Você está na página 1de 2

Gas.

Ly
Minister of Housing Utilities

BENGHAZI GAS DISTRIBUTION PROJECT


PHASE I

DETAILED ENGINEERING PROJECT

Contract:

Document Number:

Date:

Rev:

Client Approvals:
CRTD by:

2010K / 306

BGZ/01/MP/DEP.0

April 2013

CHKD by:
APPR by:

BENGHAZI GAS DITRIBUTION PHASE I


DETAILED ENGINEERING PROJECT
GasLy

Ref: BGZ/01/MP/DEP.0

April 2013

Minister of Housing Utilities

INDEX
I.

DETAILED ENGINEERING PROJECT MEMORY

II.

PRESSURE, REGULATION AND METERING STATION (PRMS) TECHNICAL


SPECIFICATIONS

III.

DISTRIBUTION, REGULATION STATION (DRS) TECHNICAL SPECIFICATIONS

IV.

CATHODIC PROTECTION

V.

MECHANICAL PIPE CALCULATION

VI.

PRMS BUILDING STRUCTURE

VII.

DRAWINGS

VIII.

MATERIAL SPECIFICATIONS

IX.

ASSEMBLY SPECIFICATIONS

X.

BILL OF QUANTITIES

XI.

BENGHAZY PHASE I PROJECT CONSTRUCTION CHART

XII.

HEALTH, SAFETY AND ENVIROMENTAL STUDY

XIII.

HAZARDOUS AREAS CLASSIFICATION STUDY

XIV.

PROJECT PHILOSOPHY

XV.

CALCULUS MEMORY

XVI.

QUALITY STUDY

Page 2 of 2

Você também pode gostar