ENUNCIATION OF A PROPOSAL

G.A.N.G.F.O.R.M

SHOW ROOM 553 Highway 13, Hiep Binh Phuoc Ward, Thu Duc District ,Hochiminh City
TEL 08 5422 6238(KOREAN) 08 5422 6267 / 08 5403 7192(VIETNAMESE)
FAX 08 5422 6237 email formaply@naver.com
 INDEX

GENERAL CONCEPT

PLAN OF DETAIL MANUFACTURE

PLAN OF SITE INSTALLATION

APPLICATION CASES
 GENERAL CONCEPT
 DIFINITION & ADVANTAGE of GANG FORM

- Safety Construction
- Improved Concrete Quality
- Reduction Cost
- Parallet Concrete Finishing - Metalboard & Mash Metal Plank Can Be Re-used On
Other Jodsites By Using Simply Scaffolding Accessories
- Since The Waler Demension Is 100x50x3.0t
(top & Bottom), Its Has An Excellent Straightness
- If The Jobsite Has Any Unused Scaffolding Pipies, Th
- With Lower Brackets Connected Each Other With A
ey Can Be Attached To The Single Clamps Which Are
Square Pipe, There Is No Solder Modification Welded On The Frame Of Steel Plank

- If Scaffolding Pipes Are Used As Handrail, The Steel


1. What Is GANG FORM? Plank Can Be Used On Other Jobsites

This is large form unit by using mo


dulaized standard form panel and - System To Arrive At Your Site
waller, cage, steel plank, ladder.
With Apartment Buildings Rising Hi - The Remainings Of The Gang Form And Its Accessori
gher Than Ever Contractors Need es Of A Completed Site Can Be Re-used After Detailed
To Consider Various Aspects Such Plan Naing And Drawing. Those Less Waste Is Produce
As Material Costs, safety, Duration d Compared To Conventional Types Of Formwork
Of Work and Labor Costs.
 GANG FORMS SUB ITEM & TECHNICAL TERMS

1
4
2 1

4
5
11 6
6 12 3
5

7 7

9
8 10 11
2
9 10
8
3
12

NO ITEM NO ITEM NO ITEM NO ITEM

1 Lifting Hook 4 Waller(upper Part) 7 Vertical Bar 10 Toe Board

2 St’l Plate 3.2t 5 Horizontal Bar 8 Waller(lower Part) 11 Working Board


3 Width Armature 6 Flat Steel 9 Cage 12 Hand Rail
 GENERAL CONCEPT
 GANG FORMS Main Description
2) GANG FORM 원.부자재 표준규격

ITEM DESCRIPTION REMARKS

UNEVENNESS PLATE Plate 2.0thk

FLAT PLATE Plate 3.2thk

HORIZONTAL BAR-UPPER PART (WALER) 2ㄷ-channel 100x50x5x7thk

HORIZONTAL ARMATURE Pipe-50x30x2.3thk

VERTICAL ARMATURE Pipe-50x30x2.3thk

LIFTING HOOK Ss400 Φ22mm Pilling Bar

TOP & BOTTOM CAGE FRAME S.Q Pipe(40x40x1.6thk)

CAGE HANDRAIL S.Q Pipe(40x20x1.4thk)

MATERIAL KEEPING BOX Steel 3.2thk

WORKING BOARD FRAME S.Q Pipe:40x40x1.6thk

CORNER FLAT BAR Steel Flat 75x6thk&100x6thk

CORNER ANGLE 65x65x6thk

WORKING BOARD Sg-362 Exp.Metal & Pierced Steel Plate (P.S.P)


 WEIGHT CALCULATION SHEET ( 135.3M2 SIDE WALL / HEIGHT : 3M)

