CAPACITY
DESEIN IS INDIAS LEADING ENGINEERING POWER
PLANT CONSULTANCY WITH TRACK RECORD OF 50 YEARS.
DESEIN PROVIDES TOTAL ENGINEERING, PROCUREMENT,
CONSTRUCTION & COMMISSIONING SUPERVISION FOR
UNIT SIZE UTO 800 MW FOR BOTH SUPER-CRITICAL &
SUB-CRITICAL.
POWER PLANT DESIGN IS DRIVEN BY ITS EXPERTISE &
EXPERIENCE
OF
THE
THERMAL
CYCLE.
DESEIN
CONCEPTUALIZES THE COMPLETE LIFE CYCLE OF THE
PROJECT- PROJECT FEASIBILITY, DETAILED ENGINEERING,
OPERATION & MAINTENANCE AND RENOVATION &
MODERNIZATION.
DESEIN HAS WORKED ON DIFFERENT FUELS SUCH AS
COAL,
GAS,
LIGNITE,
WASHERY
REJECTS
AND
RENEWABLES.
2
CAPACITY
Contd
LATEST
COMMUNICATION
FACILITIES
FOR
CORRESPONDENCE, TRANSFER OF TECHNICAL DATA
AND DRAWINGS ETC.
ACCREDITED WITH: QCI-NABET VIDE MoEF, O.M. No. J11013/77/2004-IA II (I) DATED 30.09.2011 FOR CAT.
A, UNDER S.No. 15 OF LIST A
STRENGTHS
EXTENSIVE DOMESTIC AND INTERNATIONAL EXPERIENCE
ENGINEERING,
PROCUREMENT & CONSTRUCTION CAPABILITIES
TURNKEY ASSIGNMENTS FOR CONSORTIUM
LARGE MULTI-DISCIPLINARY INFRASTRUCTURE PROJECTS
GLOBAL STRATEGIC ALLIANCES
STRONG TEAM SKILLS IN ALL DISCIPLINES
ENVIRONMENT
INCLUDING
WORK ENVIRONMENT
EQUIPPED WITH STATE-OF-THE-ART MAIN SOFTWARE TOOLS SUCH AS:
PDS
PDMS
AUTOPLANT
SOLIDWORKS 2010
REVIT STRUCTURALS
CIVIL 3D
CAESAR II
GT PRO / GT MASTER
ISC ST3
AERMOD
PRIMAVERA
STAAD PRO
SECTION WIZARD
CAD RC
MAP GUIDE
NISA
MICRO STATION
MS Office
LIBSYS
SB SLOPE 3
Feasibility Studies
Detailed Project Reports
Environmental Impact Studies
Design & Detailed Engineering
Total Engineering Consultancy
(Concept To Commissioning)
CONSTRUCTION OF POWER PLANTS
Turnkey Contracting
Engineering, Procurement &
Construction
POST-COMMISSIONING SERVICES
Effluent Treatment
6
REPORT/DETAILED
PROJECT
REPORT
&
MAINTENANCE
FOR
20
POWER
PROJECTS
7
EMPANELLMENT
ACCREDITATION (QCI/NABET)
Client
Assignments
/ Projects
ToR/NoC
EC
Obtained Obtained
1.
23.11.06
07.04.08
3.
PFC
Consulting Ltd.
11.07.08
1980 (3x660)
MW Talwandi
Sabo TPP
(Punjab)
10
Contd
ToR
EC
Obtained Obtained
Feasibility Report, Project Report 20.05.09 Recomm
&
-ended
(Bankable), EIA and SIA Studies,
Topographical Survey, Area Drainage 08.11.12 for EC
by EAC
Study
and
Geo-Technical
Investigation.
S.No.
Client
4.
PFC
Consulting Ltd.
4000 MW
Odisha
UMPP
(Odisha )
5.
PFC
Consulting Ltd.
1320 (2x660)
MW Rajpura
TPP
(Punjab)
6.
MAHAGENCO
03.10.08
COMPOSITION OF TEAM
TEAM LEADER (TL) / TEAM MEMBERS (TM) TO BE DEPLOYED
S.N
o.
Name
Designati Qualificatio
on
n
Area of
Specialization
Position/
Experienc
e
Consulta B.E.
nt
(Mech.)
