Você está na página 1de 1

Government of Nepal

Ministry of Physical Planning and Works


Department of Roads
Planning & Design Branch
Babarmahal, Kathmandu, Nepal

H A L F

S E C T IO N A L

P L A N

O F

P IE R

A T

D -D

DETAIL ENGINEERING DESIGN

Contract No.:BU-DSD11/64-65(Package-11)

SCALE-1:50

PATHARIYA BRIDGE
OVER PATHARIYA RIVER
ALONG BAINING-PRATAPPUR TIKAPUR
ROAD
KAILAI DISTRICT

Consultants:

ST3
ST4
ST5
ST6
ST7
ST8

Approved by :

Checked by :

6 STIRRUPS @60
(ST3,ST4,ST5,ST6,ST
20 @200 C/C
(ST 2)

Designed by : Nhuchhe N. Maharjan

SCALE-1:25

DETAIL OF STOPPER

20 @200 C/C
(ST 1)

ERMC Consultants (P) Ltd.


Baneswor Kathmandu

278

425

200
278

60

1550

ST1

20

20

13

13

3.74

3.68

1.23

1.12

0.22

0.22

0.22

2.47

2.47

(Kg/m)

0.85

0.84

0.82

0.81

60.76

35.96

(Kg)

WEIGHT WEIGHT

ST2

3.80

0.22

0.86

(m)

ST3

3.85

0.22

NOS. LENGTH

ST4

3.91

DIA.

ST5

0.87

(mm)

ST6

0.22

LABEL

ST7

3.96

Pier Pile Foundation Details

Sheet Title:

Dwg. No:

Sheet No: 14

PATHA-BRG-14

TOTAL PER STOPPER 101.77 kg

1.0m

0.5

2m

ST8

1:100

1550

1550

1550

1550

1550

750

200

60

230
60

259
60

60

287

372

343

60

315

200

SHAPE

BAR BENDING SCHEDULE OF PIER STOPPER (PER STOPPER)


S.N.
1

NOTES:-

SCALE:

0.125m 0
0.5m

DATE : April, 2010

Você também pode gostar