Bowala Nand Prayag Hydroelectric Project

generating power
for the generation

IT IS A RUN OF THE RIVER SCHEME, ON RIVER


ALAKNANDA IN DISTRICT CHAMOLI AND ABOUT 200
Km FROM RISHIKESH (NEAREST RAILHEAD).
GROSS HEAD AVAILABLE IS 158 M BETWEEN BOWALA
BARRGE SITE & NAND PRAYAG PH SITE
AS PER EARLIER DPR ESTIMATED ANNUAL
GENERATION IS 782 MU THROUGH A POWER HOUSE OF
3X44 MW INSTALLED CAPACITY.

Uttaranchal Jal Vidyut Nigam Limited

generating power
for the generation

Bowala Nand Prayag Hydroelectric Project


Salient Features
On Broad Level
Details

As per Existing DPR

-Installed capacity

132 MW

-Number of units

-Design Energy
(90% dependable energy)

782 GWH

-Average year energy

862 GWH

* Installed Capacity and Design Energy is likely to be revised on the higher side
in view of updation of Hydrological data available from other adjoining project

Uttaranchal Jal Vidyut Nigam Limited

generating power
for the generation

Bowala Nand Prayag Hydroelectric Project


Salient Features
Hydrology
Details

As per Existing DPR

Available Data

from 1970-71 to 1981-82

Design Discharge

123 m3/s

Minimum discharge:
90% available discharge

30 m3/s

50% available discharge

40 m3/s

Design Flood

9000 cumecs

Note : The hydrology is being updated inview of latest collected


data in the revised and updated DPR

Uttaranchal Jal Vidyut Nigam Limited

generating power
for the generation

Bowala Nand Prayag Hydroelectric Project


Salient Features
Details

As per Existing DPR

Barrage
Barrage Length

102.5 m

No. & Size of Bays

6 Bays of 15.0 m each

No. & Size of Gates

6 Nos. of 15.3X9.3 m each

Crest level

1018 m a.s.l.

Road Level

1036 m a.s.l.

Pond Level-Minimum

1027.0 m

Pond Level-Maximum

1028.2 m

Uttaranchal Jal Vidyut Nigam Limited

generating power
for the generation

Bowala Nand Prayag Hydroelectric Project


Salient Features
Details

As per Existing DPR

Head Regulator
Overall Length

27 m

No. & Size of Spans

3 No. of 8.0 m each

No. & Size of Gates

3 No. of 8.3X4.3 m each

Crest Elevation

1021.75 m

Desilting Chambers
Type

Surface

Size

181.5X68.0

Top level of Hoppers

1018.314 m

Bottom level of Conduits

1010.28 m

Design Discharge (for flushing)

37 Cumecs

Particle size to be removed

0.15 mm

Uttaranchal Jal Vidyut Nigam Limited

generating power
for the generation

Bowala Nand Prayag Hydroelectric Project


Salient Features
Details

As per Existing DPR

Head Race Tunnel


Shape & Diameter

Horse Shoe, 5.6 m

Length

9.3 Km

Slope

1: 232.2

Design Discharge

123 Cumecs

Surge Tank
Type

Restricted Orifice

Size

45.0 m High, 14.0 m Dia

Top Level (EL-m)

1033 m

Bottom Level

988 m

Note : The layout of HRT is being revised considering optimisation


of tunnel length and approach edit on techno commercial basis

Uttaranchal Jal Vidyut Nigam Limited

generating power
for the generation

Bowala Nand Prayag Hydroelectric Project


Salient Features
Details

As per Existing DPR

Penstocks
Number & Size

3 Nos. of 3.22 m Dia

Thickness of Steel Liner

15 mm to 20 mm

Power House
Type

Surface

Turbine Type

Francis

Installed Capacity(MW)

3 X 44

Size of Power House

68 m X 31 m

Tail Race Channel


Length

110 m

Size & Shape

7.2m X 4.5 m, Rectangular

Uttaranchal Jal Vidyut Nigam Limited

generating power
for the generation

Bowala Nand Prayag Hydroelectric Project


Status

NEED FOR REVISION OF EXISTING DPR


Updation & Proper utilisation of Water resource available
Reviewing Hydrology
Use of latest technologies after detailed S&I
WORK AWARDED TO M/S HALCROW GROUP LTD. LONDON
Inception report received
Revised Hydrology report expected by mid September05
Final DPR expected by MaY06

Uttaranchal Jal Vidyut Nigam Limited

generating power
for the generation

Bowala Nand Prayag Hydroelectric Project


Infrastructure

Project located on Delhi-Mana National Highway


Base Camp is being placed at old I&P Colony of
Irrigation Deptt. at Chamoli.

Uttaranchal Jal Vidyut Nigam Limited

Bowala Nand Prayag Hydroelectric Project


Investigation
generating power
for the generation

MOEF clearance for carrying out S&I works received


Survey Work:
Control Survey Completed
Contour Survey Completed
EIA Studies being carried out by M/S RITES, Gurgaon:
Studies nearing Completion
Public Hearing shall be held after availability of revised DP
Geological Investigation:
Carried out at the time of preparation of DPR (Old)
Additional Investigations identified and work being awarded

Uttaranchal Jal Vidyut Nigam Limited

generating power
for the generation

Bowala Nand Prayag Hydroelectric Project


Action Plan

Phase I : Preconstruction Activities


Comprises of all Survey & Investigations, preparation of
comprehensive and bankable DPR, construction of transit
residences, office building and acquisition of land.
Phase II : Infrastructure Works
All infrastructure works of approach roads, township,
offices, storage space, construction power, other facilities
and construction of adits.

Phase III: Construction of the Project

Comprises all works required upto commissioning stage


of the project.
Uttaranchal Jal Vidyut Nigam Limited

generating power
for the generation

S.N.

Bowala Nand Prayag Hydroelectric Project


Schedule
Activity

Schedule DOC

Award of DPR preparation Consultancy work

Awarded

Submission of Final updated DPR

31/05/2006

Obtaining all clearances

31/08/2006

Phase II Consultancy work award

31/08/2006

Award of packages for civil works

31/12/2006

Completion of HRT

30/06/2011

10

Completion of Barrage & Power House

31/10/2011

11

Commissioning of the Project

31/12/2011

Uttaranchal Jal Vidyut Nigam Limited

generating power
for the generation

Bowala Nand Prayag Hydroelectric Project


Financial

Expected expenditure upto


DPR preparation

Rs.2.5
Crores

GOU Funding

During Construction :
Total estimated cost of project
(expected as per revised DPR)

Rs.1000
Crores

Debt

Rs.700
Crores

From Lending
Institutions

Equity

Rs.300
Crores

GOU Funds and


Internal Resources
of UJVNL

Uttaranchal Jal Vidyut Nigam Limited