Date: 23 February 2014
Time allowed: 3 Hours
OPEN BOOK
Answer All 25 questions (multiple-choice questions -MCQ and other types)
volume.
compacted
natural in situ
bulk
compatible
2. The total amount oflabour cost foranexcavation task is $ 6000.Three workers are excavated
to the earth. The labour eost is $ 30 per hour and the working time is 8 hours per day. The
.:J
(a)
(b)
(c)
(d)
12.5
8.33
5.0
3.0
3. Draw CPM arrow diagram for the following work. The CPM diagram is likely to be:
3
(A)
(B)
(C)
(D)
ID
Activity
1
2
3
4
5
6
7
Excavation
Order Materials
Order Paint
Lean Concrete
Brick Work
Duration, Day
2
1
7
2
4
Plastering
Successor
2,3,4
4
7
5
Remark
6
7
Page lof7
4. The strength of cylinders and eubes made from the same concrete differ from one another.
There is no simple relationship between the strengths of the specimens of the two shapes. The
at strengths of more than
ratio of the strengths of the eylinder to the cube is nearly
100 MPa.
(a) 0.7
(b) 0.8
(c) 0.9
(d) 1.0
of reinforcement.
7. In a layer of saturated clay, a cone penetration was conducted. At a depth of 10 m below the
ground surface, qc was determined to be 1400 kN/m 2 , Estimate the undrained shear strength of
the elay. Given: unit weight of saturated clay ~ 18 kN/m 3 and N k ~ 15.
(a)
(b)
(c)
(d)
64.2 kN/m'
76.3 kN/m'
81.3 kN/m'
110.9 kN/m'
8. A horizontaL stratified soiL deposit eonsists of three layers eaeh uniform in itself. The
permeabilities of these layers are 8xlO-4 em/s, 52x10-4 em/s, and 6xlO-4 em/s, and their
thicknesses are 7, 3,10 m respeetively. Find the effective average permeability of the deposit
in the vertical direetion. The deposit is shown in Figure below.
(a)
(b)
(e)
(d)
5.6xI0" ern/a
6.8xI04 emls
7.7xI04 emls
8.4xI0" cm/s
Arsflayer
..""'" Jayer
Third Jayer
7t
3m
10m
Page2of7
9. The soils may be considered liquefiable, ifthe liquid limit of non-cohesive soil is less than
A.
B.
C.
D.
25
35
40
55
10. A 1O-foot high gravity retaining wall is designed with no wall-soil friction. Calculate the wall
width B to attain a FS = 1.5 against overturning.
(a)
(b)
(e)
(d)
3.0 feet
3.5 feet
4.0 feet
4.5 feet
#=10'
11. What load combination produces the maximum downward deflection atpoint C.
Live load-!
Live load-3
Dead Load
12. Whieh of the shear force diagrams shown best represents the loading on the beam shown in the
figure.
100 k-ft
10'-0"
l' "
l-----=--"----t
Page 3 of 1
(b)
(e)
5k
5k
(d)
13. A simply supported truss is loaded as shown in figure. The load (kips) for member "a" and
vertical reaction at support B are almostnearly.
50 kips
10'
B
~ 100 kips
%
Member a
25
50
0
16.66
(a)
(b)
(e)
(d)
10'
10'
,y
10'
Reaction B
67.33
83.33
50
14. A small water tank is supported on a slender coLumn as shown. Neglecting the weight of
column, ehoose the correct natural period of vibration.
(a)
(b)
(e)
(d)
0.25 s
0.333 s
0.5 s
0.625 s
.00. leg
I =8e-3m
E;2eSMP
Page 4 of 7
15. A plate is modeled for single footing-pad and meshed to be used in finite element application.
FEA can handle rectangle, triangle and quadrilateral elements without mid-nodes. Colum is
located at mid point of square footing pad. Choose correct mesh for footing
<,
/"-.. 1/
"-../
I)
/
/"-..
