01.00.00
ESTRUCTURAS
01.01.00
0.000
01.01.01
01.01.01.01
CONSTRUCCIONES PROVISIONALES
ALQUILER DE OFICINA Y ALMACEN PARA OBRA
0.000
0.000
01.01.02.02
INSTALACIONES PROVISIONALES
AGUA PARA LA CONSTRUCCIN
Agua provisional para la construccin
1.00
1.00
1.00
1.00
34.94
0.000
Mes
1.00
Glb
34.94
ML
4.00
Mes
4.00
Mes
229.19
M2
1.000
0.000
0.000
34.940
1.00
4.00
4.000
1.00
4.00
4.000
0.000
1.00
1.00
Area =
229.19
1.00
1.00
1.00
1.00
1.00
1.00
Area =
Area =
Area =
27.82
22.94
20.00
1.00
1.00
1.00
1.00
1.00
1.00
Area =
Area =
Area =
41.20
22.94
20.00
229.188
0.000
0.000
0.000
27.820
22.940
20.000
0.000
41.200
22.940
20.000
En Vivienda
1.00
1.00
Area =
137.62
137.620
En SS.HH
1.00
1.00
Area =
5.88
5.880
Escalera de Acceso
1.00
1.00
Area =
11.61
11.610
Balcon
1.00
1.00
Area =
1.44
1.440
1.00
1.00
1.00
1.00
47.40
7.70
0.65
0.65
3.20
3.20
0.000
98.592
16.016
1.00
1.00
1.00
1.00
4.00
5.20
0.65
0.65
3.20
3.20
8.320
10.816
1.00
1.00
7..7
0.65
3.20
1.00
1.00
53.90
0.65
3.80
2.080
0.000
133.133
1.00
1.00
1.00
1.00
4.00
5.20
0.65
0.65
3.80
3.80
9.880
12.844
1.00
1.00
1.50
0.60
0.80
0.720
1.00
1.00
6.50
0.20
3.00
3.900
1.00
1.00
Area =
1.98
1.980
En Vivienda
En 1er Nivel
En 2do Nivel
En 1er Nivel
En 2do Nivel
En SS.HH
3.00
0.000
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
Limpieza preliminar del Terreno
UND
3.000
01.01.03
01.01.03.01
01.01.02
01.01.02.01
3.00
01.01.01.03
1.00
TOTAL
PLANILLA DE METRADOS
PROYECTO : "EDIFICIO COMERCIAL"
PROPIETARIO
PLANO
ESPECIALIDAD : ESTRUCTURAS
FECHA
HECHO POR
HOJA N
: INDICADO
: BC - SH
DESCRIPCION
En Vivienda
En SS.HH
CANT. N VECES
1.20
1.00
70.200
4.400
1.00
Vol =
#REF!
% Esponj =
1.40
#REF!
1.00
Area =
#REF!
% Esponj =
1.40
#REF!
1.00
1.000
01.04.02
01.04.03
01.04.04
0.000
0.000
0.000
1.00
1.00
Area =
229.19
1.00
1.00
Area =
229.19
01.04.00
01.04.01
1.00
PARCIAL
58.50
4.40
01.03.02
ALTO
1.00
1.00
01.02.01
01.03.00
01.03.01
DIMENSIONES
ANCHO
1.00
1.00
01.02.00
LARGO
SEGURIDAD Y SALUD
ELABORACIN, IMPLEMENTACIN Y ADMINISTRACIN DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
Elaboracion, implementacion y Administracion del Plan de Seg 1.00
1.00
-
229.188
0.000
0.000
229.188
TOTAL
UND
1.00
Glb
229.19
M2
229.19
M2
1.00
Glb
1.00
Glb
1.00
Glb
1.00
Glb
1.00
Glb
1.00
Glb
229.19
M2
124.75
M3
67.30
M3
1.000
0.000
1.00
1.00
1.000
0.000
1.00
1.00
1.000
0.000
1.00
1.00
1.000
0.000
01.04.05
01.04.06
1.00
1.00
1.000
1.00
1.000
01.05.00
MOVIMIENTO DE TIERRAS
01.05.01
01.05.02
01.05.03
0.000
1.00
Area =
229.19
0.000
229.188
20.00
1.00
2.00
2.00
1.50
0.000
0.000
120.000
1.00
1.00
1.40
2.26
1.50
4.746
1.00
0.26
0.50
0.70
0.000
0.000
0.091
1.00
2.00
1.00
1.00
2.27
0.26
0.50
0.50
0.70
0.70
0.795
0.182
1.00
1.00
1.00
1.00
1.28
2.26
0.50
0.50
0.70
0.70
0.000
0.448
0.791
Eje 1-1
Entre eje A-B
Eje 4-4
0.000
PLANILLA DE METRADOS
PROYECTO : "EDIFICIO COMERCIAL"
PROPIETARIO
PLANO
ESPECIALIDAD : ESTRUCTURAS
FECHA
HECHO POR
HOJA N
: INDICADO
: BC - SH
DESCRIPCION
Entre eje A-B
Entre eje B-C
Entre eje C-D
Entre eje D-E
Eje A-A
Entre eje 2-3
Entre eje 3-4
LARGO
DIMENSIONES
ANCHO
ALTO
PARCIAL
1.00
1.00
1.26
0.50
0.70
0.441
1.00
1.00
1.00
1.00
1.00
1.00
2.26
2.26
1.26
0.50
0.50
0.50
0.70
0.70
0.70
0.791
0.791
0.441
1.00
1.00
2.13
0.50
0.70
0.000
0.746
1.00
1.00
2.13
0.50
0.70
1.00
1.00
1.28
0.50
0.70
0.746
0.000
0.448
1.00
1.00
1.00
1.00
2.13
2.08
0.50
0.50
0.70
0.70
0.746
0.728
1.00
1.00
1.00
1.00
1.09
2.13
0.50
0.50
0.70
0.70
0.000
0.382
0.746
1.00
1.00
2.05
0.50
0.70
1.00
1.00
1.00
1.00
1.00
1.00
0.96
2.08
2.02
0.50
0.50
0.50
0.70
0.70
0.70
0.718
0.000
0.336
0.728
0.707
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.29
0.90
2.42
3.08
0.90
0.85
1.98
1.20
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.90
1.152
0.315
0.847
1.078
0.630
0.298
0.693
0.540
1.00
3.00
3.10
1.80
2.25
37.665
En Tienda N 02
En Tienda N 03
1.00
1.00
1.00
1.00
1.00
1.00
Area=
Area=
Area=
25.35
26.42
37.82
0.10
0.10
0.10
2.535
2.642
3.782
En Tienda N 04
En SS.HH.
1.00
1.00
1.00
1.00
Area=
Area=
27.34
3.66
0.10
0.10
2.734
0.366
1.00
1.00
1.00
1.00
Area=
Area=
1.37
0.85
0.10
0.10
0.137
0.085
0.000
Eje C-C
Entre eje 1-2
01.05.04
CANT. N VECES
0.000
0.000
2.00
0.45
0.84
2.00
0.30
0.50
0.90
0.90
0.60
72.000
-2.430
-1.260
-1.00
-3.00
1.00
1.00
1.68
0.84
0.50
0.50
0.60
0.60
-0.504
-0.756
-2.00
-6.00
-4.00
1.00
1.00
1.00
1.70
0.84
0.80
0.50
0.50
0.50
0.60
0.60
0.60
-1.020
-1.512
-0.960
-2.00
-4.00
1.00
1.00
1.59
0.80
0.50
0.50
0.60
0.60
-0.954
-0.960
-2.00
-4.00
-2.00
1.00
1.00
1.00
1.59
0.80
1.59
0.50
0.50
0.50
0.60
0.60
0.60
-0.954
-0.960
-0.954
-4.00
1.00
0.80
0.50
0.60
-0.960
TOTAL
UND
59.66
M3
PLANILLA DE METRADOS
PROYECTO : "EDIFICIO COMERCIAL"
PROPIETARIO
PLANO
ESPECIALIDAD : ESTRUCTURAS
FECHA
HECHO POR
HOJA N
: INDICADO
: BC - SH
DESCRIPCION
Relleno en Zapata Z-2
Descuento de Placa
Descuento de Cimiento
01.05.05
ALTO
PARCIAL
1.00
1.00
2.27
1.40
0.90
2.860
1.00
1.00
1.00
2.60
0.58
0.29
0.25
0.50
0.50
0.90
0.60
0.60
-0.585
-0.348
-0.087
0.000
2.00
2.00
3.00
3.00
2.50
1.80
0.30
0.30
Esp. =
1.20
Vol. =
114.97
Esp. =
1.20
Vol. =
114.97
2.25
2.25
Eje 3-3
Entre eje A-B
Entre eje B-C
Eje 4-4
Entre eje A-B
Entre eje B-C
Entre eje C-D
Entre eje D-E
Eje A-A
Entre eje 1-2
Entre eje 2-3
Entre eje 3-4
Eje C-C
Entre eje 1-2
Entre eje 2-3
Entre eje 3-4
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.09
1.63
1.25
1.08
1.10
0.50
0.50
0.50
0.50
0.50
0.60
0.60
0.60
0.60
0.60
1.00
1.00
1.00
1.00
3.80
3.95
0.50
0.50
0.60
0.60
1.00
1.00
3.81
0.50
0.60
0.000
0.327
0.489
0.375
0.324
0.330
0.000
1.140
1.185
0.000
1.143
1.00
1.00
1.00
1.00
1.00
1.00
3.96
3.96
3.81
0.50
0.50
0.50
0.60
0.60
0.60
1.188
1.188
1.143
1.00
1.00
0.80
0.50
0.60
0.000
0.240
1.00
1.00
1.00
1.00
3.73
1.10
0.50
0.50
0.60
0.60
1.119
0.330
0.000
1.00
1.00
1.00
1.00
3.58
3.73
0.50
0.50
0.60
0.60
1.074
1.119
1.00
1.00
4.48
0.50
0.60
1.00
1.00
3.48
0.50
0.60
1.344
0.000
1.044
1.00
1.00
1.00
1.00
3.73
4.45
0.50
0.50
0.60
0.60
1.119
1.335
1.00
1.00
1.00
1.00
3.29
3.73
0.50
0.50
0.60
0.60
0.000
0.987
1.119
1.00
1.00
4.42
0.50
0.60
1.326
1.00
1.00
1.00
1.00
1.00
1.00
4.00
0.90
2.42
0.50
0.50
0.50
0.60
0.60
0.60
1.200
0.270
0.726
1.00
1.00
3.78
0.50
0.60
1.134
Eje D-D
Entre eje 1-2
17.42
M3
137.96
M3
137.96
M3
26.75
M3
137.96
UND
137.96
Eje 1-1
Entre eje A-B
Entre eje B-C
TOTAL
10.125
7.290
0.000
DIMENSIONES
ANCHO
-1.00
-2.00
-1.00
LARGO
01.05.06
CANT. N VECES
PLANILLA DE METRADOS
PROYECTO : "EDIFICIO COMERCIAL"
PROPIETARIO
PLANO
ESPECIALIDAD : ESTRUCTURAS
FECHA
HECHO POR
HOJA N
: INDICADO
: BC - SH
DESCRIPCION
01.06.02
01.06.02.01
CANT. N VECES
LARGO
DIMENSIONES
ANCHO
ALTO
2.00
1.00
0.90
0.50
0.60
0.540
1.00
1.00
1.00
1.00
1.00
1.00
1.43
1.98
1.30
0.50
0.50
0.50
0.60
