Você está na página 1de 1

Analisa EI-512

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

SKPD

: DINAS PU BINA MARGA KAB. MUSI BANYUASIN APBD TA. 2014

KEGIATAN
PEKERJAAN
KECAMATAN
KABUPATEN
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

: PENINGKATAN JALAN
: PENINGKATAN JALAN SUMBER SARI (D4) - SRI MULYO (D1) DENGAN BETON
KECAMATAN TUNGKAL JAYA
: MUSI BANYUASIN
: 5.1 (2)
PERKIRAAN VOL. PEK.
:
513.75
: Lps. Pond. Agg. Kls. B
TOTAL HARGA (Rp.)
:
358,983,156.71
: M3
% THD. BIAYA PROYEK
:
21.49

PERKIRAAN
SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1.
2.

Pekerja
Mandor

(L01)
(L03)

jam
jam

0.0595
0.0085

HARGA
SATUAN
(Rp.)

10,285.71
11,571.42

JUMLAH HARGA TENAGA


B.

BAHAN

1.

Aggregat B

M27

M3

1.2586

545,725.55

JUMLAH HARGA BAHAN


C.
1.
2.
1.
2.
3.
4.

PERALATAN
Wheel Loader
Dump Truck
Motor Grader
Tandem Roller
Water Tanker
Alat Bantu

(E15)
(E08)
(E13)
(E17)
(E23)

jam
jam
jam
jam
jam
Ls

0.0085
0.0299
0.0029
0.0134
0.0141
1.0000

375,265.26
318,581.59
575,933.17
373,616.34
312,840.91
100.00

JUMLAH HARGA PERALATAN


D.
E.
F.
Note: 1
2
3
4

JUMLAH
HARGA
(Rp.)

611.66
98.30

709.96

686,855.24

686,855.24

1,686.55
5,001.56
4,397.36
100.00

11,185.47

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


698,750.67
OVERHEAD & PROFIT
0.0 % x D
0.00
HARGA SATUAN PEKERJAAN ( D + E )
698,750.67
SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SEKAYU, 25 JULI 2014
PENAWAR,
CV. CHANDRA JAYA

TAUFIK HIDAYAT
Direktur

Você também pode gostar