"-../
A
.--
"
1/
1"-..
>
I'"
/\
16. The pin on the frame at B has a diameter of 0.25 in. If the pin is subjected to double shear,
determine the average shear stress in the pin at B.
(a)
3.05 ksi
(b)
3.55 ksi
(e)
6.55 ksi
(d)
6.05 ksi
, '-----j
17. The piece of plastic is originally rectangular. Determine the average normal strain that oecurs
')
'<
(a)
10.8(10') mmlmm
(b)
(11.8(10"') mmlmm
(e)
12.8(10') mmlmm
(d)
13.8(10') mmlmm
300mm
1
D
--f
]'Imm
----4l'OOmm--I--I
3mm
Page5 of7
18. Column load will be checked with allowable bearing stress onto footing base plate. Cylinder
strength of concrete is 3000psi and column location is on the edge of mat footing. By using
ACI318-(l995 to 2005) maximum uitimate column ioad will be nearest to
(a)
(b)
(c)
(d)
700
750
800
850
kip
kip
kip
kip
"
19. Stability index ofRCC frame is found between 0.05 and 0.1. How can man judge the
condition of system?
Stability index
20. For a rectangular channel of 3 m wide laid on 10 slope, if Q= 24 mJ/s, what is the critical depth
Yc?
(a) 1.26 m
(b) 1.5 m
(c) 1.87 m
(d) 2.0 m
21. If 3 m wide rectangular channel laid on 10 slope is built of rubble cement (Manning's n =
0.020), what is the uniform-flow rate when the water depth is 2 m?
(a)
(b)
(c)
(d)
6 mJls
18 mJls
36 mJls
40 mJls
Page 6 of 7
23. If rainfall intensity of 1.5 km2 catchment is 2.9 cm/hr and its runoffcoefficient is 0.3. runoffis
obtained as
(a) 1.31 eumees
(b) 1.31 eusec
(c) 3.63 cumecs
(d) 3.63 cusec
24. Design flow rate of 1000 gal/day/if for average flow rate is used to design a primary clarifier.
Determine the diameter of a primary clarifier at average flow to treat a flow of 1 MGD.
(a)
(b)
(c)
(d)
,:J
29
36
46
56
Sample volume ~ 10 mL
(a) 72 mg/L
(b) 188 mgIL
(e) 241 mg/L
(d) 181 mgIL
Page 7of7
earth pressure
active earth pressure
[. / 2. Allowing for exeevation to be made 2' - 0" clear of the building Lines and to a total
,)
depth of 5'- 0" below the grade, the volume of each should be ealculated as follow
(a) 12,800.00 Cu.ft
(b) 12,000.00 Cu.ft
(e) 11,980.00 Cu.ft
(b)
(c)
(d)
(b) You have just taken over as manager of a project that will create many
benefits for the performing organization, but you sense a high level of
resistance in various stakeholders' right from the start. What is the most
(a) Develop a responsibility assignment matrix (RAM) whieh clearly shows the
responsibility of each stakeholder for the various project activities and who
needs 10 be consulted and informed.
(b) Develop an organization diagram, which places each of the stakeholders at an
appropriate position inside the project and allows for certain Jines of
communieation while disallowing others.
(e) Schedule a meeting with these stakeholders to present the project, discuss and
establish ground rules, ensure their involvement and identify initial personal
and organizational issues.
(d) Do not talk to these stakeholders too much at this time; instead create
faitsaccomplish, which will later force the stakeholders to support the project
due to a laek of altematives for them.
Page 1 of 7
C)
(b)
project.
In the compressive strength test for ordinary Portland cement Type I, 7 days
strength should not be less than
MPa. (ASTM standard)
(a) 15
(b) 17
(c) 19
(d) 21
/
6. In coarse aggregates for concrete, maximum limit of clay lump and friable particles
in mass percent of total sample is
_
(a) 4
(b) 6
(c) 8
(d) 10
/
/7. The observed standard penetration test value in a deposit of fully submerged sand
was 45 at a depth of 6.5 m. The effective unit weight of the soil is 10 kN/m'. The
other data given are (a) hammer efficiency = 0.6, (b) drill rod correction factor =
0.95, and (c) borehole correction factor = 1.05. Determine the corrected SPT value
(N,)".