0.60
0.60
0.429
0.594
0.390
2.00
1.00
0.80
0.50
0.60
0.480
SOBRECIMIENTOS
CONCRETO 1:8+25% PM 3" MAX. PARA SOBRECIMIENTOS
Entre eje A-B
Entre eje B-C
1.00
1.00
1.00
1.00
1.09
1.63
0.15
0.15
0.30
0.30
0.049
0.073
1.00
1.00
1.00
1.00
1.00
1.00
1.25
1.08
1.10
0.15
0.15
0.15
0.30
0.30
0.30
0.056
0.049
0.050
1.00
1.00
1.00
1.00
1.00
1.00
3.80
2.05
1.30
0.25
0.25
0.25
0.30
0.30
0.30
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.81
3.96
3.96
3.81
0.25
0.25
0.25
0.25
0.30
0.30
0.30
0.30
1.00
1.00
1.00
1.00
1.00
1.00
0.80
3.73
1.10
0.15
0.15
0.15
0.30
0.30
0.30
1.00
1.00
1.00
1.00
1.00
1.00
3.58
3.13
4.48
0.25
0.25
0.25
0.30
0.30
0.30
0.000
0.285
0.154
0.098
0.000
0.286
0.297
0.297
0.286
0.000
0.036
0.168
0.050
0.000
0.269
0.235
0.336
1.00
1.00
1.00
1.00
3.48
3.73
0.25
0.25
0.30
0.30
0.000
0.261
0.280
1.00
1.00
4.45
0.25
0.30
0.334
0.000
1.00
1.00
1.00
1.00
1.00
1.00
3.29
3.73
4.42
0.25
0.25
0.25
0.30
0.30
0.30
0.247
0.280
0.332
1.00
1.00
4.21
0.15
0.30
0.189
1.00
1.00
1.00
1.00
1.00
1.00
1.35
2.27
1.29
0.15
0.15
0.15
0.30
0.30
0.30
0.061
0.102
0.058
1.00
1.00
1.00
1.00
0.61
1.27
0.15
0.15
0.30
0.30
0.027
0.057
2.00
1.00
1.00
1.00
1.00
1.00
1.95
1.20
1.20
0.15
0.15
0.15
0.30
0.30
0.30
0.176
0.054
0.054
2.00
1.00
1.31
0.15
0.30
0.118
Eje 3-3
Entre eje A-B
Entre eje B-C
Eje 4-4
Entre eje A-B
Entre eje B-C
Entre eje C-D
Entre eje D-E
Eje A-A
Entre eje 1-2
Entre eje 2-3
Entre eje 3-4
Eje C-C
Entre eje 1-2
Entre eje 2-3
Entre eje 3-4
Eje D-D
TOTAL
UND
5.70
M3
51.25
M2
0.000
Eje 1-1
01.06.02.02
PARCIAL
2.00
1.00
1.09
0.30
0.000
0.654
2.00
1.00
1.63
0.30
0.978
PLANILLA DE METRADOS
PROYECTO : "EDIFICIO COMERCIAL"
PROPIETARIO
PLANO
ESPECIALIDAD : ESTRUCTURAS
FECHA
HECHO POR
HOJA N
: INDICADO
: BC - SH
DESCRIPCION
CANT. N VECES
LARGO
DIMENSIONES
ANCHO
ALTO
PARCIAL
2.00
1.00
1.25
0.30
0.750
2.00
2.00
1.00
1.00
1.08
1.10
0.30
0.30
0.648
0.660
0.000
2.00
2.00
1.00
1.00
3.80
2.05
0.30
0.30
2.280
1.230
2.00
1.00
1.30
0.30
2.00
1.00
3.81
0.30
0.780
0.000
2.286
2.00
2.00
1.00
1.00
3.96
3.96
0.30
0.30
2.376
2.376
2.00
1.00
3.81
0.30
2.00
1.00
0.80
0.30
2.286
0.000
0.480
2.00
2.00
1.00
1.00
3.73
1.10
0.30
0.30
2.00
2.00
2.00
1.00
1.00
1.00
3.58
3.13
4.48
0.30
0.30
0.30
2.00
2.00
2.00
1.00
1.00
1.00
3.48
3.73
4.45
0.30
0.30
0.30
2.00
2.00
2.00
1.00
1.00
1.00
3.29
3.73
4.42
0.30
0.30
0.30
2.238
0.660
0.000
2.148
1.878
2.688
0.000
2.088
2.238
2.670
0.000
1.974
2.238
2.652
2.00
2.00
1.00
1.00
4.21
1.35
0.30
0.30
2.526
0.810
2.00
2.00
2.00
1.00
1.00
1.00
2.27
1.29
0.61
0.30
0.30
0.30
1.362
0.774
0.366
2.00
2.00
1.00
1.00
1.27
1.95
0.30
0.30
0.762
1.170
2.00
2.00
2.00
1.00
1.00
1.00
1.20
1.20
1.31
0.30
0.30
0.30
0.720
0.720
0.786
En Tienda N 01
En Tienda N 02
1.00
1.00
1.00
1.00
Area=
Area=
39.63
47.34
39.626
47.344
En Tienda N 03
En Tienda N 04
En SS.HH.
1.00
1.00
1.00
1.00
Area=
Area=
52.08
49.20
52.080
49.200
1.00
1.00
1.00
1.00
1.00
1.00
Area=
Area=
Area=
2.31
4.37
2.31
2.313
4.370
2.306
1.00
1.00
2.00
2.00
0.50
2.000
1.00
1.00
2.27
1.40
0.50
1.589
01.06.03
FALSOPISO
01.06.03.01
01.07.00
01.07.01
01.07.01.01
ZAPATAS
CONCRETO fc = 210 kg/cm2 PARA ZAPATAS
En Zapata Z-1
En Zapata Z-2
TOTAL
UND
197.24
M2
3.59
M3
PLANILLA DE METRADOS
PROYECTO : "EDIFICIO COMERCIAL"
PROPIETARIO
PLANO
ESPECIALIDAD : ESTRUCTURAS
FECHA
HECHO POR
HOJA N
: INDICADO
: BC - SH
01.07.01.02
DESCRIPCION
1.00
1.00
PARCIAL
TOTAL
UND
0.000
646.530
0.000
646.53
KG
42.30
M3
5,977.00
KG
418.24
M2
131.11
M3
0.000
0.000
1.00
1.00
1.00
0.45
0.45
0.35
0.30
0.30
0.30
12.30
2.60
2.60
33.210
0.702
0.546
Placa P - 1
1.00
1.00
2.55
0.25
12.30
7.841
1.00
1.00
01.07.03
01.07.03.01
ALTO
20.00
2.00
2.00
DIMENSIONES
ANCHO
COLUMNAS
CONCRETO fc = 210 kg/cm2 PARA COLUMNAS
Columnas C - 1
01.07.02.02
LARGO
01.07.02
01.07.02.01
CANT. N VECES
20.00
1.00
1.00
1.00
1.50
5.20
4.30
4.30
129.000
22.360
20.00
1.00
3.00
3.00
1.50
5.20
2.40
2.40
216.000
37.440
2.00
2.00
1.00
1.00
1.50
1.30
2.40
2.40
7.200
6.240
VIGAS
CONCRETO fc = 210 kg/cm2 PARA VIGAS Y DINTELES
1.00
1.00
1.00
1.00
1.00
1.00
3.87
3.73
4.50
0.25
0.25
0.25
0.45
0.45
0.45
0.000
0.435
0.420
0.506
Eje C
1.00
1.00
1.00
1.00
1.00
1.00
3.67
3.73
4.48
0.25
0.25
0.25
0.45
0.45
0.45
0.413
0.420
0.504
Eje D
1.00
1.00
1.00
1.00
3.48
3.73
0.25
0.25
0.45
0.45
0.392
0.420
1.00
1.00
4.45
0.25
0.45
1.00
1.00
4.06
0.25
0.45
0.501
0.000
0.457
1.00
1.00
1.00
1.00
3.73
4.53
0.25
0.25
0.45
0.45
0.420
0.510
1.00
1.00
1.00
1.00
1.00
1.00
3.29
3.73
4.42
0.25
0.25
0.25
0.45
0.45
0.45
0.370
0.420
0.497
Eje E
Eje C
0.000
2.00
2.00
4.00
4.00
3.79
3.94
0.25
0.25
3.00
0.30
22.740
2.364
0.000
1.00
1.00
4.10
0.30
0.17
0.209
0.000
1.00
1.00
1.00
1.00
1.00
1.00
3.87
3.73
4.50
0.25
0.25
0.25
0.45
0.45
0.45
0.435
0.420
0.506
1.00
1.00
3.67
0.25
0.45
0.413
PLANILLA DE METRADOS
PROYECTO : "EDIFICIO COMERCIAL"
PROPIETARIO
PLANO
ESPECIALIDAD : ESTRUCTURAS
FECHA
HECHO POR
HOJA N
: INDICADO
: BC - SH
DESCRIPCION
CANT. N VECES
LARGO
DIMENSIONES
ANCHO
ALTO
PARCIAL
1.00
1.00
3.73
0.25
0.45
0.420
1.00
1.00
1.00
1.00
1.00
1.00
4.48
3.48
3.73
0.25
0.25
0.25
0.45
0.45
0.45
0.504
0.392
0.420
1.00
1.00
4.45
0.25
0.45
0.501
0.000
1.00
1.00
1.00
1.00
1.00
1.00
4.06
3.73
4.53
0.25
0.25
0.25
0.45
0.45
0.45
0.457
0.420
0.510
1.00
1.00
1.00
1.00
3.29
3.73
0.25
0.25
0.45
0.45
0.370
0.420
1.00
1.00
4.42
0.25
0.45
0.497
0.000
2.00
2.00
4.00
4.00
3.79
3.94
0.25
0.25
3.00
0.30
1.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
4.10
3.95
4.05
2.20
0.30
0.30
0.30
0.30
0.17
0.17
0.17
0.17
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.87
3.73
4.50
3.67
3.73
4.48
3.48
3.73
4.45
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
22.740
2.364
0.000
0.209
0.403
0.413
0.224
0.000
0.435
0.420
0.506
0.413
0.420
0.504
0.392
0.420
0.501
1.00
1.00
1.00
1.00
4.06
3.73
0.25
0.25
0.45
0.45
0.000
0.457
0.420
1.00
1.00
1.00
1.00
4.53
3.29
0.25
0.25
0.45
0.45
0.510
0.370
1.00
1.00
1.00
1.00
3.73
4.42
0.25
0.25
0.45
0.45
0.420
0.497
0.000
2.00
4.00
3.79
0.25
3.00
22.740
2.00
4.00
3.94
0.25
0.30
1.00
1.00
4.10
0.30
0.17
2.364
0.000
0.209
2.00
2.00
1.00
1.00
3.95
4.05
0.30
0.30
0.17
0.17
0.403
0.413
2.00
1.00
2.20
0.30
0.17
1.00
1.00
3.87
0.25
0.45
0.224
0.000
0.435
1.00
1.00
1.00
1.00
3.73
4.50
0.25
0.25
0.45
0.45
0.420
0.506
Eje C
1.00
1.00
1.00
1.00
1.00
1.00
3.67
3.73
4.48
0.25
0.25
0.25
0.45
0.45
0.45
0.413
0.420
0.504
Eje D
1.00
1.00
3.48
0.25
0.45
0.392
Eje D
Eje E
Eje C
Eje D
Eje E
TOTAL
UND
PLANILLA DE METRADOS
PROYECTO : "EDIFICIO COMERCIAL"
PROPIETARIO
PLANO
ESPECIALIDAD : ESTRUCTURAS
FECHA
HECHO POR
HOJA N
: INDICADO
: BC - SH
DESCRIPCION
Eje E
01.07.03.03
LARGO
DIMENSIONES
ANCHO
ALTO
PARCIAL
1.00
1.00
3.73
0.25
0.45
0.420
1.00
1.00
4.45
0.25
0.45
1.00
1.00
4.06
0.25
0.45
