,250
756,800
225,000
4,884,050
488,405
5,372,455

5372455

=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

980,500
1,417,500
604,800
475,000
146,250
78,750
97,500
41,600
3,841,900
384,190
4,226,090

4226090

=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

980,500
1,417,500
604,800
475,000
146,250
78,750
97,500
41,600
3,841,900
384,190
4,226,090

4226090

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

954,000
1,260,000
537,600
475,000
146,250

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

70,000
96,000
39,000
3,577,850
357,785
3,935,635

3935635

=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

675,750
1,290,000
550,400
475,000
146,250
76,500
3,213,900
321,390
3,535,290

3535290

=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

662,500
1,380,000
588,800
475,000
146,250
78,000
3,330,550
333,055
3,663,605

3663605

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,030,750
288,745
325,000
6,644,495
664,450
7,308,945

7308945

=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

795,000
2,737,500
1,168,000
475,000
292,500
90,000
5,558,000
555,800
6,113,800

6113800

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

609,500
96,250
61,500
66,300
833,550
83,355
916,905

Rp

1,272,000

568400 0.619912

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

266,250
112,500
152,100
1,802,850
180,285
1,983,135

1983135

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

689,000
135,000
67,500
76,700
968,200
96,820
1,065,020

1065020

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

397,500
70,000
45,000
39,000
551,500
55,150
606,650

606650

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

731,250
13,753,000
998,250
15,482,500
1,548,250
17,030,750

17030750

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

0
40,132,750
660,000
201,000
0
40,993,750
4,099,375
45,093,125

40878950

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

0
40,132,750
660,000
201,000
0
40,993,750
4,099,375
45,093,125

=
=
=
=

Rp
Rp
Rp
Rp

0
40,132,750
660,000
201,000

=
=
=
=

Rp
Rp
Rp
Rp

0
40,993,750
4,099,375
45,093,125

ANALISA HARGA SATUAN PEKERJAAN

Kode

Item SatuaSat

Koef

Harga
Satuan
Rp.

Harga
Bahan
Rp.

Harga
Upah
Rp.

1 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 2 M'


Tukang Galorg
0.526
60000
0
31560
Mandor
org
0.052
75000
3900
Alat Bantu ls
1
25000
25000
Total

Rp.
60460
Keuntun
Rp.
0
0
6046
Total H

Rp.
66506
Dibulatkan
2 1 M3 PEK. BUANGAN TANAH KELUAR LOKASI
Sewa BekuJam
0.025
312500
Sewa Dump
Jam
0.025
62500
Alat Bantu ls
1
45000
Total

Rp.
Keuntun
Rp.
0
Total H

Rp.
Dibulatkan
3 1 M3 URUGAN TANAH KEMBALI
Tukang Galorg
0.192
Mandor
org
0.019
Alat Bantu ls
1
Total
.. Rp.
Keuntu
.. Rp.
Total
.. Rp.
Dibulatkan

40000
75000
1000
0

4 1 M3 PEMADATAN TANAH SETIAP 20 CM


Tanah Urum3
1.3
15000
Tukang Galorg
0.5
40000
Mandor
org
0.05
75000
Alat Bantu lot
0.125
1000
Total
.. Rp.
Keuntu
.. Rp.
0
Total
.. Rp.
Dibulatkan
5 1 M3 URUGAN PASIR URUG
Pasir Urug m3
1.2
Pekerja
org
0.15
Mandor
org
0.01
Total
.. Rp.

135000
312500
75000

7812.5
1562.5
45000
54375
5437.5
59812.5

7680

7680
768
8448

7812.5
1562.5
45000
54375
5437.5
59812.5
59812

7680
1425
1000
10105
1010.5
11115.5
11115

20000
3750
125
23875
2387.5
26262.5

19500
20000
3750
125
43375
4337.5
47712.5
47712

162000

162000

31560
3900
25000
60460
6046
66506
66506

1425
1000
2425
242.5
2667.5

19500

19500
0
19500

Jumlah
Harga
Rp.

46875
750
47625

162000
46875
750
209625

0.1

0.1

0.1

0.1

Keuntu
.. Rp.
Total
.. Rp.
Dibulatkan

6 1 M2 PAGAR PENGAMAN PROYEK


Seng gelomlbr
1.43
22500
Kayu Born m3
0.036 2500000
Paku 5-7 kg
0.2
12500
Ongkos pals
1
17500
Total
.. Rp.
Keuntu
.. Rp.
0
Total
.. Rp.
Dibulatkan
1 M2 PAGAR PENGA
2 X
7 1 M2 DIREKSI KEET
Seng gelomlbr
1.1
22500
Kayu Born m3
0.1 2500000
Paku 5-7 kg
0.25
12500
Tripleks 3 lbr
0.5
60000
PC
zak
0.1
56500
Pasir pasa m3
0.25
160000
Bata mera bh
70
600
Peralatan ls
1
5000
Ongkos pals
1
25000
Total
.. Rp.
Keuntu
.. Rp.
0
Total
.. Rp.
Dibulatkan

16200
178200

4762.5 20962.5
52387.5 230587.5
230587

32175
90000
2500

32175
90000
2500
17500
142175
14217.5
156392.5
156392
312784

92500
9250
101750

17500
17500
1750
19250

156392

24750
250000
3125
30000
5650
40000
42000
5000
375775
4700
380475

25000
25000
2500
27500

24750
250000
3125
30000
5650
40000
42000
5000
25000
425525
42552.5
468077.5
468077

8 1 M3 PEK. GALIAN TANAH BIASA PAKAI ALAT BERAT


Sewa BekuJam
0.025
312500
7812.5
7812.5
Operator Jam
0.025
18750
468.75
468.75
Alat Bantu ls
1
22500
22500
22500
Total

Rp.
30781.25 30781.25
Keuntun
Rp.
0
0 3078.125 3078.125
Total H

Rp.
33859.38 33859.38
Dibulatkan
33859
9 1 M3 LANTAI KERJA 1 PC : 3 PS : 5 KRL
PC
zak
3.956
56500
Pasir Beto m3
0.55
220000
Split Peca m3
0.93
220000
Peralatan ls
0.075
15000
Pekerja
org
1.3
35000
Tk. Batu S org
0.2
50000
Kepala Tu org
0.05
65000
Mandor
org
0.01
75000
Total
.. Rp.
Keuntu
.. Rp.
0