(a) 54
(b) 56
(c) 58
(d) 60
Page 2 of 7
!/
8. The anchorage force for a temporary scaffolding structure with 40 psf gross loading
as shown shall be
-'il~ 'j0l' f
Yl- ~tl.e.
\0
sf"""',"", ? /
=:'4F~ 4D f' }
\0
( )
9.
(a)
(b)
(c)
(d)
480 pound ..
160 pound
320 pound
380 pound
Ca) 16
(b) 18
Cc) 20
(d) 22
...
"
10. A clay layer 3.66 m thick rests beneath a deposit of submerged sand 7.92 m thick.
The top of the sand is located 3.05 m below the surface of a lake. The saturated unit
weight of the sand is 19.62 kN/m' and of the clay is 18.36 kN/m'. Compute the
effective vertical pressure at mid height of the clay layer.
.-,
.,
Page30f7
"
(a)
(b)
(c)
(d)
91.5
93.3
95.4
97.3
kN/m'
kN/m'
kN/m'
kN/m'
(11J Vibration is likely not to he a problem for spread footing, when the relative density
of the sand close to
(a) 0.5 (50%)
(b) 0.75 (75%)
(c) 0.9 (90%)
(d) Unity (100%)
"iz. It is essential that the soil conditions are known within the significant depth of any
foundation. Significant depth will be approximated by width of footing (B) and
choose from followings for square footing.
(a) 1.5B
(b) 2.0B
(c) 2.5B
(d) 3.0B
'.
f)
,~~
(A)
(a) Stem centered
Ab) Outside stem face-centered
(c) Backfill stem face-centered
(d) None of the above
Page 4 of 7
"".'--"."--.,
./ '
./
/
14. A simply supported truss is loaded as shown in figure. The member force "a" and
vertical upward reaction at support B are almost nearly.
10'
B
00 kips
IV'
Member "a"(ki~s}
( )
,r
I Q'
100 kips
11 '
;1
Reaction B(kips}
(a) 100(!ension)
100
(b) 100(tension)
96.77
(c) JOO(compression)
96.77
(d) 100(compression)
100
15. A propped cantilever beam shown below carry 8 point load P. The magnitude of
load P (with its plastic moment capacity Mp) that would cause collapse of the beam
p
"16. If the resultant force is required to aet along the positive u axis and have a
magnitude of 5 kN, determine the required magnitude ofFB and its direction 9.
y
F,,=3kN
_-x
B~"
Page 5 of7
if
.J'
,
",
'i,
/.
17. Determine the magnitude and direction measured counterclockwise from the
positive x axis of the resultant force of the three forces acting on the ring A. Take PI
~
500N and
e ~20'.
.'
r,
600 N
"
condition is
-t!-~
I
rolll.
.,
}"
a. 48 ksi
b. 56 ksi
,c. 60 ksi
d. 66 ksi
" 19. Solid one-way slab is resting on rigid beams whieh have the centerto center
distance of 14 ft. Slab is made of normal weight concrete and its reinforcing bar has
yield strength of 50000 psi. One end of slab is not continuous. Minimum slab
thickness compliantto ACI 318-2008 is nearest to
a. 6.0 in
h. 6.5 in
c.
7.0 in
d. 7.5 in
F"
22. Minor losses through valves, fittings, bends, contractions, ete" are commonly
modeled as proportional to
(a) Total head
(h) Static head
(e). Velocity head
(d) Pressure drop
23. The underground formations, whieh serve as good aquifers are in the order:
(3) consolidated formations of clays and shales
(b) rock with no signs of weathering or fractures
:)
()
Given the following data is respect of sedimentation tank volume of tank = 10m x
50 m x: 1.5m (deep)
Flow rate
= 500 m/day
Page 7 of7
I
I
:1 '---,.