0.501
0.000
0.457
1.00
1.00
1.00
1.00
3.73
4.53
0.25
0.25
0.45
0.45
0.420
0.510
1.00
1.00
1.00
1.00
1.00
1.00
3.29
3.73
4.42
0.25
0.25
0.25
0.45
0.45
0.45
0.370
0.420
0.497
4.00
4.00
3.79
3.94
0.25
0.25
3.00
0.30
22.740
2.364
0.000
1.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
4.10
3.95
4.05
2.20
0.30
0.30
0.30
0.30
0.17
0.17
0.17
0.17
0.209
0.403
0.413
0.224
1.00
7,093.340
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
3.87
3.73
4.50
3.87
3.73
4.50
0.25
0.25
0.25
-
0.25
0.25
0.25
0.000
0.000
0.968
0.933
1.125
1.935
1.865
2.250
1.00
1.00
1.00
1.00
3.67
3.73
0.25
0.25
0.918
0.933
1.00
1.00
1.00
2.00
4.48
3.67
0.25
-
0.25
1.120
1.835
1.00
1.00
2.00
2.00
3.73
4.48
0.25
0.25
1.865
2.240
1.00
1.00
1.00
1.00
3.48
3.73
0.25
0.25
0.870
0.933
1.00
1.00
1.00
1.00
2.00
2.00
4.45
3.48
3.73
0.25
-
0.25
0.25
1.113
1.740
1.865
1.00
2.00
4.45
0.25
2.225
0.000
1.00
1.00
1.00
1.00
4.06
3.73
0.25
0.25
1.015
0.933
1.00
1.00
1.00
2.00
4.53
4.06
0.25
-
0.25
1.133
2.030
1.00
1.00
2.00
2.00
3.73
4.53
0.25
0.25
1.865
2.265
1.00
1.00
3.29
0.25
0.823
Lados de viga
TOTAL
UND
7,093.34
KG
312.81
M2
0.000
2.00
2.00
01.07.03.02
CANT. N VECES
Eje C
Fondo de viga
Lados de viga
Eje D
Fondo de viga
Lados de viga
Lados de viga
Eje E
Fondo de viga
PLANILLA DE METRADOS
PROYECTO : "EDIFICIO COMERCIAL"
PROPIETARIO
PLANO
ESPECIALIDAD : ESTRUCTURAS
FECHA
HECHO POR
HOJA N
: INDICADO
: BC - SH
DESCRIPCION
CANT. N VECES
LARGO
DIMENSIONES
ANCHO
ALTO
PARCIAL
1.00
1.00
3.73
0.25
0.933
1.00
1.00
1.00
1.00
2.00
2.00
4.42
3.29
3.73
0.25
-
0.25
0.25
1.105
1.645
1.865
1.00
2.00
4.42
0.25
2.210
0.000
2.00
2.00
4.00
4.00
3.79
3.94
0.25
0.25
7.580
7.880
4.00
4.00
4.00
4.00
3.79
3.94
0.10
0.10
6.064
6.304
1.00
1.00
4.10
0.30
0.000
1.230
0.000
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
3.87
3.73
4.50
3.87
3.73
4.50
0.25
0.25
0.25
-
0.25
0.25
0.25
0.000
0.968
0.933
1.125
1.935
1.865
2.250
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
3.67
3.73
4.48
3.67
3.73
4.48
0.25
0.25
0.25
-
0.25
0.25
0.25
0.918
0.933
1.120
1.835
1.865
2.240
1.00
1.00
1.00
1.00
3.48
3.73
0.25
0.25
0.870
0.933
1.00
1.00
1.00
1.00
2.00
2.00
4.45
3.48
3.73
0.25
-
0.25
0.25
1.113
1.740
1.865
1.00
2.00
4.45
0.25
2.225
0.000
1.00
1.00
1.00
1.00
4.06
3.73
0.25
0.25
1.015
0.933
1.00
1.00
1.00
2.00
4.53
4.06
0.25
-
0.25
1.133
2.030
1.00
1.00
2.00
2.00
3.73
4.53
0.25
0.25
1.865
2.265
1.00
1.00
1.00
1.00
3.29
3.73
0.25
0.25
0.823
0.933
1.00
1.00
1.00
1.00
2.00
2.00
4.42
3.29
3.73
0.25
-
0.25
0.25
1.105
1.645
1.865
1.00
2.00
4.42
0.25
2.210
0.000
2.00
2.00
4.00
4.00
3.79
3.94
0.25
0.25
7.580
7.880
4.00
4.00
3.79
0.10
6.064
Lados de viga
Lados de viga
Eje C
Fondo de viga
Lados de viga
Eje D
Fondo de viga
Lados de viga
Lados de viga
TOTAL
UND
Eje E
Fondo de viga
Lados de viga
PLANILLA DE METRADOS
PROYECTO : "EDIFICIO COMERCIAL"
PROPIETARIO
PLANO
ESPECIALIDAD : ESTRUCTURAS
FECHA
HECHO POR
HOJA N
: INDICADO
: BC - SH
DESCRIPCION
CANT. N VECES
LARGO
DIMENSIONES
ANCHO
ALTO
PARCIAL
4.00
4.00
3.94
0.10
6.304
1.00
2.00
1.00
1.00
4.10
3.95
0.30
0.30
0.000
1.230
2.370
2.00
2.00
1.00
1.00
4.05
2.20
0.30
0.30
2.430
1.320
1.00
1.00
3.87
0.25
0.000
0.000
0.968
1.00
1.00
1.00
1.00
3.73
4.50
0.25
0.25
0.933
1.125
1.00
1.00
1.00
2.00
2.00
2.00
3.87
3.73
4.50
0.25
0.25
0.25
1.935
1.865
2.250
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
3.67
3.73
4.48
3.67
3.73
4.48
0.25
0.25
0.25
-
0.25
0.25
0.25
0.918
0.933
1.120
1.835
1.865
2.240
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
3.48
3.73
4.45
3.48
3.73
4.45
0.25
0.25
0.25
-
0.25
0.25
0.25
0.870
0.933
1.113
1.740
1.865
2.225
0.000
1.00
1.00
4.06
0.25
1.015
Lados de viga
1.00
1.00
1.00
1.00
1.00
2.00
3.73
4.53
4.06
0.25
0.25
-
0.25
0.933
1.133
2.030
1.00
1.00
2.00
2.00
3.73
4.53
0.25
0.25
1.865
2.265
1.00
1.00
1.00
1.00
3.29
3.73
0.25
0.25
0.823
0.933
1.00
1.00
1.00
2.00
4.42
3.29
0.25
-
0.25
1.105
1.645
1.00
1.00
2.00
2.00
3.73
4.42
0.25
0.25
1.865
2.210
0.000
2.00
4.00
3.79
0.25
7.580
2.00
4.00
4.00
4.00
4.00
4.00
3.94
3.79
3.94
0.25
-
0.10
0.10
7.880
6.064
6.304
1.00
1.00
4.10
0.30
0.000
1.230
2.00
2.00
2.00
1.00
1.00
1.00
3.95
4.05
2.20
0.30
0.30
0.30
2.370
2.430
1.320
Lados de viga
Eje C
Fondo de viga
Lados de viga
Eje D
Fondo de viga
Lados de viga
TOTAL
UND
Eje E
Fondo de viga
Lados de viga
0.000
PLANILLA DE METRADOS
PROYECTO : "EDIFICIO COMERCIAL"
PROPIETARIO
PLANO
ESPECIALIDAD : ESTRUCTURAS
FECHA
HECHO POR
HOJA N
: INDICADO
: BC - SH
DESCRIPCION
Eje B
Fondo de viga
CANT. N VECES
LARGO
DIMENSIONES
ANCHO
ALTO
PARCIAL
1.00
1.00
1.00
3.87
3.73
4.50
0.25
0.25
0.25
0.968
0.933
1.125
1.00
1.00
2.00
2.00
3.87
3.73
0.25
0.25
1.935
1.865
1.00
2.00
4.50
0.25
2.250
1.00
1.00
3.67
0.25
0.918
1.00
1.00
1.00
1.00
3.73
4.48
0.25
0.25
0.933
1.120
1.00
1.00
1.00
2.00
2.00
2.00
3.67
3.73
4.48
0.25
0.25
0.25
1.835
1.865
2.240
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
3.48
3.73
4.45
3.48
3.73
4.45
0.25
0.25
0.25
-
0.25
0.25
0.25
0.870
0.933
1.113
1.740
1.865
2.225
0.000
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
4.06
3.73
4.53
4.06
3.73
4.53
0.25
0.25
0.25
-
0.25
0.25
0.25
1.015
0.933
1.133
2.030
1.865
2.265
Eje E
Fondo de viga
1.00
1.00
3.29
0.25
0.823
Lados de viga
1.00
1.00
1.00
1.00
1.00
2.00
3.73
4.42
3.29
0.25
0.25
-
0.25
0.933
1.105
1.645
1.00
1.00
2.00
2.00
3.73
4.42
0.25
0.25
1.865
2.210
Eje C
Fondo de viga
Lados de viga
Eje D
Fondo de viga
Lados de viga
Lados de viga
01.07.04
LOSA ALIGERADA
01.07.04.01
59.94
M3
0.000
UND
0.000
1.00
1.00
1.00
Lados de viga
TOTAL
2.00
4.00
3.79
0.25
7.580
2.00
4.00
4.00
4.00
3.94
3.79
0.25
-
0.10
7.880
6.064
4.00
4.00
3.94
0.10
1.00
1.00
4.10
0.30
6.304
0.000
1.230
2.00
2.00
1.00
1.00
3.95
4.05
0.30
0.30
2.370
2.430
2.00
1.00
2.20
0.30
1.320
En 1er Piso
Losa de 5 cm de Espesor
Entre Ejes 1-2 y A-B
Entre Ejes 1-2 y B-C
1.00
1.00
1.00
1.00
3.89
1.33
4.28
4.14
0.05
0.05
0.000
0.832
0.275
1.00
1.00
4.04
3.89
0.05
0.786
PLANILLA DE METRADOS
PROYECTO : "EDIFICIO COMERCIAL"
PROPIETARIO
PLANO
ESPECIALIDAD : ESTRUCTURAS
FECHA
HECHO POR
HOJA N
: INDICADO
: BC - SH
DESCRIPCION
CANT. N VECES
LARGO
DIMENSIONES
ANCHO
ALTO
PARCIAL
1.00
1.00
3.84
3.70
0.05
0.710
1.00
1.00
1.00
1.00
1.00
1.00
3.90
3.95
4.04
3.88
3.88
3.88
0.05
0.05
0.05
0.757
0.766
0.784
1.00
1.00
1.00
1.00
3.84
3.91
3.88
4.67
0.05
0.05
0.745
0.913
1.00
1.00
1.00
1.00
1.00
1.00
3.96
4.06
3.86
4.64
4.61
4.59
0.05
0.05
0.05
0.919
0.936
0.886
1.00
3.00
Area=
1.27
0.05
0.190
10.00
9.00
9.00
1.00
1.00
1.00
3.89
1.33
4.04
0.10
0.10
0.10
0.15
0.15
0.15
0.584
0.180
0.545
8.00
9.00
9.00
9.00
9.00
11.00
11.00
10.00
10.00
6.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
3.84
3.90
3.95
4.04
3.84
3.91
3.96
4.06
3.86