BASED CACULATION BASED CACULATION


ITEM WEIGHT ITEM WEIGHT
<IRON CONTENT : 7.85KG/M2> <IRON CONTENT : 7.85KG/M2>

UNPATTERN PLATE 12.89× 3× 3.2T 971.4kg SQUARE PIPE ㄷ-75× 45× 2.3T× 3M× 2EA 17.9kg
<3>
CENTER LINE {(0.069X27M)+(0.049X29M)}× 2T 51.5kg CRANE PILLING BAR ¢22× 4.2MX2EA 25kg
HOOK
HORIZONTAL
C-75× 45× 15× 2.3T× 12.89M× 11단 499.2kg 3. SUB TOTAL 43kg
ARMATURE
VERTICAL
C-75× 45× 15× 2.3T× 3.8M× 2EA× 22 668kg HORIZONTALITY ㅁ-20× 40× 1.4T× 15M× 11SH 217.6kg
ARMATURE <4>
WALLER ㄷ-100× 50× 7T× 12.89M× 2EA 283.3kg HAND VERTICALITY ㅁ-20× 40× 1.4T× 9.2M× 2EA 24.3kg
<1> RAIL
GANG FLAT STEEL 75× 6T× 3M× 2EA 21.20kg 4. SUB TOTAL 242kg
FORM
LOWER PART-
HORIZONTAL
ARMATURE C-75× 45× 15× 2.3T× 12.89M× 2단 45.38kg W=450 4SH× 15M× 20kg/M2 378kg
METAL BOARD
<5>
SLANTING LINE
ㅁ-50× 30× 1.8T× 3.8M× 2EA 17.2kg WORKING W=600 1SH× 15M× 20kg/M2 168kg
SQUARE PIPE
BOARD
TOE BOARD 50× 100× 1.2T 106kg

1. SUB TOTAL 2557kg 5. SUB TOTAL 652kg


UPPER PART
ㅁ-40× 40× 1.6T× 7.43M× 10EA 149.3kg <6> LADDER ㅁ-40× 40× 1.6T× 9M 18.1kg
(GENERAL)
SLANTING LINES ㅁ-40× 40× 1.6T× 8.18M× 2EA 32.9kg <7> BOLT M12× 120 ETC. 50kg
<2> LOWER PART
ㅁ-40× 40× 1.6T× 10.95M× 10EA 220kg
CAGE (GENERAL) <8>
INCLUDING WING NUT, WASHER 12× 700L× 5× 20 100kg
BOLT TIE
SLANTING LINES ㅁ-40× 40× 1.6T× 11.70M× 2EA 47kg

2. SUB TOTAL 449kg 6. SUB TOTAL 168kg

GRAND TOTAL 4111kg

** 4,111kg / 38.67㎡ = 106.3kg / M2 (110KG/M2)


 DETAIL PLAN OF MANUFACTURE
 Lifting Ring-Pilling bar(22mm)

■ WELD PILLING BAR (D22)


■ 2EA OR MORE INSTALLATION PER 1PLACE (SIDE WALL)
■ LENGTH OF LIFTING HOOK FOR INSTALLATION (H)

Gang For
High Lobby
Gang For m Below Gang For
Balcony F Balcony F
m 6m Or The 6m m Below
orm 4m orm 5m
More ~ 3m Or The 3m
Or More Or More
More

2M 1.5M 0.7M 1.5M 0.7M

Crossing Of Horiaontal Bar


Length Of Weding : More Than 25mm
Time Of Welding : More Than 4Point

1. ``
 DETAIL PLAN OF MANUFACTURE
 Cage & Working Board

DIFFERENT CAGE
CAGE SPACE OF
INSTALLATION
WORKING
BOARD

ADDITIONAL DIFFERENT CAGE


HAND
RAIL

BELOW THE
150MM
 DETAIL PLAN OF MANUFACTURE
 Toe Board

A REASON FOR INSTALLATION

1. PROTECTION FROM WORKERS SLIDING ACCIDENT

2. PROTECTION FROM FALLING TOOLS & MATERIALS

3. INSTALLATION TO 5TH WORKING BOARD

4. INSTALLATION PLACE

- PIPE OF WORKING BOARD + HAND RAIL

THE TOTAL INSTALLATION


5 STEP
100

내측 외측
 APPLICATION CASE
 Side Wall Cage, Installation Working Board
 APPLICATION CASE
 Application GCS of Side Wall
 APPLICATION CASE
 Application GCS of Side Wall
 APPLICATION CASE
 Application Specialized Pattern of Side Wall
 APPLICATION CASE
 Application Specialized Pattern of Side Wall
5. 측벽 특화문양(오산 원동현장)
 APPLICATION CASE
 Application Joint Concrete Pavement of Outside Wall
 APPLICATION CASE
 Application of Elev-Pit Box Form
 APPLICATION CASE
 Before the Installation
 APPLICATION CASE
 Before the Installation