.L:'::-L-~~
, '0'
rs
GO'. 0"
\ (J
c)
'./ .
Sample Question
29
I. The figure shows a survey grid for a construction site excavation. The each grid interseetion is
mentioned the depth of cut at that location. The total excavation volume ( sadrum ) is most
nearly:
ao
e
(a) 32.9 sedrum
. s.o
-4.0'
-4.S'
.
(b) 40.8 sadrum
(c) 57.5 sadrum
,.
. S.O
-4.0'
(d) 65.7 sadrum
.
,
,
,.
,
/"
-3.5'
v''
sr
-+
.2.5
2. In the figure, the radius ofa curve is 500 ft.The chord length L is 300 ft. Find the most nearly
(a) 304.7 ft
7
U
(b) 307.5 ft
(c) 310.2 ft
(d) 312.9 ft
500'
A
LThe earthwork is balance (cut and fill).
II. Filing from borrow pit is needed.
III. Throw-away cutting as waste is
needed.
(a) 1 only
(b) II only
(c) III onLy
(d) II & 1II
Elevation
Be
~--""';-+t--7'''---+-!----~"",,~
Finished
e Profile
Mass diagram
Page lof?
4. The figure shows a survey circular grid for a circular building eonstruction site excavation. The
each grid intersection is the depth of cut at that location. The total excavation volume ( sadrum )
is most nearly:
-9'
-8'
'
-10'
1---1-12'
~'
-9'
5. Prepare a preliminary estimate of a four storied office Building having a carpet area of 2000 sq.m
for obtaining the administrative approval of the Government given the following data. It may be
assumed that 30 % of the built up area will be taken by the corridors, verandahs lavatories,
staircases, etc., and 10 % ofthe built up area will be occupied by walls. The total amount of nearly
for
Plinth area rate is - $ 950.00 per sq.m
Extra due to deep foundation at site - I % of building cost.
Extra for special Architectural treatment -0.5 % of building cost
Extra for water supply and sanitary installations - 6 % of building cost
Extra for Electric installations - 12.5 % of building cost
Extra for other services - 5 % of building cost
Contingencies - 2 %
Supervision chargers - 80 %
(a) $ 4374000
(b) $ 3958000
(c) $ 3167000
(d) $ 1950000
i)
6. Prepare a first running bill of a contractor for the construction of a building from the following
data:
i.
Earthwork in exeavation in foundation - 35 cu.m@$ 180.00 per CU.m
ii.
Lime concrete in foundation-
14 cu.m @$ 73.00 per cu.m
iii.
R.C.C work(l:2:4) excluding steel but including centering and shuttering
4 cu.m @ $ 290.00 per cu.rn
IV.
2.5cm thick (1:1 :3) D.P.C-
20 sq.m@$9.00persq.m
v.
First class brick work in (1:6) in cement mortar in foundation work
30 cu.m @ 80.00 per cu.m
vi.
First class brick work in (1:3)cm in superstrocture
20cu.m @ $ 84.00 per cu.m
VB.
Mild steel work in Reinforcement3 ton @ $ 200.00 per ton
Page 2 of7
The details of materials issue to the contractor from government stock with their issue rates are
as follows:
Cement
7. Calculate the cost of carriage of 45,000 bricks by bullock carts from a distance of7 km on earthen
road. The cart can make three trips per dayand can carry 300 bricks per trip. The wages of bullock
cart may be taken as $ 30.00 per day including driver.