0.70
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.461
0.527
0.533
0.545
0.518
0.645
0.653
0.609
0.579
0.189
1.00
1.00
1.00
1.00
1.00
3.00
3.00
3.00
3.00
3.00
3.89
1.33
4.04
3.84
3.90
4.28
4.14
3.89
3.70
3.88
0.05
0.05
0.05
0.05
0.05
0.000
2.497
0.826
2.357
2.131
2.270
1.00
1.00
1.00
3.00
3.00
3.00
3.95
1.15
4.04
2.72
1.01
2.73
0.05
0.05
0.05
1.612
0.174
1.654
1.00
1.00
3.00
3.00
0.71
3.84
1.01
3.88
0.05
0.05
0.108
2.235
1.00
1.00
1.00
3.00
3.00
3.00
3.91
3.96
1.15
4.67
3.55
0.42
0.05
0.05
0.05
2.739
2.109
0.072
1.00
1.00
3.00
3.00
4.06
0.71
3.55
0.94
0.05
0.05
2.162
0.100
1.00
1.00
3.00
3.00
3.86
Area=
4.59
1.27
0.05
0.05
2.658
0.190
10.00
9.00
3.00
3.00
3.89
1.33
0.10
0.10
0.15
0.15
1.751
0.539
9.00
8.00
9.00
3.00
3.00
3.00
4.04
3.84
3.90
0.10
0.10
0.10
0.15
0.15
0.15
1.636
1.382
1.580
6.00
2.00
3.00
3.00
3.95
1.15
0.10
0.10
0.15
0.15
1.067
0.104
6.00
2.00
9.00
3.00
3.00
3.00
4.04
0.71
3.84
0.10
0.10
0.10
0.15
0.15
0.15
1.091
0.064
1.555
11.00
3.00
3.91
0.10
0.15
1.935
TOTAL
UND
PLANILLA DE METRADOS
PROYECTO : "EDIFICIO COMERCIAL"
PROPIETARIO
PLANO
ESPECIALIDAD : ESTRUCTURAS
FECHA
HECHO POR
HOJA N
: INDICADO
: BC - SH
01.07.04.02
DESCRIPCION
CANT. N VECES
ALTO
PARCIAL
8.00
3.00
3.96
0.10
0.15
1.426
1.00
8.00
1.00
3.00
3.00
3.00
1.15
4.06
0.71
0.10
0.10
0.10
0.15
0.15
0.15
0.052
1.462
0.032
10.00
6.00
3.00
9.00
3.86
0.70
0.10
0.10
0.15
0.15
1.737
0.567
1.00
UND
4,319.08
KG
707.88
M2
5,896.60
Und
0.000
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
3.89
1.33
4.04
3.84
3.90
3.95
4.04
3.84
3.91
3.96
4.06
3.86
Area=
4.28
4.14
3.89
3.70
3.88
3.88
3.88
3.88
4.67
4.64
4.61
4.59
1.27
16.649
5.506
15.716
14.208
15.132
15.326
15.675
14.899
18.260
18.374
18.717
17.717
3.807
1.00
1.00
3.00
3.00
3.89
1.33
4.28
4.14
0.000
49.948
16.519
1.00
1.00
1.00
3.00
3.00
3.00
4.04
3.84
3.90
3.89
3.70
3.88
47.147
42.624
45.396
1.00
1.00
3.00
3.00
3.95
1.15
2.72
1.01
32.232
3.485
1.00
1.00
1.00
3.00
3.00
3.00
4.04
0.71
3.84
2.73
1.01
3.88
33.088
2.151
44.698
1.00
1.00
3.00
3.00
3.91
3.96
4.67
3.55
54.779
42.174
1.00
1.00
1.00
3.00
3.00
3.00
1.15
4.06
0.71
0.42
3.55
0.94
1.449
43.239
2.002
1.00
1.00
3.00
3.00
3.86
Area=
4.59
1.27
53.152
3.807
TOTAL
4,319.080
01.07.04.04
DIMENSIONES
ANCHO
LARGO
1.00
3.89
4.28
N Lad/m2
8.33
0.000
138.688
1.00
1.00
1.00
1.00
1.00
1.00
1.33
4.04
3.84
4.14
3.89
3.70
8.33
8.33
8.33
45.867
130.911
118.353
1.00
1.00
3.90
3.88
8.33
126.050
Losa aligerada
Entre Ejes 1-2 y A-B
Entre Ejes 1-2 y B-C
PLANILLA DE METRADOS
PROYECTO : "EDIFICIO COMERCIAL"
PROPIETARIO
PLANO
ESPECIALIDAD : ESTRUCTURAS
FECHA
HECHO POR
HOJA N
: INDICADO
: BC - SH
DESCRIPCION
Entre Ejes 2-3 y B-C
Entre Ejes 2-3 y C-D
Entre Ejes 2-3 y D-E
Entre Ejes 3-4 y A-B
Entre Ejes 3-4 y B-C
Entre Ejes 3-4 y C-D
Entre Ejes 3-4 y D-E
Volado Entre Ejes 1-2 y A
Ladrillos en Losa de 2do, 3er y 4to Piso
Entre Ejes 1-2 y A-B
Entre Ejes 1-2 y B-C
Entre Ejes 1-2 y C-D
Entre Ejes 1-2 y D-E
Entre Ejes 2-3 y A-B
Entre Ejes 2-3 y B-C
Entre Ejes 2-3 y C-D
Entre Ejes 2-3 y D-E
Entre Ejes 3-4 y A-B
Entre Ejes 3-4 y B-C
Entre Ejes 3-4 y C-D
Entre Ejes 3-4 y D-E
Volado Entre Ejes 1-4 y A
01.07.05
01.07.05.01
1.00
1.00
3.95
3.88
8.33
127.666
1.00
1.00
1.00
1.00
1.00
1.00
4.04
3.84
3.91
3.88
3.88
4.67
8.33
8.33
8.33
130.574
124.110
152.103
1.00
1.00
1.00
1.00
3.96
4.06
4.64
4.61
8.33
8.33
153.059
155.909
1.00
1.00
1.00
3.00
3.86
Area=
4.59
1.27
8.33
8.33
N Lad/m2
147.586
31.712
1.00
1.00
3.00
3.00
3.89
1.33
4.28
4.14
8.33
8.33
416.064
137.600
1.00
1.00
1.00
3.00
3.00
3.00
4.04
3.84
3.90
3.89
3.70
3.88
8.33
8.33
8.33
392.733
355.058
378.149
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.95
1.15
4.04
0.71
3.84
3.91
3.96
1.15
4.06
0.71
3.86
Area=
2.72
1.01
2.73
1.01
3.88
4.67
3.55
0.42
3.55
0.94
4.59
1.27
8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33
268.493
29.026
275.620
17.920
372.331
456.310
351.309
12.070
360.181
16.678
442.758
31.712
4.00
4.00
Area=
1.78
0.15
4.270
1.00
1.00
5.82
5.01
0.15
4.374
1.00
1.00
4.00
Area=
1.78
28.464
1.00
5.82
5.01
29.158
1.00
1.00
1.23
Area=
0.84
1.031
1.00
1.00
1.00
1.00
1.23
1.23
Area=
Area=
1.07
0.92
1.305
1.131
1.00
1.00
1.00
1.00
1.00
1.00
1.23
1.23
1.23
Area=
Area=
Area=
0.92
0.92
0.92
1.131
1.131
1.131
1.00
1.00
ESCALERAS
CONCRETO fc = 210 kg/cm2 PARA ESCALERA
TOTAL
UND
8.64
M3
433.30
KG
57.62
M2
6.86
M3
686.20
KG
53.94
M2
433.300
1.00
01.07.06.03
PARCIAL
4.00
01.07.06.02
ALTO
01.07.06
01.07.06.01
DIMENSIONES
ANCHO
01.07.05.03
LARGO
LOSA MACIZA
CONCRETO EN LOSA MACIZA f'c=210 kg/cm2
Concreto en Losa Maciza de 1er, 2do, 3er y 4to Piso
Volado Entre Ejes A-E y 1
Losa En Tanque elevado
01.07.05.02
CANT. N VECES
686.200
Tramo N 01
HOJA DE METRADOS GENERAL.................................................................................................................................................HOJA
NUMERO: 15
PLANILLA DE METRADOS
PROYECTO : "EDIFICIO COMERCIAL"
PROPIETARIO
PLANO
ESPECIALIDAD : ESTRUCTURAS
FECHA
HECHO POR
HOJA N
: INDICADO
: BC - SH
DESCRIPCION
CANT. N VECES
LARGO
DIMENSIONES
ANCHO
ALTO
PARCIAL
1.00
Encofrado y Desencofrado en fondo de Escalera
Encofrado y Desencofrado en fondo de Descanso d 1.00
Encofrado y Desencofrado en costado de Escalera 2.00
Encofrado y Desencofrado en contrapaso de Escal 10.00
1.00
2.41
1.23
2.952
1.00
1.00
1.00
0.87
Area=
0.18
1.23
0.84
1.23
1.070
1.684
2.153
1.00
Encofrado y Desencofrado en fondo de Escalera
Encofrado y Desencofrado en fondo de Descanso d 1.00
1.00
Encofrado y Desencofrado en costado de Escalera 2.00
1.00
3.05
1.23
3.736
1.00
1.00
1.00
1.07
0.87
Area=
1.23
1.23
1.07
1.316
1.070
2.130
1.00
0.18
1.23
2.153
1.00
Encofrado y Desencofrado en fondo de Descanso d 1.00
1.00
1.00
1.00
1.00
2.45
1.05
0.86
1.23
1.23
1.23
3.001
1.292
1.058
1.00
1.00
Area=
0.18
0.92
1.23
1.846
1.722
1.00
Encofrado y Desencofrado en fondo de Escalera
Encofrado y Desencofrado en fondo de Descanso d 1.00
1.00
Encofrado y Desencofrado en costado de Escalera 2.00
Encofrado y Desencofrado en contrapaso de Escal 8.00
1.00
1.00
1.00
1.00
1.00
2.45
1.05
0.86
Area=
0.18
1.23
1.23
1.23
0.92
1.23
3.001
1.292
1.058
1.846
1.722
1.00
Encofrado y Desencofrado en fondo de Escalera
Encofrado y Desencofrado en fondo de Descanso d 1.00
1.00
Encofrado y Desencofrado en costado de Escalera 2.00
Encofrado y Desencofrado en contrapaso de Escal 8.00
1.00
1.00
1.00
1.00
1.00
2.45
1.05
0.86
Area=
0.18
1.23
1.23
1.23
0.92
1.23
3.001
1.292
1.058
1.846
1.722
1.00
Encofrado y Desencofrado en fondo de Escalera
Encofrado y Desencofrado en fondo de Descanso d 1.00
1.00
Encofrado y Desencofrado en costado de Escalera 2.00
Encofrado y Desencofrado en contrapaso de Escal 8.00
1.00
1.00
2.45