223514
121000
204600
1125

550239
0

45500
10000
3250
750
59500
5950

223514
121000
204600
1125
45500
10000
3250
750
609739
60973.9

0.1

0.1

0.1

4000

0.1
2916.667

0.1

Total
.. Rp.
Dibulatkan
10 1 M3 COR BETON SITE MIX K-225
PC
zak
7.896
56500
Split Peca m3
0.81
200000
Pasir Beto m3
0.49
200000
Peralatan ls
0.07
15000
Pekerja
org
1.5
35000
Tk. Batu S org
0.5
50000
Kp. Tukangorg
0.05
65000
Mandor
org
0.01
75000
Total
Rp.
Keuntu
Rp.
0
Total
.. Rp.
Dibulatkan
11 1 M3 COR BETON SITE MIX K-300
PC
zak
8.696
56500
Split Pec m3
0.81
200000
Pasir Bet m3
0.49
200000
Peralatan ls
0.07
15000
Pekerja org
1.5
35000
Tk. Batu org
0.5
50000
Kep. Tuka org
0.05
65000
Mandor org
0.01
75000
Total
Rp.
Keuntu
Rp.
0
Total
.. Rp.
Dibulatkan
12 1 M3 COR BETON READY MIX
Beton Ream3
1
Alat Bant ls
1
Pekerja org
2.5
Tk. Batu org
0.25
Kep. Tuka org
0.1
Mandor org
0.01
Total
Rp.
Keuntu
Rp.
Total
.. Rp.
Dibulatkan
13 1 M3 COR BETON READY MIX
Beton Ream3
1
Alat Bant ls
1
Pekerja org
2.5
Tk. Batu org
0.25
Kep. Tuka org
0.1
Mandor org
0.01

625000
15000
35000
50000
65000
75000
0

690000
30000
35000
50000
65000
75000

550239

65450 670712.9
670712

446124
162000
98000
1050

446124
162000
98000
1050
52500
25000
3250
750
788674
78867.4
867541.4
867541

707174
0
707174

52500
25000
3250
750
81500
8150
89650

491324
162000
98000
1050

752374
0
752374

52500
25000
3250
750
81500
8150
89650

625000
15000

640000
0
640000

87500
12500
6500
750
107250
10725
117975

690000
30000
87500
12500
6500
750

491324
162000
98000
1050
52500
25000
3250
750
833874
83387.4
917261.4
917261

625000
15000
87500
12500
6500
750
747250
74725
821975
821975

690000
30000
87500
12500
6500
750

0.1

726624
0.1

0.1

Total
Rp.
Keuntu
Rp.
Total
.. Rp.
Dibulatkan

14 1 KG BESI BETON TERPASANG U. 24


Besi Betonkg
1.05
8000
Kawat Bet kg
0.01
14500
Peralatan, ls
0.02
1000
Tk. Besi B org
0.025
50000
Tk. Besi B org
0.015
60000
Kep. Tukanorg
0.01
65000
Mandor
org
0.005
75000
Total
.. Rp.
Keuntu
Rp.
0
Total
.. Rp.
Dibulatkan
15 1 KG BESI BETON TERPASANG U. 39
Besi Betonkg
1.05
8000
Kawat Bet kg
0.01
14500
Peralatan, ls
0.02
1000
Tk. Besi B org
0.036
50000
Tk. Besi B org
0.016
60000
Kep. Besi org
0.011
65000
Mandor
org
0.005
75000
Total
.. Rp.
Keuntu
Rp.
0
Total
.. Rp.
Dibulatkan
16 1 M2 WIREMESH U. 50
Wiremesh m2
1.01
Kawat Bet kg
0.1
Pekerja
org
0.1
Tk. Besi B org
0.075
Mandor
org
0.01
Total
.. Rp.
Keuntu
Rp.
Total
.. Rp.
Dibulatkan

32500
14500
35000
50000
75000
0

17 1 M2 BEKISTING DENGAN PAPAN


Papan Terem3
0.024 1650000
Kaso 5/7 Bm3
0.017 2500000
Paku
kg
0.4
12500
Pekerja
org
0.12
35000
Tk. Kayu Sorg
0.15
50000
Kp. Tukan org
0.15
65000
Mandor
org
0.05
75000

720000
0
720000

107250
10725
117975

8400
145
20

8565
0
8565

1250
900
650
375
3175
317.5
3492.5

8400
145
20

8565
0
8565

1800
960
715
375
3850
385
4235

32825
1450

34275
0
34275

3500
3750
750
8000
800
8800

39600
42500
5000
4200
7500
9750
3750

827250
82725
909975
909975

8400
145
20
1250
900
650
375
11740
1174
12914
12914

8400
145
20
1800
960
715
375
12415
1241.5
13656.5
13656

32825
1450
3500
3750
750
42275
4227.5
46502.5
46502

39600
42500
5000
4200
7500
9750
3750

0.1

0.1

0.1
9300

0.1

Tk. Kayu 1 org


0.12
Total
.. Rp.
Keuntu
.. Rp.
Total
.. Rp.
Dibulatkan

50000
0

18 1 M2 BEKISTING MULTIPLEK 9 MM
Multiplek 9 m2
0.347
120000
Kaso 5/7 Bm3
0.017 2500000
Paku
kg
0.4
12500
Pekerja
org
0.12
35000
Kp. Tukan org
0.15
65000
Mandor
org
0.05
75000
Tk. Kayu 1 org
0.12
50000
Total
.. Rp.
Keuntun .. Rp.
0
Total
.. Rp.
Dibulatkan
19 1 M2 PAS. STOOT WERK
Kayu Stootbt
9 34722.22
Papan Terem3
0.016 1650000
Paku
kg
0.5
12500
Pekerja
org
0.15
35000
Tk. Kayu Sorg
0.2
60000
Kp. Tukan org
0.2
65000
Mandor
org
0.017
75000
Total
.. Rp.
Keuntun .. Rp.
0
Total
.. Rp.
Dibulatkan
20 1 M2 BEKISTING BONDEKS
Bondek
m2
1.01
Kawat las kg
0.1
Pekerja
org
0.05
Tk. Besi B org
0.09
Mandor
org
0.01
Total
.. Rp.
Keuntun .. Rp.
Total
.. Rp.
Dibulatkan
21 1 M2 BEKISTING BATA
Bata mera bh
PC
kg
Pasir pasa org
Pekerja
org
Tk. Batu org
Kep. Tuka org

