ALISA HARGA SATUAN

Analisa EI-21
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

SKPD
KEGIATAN
PEKERJAAN
KECAMATAN
KECAMATAN
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

: DINAS PU BINA MARGA KAB. MUSI BANYUASIN APBD TA. 2014


: PENINGKATAN JALAN
: PENINGKATAN JALAN SUMBER SARI (D4) - SRI MULYO (D1) DENGAN BETON
KECAMATAN TUNGKAL JAYA
: MUSI BANYUASIN
: 2.1
: Galian Utk Drainase, Saluran dan Saluran Air
: M3

PERKIRAAN
SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1.
2.

Pekerja
Mandor

B.

(L01)
(L03)

jam
jam

0.0298
0.0075

HARGA
SATUAN
(Rp.)

10,285.71
11,571.42

JUMLAH
HARGA
(Rp.)

307.01
86.35

JUMLAH HARGA TENAGA

393.36

JUMLAH HARGA BAHAN

0.00

BAHAN

C.

PERALATAN

1.
2.
3.

Excavator
Dump Truck
Alat Bantu

(E10)
(E08)

jam
jam
Ls

0.0075
0.0653
1.0000

555,806.44
318,581.59
100.00

JUMLAH HARGA PERALATAN


D.
E.
F.
Note: 1
2
3
4

4,147.49
20,801.29
100.00

25,048.77

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


25,442.13
OVERHEAD & PROFIT
0.0 % x D
0.00
HARGA SATUAN PEKERJAAN ( D + E )
25,442.13
SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SEKAYU, 25 JULI 2014
PENAWAR,
CV. CHANDRA JAYA

TAUFIK HIDAYAT