ENGINEERING & CONSTRUCTION
PT KRAKATAU ENGINEERING
WPS & PQR
WATER SUPLAY FACILITIES
PROJECT + WATER SUPLAY FACILITIES
PLANT £ INTEGRATED STEEL MILL
curent + PT. KRAKATAU POSCO
2087208
escraron | oxre | prenaneD | cHeceenReh
B PT. KRAKATAU ENGINEERING CORPORATION oy
WELDING PROCEDURE SPECIFICATION (WPS)
company Name PT, WAAYATAU EXGINEERING CORP.
‘walang Proceaue Speciation No. SRECIMPS-ASWE-OOL Rev. @ By: aryota
‘Supporting POR Na fe), RECPOCASMDOL Rev. 0 Cate Tune TS
\wlcng Process (es) csi Type(s) man
[Foner rawxe2y
Jin Design cme -
Backng (Yes mo —
Backng Matera Type) nove -
(Refer i a baking ad rare)
S| Sum coe” | ]contron corr
for Detal S00 Page 3 of
1 tePxe__2 Group No, -_L
{STH AIOS Gr_8 oF Wquivalene —
Gove 2 4.7 = 26.5 om Flt AL
Gone ALL SF uy
ther: EACH SINGLE PASS SHALL NOTEXCEED 17"
"Each base Notl- Fle Waal ConBinaton sho be recoded individual‘WELDING PROCEDURE SPECIFICATION (WPS)
[POST WELD HEAT TREATMENT (W407)
[Temperature Range 2 ove
fre Range oe
ede of ea Tranter or GMAW
lected Wire Feed Speed Range
"TECaNIGUE (aW-To)
‘Skrg ef Weave Seas
Otte Gs Cup Sze
tna ena ites CearaPT. KRAKATAU ENGINEERING CORPORATION oxy oF
4. Rea 12 Cg aD, NDONESIA
WPSNo. :KEGAWPS-ASME-COT Reu.0
JOINT DETAIL
Note: Far maximum *T* refer page 1
CONTROL COPY
=|
€
Prepare by
_ bese
MARYOTO.PT. KRAKATAU ENGINEERING CORPORATION Ou Bl
ou" AStionan tee @e
PROCEDURE QUALIFICATION RECORDS (PAR)
Recor actin Coniion Una BWR Tea Cope
ace