70
0.2074
0.058
0.3218
0.1805
0.0158

85000
15000
35000
60000
75000
0

600
56500
160000
35000
50000
65000

87100
0
87100

6000
31200
3120
34320

41640
42500
5000

89140
0
89140

4200
9750
3750
6000
23700
2370
26070

156250
13200
6250

175700
0
175700

5250
12000
13000
1275
31525
3152.5
34677.5

85850
1500

87350
0
87350

1750
5400
750
7900
790
8690

42000
11718.1
9280
11263
9025
1027

6000
118300
11830
130130
130130

41640
42500
5000
4200
9750
3750
6000
112840
11284
124124
124124

78125
6600
6250
5250
12000
13000
1275
122500
12250
134750
0

85850
1500
1750
5400
750
95250
9525
104775
104775

42000
11718.1
9280
11263
9025
1027

0.1

0.1

0.1

0.1

Mandor
org
0.0083
Total
.. Rp.
Keuntun .. Rp.
Total
.. Rp.
Dibulatkan

75000
0

622.5
622.5
62998.1 21937.5 84935.6
0 2193.75 8493.56
62998.1 24131.25 93429.16
93429

7857.143
0.1

DAFTAR HARGA SATUAN UPAH DAN BAHAN


Hal. 1
No.

JENIS

1
I.

HARGA

SATUAN KETERANGAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

3
U PAH
PEKERJA
Rp.
TUKANG BATU
Rp.
KEPALA TUKANG BATU
Rp.
TUKANG KAYU
Rp.
KEPALA TUKANG KAYU
Rp.
TUKANG CAT/PLITUR
Rp.
KEPALA TUKANG CAT/PLITUR Rp.
TUKANG BESI BETON
Rp.
KEPALA TUKANG BESI BETON Rp.
TUKANG BESI PROFIL
Rp.
KEPALA TUKANG BESI PROFILRp.
PEMBANTU OPERATOR
Rp.
OPERATOR TERLATIH
Rp.
SUPIR TERAMPIL
Rp.
PEMBANTU SUPIR
Rp.
MANDOR
Rp.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

BAHAN
BAHAN AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA
PASIR URUG
Rp.
80000 m3
PASIR PASANG
Rp.
140000 m3
PASIR BETON
Rp.
160000 m3
BATU PECAH 1-2 CM
Rp.
170000 m3
BATU PECAH MESIN 2/3
Rp.
160000 m3
BATU PECAH MESIN 3/5
Rp.
150000 m3
BATU PECAH 5-7 CM
Rp.
130000 m3
BATU PECAH 7-10 CM
Rp.
120000 m3
BATU BELAH UNTUK PONDASIRp.
125000 m3
BATU KALI
Rp.
105000 m3
BATU ANDESIT
Rp.
140000 m2
BATU TEMPEL HITAM
Rp.
130000 m2
BATA MERAH BAKAR KEAS I Rp.
500 bh
BATA MERAH BAKAR KELAS II Rp.
425 bh
BATA CONBLOCK 40x20x10 CMRp.
3000 bh
BATA RINGAN HEBEL T. 10 CM Rp.
1000000 m3
PM 100-THIN BED MORTAR (U Rp.
2250 kg
PM 200-RENDER MORTAR (BA Rp.
1175 kg
PM 310-ACIAN PRIME MORTARRp.
1750 kg
SEMEN PC (TIGA RODA - 50 K Rp.
55000 zak
SEMEN WARNA (DUA GUNUNGRp.
4000 kg
SEMEN WARNA (MITZUBISHI) Rp.
5000 kg
BETON READY MIX K-175
Rp.
675000 m3
BETON READY MIX K-225
Rp.
700000 m3

II.
A.

4
40000
55000
60000
55000
60000
55000
60000
55000
60000
55000
60000
45000
70000
70000
45000
70000

1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari

25

BETON READY MIX K-250


Rp.
710000 m3
BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA
ALKALI (CAT DASAR ICI)
Rp.
47500 ltr
PLAMIR TEMBOK (SANLEX)
Rp.
11700 kg
CAT TEMBOK (VINILEX)
Rp.
14000 kg
CAT TEMBOK (ICI)
Rp.
30000 kg
ROL CAT TEMBOK
Rp.
32000 bh
KAPE TEMBOK
Rp.
9600 bh
KAPE KAYU
Rp.
8500 bh
ML 131 CLEAR DANAGLOS
Rp.
40000 kg
KWAS 3"
Rp.
12500 bh
KWAS 4"
Rp.
15000 bh
OKER (MATAHARI)
Rp.
17100 kg
OYAN
Rp.
4000 bks
OTEM (PEWARNA PLITUR)
Rp.
6000 bks
SPIRTUS
Rp.
6900 ltr

B.
26
27
28
29
30
31
32
33
34
35
36
37
38
39

2
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65

C.
66
67
68

3
SODA API
Rp.
BAHAN PLITUR KRIPIK (SIRLAKRp.
DEMPUL LILIN
Rp.
DEMPUL PLITUR
Rp.
DEMPUL HALUS.IMPRA (WOODRp.
TERPENTIN
Rp.
TINNER B
Rp.
KUMPON
Rp.
MELAMIN SENDING SILLER MSRp.
AMPELAS DUCO
Rp.
VERNIS (COPAL)
Rp.
PLITUR JADI (KEMUDI)
Rp.
DEMPUL KAYU
Rp.
MENI KAYU/BESI (GENTONG) Rp.
CAT KAYU (AVIAN)
Rp.
CAT KAYU (DECOLUX)
Rp.
CAT BESI (AVIAN)
Rp.
CAT BESI (DECOLUX)
Rp.
FLINGCOAT (GENTONG)
Rp.
MINYAK BAKAR SOLAR
Rp.
MINYAK BAKAR PREMIUM
Rp.
MINYAK TANAH
Rp.
MINYAK PELUMAS
Rp.
INJUK
Rp.
WATER PROOFING (NO DROP)Rp.
WATER PROOFING (AQUA PRORp.
BAHAN KAYU BERIKUT BAHAN JADINYA
KAYU LOKAL/RAWA (ALBASIAHRp.
KAYU BALOK MARANTI
Rp.
KAYU PAPAN MARANTI
Rp.