Feasibility
Report &
Detailed Project
Report
TL /
42Yrs
Dr. P. C.
2.
Jha
Executiv
e
Director
Environment
Management
TM / 30
Yrs.
Mr. S.
3.
Das
Executiv
e
Director
Mechanical
Engg. Boiler&
Air Pollution
TM / 36
Yrs.
1.
Mr. P.
Dutt
4.
Mr. S. K.
Dandona
5.
Mr. K. K.
Singh
Ph.D
(Ecology)
M.Tech
(Thermal
Engg.)
Consulta
Electrical Engg.
B.E. (Elec.)
nt
Executiv Mineral
e
Engg.
Mineral Engg.
Director
& MBA
TM / 53
Yrs.
TM / 37
Yrs.
12
COMPOSITION OF TEAM
TEAM LEADER (TL) / TEAM MEMBERS (TM) TO BE DEPLOYED
contd...
S.N
Position/
o.
Name
Designati Qualificatio
on
n
9. Mr.
Mukesh
K.
Sharma
Manager PGD
(Ecology &
Environmen
t)
Sr.
B. Tech.
10. Mr. N. Ali
Manager (Civil)
Sr.
Mr.
B.E.
11.
Engineer
C.Mishra
(Mech.)
.
12.
B. E.
Mr. D.
Consulta
(Metallurgy
Dasgupta nt
)
13.
Mr. S. C.
Jain
14. Dr. P. G.
Consulta AMIE
nt
(Chem.)
Consulta Ph.D (Ag.
Area of
Specialization
Experienc
e
Environment
Management
TM / 27
Yrs.
Civil related
activities
TM / 13
Yrs.
TM / 9
Yrs.
Environmental
Enginnering
Water System/
Waste
Management
Landuse/ Soil
TM / 50
Yrs.
TM / 49
Yrs.
TM / 50
13
14
SCOPE OF WORK
PROPONENT
BIDDER
SITE MOBILISATION,
PFR & FORM-1,
ToR FROM MoEF&CC
BASELINE DATA GENERATION
TOPOGRAPHICAL SURVEY
AREA DRAINAGE STUDY
GEO-TECHNICAL INVESTIGATION,
SOCIO-ECONOMIC STUDY
PROJECT INFORMATION REPORT
EIA STUDIES
DETAILED PROJECT REPORT,
LAND ACQUISITION
COMPREHENSIVE SIA, R&R PLAN AND
CSR PLAN
STATUTORY CLEARANCES
(AS APPLICABLE)
15
AND
INCLUDING
BROAD
17
Contd
AND
FOR
18
BASELINE STUDY
20
21
22
FOREST CLEARANCE
23
PUBLIC HEARING
25
THEN
BE
THE DPR WILL PROVIDE TARIFF CALCULATION, LOANEQUITY RATIO, IRR, IDC ETC. TO ESTABLISH THE
VIABILITY OF THE PROJECT.
TASK 1100
ENVIRONMENTAL CLEARANCE
EXECUTION PLAN
AFTER THE KICK-OFF MEETING WORK PLAN WILL BE
FINALISED.
ARRANGEMENTS
WILL
BE
MADE
FOR
RECONNAISSANCE SURVEY AS WELL AS OPENING
OF SITE OFFICE AT KAKWARA OR BANKA IN
CONSULTATION WITH PFCCL.
PLANNING AND MANAGEMENT OF OPERATIONS WILL
BE CARRIED OUT FROM THE HEAD OFFICE IN DELHI.
FOR THE TASKS IDENTIFIED SEPARATE TEAMS WILL
BE DEPLOYED WITH TIME- FRAMES TO COMPLETE
THEM.
28
EXECUTION PLAN
Contd
MONITORING AND SURVEY DATA GENERATED AND
SECONDARY DATA COLLECTED WILL BE COLLATED
AND ANALYSED IN DELHI.
DOCUMENTATION AND GENERATION OF VARIOUS
DRAWINGS, MAPS, REPORTS WILL TAKE PLACE IN
DELHI.
ALL THROUGH THE STUDY, THE TEAM LEADER/
MEMBERS WILL HAVE REGULAR INTERACTION WITH
THE
PFCCL
TO
ENSURE
THAT
THE
STUDY
PROGRESSES AS PER THE PLAN FOR TIMELY
COMPLETION.
29
Thank You
30