1.05
1.23
1.23
3.001
1.292
1.00
1.00
1.00
0.86
Area=
0.18
1.23
0.92
1.23
1.058
1.846
1.722
TOTAL
UND
9.81
M3
628.88
KG
83.46
M2
Tramo N 02
Tramo N 03
Tramo N 04
Tramo N 05
Tramo N 06
01.07.07
CISTERNA
01.07.07.01
01.07.07.02
1.00
1.00
3.00
3.00
2.50
5.80
1.20
Area=
0.20
0.08
1.800
1.305
Concreto en Pantalla
Concreto en Losa de superior
1.00
1.00
3.00
3.00
6.80
2.20
0.15
0.90
1.90
0.15
5.814
0.891
1.00
1.00
2.00
2.00
2.00
3.00
3.00
3.00
2.20
0.90
2.50
1.90
1.90
1.90
25.080
10.260
28.500
2.00
1.00
3.00
3.00
1.20
2.20
0.90
1.90
-
13.680
5.940
01.07.07.03
628.880
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
01.07.01.02
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4
0.250
PARCIAL
Zapata 01:
C -1
2.00
"
Z1
2.00
Acero Longitudinal
Longitud Del Acero (L1).. 1.82
5/8
10.00
20.00
1.82
364.00
564.93
5/8
10.00
1.00
"
1.82
18.20
28.25
Acero Transversal
Longitud Del Acero (L1).. 1.82
"
HOJA DE METRADOS ACERO.................................................................................................................................................HOJA NUMERO: 17
TOTAL
UND
646.53
Kg
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
m
"
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4
0.250
PARCIAL
Zapata 02:
m
m
"
P- 1
1.40
Z2
"
2.27
Acero Longitudinal
Longitud Del Acero (L1).. 2.13
5/8
12.00
1.00
2.13
25.56
39.67
5/8
7.00
1.00
1.26
8.82
13.69
Acero Transversal
Longitud Del Acero (L1).. 1.26
"
"
"
HOJA DE METRADOS ACERO.................................................................................................................................................HOJA NUMERO: 18
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
01.07.02.02
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
m
m
12.7 m
0.35 m
0.35 m
Acero Longitudinal
Longitud Del Acero ......
12.70
5/8
8.00
18.00
12.70
1828.80
2838.30
0.35
5/8
8.00
18.00
50.40
78.22
0.35
5/8
8.00
18.00
0.35
"
0.35
50.40
78.22
Longitud De Empalme...
0.60
5/8
8.00
18.00
0.60
86.40
134.09
379.93
8.69
15.3 m
0.35 m
0.35 m
"
Acero Longitudinal
Longitud Del Acero ......
Longitud De Gancho Superioro
15.30
0.35
m
m
5/8
5/8
8.00
8.00
2.00
2.00
15.30
0.35
244.80
5.60
0.35
5/8
8.00
2.00
0.35
5.60
8.69
Longitud De Empalme...
0.60
5/8
8.00
2.00
0.60
9.60
14.90
"
HOJA DE METRADOS ACERO.................................................................................................................................................HOJA NUMERO: 19
TOTAL
UND
5,977.00
Kg
"
ESPECIALIDA: ESTRUCTURAS
"
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
"
0.45
3/8"
1 @ .05
8 @ .10
Rto @ .25 C/EXT.
1/4 "
0.250
PARCIAL
m
m
0.30
"
1.58
3/8
96.00
18.00
1.58
2730.24
1526.20
0.12
0.12
m
m
3/8
3/8
96.00
96.00
18.00
18.00
0.12
0.12"
207.36
207.36
115.91
115.91
1.58
3/8
118.00
2.00
1.58
372.88
208.44
0.12
3/8
118.00
2.00
28.32
15.83
0.12
3/8
118.00
2.00
0.12
"
0.12
28.32
15.83
Columna Tipo 02
2.72 m
0.35 m
"
"
0.35 m
Acero Longitudinal
Longitud Del Acero ......
2.72
5/8
6.00
2.00
2.72
32.64
50.66
0.35
5/8
6.00
2.00
0.35
4.20
6.52
0.35
5/8
6.00
2.00
0.35"
4.20
6.52
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
Longitud De Empalme...
0.00
5/8
6.00
2.00
65/8"
0.00
1/4 "
0.250
PARCIAL
0.00
0.00
39.20
4.80
21.91
2.68
4.80
2.68
"
m
m
3/8"
1 @ .05
8 @ .10
Rto @ .25 C/EXT.
0.98
0.12
m
m
3/8
3/8
20.00
20.00
2.00
2.00
0.12
3/8
20.00
2.00
0.98
0.12"
0.12
Placa Tipo 01
12.7 m
0.3 m
0.3 m
"
Acero Longitudinal
Longitud Del Acero ......
12.70
3/8
22.00
1.00
12.70
279.40
156.18
0.30
3/8
22.00
1.00
0.30
6.60
3.69
0.30
0.40
m
m
3/8
3/8
22.00
22.00
1.00
1.00
0.30
0.40
6.60
8.80
3.69
4.92
2.32 m
"
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
0.19 m
1/4 "
0.250
PARCIAL
0.19 m
2.32
0.19
m
m
3/8
3/8
62.00
62.00
1.00
1.00
m
m
2.32
0.19
0.19
3/8
62.00
1.00
0.19
11.78
6.59
Longitud De Empalme...
0.00
3/8
62.00
1.00
0.00
0.00
0.00
132.48
9.60
74.06
5.37
9.60
5.37
Acero Transversal
143.84
11.78
80.41
6.59
0.60
"
0.25
Ref. 8 5/8"
ESTRIBOS 3/8": 1 @ 0.05,
9@0.10,RTO @ 0.25 C/E.
Estribos
2.40
1.38
0.10
m
m
3/8
3/8
96.00
96.00
1.00
1.00
0.10
3/8
96.00
1.00
1.38
0.10"
0.10
"
HOJA DE METRADOS ACERO.................................................................................................................................................HOJA NUMERO: 22
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
01.07.03.02
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
m
m
13.6 m
0.25 m
0.25 m
Acero Longitudinal
Longitud Del Acero ......
13.60
5/8
2.00
12.00
13.60
326.40
506.57
0.25
0.25
m
m
5/8
5/8
2.00
2.00
12.00
12.00
0.25
0.25
6.00
6.00
9.31
9.31
Longitud De Empalme...
0.80
5/8
2.00
12.00
0.80
"
19.20
29.80
1.2 m
0.25 m
Acero Longitudinal
Longitud Del Acero ......
1.20
5/8
2.00
12.00
1.20
28.80
44.70
0.25
5/8
2.00
12.00
6.00
9.31
5/8
5/8
2.00
2.00
12.00
12.00
0.25
"
0.00
0.00
0.00
0.00
0.00
0.00
1.45 m
0m
0.25 m
Acero Longitudinal
"
TOTAL
UND
7,093.34
Kg
"
ESPECIALIDA: ESTRUCTURAS
"
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
1.45
5/8
2.00
12.00
"
1.45
34.80
54.01
0.00
5/8
2.00
12.00
0.00
0.00
0.00
0.25
5/8
2.00
12.00
6.00
9.31
5/8
2.00
12.00
0.25
m
0.00m
0.00
0.00
64.80
0.00
100.57
0.00
0.00
0.00
0.00
0.00
67.20
104.29
Longitud De Empalme...
2.7 m
0m
"
Acero Longitudinal
Longitud Del Acero ......
Longitud De Gancho Izquierdo
2.70
0.00
m
m
5/8
5/8
2.00
2.00
12.00
12.00
5/8
5/8
2.00
2.00
12.00
12.00
2.70
0.00"
0.00
0.00
"
2.8 m
0m
Acero Longitudinal
m
5/8
2.00
12.00
"
2.80"
0.00
0.00
0.00
5/8
2.00
12.00
0.00
0.00
0.00
Longitud De Empalme...
5/8
2.00
12.00
0.00
0.00
0.00
2.80
5/8
2.00
12.00
0.00
0.2 m
0.2 m
"
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
13.6 m
Acero Longitudinal
Longitud Del Acero ......
13.60
5/8
2.00
12.00
0.20
5/8
2.00
12.00
0.20
0.60
m
m
5/8
5/8
2.00
2.00
12.00
12.00
13.60
"
m
0.20m
0.20
0.60
5/8
5/8
2.00
2.00
12.00
12.00
5/8
2.00
Longitud De Empalme...
5/8
2.00
326.40
506.57
4.80
7.45
4.80
14.40
7.45
22.35
"
2.60
0.00
62.40
0.00
96.84
0.00
12.00
0.00
0.00
0.00
12.00
0.00
0.00
0.00
m
2.6 m
Acero Longitudinal
"
2.23 m
Acero Longitudinal
Longitud Del Acero ......
5/8
2.00
12.00
2.23
53.52
83.06
2.23
5/8
5/8
2.00
2.00
12.00
12.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud De Empalme...
5/8
2.00
12.00
0.00
0.00
0.00
"
HOJA DE METRADOS ACERO.................................................................................................................................................HOJA NUMERO: 25
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
m
2.95 m
Longitud Del Acero ...... 2.95 m
Longitud De Gancho Izquierdo... m
5/8
5/8
2.00
2.00
12.00
12.00
m
m
2.95
0.00
5/8
2.00
12.00
0.00
0.00
0.00
Longitud De Empalme...