4
2500
75000
17500
17500
35000
4500
24000
42700
45000
400
15000
17500
47000
19200
50000
58000
41000
44700
10000
4500
4500
3000
28000
10000
40000
44000

bks
kg
kg
kg
kg
ltr
ltr
kg
kg
lbr
ltr
ltr
kg
kg
kg
kg
kg
kg
ltr
ltr
ltr
ltr
ltr
kg
kg
kg

1200000 m3
2750000 m3
2900000 m3

Hal. 2
5

69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85

KAYU BALOK MAHONI


Rp.
KAYU PAPAN MAHONI
Rp.
KAYU TERENTANG
Rp.
KAYU BALOK BORNEO SUPER Rp.
KAYU PAPAN BORNEO SUPER Rp.
KAYU BALOK KAMPER BANJA Rp.
KAYU PAPAN KAMPER BANJARRp.
KAYU BALOK KAMPER OVEN Rp.
KAYU PAPAN KAMPER OVEN Rp.
KAYU DOLKEN 5 - 7 CM
Rp.
KAYU DOLKEN 8 - 10 CM
Rp.
KUSEN KAYU KAMPER FINISH Rp.
PLINT MULTIPLEKS LAPIS MEGRp.
LIST MULTIPLEKS LAPIS MEGARp.
LIST MULTIPLEKS LAPIS MEGARp.
LIST KAYU KAMPER DIPROFIL Rp.
WALLPAPER TERPASANG
Rp.
BAHAN KAYU LAPIS
TRIPLEK 3 MM (120 x 240 CM) Rp.
TRIPLEK 4 MM (120 x 240 CM) Rp.
TRIPLEK 4 MM (UKURAN PINTURp.
TRIPLEK 6 MM (120 x 240 CM) Rp.
TRIPLEK 9 MM (120 x 240 CM) Rp.
MULTIPLEK 9 MM (120 x 240 C Rp.
MEGATEAK 4 MM (120 x 240 C Rp.
MEGATEAK 4 MM (UKURAN PI Rp.
MELAMIN 4 MM (120 x 240 CM) Rp.
FORMICA (UKURAN PINTU)
Rp.

D.
86
87
88
89
90
91
92
93
94
95

E.
96
97
98
99
100
F.
101
102
103
104
105
106
G.
107
108
109
110

2750000
2900000
1550000
3500000
3800000
5200000
5600000
7200000
7600000
17500
30000
95000
22500
15000
30000
10000
45000

m3
m3
m3
m3
m3
m3
m3
m3
m3
btg
btg
m'
m'
m'
m'
m'
m2

62100
84200
64000
97000
146000
146000
121000
98000
110000
90000

lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr

Hal. 3
5

60000
70000
30000
12000
35000

lbr
lbr
lbr
m'
m'

2m'/btg
2m'/btg

55000
60000
70000
65000
110000
7500

m2
m2
m2
m2
m2
bh

45000
60000
230000
85000

bh
bh
m'
bh

3
BAHAN PENUTUP RANGKA PLAFOND
BAHAN PLAFON GRC PLAT 4 Rp.
GYFSUM 120x240 CM, EX DN Rp.
GYPTILE JAYABOARD 120x60 CRp.
LIST GIFSUM MOTIF LURUS/MIRp.
DROP CEILING MOTIF SINGLE Rp.
BAHAN LANTAI DAN PELAPIS DINDING
KERAMIK 20/20 KW 1 ANTI SLI Rp.
KERAMIK 25/25 KW 1 ANTI SLI Rp.
KERAMIK 33/25 KW 1 WARNA Rp.
KERAMIK 40/40 KW 1 WARNA Rp.
GRANITE TILE 60/60 (D-EURO Rp.
LIST / BORDER KERAMIK 8/25 Rp.
BAHAN SALURAN AIR KOTOR/BERSIH
GRAVEL U 20 CM
Rp.
GRAVEL U 30 CM
Rp.
U-DITCH STANDAR TYPE U-40 Rp.
COVER UDITCH TYPE Uditch WRp.

111
112
113
114
115
116
117
118
119
120
121
122
123

PIPA PVC 1/2" AW (Wavin)


Rp.
PIPA PVC 3/4" AW (Wavin)
Rp.
PIPA PVC 1" AW (Wavin)
Rp.
PIPA PVC 1 1/4" AW (Wavin) Rp.
PIPA PVC 1 1/2" AW (Wavin) Rp.
PIPA PVC 2" AW (Wavin)
Rp.
PIPA PVC 2 1/2" AW (Wavin) Rp.
PIPA PVC 3" AW (Wavin)
Rp.
PIPA PVC 4" AW (Wavin)
Rp.
PIPA PVC 5" AW (Wavin)
Rp.
LEM PARALON
Rp.
LEM PUTIH (FOX)
Rp.
LEM KUNING (AICA/AIBON)
Rp.
BAHAN LOGAM DAN BAHAN JADINYA
BESI BETON U 24 (RATA-RATA)Rp.
BESI BETON U 39/U 32 (RATA- Rp.
BESI STRIP
Rp.
BESI SIKU EX DN
Rp.
BESI PROFIL DN SII
Rp.
TREKSTANG BESI DIA. 12 MM Rp.
BESI BATANG TARIK DIA. 16 M Rp.
BESI IKATAN ANGIN BESI DIA. Rp.
WIREMESH M6
Rp.
WIREMESH M7
Rp.
WIREMESH M8
Rp.
FLOOR DECK
Rp.
RANGKA PIPA HOLLOW 20x40 Rp.
RANGKA PIPA HOLLOW 40x40 Rp.
RANGKA METAL PURING UTAMRp.
RANGKA METAL PURING PEMBRp.
KAWAT LAS LISTRIK
Rp.
KAWAT LAS KARBIT
Rp.

G.
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141

2
142
143
144
145
146
147
148
149
150

H.
151
152
153
154

8500
10000
12000
14000
16500
23000
30000
40000
50000
70000
6000
20000
25000

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
tube
kg
kg

8750
8800
9200
9200
9750
20000
90000
75000
33600
44400
56400
115000
6000
8000
7000
5000
15000
17800

kg
kg
kg
kg
kg
bh
set
set
m2
m2
m2
m2
m'
m'
m'
m'
kg
kg

3
KAWAT BETON
KUSEN ALUMINIUM 1 1/2 X 3"
KUSEN ALUMINIUM 1 1/2 X 4"
KUSEN ALUMINIUM 1 1/2 X 6"
KARET KACA + GASKET
SILIKON
PRIME PINTU ALUMINIUM
PRIME JENDELA ALUMINIUM
PRIME JENDELA ALUMINIUM
BAHAN KACA
KACA POLOS 5 MM
KACA POLOS 8 MM
KACA RAYBAND 5 MM
KACA RAYBAND 8 MM

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

17700
95000
110000
150000
3000
8000
85000
75000
85000

kg
m'
m'
m'
m'
m'
m'
m'
m'

Rp.
Rp.
Rp.
Rp.

