SKPD
KEGIATAN
PEKERJAAN
KECAMATAN
KABUPATEN
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
: PENINGKATAN JALAN
: PENINGKATAN JALAN SUMBER SARI (D4) - SRI MULYO (D1) DENGAN BETON
KECAMATAN TUNGKAL JAYA
: MUSI BANYUASIN
: 5.1 (2)
PERKIRAAN VOL. PEK.
:
513.75
: Lps. Pond. Agg. Kls. B
TOTAL HARGA (Rp.)
:
358,983,156.71
: M3
% THD. BIAYA PROYEK
:
21.49
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
jam
jam
0.0595
0.0085
HARGA
SATUAN
(Rp.)
10,285.71
11,571.42
BAHAN
1.
Aggregat B
M27
M3
1.2586
545,725.55
PERALATAN
Wheel Loader
Dump Truck
Motor Grader
Tandem Roller
Water Tanker
Alat Bantu
(E15)
(E08)
(E13)
(E17)
(E23)
jam
jam
jam
jam
jam
Ls
0.0085
0.0299
0.0029
0.0134
0.0141
1.0000
375,265.26
318,581.59
575,933.17
373,616.34
312,840.91
100.00
JUMLAH
HARGA
(Rp.)
611.66
98.30
709.96
686,855.24
686,855.24
1,686.55
5,001.56
4,397.36
100.00
11,185.47
TAUFIK HIDAYAT
Direktur