5/8
2.00
12.00
0.00
0.00
0.00
Acero Longitudinal
70.80
0.00
109.88
0.00
65/8"
"
3/8",1@0.05,9@0.10,
Rto.@0.20 A/E
1.08
3/8
89.00
12.00
1.08
1153.44
644.77
0.12
3/8
89.00
12.00
128.16
71.64
0.12
3/8
89.00
12.00
0.12"
0.12
128.16
71.64
0.25 m
"
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
13.60
5/8
2.00
8.00
13.60
217.60
337.72
0.25
5/8
2.00
8.00
0.25
4.00
6.21
0.25
5/8
2.00
8.00
4.00
6.21
0.80
5/8
2.00
8.00
0.25
m
0.80m
Longitud De Empalme...
12.80
19.87
m
m
5/8
5/8
1.00
1.00
8.00
8.00
9.60
2.00
14.90
3.10
5/8
5/8
1.00
1.00
8.00
8.00
1.20
0.25"
0.00
0.00
0.00
0.00
0.00
0.00
1.2 m
0.25 m
Acero Longitudinal
Longitud Del Acero ......
Longitud De Gancho Izquierdo
1.20
0.25
1.45 m
0m
0.25 m
Acero Longitudinal
Longitud Del Acero ......
1.45
5/8
1.00
8.00
"
1.45
11.60
18.00
0.00
5/8
1.00
8.00
0.00
0.00
0.00
0.25
5/8
1.00
8.00
0.25
2.00
3.10
5/8
1.00
8.00
0.00
0.00
0.00
Longitud De Empalme...
2.7 m
0m
"
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
Acero Longitudinal
Longitud Del Acero ......
2.70
5/8
1.00
8.00
0.00
5/8
1.00
8.00
5/8
5/8
1.00
1.00
8.00
8.00
2.70
m
0.00m
0.00
0.00
21.60
33.52
0.00
0.00
0.00
0.00
0.00
0.00
m
m
5/8
5/8
1.00
1.00
8.00
8.00
"
2.80
0.00
22.40
0.00
34.76
0.00
5/8
1.00
Longitud De Empalme...
5/8
1.00
8.00
0.00
0.00
0.00
8.00
0.00
0.00
0.00
2.8 m
0m
Acero Longitudinal
Longitud Del Acero ......
Longitud De Gancho Izquierdo
2.80
0.00
0.2 m
0.2 m
"
13.6 m
Acero Longitudinal
Longitud Del Acero ......
13.60
5/8
2.00
8.00
13.60
217.60
337.72
0.20
0.20
m
m
5/8
5/8
2.00
2.00
8.00
8.00
0.20
0.20
3.20
3.20
4.97
4.97
Longitud De Empalme...
0.60
5/8
2.00
8.00
0.60
9.60
14.90
"
HOJA DE METRADOS ACERO.................................................................................................................................................HOJA NUMERO: 28
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
m
2.6 m
Longitud Del Acero ...... 2.60 m
Longitud De Gancho Izquierdo... m
5/8
5/8
1.00
1.00
8.00
8.00
m
m
2.60
0.00
5/8
1.00
8.00
0.00
0.00
0.00
Longitud De Empalme...
5/8
1.00
8.00
0.00
0.00
0.00
Acero Longitudinal
2.23
20.80
0.00
32.28
0.00
"
2.23 m
Acero Longitudinal
Longitud Del Acero ......
5/8
1.00
8.00
2.23
17.84
27.69
5/8
1.00
8.00
0.00
0.00
0.00
5/8
1.00
8.00
0.00
0.00
0.00
Longitud De Empalme...
5/8
1.00
8.00
0.00
0.00
0.00
"
m
m
2.95 m
Acero Longitudinal
Longitud Del Acero ......
2.95
5/8
1.00
1.00
2.95
2.95
4.58
5/8
1.00
1.00
0.00
0.00
0.00
5/8
1.00
1.00
0.00"
0.00
0.00
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
Longitud De Empalme...
5/8
1.00
1.00
65/8"
0.00
1/4 "
0.250
PARCIAL
0.00
0.00
m
m
3/8",1@0.05,9@0.10,
Rto.@0.20 A/E
1.08
0.12
m
m
3/8
3/8
89.00
89.00
8.00
8.00
1.08
0.12"
768.96
85.44
429.85
47.76
0.12
3/8
89.00
8.00
0.12
85.44
47.76
0.25 m
Acero Longitudinal
Longitud Del Acero ......
16.20
5/8
2.00
16.00
"
16.20
518.40
804.56
0.25
0.25
m
m
5/8
5/8
2.00
2.00
16.00
16.00
0.25
0.25
8.00
8.00
12.42
12.42
Longitud De Empalme...
0.80
5/8
2.00
16.00
0.80
25.60
39.73
1.06 m
0.25 m
"
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
Acero Longitudinal
Longitud Del Acero ......
1.06
5/8
2.00
16.00
0.25
5/8
2.00
16.00
5/8
5/8
2.00
2.00
16.00
16.00
1.06
m
0.25m
0.00
0.00
33.92
52.64
8.00
12.42
0.00
0.00
0.00
0.00
m
m
5/8
5/8
3.00
3.00
16.00
16.00
"
2.60
0.00
124.80
0.00
193.69
0.00
5/8
3.00
Longitud De Empalme...
5/8
3.00
16.00
0.00
0.00
0.00
16.00
0.00
0.00
0.00
2.6 m
0m
Acero Longitudinal
Longitud Del Acero ......
Longitud De Gancho Izquierdo
2.60
0.00
0.2 m
0.2 m
"
16.2 m
Acero Longitudinal
Longitud Del Acero ......
16.20
5/8
2.00
16.00
16.20
518.40
804.56
0.20
0.20
m
m
5/8
5/8
2.00
2.00
16.00
16.00
0.20
0.20
6.40
6.40
9.93
9.93
Longitud De Empalme...
0.60
5/8
2.00
16.00
0.60
19.20
29.80
"
HOJA DE METRADOS ACERO.................................................................................................................................................HOJA NUMERO: 31
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
m
2.35 m
Longitud Del Acero ...... 2.35 m
Longitud De Gancho Izquierdo... m
5/8
5/8
2.00
2.00
16.00
16.00
m
m
2.35
0.00
5/8
2.00
16.00
0.00
0.00
0.00
Longitud De Empalme...
5/8
2.00
16.00
0.00
0.00
0.00
Acero Longitudinal
2.40
75.20
0.00
116.71
0.00
"
2.4 m
Acero Longitudinal
Longitud Del Acero ......
5/8
2.00
16.00
2.40
76.80
119.19
5/8
2.00
16.00
0.00
0.00
0.00
5/8
2.00
16.00
0.00
0.00
0.00
Longitud De Empalme...
5/8
2.00
16.00
0.00
0.00
0.00
"
55/8"
3/8",1@0.05,6@0.10,
2@0.15,Rto.@0.20 A/E
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
0.78
3/8
108.00
16.00
0.78
1347.84
753.44
0.10
3/8
108.00
16.00
0.10
172.80
96.60
0.10
3/8
108.00
16.00
0.10
m
m
172.80
96.60
"
"
"
HOJA DE METRADOS ACERO.................................................................................................................................................HOJA NUMERO: 33
TOTAL
UND
ESPECIALIDAD : ESTRUCTURAS
HECHO POR
HOJA N: INDICADO
: BC - SH
N PARTIDA
01.07.04.02
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
1m
0.2 m
Acero Longitudinal
Longitud Del Acero ......
Longitud De Gancho Derecho
1.00
0.20
m
m
1/2
1/2
2.00
2.00
20.00
20.00
1.00
0.20
40.00
8.00
39.72
7.94
Longitud De Empalme...
0.00
1/2
2.00
20.00
0.00
"
0.00
0.00
2.45
1/2
3.00
20.00
147.00
145.97
0.00
1/2
3.00
20.00
2.45
0.00"
Longitud De Empalme...
0.00
0.00
m
m
1/2
1/2
1.00
1.00
20.00
20.00
16.20
0.45"
324.00
9.00
321.73
8.94
2.45 m
Acero Longitudinal
16.2 m
Acero Longitudinal
TOTAL
UND
4,319.08
Kg
"
ESPECIALIDAD : ESTRUCTURAS
HECHO POR
"
: BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
1/4 "
mm)
" 0.250
DESCRIPCION
PARCIAL
1m
0.2 m
m
m
Acero Longitudinal
Longitud Del Acero ......
Longitud De Gancho Derecho
1.00
0.20
Longitud De Empalme...
m
m
1/2
1/2
2.00
2.00
10.00
10.00
1.00
0.20"
20.00
4.00
19.86
3.97
1/2
2.00
10.00
0.00
0.00
0.00
1.3 m
0.2 m
"
Acero Longitudinal
Longitud Del Acero ......
1.30
1/2
1.00
10.00
1.30"
13.00
12.91
Longitud De Empalme...
0.20
1/2
1.00
10.00
0.20
2.00
1.99
24.50
0.00
24.33
0.00
2.45 m
"
m
Acero Longitudinal
Longitud Del Acero ......
2.45 m
Longitud De Gancho Derecho... m
2.84 m
1/2
1/2
1.00
1.00
10.00
10.00
2.45
0.00
"
"
HOJA DE METRADOS ACERO.................................................................................................................................................HOJA
NUMERO: 35
TOTAL
UND
"
: BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
"
Acero Longitudinal
Longitud Del Acero ......
2.84
1/2
1.00
10.00
28.40
28.20
0.00
1/2
1.00
10.00
2.84
m
0.00m
Longitud De Empalme...
0.00
0.00
6.69
1/2
1.00
10.00
6.69
66.90
66.43
Longitud De Empalme...
0.00
1/2
1.00
10.00
0.00"
0.00
0.00
Acero Longitudinal
Longitud Del Acero ......
8.64
1/2
1.00
10.00
8.64
86.40
85.80
Longitud De Empalme...
0.00
1/2
1.00
10.00
0.00"
0.00
0.00
6.69 m
Acero Longitudinal
8.64 m
Acero Longitudinal
"
TOTAL
UND
ESPECIALIDAD : ESTRUCTURAS
HECHO POR
HOJA N: INDICADO
: BC - SH
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
0.38
8/1
55.00
20.00
0.38
1/4 "
0.250
PARCIAL
418.00
49.32
190.00
22.42
m
m
0.38 m
Acero Longitudinal
Longitud Del Acero ......
0.38
8/1
50.00
10.00
0.38
"
13.48 m
Acero Longitudinal
Longitud Del Acero ......
13.48
Longitud De Empalme...
8/1
72.00
1.00
13.48
970.56
114.53
8/1
72.00
1.00
0.00
0.00
0.00
"
17.82 m
Acero Longitudinal
Longitud Del Acero ......
Longitud De Empalme...