(a) $ 5000
(b) 1500
(c) $ 1000
(d) $ 500
CJ
8. A 300m x 400m room has been prepared for painting. The walls are 10m high and will required
two coats of paint on the new surface for proper coverage.If the one gal of paint covers 250 sq.m
and caleulate the required paints are
(a) $ 90
(b) $60
(c) $56
(d) $ 45
A CPM table is listed below. The early start of Plumbing work is likely to be:
(a) 8
(b)7
(c) 6
(d) 5
ID
I
2
3
4
5
'6
7
8
Activitv
Excavation
Order Materials
Order Brick
Lean Concrete
Brick Work
Plumbing
Plastering
Painting and Finishing
Duration. Dav
2
I
2
1
4
2
4
2
Successor
3,4
4,6
5
5
6
7
8
Remark
Page :iof7
10. A pond of 50 feet by 10 feel and 3 feet depth has to be excavated manually. Rate of excavation
is estimated as 100 eft per worker per day. The work has to be eompleted in 3 days. Number of
workers to be used daily is most likely to be:
(a) 3
(b) 4
(c) 5
(d) 6
11. A concrete eubie block will beplaeed under the ground level as an anchorage block in the given
figure. The concrete bloek should resist a given tension force with safety factor 1.5. Find the size
of the cubic concrete block. The density of concrete is 150 Ib/cu-ft. Friction factor between
eonerete and soil is 0.5, and the passive force is not considered.
30 kips
(A). 5',5',5'
(B). 6\<6',6'
(C). 8\<8',8'
(0). 9',9',9'
Cube
'.'
Cube
Cube
......
:)
.
"
....... '"'.,=--
......
.
..... ~ .':
'.1',
~:-: /~.::
Cube
'.
.
,
'
45'
., .. :, .
12. We require a mix with a mean 28 day compressive strength (measured on standard cylinders) of 35
MPa and a slump of 100 mm, ordinary Portland eement being used. The maximum size of well
shaped angular aggregate is 25 mm. Its bulk density is 1600 kg/m' and its specific gravity is 2.64.
The available fine aggregate has a fineness of 2.6 and a speeific gravity of 2.58. , No air
entrainment is required. Calculate the quantities of ingredients as a first trial. (Refer to Table 19.1,
14.5 and 14.6.) (Use American Method)
13. The following table lists the strength test data from 6 batches of concrete. For each batch, two
cylinders were cast and tested al28 days. Required strength f,~ 4000 psi.
Batch #
Cylinder # I
Cylinder #2
3900
3960
3950
4050
4040
4100
4100
4072
4062
3950
3850
3900
Test average
Averageof3
conseeutive tests
(a)
(b)
(c)
(d)
Batch # 1
Batch # 2
Batch # 5
Batch # 6
14. Explain in detail about Vebe test which is derived to measure the workability of the eoncrete mix.
15. Flow table test is widely used for flowing concrete made with
(a) retarding
(b) waterreducing
(c) quick setting
(d) superplasticizng
admixtures.
16. Formworkfor 8-ft-high concrete wall is required in a construction work. The rate of concrete
pouring is estimated to be 20 ft/hr for that 4' wide concrete wall. The eoncrete has long setting
time due to usingadmixture, and so it can be considered as liquidtype up to 8-ft-high concreting.
The concrete density is 150 lb/cu-ft.
Find the axial force (kips) of strut 1 which is arranged at 4' C/C along the fonnwork wall.
,4',
"," \T
.:..;:..o..;~,{.;:~
:.o.I~ '" I ~.
,',
.'~A~ 4.: 1
.' J '.~
~''':'''''~:-.t'.:~
.s;.'!....
~,....
.)'i..
r "_0/-
.." 8'
~:'~).;~:
: ~:?-.~~t "t
~",:,"
~ :.,~::t'!~t.
"
I e .., .. , . \
A bracket is anehored to a concrete using 4 bolts ( upper 2 bolts and lower 2 bolts ) into
embedded insert as shown in the figure. Find the size of bolts to resist the acting load 110
kips with the strength of Fy ~ 40000 lb/sq-in,
ItOkips
(A).
(D).
(C).
(D).
112" 0 Bolt
)14' 0 Dolt
1" 0 Bol.