75000
130000
85000
240000

m2
m2
m2
m2

Hal. 4
5

155
156

KACA POLOS 10 MM
KACA TEMPERED 12 MM
BAHAN PAKU DAN MUR BOUT
PAKU 1 - 3 Cm
PAKU 5 - 7 Cm
SKRUP GYPSUM
BAUD DAN MUR 12 MM
BAUD DAN MUR 19 MM
BAUD ANGKUR 22 MM
BAUD ANGKUR 25 MM

I.
155
156
157
158
159
160
161
J.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

BAHAN PERPIPAAN
CLOSET DUDUK LENGKAP ASSRp.
CLOSET JONGKOK TOTO
Rp.
WASTAFEL LENGKAP ASSESOR
Rp.
URINOIR MUSLIM LENGKAP ASRp.
SEKAT URINOIR LENGKAP ASSRp.
KITCHEN ZINK
Rp.
TEMPAT SABUN STAINLESS Rp.
BAK FIBREGLASS STANDAR Rp.
JET WASHER SEK. TOTO
Rp.
HAND SHOWER SEK. TOTO
Rp.
KRAN TEMBOK SEK. TOTO
Rp.
KRAN GANDA SEK. TOTO
Rp.
KRAN BEBEK SEK. TOTO
Rp.
FLOOR DRAIN SEK. TOTO
Rp.
CLEAN OUT 4"
Rp.
ROOF DRAIN STAINLESS
Rp.
KACA CERMIN (DIBOVLE) DI ATRp.
BAHAN ALAT PENGGANTUNG
KUNCI TANAM 2 PUTARAN
Rp.
KUNCI KM BULAT (ALFA)
Rp.
ENGSEL PINTU (UNILON)
Rp.
ENGSEL JENDELA (UNILON) Rp.
ENGSEL ANGIN
Rp.
GRENDEL PINTU KAYU
Rp.
RAMBUNCIS
Rp.
ENGSEL CASEMENT 16"
Rp.
HANDLE/PEGANGAN PINTU STRp.
KUNCI PINTU ALUMINIUM
Rp.
FLOORHING
Rp.
GRENDEL PINTU ALUMINIUM Rp.

162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
K.
179
180
181
182
183
184
185
186
187
188
189
190

Rp.
Rp.

145000 m2
525000 m2
18000
15000
300
5000
7500
10000
12500

kg
kg
bh
bh
bh
bh
bh

1600000
350000
1200000
1450000
725000
900000
150000
250000
110000
250000
170000
175000
275000
150000
160000
150000
275000

set
bh
bh
bh
bh
bh
bh
bh
set
set
set
set
set
bh
bh
bh
set

200000
40000
15000
12000
30000
30000
15000
45000
350000
180000
600000
125000

bh
bh
bh
bh
bh
bh
set
set
set
set
set
set

1 set 2 bh
1 set 2 bh

Hal. 5
5

124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142

PIPA GSP MEDIUM 1/2 "


PIPA GSP MEDIUM 3/4 "
PIPA GSP MEDIUM 1 "
PIPA GSP MEDIUM 1 1/4 "
PIPA GSP MEDIUM 1 1/2"
PIPA GSP MEDIUM 2"
GATE VALVE 2"
GATE VALVE 1 1/2"
GATE VALVE 1 1/4"
GATE VALVE 1"
CHECK VALVE 2"
FLEXIBLE JOINT 2"
Y STAINER 2"
Y STAINER 1 1/4"
FLOAT VALVE 1"
FLOAT VALVE 2"
WLC, TERMASUK KABEL KON
PRESSURE GAUGE
HEADER 3"

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

24000
32000
40000
52000
65000
80000
950000
800000
420000
280000
1100000
320000
780000
290000
250000
420000
760000
95000
1200000

m'
m'
m'
m'
m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210

BAHAN ELEKTRIKAL
Lampu Baret Persegi TL Bulat Rp.
Downlight PLE 14 w (E27)
Rp.
Lampu Roset PLE 11 W (E27) Rp.
Armature 2 x 18 W (RM)
Rp.
Armature 2 x 36 W (RM 300) A Rp.
Saklar Tunggal 10 A, 1 Phasa
Rp.
Saklar Ganda 10 A, 1 Phasa
Rp.
Saklar Hotel Tunggal 10 A, 1 Ph Rp.
Saklar Hotel Ganda 10 A, 1 Pha Rp.
Saklar Grid 4 Gang 10 A, 1 Phas Rp.
Saklar Grid 6 Gang 10 A, 1 Phas Rp.
Stop Kontak 16 A, 1 Phasa
Rp.
Kabel NYY 4Cx10 Sqmm
Rp.
Kabel NYY 4Cx6 Sqmm
Rp.
Kabel NYM 3Cx2,5 Sqmm
Rp.
Kabel NYA 1 x 4 mm
Rp.
Kabel NYA 1Cx6 Sqmm
Rp.
Conduit dia 20 mm (3/4")
Rp.
Pipa Konduit dia 20 mm2 (3/4") Rp.
Kabel Tray 200 x 100 Sqmm
Rp.

190000
115000
54000
320000
520000
20000
30000
22000
40000
220000
320000
23000
67000
42000
11000
4000
7200
2200
2200
140000

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m'
m'
m'
m'
m'
m'
m'
m'

L.

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

OK

211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255

Kabel Tray 300 x 100 Sqmm


Kabel Ladder 300 x 100 Sqmm
Kabel Ladder 200 x 100 Sqmm
Tee 300 x 100 Sqmm
Elbow 300 x 100 Sqmm
Cross 300 x 100 Sqmm
Tee 200 x 100 Sqmm
Elbow 200 x 100 Sqmm
Cross 200 x 100 Sqmm
MCCB 100 A, 3 phasa
MCCB 50 A, 3 phasa
MCB 40 A, 3 phasa
MCB 32 A, 3 phasa
MCB 16 A, 1 phasa
MCB 10 A, 1 phasa
MCB 6 A, 1 phasa
Indicator Lamp
Fuse 4 A
Amper meter
Volt meter
Selector switch
Cosphi meter
CT 63 / 5A
Box Panel 600 x 500 x 250
Box Panel 1200 x800 x 400
Outlet Telephone
Kabel Stel K - 011 2 x 2 x 0,6 m
Kabel Stel K - 011 10 x 2 x 0,6
TB - T 10 pairs
Photo Electric Smoke Detector
Rate of Rise Heat Detector
Fixed Temperatur Heat Detector
Alarm Bell
Manual Push Button
MCFA 4 Zone
Anunciator
Kabel NYY 4Cx25 Sqmm
Kabel NYA 1Cx16 Sqmm
Kabel NYFGBY 4Cx50 Sqmm
TB - TP 20 pairs
MDF - TP 80 pairs
PABX 6 / 36
Kabel Stel - K 20 x 2 x 0,6 mm2
Lampu Indicator
Kabel NYM 3 x 2,5 mm

2
256

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3
Kabel NYA 2 x 1,5 mm

Rp.