17.82
8/1
55.00
1.00
17.82
980.10
115.65
8/1
55.00
1.00
0.00
0.00
0.00
"
TOTAL
UND
ESPECIALIDAD : ESTRUCTURAS
HECHO POR
HOJA N: INDICADO
: BC - SH
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
m
m
0.2 m
Acero Longitudinal
Longitud Del Acero ......
1.30
1/2
10.00
3.00
1.30
39.00
38.73
0.20
1/2
10.00
3.00
0.20
6.00
5.96
Longitud De Empalme...
0.00
1/2
10.00
3.00
0.00
0.00
0.00
"
2.45 m
Acero Longitudinal
Longitud Del Acero ......
2.45
1/2
10.00
3.00
2.45
73.50
72.99
Longitud De Empalme...
0.00
1/2
10.00
3.00
0.00
0.00
0.00
"
8.64 m
Acero Longitudinal
Longitud Del Acero ......
Longitud De Empalme...
1.92 m
8.64
1/2
10.00
3.00
8.64
259.20
257.39
1/2
10.00
3.00
0.00
0.00
0.00
"
TOTAL
UND
ESPECIALIDAD : ESTRUCTURAS
HECHO POR
HOJA N: INDICADO
: BC - SH
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
0.2 m
Acero Longitudinal
57.60
57.20
3.00
m
1.92m
0.20
6.00
5.96
10.00
3.00
0.00
0.00
0.00
1.92
1/2
10.00
3.00
0.20
1/2
10.00
1/2
Longitud De Empalme...
2.84 m
0.2 m
Acero Longitudinal
Longitud Del Acero ......
2.84
1/2
10.00
3.00
"
2.84
85.20
84.60
Longitud De Empalme...
0.20
1/2
10.00
3.00
0.20
6.00
5.96
6.7 m
m
"
Acero Longitudinal
Longitud Del Acero ......
1/2
10.00
3.00
6.70
201.00
199.59
6.70
1/2
10.00
3.00
0.00
0.00
0.00
1m
0.2 m
Acero Longitudinal
"
TOTAL
UND
ESPECIALIDAD : ESTRUCTURAS
HECHO POR
HOJA N: INDICADO
: BC - SH
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1.00
0.20
Longitud De Empalme...
1/4 "
0.250
PARCIAL
m
m
1/2
1/2
7.00
7.00
3.00
3.00
1.00
0.20
21.00
4.20
20.85
4.17
1/2
7.00
3.00
0.00
m
m
0.00
0.00
1.9 m
0.2 m
Acero Longitudinal
Longitud Del Acero ......
1.90
1/2
7.00
3.00
1.90
39.90
39.62
Longitud De Empalme...
0.20
1/2
7.00
3.00
0.20
4.20
4.17
154.35
0.00
153.27
0.00
"
2.45 m
Acero Longitudinal
Longitud Del Acero ......
Longitud De Empalme...
2.45
0.00
m
m
1/2
1/2
21.00
21.00
3.00
3.00
2.45
0.00
"
17.74 m
Acero Longitudinal
Longitud Del Acero ......
17.74
1/2
7.00
3.00
17.74
372.54
369.93
Longitud De Empalme...
0.45
1/2
7.00
3.00
0.45
9.45
9.38
"
TOTAL
UND
ESPECIALIDAD : ESTRUCTURAS
HECHO POR
HOJA N: INDICADO
: BC - SH
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
1.78 m
0.2 m
1.78
1/2
5.00
3.00
m
m
1.78
m
m
1/2
1/2
5.00
5.00
3.00
3.00
0.20
0.00
Acero Longitudinal
Longitud Del Acero ......
26.70
26.51
3.00
0.00
2.98
0.00
2.65 m
0.2 m
"
Acero Longitudinal
Longitud Del Acero ......
2.65
1/2
5.00
3.00
2.65
39.75
39.47
Longitud De Empalme...
0.20
1/2
5.00
3.00
0.20
3.00
2.98
6.24 m
"
Acero Longitudinal
Longitud Del Acero ......
6.24
1/2
5.00
3.00
6.24
93.60
92.94
Longitud De Empalme...
0.00
1/2
5.00
3.00
0.00
0.00
0.00
2.22 m
0.2 m
"
TOTAL
UND
ESPECIALIDAD : ESTRUCTURAS
HECHO POR
HOJA N: INDICADO
: BC - SH
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
Acero Longitudinal
Longitud Del Acero ......
2.22
1/2
5.00
3.00
2.22
33.30
33.07
0.20
1/2
5.00
3.00
3.00
2.98
1/2
5.00
3.00
0.20
m
0.00m
0.00
0.00
Longitud De Empalme...
1m
0.2 m
Acero Longitudinal
Longitud Del Acero ......
1.00
1/2
5.00
3.00
1.00
15.00
14.90
Longitud De Empalme...
0.20
1/2
5.00
3.00
0.20"
3.00
2.98
Acero Longitudinal
Longitud Del Acero ......
5.22
1/2
5.00
3.00
5.22
78.30
77.75
Longitud De Empalme...
0.00
1/2
5.00
3.00
0.00"
0.00
0.00
1.40
1/2
9.00
3.00
1.40
37.80
37.54
0.20
1/2
9.00
3.00
0.20"
5.40
5.36
5.22 m
1.4 m
0.2 m
Acero Longitudinal
TOTAL
UND
ESPECIALIDAD : ESTRUCTURAS
HECHO POR
HOJA N: INDICADO
: BC - SH
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
Longitud De Empalme...
1/2
9.00
3.00
1.3 m
0.00
1/4 "
0.250
PARCIAL
0.00
0.00
m
m
0.2 m
Acero Longitudinal
Longitud Del Acero ......
1.30
1/2
9.00
3.00
1.30
35.10
34.85
Longitud De Empalme...
0.20
1/2
9.00
3.00
0.20
5.40
5.36
2.45 m
"
Acero Longitudinal
Longitud Del Acero ......
2.45
1/2
27.00
3.00
2.45
198.45
197.06
Longitud De Empalme...
0.00
1/2
27.00
3.00
0.00
0.00
0.00
470.88
12.15
467.58
12.06
17.44 m
"
Acero Longitudinal
Longitud Del Acero ...... 17.44
Longitud De Empalme... 0.45
m
m
1/2
1/2
9.00
9.00
3.00
3.00
17.44
0.45
"
TOTAL
UND
ESPECIALIDAD : ESTRUCTURAS
HECHO POR
HOJA N: INDICADO
: BC - SH
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
Acero Longitudinal
Longitud Del Acero ......
0.38
8/1
23.00
30.00
m
m
0.38
1/4 "
0.250
PARCIAL
262.20
30.94
342.00
40.36
478.80
56.50
0.38 m
"
Acero Longitudinal
Longitud Del Acero ......
0.38
8/1
30.00
30.00
0.38
0.38 m
Acero Longitudinal
Longitud Del Acero ......
"
0.38
8/1
60.00
21.00
0.38
0.38 m
"
TOTAL
UND
ESPECIALIDAD : ESTRUCTURAS
HECHO POR
HOJA N: INDICADO
: BC - SH
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
Acero Longitudinal
Longitud Del Acero ......
0.38
8/1
22.00
15.00
0.38
1/4 "
0.250
PARCIAL
125.40
14.80
102.60
12.11
605.34
71.43
m
m
0.38 m
Acero Longitudinal
Longitud Del Acero ......
0.38
8/1
18.00
15.00
0.38 m
0.38
"
Acero Longitudinal
Longitud Del Acero ......
0.38
8/1
59.00
27.00
0.38
"
Acero Longitudinal
Longitud Del Acero ......
13.80
8/1
25.00
3.00
13.80
1035.00
122.13
Longitud De Empalme...
0.00
8/1
25.00
3.00
0.00
"
0.00
0.00
TOTAL
UND
ESPECIALIDAD : ESTRUCTURAS
HECHO POR
HOJA N: INDICADO
: BC - SH
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
13.14 m
13.14
8/1
22.00
3.00
m
m
13.14
867.24
102.33
Longitud De Empalme...
0.00
8/1
22.00
3.00
0.00
0.00
0.00
Acero Longitudinal
Longitud Del Acero ......
5.12
8/1
25.00
3.00
"
5.12
384.00
45.31
Longitud De Empalme...
0.00
8/1
25.00
3.00
0.00
0.00
0.00
7.35
8/1
15.00
3.00
"
7.35
330.75
39.03
Longitud De Empalme...
0.00
8/1
15.00
3.00
0.00
0.00
0.00
Acero Longitudinal
5.12 m
7.35 m
Acero Longitudinal
2.88 m
Acero Longitudinal
"
TOTAL
UND
ESPECIALIDAD : ESTRUCTURAS
HECHO POR
HOJA N: INDICADO
: BC - SH
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
2.88
0.00
m
m
8/1
8/1
11.00
11.00
3.00
3.00
2.88
0.00
1/4 "
0.250
PARCIAL
95.04
0.00
11.21
0.00
m
m
17.52 m
Acero Longitudinal
Longitud Del Acero ......
17.52
8/1
17.00
3.00
17.52
893.52
105.44
Longitud De Empalme...
0.00
8/1
17.00
3.00
0.00
0.00
0.00
6.24 m
"
Acero Longitudinal
Longitud Del Acero ......
6.24
8/1
9.00
3.00
6.24
168.48
19.88
Longitud De Empalme...
0.00
8/1
9.00
3.00
0.00
0.00
0.00
5.22 m
"
Acero Longitudinal
Longitud Del Acero ......
5.22
8/1
9.00
3.00
5.22
140.94
16.63
Longitud De Empalme...
0.00
8/1
9.00
3.00
0.00
0.00
0.00
17.82 m
"
TOTAL
UND
ESPECIALIDAD : ESTRUCTURAS
HECHO POR
HOJA N: INDICADO
: BC - SH
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
Acero Longitudinal
1/4 "
0.250
PARCIAL
641.52
75.70
3.00
m
17.82m
0.00
0.00
0.00
20.00
20.00
3.00
3.00
6.70"
0.00
402.00
0.00
47.44
0.00
8/1
17.00
3.00
440.64
52.00
17.00
3.00
8.64"
0.00
8/1
0.00
0.00
17.82
8/1
12.00
3.00
Longitud De Empalme...
0.00
8/1
12.00
6.70
0.00
m
m
8/1
8/1
8.64
Longitud De Empalme...
0.00
6.7 m
Acero Longitudinal
Longitud Del Acero ......
Longitud De Empalme...
8.64 m
Acero Longitudinal
"
TOTAL
UND
ESPECIALIDAD : ESTRUCTURAS
HECHO POR
HOJA N: INDICADO
: BC - SH
N PARTIDA
01.07.05.02
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
2.25 m
"
Acero Longitudinal
Longitud Del Acero ......
3/8
4.00
16.00
2.25
144.00
80.50
2.25
3/8
3/8
4.00
4.00
16.00
16.00
0.00
0.00
0.00
0.00
0.00
0.00
1.1 m
"
Acero Transversal
Longitud Del Acero ......