I 111' 0 Bolt
Page5 of7
18.
~--7----f..,1
6'-9
(A). 3'-9"
(B). 4'-0"
(C). 4'3"
(D). 4'6"
19.
S'
Put appropriate colour (green, white, red, yellow) to be used in the following safety signs
Safety First
---------------------------------
Danger Signs
----------------------------.----
Caution Signs
---------------------------------
Directional Signs
----~---------p---------~---------
All workers
Bar bender
Welder
(5)
Coneretor
Conerete breaker
(6)
Seaffold installer
(4)
(A)
(B)
(C)
(D)
(E)
(F)
Glove
Goggle
Safety belt
Ear plug
Long boot
Shoes & Helmet
,' )
21. Fill in the blank with suitable words given below at eachsentence.
(A) edge
(8) briefing (C) proper (D) correet
(l) --------------~ aU the workers about safety awareness.
(E) educate
(F) clean
(2) Safety -------------- should be done everyday before stating the works.
(3) Keep working place always ------------.
Page 6 of7
22.
D. Edge cleaning
Sr
No.
I
Work activities
Hazard
Earthwork excavation
Electrical wiring
Electrical Shock
Carrying of material
Working atheight
Risk control
..
23.
N x 200,000 / EH where N
number of
Incident Category
Minor injuries (first aid only)
20
(a)
(b)
(c)
(d)
()
24.
6.80
2.80
2.00
1.00
Sr
Roofing works
ego
Possibility
Risk
control
Fal! down
Safety Belt
Hazard
Cook activity
No.
1.
Delivery of concrete by AG
Hit by reversing
2.
Wound by cutting
3.
(A)
proper use
(D)
(E)
(e)
Additional
control
Safety net
underneath
A source of suitable borrow area has been located near construction site for
theembankment.
Assume that there is no seil loss in transporting the soil from borrow pitto
construction site.
115.0 lb/cu-ft
19.0 %
2.65
12.0
120.0
lb/cu-ft
Each dump truck can carry 4.0 sadrum. The void ratio of the soil is 1.2 during
transport.
How many number of dump trucks will be needed for this project.
(a)
(b)
(c)
(d)
1706
1796
1886
1976
trucks
trucks
trucks
trucks
Page lof8
o(.L
3
VIR
Sbift = L-/24R
Tangent length IT
(A).
2197.~6
meter
Transition Curve
Transition Curve
I
I,
3. According to the grade profile and mass diagram for a roadway construction project
shown, which of the following is/are true.
I.
II.
III.
CD
,1/
<,
Elevati01
(A). I only
(B). tI OI~y
(C). ttl only
(D). tI & ttl
<,
./
-- "----
-:
Finishe Orac
1/
'volume
./
-.
Prom.
<.
/
I'
GH
4. Prepare the plinth area estimate for the timber building as shown in line plan. The cost
of similar building whose dimensions are (10' x 10') + (20' xiS') + (15' xiS')
constructed in the same localitywas kyats800,OOO only, So the estimated cost for
proposed timber building are:
(a) 1,630,000 kyats
(b) 1,360,000 kyats
(e) 5,000,000 kyats
(d) 3,160,000 kyats
kilcb ...
( H'R 15')
.............
P"u.e
[;v,ol i 00 ...
(11'" 12')
Line Pla'n
( c I c dim en sic n )
5. A Building requires 50 concrete beams that arc 10" wide x 20" exposed depth and
30' 0" long. The table indicates the amount of material required per 100 SFCA (sq.ft
of contact area) ofconcrcte beams,
Number
or
Ry wood(
""
1
.,.-..", ......"._" .. _.............."" ..
2
105
"
lumber ( R -ft )
N ails ( I. )
275
_.. ..................... .......... .... ................ ........... ............ ......_.. ... ................."'..
50
140
2
......"................ ..........._, ........................... ....................._..._..........