210000
160000
130000
280000
240000
340000
240000
190000
280000
680000
660000
440000
420000
56000
56000
56000
65000
22000
200000
220000
85000
1400000
80000
900000
3200000
30000
2700
5200
620000
580000
310000
270000
240000
340000
26800000
8500000
106000
16000
210000
780000
1100000
45500000
8400
680000
11000

m'
m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
unit
unit
bh
m'
m'
unit
bh
bh
bh
bh
bh
unit
unit
m'
m'
m'
bh
bh
bh
bh
bh
m'

4
4000 m'

OK
OK
OK

OK

Hal. 6
5

257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275

MDF - Fa 40 pairs
Rp.
Outlet Data
Rp.
HUB / Switch 24 ports
Rp.
Pantch Panel HUB / Switch 8 porRp.
Rack 8U
Rp.
Kabel UTP Cat 6
Rp.
Ceiling Speaker 3 w
Rp.
Volume Kontrol
Rp.
TB - TS. 10 pairs
Rp.
Pre Recorder Evaluation
Rp.
Compact Dist / MP3 Player
Rp.
SM / FM Tuner
Rp.
Emergency Microphone
Rp.
Mixer Pre - Amplifier
Rp.
Equalizer
Rp.
Power Amplifier 1 x 240 w
Rp.
Rack
Rp.
MDF - SS 20 Pairs
Rp.
Kabel NYMHY 3 x 2,5 mm2
Rp.

880000
85000
640000
490000
1800000
5000
65000
125000
700000
4050000
2948000
3344000
685520
10383648
1679392
5060000
8402240
950000
13900

bh
bh
bh
bh
bh
m'
bh
bh
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
m'

25308.64
34479.72
44973.54

95000

3000
8000
85000

ANALISA HARGA SATUAN


#REF!
#REF!
KODE ANALISA
URAIAN

No.
1
A.
106

107

108

109

110

111

112

HARGA
KOEFISIE SATUAN SATUAN
(Rp.)
4
5
6

2
3
PEKERJAAN KUSEN ALUMINIUM
KC-1
1 M2 PAS. KACA RAYBAND 5 MM
a.
Kaca Rayband 5 mm
1.05
b.
Pekerja
0.015
c.
Tukang Kayu
0.15
Jumlah
Dibulatkan
KC-2
1 M2 PAS. KACA RAYBAND 8 MM
a.
Kaca Rayband 5 mm
1.05
b.
Pekerja
0.015
c.
Tukang Kayu
0.15
Jumlah
Dibulatkan
KC-3
1 M2 PAS. KACA POLOS 5 MM
a.
Kaca Polos 5 mm
1.05
b.
Pekerja
0.015
c.
Tukang Kayu
0.15
Jumlah
Dibulatkan
KC-4
1 M2 PAS. KACA POLOS 8 MM
a.
Kaca Polos 8 mm
1.05
b.
Pekerja
0.015
c.
Tukang Kayu
0.15
Jumlah
Dibulatkan
KC-5
1 M2 PAS. KACA POLOS 10 MM
a.
Kaca Polos 10 mm
1.05
b.
Pekerja
0.015
c.
Tukang Kayu
0.15
Jumlah
Dibulatkan
KC-5
1 M2 PAS. KACA TEMPERED 12 MM
a.
Kaca Tempered 12 mm
1.05
b.
Pekerja
0.015
c.
Tukang Kayu
0.15
Jumlah
Dibulatkan
KS-1
1 BH KUSEN PINTU & JENDELA PJ1
a.
Kusen Aluminium Atas & Antara
45.7
b.
Kusen Aluminium Bawah 4"
18.05
c.
Kaca Tempered t. 12 mm
71.9775
d.
Over Panel Pivot Patch, Top Pa
6

JUMLAH
[4 x 6]
(Rp.)
7
OK

M2
Org
Org

85000
40000
55000

89250
600
8250
98100
98100
OK

M2
Org
Org

240000
40000
55000

252000
600
8250
260850
260850
OK

M2
Org
Org

75000
40000
55000

78750
600
8250
87600
87600

M2
Org
Org

130000
40000
55000

136500
600
8250
145350
145350

M2
Org
Org

145000
40000
55000

152250
600
8250
161100
161100

M2
Org
Org

525000
40000
55000

551250
600
8250
560100
560100

M'
M'
M2
Set

150000
110000
560100
1500000

6855000
1985500
40314598
9000000

OK

OK

OK

e.

113 KS-2
a.
b.
c.
d.
e.

114 KS-3
a.
b.
c.
d.

115 KS-4
a.
b.
c.
d.
e.
f.
g.
h.
I.
j.

116 KS-5
a.
b.
c.
d.
e.
f.

Patch, Bottom Lock, Floor Hing & Hendle Stainless


Upah Pasang
0.02 Lot
Jumlah
Keuntungan Max.
=
10 %
x
Jumlah
Dibulatkan
1 BH KUSEN PINTU & JENDELA PJ2
Kusen Aluminium Atas & Antara
7.2 M'
Kusen Aluminium Bawah 4"
2 M'
Kaca Tempered t. 12 mm
11.34 M2
Over Panel Pivot Patch, Top Pa
2 Set
Patch, Bottom Lock, Floor Hing & Hendle Stainless
Upah Pasang
0.02 Lot
Jumlah
Keuntungan Max.
=
10 %
x
Jumlah
Dibulatkan
1 BH KUSEN PINTU PD1A
Kusen Aluminium Atas & Antara
9.6 M'
Kaca Tempered t. 12 mm
15.12 M2
Over Panel Pivot Patch, Top Pa
6 Set
Patch, Bottom Lock, Floor Hing & Hendle Stainless
Upah Pasang
0.02 Lot
Jumlah
Keuntungan Max.
=
10 %
x
Jumlah
Dibulatkan
1 BH KUSEN TYPE PD1 (ALUMINIUM)
Kusen Aluminium 1 1/2 x 3" War
21.09 M'
Kaca Rayban 5 mm
2.53 M2
Karet
10.6 M'
Sealant
12 M'
Daun Pintu Aluminium
11.6 M'
Engsel Pintu
6 Ps
Kunci Pintu (Patch lock + cylinde
1 Unit
Grendel Pintu Alumunium
2 Ps
Tarikan (Handle) Alumunium
2 Ps
Upah Pasang
0.1 Lot
Jumlah
Keuntungan Max.
=
10 %
x
Jumlah
Dibulatkan
1 BH KUSEN TYPE PD2
Kusen Aluminium 1 1/2 x 3" War
5.6 M'
Sealant
11.2 M'
Daun Double Megateak
2.52 M2
Kayu Kuat Kelas II (Kamper)
Engsel Pintu
6 Ps
Kunci Pintu 2 Putaran
1 Unit
Grendel Pintu kayu
2 Ps

