SUBSEA HANDLING EQUIPMENT

BOP HANDLING SEMIS


& DRILLSHIPS
BOP Handling System designs must address the
testing sequences, storage, sea-fastening, guidance
and assembly of the constituent components of BOP
stack, along with the running and retrieval of the fully
assembled stack.
There are several ways in which this can be achieved
using combinations of Carriers, Transporters,
Elevators, Overhead Cranes, Spider Beams and
Gantry Cranes.
Being on-board floating vessels, it is imperative that
suitable guidance systems are employed to safely
escort the BOP Stack / its components during
horizontal transfers as well as vertical deployment
through the moonpool area. Safety of crew, and
protection of equipment and structure from damage
are critical considerations in designing such a system.
Elevation on transporter,
overhead BOP crane & BOP
stack.

Elevating fork-type BOP


transporter

Bulkhead guidance

DESIGNED & CONSTRUCTED


TO OPERATE IN ZONE 1 & SAFE AREAS

Overhead BOP Crane

SUBSEA HANDLING EQUIPMENT

PRODUCT
NAME SEMIS
BOP HANDLING
HERE
& DRILLSHIPS

BOP Carrier

Skids

Spider beams

Testing & assembly of LMRP & BOP


(overhead systems or deck mounted systems)
Transfer to / from well centre
Bulkhead guidance
LMRP guidance
Sea fixing arrangements
Test stump mechanisms
Spider beams
Riser and casing hang-off (up to 1000Te)
Moonpool equipment management, power and control
Integrated Xmas tree handling systems

Block 1, Units 3-7


Souterhead Road
Altens
Aberdeen AB12 3LF Scotland UK
T: +44 (0) 1224 249355
F: +44 (0) 1224 249339
E: info@efcroup.net

1424 West Sam Houston Parkway North


Suite 140
Houston
Texas 77043 USA
T: +1 713 468 5325
F: +1 713 468 3498
E: info@efcgroup.net

65 Victoria Road
Guiseley
Leeds
LS20 8DQ
England UK
T: +44(0)1943 870 822
E: info@efcgroup.net

www.efcgroup.net

BOP
Elevator

11c Tuas Road


Singapore
638509
T: +65 6794 5261
E: info@efcgroup.net

Você também pode gostar