. . ....3.. .....__,, ....." ....._...."40
1.5
1 0
............................................. ....... ................................................ .." ..... _..........._.................. .. ....................... _..............
"
"
"
"."
"
A supplier has quoted $ 1.0/ R.ft for lumber, $ 1.1 / sq.ft for ply wood, $ 1.2 /lb for
nails, If the forms will be used three times, The material cost is most nearly
(a) $ 6250
(b) $ 9738
(e) $ 5620
(d) s 7938
Page30f8
C}
6.Extract the detail of measurements for the Brick work with ( I : 3 ) cement mortar for
superstructure.
D = 4' - 0" x 7' - 0"
W= 4'-0"x4'-0"
(J
7. What are the major problems in using pumping for concreting works?
C)
16..The rigging shown will be used to lift 100'long prestressed-concrete girder. The
weight of girder is 60 Ton. Find the size of sling to lift the girder with safety factor
1.7.
Breaking strength of standard steel wire ropes:
3 '
(A). I"
diameter-rope
(B). 1 1/4" diameter-rope
100'
17. The free standing tower crane shown will be supported on a 12'x12' square-based
concrete footing with thickness ( t ) feet to prevent overturning. The unit weight of
concrete is 150 lb/cu-ft. The given data as the foolowings ;
Pick Load
Boom weight
Counerweight
Mast weight
Windon boom
Wind on mast
Pp> 10 kips
at
Pb 5 kips
at
at
Pc ~ 12 kips
Pm e v kips
at
Wb ~ 1 kips
at
wme 0.05 kip/ft over
ft
Xb ~ 15 ft
Xc ~ 30 ft
Xm v O ft
Yb ~ 85 ft
Ym ~ 100 ft
Xp~60
Find thikncss of square footing to provide adequade footing weight, neglecting sway
of the tower.
(A). 6.14 ft
(B). 7.41 ft
(C). 8.23 ft
(D). 9.76 ft
n e wm
Pp
Pm
Page s ors
C.)
] 8. In a low-cost housing project, the rigging shown will be used to lift 20'x12'xlO'
room-type module TIle weight of module is 18 Ton. Findthe size of sling to lift
module with S.F ~ 1.6.
:Breaking strength of standard steel wire ropes:
(1).1/4" diameterrope
~3.39 Ton
. (2).3/8" diameterrope
~ 5.31
Ton
(3).1/2" diameterrope
~9.35 Ton
18 TOll
1 '
~i
CJ
F'
diameter rope
:.
"ciflmeter rope
~
20'~12~
l'10'
J
(B) Barricade
(E)
Sr
No.
1
Work activities
Hazard
Earthwork excavation
Electrical wiring
Electrical Shock
Lifting material
Falling Down
Fire accident
Wound by eutting
Page 6 of 8
Risk control
'
,:'T
(E)
(C) Backhorn
Earthmoving equipment
(1) Heavy vehiele must have --------,------------------ while using back gear.
(2) Don't let unnecessary persons sitting on the -----------------------,
(3) Should keep safe -------------------- always while operating heavy equipment
(4) Keep your -------------------------- always clean and tidy,
(5) Don't ------------------- things over the people,
0)
21. }i'ill in the blanks with appropriate eontrol action.
(C)traffiemarshall to assign
Work activity
Hazard
Possibility
Risk control
eg.
Roofingworks
Fall down
Safety Belt
Delivery of concrete by AG
Hit by reversing
2,
Storage of fuel
Fire
Crane lifting
Falling down
3,
Page
z ot a
Others workers
stavawav
Additional
control
Safety net
underneath
r~115pcf
-65pcf
+I-35
.,
22. Value of earth pressure at Al is
(J
l.
230 psf
ll.
298 psf
11L
374 psf
IV.
423 psf
i. 3569 psf
7900 psf
IV.
8500 psf
,.')
1.
0.65 ft
11.
1.12 ft
lll.
1.68 ft
iv. 2.1 ft
****