49155098

983102
59138200
59138200 5913820
65052020
65052019
150000 1080000
110000
220000
560100 6351534
1500000 3000000
7651534 153030.7
10804565
10804565 1080456
11885021
11885021
150000 1440000
560100 8468712
1500000 9000000
9908712 198174.2
19106886
19106886 1910689
21017575
21017574
OK
95000 2003550
98100
248193
3000
31800
8000
96000
85000
986000
7500
45000
180000
180000
125000
250000
350000
700000
4540543 454054.3
4994597
4994597 499459.7
5494057
5494057
OK
95000
532000
8000
89600
506440 1276229
15000
200000
30000

90000
200000
60000

g.
h.

117 KS-6
a.
b.
c.
d.
e.
f.
g.

118 KS-7
a.
b.
c.
d.
e.
f.
g.

119 KS-8
a.
b.
c.
d.
e.
f.
g.

120 KS-9
a.
c.
d.
e.

Melamic Daun Pintu


Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN TYPE P1
Kusen Aluminium 1 1/2 x 3" War
Sealant
Daun Double Megateak
Kayu Kuat Kelas II (Kamper)
Engsel Pintu
Kunci Pintu 2 Putaran
Melamic Daun Pintu
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN TYPE P2
Kusen Aluminium 1 1/2 x 3" War
Sealant
Daun Megateak + Formica
Kayu Kuat Kelas II (Kamper)
Engsel Pintu
Kunci Pintu KM Bulat
Melamic Daun Pintu
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN TYPE P3
Kusen Aluminium 1 1/2 x 3" War
Sealant
Daun Double Megateak
Kayu Kuat Kelas II (Kamper)
Engsel Pintu
Kunci Pintu KM Bulat
Melamic Daun Pintu
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN TYPE PB1
Kusen Plat Besi Tekuk t. 2mm
Daun Pintu Plat Besi Tekuk t.
Engsel Pintu Besi
Kunci Tanam

5.04 M2
0.1 Lot
10 %

84282 424781.3
2247829 224782.9
2897393
2897393 289739.3
3187132
3187132
OK

5.2 M'
10.4 M'
1.68 M2
3
1
3.36
0.1

95000
494000
8000
83200
506440 850819.2

Ps
Unit
M2
Lot

10 %

15000
45000
200000
200000
84282 283187.5
1956207 195620.7
2151827
2151827 215182.7
2367010
2367010
OK

5.1 M'
10.2 M'
1.47 M2
3
1
1.47
0.05

95000
8000
573034

Ps
Unit
M2
Lot

10 %

5.1 M'
10.2 M'
1.47 M2
3
1
2.94
0.05

1
1
3
1

Unit
Unit
Ps
Unit

15000
45000
40000
40000
84282 123894.5
1617355 80867.73
1698222
1698222 169822.2
1868044
1868044
95000
484500
8000
81600
260850 383449.5

Ps
Unit
M2
Lot

10 %

484500
81600
842360

15000
45000
200000
200000
84282 247789.1
1442339 72116.93
1514456
1514456 151445.6
1665901
1665901
750000
750000
1500000 1500000
25000
75000
200000
200000

f.
g.

121 KS-10
a.
b.
c.
d.
e.
f.
g.

122 KS-11
a.
b.
c.
d.
e.
f.
g.

123 KS-12
a.
b.
c.
d.

124 KS-13
a.
b.
c.
d.

Pengecatan dengan Cat Besi


Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN TYPE PS1
Kusen Aluminium 1 1/2 x 3" War
Sealant
Daun Double Megateak
Kayu Kuat Kelas II (Kamper)
Engsel Pintu
Kunci Pintu KM Bulat
Melamic Daun Pintu
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN TYPE PS2
Kusen Aluminium 1 1/2 x 3" War
Sealant
Daun Double Megateak
Kayu Kuat Kelas II (Kamper)
Engsel Pintu
Kunci Pintu KM Bulat
Melamic Daun Pintu
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN JENDELA J1
Kusen Aluminium Atas & Antara
Kusen Aluminium Bawah 4"
Kaca Tempered t. 12 mm
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN JENDELA J1A
Kusen Aluminium Atas & Antara
Kusen Aluminium Bawah 4"
Kaca Tempered t. 12 mm
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

4.4 M2
0.05 Lot
10 %

60000
2789000
x

4.7 M'
9.4 M'
1.13 M2
2
1
2.26
0.05

95000
446500
8000
75200
260850 294760.5

Ps
Unit
M2
Lot

10 %

3.9 M'
7.8 M'
0.62 M2
2
1
1.24
0.05

15000
30000
200000
200000
84282 190477.3
1236938 61846.89
1298785
1298785 129878.5
1428663
1428663
95000
8000
260850

Ps
Unit
M2
Lot

10 %

2928450

264000
139450
2928450
292845
3221295
3221295

370500
62400
161727

15000
30000
200000
200000
84282 104509.7
929136.7 46456.83
975593.5
975593.5 97559.35
1073153
1073152
OK

15.6
7.8
33.54
0.02

M'
M'
M2
Lot

10 %

14.6
7.3
31.39
0.02

M'
M'
M2
Lot

10 %

150000 2340000
110000
858000
560100 18785754
21983754 439675.1
22423429
22423429 2242343
24665772
24665771
150000 2190000
110000
803000
560100 17581539
20574539 411490.8
20986030
20986030 2098603
23084633
23084632