1.10
3/8
12.00
16.00
1.10
211.20
118.06
Longitud De Empalme...
0.00
3/8
12.00
16.00
0.00
0.00
0.00
"
TOTAL
UND
433.30
Kg
"
ESPECIALIDAD : ESTRUCTURAS
HECHO POR
"
: BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
1/4 "
mm)
" 0.250
DESCRIPCION
Acero Longitudinal
Longitud Del Acero ......
4.40
1/2
30.00
1.00
1/2
30.00
1.00
Longitud De Empalme...
1/2
30.00
1.00
0.00
m
4.40m
0.00
0.00
"
PARCIAL
132.00
131.08
0.00
0.00
0.00
0.00
104.40
103.67
0.00
0.00
5.8 m
"
Acero Transversal
Longitud Del Acero ......
5.80
1/2
18.00
1.00
Longitud De Empalme...
0.00
1/2
18.00
1.00
5.80
0.00"
"
"
"
HOJA DE METRADOS ACERO.................................................................................................................................................HOJA
NUMERO: 50
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
01.07.06.02
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
0.91
0.17
m
m
3.04
"
0.82
0.28
Acero Longitudinal
Longitud Del Acero ......
4.77
1/2
9.00
1.00
4.77
42.93
42.63
0.17
1/2
9.00
1.00
1.53
1.52
0.28
1/2
9.00
1.00
0.17
"
0.28
2.52
2.50
0.78
1.03
"
TOTAL
UND
686.20
Kg
"
ESPECIALIDA: ESTRUCTURAS
"
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
"
1.03
1/4 "
0.250
PARCIAL
m
m
0.31
Acero Longitudinal
Longitud Del Acero ......
1.03
1/2
9.00
1.00
1.03
9.27
9.21
0.78
1/2
9.00
1.00
7.02
6.97
0.31
1/2
9.00
1.00
0.78
"
0.31
2.79
2.77
0.66
0.12
"
1/2"
1.22
@0.15
Acero Longitudinal
Longitud Del Acero ......
1.22
1/2
9.00
1.00
"
1.22
10.98
10.90
0.12
1/2
9.00
1.00
0.12
1.08
1.07
0.66
1/2
9.00
1.00
0.66
5.94
5.90
"
"
1.225 m
Acero Transversal
Longitud Del Acero ......
1.23
3/8
20.00
1.00
1.23
24.50
13.70
3/8
20.00
1.00
0.00
0.00
0.00
3/8
20.00
1.00
0.00"
0.00
0.00
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
Tramo 02
0.91
"
m
m
0.17
1/2"
@0.15
3.24
"
0.09
1.29
1/2"
Acero Longitudinal
Longitud Del Acero ......
5.44
1/2
9.00
1.00
48.96
48.62
0.09
1/2
9.00
1.00
5.44"
0.09
0.81
0.80
0.17
1/2
9.00
1.00
0.17
1.53
1.52
1.43
0.20
1/2"
@0.15
0.18
"
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
Acero Longitudinal
Longitud Del Acero ......
1.43
1/2
9.00
1.00
1.43
12.87
12.78
0.18
1/2
9.00
1.00
1.62
1.61
0.20
1/2
9.00
1.00
0.18
m
0.20m
1.80
1.79
1.17
0.20
m
m
1/2
1/2
9.00
9.00
1.00
1.00
"
1.17
0.20
10.53
1.80
10.46
1.79
1/2
9.00
1.00
0.00
0.00
0.00
1/2"
@0.15
1.17
Acero Longitudinal
0.20
0.66
0.12
"
1.22
1/2"
@0.15
Acero Longitudinal
Longitud Del Acero ......
Longitud De Gancho Derecha
1.22
0.66
m
m
1/2
1/2
9.00
9.00
1.00
1.00
1.22
0.66
10.98
5.94
10.90
5.90
0.12
1/2
9.00
1.00
0.12
1.08
1.07
"
HOJA DE METRADOS ACERO.................................................................................................................................................HOJA NUMERO: 54
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
1.225 m
3/8
3/8
33.00
33.00
1.00
1.00
m
m
1.23
0.00
3/8
33.00
1.00
0.00
Acero Transversal
40.43
0.00
22.60
0.00
0.00
0.00
Tramo 03 - 05
0.92
0.25
"
1/2"
@0.15
2.69
"
1.28
0.17
1/2"
@0.15
Acero Longitudinal
Longitud Del Acero ......
4.88
1/2
9.00
2.00
4.88
87.84
87.23
0.17
1/2
9.00
2.00
0.17"
3.06
3.04
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
0.25
1/2
9.00
2.00
1.46
0.20
PARCIAL
4.50
4.47
m
m
0.34
1/2"
@0.15
0.25
1/4 "
0.250
Acero Longitudinal
Longitud Del Acero ......
1.46
1/2
9.00
2.00
1.46
26.28
26.10
0.34
1/2
9.00
2.00
0.34
6.12
6.08
0.20
1/2
9.00
2.00
0.20
3.60
3.57
"
1.12
1/2"
@0.15
0.20
Acero Longitudinal
Longitud Del Acero ......
1.12
1/2
9.00
2.00
"
1.12
20.16
20.02
0.20
1/2
9.00
2.00
0.20
3.60
3.57
1/2
9.00
2.00
0.00
0.00
0.00
1.22
0.70
0.21
1/2"
@0.15
"
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
1.22
DESCRIPCION
N PARTIDA
0.21
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
0.70
1/2"
@0.15
1/4 "
0.250
PARCIAL
Acero Longitudinal
Longitud Del Acero ......
1.22
1/2
9.00
2.00
0.70
1/2
9.00
2.00
0.21
1/2
9.00
2.00
1.23
3/8
31.00
2.00
3/8
3/8
31.00
31.00
2.00
2.00
1.22
m
0.70m
0.21
21.96
21.81
12.60
12.51
3.78
3.75
1.23"
0.00
0.00
75.95
42.46
0.00
0.00
0.00
0.00
1.225 m
Acero Transversal
Longitud Del Acero ......
Tramo 04 - 06
0.92
0.25
"
1/2"
@0.15
2.69
1.28
"
0.17
1/2"
HOJA DE METRADOS ACERO.................................................................................................................................................HOJA
NUMERO: 57
@0.15
TOTAL
UND
0.92
0.25
ESPECIALIDA: ESTRUCTURAS
1/2"
HECHO POR : BC - SH
HOJA N: INDICADO
@0.15
N PARTIDA
DESCRIPCION
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
2.69
1.28
1/4 "
0.250
PARCIAL
0.17
1/2"
@0.15
4.88
0.17
m
m
1/2
1/2
9.00
9.00
2.00
2.00
m
m
4.88
0.17
0.25
1/2
9.00
2.00
0.25
Acero Longitudinal
87.84
3.06
87.23
3.04
4.50
4.47
1.46
0.20
0.34
1/2"
@0.15
"
Acero Longitudinal
Longitud Del Acero ......
1.46
1/2
9.00
2.00
1.46
26.28
26.10
0.34
1/2
9.00
2.00
0.34
6.12
6.08
0.20
1/2
9.00
2.00
0.20
3.60
3.57
20.16
20.02
"
1.12
1/2"
@0.15
0.20
Acero Longitudinal
Longitud Del Acero ......
1.12
1/2
9.00
2.00
1.12"
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
0.20
1/4 "
0.250
PARCIAL
1/2
9.00
2.00
0.20
3.60
3.57
1/2
9.00
2.00
0.00
0.00
0.00
m
m
1.22
0.70
0.21
1/2"
@0.15
Acero Longitudinal
Longitud Del Acero ......
1.22
1/2
9.00
2.00
1.22
21.96
21.81
0.70
0.21
m
m
1/2
1/2
9.00
9.00
2.00
2.00
0.70
0.21"
12.60
3.78
12.51
3.75
3/8
3/8
31.00
31.00
2.00
2.00
75.95
0.00
42.46
0.00
3/8
31.00
2.00
1.23
0.00"
0.00
0.00
1.225 m
Acero Transversal
0.00
"
HOJA DE METRADOS ACERO.................................................................................................................................................HOJA NUMERO: 59
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
01.07.07.02
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
1/4 "
0.250
PARCIAL
0.20
m
m
0.20
1.20
0.20
0.20
"
2.50
0.20
0.35 m
2.42 m
"
Acero Longitudinal
Longitud Del Acero ......
2.42
3/8
8.00
3.00
2.42
58.08
32.47
0.35
0.35
m
m
3/8
3/8
8.00
8.00
3.00
3.00
0.35
0.35
8.40
8.40
4.70
4.70
0.35 m
0.35 m
1.12 m
"
TOTAL
UND
628.88
Kg
"
ESPECIALIDA: ESTRUCTURAS
"
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
"
Acero Transversal
1/4 "
0.250
PARCIAL
1.12
3/8
17.00
3.00
1.12
57.12
31.93
0.35
3/8
17.00
3.00
17.85
9.98
0.35
3/8
17.00
3.00
0.35
m
0.35m
17.85
9.98
"
2.2 m
"
0.3 m
"
Acero Longitudinal
Longitud Del Acero ......
2.20
3/8
46.00
3.00
2.20
303.60
169.71
0.30
0.30
m
m
3/8
3/8
46.00
46.00
3.00
3.00
0.30
0.30"
41.40
41.40
23.14
23.14
"
0.3 m
0.3 m
1.15 m
Acero Transversal
Longitud Del Acero ......
1.15
3/8
14.00
6.00
1.15
96.60
54.00
0.30
3/8
14.00
6.00
0.30
25.20
14.09
0.30
3/8
14.00
6.00
0.30"
25.20
14.09
TOTAL
UND
ESPECIALIDA: ESTRUCTURAS
HECHO POR : BC - SH
HOJA N: INDICADO
N PARTIDA
N
m
(Pulg/ CANT.
LONG.
VECES
mm)
DESCRIPCION
0.3 m
0.3 m
1/4 "
0.250
PARCIAL
"
m
m
2.45 m
Acero Transversal
Longitud Del Acero ......
2.45
3/8
14.00
6.00
2.45
205.80
115.04
0.30
3/8
14.00
6.00
0.30
25.20
14.09
0.30
3/8
14.00
6.00
0.30
25.20
14.09
"
0.35 m
Acero Longitudinal
Longitud Del Acero ......
2.42
3/8
8.00
3.00
2.42
58.08
32.47
0.35
3/8
8.00
3.00
0.35
8.40
4.70
0.35
3/8
8.00
3.00
0.35
8.40
4.70
0.35 m
"
0.35 m
Acero Transversal
Longitud Del Acero ......
Longitud De Gancho Derecha
1.12
0.35
m
m
3/8
3/8
17.00
17.00
3.00
3.00
1.12
0.35
57.12
17.85
31.93
9.98
0.35
3/8
17.00
3.00
0.35
17.85
9.98
"
HOJA DE METRADOS ACERO.................................................................................................................................................HOJA NUMERO: 62
TOTAL
UND