125 KS-14
a.
b.
c.
d.
e.
f.
g.
h.

126 KS-15
a.
b.
c.
d.
e.
f.
g.
h.

127 KS-16
a.
b.
c.
d.
e.
f.
g.
h.

128 KS-17
a.
b.
c.
d.

129 KS-18
a.

1 BH KUSEN JENDELA J2
Kusen Aluminium 1 1/2 x 3" War
Kaca Polos 5 mm
Karet
Sealant
Daun Jendela Aluminium
Engsel Casemet 16"
Rambuncis
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN JENDELA J3
Kusen Aluminium 1 1/2 x 3" War
Kaca Polos 5 mm
Karet
Sealant
Daun Jendela Aluminium
Engsel Casemet 16"
Rambuncis
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN JENDELA J4
Kusen Aluminium 1 1/2 x 3" War
Kaca Polos 5 mm
Karet
Sealant
Daun Jendela Aluminium
Engsel Casemet 16"
Rambuncis
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN J5
Kusen Aluminium Atas & Bawah
Kaca Tempered t. 12 mm
Kusen Aluminium Tengah/Tegak
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN J6
Kusen Aluminium Atas & Bawah

OK
17.8
5.3
23.9
19.8
16.2
4
4
0.05

M'
M2
M'
M'
M'
Ps
Bh
Lot

10 %

150000 2670000
87600
464280
3000
71700
8000
158400
75000 1215000
45000
180000
15000
60000
4819380
240969
5060349
5060349 506034.9
5566384
5566383
OK

9.2
2.4
10.9
13.6
7.2
2
2
0.05

M'
M2
M'
M'
M'
Ps
Bh
Lot

10 %

23.6
7.6
33
23.6
7.8
2
2
0.05

M'
M2
M'
M'
M'
Ps
Bh
Lot

10 %

24.2
43.56
24.2
0.02

M'
M2
M'
Lot

10 %

22 M'

150000 1380000
87600
210240
3000
32700
8000
108800
75000
540000
45000
90000
15000
30000
2391740
119587
2511327
2511327 251132.7
2762460
2762459
150000 3540000
87600
665760
3000
99000
8000
188800
75000
585000
45000
90000
15000
30000
5198560
259928
5458488
5458488 545848.8
6004337
6004336
95000
560100
150000
26696956

2299000
24397956
3630000
533939.1
30860895
30860895 3086090
33946985
33946984
95000 2090000

b.
c.
d.

130 KS-19
a.
b.
c.
d.
e.
f.
g.
h.

131 KS-20
a.
b.
c.
d.
e.

132 KS-21
a.
b.
c.
d.
e.

133 KS-22
a.
b.
c.
d.
e.

Kaca Tempered t. 12 mm
Kusen Aluminium Tengah/Tegak
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN JENDELA J7
Kusen Aluminium 1 1/2 x 3" War
Kaca Polos 5 mm
Karet
Sealant
Daun Jendela Aluminium
Engsel Casemet 16"
Rambuncis
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN JENDELA J8
Kusen Aluminium 1 1/2 x 3" War
Kaca Polos 5 mm
Karet
Sealant
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN JENDELA J9
Kusen Aluminium 1 1/2 x 3" War
Kaca Polos 8 mm
Karet
Sealant
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN JENDELA B1
Kusen Aluminium 1 1/2 x 3" War
Kaca Polos 5 mm
Karet
Sealant
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

39.6 M2
22 M'
0.02 Lot
10 %

33.8
13.25
50.2
32.4
10.8
2
2
0.05

M'
M2
M'
M'
M'
Ps
Bh
Lot

10 %

560100 22179960
150000 3300000
24269960 485399.2
28055359
28055359 2805536
30860895
30860895
150000 5070000
87600 1160700
3000
150600
8000
259200
75000
810000
45000
90000
15000
30000
7570500
378525
7949025
7949025 794902.5
8743928
8743927
OK

3.6
0.72
3.4
7.2
0.05

M'
M2
M'
M'
Lot

10 %

150000
87600
3000
8000
4819380
x

540000
63072
10200
57600
240969
911841
911841 91184.1
1003025
1003025
OK

17.2
12.24
17.2
34.4
0.05

M'
M2
M'
M'
Lot

10 %

150000 2580000
145350 1779084
3000
51600
8000
275200
4685884 234294.2
4920178
4920178 492017.8
5412196
5412196
OK

3.8
0.66
2.1
3.8
0.05

M'
M2
M'
M'
Lot

10 %

150000
87600
3000
8000
664516

570000
57816
6300
30400
33225.8
697741.8
697741.8 69774.18
767516
767515

134 KS-23
a.
b.
c.
d.
e.

135 PTS
a.
b.
c.
d.
e.

136 RAILL-1
a.
b.
d.
e.
f.

137 RAILL-2
a.
b.
c.
d.
e.

1 BH KUSEN JENDELA B2
Kusen Aluminium 1 1/2 x 3" War
7.7 M'
150000
Kaca Polos 5 mm
1.62 M2
87600
Karet
4.7 M'
3000
Sealant
14 M'
8000
Upah Pasang
0.05 Lot
1423012
Jumlah
Keuntungan Max.
=
10 %
x
1494163
Jumlah
Dibulatkan
1 M2 DINDING PARTISI
1 M2
Panel Double Gypsum t. 9 mm
2 M2
24500
Rangka Pipa Hollow 40X40
1 M'
8000
Rangka Pipa Hollow 40X20
1.5 M'
6000
Upah Pasang dan Alat Bantu
1 M2
5000
Pengecatan dengan cat tembok
2 M2
24468
Jumlah
Keuntungan Max.
=
10 %
x
119936
Jumlah
Dibulatkan
1 M' RAILLING TANGGA PIPA STAINLESS
Pipa Stainless diameter 2"
2 M'
120000
Pipa Stainless diameter 1"
4 M'
80000
Pabrikasi & Pengelasan
1 Lot
75000
Alat Bantu
1 M'
20000
Ongkos pasang & penghalusan
0.1 Lot
635000
Jumlah
Keuntungan Max.
=
10 %
x
718500
Jumlah
Dibulatkan
1 M' HAND RAILLING PADA DINDING PIPA STAINLESS
Pipa Stainless diameter 2"
1 M'
120000
Pipa Stainless diameter 1"
0.2 M'
80000
Peralatan dudukan tiang
2 Bh
20000
Alat Bantu
0.15 M2
10000
Ongkos pasang & penghalusan
0.05 Lot
176000
Jumlah
Keuntungan Max.
=
10 %
x
186300
Jumlah
Dibulatkan

1155000
141912
14100
112000
71150.6
1494163
149416.3
1643579
1643578
49000
8000
9000
5000
48936
119936
11993.6
131929.6
131929
240000
320000
75000
20000
63500
718500
71850
790350
790350
120000
16000
40000
1500
8800
186300
18630
204930
204930